Amendment 0002 Concept Drawings FTC DoDEA CSO Roof and RTU Replacement_ RFP_25.12.1.pdf
PDF 4 MB Posted
- Attached to
- FTC CSO DoDEA Roof and RTU Replacement
- Solicitation number
- W912QR-52803153
About this file
These are construction design documents for a roof and rooftop unit (RTU) replacement project at Building 84 for the Department of Defense Education Activity (DoDEA) located at Fort Campbell, Kentucky. The project involves comprehensive roof system replacement, including demolition of existing roofing materials, installation of new polyiso insulation, cover board, PVC roofing membrane, and replacement of multiple rooftop mechanical units. The design includes base bid and optional bid items, such as full roof replacement (Bid Option 1), new metal gutters, downspouts, and expansion joints. Mechanical and electrical work includes removing existing natural gas piping, replacing air handling units, exhaust fans, and reworking electrical circuits and photocell installations. The project is designed to meet IECC Climate Zone 4A insulation requirements with an R-30 roof insulation specification.
The design documents provide detailed plans for the demolition and replacement process, including specific notes on roof slopes, curb heights, drainage requirements, and transition methods between existing and new roofing systems. The project scope covers multiple roof sections with varying dimensions, and includes provisions for maintaining existing roof structure elements while upgrading the overall roofing and mechanical systems. The US Army Corps of Engineers has prepared these concept documents, which are marked "CONCEPT, NOT FOR CONSTRUCTION", indicating they are preliminary design plans subject to potential modifications before final construction implementation.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT SITE
PROJECT SITE
AREA OF
CONSTRUCTION
ACCESS
GATE
ACCESS ROUTEACC
ESS R
O U
TE
PROJECT SITE
MAP ENLARGEMENT
.ARCHITECTURAL.
AD1.0 ROOF - CONCEPT DEMOLITION PLAN
A1.3 ROOF PLAN
.GENERAL.
G1.1 GENERAL NOTES, SYMBOLS AND ABBREVIATIONS
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D A
T E
US Army Corps of Engineers ®
SOLICITATION NO.:
CONTRACT NO.:
ISSUE DATE:
VOLUME:
M A
R K
D E
S C
R
IP
T
IO
N
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
G0.1
C O
V E
R S
H E
E T
F O
R T
C A
M P
B E
L L K
E N
T U
C K
Y
C O
N C
E P
T N
O T
F O
R C
O N
S T
R U
C T
IO
N
F T
C C
S O
D o D
E A
R O
O F
A N
D R
T U
R E
P L A
C E
M E
N T
FORT CAMPBELL, KENTUCKY
FTC CSO DoDEA ROOF AND RTU REPLACEMENT
CONCEPT, NOT FOR CONSTRUCTION
DRAWING INDEX
.MECHANICAL.
M1.0 MECHANICAL PLAN
.ELECTRICAL.
E-1.0 ROOFTOP POWER EQUIPMENT PLAN
E-2.0 DODEA Rooftop HVAC Power
BUILDING ID: 84
NORTHNORTH
CONSTRUCTION LAYDOWN AREAVICINITY MAP ENLARGEMENTVICINITY MAP
NORTH
118' - 2" 60' - 1 1/8" 110' - 4 1/8"
66' - 1 1/4" 43' - 0 3/8"
/8
/8
3' - 6 5/8"
3' - 5 1/2"
18' - 0 1/8" 73' - 1 1/2" 16' - 11 7/8" 33' - 0 3/4"
/4
/8
D-22.1
D-22.1
E07-01
D-23.1
E07-02
E07-02
E07-02
D-23.1
D-22.1
D-23.1
D-22.1D-22.1
D-23.1
D-22.1
D-22.1
D-23.1
D-22.1
D-23.1
D-22.1
D-22.1
D-23.1
D-22.1D-22.1
D-23.1
D-22.1
D-23.1
D-22.1
D-22.1
D-07.1
D-22.1
D-23.1
D-07.1
D-07.1D-07.1
D-07.1D-07.1
D-07.1D-07.1
D-07.1D-07.1
E07-01
E07-01
D-10.1
D-07.3
D-07.2
D-07.3
D-07.3
D-07.3
D-07.3
D-07.3 D-07.3
D-07.3
D-07.3
D-07.3 D-07.3
D-07.3
D-07.3
A1.3
A1.3
REFERENCE KEYNOTES
EXISTING ROOF STRUCTURE JOISTS
EXISTING GYPSUM FORM BOARD
TO REMAIN
EXISTING POURED GYPSUM,
THICKNESS VARIES FROM 2" TO 2.5"
TO REMAIN
EXISTING NAILED FIBERGLASS
BASE SHEET TO BE DEMO'D
SPRAYED POLYURETHANE FOAM
TO BE DEMO'D
SILICONE COATING TO BE DEMO'D
SKIM COAT / PATCH POURED GYP
AFTER CUTTING BULB TEES N
E
W
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
AD1.0
R O
O F
C
O N
C E
P T
D E
M O
L
IT
IO
N
P L A
N
F O
R T
C A
M P
B E
L L K
E N
T U
C K
Y
F T
C C
S O
D o D
E A
R O
O F
A N
D R
T U
R E
P L A
C E
M E
N T
SCALE: 1" = 10'-0"
CONCEPT ROOF DEMO PLAN
SCALE: 1" = 1'-0"
EXISTING ROOF CONCEPT DEMO
NORTH
D-07.1 BID OPTION 1: DEMO EXISTING ROOFING SYSTEM TO
DECK. PATCH DECK WHERE DAMAGED BY DEMO AND
PREVIOUS BULB TEE FASTENERS.
D-07.2 BASE BID: REMOVE 4FT PERIMETER SECTION OF
ROOFING AROUND THE RTU REPLACEMENTS TO ALLOW
PROPER FLASHING AND PUT BACK OF ROOFING
SYSTEMS. (NOT APPLICABLE IF BID OPTION 1 ACCEPTED)
D-07.3 BID OPTION 1: DEMO SECTION AROUND ROOF DRAIN
PENETRATION TO ALLOW FOR CAPPING OF PIPE AND
PATCH BACK OF ROOFING. NOTE LOCATIONS WHERE
DRAIN BODY IS WITHIN 4FT DISTANCE OF RTU
REPLACEMENT; IN THIS INSTANCE ONLY DRAINS TO BE
REMOVED AND CAPPED WITH BASE BID SCOPE.
D-10.1 BID OPTION 3: REMOVE EXISTING FABRIC AWNING AND
FRAME.
D-22.1 BID OPTION 1: DEMO EXISTING ROOF DRAINS. REMOVE
DRAIN BODY AND PIPING BELOW DECK. CAP ABANDONED
LINES AND LABEL LINES WHERE UNABLE TO REMOVE.
D-23.1 BASE BID: DEMO EXISTING ROOF TOP UNITS TO PREPARE
FOR NEW REPLACEMENT OF UNITS, COORDINATE WITH
MECHANICAL INFO FOR REMOVAL.
D-23.2 BASE BID: DEMO ABANDONED GAS LINES ON ROOF.
E07-01 EXISTING ROOF EDGE
E07-02 EXISTING ROOF EXPANSION JOINT TO BE REMOVED AND
REPLACED.
R E
V
IS
E D
IN
A
C C
O R
D A
N C
E W
IT
H
A M
E N
D M
E N
T
ROOF PLAN GENERAL NOTES
A. ROOF PLAN GENERAL NOTES APPLY TO ALL ROOF PLAN
SHEETS.
B. ROOF SLOPES ARE CREATED BY TAPERED IN INSULATION.
C. TAPERED INSULATION SHALL PROVIDE A MINIMUM OF 1/2-INCH
PER FOOT OF SLOPE TO ROOF DRAINS, UNLESS NOTED
OTHERWISE.
D. ALL ROOF CURBS TO BE A MINIMUM OF 8 INCHES ABOVE
ROOFING LEVELS. PROVIDE TAPERED INSULATION ROOF
SADDLES AT ROOF CURBS TO PROVIDE DRAINAGE AROUND
CURB.
COORDINATE THE SIZE AND LOCATION OF ROOF PENETRATIONS
FOR MECHANICAL AND ELECTRICAL EQUIPMENT. REFER TO
MECHANICAL AND ELECTRICAL DRAWINGS FOR PENETRATIONS
NOT SHOWN ON THIS DRAWING.
E. FLASH PENETRATION, CURBS, VENTS AND STACKS PER
MANUFACTURER'S RECOMMENDATIONS IF DETAIL NOT SHOWN
ON DRAWINGS.
/2
1/2" / 1'-0"
/2
1/2" / 1'-0"
/8
" / 1 '-0
/8
A-10.1
A-7.2
A-7.3
A-7.21 A-7.4
A-7.5
A-7.5
A-7.5
A-7.2
A-7.21
A-7.4
A-7.4
A-7.2
A-7.2
A-7.21
A-7.2
A-7.21
A-7.2
A-7.21
A-7.21
A-7.3
A-7.3 A-7.4
A-7.6 A-7.6 A-7.6 A-7.6 A-7.6
A-7.6 A-7.6 A-7.6 A-7.6 A-7.6 A-7.6 A-7.6 A-7.6 A-7.6
A-7.7
A-7.6
A-7.7
A-7.8
/2
/2
/2
/2
A-7.9
A-7.9 A-7.10
A-7.10 A-7.9 A-7.9
A-7.9
A-7.9
A-7.9
RIDGERIDGE RIDGE RIDGE RIDGE
RID
GE
RIDG
E
RID
GE
RIDG
E
A-7.11
A-7.11
A-7.11
2' - 6" TYP.
/8
5' - 0"
2' - 6"
2' - 6"1
A1.3
TYP.
A1.3
TYP.
"4' - 0"
4' - 0"
PRE-FINISHED METAL DRIP EDGE
WITH HEMMED EDGE
ROOFING MEMBRANE.
SHINGLE LAP OVER
EDGE PER
MENUFACTURER
WRITTEN INSTRUCTIONS
GALVANIZED ROOFING SHEET
METAL FASTERNERS AT 4" OC
STAGGERED OR PER MFG
WRITTEN INSTARTUCTIONS
RIGID POLY-ISO
ROOFING INSULATION
EXISTING ROOF
DECK SYSTEM.
TREATED WOOD NAILERS
METAL FASCIA CLEAT FASTENED
TO NAILERS 12"OC MIN
PRE-FINISHED SHEET
METAL GUTTER EXISTING EXTERIOR WALL
SELF ADHERED FLASHING
EDGE MEMBRANE
WOOD NAILER
METAL
COUNTERFLASHING
WITH DRIP EDGE,
INSTALL SELF
ADHERED FLASHING AT
POINT OF SCREW
ATTACHMENT
RTU
INSULTATED
RTU CURB
ROOF DECK ASSEMBLY
ROOFING MEMBRANE
FASTENERS AT 12" OC
WOOD NAILERS
A B
O V
E F
IN
IS
H E
D R
O O
F
IN
G
M
IN
REFERENCE KEYNOTES
EXISTING ROOF STRUCTURE JOISTS
EXISTING GYPSUM FORM BOARD TO
REMAIN
EXISTING POURED GYPSUM, THICKNESS
VARIES FROM 2" TO 2.5"
EXISTING NAILED FIBERGLASS BASE
SHEET
EXISTING SPRAYED
POLYURETHANE FOAM
EXISTING SILICONE COATING
CUT EXISTING ROOFING SYSTEM BACK
PER PLANS
INSTALL SEPARATION BOARD AND SEALANT
JOINT AT INSTALL OF NEW ROOFING COVER
BOARD HEIGHT TRANSITION. THIS CAN BE
REMOVED AT LATER DATE TO ALLOW INSTALL
OF REMAINED OF ROOFING.
NEW ROOFING ASSEMBLY SLOPED TO DRAIN
OVER EDGE
APPLY FLEXIBLE MEMBRANE IN CONTINUOUS
BED OF SILICONE ADHESIVE BETWEEN
EXISTING ROOFING AND NEW MEMBRANE
BACKER ROD AND SEALANT OVER EXTERIOR
ROOFING BOARD TO ASSIST IN SETTING NEW
POLY ISO.
NEW EXISTING
1/2" / 1'-0"
V A
R
IE
S
ROOF SLOPE LINE FOR FULL ROOF
REPLACEMENT. CONTINUOUS
UNINTERUPTED SLOPE TO EDGES
• IF BASE BID OPTION ALONE IS ACCEPTED WITHOUT
THE FULL ROOF REPLACEMENT IN OPTION 1 THE
ROOFING MATERIAL TRANSITIONS SHALL BE
JOINTED FROM NEW TO OLD AS FOLLOWS:
• REPLACEMENT OF RTU UNITS WITH CURBS
AND FLASHINGS AS DESCRIBED ABOVE.
1. RTU VERTICAL PLACEMENT SHALL BE
SET TO THE HEIGHT OF THE NEW ROOF
SLOPE ELEVATION.
• REPLACE ROOFING SYSTEM A DISTANCE OF
4FT OFFSET FROM ALL FINISHED EDGES OF
THE RTU UNITS AS INDICATED IN THE
DRAWINGS. PROVIDE TRANSITION STRIP
AND FLASHING TO THE EXISTING ROOFING
SYSTEM FROM THE NEW.
THE INTENT OF THIS DETAIL IS TO FACILITATE AN
EASIER ROOFING SYSTEM REPLACEMENT FOR THE
MAJORITY OF THE ROOFING AT A LATER DATE BY
HAVING THE RTU UNITS SET AT THE HEIGHT OF
FULL REPLACEMENT.
EXISTING ROOF STRUCTURE JOISTS
EXISTING GYPSUM FORM BOARD
TO REMAIN
EXISTING POURED GYPSUM,
THICKNESS VARIES FROM 2" TO 2.5"
NEW THERMAL INSULATION - POLY-
ISO BASIS OF DESIGN
NEW 5/8" DENS-DECK COVER BOARD
NEW FULLY ADHERED PVC
ROOFING MEMBRANE
/8
/2
/2
/8
FT CAMPBELL IS CLIMATE ZONE 4A
IECC CODE REQUIRES R-30 ROOF
INSULATION
SKIM COAT / PATCH POURED GYP
AFTER DEMO CUTTING OF BULB TEES
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
A1.3
R O
O F
P L A
N
F O
R T
C A
M P
B E
L L K
E N
T U
C K
Y
F T
C C
S O
D o D
E A
R O
O F
A N
D R
T U
R E
P L A
C E
M E
N T
SCALE: 1" = 10'-0"
ROOF PLAN
SCALE: 1/2" = 1'-0"
Roof gutter detail
SCALE: 1/2" = 1'-0"
Roof RTU Curb with counterflashing
SCALE: 1" = 1'-0"A1.3
1 EXISTING ROOF TIE-IN TO NEW ROOF SYSTEM
NORTH
TOTALS: 8.35" 30.16
INSIDE AIR FILM 0.00" 0.92
GYP BOARD UNDERLAYMENT 0.63" 1.07 0.67
POURED GYP DECK 2.00" 1 2.00
POLY-ISO INSULATION 4.50" 5.7 25.65
COVER BOARD 0.625" 1.07 0.67
PVC ROOFING MEMBRANE 0.60" 0.00
OUTSIDE AIR FILM 0.00" 0.25
MATERIAL
DEPTH R/IN R-VAULE
SCALE: 1" = 1'-0"
REPLACEMENT ROOF ASSEMBLY
A-7.2 BASE BID: NEW RTU WITH ROOF CURB AND FLASHING.
SET RTU TO HEIGHT OF FUTURE ROOF REPLACEMENT
TAPER.
A-7.3 BID OPTION 1: NEW PREFINISHED METAL GUTTER
WITH OPEN-FACE DOWNSPOUTS
A-7.4 BID OPTION 1: REPLACE ROOF SYSTEM ENTIRELY
FROM DECKING THROUGH MEMBRANE. NOTE
SLOPING OF TAPERED INSULATION FOR DRAINAGE.
A-7.5 BID OPTION 1: NEW ROOF EXPANSION JOINT
A-7.6 BID OPTION 1: NEW PREFINISHED METAL OPEN FACE
DOWNSPOUT WITH OFFSET TO WALL FROM GUTTER.
A-7.7 BID OPTION 1: NEW METAL COPING CAP TO MATCH
WALL PANELS.
A-7.8 BID OPTION 1: NEW MEMBRANE ROOFING CRICKET TO
DIRECT WATER TO GUTTER AND DOWNSPOUT.
A-7.9 BID OPTION 1: NEW 1/2"/12" SLOPED MEMBRANE
CRICKET ON HIGH SIDE OF RTU UNITS, TYP.
A-7.10 BID OPTION 1: EXTEND ROOF SLOPE TAPERED FOAM
AND MEMBRANE TO RTU CURB, INFILL REMAINDER
WITH CRICKET.
A-7.11 BID OPTION 1: EMBOSSED TRACTION WALKING PATH,
125MIL MEMBRANE HEAT WELDED TO PRIMARY
MEMBRANE.
A-7.21 BASE BID: REPLACE ROOFING 4FT DISTANCE AROUND
RTU UNITS. PROVIDE TRANSITION STRIP AND
FLASHING. (NOT APPLICABLE IF BID OPTION 1 IS
ACCEPTED)
A-10.1 BID OPTION 3: NEW PREFINISHED GALVALUME
STANDING SEAM METAL AWNING ROOF AND FRAME
TO MATCH SIZE AND LOCATION OF EXISTING.
R E
V
IS
E D
IN
A
C C
O R
D A
N C
E W
IT
H
A M
E N
D M
E N
T
REFERENCE KEYNOTES
A1.3
A1.3
118' - 2" 60' - 1 1/8" 110' - 4 1/8"
66' - 1 1/4" 43' - 0 3/8"
18' - 0 1/8" 73' - 1 1/2" 16' - 11 7/8" 33' - 0 3/4"
/4
/8
R T
U -5
R T
U -5
R T
U -5
R T
U -5
R T
U -5
R T
U -5
R T
U -1
RTU-14A
R T
U -1
A
RTU-52
EF-16 IH-1
M3
M2 M1
M4 M5
M3
M3
M3
M3
M3 M3
M3
M3
M3
M6
TYP.
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
M1.0
M E
C H
A N
IC
A
L P
L A
N
F O
R T
C A
M P
B E
L L K
E N
T U
C K
Y
F T
C C
S O
D o D
E A
R O
O F
A N
D R
T U
R E
P L A
C E
M E
N T
M1 DEMOLISH EXISTING NATURAL GAS PIPING BACK TO MAIN
AND SEAL AND CAP. REFER TO RFP.
M2 DEMOLISH EXISTING NATURAL GAS PIPING BACK TO THE
METER AND PROVIDE CONNECTIONS TO THE NEW
ROOFTOP AIRHANDLING UNITS WITH THE NEWLY
INSTALLED NATURAL GAS PIPING. REFER TO RFP.
M3 APPROXIMATE LOCATION OF THE ROOFTOP AIR
HANDLING UNIT SHOWN FOR REFERENCE. EXISTING
UNITS TO BE DEMOLISHED AND REPLACED WITH NEW
INCOMING UNITS. ROOF CURB TO BE MODIFIED AS
NEEDED TO PROVIDE CONNECTIONS TO THE EXISTING
DUCTS BELOW. REFER TO RFP. TYPICAL.
M4 APPROXIMATE LOCATION OF EXISTING EXHAUST FANS
SHOWN FOR REFERENCE. EXISTING EXHAUST FAN TO BE
DEMOLISHED. REFER TO RFP. TYPICAL.
M5 APPROXIMATE LOCATION OF EXISTING GRAVITY HOOD
TO BE DEMOLISHED. REFER TO RFP.
M6 EXISTING FLOOR DRAINS SHOWN FOR REFERENCE ONLY.
REFER TO RFP.
NORTH
SCALE: 1" = 10'-0"
MECHANICAL PLAN
GENERAL NOTES:
1. DESIGN SPACE TEMPERATURE FOR COOLING SEASON IS 74 +/-2
DEGREE FAHRENHEIT.
2. DESIGN SPACE TEMPERATURE FOR HEATING SEASON IS 72 +/- 2
DEGREE FAHRENHEIT.
3. FOR CAPACITY DETERMINATION, 68 DEGREE FAHRENHEIT SPACE
DESIGN TEMPERATURE WILL BE USED FOR COOLING SEASON AND
78 DEGREE FAHRENHEIT DESIGN SPACE TEMPERATURE WILL BE
USED FOR HEATING SEASON.
A1.3
A1.3
118' - 2" 60' - 1 1/8" 110' - 4 1/8"
66' - 1 1/4" 43' - 0 3/8"
18' - 0 1/8" 73' - 1 1/2" 16' - 11 7/8" 33' - 0 3/4"
/4
/8
R T
U -5
R T
U -5
R T
U -5
R T
U -5
R T
U -5
R T
U -5
R T
U -1
RTU-14A
R T
U -1
A
RTU-52
E1
E1
E1
E1 E1
E1 E1
E1
E1
E1
EF-16 IH-1
E4
E2
E3
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
E1.0
E L E
C T
R
IC
A L P
L A
N
F O
R T
C A
M P
B E
L L K
E N
T U
C K
Y
F T
C C
S O
D o D
E A
R O
O F
A N
D R
T U
R E
P L A
C E
M E
N T
E1 BRANCH CIRCUIT THAT SERVED EXISTING RTU SHALL BE
REWORKED TO THIS NEW RTU. REFER TO RFP.
E2 EXISTING FEEDER SHALL REROUTE INSIDE THE ROOF
CURB TO THIS NEW UNIT TO REMOVE UNNECESSARY
ROOF PENETRATION. REFER TO RFP FOR ALL
DISCIPLINES FOR COORDINATION.
E3 EXISTING PHOTOCELL AT THIS LOCATION SHALL BE
DEMOLISHED AND PROVIDED WITH NEW. WIRING AND
CONDUIT SHALL BE REWORKED THROUGH NEAREST
ROOF CURB TO REMOVE UNNECESSARY ROOF
PENETRATION. REFER TO RFP.
E4 CIRCUIT SERVING THIS EXISTING EF-16 UNIT SHALL BE
COMPLETELY DEMOLISHED. REFER TO RFP.
NORTH
SCALE: 1" = 10'-0"
ELECTRICAL PLAN
E6
E5
SCALE: 1 : 9
DODEA CSO Bldg. 84 Flooplan
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
E2.0
E L E
C T
R
IC
A L P
L A
N
F O
R T
C A
M P
B E
L L K
E N
T U
C K
Y
F T
C C
S O
D o D
E A
R O
O F
A N
D R
T U
R E
P L A
C E
M E
N T
E5 LOCATION OF WALL-MOUNTED DATA RACK CONNECTED
TO THE DODEA MAIN NETWORK.
E6 LOCATION OF CLOSEST 120/208V, 225A RATED
ELECTRICAL PANEL WITH PROVIDED SPACES.
NORTH
File details come from the government source that posted it. Updated .