Amendment 0001 W912QR26BA022.pdf
PDF 842 KB Posted
- Solicitation number
- W912QR26BA022
About this file
This is a Standard Form 30 (SF-30) Amendment of Solicitation/Modification of Contract issued by the U.S. Army Corps of Engineers (USACE) Louisville District. The amendment is numbered 001, effective July 31, 2026, and pertains to solicitation W912QR26BA022, dated July 28, 2026. The contracting office is the KO Contracting Division located at 220 W Main Street, 3rd Floor, Louisville, Kentucky 40202-2230, with Ranzel L. Merideth serving as the contracting officer contact.
The primary purpose of Amendment 001 is to insert Site Visit information for the VEWMEC project. The amendment modifies the list of drawing sheets in Section 00 01 15 by updating the attachments table and revising document dates and URLs. Specifically, Section 00 73 00 Supplementary Conditions was modified, with the attachment date changed from July 23, 2026 to July 29, 2026 and the attachment URL updated from 18003030 to 18333660. The page count for Section 00 73 00 Supplementary Conditions was increased from none to three pages. Additional documents included in the solicitation include Price Breakout Schedule (3 pages), Project Instructions (2 pages), Bidder Checklist (1 page), Electronic Submission Instructions (3 pages), Bid Opening Language (2 pages), Reps & Certs (1 page), and Wage Rates (5 pages), all dated July 17-21, 2026. The amendment is not extended, and offers must acknowledge receipt prior to the deadline specified in the solicitation.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of theoffer submitted;
or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER.
If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
16C. DATE SIGNED
Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE PAGE OF PAGES
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBE
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
J 1 4
0001 31 JUL 2026 520560
W912QR
W072 ENDIST LOUISVILLE
KO CONTRACTING DIVISION, 220 W MAIN STREET 3RD FLOOR
LOUISVILLE, KY 40202-2230
UNITED STATES
RANZEL MERIDETH, EMAIL: RANZEL.L.MERIDETH@USACE.AMY.MIL TELEPHONE:
(502) 315-6855
SCD: PAS:
W912QR26BA022
28 JUL 2026
SEE SECTION G - CONTRACT ADMINISTRATION DATA
Amendment 001 - inserts Site Visit information for the VEWMEC project.
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
Section 00 01 15 - List of Drawing Sheets
The attachments table has changed from:
To:
The following contract documents were modified:
The following contract documents Page Counts were changed:
File details come from the government source that posted it. Updated .