W912QR26BA001_Plans-0002.pdf
PDF 16 MB Posted
- Solicitation number
- W912QR26BA001
About this file
These are architectural and engineering drawing files for the renovation of the Squadron Operations Facility (Building 7087) at Westover Air Reserve Base in Massachusetts. The comprehensive set of technical drawings covers multiple disciplines including architectural demolition plans, interior finishes, furniture and equipment layouts, electrical systems, mechanical systems, telecommunications infrastructure, and civil engineering details for a 37,000 square foot facility renovation.
The drawings detail a phased renovation approach across Level 1 and Level 2 of the facility, with specific focus on Areas C, D, G, and H. Key elements include comprehensive demolition of existing systems, replacement of electrical and HVAC infrastructure, installation of new telecommunications networks, interior finish upgrades, and integration of new furniture and equipment. The project involves complex renovations that must maintain operational continuity for existing systems like the C-5 simulator and base communications infrastructure. The technical drawings are part of a construction contract with an estimated duration of 519 calendar days, with a total project value anticipated between $10 million and $25 million, issued by the US Army Corps of Engineers Louisville District.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DRAWING ABBREVIATIONS
REVISION
DRAWING SYMBOLS
SHEET ON WHICH DETAIL
IS DRAWN
BUILDING ELEVATION
WALL SECTION
BUILDING SECTION
ROOM NAME AND
NUMBER
NOTES BY SYMBOL
(KEYNOTES)
A2
A-201
A1
A-310
A1
A-301
A1
A-301
A0
A-101
A-201
A4
A4
A4
A4
INTERIOR ELEVATION
MULTIPLE VIEWS
DETAIL IDENTIFICATION
TITLE OF DRAWING
STATED SCALE
TRUE NORTH ARROW
TRUE NORTH
DETAIL IDENTIFICATION
ENLARGED PLAN/DETAIL
REFERENCE
A1
A-101
A1
A2
A3
SCALE 1/8" = 1'-0"
VIEW NAME
A1
ROOM
NAME
NUMBERING SYSTEM
G-010
DISCIPLINE:
G - GENERAL
V - SURVEY/MAPPING
B - GEOTECHNICAL
C - CIVIL
L - LANDSCAPE
S - STRUCTURAL
A - ARCHITECTURE
I - INTERIORS
F - FIRE PROTECTION
P - PLUMBING
D - PROCESS
M - MECHANICAL
E - ELECTRICAL
T - TELECOMM
R - RESOURCES
SERIES NUMBER
0 - GENERAL
1 - PLANS
2 - ELEVATIONS
3 - SECTIONS
4 - ENLARGED PLANS
5 - DETAILS
6 - SCHEDULES
7 - DIAGRAMS
8 - USER DEFINED
9 - 3D REPRESENTATIONS
SHEET NUMBER
WITHIN SERIES
A
GRID TYPE
MATCHLINE
A1/AE101
VIEW REFERENCE /
MATCHLINE
NOTES BY SYMBOL
(DEMO-KEYNOTES)
02 4 8134
SCALE: 1/4"=1'-0"
GRAPHIC SCALE
X
X
R E
G I S
T
ERED ARCH
IT
E
C T
S T
A T E
O F T EX
A S
M A T
TH
EW THOMAS
H A
R E
2 2 8 5 3
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
J A
C O
B S
G O
V E
R N
M E
N T
S E
R V
IC
E
S C
O
T e xa s R e g is te re d E n g in e e ri n g F ir m
F -2
M a in
S tr e e t, F o rt
W o rt h
T X
F
IL
E N
A M
E
L O
U
IS
V
IL
L E
D
IS
T R
IC
T
L O
U
IS
V
IL
L E
K
E N
T U
C K
Y
R E
P A
IR
S
Q U
A D
R O
N O
P E
R A
T
IO
N S
B L D
G
H A
N G
A R
W E
S T
O V
E R
A R
B M
A U
S A
C E
P
A F
P R
O J E
C T
Y
T P
M
-0
CERTIFIED FINAL
V S
A R
O N
I
G
IN
G L
IS
M H
A R
E
M H
A R
E
J a c o b s P ro j.
N o
L
D A
R
D
E C
GI003
A B
B R
E V
IA
T
IO
N
S A
N D
D R
A W
IN
G
S Y
M B
O L
S
Y T
P M
-0
-G
I0
A
A AMPERE
A LABEL CLASS A DOOR
A/C AIR CONDITIONING
A/C UNIT AIR CONDITIONING UNIT
A/E ARCHITECT/ ENGINEER
AASHTO AMERICAN ASSOCIATION OF STATE HIGHWAY
AND TRANSPORTATION OFFICIALS
AB ANCHOR BOLT
ABAAG ARCHITECTURAL BARRIERS ACT ACCESSIBILITY
GUIDELINES
AC ALTERNATING CURRENT/ABOVE COUNTER,
ASPHALT CONCRETE
ACC ACCESSIBLE
ACI AMERICAN CONCRETE INSTITUTE
ACS AUTOMATIC CONTROL SYSTEM
ACS DR ACCESS DOOR
ACS FLR ACCESS FLOOR
ACS PNL ACCESS PANEL
ACST ACOUSTICAL
ACT ACOUSTICAL CEILING TILE
AD AIR DEVICE
ADA AMERICANS WITH DISABILITIES ACT
ADDL ADDITIONAL
ADJ ADJUSTABLE
ADMIN ADMINISTRATION
AF AMPERE FRAME
AFC ABOVE FINISHED COUNTER
AFCI ARC FAULT CIRCUIT INTERRUPTER
AFF ABOVE FINISHED FLOOR
AFG ABOVE FINISHED GRADE
AFS ABOVE FINISHED SLAB
AGGR AGGREGATE
AHU AIR HANDLING UNIT
AIB AIR INFILTRATION BARRIER
AIC AMPERE INTERRUPTING CAPACITY
AISC AMERICAN INSTITUTE OF STEEL
CONSTRUCTION
ALNMT ALIGNMENT
ALUM ALUMINUM
ANOD ANODIZE
ANT ANTENNA
APC ACOUSTICAL PANEL CEILING
APPROX APPROXIMATE (-LY)
ARCH ARCHITECT (-TURAL)
ASC ABOVE SUSPENDED CEILING
ASCE AMERICAN SOCIETY OF CIVIL ENGINEERS
ASPH ASPHALT
ASSY ASSEMBLY
ASTM AMERICAN SOCIETY FOR TESTING AND
MATERIALS
ASYM ASYMMETRICAL
AT AMPERE TRIP
ATS AUTOMATIC TRANSFER SWITCH
AUTO AUTOMATIC
AUX AUXILIARY
AVG AVERAGE
AWG AMERICAN WIRE GAUGE
AWI ARCHITECTURAL WOODWORK INSTITUTE
AWT ACOUSTICAL WALL TREATMENT
AWWA AMERICAN WATER WORKS ASSOCIATION
B
B LABEL CLASS B DOOR
B-B, B/B BACK TO BACK
BALC BALCONY
BATT BATTERY
BB BASEBOARD
BBW BACK BOTTOM OF WALL
BC BACK OF CURB, BOTTOM OF CURB, BOOKCASE
BD BOARD
BDRY BOUNDARY
BEG BEGIN
BEV BEVEL
BF BOTH FACES
BFF BELOW FINISH FLOOR
BFP BACKFLOW PREVENTER
BHMA BUILDER'S HARDWARE MANUFACTURER'S
ASSOCIATION
BKBD BACKBOARD
BLDG BUILDING
BLKG BLOCKING
BLT IN BUILT-IN
BLW BELOW
BM BALANCED MAGNETIC SWITCH, BEAM,
BENCHMARK
BMPS BEST MANAGEMENT PRACTICES
BMS BUILDING MANAGEMENT SYSTEM
BN BULLNOSE
BOD BOTTOM OF DUCT
BOP BOTTOM OF PIPE
BOS BOTTOM OF STEEL
BOT BOTTOM
BP BASE PLATE, BUILDING PAPER
BRES BULLET-RESISTANT
BRG BEARING
BRKR BREAKER
C
C CHANNEL, CHANNEL SHAPE, COMPRESSION,
CONDUIT
C CONT CAST CONCRETE
C LABEL CLASS C DOOR
C&G CURB AND GUTTER
C-C, C/C, C
TO C
CENTER TO CENTER
CAB CABINET
CATW CATWALK
CAV CAVITY
CB CATCH BASIN, CERAMIC BASE, CIRCUIT
BREAKER
CBB CEMENTITIOUS (BACKER) BOARD
CCH CORROSION CONTROL HANGAR
CD CARBON DIOXIDE SENSOR
CDW CHILLED DRINKING WATER
CEM CEMENT
CEM PLAS CEMENT PLASTER
CEQ COLLATERAL EQUIPMENT
CER CERAMIC
CF CONTRACTOR FURNISHED
CF/CI CONTRACTOR FURNISHED/ CONTRACTOR
INSTALLED
CF/GI CONTRACTOR FURNISHED/ GOVERNMENT
INSTALLED
CFE CONTRACTOR FURNISHED EQUIPMENT
CFLG COUNTER FLASHING
CFM CUBIC FEET PER MINUTE
CFMF COLD-FORMED METAL FRAMING
CFS CUBIC FEET PER SECOND
CG CORNER GUARD
CHFR CHAMFER
CI CAST IRON, CURB INLET
CIP CAST IRON PIPE, CAST-IN-PLACE
CJ CONSTRUCTION JOINT, CONTROL JOINT
CKT CIRCUIT
CL CENTER LINE, CLASS
CLDG CLADDING
CLG CEILING
CLG DIFF CEILING DIFFUSER
CLG HT CEILING HEIGHT
CLL COLUMN LINE
CLO CLOSET
CLR CLEAR, (-ANCE), COLOR
CLRM CLASSROOM
CLWG CLEAR WIRE GLASS
CM CENTIMETER
CMPST COMPOSITE
CMU CONCRETE MASONRY UNIT
CNDS CONDENSATE
CNR CORNER
CO CLEAN OUT
CO/ NOX CARBON MONOXIDE / NITROGEN OXIDE
COE CORPS OF ENGINEER'S (US ARMY)
COL COLUMN
COMM COMMUNICATION (-S)
COMPR COMPRESSOR
CONC CONCRETE
CONC FLR CONCRETE FLOOR
CONF CONFERENCE
CONN CONNECT (-ION)
CONST CONSTRUCT (-ION)
CONT CONTINUED, CONTINUOUS
COORD COORDINATE
COR CONTRACTING OFFICER'S REPRESENTATIVE
CORR CORRIDOR
COV COVER
CP CIRCULATION PUMP, CONCRETE PIPE
CPT CARPET
CR CONTROL ROOM
CRS COLD ROLLED STEEL
CS CAST STONE
CSWK CASEWORK
CT CERAMIC TILE, CURRENT TRANSFORMER
CTB CEMENT TREATED BASE, CERAMIC TILE BASE
CTF CERAMIC TILE FLOOR
CTR CENTER
CTRL CONTROL
CU CONDENSING UNIT, COPPER
CU FT CUBIC FEET
CW CASEMENT WINDOW
CWR CONDENSER WATER RETURN
CWS CONDENSER WATER SUPPLY
D
D DEPTH
D LABEL CLASS D DOOR
E
E EAST (FOR COORDINATES)
E LABEL CLASS E DOOR
EA EACH, EXHAUST AIR
EDP1 EMERGENCY DISTRIBUTION PANELBOARD 1
EEWS EMERGENCY EYEWASH/SHOWER
EF EACH FACE
EF, EXH FN EXHAUST FAN
EGB ELECTRICAL GROUND BAR
EHD ELECTRIC HAND DRYER
EIFS EXTERIOR INSULATION AND FINISH SYSTEM
EJ EXPANSION JOINT
EL ELEVATION
ELEC ELECTRIC (-AL)
ELEV ELEVATOR
EMCS ENERGY MANAGEMENT CONTROL SYSTEM
EMER EMERGENCY
EMT ELECTRICAL METALLIC TUBING
ENCL ENCLOSURE
ENGR ENGINEER
ENTR ENTRANCE
ENVIR ENVIRONMENT
EOD EDGE OF DECK
EOS EDGE OF SLAB
EP EDGE OF PAVEMENT, EXPLOSION PROOF
EPS EXPANDED POLYSTYRENE BOARD (INSULATION)
EQ EQUAL
EQUIP EQUIPMENT
ES EACH SIDE, HVAC EMERGNECY SWITCH
ESB EMERGENCY SWITCHBOARD
ESCAL ESCALATOR
ESD ELECTROSTATIC DISSIPATING
ET EXPANSION TANK
EW EACH WAY
EWC ELECTRIC WATER COOLER
EWEF EACH WAY, EACH FACE
EX, EXIST EXISTING
EXH EXHAUST
EXH HD EXHAUST HOOD
EXHV EXHAUST VENT
EXP EXPANSION, EXPOSED
EXT EXTERIOR, EXTINGUISHER
EXT GR EXTERIOR GRADE
EXT LT EXIT LIGHT
F
F FEMALE, FIRE WATER
FA FIRE ALARM
FAAP FIRE ALARM ANNUNCIATOR PANEL
FACIL FACILITY
FACP FIRE ALARM CONTROL PANEL
FAS BD FASCIA BOARD
FB FACE OF BUILDING
FC FREQUENCY CONVERTER/FOOTCANDLE
FC BRK FACE BRICK
FC/ DC FREQUENCY CONVERTER/DC RECTIFIER
FCO FLOOR CLEANOUT
FCU FAN COIL UNIT
FD FIRE DAMPER, FLOOR DRAIN
FDC FIRE DEPARTMENT CONNECTION
G
G GROUND/GROUNDING CONDUCTOR, NATURAL
GAS
GA GAGE OR GAUGE
GAL GALLON
GALV GALVANIZED
GB GRAB BAR, GRADE BEAM
GDR GUARDRAIL
GEN GENERAL, GENERATOR
GF/CI GOVERNMENT FURNISHED / CONTRACTOR
INSTALLED
GF/GI GOVERNMENT FURNISHED / GOVERNMENT
INSTALLED
GFCI, GFI GROUND FAULT CIRCUIT INTERRUPTER
GFE GOVERNMENT FURNISHED EQUIPMENT
GFRG GLASS-FIBER-REINFORCED GYPSUM
REINFORCED GYPSUM
GLZ GLAZING
GND/GRD GROUND/GROUNDING
GPM GALLONS PER MINUTE
GR GRADE
GR FL GROUND FLOOR
GRTG GRATING
GSB GYPSUM SHEATHING BOARD
GT GROUT
GUT GUTTER
GV GATE VALVE
GYP BD GYPSUM BOARD
GYP PLAS GYPSUM PLASTER
B
BRKT BRACKET
BRZ BRONZE
BS BOTH SIDES
BSMT BASEMENT
BTU BRITISH THERMAL UNIT
BTWN BETWEEN
BUR BUILT-UP ROOFING
D
D/S DISCONNECT SWITCH
DA DRAINAGE AREA
DALI DIGITAL ADDRESSABLE LIGHTING INTERFACE
DB DIRECT BURIAL, DRY BULB
DBL DOUBLE
DBM DOUBLE BALANCED MAGNETIC SWITCH
DC DIRECT CURRENT
DCBFP DOUBLE CHECK BACKFLOW PREVENTER
DCD DOUBLE CHECK DETECTOR
DCO DOUBLE CLEANOUT
DCW DOMESTIC COLD WATER
DEF DEFLECTION/DEFORM
DEG DEGREE
DEMO DEMOLITION
DEPT DEPARTMENT
DET DETAIL
DHW DOMESTIC HOT WATER
DI DUCTILE IRON
DIA DIAMETER
DIAG DIAGONAL
DIM DIMENSION
DIR DIRECTION
DISC DISCONNECT
DIST DISTANCE
DL DEAD LOAD
DN DOWN
DOC DOCUMENT
DR DOOR, DRIVE
DR FR DOOR FRAME
DR OPN DOOR OPENING
DS DOWNSPOUT
DW DISHWASHER, DOMESTIC WATER
DWG(S) DRAWING(S)
DWL DOWEL
DX DIRECT EXPANSION
F
FDN, FDT FOUNDATION
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER CABINET
FED FEDERAL
FF FINISH FACE, FINISH FLOOR
FF EL FINISH FLOOR ELEVATION
FF INSUL FOIL FACED INSULATION
FF&E FURNITURE, FIXTURES & EQUIPMENT
FG FINISHED GRADE
FGL FIBERGLASS
FH FIRE HOSE
FHP FULL HEIGHT PARTITION
FIN FINISH
FIN BS FINISH BOTH SIDE
FIN GR FINISH GRADE
FIXT FIXTURE
FL FLOW LINE
FLA FULL LOAD AMPERES
FLDG FOLDING
FLEX FLEXIBLE
FLG FLOORING
FLMT FLUSH MOUNT
FLOUR FLOURESCENT
FLR FLOOR
FM FACTORY MUTUAL, FORCE MAIN, FREQUENCY
MODULATION
FO FAIL OPEN, FIBER OPTIC, FINISH OPENING
FOC FACE OF CONCRETE
FOM FACE OF MASONRY
FOW FACE OF WALL
FP FIRE PROTECTION
FPM FEET PER MINUTE
FR FIRE RATING, FIRE RESISTANT
FRG FIBER REINFORCED GYPSUM
FRP FIBERGLASS REINFORCED PLASTIC
FRTW FIRE RETARDANT TREATED WOOD
FS FAR SIDE, FEDERAL SPECIFICATION, FINISHED
SURFACE, FLOOR SINK
FSTNR FASTENER
FT FEET
FTG FOOTING
FU FUSE
FURG FURRING
FURN FURNITURE
FVNR FULL VOLTAGE, NON-REVERSING
FWC FABRIC WALL COVERING
FXTR FIXTURE
H
HP HIGH POINT, HORSEPOWER
HR HOUR
HS HEADED STUD
HSF HIGH FLOW SILT FENCE
HSS HOLLOW STRUCTURAL SECTION
HT, H HEIGHT
HVAC HEATING VENTILATION & AIR CONDITIONING
HW HOT WATER
HYDR HYDRAULIC
HZ HERTZ
H
HB HOSE BIBB
HC HANDICAP
HDPE HIGH DENSITY POLYETHYLENE
HDW HARDWARE
HDWD HARDWOOD
HDWL HEADWALL
HEF HIGH EXPANSION FOAM
HEPA HIGH EFFICIENCY PARTICULATE AIR (FILTER)
HH HANDHOLE
HID HIGH INTENSITY DISCHARGE
HM HOLLOW METAL
HMAC HOT MIX ASPHALT CONCRETE
HMD HOLLOW METAL DOOR
HMF HOLLOW METAL FRAME
HNDRL HANDRAIL
HOA HAND-OFF-AUTOMATIC
HORIZ HORIZONTAL
I
IAP INITIAL ACCUMULATION POINT
IBC INTERNATIONAL BUILDING CODE
ID INTERNAL DIAMETER
IDA INITIAL DECONTAMINATION AREA
IDS INTRUSION DETECTION SYSTEM
IN INCH
INCL INCLUDE
INL INLET
INT INTERIOR
INV INVERT
J
J-SIIDS JOINT-SERVICE INTERIOR INTRUSION
DETECTION SYSTEM
JAN JANITOR
JB JUNCTION BOX
JRCP JOINT REINFORCED CONCRETE PAVEMENT
JST JOIST
JT JOINT
K
K KILO, KIPS (1000LBS)
KAIC KILO AMPERE INTERRUPTING CAPACITY
KCMIL THOUSAND CIRCULAR MILS
KIT KITCHEN
KPD KEYPAD
KPL KICKPLATE
KV KILOVOLT
KVA KILOVOLT-AMPERE
KW KILOWATT
KWh KILOWATT HOUR
L
L ANGLE SHAPE, LENGTH, LONG
LAM LAMINATE
LAT LATERAL
LAV LAVATORY
LB, LBS POUND
LBP LEAD BASED PAINT
LBR LUMBER
LCP LEAD CONTAINING PAINT, LIGHTING CONTROL
PANEL
LDG LANDING
LE/FE LOW EMITTING AND FUEL EFFICIENT
LED LIGHT EMITTING DIODE
LF LINEAR FEET (LONG)
LFMC LIQUID-TIGHT FLEXIBLE METAL CONDUIT
LG LONG
LH LEFT HAND
LIB LIBRARY
LIN LINEAR
LKR LOCKER
LL LIVE LOAD
LLH LONG LEG HORIZONTAL
LLV LONG LEG VERTICAL
LNDSCP LANDSCAPE
LOC LOCATION
LP LOW POINT
LS LIME-STABILIZED, LUMP SUM
LSIG LONG TIME, SHORT TIME, INSTANTANEOUS,
GROUND FAULT
LT LEFT, LIGHT
LTG LIGHTING
LV LOW VOLTAGE
LVDR LOUVER DOOR
LVR LOUVER
LYR LAYER
1 1
A
M E
N D
M E
N T
B
ID
D E
R I N
Q U
IR
IE
S
N
O V
11/21/2025
W
2Q R
BA
1_
Pl an s-
R E
G I S
T
ERED ARCH
IT
E
C T
S T
A T E
O F T EX
A S
M A T
TH
EW THOMAS
H A
R E
2 2 8 5 3
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
J A
C O
B S
G O
V E
R N
M E
N T
S E
R V
IC
E
S C
O
T e xa s R e g is te re d E n g in e e ri n g F ir m
F -2
M a in
S tr e e t, F o rt
W o rt h
T X
F
IL
E N
A M
E
L O
U
IS
V
IL
L E
D
IS
T R
IC
T
L O
U
IS
V
IL
L E
K
E N
T U
C K
Y
R E
P A
IR
S
Q U
A D
R O
N O
P E
R A
T
IO
N S
B L D
G
H A
N G
A R
W E
S T
O V
E R
A R
B M
A U
S A
C E
P
A F
P R
O J E
C T
Y
T P
M
-0
CERTIFIED FINAL
V S
A R
O N
I
G
IN
G L
IS
M H
A R
E
M H
A R
E
J a c o b s P ro j.
N o
L
D A
R
D
E C
A-001
G E
N E
R A
L N
O T
E S
A N
D G
E N
E R
A L
D E
M O
L
IT
IO
N
P L A
N N
O T
E S
Y T
P M
-0
-A
-0
GENERAL DEMOLITION PLAN NOTES
1 DEMOLITION NOTES ARE TO DEFINE INTENT. DEMOLITION MUST INCLUDE ALL ITEMS INDICATED ON THE DEMOLITION PLANS AND ALL
OTHER ITEMS REQUIRED TO BE DEMOLISHED TO ACCOMPLISH NEW CONSTRUCTION AND FINISH INDICATED THROUGHOUT SET OF
CONTRACT DOCUMENTS
2 ALL DEMOLITION WORK MUST BE PERFORMED WITH "DUE CARE AND DILIGENCE" IN ORDER TO PREVENT ARBITRARY DAMAGE OR INTERRUPTION OF SERVICE OF CONCEALED UTILITIES INTENDED TO REMAIN IN SERVICE. DISCOVERY OF CONDITIONS LOCATED DIFFERENTLY FROM THAT INDICATED OR NOT IDENTIFIED, SHALL BE REPORTED TO THE CONTRACTING OFFICER PRIOR TO
DEMOLITION
3 THE INFORMATION ON THESE DEMOLITION SHEETS IS DIAGRAMMATIC AND IS NOT INTENDED TO SHOW EACH AND EVERY CONDITION
OF THE EXISTING BUILDING
4 EXISTING CONSTRUCTION SHOWN BASED UPON CONTRACTING OFFICER FURNISHED PLANS AND ONSITE OBSERVATIONS. ANY DISCREPANCIES BETWEEN DRAWINGS AND ACTUAL FIELD CONDITIONS MUST BE REPORTED TO THE CONTRACTING OFFICER PRIOR
TO PROCEEDING WITH WORK.
5 THE DEMOLITION IN HANGAR 1 WILL NOT BE COMPLETED ALL AT ONCE; IT WILL BE PHASED IN THREE (3) SEPERATE DEMOLITION AND
CONSTRUCTION PHASES. PHASES 3 AND 4 APPLY TO THE WEST AND SOUTH WINGS ONLY.
6 THE SCOPE OF DEMOLITION (WHERE APPLICABLE): REMOVE ALL EXISTING FLOOR FINISHES, WALL BASES, FURR-OUTS, PARTITIONS AND PORTIONS OF MASONRY WALLS (AS INDICATED IN PLANS), WAINSCOTS, CEILING SYSTEMS, UTILITY SUPPORTS AND OTHER MISCELLANEOUS, CONSTRUCTION UNLESS OTHERWISE NOTED TO PROVIDE A CLEAN SPACE TO INITIATE NEW CONSTRUCTION IN
THE AREAS DESIGNATED FOR NEW WORK.
7 FIELD VERIFY EXISTING CONDITIONS AND INFORM THE CONTRACTING OFFICER OF ANY DISCREPANCIES BETWEEN DRAWINGS AND
ACTUAL FIELD CONDITIONS PRIOR TO PROCEEDING WITH WORK.
8 COORDINATE WITH THE CONTRACTING OFFICER THE SCHEDULE OF WORK AND SAFETY DEMARCATIONS
9 COORDINATE WITH CONTRACTING OFFICER FOR DEMOLITION / STAGING SCHEDULE BEFORE DEMOLITION BEGINS
10 CONTRACTOR IS TO PROTECT AND MAINTAIN EXISTING ROOF, PLUMBING, ELEC, LIGHTING, AND FIRE PROTECTION THAT IS REQUIRED TO REMAIN IN SERVICE; REFER TO MECHANICAL, PLUMBING, ELECTRICAL, AND FIRE PROTECTION.
11 PROVIDE TEMPORARY AIR TIGHT DUST PARTITIONS TO SEPARATE AREAS OF DEMOLITION AND CONSTRUCTION FROM OCCUPIED AREAS; COORDINATE WITH FINISH WORK AND PHASING SCHEDULE. REFER TO SHEET A-600 FOR THE TEMPORARY DUST PARTITION
TYPE.
12 COORDINATE ALL DEMOLITION WORK WITH CONTRACTING OFFICER, AS PORTIONS OF FACILITY WILL CONTUNUE TO BE IN
OPERATION DURING THE LENGTH OF THE PROJECT.
13 THE CONTRACTOR IS TO STOP WORK IMMEDIATELY AND NOTIFY THE CONTRACTING OFFICER IF ASBESTOS CONTAINING MATERIALS
ARE DISCOVERED THAT ARE NOT SHOWN ON THE HAZMAT SHEETS H-001 THRU H-005.
14 VERIFY THAT AREAS REQUIRED TO REMAIN IN USE ARE SEPARATED PROPERLY FROM THOSE WHERE DEMOLITION WILL BE CONDUCTED, DUST CONTROLS ARE IN PLACE, FIRE SAFETY AND EXIT ROUTES ARE READIED FOR CONTINUOUS USE (PROPER
SIGNAGE, ILLUMINATION AND FIRE EXTINGUISHERS ARE IN PLACE), ETC.
15 REFER TO CIVIL, STRUCTURAL, MECHANICAL, ELECTRICAL, AND PLUMBING DRAWINGS FOR DEMOLITION OF ADDITIONAL ITEMS, TYPICAL FOR ALL AREAS.
16 IN THE AREAS DESIGNATED FOR NEW WORK ALL HOLES CREATED IN THE EXISTING ROOF, FROM THE REMOVAL OF EXISTING VENT PIPES, EXHAUST FANS, AND OTHER ITEMS, WILL BE PATCHED PER SMACNA AND TPO ROOFING GUIDELINES LISTED IN SPECIFICATION
SECTION 07 54 23 TO MAINTAIN EXISTING ROOF WARRANTY.
17 IN THE AREAS DESIGNATED FOR NEW WORK REMOVE ALL HARDWARE, HANGERS, ANCHOR SYSTEMS, MISC METAL ATTACHMENTS, ETC. PATCH AND FINISH TO MATCH ADJACENT SURFACE.
18 REFER TO STRUCTURAL FOR INSTALLATION OF NEW LINTELS, IN MASONRY WALL AREAS DESIGNATED TO BE OPENED. (DOORS, PASSAGE WAYS, DUCTWORK, ETC.)
19 REMOVE ALL ABANDONED CEILING SYSTEMS AND THEIR SUPPORTS. PROVIDE A CLEAN SPACE TO INITIATE NEW CONSTRUCTION.
20 COORDINATE WITH STRUCTURAL FOR AREAS OF EXISTING CONCRETE FLOOR AND ROOF THAT NEED TO BE OPENED FOR NEW
UTILITY INSTALLATIONS.
21 REFER TO STRUCTURAL, FIRE PROTECTION, PLUMBING, MECHANICAL, AND ELECTRICAL DRAWINGS FOR LOCATIONS OF ADDITIONAL
PENETRATIONS.
22 REPAIR AND FINISH ALL HOLES IN WALLS, UNDERSIDE OF CONCRETE DECKS AND FLOORS LEFT FROM REMOVAL OF HARDWARE, FASTENERS, DUCTS, PIPES, CONDUIT, ETC AND RESTORE TO ORIGINAL INTEGRITY; RE: STRUCTURAL, MECHANICAL, PLUMBING, ELECTRICAL
23 ALL MATERIALS REMOVED BY CONTRACTOR MUST BE DISPOSED OF BY CONTRACTOR AT AN OFF-SITE LOCATION, UNLESS
OTHERWISE NOTED BY CONTRACTING OFFICER.
24 REFER TO STRUCTURAL FOR SPECIFIC AREAS OF STRUCTURAL DEMOLITION.
25 PATCH AND REPAIR ALL HOLES IN WALLS, CEILINGS, CONCRETE COLUMNS, AND FLOORS PRODUCED DURING DEMOLITION. PATCH
TO MATCH ADJACENT CONSTRUCTION.
26 A HAZARDOUS MATERIALS SURVEY HAS BEEN CONDUCTED FOR HANGAR 1. SEE SPECIFICATIONS SECTION: 01 57 19.00 06 FOR THE INSPECTION REPORT. REPORT ANY SUSPICIOUS MATERIAL SUCH AS UNIDENTIFIED WASTE, IMPROPERLY STORED FUELS OR CHEMICALS, ETC NOT IDENTIFIED IN THE INSPECTION REPORT TO THE CONTRACTING OFFICER AND REQUEST GUIDANCE.
27 ONLY THE SINGLE-STORY, WEST WING ROOF OF THE HANGAR ROOF HAS BEEN INSPECTED FOR HAZARDOUS MATERIALS. THE CONTRACTOR MUST PERFORM TESTS AS NEEDED FOR HAZARDOUS MATERIALS PRIOR TO DISTURBING ROOF MATERIALS. THE CONTRACTOR IS RESPONSIBLE FOR PROPER HANDLING AND DISPOSAL OF ANY HAZARDOUS MATERIALS ENCOUNTERED.
28 CONTRACTOR IS TO PROTECT EXISTING CONCRETE ENCASED CRITICAL TIE RODS IN-LINE WITH THE STEEL ARCHES +/-9" UNDER
FLOOR SLAB OF THE CENTRAL BAY, NORTH WING, AND SOUTH WING.
29 AT SAW CUTS OF EXISTING CONCRETE FLOOR SLAB; COORDINATE WITH CONTRACTING OFFICER FOR SCHEDULING OF CUTTING OF FLOOR SLAB. CONTRACTOR TO OVERSEE CONCRETE FLOOR CUTTING PROCESS AND CONTROL / MITIGATE FLYING DUST. USE VACUUM CLEANER DURING CUTTING EXERCISE. NEW INFILL TO ALIGN WITH EXISTING ADJACENT FACE OF SLAB.
30 THE CONTRACTOR IS RESPONSIBLE FOR IMPLEMENTING ALL INSTRUCTIONS AND GUIDELINES IN THE HAZMAT REPORT AS FOUND IN SPECIFICATIONS FOR ALL ACTIVITIES ASSOCIATED WITH DEMOLITION AND REMEDIATION FOR ALL CONSTRUCTION ACTIVITIES
DURING THE BUILDING RENOVATION.
31 CONTRACTOR TO EXERCISE CARE DURING DEMOLITION OF AREAS LIKELY TO CONTAIN HIDDEN OR OBSCURED SYSTEMS BEYOND
FINISHED SURFACES.
32 THE CONTRACTOR MUST VERIFY CONSTRUCTION LAYOUT PRIOR TO COMMENCEMENT OF CONSTRUCTION.
33 CONTRACTOR SHOULD FIELD MEASURE ALL EXISTING OPENINGS WHERE DOORS AND WINDOWS WILL BE INSTALLED.
34 COORDINATE ALL NEW MEP OPENINGS REQUIRED IN THE HORIZONTAL ASSEMBLIES WITH OTHER DISCIPLINES.
35 REFER TO DEMOLITION ELEVATIONS ON SHEETS AD200 AND AD201 FOR REMOVAL OF EXISTING WINDOWS, DOORS, AND LOUVERS.
36 ALL EXISTING STEEL LINTELS ABOVE DOORS, WINDOWS, LOUVERS, AND OPENINGS SHALL BE CLEANED OF ALL VISIBLE RUST AND
OLD FINISHES, AND THEN PRIMED AND PAINTED.
37 IN FILL HOLES IN EXISTING SLAB AND FINISH AT LOCATIONS OF REMOVED PLUMBING DRAINS, VENTS, PIPES, ETC. PATCH TO MATCH
ADJACENT SURFACE
38 SHOULD CONSTRUCTION WORK REQUIRE WORK TO BE PERFORMED OUTSIDE THE PHASE 3 AND 4 LIMITS, REFER TO THE HAZARDOUS MATERIALS REPORT IN THE SPECIFICATIONS SECTION 01 57 19.00 06 FOR POTENTIAL ASBESTOS CONTAINING
MATERIALS (ACM) PRIOR TO BEGINNING THE WORK.
39 SHOULD CONSTRUCTION WORK REQUIRE WORK TO BE PERFORMED OUTSIDE THE PHASE 3 AND 4 LIMITS, REPAIR THE AREAS DISTURBED OR DAMAGED BY WORK DONE IN THAT AREA TO MATCH THE EXISTING FINISHES AND CONSTRUCTION.
40 ALL PAINTED SURFACES ARE ASSUMED TO CONTAIN LEAD AND WILL BE MANAGED IN ACCORDANCE WITH THE OSHA LEAD IN CONSTRUCTION STANDARD 29 CFR 1926.62. SEE SPECIFICATIONS SECTION: 01 57 19.00 06 FOR THE INSPECTION REPORT.
41 THE EXISTING C-5 TRAINING SIMULATOR ENCLOSURE IN THE CENTRAL BAY IS TO REMAIN IN PLACE AND MUST REMAIN IN OPERATION DURING CONSTRUCTION. PROTECT C-5 SIMULATOR AND ALL UTILITIES THAT SERVICE IT DURING CONSTRUCTION. ANY DISRUPTIONS IN UTILITY SERVICES TO THE C-5 SIMULATOR AND HANGAR 1 MUST BE COORDINATED WITH THE CONTRACTING OFFICER A MINIMUM
OF 15 CALENDAR DAYS IN ADVANCE.
GENERAL NOTES
1 HANGAR 1 IS AN ACTIVE BUILDING AND WILL CONTINUE TO BE USED WHILE THE RENOVATION WORK IS BEING DONE
2 COORDINATE WITH CONTRACTING OFFICER TO IDENTIFY SECURE AND/OR "OFF-LIMITS" AREAS IN THE HANGAR WHILE THE BUILDING
IS BEING RENOVATED.
3 REFER TO A-600 FOR PARTITION TYPES AND DETAILS.
4 DO NOT SCALE DRAWINGS FOR CONSTRUCTION PURPOSES.
5 BUILDING RENOVATION DRAWINGS INDICATE THE GENERAL INTENT OF DEMOLITION FOR THE PURPOSE OF CONSTRUCTING NEW SYSTEMS AND ASSEMBLIES. CARE HAS BEEN EXERCISED TO IDENTIFY THE EXISTING SERVICES (PLUMBING LINES, ELECTRICAL LINES, AND TELECOM LINES) AND EXISTING CONSTRUCTION DETAILS WHERE NEW CONSTRUCTION TAKES PLACE. EXISTING SERVICES TO REMAIN MUST STAY IN PLACE. HOWEVER, NOT ALL EXISTING CONDITIONS MAY BE INDICATED; YET THE CONTRACTOR IS NONE THE LESS RESPONSIBLE FOR CONSTRUCTING A COMPLETED PROJECT REGARDLESS OF ENCOUNTERED UNDOCUMENTED ASSEMBLIES AND SERVICES. ANY UNDOCUMENTED SERVICES AND ASSEMBLIES ENCOUNTERED DURING CONSTRUCTION SHALL BE IDENTIFIED TO THE CONTRACTING OFFICER AND DOCUMENTED. PRIOR TO REQUESTING ADDITIONAL INFORMATION, THE CONTRACTOR SHALL REVIEW ALL SIMILAR CONDITIONS AND PROPOSE AN ALTERNATIVE SOLUTION BASED ON A SIMILAR CONTRACT
DOCUMENT DETAIL
6 THERE IS NO EXISTING VAPOR BARRIER UNDER THE EXISTING LEVEL 1 SLAB. A FLUID APPLIED MOISTURE MITIGATING SEALER MUST BE APPLIED BEFORE INSTALLING NEW FLOOR FINISHES AND ADHESIVES ON THE EXISTING LEVEL 1 SLAB. CONTRACTOR MUST INSURE THAT THE MOISTURE MITIGATING SEALER IS COMPATIBLE WITH THE NEW FLOOR FINISHES AND ADHESIVES AND DOES NOT
VOID THE MANUFACTURER'S WARRANTY OF THE FLOOR FINISHES AND ADHESIVES.
7 REPAIR ANY HOLES IN EXISTING WALLS CAUSED BY PHASE 3 AND 4 CONSTRUCTION
8 VERIFY AND DOCUMENT CONDITIONS AND DIMENSIONS ON THE JOB.
9 VERIFY SIZE, LOCATIONS AND CHARACTERISTICS OF ALL EQUIPMENT TO BE FURNISHED WITH MANUFACTURERS OR SUPPLIERS
BEFORE BEGINNING CONSTRUCTION
10 VERIFY SIZE AND LOCATION OF ALL OPENINGS FOR EQUIPMENT AND RELATED WORK
11 ALL PLAN DIMENSIONS ARE TO FACE OF GYPSUM BOARD, FACE OF CONCRETE MASONRY UNITS OR CENTERLINE OF COLUMNS.
12 REFER TO MECHANICAL, PLUMBING AND ELECTRICAL DRAWINGS FOR ADDITIONAL LOCATIONS OF PENETRATIONS OCCURRING
WITHIN FLOOR, WALL, CEILING AND ROOF SYSTEMS.
13 REFER TO MECHANICAL, PLUMBING AND ELECTRICAL DRAWINGS FOR LOCATIONS OF EQUIPMENT NOT SHOWN ON ARCHITECTURAL
DRAWINGS.
14 COORDINATE LOCATIONS OF ALL NEW AND EXISTING FLOOR DRAINS, REFER TO PLUMBING.
15 THE LEAN TO'S FINISH FLOOR ELEVATION OF 0'-9" IS A RELATIVE ELEVATION USED FOR DESIGN COORDINATION WITHIN THE FACILITY. REFER TO CIVIL ENGINEERING DRAWING FOR ACTUAL TOPOGRAPHICAL ELEVATIONS.
16 THE PARTIAL DEMOLITION ASSOCIATED WITH PHASE 3 AND 4 WILL BASICALLY BE CONCENTRATED IN THE WEST WING AND THE FIRST AND SECOND FLOOR OF THE SOUTH WING. ADDITIONAL TEMPORARY DEMOLITION AND RENOVATION WORK WILL BE LOCATED IN THE INTERIOR MECHANICAL AREA IN THE CENTRAL BAY. REFER TO MEP FOR PARTIAL DEMOLITION OF EXISTING MEP
REQUIREMENTS AND TIMING REGARDING SYSTEMS.
17 AT THE INITIATION OF DEMOLITION WORK, COORDINATE WITH THE CONTRACTING OFFICER ON THE FOLLOWING: ACCESS TO THE HANGAR, ACCESS TO DESIGNATED PORTIONS OF THE HANGAR, ACCESS TO THE FLIGHT-LINE (THE BASE REQUIRES SPECIFIC ACTIONS AND METHODOLOGIES OF PROTECTION DUE TO SAFETY AND SECURITY IN THE FLIGHT-LINE AND
PROTECTION/SEPARATION REQUIREMENTS FOR PERSONNEL)
18 DURING THE DEMOLITION PROCESS, COORDINATE WITH THE CONTRACTING OFFICER ON THE FOLLOWING: SALVAGING OF SPECIFIC ITEMS, WORK SCHEDULES, AND AREAS THAT NEED TO BE SEPARATED BECAUSE OTHER PORTIONS OF THE HANGAR WILL REMAIN IN
USE.
19 COORDINATE WITH CONTRACTING OFFICER FOR DEMOLITION OF EXISTING SYSTEMS LOCATED BEYOND THE PERIMETER OF THE BUILDING (RE: CIVIL) AND PROTECTION/SEPARATION OF ADJACENT AREAS TO REMAIN IN USE.
20 VERIFY THAT AREAS REQUIRED TO REMAIN IN USE ARE SEPARATED PROPERLY FROM THOSE WHERE DEMOLITION WILL BE CONDUCTED, DUST CONTROLS ARE IN PLACE, FIRE SAFETY AND EXIT ROUTES ARE READIED FOR CONTINUOUS USE (PROPER
SIGNAGE, ILLUMINATION AND FIRE EXTINGUISHERS ARE IN PLACE), ETC.
21 COORDINATE WITH CONTRACTING OFFICER WHICH EXTERIOR DOOR IS GOING TO BE USED AT EACH PHASE OF DEMOLITION AND CONSTRUCTION AND INSTALL PROPER SEPARATION OF CIRCULATION AT EXTERIOR SPACES TO PREVENT THE MIX OF PERSONNEL
(MILITARY AND CONSTRUCTION)
22 FOR ADDITIONAL GENERAL AND DEMOLITION NOTES REFER THIS SHEET, FLOOR PLANS, AND ELEVATIONS.
23 REFER TO SHEET GI009 FOR AIR BARRIER BOUNDARIES FOR THE PHASE III AND IV SCOPE OF WORK.
A
M E
N D
M E
N T
B
ID
D E
R I N
Q U
IR
IE
S
N
O V
11/21/2025
W
2Q R
BA
1_
Pl an s-
A B C
2.8
3.8
4.8
5.8
MATCHLINE
REFER A6 AD111
AD201
B5
AD200
D5
056056
054025
025 054
056056
056 027
025 003
033033033
025054
054014
UCC/
FLYING
SUPER
OPS
OFFICER
SECRETARY
1110OPS
OFFICER
WOMEN'S
MEN'S
MECH
FOYER
LOBBY
MECH
GEN
STOR
CLASSIFIED
WORKSTATIONS
INTEL
WORK
AREA
TACTICS
OFFICE
1114.1
TACTICS
TESTING
HALL
MECH
UCC/
FLYING
SUPER
1109.1
CLASSIFIED
TRNG
SIMULATOR
ROOM
AIRCREW
BRIEFING
RM
106052
049 106
014 054
014 029029
054014025
052052
TYP
3'-0"
108108
042042
AD201
A5
061 061
052052
9'-0"
054014
T Y
P
027027
033033
BOILER
STORAGE
1119.1 033
014 054
A B C
8.2
9.2
10.2
10.8
11.8
MATCHLINE
REFER A2 AD111
M A
T C
H L
IN
E
R E
F E
R D
A
D
ELECTRICAL
025 014
AIRCREW
BRIEFING
RM
AFE
EQUIP
STORAGE
1125.2
COMPUTER
WORK
STATIONS
AFE
WORK
1125.1
AFE
SUPER
BREAK
RM
AFE
WORK
STATION
AFE
EQUIP
STORAGE
AFE
CLASSRM
054054
073073
108108
014 054
025054
014 054
025014 054
161161
AREA OF EXIST MASONRY WALL TO
BE REMOVED; REFER TO STRUCT
FOR NEW LINTELS
APPROX LOCATION AND SIZE OF
CONC FLOOR SLAB TO BE REMOVED
FOR NEW WORK. RE: MEP AND
STRUCT FOR BACK-FILL. BACK-FILL
TO ALIGN WITH EXIST FACE OF SLAB.
EXISTING PARTITION TO BE REMOVED
REMOVE EXISTING DOOR AND
DOOR FRAME SYSTEM, UNO
LEGEND
EXISTING PARTITION TO REMAIN
R E
G I S
T
ERED ARCH
IT
E
C T
S T
A T E
O F T EX
A S
M A T
TH
EW THOMAS
H A
R E
2 2 8 5 3
164 8268
SCALE: 1/8"=1'-0"
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
J A
C O
B S
G O
V E
R N
M E
N T
S E
R V
IC
E
S C
O
T e xa s R e g is te re d E n g in e e ri n g F ir m
F -2
M a in
S tr e e t, F o rt
W o rt h
T X
F
IL
E N
A M
E
L O
U
IS
V
IL
L E
D
IS
T R
IC
T
L O
U
IS
V
IL
L E
K
E N
T U
C K
Y
R E
P A
IR
S
Q U
A D
R O
N O
P E
R A
T
IO
N S
B L D
G
H A
N G
A R
W E
S T
O V
E R
A R
B M
A U
S A
C E
P
A F
P R
O J E
C T
Y
T P
M
-0
CERTIFIED FINAL
C
D
AREAS C&D
KEY PLANKEY PLAN
V S
A R
O N
I
G
IN
G L
IS
M H
A R
E
M H
A R
E
J a c o b s P ro j.
N o
L
D A
R
D
E C
AD111
P A
R T
IA
L
D E
M O
L
IT
IO
N
P L A
N S
L E
V E
L
A
R E
A S
C A
N D
D
Y T
P M
-0
-A
D
SCALE 1/8" = 1'-0"A2
PARTIAL DEMOLITION PLAN - LEVEL 1 - AREA C
SCALE 1/8" = 1'-0"A6
PARTIAL DEMOLITION PLAN - LEVEL 1 - AREA D
GENERAL NOTES - DEMO PLANS
A REFER TO GI003 FOR ABBREVIATIONS.
B REFER TO A-001 FOR GENERAL NOTES, GENERAL DEMOLITION PLAN
NOTES, AND SYMBOLS.
C REFER TO AD140 EXISTING ROOM FINISH SCHEDULE.
D FF&E REMAINING AFTER GOVERNMENT PERSONNEL MOVE OUT WILL BE
REMOVED FROM BUILDING AND DISPOSED OF BY THE GENERAL
CONTRACTOR.
E REMOVE FURRING PARTITION AT EXTERIOR WALLS. EXTERIOR MASONRY
WALL TO REMAIN. CLEAN AND PREP FOR APPLICATION OF FLUID APPLIED
AIR BARRIER. TYPICAL AT ALL EXTERIOR WALLS.
KEYNOTES
001 REMOVE SIGNAGE AND ATTACHMENTS; INFILL ANY HOLES TO MATCH
EXTERIOR FINISHES AS REQUIRED. RETURN OR DISPOSE OF SIGNAGE AS
INSTRUCTED BY CONTRACTING OFFICER.
003 REMOVE DOOR AND FRAME SYSTEM. INFILL WALL, REFER TO PLANS.
006 CONTRACTOR TO REMOVE AWNING AND SALVAGE FOR REINSTALLATION
ONCE THE ENTRY STOREFRONT HAS BEEN REPLACED AND MASONRY
REPAIRS HAVE BEEN MADE AT THIS LOCATION. REFER TO PLANS AND
EXTERIOR ELEVATIONS.
007 REMOVE BRICK MASONRY PANEL FROM MASONRY OPENING; PROTECT
REMAINING PERIMETER MASONRY AND SILL.
009 REMOVE FURRED WALL UNDER BASE HEATERS.
011 REMOVE PORTION OF WALL FOR NEW DOOR, REFER TO FLOOR PLAN
014 REMOVE ALL FLOOR FINISHES AND BASE TRIM IN THIS AREA.
022 SALVAGE OVERHEAD PROJECTOR AND RETURN TO CONTRACTING
OFFICER.
025 REMOVE CEILING, LIGHTING, DIFFUSERS, AND ASSOCIATED CEILING
MOUNTED EQUIPMENT IN THIS AREA. REFER TO MECHANICAL AND
ELECTRICAL
026 REMOVE WALK-OFF MAT.
027 REMOVE CASEWORK AND COUNTERS.
028 REMOVE 6" TALL RAISED PLATFORM AND RAMP.
029 SALVAGE DISPLAY CASE AND OR MARKER BOARD; RETURN TO
CONTRACTING OFFICER.
030 SALVAGE WALL-MOUNTED FLAT TELEVISION AND RETURN TO
CONTRACTING OFFICER.
033 REMOVE HVAC UNIT, DUCTWORK, AND ASSOCIATED SUPPORTS AND
WIRING; REFER TO MEP FOR ADDITIONAL DEMOLITION NOTES.
038 REMOVE STEEL ENTRY CANOPY AND SUPPORTING STRUCTURE. PATCH
AND REPAIR EXTERIOR MASONRY WALL AS NEEDED WITH BRICK TO
MATCH EXISTING.
042 REMOVE PORTION OF WALL TO ALLOW FOR ACCESS TO INSTALL
PREFINISHED ALUMINUM WINDOWS, REFER TO PLANS. TYPICAL
044 HVAC EQUIPMENT TO REMAIN. PROTECT DURING CONSTRUCTION; REFER
TO MEP.
049 STEEL COLUMNS TO REMAIN. CLEAN OFF ANY LOOSE PAINT AND PREPARE
FOR NEW FINISHES, REFER TO PLANS.
050 REMOVE AND DISPOSE OF AUDITORIUM SEATING AND ASSOCIATED
HARDWARE.
052 SALVAGE PROJECTION SCREEN SYSTEM AND RETURN TO CONTRACTING
OFFICER.
054 REMOVE VINYL WALLCOVERING FROM WALLS AND PREPARE WALL FOR
PAINT, TYPICAL
056 REMOVE WINDOW AND/OR DOOR SYSTEM AND INTERIOR WINDOW SILL.
EXTERIOR WINDOW SILL TO REMAIN; PROTECT.
057 REMOVE AND DISPOSE DEMOUNTABLE PARTITIONS
058 REMOVE FLOOR MOUNTED ACCESS GRATE AND PREPARE OPENING FOR
NEW FLOOR MOUNTED ACCESS HATCH, REFER TO FLOOR PLAN
061 REMOVE DISPOSE OF ACCORDION PARTITION, TRACK, GYPSUM BOARD
CEILING AND SUPPORT STRUCTURE ABOVE.
062 FIRE PROTECTION EQUIPMENT TO REMAIN. PROTECT DURING
CONSTRUCTION, REFER TO FIRE PROTECTION.
065 ROOF DRAIN SYSTEM AND LEADERS TO REMAIN, REFER TO PLUMBING.
073 REMOVE PLUMBING FIXTURES, REFER TO PLUMBING
077 EXISTING EXHAUST CHASE TO REMAIN, PROTECT DURING
CONSTRUCTION.
078 REMOVE FIRE EXTINGUISHER CABINET; PATCH AND REPAIR WALL
097 REMOVE BASE HEATERS, TYPICAL, RE: MECHANICAL
098 TEMPORARY DUST PARTITION AND DOOR; REFER TO PARTITION TYPES.
DOOR TO HAVE DUST/SOUND SEALS AND LOCKABLE DOOR HARDWARE.
REMOVE AT COMPLETION OF CONSTRUCTION. REPAIR ANY DAMAGED
FINISHES FROM PARTITION REMOVAL.
106 SALVAGE SMART BOARD SYSTEM AND RETURN TO CONTRACTING
OFFICER.
108 REMOVE WOOD CHAIR RAIL FROM ALL WALLS, TYPICAL
120 REMOVE ELECTRICAL PANELS AND ASSOCIATED CONDUIT, REFER TO
ELECTRICAL DRAWINGS.
146 REMOVE ACOUSTIC PANELS, WOOD CHAIR RAIL, AND PREPARE WALL FOR
PAINT
150 ELECTRICAL DISPLAY TO REMAIN IN PLACE; PROTECT DURING
CONSTRUCTION.
161 REMOVE ELECTRICAL EQUIPMENT, REFER TO ELECTRICAL
172 REMOVE CONCRETE CURB. SAW CUT TO BE FLUSH WITH EXISTING
CONCRETE FLOOR.
' ' 000
TRUE NORTHTRUE NORTH
1 1
1 1
A
M E
N D
M E
N T
B
ID
D E
R I N
Q U
IR
IE
S
N
O V
11/21/2025
W
2Q R
BA
1_
Pl an s-
UP
COMPUTER
RM
C D E F G H
11.8
UP
M A
T C
H L
IN
E
R E
F E
R A
A
D
M A
T C
H L
IN
E
R E
F E
R A
A
D
ELECTRICAL
TRASH /
RECYCLE
AD201
E5
014025
056056056056 056056 056 056
014025
014 025
014025
014 025
014 025
014 025
097 012
014025
014 025
078333
FLIGHT
SAFETY
PARTS
STOR
MECH
CONFERENCE
RM
CC
ADMIN
DEPUTY
RESOURCE
ADVISOR
STOR
HALL
FLT
SAFETY
MAINT
SUPER
FLT
SAFETY
PARTS
STORAGE
STAIR
FLT
SAFETY
TECH
HALL
1178 PRINTER/FAX
025025014054
014 025
054 014
040 040
172120
120120
097097
161 068
333333
I J K L M N
M A
T C
H L
IN
E
R E
F E
R D
A
D
TRASH /
RECYCLE
COMM
ELEV
LOBBY
ELEC
ELEVATOR
MACHINE
ROOM
STAIR 3
AD201
C5
AD201
A1
AD201
A4
097 097
014 025
029 029029014025 014025
057 057
012 057 012
056 056 056
GEN
STORAGE
ORDERLY
ROOM
014 025
056 056
056 056056
014025054
EXEC
OFFICER
PERSONELIST
SELF
INSPECTOR
1150.1
CAREER
ADVISOR
STOR
MECH
WOMEN'S
MEN'S
SHOWER
1155.1
GARAGE
STAIR
MECH
WOMEN'S
SHOWER
1154.1
MEN'S
GEN
STORAGE
1156.2
GEN
STORAGE
1156.1
HALL
HALL
PRINTER/FAX
E X
IS
T
IN
G
C
O N
S T
R U
C T
IO
N
L
IM
IT
E
D W
O
K
T
H
IS
A R
E A
R E
N O
V A
T
IO
N S
C O
P E
F W
O R
K I
N T
H
IS
A R
A
120120
055055
(ABOVE)
AREA OF EXIST MASONRY WALL TO
BE REMOVED; REFER TO STRUCT
FOR NEW LINTELS
APPROX LOCATION AND SIZE OF
CONC FLOOR SLAB TO BE REMOVED
FOR NEW WORK. RE: MEP AND
STRUCT FOR BACK-FILL. BACK-FILL
TO ALIGN WITH EXIST FACE OF SLAB.
EXISTING PARTITION TO BE REMOVED
REMOVE EXISTING DOOR AND
DOOR FRAME SYSTEM, UNO
LEGEND
EXISTING PARTITION TO REMAIN
R E
G I S
T
ERED ARCH
IT
E
C T
S T
A T E
O F T EX
A S
M A T
TH
EW THOMAS
H A
R E
2 2 8 5 3
164 8268
SCALE: 1/8"=1'-0"
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
G H
J A
C O
B S
G O
V E
R N
M E
N T
S E
R V
IC
E
S C
O
T e xa s R e g is te re d E n g in e e ri n g F ir m
F -2
M a in
S tr e e t, F o rt
W o rt h
T X
F
IL
E N
A M
E
L O
U
IS
V
IL
L E
D
IS
T R
IC
T
L O
U
IS
V
IL
L E
K
E N
T U
C K
Y
R E
P A
IR
S
Q U
A D
R O
N O
P E
R A
T
IO
N S
B L D
G
H A
N G
A R
W E
S T
O V
E R
A R
B M
A U
S A
C E
P
A F
P R
O J E
C T
Y
T P
M
-0
CERTIFIED FINAL
AREAS G&H
KEY PLANKEY PLAN
V S
A R
O N
I
G
IN
G L
IS
M H
A R
E
M H
A R
E
J a c o b s P ro j.
N o
L
D A
R
D
E C
AD112
P A
R T
IA
L
D E
M O
L
IT
IO
N
P L A
N S
L E
V E
L
A
R E
A S
G A
N D
H
Y T
P M
-0
-A
D
SCALE 1/8" = 1'-0"D6
PARTIAL DEMOLITION PLAN - LEVEL 1 - AREA G
SCALE 1/8" = 1'-0"A6
PARTIAL DEMOLITION PLAN - LEVEL 1 - AREA H
GENERAL NOTES - DEMO PLANS
A REFER TO GI003 FOR ABBREVIATIONS.
B REFER TO A-001 FOR GENERAL NOTES, GENERAL DEMOLITION PLAN
NOTES, AND SYMBOLS.
C REFER TO AD140 EXISTING ROOM FINISH SCHEDULE.
D FF&E REMAINING AFTER GOVERNMENT PERSONNEL MOVE OUT WILL BE
REMOVED FROM BUILDING AND DISPOSED OF BY THE GENERAL
CONTRACTOR.
E REMOVE FURRING PARTITION AT EXTERIOR WALLS. EXTERIOR MASONRY
WALL TO REMAIN. CLEAN AND PREP FOR APPLICATION OF FLUID APPLIED
AIR BARRIER. TYPICAL AT ALL EXTERIOR WALLS.
KEYNOTES
003 REMOVE DOOR AND FRAME SYSTEM. INFILL WALL, REFER TO PLANS.
010 CEILING ABOVE TO REMAIN, REPAIR AS NEEDED AND PROTECT DURING
CONSTRUCTION.
012 REMOVE GYPSUM BOARD FURRING AROUND STEEL STRUCTURE.
PROTECT STRUCTURE DURING CONSTRUCTION.
014 REMOVE ALL FLOOR FINISHES AND BASE TRIM IN THIS AREA.
025 REMOVE CEILING, LIGHTING, DIFFUSERS, AND ASSOCIATED CEILING
MOUNTED EQUIPMENT IN THIS AREA. REFER TO MECHANICAL AND
ELECTRICAL
026 REMOVE WALK-OFF MAT.
029 SALVAGE DISPLAY CASE AND OR MARKER BOARD; RETURN TO
CONTRACTING OFFICER.
030 SALVAGE WALL-MOUNTED FLAT TELEVISION AND RETURN TO
CONTRACTING OFFICER.
039 REMOVE FLOOR FINISHES FROM EXISTING STAIR, TYPICAL.
040 ELECTRICAL AND MECHANICAL EQUIPMENT TO REMAIN IN THIS AREA,
PROTECT DURING CONSTRUCTION. REFER TO MECHANICAL AND
ELECTRICAL
041 THE EXISTING C-5 TRAINING SIMULATOR ENCLOSURE IN THE CENTRAL
BAY IS TO REMAIN IN PLACE AND MUST REMAIN IN OPERATION DURING
CONSTRUCTION. PROTECT C-5 SIMULATOR AND ALL UTILITIES THAT
SERVICE IT DURING CONSTRUCTION. ANY DISRUPTIONS IN UTILITY
SERVICES TO THE C-5 SIMULATOR AND HANGAR 1 MUST BE
COORDINATED WITH THE CONTRACTING OFFICER A MINIMUM OF 15
CALENDAR DAYS IN ADVANCE.
042 REMOVE PORTION OF WALL TO ALLOW FOR ACCESS TO INSTALL
PREFINISHED ALUMINUM WINDOWS, REFER TO PLANS. TYPICAL
048 REMOVE LOUVER IN WALL AND INFILL OPENING, REFER TO FLOOR PLANS.
053 REFINISH WOOD HANDRAILS. CLEAN AND PREPARE METAL RAILINGS AND
STAIRS FOR PAINT. REPLACE MISSING DECORATIVE TRIM. REFER TO
INTERIORS FOR FINISHES.
054 REMOVE VINYL WALLCOVERING FROM WALLS AND PREPARE WALL FOR
PAINT, TYPICAL
055 REMOVE METAL FLOOR GRATE AND INFILL OPENING IN FLOOR.
CONCRETE BACKFILL TO BE FLUSH WITH FACE OF EXISTING STRUCTURE.
REFER TO STRUCTURAL FOR FLOOR INFILL DETAIL.
056 REMOVE WINDOW AND/OR DOOR SYSTEM AND INTERIOR WINDOW SILL.
EXTERIOR WINDOW SILL TO REMAIN; PROTECT.
057 REMOVE AND DISPOSE DEMOUNTABLE PARTITIONS
066 REMOVE FLOOR DRAIN, INFILL HOLE IN FLOOR WITH CONCRETE TO BE
FLUSH WITH FACE OF EXISTING SLAB. REFER TO PLUMBING.
068 REMOVE FURRING PARTITION AT EXTERIOR WALLS. EXTERIOR MASONRY
WALL TO REMAIN. CLEAN AND PREP FOR APPLICATION OF FLUID APPLIED
AIR BARRIER. TYPICAL AT ALL EXTERIOR WALLS.
073 REMOVE PLUMBING FIXTURES, REFER TO PLUMBING
078 REMOVE FIRE EXTINGUISHER CABINET; PATCH AND REPAIR WALL
079 REPLACE EXISTING DOOR WITH NEW HM DOOR WITHOUT HOLES FOR
HARDWARE, UNDER CUT DOOR 1", AND WELD SHUT, PREPARE FOR
PAINT. INFILL EXISTING OPENING, REFER TO DETAIL A3/A-620
091 REMOVE AND REPLACE TOILET, ASSOCIATED ACCESSORIES, AND TOILET
PARTITION. REFER TO PLANS, AND INTERIORS FOR FINISHES.
097 REMOVE BASE HEATERS, TYPICAL, RE: MECHANICAL
120 REMOVE ELECTRICAL PANELS AND ASSOCIATED CONDUIT, REFER TO
ELECTRICAL DRAWINGS.
161 REMOVE ELECTRICAL EQUIPMENT, REFER TO ELECTRICAL
172 REMOVE CONCRETE CURB. SAW CUT TO BE FLUSH WITH EXISTING
CONCRETE FLOOR.
333 REMOVE MECHANICAL EQUIPMENT, REFER TO MECHANICAL.
' ' 000
TRUE NORTH
A
M E
N D
M E
N T
B
ID
D E
R I N
Q U
IR
IE
S
N
O V
11/21/2025
W
2Q R
BA
1_
Pl an s-
C D E F G H
11.8
M A
T C
H L
IN
E
R E
F E
R A
A
D
AD201
E5
056 056 056 056 056
056056056
030 029
COPY/FAX
SITE
MGR
CBT RM
INSTRUCTOR'S
OFFICE
WAITING
RM
GEN
STOR
BREAK
TEST
INSTRUCTOR
CLASS
RM
CLASS
RM
CLASS
RM
CLASS
RM
CLASS
RM
LOADMASTER
INSTRUCTOR
OFFICE
GEN
STOR
MECH
2204.1
HALL
STAIR
HALL
HALL
HALL
I J K L M N
M A
T C
H L
IN
E
R E
F E
R D
A
D
AD201
C5
AD201
A1
AD201
A4
056056056056056056056056
080 080 080
COPY/FAX
SITE
MGR
CBT
CURRENT
OPS
STOR
MECH
MEN'S
CC
1ST SGT
HALL
HALL
2253 STAIR
CLOS
STUDY
TRAINING
MECH
JC
MECH
E X
IS
T
G
C
N
S T
R U
C T
IO
N
L
IM
IT
E
D W
O
K
H
IS
A R
E A
R E
N O
V A
T
IO
N S
C O
P
W
O R
K I
N T
H
IS
A R
A
025 014
025014
031036
073011
025 014
025014
AREA OF EXIST MASONRY WALL TO
BE REMOVED; REFER TO STRUCT
FOR NEW LINTELS
APPROX LOCATION AND SIZE OF
CONC FLOOR SLAB TO BE REMOVED
FOR NEW WORK. RE: MEP AND
STRUCT FOR BACK-FILL. BACK-FILL
TO ALIGN WITH EXIST FACE OF SLAB.
EXISTING PARTITION TO BE REMOVED
REMOVE EXISTING DOOR AND
DOOR FRAME SYSTEM, UNO
LEGEND
EXISTING PARTITION TO REMAIN
R E
G I S
T
ERED ARCH
IT
E
C T
S T
A T E
O F T EX
A S
M A T
TH
EW THOMAS
H A
R E
2 2 8 5 3
164 8268
SCALE: 1/8"=1'-0"
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
G H
J A
C O
B S
G O
V E
R N
M E
N T
S E
R V
IC
E
S C
O
T e xa s R e g is te re d E n g in e e ri n g F ir m
F -2
M a in
S tr e e t, F o rt
W o rt h
T X
TRUE NORTH
F
IL
E N
A M
E
L O
U
IS
V
IL
L E
D
IS
T R
IC
T
L O
U
IS
V
IL
L E
K
E N
T U
C K
Y
R E
P A
IR
S
Q U
A D
R O
N O
P E
R A
T
IO
N S
B L D
G
H A
N G
A R
W E
S T
O V
E R
A R
B M
A U
S A
C E
P
A F
P R
O J E
C T
Y
T P
M
-0
CERTIFIED FINAL
AREAS G&H
KEY PLANKEY PLAN
V S
A R
O N
I
G
IN
G L
IS
M H
A R
E
M H
A R
E
J a c o b s P ro j.
N o
L
D A
R
D
E C
AD122
P A
R T
IA
L
D E
M O
L
IT
IO
N
P L A
N S
L E
V E
L
A
R E
A S
G A
N D
H
Y T
P M
-0
-A
D
SCALE 1/8" = 1'-0"D5
PARTIAL DEMOLITION PLAN - LEVEL 2 - AREA G
SCALE 1/8" = 1'-0"A5
PARTIAL DEMOLITION PLAN - LEVEL 2 - AREA H
GENERAL NOTES - DEMO PLANS
A REFER TO GI003 FOR ABBREVIATIONS.
B REFER TO A-001 FOR GENERAL NOTES, GENERAL DEMOLITION PLAN
NOTES, AND SYMBOLS.
C REFER TO AD140 EXISTING ROOM FINISH SCHEDULE.
D FF&E REMAINING AFTER GOVERNMENT PERSONNEL MOVE OUT WILL BE
REMOVED FROM BUILDING AND DISPOSED OF BY THE GENERAL
CONTRACTOR.
E REMOVE FURRING PARTITION AT EXTERIOR WALLS. EXTERIOR MASONRY
WALL TO REMAIN. CLEAN AND PREP FOR APPLICATION OF FLUID APPLIED
AIR BARRIER. TYPICAL AT ALL EXTERIOR WALLS.
KEYNOTES
008 REMOVE WALL MOUNTED AIR CONDITIONING WINDOW UNIT; RETURN TO
CONTRACTING OFFICER. INFILL OPENING IN WALL TO MATCH EXISTING
ADJACENT WALLS.
011 REMOVE PORTION OF WALL FOR NEW DOOR, REFER TO FLOOR PLAN
012 REMOVE GYPSUM BOARD FURRING AROUND STEEL STRUCTURE.
PROTECT STRUCTURE DURING CONSTRUCTION.
014 REMOVE ALL FLOOR FINISHES AND BASE TRIM IN THIS AREA.
023 REMOVE JANITOR SINK AND WALL MOUNTED ACCESSORIES. REFER TO
PLUMBING.
024 SALVAGE OVERHEAD PROJECTION SYSTEM; RETURN TO CONTRACTING
OFFICER.
025 REMOVE CEILING, LIGHTING, DIFFUSERS, AND ASSOCIATED CEILING
MOUNTED EQUIPMENT IN THIS AREA. REFER TO MECHANICAL AND
ELECTRICAL
029 SALVAGE DISPLAY CASE AND OR MARKER BOARD; RETURN TO
CONTRACTING OFFICER.
030 SALVAGE WALL-MOUNTED FLAT TELEVISION AND RETURN TO
CONTRACTING OFFICER.
031 REMOVE TILE FLOOR, WAINSCOT, TOILET PARTITIONS, AND ACCESSORIES
036 REMOVE HVAC VENT/DUCTWORK; REFER TO MECHANICAL.
039 REMOVE FLOOR FINISHES FROM EXISTING STAIR, TYPICAL.
045 DEMOLISH PORTION OF EXISTING +/- 13'-0" TALL MASONRY WALL TO 3'-6"
AFF, AND PREP FOR NEW CAP
049 STEEL COLUMNS TO REMAIN. CLEAN OFF ANY LOOSE PAINT AND
PREPARE FOR NEW FINISHES, REFER TO PLANS.
053 REFINISH WOOD HANDRAILS. CLEAN AND PREPARE METAL RAILINGS AND
STAIRS FOR PAINT. REPLACE MISSING DECORATIVE TRIM. REFER TO
INTERIORS FOR FINISHES.
056 REMOVE WINDOW AND/OR DOOR SYSTEM AND INTERIOR WINDOW SILL.
EXTERIOR WINDOW SILL TO REMAIN; PROTECT.
059 REMOVE WALL MOUNTED METAL ACCESS LADDER AND PATCH HOLES IN
WALL
068 REMOVE FURRING PARTITION AT EXTERIOR WALLS. EXTERIOR MASONRY
WALL TO REMAIN. CLEAN AND PREP FOR APPLICATION OF FLUID APPLIED
AIR BARRIER. TYPICAL AT ALL EXTERIOR WALLS.
073 REMOVE PLUMBING FIXTURES, REFER TO PLUMBING
078 REMOVE FIRE EXTINGUISHER CABINET; PATCH AND REPAIR WALL
080 REMOVE STEEL PIPE RAILING. EXISTING CONC CURB TO REMAIN. PATCH,
FINISH, AND PAINT EXPOSED FACE OF CONC CURB
120 REMOVE ELECTRICAL PANELS AND ASSOCIATED CONDUIT, REFER TO
ELECTRICAL DRAWINGS.
143 ROOF BELOW; REFER TO AD130.
333 REMOVE MECHANICAL EQUIPMENT, REFER TO MECHANICAL.
335 REMOVE STEEL ACCESS STAIRS TO EXTENTS SHOWN. ANCHOR
REMAINING STAIRS TO STEEL STRUCTURE ABOVE, PROTECT REMAINING
STAIRS DURING CONSTRUCTION. REFER: G8/AD210.
351 EXISTING ROOF BELOW.
' ' 000
A
M E
N D
M E
N T
B
ID
D E
R I N
Q U
IR
IE
S
N
O V
11/21/2025
W
2Q R
BA
1_
Pl an s-
M M
G H I J K L M NJ.1 K.1 L.1 M.1 M.9I.1G.6G.2
7.5
STORAGE
STORAGE
COPY/BREAK
SITE
MGR
VTRAT
FLIGHT
SAFETY
SUPR
INSTRUCTORS
FLIGHT
TECHS
COPY
TRAINING
TRAINING
TRAINING
TRAINING
10'-3"
UC2
USH1
ETB5 ETB5 ETB5 ETB5 ETB5
ETB5 ETB5 ETB5 ETB5 ETB5
UMC1
UL1
ECH1
ECH1
ECH1
ECH1
UTV6
ETB4
UAV3
UTV3
UTV4
UTV5
UAV2
ETB6
ECH1
ECH2
ECH2
ECH2
UAV1 ECH1ECH1 ECH1 ECH1 ECH1
ECH1ECH1ECH1ECH1ECH1
ECH2
ECH2 ECH2
ECH2
ETB4
ECH1
ECH1
UST1
EST1
EST2
EST1
UTV1
EMB1
ED3
ED3
ED3
ED3
ED3
ECH1
ECH1
ECH1
ECH1
ECH1ECH1
ECH1
ED2 ED2 ED2
ECH2
ECH2
ECH2
ECH2
ECH2
ECH2
ECH2
ECH2
ECH2 ECH2
ECH2ECH1
TRAINING
TRAINING
UTV2
ETB3
ED1
ECH1
EST1
ETB3
ED1
ECH2
ECH1
ETB2
EQ7
UCBT1
UCBT1
UCBT1
UCBT1
UAP1 UAP2 UAP3 UAP4ETB7
ECH2
R E
G I S
T
ERED ARCH
IT
E
C T
S T
A T E
O F T EX
A S
M A T
TH
EW THOMAS
H A
R E
2 2 8 5 3
164 8268
SCALE: 1/8"=1'-0"
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
J A
C O
B S
G O
V E
R N
M E
N T
S E
R V
IC
E
S C
O
T e xa s R e g is te re d E n g in e e ri n g F ir m
F -2
M a in
S tr e e t, F o rt
W o rt h
T X
TRUE NORTH
F
IL
E N
A M
E
L O
U
IS
V
IL
L E
D
IS
T R
IC
T
L O
U
IS
V
IL
L E
K
E N
T U
C K
Y
R E
P A
IR
S
Q U
A D
R O
N O
P E
R A
T
IO
N S
B L D
G
H A
N G
A R
W E
S T
O V
E R
A R
B M
A U
S A
C E
P
A F
P R
O J E
C T
Y
T P
M
-0
CERTIFIED FINAL
V S
A R
O N
I
G
IN
G L
IS
M H
A R
E
M H
A R
E
J a c o b s P ro j.
N o
L
D A
R
D
E C
AE170
IN
T
E R
IO
R
T E
M P
O R
A R
Y C
U S
T O
M E
R F
A C
IL
IT
Y P
L A
N
Y T
P M
-0
-A
E
SCALE 1/8" = 1'-0"A7
INTERIOR TEMPORARY CUSTOMER FACILITY PLAN
KEYNOTES
162 WALL MOUNTED COMM EQUIPMENT, REFER TO TELECOMM
GENERAL NOTES - TEMPORARY TRAILERS
A TRAILER LAYOUTS ARE BASED ON EXISTING FURNITURE.
REFER TO SHEETS ID140 THRU ID145 FOR LOCATION OF
EXISTING FURNITURE. REFER TO SHEET ID145 FOR
EXISTING FURNITURE SCHEDULE. CONFIRM USER
PROVIDED ITEMS WITH USER BEFORE DEMOLITION.
B FURNITURE IS CFCI UNLESS OTHERWISE NOTED. REFER TO
SPEC SECTION: 01 50 00 TEMPORARY FACILITIES AND
CONTROLS FOR BASIS OF DESIGN.
C CONTRACTOR TO VERIFY FURNITURE REQUIREMENTS AND
LAYOUT WITH CONTRACTING OFFICER.
D FOR ADDITIONAL INFORMATION REFER TO SPEC SECTION:
01 52 00 TEMPORARY CUSTOMER FACILITIES AND
CONTROLS.
E PROVIDE WALL BLOCKING FOR ALL WALL MOUNTED TVS,
MONITORS, AND MARKERBOARDS.
' ' 000
FURNISHED TEMPORARY TRAILER FURNITURE SCHEDULE
ITEM
CODE ITEM DESCRIPTION NOTES
ECH1 CHAIR, TASK CFCI FULLY ADJUSTABLE TASK CHAIR
ECH2 CHAIR, TRAINING CFCI TRAINING CHAIR
ED1 DESK, L-SHAPED CFCI L-SHAPE DESK WITH SURFACE MOUNTED OVERHEAD STORAGE AND B/B/F
ED2 DESK, 30" X 60" CFCI WORKTABLE WITH OVERHEAD SHELVES
ED3 DESK, 36" x 66" CFCI
EMB1 MARKER BOARD CFCI
EQ7 VTRAT EQUIPMENT GFCI EQUIPMENT
EST1 STORAGE, LAT FILE 5H CFCI
EST2 STORAGE,CABINET 24" x 36" CFCI
ETB2 TABLE, 30" x 54" CFCI
ETB3 TABLE, 30" x 60" CFCI
ETB4 TABLE, 36" x 72" CFCI
ETB5 TABLE, 30" x 48" CFCI GANGING TRAINING TABLE WITH WIRE MANAGEMENT TROUGH BELOW. (2) POWER & (1)
DATA ACCESSIBLE FROM TABLE TOP.
ETB6 TRAINING TABLE, 42"X96" CFCI
ETB7 TABLE, 72" X 24" CFCI TABLE TO ACCOMODATE USER PROVIDED BREAK ROOM APPLIANCES.
UAP1 REFRIGERATOR GFCI EQUIPMENT
UAP2 MICROWAVE GFCI EQUIPMENT
UAP3 TOASTER GFCI EQUIPMENT
UAP4 COFFEE MAKER GFCI EQUIPMENT
UAV1 AV CART GFCI EQUIPMENT
UAV2 AV CART GFCI EQUIPMENT
UAV3 AV CART GFCI EQUIPMENT
UC2 COPIER GFCI EQUIPMENT
UCBT1 CBT CARREL GFCI EQUIPMENT
UL1 LECTERN GFCI EQUIPMENT
UMC1 MAIL CART, 18" x 32" GFCI EQUIPMENT
USH1 SHREDDER GFCI EQUIPMENT
UST1 STORAGE, SAFE GFCI EQUIPMENT
UTV1 MONITOR PROVIDE WALL BLOCKING. GFCI MONITOR WITH BRACKET
UTV2 MONITOR PROVIDE WALL BLOCKING. GFCI MONITOR WITH BRACKET
UTV3 MONITOR PROVIDE WALL BLOCKING. GFCI MONITOR WITH BRACKET
UTV4 MONITOR PROVIDE WALL BLOCKING. GFCI MONITOR WITH BRACKET
UTV5 MONITOR PROVIDE WALL BLOCKING. GFCI MONITOR WITH BRACKET
UTV6 MONITOR PROVIDE WALL BLOCKING. GFCI MONITOR WITH BRACKET
11 1
DUPLICATE NOTES OMITTED
A
M E
N D
M E
N T
B
ID
D E
R I N
Q U
IR
IE
S
N
O V
11/21/2025
W
2Q R
BA
1_
Pl an s-
C1
ACCESSIBLE HIGH-LOW
ELECTRIC WATER COOLER
R E
P
L A
N S
RE: PLANS
R E
R
C P
M A
X
EWC-1
EWC-1
CEILING,
AS
SCHED
2'-6" X 4'-0"
CLEAR
FLOOR
SPACE
SPOUT
SPOUT
BOTTLE
FILLING
STATION
M
IN
ELECTRIC WATER
COOLER: THE SPOUT
SHALL PROVIDE
A FLOW OF WATER 4"
HIGH. CONTROLS SHALL
BE FRONT MOUNTED
EWC - 1
J1 STANDARD JANITORS CLOSET
USMH - 1
MS - 1
SSF - 1
USMH - 1
SSF - 1
FMS - 1
USMH-1 HEAVY DUTY SHELF WITH MOP
HOLDERS AND RAG HOOKS
8"X36"
MS-1 FLOOR MOUNTED UTILITY SINK,
2'-0" X 3'-0"
SSF-1 FAUCET WITH BUCKET HOOK,
TOP BRACE, VACUUM BREAKER,
HOSE THREADS
SD-1
MG-1
1' - 3" EQ EQ 1' - 3"
RE: PLAN
SD-1
2'-6"x 4'-0"
CLEAR FLOOR
SPACE
L- 1
ABA APRON
RE: INTERIORS
WALL MOUNTED SOAP DISP, STOKO
REFRESH DISPENSER 1000
ACCESSIBLE UNDER COUNTER MOUNTED
LAVATORY
MG - 1 MIRROR - FULL WIDTH
SD- 1
L2 ACCESSIBLE MULTIPLE
COUNTER MOUNTED LAVATORIES (3 EQ SPACED)
M A
X
EQ EQ EQ EQ
L-1
L-1
L-1
L- 1 ACCESSIBLE UNDER
COUNTER MOUNTED
LAVATORY
L1 ACCESSIBLE MULTIPLE
COUNTER MOUNTED LAVATORY
1' - 3" RE: PLAN 1' - 3"
SD-1
ABA APRON
RE: INTERIORS
MG-1
2'-6" x 4'-0"
CLEAR
FLOOR
SPACE
" SD-1
L-1
SD- 1 WALL MOUNTED SOAP
DISP, STOKO REFRESH
DISPENSER 1000
MG - 1 MIRROR - FULL WIDTH
EQ EQ
M A
X
EQ EQ
L-1
1" 3' - 0" 1"
1' - 6" 1' - 6"
WC-1
TTD-1
CH-1
S1
STANDARD
STALL
TSCD-1
TSCD-1
TTD-1
SURFACE MOUNTED TOILET
SEAT COVER DISPENSER;
BOBRICK; B-4221
SURFACE MOUNTED TOILET
PAPER DISPENSER BAY WEST:
80300
6" 2' - 0" 6"
WC-1 STANDARD TOILET
COAT HOOK BUMPER; SOLID
CAST ALUMINUM; BOBRICK: B- 211
CH-1
SND-1
TTD-1
SANITARY NAPKIN DISPOSAL
(UNISEX/WOMEN'S RR ONLY)
SND-1
M
IN
M A
X
WC-2
TTD-1
GB-1
CH-1
DB-1
TTD-1
S2 END OF ROW
ACCESSIBLE STALL
SURFACE MOUNTED
TOILET PAPER DISPENSER
BAY WEST: 80300
WC-2
LOCATE FLUSH
HANDLE ON SIDE
OPPOSITE WALLGB-1
TSCD-1
SURFACE MOUNTED
DOOR BUMPER,
CENTER ON DOOR,
BOBRICK: B-687
TTD-1
DB-1
COAT HOOK BUMPER; SOLID
CAST ALUMINUM; BOBRICK:
B- 211
CH-1 GRAB BAR L SHAPE
BOBRICK: B-68137
GB-1
ACCESSIBLE TOILETWC-2
TSCD-1 SURFACE MOUNTED
TOILET SEAT
COVER DISPENSER;
BOBRICK; B-4221
LOCATE TOILET
DIAGONALLY FROM
DOOR OPENING
WC-2
3'-0"
MAX
16"-18"
M A
X
4" 2'-8" 2'-0"
5'-0"
"M
A X
M A
X
SNTD - 1
TSCD - 1
SNTD - 1 SURFACE MOUNTED SANITANY
NAPKIN/TAMPON VENDOR,
BOBRICK: B - 282 25
TSCD - 1 RECESSED TOILET SEAT-COVER
DISPENSER, BOBRICK: B - 301
MISCELLANIOUS TOILET ROOM
MOUNTING HEIGHTS
H E
IG
H
T O
F F
F L O
O R
R E
C O
M M
E N
D E
D M
O U
N T
IN
G
HD-1
HD-1 RECESSED ELECTRIC
HAND DRYER (NO TOUCH),
R E
C O
M M
E N
D E
D M
O U
N T
IN
G
H E
IG
H
T O
F F
F L O
O R
SURFACE MOUNTED PAPER TOWEL
DISPENSER, BAY WEST: 89500
PTWR-1
PTWR-
M A
X
TOILET STALL NOTES:
1. REFER TO PLAN FOR
QUANTITIES AND
ORIENTATION
OF TOILET PARTITIONS AND
URINAL SCREENS
P1 STANDARD FLOOR MOUNTED
PRT-1 1" THICK SOLID TOILET
PARTITION AS SPECIFIED,
REFER TO INTERIORS.
U-1 1" THICK SOLID URINAL
SCREEN AS SPECIFIED,
REFER TO INTERIORS.
CH-1 CLOTHES HOOK AND
BUMPER CENTER ON
DOOR; BOBRICK: B-212
DB-1 DOOR BUMPER; BOBRICK:
B-687
1' - 6"
U-1
DB-1
PRT-1 PRT-1
CH-1
TOILET PARTITIONS
U1
U2 SC1
U1 U2
SC1
RIM
RIM
2'-6" (U-2)
3'-0" (U-1)
EQ EQ
U1
U2
STANDARD URINAL
ACCESSIBLE URINAL
U1 STANDARD URINAL
U2 ACCESSIBLE URINAL
SC1 URINAL SCREEN
R E
G I S
T
ERED ARCH
IT
E
C T
S T
A T E
O F T EX
A S
M A T
TH
EW THOMAS
H A
R E
2 2 8 5 3
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
J A
C O
B S
G O
V E
R N
M E
N T
S E
R V
IC
E
S C
O
T e xa s R e g is te re d E n g in e e ri n g F ir m
F -2
M a in
S tr e e t, F o rt
W o rt h
T X
F
IL
E N
A M
E
L O
U
IS
V
IL
L E
D
IS
T R
IC
T
L O
U
IS
V
IL
L E
K
E N
T U
C K
Y
R E
P A
IR
S
Q U
A D
R O
N O
P E
R A
T
IO
N S
B L D
G
H A
N G
A R
W E
S T
O V
E R
A R
B M
A U
S A
C E
P
A F
P R
O J E
C T
Y
T P
M
-0
CERTIFIED FINAL
V S
A R
O N
I
G
IN
G L
IS
M H
A R
E
M H
A R
E
J a c o b s P ro j.
N o
L
D A
R
D
E C
A-402
R E
S T
R O
O M
A C
C E
S S
O R
IE
S
L E
G E
N D
A N
D M
O U
N T
IN
G
H E
IG
H
T S
Y T
P M
-0
-A
-4
TOILET ACCESSORIES NOTES
A MANUFACTURER PRODUCTS INDICATED
ESTABLISHES A PALLET OF COLORS AND A MINIMUM
LEVEL OF ACCEPTABLE QUALITY. IT IS NOT
INTENDED TO LIMIT THE SELECTION OF APPROVED
EQUIVALENT PRODUCTS.
B REFER TO PLAN FOR QUANTITIES AND ORIENTATION
OF TOILET PARTITIONS AND ACCESSORIES
A
M E
N D
M E
N T
B
ID
D E
R I N
Q U
IR
IE
S
N
O V
11/21/2025
W
2Q R
BA
1_
Pl an s-
AIR-DIFFUSERS W/ (2) 12.
GA. HANGER WIRES AT
ALTERNATE CONERS TO
THE STRUCTURE ABOVE
LIGHT FIXTURE: W/
(4) 12 GA. HANGER
WIRES AT
ALTERNATE
CORNERS TO THE
STRUCTURE ABOVE
NOTE:
LIGHT FIXTURE OR DIFFUSERS IN EXCESS OF 56 LBS.
REQUIRE (4) 12 GA. HANGER WIRES
12 GA. VERT.
HANGER WIRE AT
4'-0" O.C. WITH MIN.
(3) TIGHT TURNS IN 1
1/2"
MAIN
RUNNER
AT 4'-0"
O.C.
BRACED
OFF WALL
CEILING AS
SCHEDULED
MTL STUD HEADER
GYP BD
ALIGN HEADER WITH
WALL BEYOND
VARIES
V A
R
IE
S R
E R
C P
CEILING AS SCHEDULED
V A
R
IE
S
3-5/8" MTL STUD
BRACING AT 48" OC; TYP.
V A
R
IE
S A
T S
IM
LINE OF
STRUCTURE
GYP BD AT SIM
CEILING AS
SCHEDULED
MTL STUD
HEADER
GYP BD
PARTITION AS
SCHEDULED
V A
R
IE
S R
E R
C P
RE: PLANS
3-5/8" MTL STUD BRACING
AT 48" OC; TYP.
CEILING AS
SCHEDULED
MTL STUD
HEADER
GYP BD
ALIGN HEADER
WITH WALL
BEYOND
VARIES
V A
R
IE
S R
E R
C P
CEILING AS SCHEDULED
V A
R
IE
S
3-5/8" MTL
STUD BRACING
AT 48" OC; TYP.
CEILING HEIGHT
PROJECTION MOUNT
PLENUM COVER, SEAL
AROUND PROJECTION
MOUNT AND SECURE
PER MFR'S
SPECIFICATION
CEILING AS SCHEDULED
REFERENCE INTERIORS
FOR PROJECTOR.
UNIVERSAL PROJECTOR
MOUNT WITH 6"
EXTENSION PIPE, SECURE
PER MFR'S SPECIFICATION
METAL BRACING AS
REQUIRED.
R E
M
E C
H P
L U
M B
IN
G
E
L E
C
CONTINUOUS
SEALANT AROUND
PENETRATION ON
BOTH SIDES
FILL VOID AROUND
PENETRATION AND
WALL WITH EXPANSIVE
FOAM INSULATION
/2
M
IN
/2
M
IN
EXISTING EXTERIOR
WALL. CONTRACTOR TO
USE CAUTION AT
LOCATIONS OF EXISTING
EMBEDDED HISTORIC
WINDOWS, RE: PLANS
AND ELEVATIONS.
1 1/2" RUNNER AT
48" O.C.
1 1/2" RUNNER 16"
LONG - NESTED
FURRING CHANNEL,
24" O.C. MAX.
GYP BD CEILING
VINYL CONTROL
JOINT, PAINTED TO
MATCH CEILING
V E
R
IF
Y I N
F
IE
L D
EXIST WINDOW
SILL
ALUM WINDOW
SYSTEM
5/8" GYP BD BOTH
SIDES
BATT INSULATION
PARTITION, RE:
FLOOR PLANS
2-1/2" STL STUDS
CONT NEOPRENE
GASKET
CONT NEOPRENE
GASKET
RE: PLANS
EXISTING WALL
PARTITION TYPE
RE: PLANS FOR
V E
R
IF
Y I N
F
IE
L D
E X
IS
T
IN
G
L O
U V
E R
/G R
IL
L
BACKER ROD
AND SEALANT
2" RIGID INSULATION
SELF ADHERED AIR
BARRIER
TRANSITION
MEMBRANE
FLUID APPLIED AIR
BARRIER
8" CMU INFILL AT
EXIST WALLS OVER
1'-0" THICK
4" CMU INFILL AT
EXIST WALLS
UNDER 1'-0" THICK
FACE OF SEALANT
CMU INFILL ANCHOR,
RE: STRUCTURAL
PROVIDE WEEPS
AT BASE FOR
DRAINAGE
PREFINISHED METAL
WINDOW PANEL
ANCHORED TO 3-5/8"
STL FRAMING AT 12"
OC, USE GASKETED
ANCHORS THAT
MATCH THE FINISH
OF THE PANEL
CEILING HEIGHT
CEILING AS SCHEDULED
PREFINISHED
CEILING EDGE
TRIM
2-1/2"
CH-STUD
1" GYP LINER
PANEL
5/8" GYP BD
SEALANT
BATT
INSULATION
EXISTING
STRUCTURE
2" RIGID
INSULATION
EXISTING
STRUCTURE
LEVEL 03
25' - 5"
CEILING HEIGHT
AS SCHED.
1/2"
2 1/4"
1/4"
2 1/4"
1/2"
/4
MOUNTING JOIST
"L" BRACKET
PICTURE DOOR
SURFACE
MOUNTING
BRACKET
PICTURE
SURFACE
FURRING STRIPS
SUSPENDED
CEILING TILE
ACCESS DOOR
SLAT HOOK
1/4" BOLTS
4"
CLG TILE CUT OUT
1/4" THK (ATTACH
WITH MASTIC)
1/4" x 1" SCREW &
T-NUT
DRYWALL SCREW
T BAR FURNISHED
WITH CLG.
5 3/4"
FIN FLOOR
FLOOR FINISH, RE: INTERIORS
2 LAYERS 1/2" PLYWD T&G
SUBFLOOR, STAGGER JOINTS
1/2" PLYWD
NOSING AND WALL BASE, RE:
INTERIORS
PRESSURE TREATED 2X
WOOD FRAMING AT 16" O.C.
1"
1"
+/- 10"
V A
R
IE
S V
A R
IE
S
ALIGN
TLT
PARTITION
TLT
PARTITION
SUPPORTS
EXTERIOR
WALL
1"
R E
G I S
T
ERED ARCH
IT
E
C T
S T
A T E
O F T EX
A S
M A T
TH
EW THOMAS
H A
R E
2 2 8 5 3
6"6"
SCALE: 3"=1'-0"
04 2
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .