W912QR26BA001_Specs-0002.pdf
PDF 5 MB Posted
- Solicitation number
- W912QR26BA001
About this file
This document is an Amendment (Amendment 0002) to a federal solicitation for the repair of Squadron Operations Building 7087 at Westover Air Reserve Base in Massachusetts. The amendment includes updates to multiple design plan sheets and specification sections, focusing on revisions to demolition notes, salvage instructions, equipment disposition, and technical specifications across various disciplines including architectural, electrical, telecommunications, and mechanical systems.
Key changes include modifications to demolition plan notes specifying contractor responsibilities for hazardous materials, instructions for salvaging equipment like overhead projectors, wall-mounted televisions, and display cases, and updates to technical specifications for interior signage, upholstered audience seating, and other building systems. The amendment is dated 21 November 2025 with a revision date of 04 December 2025, and is part of a construction contract estimated at 519 calendar days with a project value between $10 million and $25 million. The solicitation is being issued by the U.S. Army Corps of Engineers Louisville District for a full and open competition construction contract.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT I
CONTRACT ID CODE
I
PAG� OF PAGES
I 2
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER
5. PROJECT NUMBER (If applicable)
0002 472747 & 472750
6. ISSUED BY CODE
5 DEC 2025
W912QR 7. ADMINISTERED BY (If other than Item 6) CODE I
W072 ENDIST LOUISVILLE
KO CONTRACTING DIVISION, 600 DR MARTIN LUTHER KING JR PL
LOUISVILLE, KY 40202-2230 SCD: PAS:
UNITED STATES
CHARITY MANSFIELD, EMAIL: CHARITY.A.MANSFIELD@USACE.ARMY.MIL
TELEPHONE: 000-000-0000
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER
W912QR26BA001
9B. DATED (SEE ITEM 11)
09 OCT 2025
10A. MODIFICATION OF CONTRACT/ORDER NUMBE
10B. DATED (SEE ITEM 13)
CODE I FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
� The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER.
If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
SEE SECTION G - CONTRACT ADMINISTRATION DATA
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor D is not D is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
See Schedule
Except as provided herein, all tenns and conditions of the document referenced in Item 9A or 1 OA, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
ADAM M. WANTLAND
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED
05 DEC 2025
(Signature of Contracting Officer)
R
Previous edition unusable STANDARD FORM 30 (REV.11/2016) Prescribed by GSA FAR (48 CFR) 53.243
W912QR26BA001_Specs-0002
Page 1 of 3 Amendment 0002, 21 November 2025
Date of Amendment 0002: 21 November 2025
Date of Revision: 04 December 2025
REPAIR SQUADRON OPERATIONS BLDG 7087 (HANGAR 1)
WESTOVER AIR RESERVE BASE, MASSACHUSETTS
AF PROJECT: YTPM 24-0015
USACE P2 No. 573027
Amendment 0002
SUMMARY OF CHANGES
The following is a summary of changes:
Amendment 0002 includes updates to the design in response to bidder inquiries received by 26 November 2025.
The following PLAN SHEETS have been revised and replaced in their entirety:
1. GI003 – ABBREVIATIONS AND DRAWING SYMBOLS
a. Added GFE Government Furnished Equipment
2. GC101 – EROSION CONTROL PLAN
a. Added Temporary Construction Fencing
3. A-001 – GENERAL NOTES AND GENERAL DEMOLITION PLAN NOTES
a. GENERAL DEMOLITION PLAN NOTE 30 modified to state, “THE CONTRACTOR IS
RESPONSIBLE FOR IMPLEMENTING ALL INSTRUCTIONS AND GUIDELINES IN THE HAZMAT
REPORT AS FOUND IN SPECIFICATIONS FOR ALL ACTIVITIES ASSOCIATED WITH DEMOLITION
AND REMEDIATION FOR ALL CONSTRUCTION ACTIVITIES DURING THE BUILDING
RENOVATION.”
4. AD111 – PARTIAL DEMOLITION PLANS – LEVEL 1 - AREAS C AND D
a. GENERAL NOTES – DEMO PLANS Note E modified to state, “FF&E REMAINING AFTER
GOVERNMENT PERSONNEL MOVE OUT WILL BE REMOVED FROM BUILDING AND DISPOSED
OF BY THE GENERAL CONTRACTOR.”
b. Keynote 022 modified to state, “SALVAGE OVERHEAD PROJECTOR AND RETURN TO
CONTRACTING OFFICER.”
c. Keynote 029 modified to state, “SALVAGE DISPLAY CASE AND OR MARKER BOARD; RETURN
TO CONTRACTING OFFICER.”
d. Keynote 030 modified to state, “SALVAGE WALL-MOUNTED FLAT TELEVISION AND RETURN
TO CONTRACTING OFFICER.”
e. Keynote 106 modified to state, “SALVAGE SMART BOARD SYSTEM AND RETURN TO
CONTRACTING OFFICER.”
5. AD112 – PARTIAL DEMOLITION PLANS – LEVEL 1 - AREAS G AND H
a. GENERAL NOTES – DEMO PLANS Note E modified to state, “FF&E REMAINING AFTER
GOVERNMENT PERSONNEL MOVE OUT WILL BE REMOVED FROM BUILDING AND DISPOSED
OF BY THE GENERAL CONTRACTOR.”
b. Keynote 022 modified to state, “SALVAGE OVERHEAD PROJECTOR AND RETURN TO
CONTRACTING OFFICER.”
Page 2 of 3 Amendment 0002, 21 November 2025
c. Keynote 029 modified to state, “SALVAGE DISPLAY CASE AND OR MARKER BOARD; RETURN
TO CONTRACTING OFFICER.”
d. Keynote 030 modified to state, “SALVAGE WALL-MOUNTED FLAT TELEVISION AND RETURN
TO CONTRACTING OFFICER.”
6. AD122 – PARTIAL DEMOLITION PLANS – LEVEL 2 - AREAS G AND H
a. GENERAL NOTES – DEMO PLANS Note E modified to state, “FF&E REMAINING AFTER
GOVERNMENT PERSONNEL MOVE OUT WILL BE REMOVED FROM BUILDING AND DISPOSED
OF BY THE GENERAL CONTRACTOR.”
b. Keynote 022 modified to state, “SALVAGE OVERHEAD PROJECTOR AND RETURN TO
CONTRACTING OFFICER.”
c. Keynote 029 modified to state, “SALVAGE DISPLAY CASE AND OR MARKER BOARD; RETURN
TO CONTRACTING OFFICER.”
d. Keynote 030 modified to state, “SALVAGE WALL-MOUNTED FLAT TELEVISION AND RETURN
TO CONTRACTING OFFICER.”
7. AE170 – INTERIOR TEMPORARY CUSTOMER FACILITY PLAN
a. Updated general notes to clarify temporary trailer scope.
b. Updated verbiage on FURNISHED TEMPORARY TRAILER FURNITURE SCHEDULE to clarify temporary trailer scope.
8. A- 402 – RESTROOM ACCESSORIES LEGEND AND MOUNTING HEIGHTS
a. P1 STANDARD FLOOR MOUNTED TOILET PARITITONS
1) PRT-1 description modified to state, “1” THICK SOLID TOILET PARTITION AS
SPECIFIED, REFER TO INTERIORS.”
2) U-1 description modified to state, “1” THICK SOLID URINAL SCREEN AS SPECIFIED, REFER TO INTERIORS.”
9. A-500 – PLAN, CEILING, AND MISCELLANEOUS DETAILS
a. Detail F4 PROJECTOR MOUNTING DETAIL – note calling out the Projector modified to state, “REFERENCE INTERIORS FOR PROJECTOR.”
10. A-630 – WINDOW TYPES
a. GENERAL NOTES – WINDOWS NOTE G MODIFIED TO STATE, “WINDOWS W1-1 THRU W1-13
ARE TO BE DOUBLE PANE WINDOWS WITH EXTERIOR APPLIED PREFINISHED ALUMINUM
MOUNTED MUNTINS FINISHED TO MATCH WINDOW FRAME. REFER TO WINDOW TYPES
FOR CONFIGURATION OF APPLIED MUNTINS.
11. ID140 – OVERALL EXISITING FURNITURE PLAN - LEVEL 1
a. Updated general notes to clarify temporary trailer scope.
12. ID141 – PARTIAL EXISTING FURNITURE PLAN - LEVEL 1 - AREAS C AND D
a. Updated general notes to clarify temporary trailer scope.
13. ID142 – PARTIAL EXISTING FURNITURE PLAN - LEVEL 1 - AREAS G AND H
a. Updated general notes to clarify temporary trailer scope.
14. ID143 – OVERALL EXISITING FURNITURE PLAN - LEVEL 2
a. Updated general notes to clarify temporary trailer scope.
15. ID144 – PARTIAL EXISTING FURNITURE PLAN - LEVEL 2 - AREAS C AND D
a. Updated general notes to clarify temporary trailer scope.
16. ID145 – PARTIAL EXISTING FURNITURE PLAN - LEVEL 2 - AREAS G AND H
a. Updated general notes and TEMPORARY TRAILER FURNITURE SCHEDULE to clarify temporary trailer scope.
17. IN111 – PARTIAL INTERIOR FINISH PLAN - LEVEL 1 - AREAS C AND D
a. Updated keynotes 118, 130, & 133 to clarify projector and projector screen scope. Added keynote 156 for coordination clarification.
Page 3 of 3 Amendment 0002, 21 November 2025
b. Removed note F.
18. IN112 – PARTIAL INTERIOR FINISH PLAN - LEVEL 1 - AREAS G AND H
a. Removed note F.
19. IN114 – PARTIAL INTERIOR FINISH PLAN - LEVEL 2 - AREAS G AND H
a. Removed note F.
20. IF131 – PARTIAL FURNITURE, FIXTURES, & EQUIPMENT PLAN - LEVEL 1 - AREAS C AND D
a. Updated keynotes 118, 130, & 133 to clarify projector and projector screen scope. Added keynote 156 for coordination clarification.
21. I-510 – SIGNAGE DETAILS
a. Updated detail D7/I-510 PROGRAMMABLE LED SIGN to clarify design requirements.
22. I-602 – ROOM FINISH SCHEDULE
a. Updated room finishes in rooms 2128 and 2163.
23. MH113 – PARTIAL HVAC PLANS - LEVEL 1 - AREAS C&D
a. Ductwork tag updated to oval.
24. MH114 – PARTIAL HVAC PLANS - LEVEL 1 - AREAS G&H
a. Ductwork tag updated to oval.
25. M-701 – HEATING WATER FLOW DIAGRAM
a. Added Differential Pressure Transmitter locations
26. E-701 – ONE-LINE DIAGRAM
a. Added a general note D.
27. ED131 – PARTIAL POWER DEMOLITION PLANS -LEVEL 1 -AREAS C AND D
a. Update keynote 157.
28. EP111 – PARTIAL POWER FLOOR PLANS -LEVEL 1 -AREAS C AND D
a. Update to keynote 106. Update receptacle in room 1110 and 1106.
29. TT001 – TELECOMMUNICATIONS GENERAL NOTES, SYMBOLS AND ABBREVIATIONS
a. Updated Telecommunications General Notes #24 wording to “as indicated.”
30. TD110 – OVERALL TELECOMMUNICATIONS DEMOLITION PLAN – LEVEL1
a. KEYNOTE 141 – Updated language to describe disposition of AV equipment.
b. Added additional keynote 141 to podium.
31. TT111 – PARTIAL TELECOMMUNICATIONS PLANS – LEVEL 1 – AREA C
a. Added keynotes 304 and 305 for projector locations in rooms 1110 and 1111.
32. TT112 – PARTIAL TELECOMMUNICATIONS PLANS – LEVEL 1 – AREA D
a. Added AV outlet location at instructors podium in rooms 1128 and 1129.
b. Added keynote 306 with instructions to connect AV outlet to monitor locations.
The following SPECIFICATION SECTIONS have been revised and replaced in their entirety:
1. 00 80 00.02 06-B Appendix B - Submittal Register
a. Updated submittal registry.
2. 01 11 00 Summary of Work
a. Edited specification to reflect salvage items.
3. 12 61 13 UPHOLSTERED AUDIENCE SEATING
a. Edited specification to reflect basis of design on drawings.
4. 10 14 00.20 Interior Signage
a. Edited specification to clarify LED signage design requirements.
(End of Summary of Changes)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 84 PAGES
Repair Squadron Operations B7087 (Hangar 1)
00 80 00.00 06 SD-01 Preconstruction Submittals
1.14 GLocal Agency Check
1.12 GSF1413 Statement and
Acknowledgement
1.32 GRadioactive Material/Equipment
SD-02 Shop Drawings
1.34 GMechanical/Electrical Room
Layout
SD-04 Samples
1.16 GEquipment Warranty Identification
Tags
SD-05 Design Data
1.37Progress Photographs
SD-07 Certificates
1.16Warranty of Construction
1.15 GNO ASBESTOS - CONTAINING
MATERIAL (ACM)
CERTIFICATION
1.15.2 GCertification for each individual
product installed and identified to contain mineral fibers that no asbestos-containing materials were installed
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 84 PAGES
00 80 00.00 06 1.15.2 GDocumentation to show that the products containing mineral fiber materials have been microscopically examined by an
AIHA- or NVLAP-certified laboratory and the lab has determined that the material does not contain asbestos
1.29Insurance
1.27Sales and Use Tax
SD-11 Closeout Submittals
1.7.4 GPreliminary (Working) As-Built
Drawings
1.7.1 GFinal As-Built Drawings
1.7.1.2 GCAD Working As-Built Drawings
1.9.1Equipment-in-Place List
1.9.1Maintenance and Parts Data
1.16Warranty Management Plan
01 11 00 SD-01 Preconstruction Submittals
1.5 GSalvage Plan
SD-06 Test Reports
3.3 GClash Detection Report
01 14 00 SD-01 Preconstruction Submittals
1.3.1.1List of Contact Personnel
01 32 01.00 06 SD-01 Preconstruction Submittals
1.3 GProject Scheduler Qualifications
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 84 PAGES
01 32 01.00 06 3.4.1 GPreliminary Project Schedule
3.4.2 GInitial Project Schedule
3.6.2 GPeriodic Schedule Update
01 33 00 SD-01 Preconstruction Submittals
1.8 GSubmittal Register
01 35 26.00 06 SD-01 Preconstruction Submittals
1.7Accident Prevention Plan (APP)
1.7Fatigue Management Plan
1.7Bloodborne Pathogen Plan
1.7Exposure Control Plan
1.7Automatic External Defibrillator
(AED) Program
1.7Site Layout Plan
1.7Access/Haul Road Plan
1.7Hearing Conservation Program
1.7Respiratory Protection Plan
1.7Health Hazard Control Program
1.7Hazard Communication Program
1.7Process Safety Management
Plan
1.7Lead Compliance Plan &
Specifications
1.7Asbestos Abatement Plan &
Specifications
1.7Radiation Safety Program
1.7Abrasive Blasting Plan
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 84 PAGES
01 35 26.00 06 1.7Heat Stress Monitoring Plan
1.7Cold Stress Monitoring Plan
1.7Indoor Air Quality Management
Plan
1.7Mold Remediation Plan
1.7Chromium (VI) Exposure
Evaluation
1.7Crystalline Silica Assessment
1.7Lighting Plan for Night Operations
1.7Traffic Control Plan
1.7Fire Prevention Plan
1.7Wild Land Fire Management Plan
1.7Arc Flash Hazard Analysis
1.7Assured Equipment Grounding
Control Program (AEGCP)
1.7Hazardous Energy Control Plan
1.7Standard Pre-Lift Plan (LHE)
1.7Critical Lift Plan - LHE
1.7Naval Architectural Analysis-LHE
(Floating)
1.7Floating Plant Inspection and
Certification
1.7Severe Weather Plan for Marine
Activities
1.7Emergency Plan for Marine
Activities
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 84 PAGES
01 35 26.00 06 1.7Man Overboard/Abandon Ship
Procedures
1.7Float Plan for Launches, Motorboats, Skiffs
1.7Fall Protection and Prevention
Plan
1.7Demolition/Renovation Plan (to include engineering survey)
1.7Rope Access Work Plan
1.7Excavation/Trenching Plan
1.7Fire Prevention & Protection Plan for Underground Construction
1.7Compressed Air Plan for
Underground Construction
1.7Erection and Removal Plan for
Formwork and Shoring
1.7PreCast Concrete Plan
1.7Lift-Slab Plans
1.7Masonry Bracing Plan
1.7Steel Erection Plan
1.7Explosives Safety Site Plan
(ESSP)
1.7Blasting Plan
1.7Dive Operations Plan
1.7Safe Practices Manual for Diving
Activities
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 84 PAGES
01 35 26.00 06 1.7Emergency Management Plan for
Diving
1.7Tree Felling/Maintenance
Program
1.7Aircraft/Airfield Construction
Safety & Phasing Plan (CSPP)
1.7Aircraft/Airfield Safety Plan
Compliance Document (SPCD)
1.7Site Safety and Health Plan
(HTRW)
1.7Confined Space Entry
Procedures
1.7Confined Space Program
1.8 G ROActivity Hazard Analysis (AHA)
1.5.1.1 G ROSite Safety and Health Officer
Qualifications(SSHO)
1.12.7 G ROProof of qualification for Crane
Operators
1.12.7 G ROCritical Lift Plan
SD-06 Test Reports
1.12Reports
1.12.1Accident Reports
1.12.3Monthly Exposure Reports
1.12.5Crane Reports
1.12.4Regulatory Citations and
Violations
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 84 PAGES
01 35 26.00 06 SD-07 Certificates
1.12.8Confined Space Entry Permit
1.13Hot work permit
1.12.6Crane Certificate of Compliance
01 45 04.10 06 SD-01 Preconstruction Submittals
3.2 G ROConstruction Quality Control Plan
01 45 35 SD-01 Preconstruction Submittals
3.1.2Written NDT Practices
SD-06 Test Reports
3.1.2Daily Reports
3.1.1Biweekly Reports
SD-07 Certificates
2.1AISC Certified Steel Fabricator
2.1Certificate of Compliance
1.5 GSpecial Inspector
3.1.2Qualification Records
SD-11 Closeout Submittals
3.1.2 GComprehensive Final Report
01 46 00.00 06 SD-01 Preconstruction Submittals
1.4 G DOCommissioning Specialists
1.4.2 G DOCommissioning Specialists
1.8 G DOProject Schedule
SD-05 Design Data
3.1.4 G DODesign Review Report
SD-06 Test Reports
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 84 PAGES
01 46 00.00 06 3.1.3 G DOConstruction Phase
Commissioning Plan
3.1.6.2 G DOPre-Functional Checklists
1.6Issues Log
3.1.6.5Trend Log Report
3.8.1Post-Construction Trend Log
Report
3.7 G DOCommissioning Report
3.8 G DOPost-Construction
Commissioning Report
SD-07 Certificates
1.7 G DOCertificate of Readiness
SD-10 Operation and Maintenance
Data
3.2 G DOSystems Training
3.3 G ROTraining Plan
3.3 G ROTraining Attendance Rosters
3.4 G DOSystems Manual
3.8 G DOPost-Construction Systems
Manual
3.5 G DOMaintenance and Service Life
Plans
01 50 00 SD-01 Preconstruction Submittals
1.3 GConstruction Site Plan
3.4.1 GTraffic Control Plan
2.2.1 GHaul Road Plan
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 84 PAGES
01 50 00 1.6.1.4 GContractor Computer
Cybersecurity Compliance
Statements
1.6.6 GContractor Temporary Network
Cybersecurity Compliance
Statements
SD-06 Test Reports
3.5Backflow Preventer Tests
SD-07 Certificates
1.4.1Backflow Tester
1.4Backflow Preventers
01 52 00.00 06 SD-01 Preconstruction Submittals
1.4 GTemporary Facility Site Plan
1.5 GTemporary Facility Floor Plan
01 57 19.00 06 SD-01 Preconstruction Submittals
3.18 GRadioactive Material
1.6.1Preconstruction Survey
1.11Solid Waste Management Permit
1.6.2 GRegulatory Notifications
1.7 GEnvironmental Protection Plan
1.6.5 GEmployee Training Records
1.6.4 GEnvironmental Manager
Qualifications
SD-06 Test Reports
3.6.1.1.2Laboratory Analysis
3.2.1.2Inspection Reports
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 84 PAGES
01 57 19.00 06 3.6.2.1 GSolid Waste Management Report
SD-07 Certificates
1.6.5 GEmployee Training Records
1.6.5.1Certificate of Competency
1.6.5Erosion and Sediment Control
Inspector
SD-11 Closeout Submittals
3.2.1.3 GStormwater Pollution Prevention
Plan Compliance Notebook
3.2.1.4 GStormwater Notice of Termination
3.6.1 GWaste Determination
Documentation
3.6.4.6 GDisposal Documentation for
Hazardous and Regulated Waste
1.6.5 GAssembled Employee Training
Records
1.11 GSolid Waste Management Permit
3.6.2.1 GSolid Waste Management Report
3.6.4.1 GHazardous Waste/Debris
Management
1.6.2 GRegulatory Notifications
3.6.2.1 GSales Documentation
3.6.2.1Contractor Certification
01 74 19 SD-01 Preconstruction Submittals
1.7 GConstruction Waste Management
Plan
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 84 PAGES
01 74 19 SD-06 Test Reports
1.9.2Quarterly Reports
1.9.3Annual Report
SD-11 Closeout Submittals
1.10 SFinal Construction Waste
Diversion Report
01 78 23 SD-10 Operation and Maintenance
Data
1.4 GFacility Data Workbook
3.1.1 GTraining Plan
3.1.3 GTraining Outline
3.1.2 GTraining Content
3.2.1 GOperation And Maintenance
Manual, Progress Submittal
3.2.2 GOperation And Maintenance
Manual, Prefinal Submittal
3.2.3 GOperation And Maintenance
Manual, Final Submittal
SD-11 Closeout Submittals
3.1.4 GTraining Video Recording
3.1.6 GValidation of Training Completion
3.1.1 GTraining Plan
1.6.6.7 GRecord Drawings And Utility
Systems
01 78 24.00 10 SD-01 Preconstruction Submittals
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 84 PAGES
01 78 24.00 10 1.5.1Facility Data Project Execution
Plan
SD-05 Design Data
3.1 GFacility Data Workbook, Design
3.1 GFacility Document Set, Design
SD-10 Operation and Maintenance
Data
3.2 GFacility Data Workbook, Construction Progress
3.2 GFacility Document Set, Construction Progress
SD-11 Closeout Submittals
3.3 GFacility Data Workbook, Construction Final
1.5.3 GFacility Document Set, Construction Final
3.3 GFacility Document Set, Construction Final
02 41 00 SD-01 Preconstruction Submittals
1.2.2 GDemolition Plan
1.11Existing Conditions
SD-07 Certificates
1.7 GNotification
SD-11 Closeout Submittals
3.3.4Receipts
02 81 00 SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 84 PAGES
02 81 00 2.1.1Packaging Notifications
3.1 GHazardous Waste Management
Plan
3.2 GOnsite Hazardous Waste
Management
3.3Notices of Non-Compliance and
Notices of Violation
SD-06 Test Reports
3.7 GRecordkeeping
3.7 GException Report
3.8Spill Response
SD-07 Certificates
1.4.1 GTransportation and Disposal
Coordinator
1.4.2 GTraining
1.4.3Certification
3.3.3 GShipping Documents and
Packagings Certification
3.3.4Security Plan
3.3.5Certificates of Disposal
3.6Waste Minimization
02 82 00 SD-03 Product Data
1.2.2Amended Water
1.3.9 GSafety Data Sheets (SDS) for All
Materials
2.1Encapsulants
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 84 PAGES
02 82 00 3.1.2.1Respirators
3.1.7Local Exhaust Equipment
3.1.7Pressure Differential Automatic
Recording Instrument
3.1.8Vacuums
3.1.10Glovebags
SD-06 Test Reports
1.5.5 GAir Sampling Results
1.5.6 GPressure Differential Recordings
for Local Exhaust System
3.2.11.5 GClearance Sampling
3.3.3.2 GAsbestos Disposal Quantity
Report
SD-07 Certificates
1.3.4 GEmployee Training
1.3.5 GNotifications
1.3.7 GRespiratory Protection Program
1.3.10 GAsbestos Hazard Abatement Plan
1.3.11 GTesting Laboratory
1.3.12 GLandfill Approval
1.3.12 GDelivery Tickets
1.3.12 GWaste Shipment Records
1.3.13 GTransporter Certification
1.3.14 GMedical Certification
1.5.1 GPrivate Qualified Person
Documentation
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 84 PAGES
02 82 00 1.5.2 GDesignated Competent Person
1.5.3 GWorker's License
1.5.4 GContractor's License
1.5.7 GFederal, State or Local Citations
on Previous Projects
3.1Equipment Used to Contain
Airborne Asbestos Fibers
3.1.3.3Water Filtration Equipment
3.1.8Vacuums
3.1.8Ventilation Systems
SD-11 Closeout Submittals
1.3.5 GNotifications
1.3.7.1 GRespirator Program Records
1.7.1Rental Equipment
02 83 00 SD-01 Preconstruction Submittals
1.5.1.1 GCompetent Person
1.5.1.2 GTraining Certification
1.5.2.3 GOccupational and Environmental
Assessment Data Report
1.5.2.4 GMedical Examinations
1.5.2.8 GLead Waste Management Plan
1.5.4 GLicenses, Permits and
Notifications
1.5.2.1 GLead Compliance Plan
1.5.2.2 GLead Compliance Plan
3.1.1.6 GLead Compliance Plan
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 84 PAGES
02 83 00 3.5.2.1 GWritten Evidence of TSD
Approval
SD-03 Product Data
1.6.1Respirators
1.6.4Vacuum Filters
1.6.7Negative Air Pressure System
2.1Materials and Equipment
2.1.1Expendable Supplies
3.1.1.5Local Exhaust Equipment
3.1.1.5Pressure Differential Automatic
Recording Instrument
3.1.1.6 GPressure Differential Log
SD-06 Test Reports
1.3.3 GSampling and Analysis
1.5.2.3 GOccupational and Environmental
Assessment Data Report
1.5.2.3 GSampling Results
1.5.3 GPressure Differential Recordings
For Local Exhaust System
SD-07 Certificates
1.5.1.3 GTesting Laboratory
1.5.1.4 GThird Party Consultant
Qualifications
3.5.1.1 GClearance Certification
SD-11 Closeout Submittals
3.5.2.1 GHazardous Waste Manifest
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 84 PAGES
02 83 00 3.5.2.1 GTurn-In Documents or Weight
Tickets
02 83 13.00 06 SD-01 Preconstruction Submittals
1.5.2.3 GOccupational and Environmental
Assessment Data Report
1.5.2.2 GLead Compliance Plan
1.5.1.1 GCompetent Person
1.5.1.2 GTraining Certification
1.5.2.8 GLead waste management plan
3.5.2.1 GWritten evidence
1.5.2.4 GMedical Examinations
SD-06 Test Reports
1.5.2.3 GSampling results
1.5.2.3 GOccupational and Environmental
Assessment Data Report
SD-07 Certificates
1.5.1.3 GTesting laboratory
1.5.1.4 GThird party consultant
qualifications
3.5.1.1 GClearance Certification
SD-11 Closeout Submittals
3.5.2.1 Ghazardous waste manifest
3.5.2.1 Gturn-in documents or weight
tickets
02 84 16 SD-07 Certificates
1.8.1 GQualifications of CIH
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 84 PAGES
02 84 16 1.8.1 GTraining Certification
1.8.2 GPCB and Lamp Removal Work
Plan
1.8.3 GPCB and Lamp Disposal Plan
SD-11 Closeout Submittals
3.5.2 GTransporter Certification
3.2.4Certification of Decontamination
3.5.2.1Certificate of Disposal and/or recycling
3.3.1Testing Results
03 30 00 SD-01 Preconstruction Submittals
1.6.3.1Concrete Curing Plan
1.6.5 GQuality Control Program
1.6.6 GQuality Control Personnel
Certifications
1.6.6Quality Control Organizational
Chart
1.6.8 GLaboratory Accreditation
3.3.8Maturity Method Data
SD-02 Shop Drawings
1.6.2.1 GReinforcing Steel
SD-03 Product Data
2.4.4Joint Sealants
2.4.3Joint Filler
2.1Formwork Materials
2.3.1Cementitious Materials
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 84 PAGES
03 30 00 2.4.5Vapor Retarder
2.4.1Concrete Curing Materials
2.6Reinforcement
2.3.4Admixtures
2.6.2Mechanical Reinforcing Bar
Connectors
1.8.1Local/Regional Materials
2.2.2Biodegradable Form Release
Agent
1.6.3.2Pumping Concrete
2.4.2Nonshrink Grout
SD-05 Design Data
1.6.1.1 GConcrete Mix Design
SD-06 Test Reports
1.6.1.1 GConcrete Mix Design
1.6.4.1Fly Ash
1.6.4.1Pozzolan
1.6.4.2Slag Cement
3.12.3.3 GCompressive Strength Tests
3.12.3.4Air Content
3.12.3.1Slump Tests
2.3.2Water
SD-07 Certificates
2.6.1Reinforcing Bars
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 84 PAGES
03 30 00 1.6.3.3VOC Content for Form Release
Agents, Curing Compounds, and
Concrete Penetrating Sealers
1.6.3.4Safety Data Sheets
1.8.2Forest Stewardship Council
(FSC) Certification
1.6.6.2Field Testing Technician and
Testing Agency
SD-08 Manufacturer’s Instructions
2.4.4Joint Sealants
2.4.1Curing Compound
04 03 00 SD-01 Preconstruction Submittals
1.5.1 GQuality Control Plan
1.5.1 GProject Training Program
1.5.2 GQualifications
SD-02 Shop Drawings
1.5.5Photographic Documentation
3.5.1 GStructural Upgrades
SD-03 Product Data
1.5.2Qualifications
1.5.6 GCleaning and Restoration
Methods
2.1 GCleaning Materials
2.1.4Biocides
2.2.2.2 GReplacement Mortar
2.4 GMortar Mix
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 84 PAGES
04 03 00 3.4.8.2 GWater Repellents Infiltration
3.4.8.3 GStone Consolidants
SD-04 Samples
1.5.7.1 GMock-ups
SD-05 Design Data
3.5.1 GStructural Upgrades
SD-06 Test Reports
2.2.2.1Testing and Matching
3.5.2Existing Sealants for Asbestos and PCBs
SD-07 Certificates
2.2Repair Materials
04 20 00 SD-02 Shop Drawings
3.3.2.1 GCut CMU
3.4.1.1 GDetail Drawings
SD-03 Product Data
1.5.1 GHot Weather Procedures
1.5.2 GCold Weather Procedures
2.2.2.1.1 GCement
2.4.1.1 GCementitious Materials
SD-04 Samples
2.2.2.1 GConcrete Masonry Units (CMU)
2.2.2.3 GConcrete Brick
2.4.1.3 GAdmixtures for Masonry Mortar
2.6.2 GAnchors, Ties, and Bar
Positioners
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 22 OF 84 PAGES
04 20 00 2.6.3 GJoint Reinforcement
SD-05 Design Data
2.1.2 GMasonry Compressive Strength
2.2.2.2Fire-Rated Concrete Masonry
Units
3.2.5 GBracing Calculations
SD-06 Test Reports
2.2.2.2Fire-Rated Concrete Masonry
Units
SD-07 Certificates
1.3.1Special Masonry Inspector
Qualifications
2.2.2.1Concrete Masonry Units (CMU)
2.2.2.3Concrete Brick
2.2.3Precast Concrete Units
2.4.1.1Cementitious Materials
2.4.1.3Admixtures for Masonry Mortar
2.4.2.2Admixtures for Grout
2.6.2Anchors, Ties, and Bar
Positioners
2.6.3Joint Reinforcement
SD-08 Manufacturer’s Instructions
2.4.1.3Admixtures for Masonry Mortar
2.4.2.2Admixtures for Grout
SD-10 Operation and Maintenance
Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 23 OF 84 PAGES
04 20 00 3.8Take-Back Program
SD-11 Closeout Submittals
2.2.2.1.2 SRecycled Content
05 05 23.16 SD-01 Preconstruction Submittals
3.2 GWelding Quality Assurance Plan
SD-03 Product Data
1.3 GWelding Procedure Qualifications
1.3.4Welder, Welding Operator, and
Tacker Qualification
1.3.2Previous Qualifications
1.3.3 GPre-Qualified Procedures
2.2Welding Electrodes and Rods
SD-06 Test Reports
3.3Nondestructive Testing
3.2Weld Inspection Log
SD-07 Certificates
1.3.1Certified Welding Procedure
Specifications (WPS)
1.3.1Certified Procedure Qualification
Records (PQR)
1.3.1Certified Welder Performance
Qualifications (WPQ)
1.3.5Certified Welding Inspector
1.3.5Nondestructive Testing Personnel
05 12 00 SD-01 Preconstruction Submittals
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 24 OF 84 PAGES
05 12 00 1.4.1.1 GErection and Erection Bracing
Drawings
SD-02 Shop Drawings
1.4.2 G AEFabrication Drawings
SD-03 Product Data
2.5.2Shop Primer
2.4.1Welding Electrodes and Rods
2.4.2Non-Shrink Grout
SD-05 Design Data
1.4.3 G AEDesign Calculations for Steel
Connections
1.4.2 GShoring and Temporary Bracing
SD-06 Test Reports
2.3Bolts, Nuts, and Washers
3.6.1.2Weld Inspection Reports
SD-07 Certificates
2.2Steel
2.3Bolts, Nuts, and Washers
1.3AISC Structural Steel Fabricator
Quality Certification
1.3AISC Structural Steel Erector
Quality Certification
1.4.4.1Welding Procedures and
Qualifications
2.4.1Welding Electrodes and Rods
3.6.1.1Certified Welding Inspector
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 25 OF 84 PAGES
05 12 00 3.6.1.2NDT Technician
3.4Welding Procedure Specifications
(WPS)
05 30 00 SD-02 Shop Drawings
1.3.4 GFabrication Drawings
SD-03 Product Data
2.2Accessories
2.1Deck Units
2.1.6Galvanizing Repair Paint
2.2.11Mechanical Fasteners
2.1.6Touch-Up Paint
1.3.3Welding Equipment
1.3.3Welding Rods and Accessories
SD-04 Samples
2.1.1Metal Roof Deck Units
2.2.3Flexible Closure Strips
SD-05 Design Data
2.1 GDeck Units
SD-07 Certificates
1.3.2Powder-Actuated Tool Operator
1.3.3Welder Qualifications
1.3.3Welding Procedures
1.3.1Manufacturer's Certificate
05 40 00 SD-02 Shop Drawings
1.6.1 G AEFraming Components
SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 26 OF 84 PAGES
05 40 00 2.1Studs, Joists
2.1 SRecycled Content of Steel
Products
SD-05 Design Data
1.6.2 G AEMetal Framing Calculations
SD-07 Certificates
1.4Load-Bearing Cold-Formed Metal
Framing
3.1.1Welds
06 10 00 SD-06 Test Reports
1.4.3Preservative-treated
SD-10 Operation and Maintenance
Data
3.3Take-back Program
06 41 16.00 10 SD-02 Shop Drawings
1.4.2Shop Drawings
2.8Shop Drawings
3.1Installation
SD-03 Product Data
2.1Wood Materials
2.8.7.3Finish Schedule
1.4.3Certification
SD-04 Samples
2.3 GPlastic Laminates
2.5 GCabinet Hardware
SD-07 Certificates
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 27 OF 84 PAGES
06 41 16.00 10 1.4Quality Assurance
3.1Laminate Clad Casework
06 61 16 SD-02 Shop Drawings
1.4.2 GDetail Fabrication Drawings
3.1 GInstallation
SD-03 Product Data
2.1.1 GSolid Polymer
2.2.2 SIndoor air quality for solid surface
seam and sealant products
SD-04 Samples
2.1 GMaterial
2.3.4 GCounter Tops
SD-06 Test Reports
2.1.1Test Report Results
SD-07 Certificates
1.4.1Qualifications
2.1.1 SIndoor Air Quality for solid
surface fabrication products
SD-10 Operation and Maintenance
Data
2.1.1 GSolid Polymer
07 14 00 SD-03 Product Data
2.1Fluid-Applied Membrane
2.2Membrane Primer
2.8Elastomeric Sheet
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 28 OF 84 PAGES
07 14 00 2.10Flexible Foam-Backed
Elastomeric Sheet
3.3Solvent
3.4.1Moisture Meter
2.11Protection Board
2.7Bond Breaker
SD-06 Test Reports
3.4.3 GFlood Testing
SD-11 Closeout Submittals
1.6Warranty
3.6Information Card
3.5Maintenance and Repair Training
07 19 00 SD-03 Product Data
2.2Water Repellents
SD-06 Test Reports
1.3.2Water Absorption
1.3.2Accelerated Weathering
1.3.2Resistance to Chloride Ion
Penetration
1.3.2Moisture Vapor Transmission
1.3.2Water Penetration and Leakage
SD-07 Certificates
1.3.1Manufacturer's Qualifications
1.3.1Applicator's Qualifications
1.3.3Evidence of Acceptable Variation
1.12Warranty
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 29 OF 84 PAGES
07 19 00 SD-08 Manufacturer’s Instructions
3.4Application
1.7.1Safety Data Sheets
07 21 13 SD-02 Shop Drawings
1.3 GManufacturer's Standard Details
SD-03 Product Data
1.4 GEnvironmental Data for Materials
2.1 GBlock or Board Insulation
2.2 GAccessories
2.1.3 SRecycled Content for Block or
Board Insulation
SD-07 Certificates
2.1.4 SIndoor Air Quality For Block Or
Board Insulation
SD-08 Manufacturer’s Instructions
3.3.1Insulation Installation and
Handling
3.4.5Protection Board or Coating
Installation
2.2.1Adhesive
SD-11 Closeout Submittals
1.7.1 GDraft Guarantee
1.7.1 GFinal Guarantee
1.7.2 GDraft Warranty
1.7.2 GFinal Warranty
07 21 16 SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 30 OF 84 PAGES
07 21 16 2.1 GBlanket Insulation
2.3Accessories
SD-07 Certificates
2.3.1 SIndoor Air Quality for Adhesives
SD-08 Manufacturer’s Instructions
3.3.1Insulation
07 22 00 SD-02 Shop Drawings
1.3 GInsulation Board Layout
1.3 GVerification of Existing Conditions
SD-03 Product Data
2.1 GInsulation
1.4 GCover Board
2.3 GFasteners
2.1.2 SRecycled Content For Insulation
SD-05 Design Data
1.7 GWind Resistance
SD-06 Test Reports
1.8.1 GFlame Spread Rating
SD-07 Certificates
1.6 GInstaller Qualifications
1.6 GCertificates Of Compliance For
Felt Materials
2.1.3 SIndoor Air Quality For Insulation
2.1.4 SAcceptable Foam Blowing Agents
SD-08 Manufacturer’s Instructions
2.3 GFasteners
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 31 OF 84 PAGES
07 22 00 2.1 GInsulation
07 27 10 SD-02 Shop Drawings
2.1 GAir Barrier System Shop
Drawings
SD-03 Product Data
2.1 GAir Barrier System Product Data
SD-04 Samples
3.1.2 GMock-Up
2.1 GMaterial Samples For Air Barrier
System
SD-05 Design Data
1.7 GDesign Data And Calculations
For The Air Barrier System
SD-06 Test Reports
1.7 GDesign Review Report
3.1.3 GInspection
SD-07 Certificates
1.6 G ROAir Barrier Inspector
07 27 26 SD-01 Preconstruction Submittals
1.9.1 GQualifications of Manufacturer
1.9.2 GQualifications of Installer
SD-02 Shop Drawings
1.4.1 GFluid-Applied Membrane Air
Barrier Shop Drawings
SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 32 OF 84 PAGES
07 27 26 1.4 GFluid-Applied Membrane Air
Barrier
2.2 GPrimers, Adhesives, and Mastics
2.5 GReinforcement
1.4.2 GSafety Data Sheets
SD-04 Samples
1.4.3 GMockup
SD-06 Test Reports
1.6 GCapillary Moisture Test
1.4.4 GField Peel Adhesion Test
1.4.4 GFlame Propagation of Wall
Assemblies
3.4.1 GSite Inspections
SD-08 Manufacturer’s Instructions
1.4.2 GFluid-Applied Membrane Air
Barrier Manufacturer's Printed
Instructions
1.4.2 GPrimers, Adhesives, and Mastics
Printed Manufacturer's Instructions
07 27 36 SD-01 Preconstruction Submittals
1.9.1 GQualification of Manufacturer
1.9.2 GQualification of Installer
1.10 GQuality Control Plan
1.10 GSafety Plan
1.8.1 GFire Prevention Plan
1.8.2 GRespiratory Protection Plan
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 33 OF 84 PAGES
07 27 36 SD-02 Shop Drawings
1.5.1Spray Foam Air Barrier System
Shop Drawings
1.5.1 GFire-Rated Assemblies
SD-03 Product Data
2.1.5 GBlowing Agents
2.1.2 GClosed Cell
2.2 GPrimers, Adhesives, and Mastics
2.4 GSealants
1.5.2 GSafety Data Sheets
2.1.1 GThermal Barrier Materials
2.1.1 GIgnition Barrier Coatings
2.1.6.2 GAccessories
2.1.2 SRecycled Content for Closed Cell
Spray Foam Air Barrier
SD-04 Samples
1.5.3 GSpray Foam Air Barrier Mockup
SD-06 Test Reports
1.5.4 GMockup Peel Adhesion Test
3.4.5.1 GThermographic Test
1.5.4 GFire-Ratings Of Thermal and
Ignition Barrier Materials
1.5.4 GFlame Spread and Smoke
Developed Index Ratings of SPF
Products
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NE…
This is the start of the file's text. The full file is on GovTribe.