W912QR25R0052_Specs-0003.pdf

PDF 2 MB Posted

Attached to
DTA Manned/Unmanned Tactical Vehicle Lab
Solicitation number
W912QR25R0052
Issued by

About this file

This document is an Amendment (Amendment 0003) to a federal solicitation for the Manned/Unmanned Tactical Vehicle Lab (MUMT) project at the Detroit Arsenal. The amendment modifies multiple specification sections including door hardware, overhead coiling doors, glazing, wall and door protection, roller window shades, mechanical engine exhaust systems, wet pipe sprinkler systems, fire pumps, and interior electrical distribution systems.

Key changes include updates to technical specifications, deletion of certain sections, replacement of specification sections, and modifications to drawing and specification requirements. The amendment provides revised details for various building systems and components, updates technical requirements, and adds or removes specific materials and installation guidelines. The submission date remains 11 July 2025 at 1300ET, and contractors are required to acknowledge receipt of this amendment and submit proposals by that time. The project involves constructing a single-story research and development facility for ground transport equipment testing, with approximately 31,800 square feet of space including high bay and lower bay areas.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

SEE ATTACHED SUMMARY OF CHANGES

1. CONTRACT ID CODE PAGE OF PAGES

1 4

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912QR25R0052

X 9B. DATED (SEE ITEM 11)

12-May-2025

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO.

5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

30-Jun-2025

CODE

U. S. ARMY ENGINEER DISTRICT, LOUISVILLE

600 DR. MARTIN LUTHER KING, JR. PLACE

ROOM 821

LOUISVILLE KY 40202-2239

W912QR 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912QR25R0052_Specs-0003

W912QR25R0052

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)

The following have been added by full text:

AMENDMENT 0003

Manned/Unmanned Tactical Vehicle Lab (MUMT) Detroit Arsenal, MI

Amendment 0003

SUMMARY OF CHANGES

The following Specification sections have been replaced in their entirety:

00 00 00 TABLE OF CONTENTS

01 45 04.10 06 CONTRACTOR QUALITY CONTROL

01 46 00.00 06 TOTAL BUILDING COMMISSIONING

06 41 16.00 10 PLASTIC-LAMINATE-CLAD ARCHITECTURAL CABINETS

07 42 13 METAL WALL PANELS

08 33 23 OVERHEAD COILING DOORS

08 71 00 DOOR HARDWARE

08 81 00 GLAZING

10 23 10 GLAZED INTERIOR WALL AND DOOR ASSEMBLIES

10 26 00 WALL AND DOOR PROTECTION

12 24 13 ROLLER WINDOW SHADES

21 13 13 WET PIPE SPRINKLER SYSTEMS, FIRE PROTECTION

21 30 00 FIRE PUMPS

22 00 00 PLUMBING, GENERAL PURPOSE

23 11 20 FACILITY GAS PIPING

23 35 16.17 MECHANICAL ENGINE EXHAUST SYSTEMS

26 20 00 INTERIOR DISTRIBUTION SYSTEM

27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM

28 31 76 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM, ADDRESSABLE

41 22 13.14 BRIDGE CRANES, OVERHEAD ELECTRIC, TOP RUNNING

The following Specification sections have been deleted in their entirety:

07 81 00 SPRAY-APPLIED FIREPROOFING

09 67 23.15 FUEL RESISTIVE RESINOUS FLOORING, 3-COAT SYSTEM

09 84 20 ACOUSTICAL WALL PANELS

10 51 13 METAL LOCKERS

41 24 26 HYDRAULIC POWER SYSTEMS

The following Drawings have been replaced in their entirety:

Drawing No. Drawing Name

G-002.1 SHEET INDEX - VOLUME 1

GC101 HAUL ROUTE PLAN

GC102 PROPOSED PROJECT STAGING AREAS AND FENCING

GR101 SITE PHOTO LOCATIONS

VS101 STAKING PLAN

BB101 BORING PLAN

CD101 OVERALL SITE DEMOLITION PLAN

CD102 SITE DEMOLITION PLAN

CS101 AERIAL SITE PLAN

CG101 OVERALL SITE GRADING PLAN

CG102 SITE GRADING PLAN

CG105 OVERALL EROSION CONTROL PLAN

CG106 EROSION CONTROL PLAN

CP101 OVERALL SITE PLAN

CP102 SITE PLAN

CP501 SITE DETAILS

CP502 SITE DETAILS

CU101 OVERALL SITE UTILITY PLAN

CU102 SITE UTILITY PLAN

CU141 STORM DRAIN PLAN AND PROFILE

LS101 LANDSCAPE SITE PLAN

G-002.2 SHEET INDEX - VOLUME 2

S-112 FLATWORK PLAN - AREA 1

A-041 STC RATINGS PLAN

A-107 AREA 1 RCP

A-108 AREA 2 RCP

A-109 AREA 3 RCP

A-201 BUILDING ELEVATIONS

A-504 DETAILS

A-508 DETAILS

A-602 PARTITION TYPES

A-603 DOOR SCHEDULE

A-604 WINDOW AND LOUVER SCHEDULE

I-001 MOUNTING HEIGHTS

IN103 FINISH PLAN - AREA 2

IF105 FURNITURE TYPICALS

I-401 ENLARGED PLANS AND ELEVATIONS

I-601 FINISH SCHEDULES

I-602 SIGNAGE SCHEDULE

FA-601 FIRE ALARM AND MNS RISER DIAGRAM

P-130 NAT. GAS, COMP. AIR, AND ROOF DRAINAGE-OVERALL

P-401 ENLARGED SANITARY AND VENT PLANS

P-402 ENLARGED DOMESTIC WATER AND GAS PLANS

P-502 PLUMBING DETAILS

P-601 PLUMBING SCHEDULES

P-904 COMPRESSED AIR AND NATURAL GAS RISER DIAGRAM

E-001 LEGEND

ES101 ELECTRICAL SITE PLAN

EP101 POWER PLAN – AREA 1

EP600 MECHANICAL EQUIPMENT CONNECTION SCHEDULE

E-610 ELECTRICAL SCHEDULE 01

T-000 GENERAL NOTES, SYMBOLS & ABBREVIATIONS

T-100 TELECOM SITE PLAN

T-101.2 OVERALL TELECOM PLAN - CABLE TRAY

T-104 TELECOM PLAN - AREA 3

T-500 TELECOM DETAILS

T-501 TELECOM DETAILS

TY000 GENERAL NOTES, SYMBOLS & ABBREVIATIONS

TY501 ACCESS CONTROL DOOR ELEVATIONS

The submission date remains 11 July 2025 at 1300ET. Acknowledgement of receipt of this amendment and proposals are due at this time.

-End of changes-

(End of Summary of Changes)

P2#: 506474 - Manned/Unmanned Tactical Vehicle Lab (MUMT)

PROJECT TABLE OF CONTENTS Page 1 Certified Final Submittal-Amendment 0003

Detroit Arsenal, MI PROJECT TABLE OF CONTENTS Amendment 0003 25 June 2025

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

00 80 00.00 06 04/21 SPECIAL PROVISIONS

DIVISION 01 - GENERAL REQUIREMENTS

01 11 00 08/15, CHG 2: 08/21 SUMMARY OF WORK

01 32 01.00 06 07/18 PROJECT SCHEDULE

01 33 00 08/18, CHG 4: 02/21 SUBMITTAL PROCEDURES

01 33 29.00 06 11/17 SUSTAINABILITY REPORTING

01 35 26.00 06 GOVERNMENT SAFETY REQUIREMENTS

01 42 00 02/19 SOURCES FOR REFERENCE PUBLICATIONS

00.15

04.10

11/16, CHG 2: 08/19 RESIDENT MANAGEMENT SYSTEM CONTRACTOR

MODE (RMS CM)

CONTRACTOR QUALITY CONTROL

01 45 35 11/20 SPECIAL INSPECTIONS

01 46 00.00 06 04/20 TOTAL BUILDING COMMISSIONING

19.00

11/20, 04/20

CHG 1: 08/21 TEMPORARY CONSTRUCTION FACILITIES AND

CONTROLS

TEMPORARY ENVIRONMENTAL CONTROLS AND06

01 74 19 02/19, CHG 3: 11/21

PERMITS

CONSTRUCTION WASTE MANAGEMENT AND

01 78 23 08/15, CHG 2: 08/21

DISPOSAL

OPERATION AND MAINTENANCE DATA

DIVISION 02 - EXISTING CONDITIONS

02 41 00 05/10, CHG 2: 02/19 DEMOLITION

DIVISION 03 - CONCRETE

03 30 00 02/19, CHG 3: 11/21 CAST-IN-PLACE CONCRETE

03 45 00 05/16, CHG 2: 11/21 PRECAST ARCHITECTURAL CONCRETE

DIVISION 04 - MASONRY

04 20 00 11/15, CHG 2: 05/19 UNIT MASONRY

DIVISION 05 - METALS

05 05 23.13 10 08/18 ULTRASONIC INSPECTION OF WELDMENTS

05 05 23.16 08/18 STRUCTURAL WELDING

05 12 00 08/18, CHG 2: 05/21 STRUCTURAL STEEL

05 12 13

05 21 00

07/24

05/15, CHG 1: 08/18

ARCHITECTURALLY EXPOSED STRUCTURAL

STEEL

STEEL JOIST FRAMING

05 30 00 05/15, CHG 2: 08/18 STEEL DECKS

05 40 00 05/15, CHG 1: 08/18 COLD-FORMED METAL FRAMING

05 50 13 05/17, CHG 1: 08/18 MISCELLANEOUS METAL FABRICATIONS

05 51 33 02/16, CHG 2: 02/18 METAL LADDERS

DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES

06 10 00 08/16, CHG 2: 11/18 ROUGH CARPENTRY

06 41 16.00 10 08/10, CHG 1: 11/18 PLASTIC-LAMINATE-CLAD ARCHITECTURAL

CABINETS

06 61 16 08/20 SOLID SURFACING FABRICATIONS

Detroit Arsenal, MI

PROJECT TABLE OF CONTENTS Page 2 Certified Final Submittal-Amendment 0003

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 05 23 08/19 PRESSURE TESTING AN AIR BARRIER SYSTEM

FOR AIR TIGHTNESS

07 21 13 02/16, CHG 2: 08/20 BOARD AND BLOCK INSULATION

07 22 00 02/16, CHG 3: 11/18 ROOF AND DECK INSULATION

07 27 10.00 10 08/19, CHG 1: 02/20 BUILDING AIR BARRIER SYSTEM

07 27 19.01 05/17, CHG 2: 08/20 SELF-ADHERING AIR BARRIERS

07 27 36 05/17, CHG 2: 08/20 SPRAY FOAM AIR BARRIERS

07 42 13 05/11, CHG 2: 02/18 METAL WALL PANELS

07 54 19 THERMOPLASTIC POLYOLEFIN (TPO) ROOFING

07 60 00 05/17, CHG 2: 11/18 FLASHING AND SHEET METAL

Amendm ********************************************

07 81 00 DELETED

******** *******************************************************************Amendment 0003

07 84 00 05/10, CHG 1: 08/13 FIRESTOPPING

07 92 00 08/16, CHG 3: 11/18 JOINT SEALANTS

DIVISION 08 - OPENINGS

08 11 13 08/20 STEEL DOORS AND FRAMES

08 14 00 08/16, CHG 1: 08/18 WOOD DOORS

08 31 00 05/17, CHG 1: 08/18 ACCESS DOORS AND PANELS

08 33 23 08/20 OVERHEAD COILING DOORS

08 34 73 11/19, CHG 1: 02/21 SOUND CONTROL DOOR ASSEMBLIES

08 51 13 05/19 ALUMINUM WINDOWS

08 60 45 08/20 TRANSLUCENT PANELS

08 71 00 02/16, CHG 3: 08/20 DOOR HARDWARE

08 81 00 05/19 GLAZING

08 91 00 08/20 METAL WALL LOUVERS

DIVISION 09 - FINISHES

09 22 00 02/10, CHG 2: 08/18 SUPPORTS FOR PLASTER AND GYPSUM BOARD

09 29 00 08/16, CHG 4: 02/20 GYPSUM BOARD

09 30 10 08/20 CERAMIC, QUARRY, AND GLASS TILING

09 51 00 08/20 ACOUSTICAL CEILINGS

09 62 38 08/17, CHG 1: 08/18 STATIC-CONTROL FLOORING

09 65 00 08/10, CHG 3: 08/18 RESILIENT FLOORING

Amendment 0003************************************************************

09 67 23.15 DELETED

************************************************************Amendment 0003

09 68 00 11/17, CHG 2: 08/20 CARPETING

Amendment 0003************************************************************

09 84 20 DELETED

************************************************************Amendment 0003

09 90 00 02/21 PAINTS AND COATINGS

DIVISION 10 - SPECIALTIES

10 11 00 08/20 VISUAL DISPLAY UNITS

10 14 00.20 08/20 INTERIOR SIGNAGE

10 21 13 08/20 TOILET COMPARTMENTS

10 23 10 06/24 GLAZED INTERIOR WALL AND DOOR

ASSEMBLIES

ent 0003** **************

PROJECT TABLE OF CONTENTS Page 3 Certified Final Submittal-Amendment 0003

10 26 00 08/20 WALL AND DOOR PROTECTION

10 28 13 08/20 TOILET ACCESSORIES

10 44 16 11/19 FIRE EXTINGUISHERS

DIVISION 12

12 24 13 08/20 ROLLER WINDOW SHADES

12 50 00.13 10 08/17, CHG 1: 11/18 FURNITURE AND FURNITURE INSTALLATION

12 59 00 08/17, CHG 1: 08/18 SYSTEMS FURNITURE

DIVISION 21 - FIRE SUPPRESSION

21 13 13 08/20 WET PIPE SPRINKLER SYSTEMS, FIRE

PROTECTION

21 30 00 04/08, CHG 1: 08/13 FIRE PUMPS

DIVISION 22 - PLUMBING

22 00 00 11/15, CHG 4: 05/21 PLUMBING, GENERAL PURPOSE

DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)

23 05 93.00 06 08/16 TESTING, ADJUSTING, AND BALANCING

(TAB) OF HVAC

23 07 00 02/13, CHG 7: 05/20 THERMAL INSULATION FOR MECHANICAL

SYSTEMS

23 08 00.00 20 02/21, CHG 1: 05/21 COMMISSIONING OF MECHANICAL AND

PLUMBING SYSTEMS

23 09 00 02/19, CHG 3: 05/21 INSTRUMENTATION AND CONTROL FOR HVAC

23 09 13 11/15, CHG 2: 05/21 INSTRUMENTATION AND CONTROL DEVICES

FOR HVAC

23 09 23.02 02/19, CHG 1: 02/20 BACNET DIRECT DIGITAL CONTROL FOR HVAC

AND OTHER BUILDING CONTROL SYSTEMS

23 11 20 05/20 FACILITY GAS PIPING

23 23 00 08/21 REFRIGERANT PIPING

23 30 00 05/20 HVAC AIR DISTRIBUTION

23 35 16.17 10 05/20 MECHANICAL ENGINE EXHAUST SYSTEMS

23 81 00 05/18, CHG 1: 02/21 DECENTRALIZED UNITARY HVAC EQUIPMENT

23 81 23 11/20 COMPUTER ROOM AIR CONDITIONING UNITS

DIVISION 25 - INTEGRATED AUTOMATION

25 05 11.01 05/21 CYBERSECURITY FOR HVAC DDC SYSTEMS

25 05 11.02 05/21 CYBERSECURITY FOR FIRE & MASS

NOTIFICATION CONTROL SYSTEMS

25 05 11.03 05/21 CYBERSECURITY FOR LIGHTING CONTROL

SYSTEMS

25 08 10 05/21 UTILITY MONITORING AND CONTROL SYSTEM

TESTING

25 10 10 02/19, CHG 1: 05/21 UTILITY MONITORING AND CONTROL SYSTEM

(UMCS) FRONT END AND INTEGRATION

DIVISION 26 - ELECTRICAL

26 05 73 08/23 POWER SYSTEM STUDIES

26 08 00 11/21 APPARATUS INSPECTION AND TESTING

Amendment0003*******************************************************

10 51 13 DELETED

*******************************************************Amendment 0003

PROJECT TABLE OF CONTENTS Page 4 Certified Final Submittal-Amendment 0003

26 11 16 11/21 SECONDARY UNIT SUBSTATIONS

26 13 00 05/21 SF6/HIGH-FIREPOINT FLUIDS INSULATED

PAD-MOUNTED SWITCHGEAR

26 20 00 08/19, CHG 3: 11/21 AINTERIOR DISTRIBUTION SYSTEM

26 24 13 08/21 SWITCHBOARDS

26 29 23 02/20, CHG 1: 05/21 ADJUSTABLE SPEED DRIVE (ASD) SYSTEMS

UNDER 600 VOLTS

26 41 00 11/13 LIGHTNING PROTECTION SYSTEM

26 51 00 05/20, CHG 2: 11/21 INTERIOR LIGHTING

DIVISION 27 - COMMUNICATIONS

27 10 00 08/11 BUILDING TELECOMMUNICATIONS CABLING

SYSTEM

DIVISION 28 - ELECTRONIC SAFETY AND SECURITY

28 31 76 08/20 INTERIOR FIRE ALARM AND MASS

NOTIFICATION SYSTEM, ADDRESSABLE

DIVISION 31 - EARTHWORK

31 00 00.00 06 07/18 EARTHWORK

DIVISION 32 - EXTERIOR IMPROVEMENTS

32 01 19.61 11/19 SEALING OF JOINTS IN RIGID PAVEMENT

32 05 33 08/17 LANDSCAPE ESTABLISHMENT

32 11 20 08/17 BASE COURSE FOR RIGID AND SUBBASES FOR

FLEXIBLE PAVING

32 12 13 05/17 BITUMINOUS TACK AND PRIME COATS

32 12 16.16 11/20 ROAD-MIX ASPHALT PAVING

32 13 13.06 06 06/18 PORTLAND CEMENT CONCRETE PAVEMENT FOR

ROADS AND SITE FACILITIES

32 16 19 05/18 CONCRETE CURBS, GUTTERS AND SIDEWALKS

32 17 23 08/16, CHG 5: 11/18 PAVEMENT MARKINGS

32 92 19 08/17, CHG 1: 08/21 SEEDING

32 93 00 08/17, CHG 1: 08/21 EXTERIOR PLANTS

DIVISION 33 - UTILITIES

33 05 07.13 02/24 UTILITY DIRECTIONAL DRILLING

33 05 23 08/15, CHG 2: 08/16 TRENCHLESS UTILITY INSTALLATION

33 11 00 02/18 WATER UTILITY DISTRIBUTION PIPING

33 30 00 05/18 SANITARY SEWERAGE

33 40 00 11/21 Amendment 0001 STORMWATER UTILITIES

33 46 16 05/18 SUBDRAINAGE PIPING

33 71 02 08/21 UNDERGROUND ELECTRICAL DISTRIBUTION

33 82 00 04/06 TELECOMMUNICATIONS OUTSIDE PLANT (OSP)

DIVISION 41 - MATERIAL PROCESSING AND HANDLING EQUIPMENT

41 22 13.14 11/19, CHG 1: 02/21 BRIDGE CRANES, OVERHEAD ELECTRIC, TOP

RUNNING

PAD-MOUNTED SWITCHGEAR

INTERIOR DISTRIBUTION SYSTEM

SWITCHBOARDS

Amendment 0001

SANITARY SEWERAGE

1 STORMWATER UTILITIES

SUBDRAINAGE PIPING

Amendment 0003********************************************************

41 24 26 DELETED

********************************************************Amendment 0003 -- End of Project Table of Contents --

SECTION 01 45 04.10 06

CONTRACTOR QUALITY CONTROL

04/20

Amendment 0003 25 June 2025

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by basic designation only.

ASTM INTERNATIONAL (ASTM)

ASTM D3740 (2019) Minimum Requirements for Agencies Engaged in the Testing and/or Inspection of Soil and Rock as Used in Engineering Design and Construction

ASTM E329 (2018) Standard Specification for Agencies Engaged in Construction Inspection, Testing, or Special Inspection

1.2 PAYMENT

Separate payment will not be made for providing and maintaining an effective Quality Control program, and all costs associated therewith shall be included in the applicable unit prices or lump-sum prices contained in the Bidding Schedule.

1.3 SUBMITTALS

Government approval/acceptance is required for submittals with a "G" designation; submittals not having a "G" designation are for Contractor Quality Control approval, or for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. The following shall be submitted in accordance with LRL Section 01 33 00 SUBMITTAL PROCEDURES:

SD-01 Preconstruction Submittals

Construction Quality Control Plan; G, RO

PART 2 PRODUCTS (Not Applicable)

PART 3 EXECUTION

3.1 GENERAL REQUIREMENTS

The Contractor is responsible for quality control and shall establish and maintain an effective quality control system in compliance with FAR 52.246-12 - Inspection of Construction. The quality control system shall consist of plans, procedures, and organization necessary to produce an end product which complies with the contract requirements. The system shall

SECTION 01 45 04.10 06 Page 1 Certified Final Submittal-Amendment 0003 cover all design and construction operations, both onsite and offsite, and shall be keyed to the proposed construction sequence. The site project superintendent will be held responsible for the quality of work on the job and is subject to removal by the Contracting Officer for non-compliance with the quality requirements specified in the contract. The site project superintendent in this context shall be the highest level manager responsible for the overall construction activities at the site, including quality and production. The site project superintendent shall maintain a physical presence at the site at all times, except as otherwise acceptable to the Contracting Officer, and shall be responsible for all construction and construction related activities at the site.

3.2 NOT USED

3.3 CONSTRUCTION QUALITY CONTROL PLAN (CQCP)

The Contractor shall furnish for review by the Government, not later than thirty (30) days after receipt of notice to proceed, the Contractor Construction Quality Control (CQC) Plan proposed to implement the requirements of FAR 52.246-12 - Inspection of Construction. The plan shall identify personnel, procedures, control, instructions, tests, records, and forms to be used. The Government will consider an interim plan for the first thirty (30) days of operation. Construction will be permitted to begin only after acceptance of the CQC Plan or acceptance of an interim plan applicable to the particular feature of work to be started. Work outside of the features of work included in an accepted interim plan will not be permitted to begin until acceptance of a CQC Plan or another interim plan containing the additional features of work to be started.

3.3.1 Content of the CQC Plan

The CQC Plan shall include, as a minimum, the following to cover all construction operations, both onsite and offsite, including work by subcontractors, fabricators, suppliers, and purchasing agents:

a. A description of the quality control organization, including a chart showing lines of authority and acknowledgment that the CQC staff shall implement the three phase control system for all aspects of the work specified. The staff shall include a CQC System Manager who shall report to someone higher in the Contractor's organization than the project superintendent, shall not be the superintendent.

b. The name, qualifications (in resume format), duties, responsibilities, and authorities of each person assigned a CQC function.

c. A copy of the letter to the CQC System Manager signed by an authorized official of the firm which describes the responsibilities and delegates sufficient authorities to adequately perform the functions of the CQC System Manager, including authority to stop work which is not in compliance with the contract. The CQC System Manager shall issue letters of direction to all other various quality control representatives outlining duties, authorities, and responsibilities. Copies of these letters shall also be furnished to the Government.

d. Procedures for scheduling, reviewing, certifying, and managing

SECTION 01 45 04.10 06 Page 2 submittals, including those of subcontractors, offsite fabricators, suppliers, and purchasing agents. These procedures shall be in accordance with LRL Section 01 33 00 SUBMITTAL

PROCEDURES.

e. Control, verification, and acceptance testing procedures for each specific test to include the test name, specification paragraph requiring test, feature of work to be tested, test frequency, and person responsible for each test. (Laboratory facilities will be approved by the Contracting Officer.)

f. Procedures for tracking preparatory, initial, and follow-up control phases and control, verification, and acceptance tests including documentation.

g. Procedures for tracking construction deficiencies from identification through acceptable corrective action. These procedures shall establish verification that identified deficiencies have been corrected.

h. Reporting procedures, including proposed reporting formats.

i. A list of the definable features of work. A definable feature of work is a task which is separate and distinct from other tasks, has separate control requirements, and may be identified by different trades or disciplines, or it may be work by the same trade in a different environment. Although each section of the specifications may generally be considered as a definable feature of work, there are frequently more than one definable features under a particular section. This list will be agreed upon during the coordination meeting.

3.3.2 Acceptance of Plan

Acceptance of the Contractor's plan is required prior to the start of construction. Acceptance is conditional and will be predicated on satisfactory performance during the construction. The Government reserves the right to require the Contractor to make changes in his CQC Plan and operations including removal of personnel, as necessary, to obtain the quality specified.

3.3.3 Notification of Changes

After acceptance of the CQC Plan, the Contractor shall notify the Contracting Officer in writing of any proposed change. Proposed changes are subject to acceptance by the Contracting Officer.

3.4 COORDINATION MEETING

After the Preconstruction Conference, before start of construction, and prior to acceptance by the Government of the CQC Plan, the Contractor shall meet with the Contracting Officer or Authorized Representative and discuss the Contractor's quality control system. The CQC Plan shall be submitted for review a minimum of thirty (30) calendar days prior to the Coordination Meeting. During the meeting, a mutual understanding of the system details shall be developed, including the forms for recording the CQC operations, control activities, testing, administration of the system for both onsite and offsite work, and the interrelationship of Contractor's Management and control with the Government's Quality

SECTION 01 45 04.10 06 Page 3

Assurance. Minutes of the meeting shall be prepared by the Government and signed by both the Contractor and the Contracting Officer. The minutes shall become a part of the contract file. There may be occasions when subsequent conferences will be called by either party to reconfirm mutual understandings and/or address deficiencies in the CQC system or procedures which may require corrective action by the Contractor.

3.4.1 Subcontractor CQC Orientation

Before a Subcontractor begins work on the jobsite, the CQC System Manager will train the Subcontractor and answer any questions pertaining to quality control operations. This requirement is waived only if a Subcontractor attended the initial coordination meeting described above.

A record of the orientation shall be documented in the QC Report.

3.5 CONSTRUCTION QUALITY CONTROL ORGANIZATION

3.5.1 Personnel Requirements

a. The requirements for the CQC organization are a CQC System Manager and sufficient number of additional qualified personnel to ensure safety and contract compliance. A Site Safety Health Officer (SSHO) will be required for this contract. See LRL Section 01 35 26.00 06 GOVERNMENT SAFETY REQUIREMENTS for the SSHO qualifications and duties.

b. Personnel identified in the technical provisions as requiring specialized skills to assure the required work is being performed properly will also be included as part of the CQC organization. The Contractor's CQC staff shall maintain a presence at the site at all times during progress of the work and have complete authority and responsibility to take any action necessary to ensure contract compliance. The CQC staff shall be subject to acceptance by the Contracting Officer. The Contractor shall provide adequate office space, filing systems and other resources as necessary to maintain an effective and fully functional CQC, and safety/health organization. Complete records of all letters, material submittals, shop drawing submittals, schedules and all other project documentation shall be promptly furnished to the CQC organization by the Contractor. The CQC organization shall be responsible to maintain these documents and records at the site at all times and made available to the SSHO, except as otherwise acceptable to the Contracting Officer.

3.5.2 CQC System Manager Qualifications and Duties

a. The Contractor shall identify as CQC System Manager an individual within the onsite work organization who shall be responsible for overall management of CQC and have the authority to act in all CQC matters for the Contractor. The CQC System Manager shall be a graduate engineer, graduate architect, or a graduate of construction management, with a minimum of 5 years construction experience on construction similar to this contract, or a construction person with a minimum of 10 years in related quality management work.

b. This CQC System Manager shall be employed by the Prime Contractor and be on the site at all times during construction. Alternate(s) for the CQC System Manager shall be identified in the CQC Plan to serve in the event of the CQC System Manager's absence. The requirements for the alternates shall be the same as for the designated CQC System Manager.

c. The CQC System Manager shall be:

SECTION 01 45 04.10 06 Page 4 assigned no other duties except being the CQC System Manager. Shall not be the SSHO or the superintendent.

Amendment 0003***************************************************************

3.5.3 CQC Personnel

a. The word "graduate" below indicates an individual possessing a four-year college degree accredited in the respective field listed-with experience obtained following graduation in the type of work being performed on the project.

Experience Matrix Table

AREA QUALIFICATIONS

a. NOT USED

b. Civil Graduate Civil Engineer with 2 years related experience or person with 5 yrs related experience

c. Geotechnical Graduate Geotechnical Engineer or Civil Engineer specializingin Geotechnical Engineering with 3 yrs relevant experienc e or Engineering Technician, working under the direction of a Licensed Professional Engineer, with 5 yrs relevant exper ience

d. Mechanical Graduate Mechanical Engineer with 2 yrs related experience or person with 5 yrs rela ted experience

e. Electrical Graduate Electrical Engineer with 2 yrs related ex perience or person with 5 yrs related experience

f. Structural Graduate Structural Engineer with 2 yrs related ex perience or person with 5 yrs related experience

g. Architectural Graduate Architect with 2 yrs rela ted experience or person with 5 yrs related experience

h. Environmental Graduate Environmental Engineer with 3 yrs related experience

i. LEED-AP BD+C LEED Accredited by GBCI (Green Building Certification Institute)

j. Submittals Submittal Clerk with 1yr experience

SECTION 01 45 04.10 06 Page 5

AREA QUALIFICATIONS

a. NOT USED

k. DELETED

l. Concrete, Pavements and Soils Civil Engineer identified in item B or C above, and supplemented with the Corps validated QC testing laboratory

m. DELETED

n. IT/Communications BICSI Certified RCDD Registered Communication Distribution Designer)with 2 yrs related experience

o. Roofing RCI Registered Roof Observer

***************************************************************Amendment 0003

3.5.3.1 Registered Roof Observer

a. The Contractor shall hire an independent RCI Registered Roof Observer (RRO) to perform roof installation quality control during the course of this contract. The independent RRO shall not be employed by the prime contractor but shall be subcontracted and responsible for reporting conditions simultaneously to the Government and the Contractor. The RRO shall be on site for the duration of the roofing operations. The Registered Roof Observers will perform daily oversight and quality control on all roof work to assure compliance with the projects plans and specifications.

b. The Government will supply the format of the daily report file which is intended to supplement the daily QC report instead of replacing same.

The RRO shall provide daily reports per CQC requirements, number of squares of roof places and the contractors compliance with specifications and details. The RRO shall take daily color photographs (a minimum 24 photos total for the project) of every type of activity performed that shall include (but not limited to) insulation attachment, application of roofing membrane and flashings, sheet metal installation, kettle operation, material storage/handling and compliance with safety requirements. Photos may be digital but one hard color copy shall be made daily and kept on site.

3.5.3.2 RRO COMMUNICATION WITH THE GOVERNMENT

The Registered Roof Observer shall submit all plans, schedules, reports, and documentation directly to the Contracting Officer's Representative concurrent with submission to the CQC System Manager. The RRO shall have

SECTION 01 45 04.10 06 Page 6 direct communication with the Contracting Officer's Representative regarding all elements of the roofing installation process.

3.5.4 Additional Requirement

In addition to the above experience and/or education requirements the CQC System Manager and Alternate(s) shall have completed and passed the course entitled "Construction Quality Management For Contractors" within the last 5 years. A copy of the certification shall be provided with the CQCP.

This course is periodically offered by the Associated Builders and Constructors, Inc., or Associated General Contractor, Inc., and the U.S.

Army Corps of Engineers.

3.5.5 Organizational Changes

The Contractor shall maintain the CQC staff at full strength at all times.

When it is necessary to make changes to the CQC staff, the Contractor shall revise the CQC Plan to reflect the changes and submit the changes to the Contracting Officer for acceptance.

3.6 SUBMITTALS AND DELIVERABLES

Submittals, if needed, shall be made as specified in LRL Section 01 33 00 SUBMITTAL PROCEDURES. The CQC organization shall be responsible for certifying that all submittals and deliverables are in compliance with the contract requirements. When LRL Section 01 46 00.00 06 TOTAL BUILDING COMMISSIONING is included in the contract, the submittals required by those sections shall be coordinated with LRL Section 01 33 00 SUBMITTAL PROCEDURES to ensure adequate time is allowed for each type of submittal required.

3.7 CONTROL

Contractor Quality Control is the means by which the Contractor ensures that the construction, to include that of subcontractors and suppliers, complies with the requirements of the contract. At least three phases of control shall be conducted by the CQC System Manager for each definable feature of work as follows:

3.7.1 Preparatory Phase

This phase shall be performed prior to beginning work on each definable feature of work, after all required plans/documents/materials are approved/accepted, and after copies are at the work site. This phase shall include:

a. A review of each paragraph of applicable specifications, reference codes, and standards. A copy of those sections of referenced codes and standards applicable to that portion of the work to be accomplished in the field shall be made available by the Contractor at the preparatory inspection. These copies shall be maintained in the field and available for use by Government personnel until final acceptance of the work.

b. A review of the contract drawings.

c. A check to assure that all materials and/or equipment have been tested, submitted, and approved.

SECTION 01 45 04.10 06 Page 7

d. Examination of the work area to assure that all required preliminary work has been completed and is in compliance with the contract.

e. A physical examination of required materials, equipment, and sample work to assure that they are on hand, conform to approved shop drawings or submitted data, and are properly stored.

f. A review of the appropriate activity hazard analysis to assure safety requirements are met.

g. Discussion of procedures for controlling quality of the work including repetitive deficiencies. Document construction tolerances and workmanship standards for that feature of work.

h. A check to ensure that the portion of the plan for the work to be performed has been accepted by the Contracting Officer.

i. Resolve all differences.

j. Discussion of the initial control phase.

k. Review of provisions that have been made to provide required control inspection and testing.

l. Review of the CQC plan, specifically its organization chart and delegation letters. Insure all required members of the CQC organization for this feature of work are qualified, have been appointed, accepted and have requisite authority delegated.

m. The Government shall be notified at least 24 hours in advance of beginning the preparatory control phase. This phase shall include a meeting conducted by the CQC System Manager and attended by the superintendent, other CQC personnel (as applicable), and the foreman responsible for the definable feature. The results of the preparatory phase actions shall be documented by separate minutes prepared by the CQC System Manager and attached to the daily CQC report. The Contractor shall instruct applicable workers as to the acceptable level of workmanship required in order to meet contract specifications.

3.7.2 Initial Phase

This phase shall be accomplished at the beginning of a definable feature of work. The following shall be accomplished:

a. A check of work to ensure that it is in full compliance with contract requirements. Review minutes of the preparatory meeting.

b. Verify adequacy of controls to ensure full contract compliance.

Verify required control inspection and testing.

c. Establish level of workmanship and verify that it meets minimum acceptable workmanship standards. Compare with required sample panels as appropriate.

d. Resolve all differences.

e. Check safety to include compliance with and upgrading of the

SECTION 01 45 04.10 06 Page 8 safety plan and activity hazard analysis. Review the activity analysis with each worker.

f. The Government shall be notified at least 72 hours in advance of beginning the initial phase. Separate minutes of this phase shall be prepared by the CQC System Manager and attached to the daily CQC report. Exact location of initial phase shall be indicated for future reference and comparison with follow-up phases.

g. The initial phase should be repeated for each new crew to work onsite, or any time acceptable specified quality standards are not being met.

3.7.3 Follow-up Phase

Daily checks shall be performed to assure control activities, including control testing, are providing continued compliance with contract requirements, until completion of the particular feature of work. The checks shall be made a matter of record in the CQC documentation. Final follow-up checks shall be conducted and all deficiencies corrected prior to the start of additional features of work which may be affected by the deficient work. The Contractor shall not build upon nor conceal non-conforming work.

3.7.4 Additional Preparatory and Initial Phases

Additional preparatory and initial phases shall be conducted on the same definable features of work if: the quality of on-going work is unacceptable; if there are changes in the applicable CQC staff, onsite production supervision or work crew; if work on a definable feature is resumed after a substantial period of inactivity; or if other problems develop.

3.8 TESTS

3.8.1 Testing Procedure

The Contractor shall perform specified or required tests to verify that control measures are adequate to provide a product which conforms to contract requirements. Upon request, the Contractor shall furnish to the Government duplicate samples of test specimens for possible testing by the Government. Testing includes operation and/or acceptance tests when specified. For QC testing of construction materials including soil, rock, aggregate, asphalt, concrete, and steel, the Contractor shall procure the services of a Corps of Engineers (COE) validated testing laboratory or establish a COE validated testing laboratory at the project site.

Technical specifications included in the contract that require materials testing by an approved commercial testing laboratory shall be intended to mean by a COE validated laboratory. The Contractor shall perform the following activities and record and provide the following data:

a. Verify that testing procedures comply with contract requirements.

b. Verify that facilities and testing equipment are available and comply with testing standards.

c. Check test instrument calibration data against certified standards.

d. Verify that recording forms and test identification control number

SECTION 01 45 04.10 06 Page 9 system, including all of the test documentation requirements, have been prepared.

e. Results of all tests taken, both passing and failing tests, shall be recorded on the CQC report for the date taken. Specification paragraph reference, location where tests were taken, and the sequential control number identifying the test shall be given. If approved by the Contracting Officer, actual test reports may be submitted later with a reference to the test number and date taken. An information copy of tests performed by an offsite or commercial test facility shall be provided directly to the Contracting Officer. Failure to submit timely test reports as stated may result in nonpayment for related work performed and disapproval of the test facility for this contract.

3.8.2 Testing Laboratories

3.8.2.1 Capability Check

The Government reserves the right to check laboratory equipment in the proposed laboratory for compliance with the standards set forth in the contract specifications and to check the laboratory technician's testing procedures and techniques. Laboratories utilized for testing soils, concrete, asphalt, and steel shall meet criteria detailed in ASTM D3740 and ASTM E329.

3.8.2.2 Capability Recheck

If the selected laboratory fails the capability check, the Contractor will be assessed a charge of $1,375.00 to reimburse the Government for each succeeding recheck of the laboratory or the checking of a subsequently selected laboratory. Such costs will be deducted from the contract amount due the Contractor.

3.8.3 Onsite Laboratory

The Government reserves the right to utilize the Contractor's control testing laboratory and equipment to make assurance tests, and to check the Contractor's testing procedures, techniques, and test results at no additional cost to the Government.

3.8.4 Furnishing or Transportation of Samples for Testing

Costs incidental to the transportation of samples or materials shall be borne by the Contractor. Samples of materials for test verification and acceptance testing by the Government shall be delivered to the Corps of Engineers Division Laboratory, f.o.b., at the following address:

For delivery by mail:

Geotechnical & Structures Laboratory Material Testing Center (GS-E) U.S. Army Engineer Research and Development Center 3909 Halls Ferry Road Vicksburg, MS 39180-6199

Coordination for each specific test, exact delivery location, and dates will be made through the Area Office.

SECTION 01 45 04.10 06 Page 10

3.9 COMPLETION INSPECTION

3.9.1 Punch-Out Inspection

Near the end of the work, or any increment of the work established by a time stated in the FAR 52.211-10 - Commencement, Prosecution, and Completion of Work, or by the specifications, the CQC System Manager shall conduct an inspection of the work. A punch list of items which do not conform to the approved drawings and specifications shall be prepared and included in the CQC documentation, as required by paragraph DOCUMENTATION. The list of deficiencies shall include the estimated date by which the deficiencies will be corrected. The CQC System Manager or staff shall make a second inspection to ascertain that all deficiencies have been corrected. Once this is accomplished, the Contractor shall notify the Government that the facility is ready for the Government Pre-Final inspection.

3.9.2 Pre-Final Inspection

The Government will perform the pre-final inspection to verify that the facility is complete and ready to be occupied. A Government Pre-Final Punch List may be developed as a result of this inspection. The Contractor's CQC System Manager shall ensure that all items on this list have been corrected before notifying the Government, so that a Final inspection with the customer can be scheduled. Any items noted on the Pre-Final inspection shall be corrected in a timely manner. These inspections and any deficiency corrections required by this paragraph shall be accomplished within the time slated for completion of the entire work or any particular increment of the work if the project is divided into increments by separate completion dates.

3.9.3 Final Acceptance Inspection

The Contractor's Quality Control Inspection personnel, plus the superintendent or other primary management person, and the Contracting Officer's Representative shall be in attendance at the final acceptance inspection. Additional Government personnel including, but not limited to, those from Base/Post Civil Facility Engineer user groups, and major commands may also be in attendance. The final acceptance inspection will be formally scheduled by the Contracting Officer based upon results of the Pre-Final inspection. Notice shall be given to the Contracting Officer at least fourteen (14) days prior to the final acceptance inspection and shall include the Contractor's assurance that all specific items previously identified to the Contractor as being unacceptable, along with all remaining work performed under the contract, will be complete and acceptable by the date scheduled for the final acceptance inspection.

Failure of the Contractor to have all contract work acceptably complete for this inspection will be cause for the Contracting Officer to bill the Contractor for the Government's additional inspection cost in accordance with FAR 52.246-12 - Inspection of Construction.

3.10 DOCUMENTATION

The Contractor shall maintain current records providing factual evidence that required quality control activities and/or tests have been performed. These records shall include the work of subcontractors and suppliers and shall be on an acceptable form that includes, as a minimum, the following information:

SECTION 01 45 04.10 06 Page 11

a. Contractor/subcontractor and their area of responsibility.

b. Operating plant/equipment with hours worked, idle, or down for repair.

c. Work performed each day, giving location, description, and by whom. When Network Analysis (NAS) is used, identify each phase of work performed each day by NAS activity number.

d. Test and/or control activities performed with results and references to specifications/drawings requirements. The control phase shall be identified (Preparatory, Initial, Follow-up). List of deficiencies noted, along with corrective action.

e. Quantity of materials received at the site with statement as to acceptability, storage, and reference to specifications/drawings requirements.

f. Submittals and deliverables reviewed, with contract reference, by whom, and action taken.

g. Offsite surveillance activities, including actions taken.

h. Job safety evaluations stating what was checked, results, and instructions or corrective actions.

i. Instructions given/received and conflicts in plans and/or specifications.

j. Contractor's verification statement.

k. These records shall indicate a description of trades working on the project; the number of personnel working; weather conditions encountered; and any delays encountered. These records shall cover both conforming and deficient features and shall include a statement that equipment and materials incorporated in the work and workmanship comply with the contract. The original and one copy of these records in report form shall be furnished to the Government daily within 24 hours after the date covered by the report. All calendar days shall be accounted for throughout the life of the contract. Reports shall be signed and dated by the CQC System Manager. The report from the CQC System Manager shall include copies of test reports and copies of reports prepared by all subordinate quality control personnel.

l. Deficiency Tracking System. The Contractor shall maintain a cumulative list of deficiencies identified for the duration of the project. Deficiencies to be listed include those failures, Government oral observations and Notifications of Noncompliance.

The list shall be maintained at the project site. Copies of updated listings shall be submitted to the Government at least every thirty (30) days.

3.11 NOTIFICATION OF NONCOMPLIANCE

The Contracting Officer will notify the Contractor of any detected noncompliance with the foregoing requirements. The Contractor shall take immediate corrective action after receipt of such notice. Such notice, when delivered to the Contractor at the work site, shall be deemed

SECTION 01 45 04.10 06 Page 12 sufficient for the purpose of notification. If the Contractor fails or refuses to comply promptly, the Contracting Officer may issue an order stopping all or part of the work until satisfactory corrective action has been taken. No part of the time lost due to such stop orders shall be made the subject of claim for extension of time or for excess costs or damages by the Contractor.

-- End of Section --

SECTION 01 45 04.10 06 Page 13

THIS PAGE INTENTIONALLY LEFT BLANK

SECTION 01 45 04.10 06 Page 14

SECTION 01 46 00.00 06

TOTAL BUILDING COMMISSIONING

04/20

Amendment 0003 25 June 2025

Amendment 0003***************************************************************

PART 1 GENERAL

Commission the building systems listed herein. The Commissioning Specialists must coordinate all aspects of the commissioning process.

Conform to the commissioning procedures outlined in this specification.

1.1 SYSTEMS TO BE COMMISSIONED

Commission the following systems:

Heating, Ventilating, Air Conditioning, and Refrigeration Systems

(HVAC)

Building Automation System

Utility Monitoring and Control System

Lighting Systems

Power Distribution Systems

DELETED

Service Water Heating Systems

Plumbing Systems

DELETED

DELETED

Process Cooling Tower Water System

Energy and Water Utility Metering Systems and Sub-Meters

Building Envelope: include moisture, thermal integrity, and air tightness for the entire building envelope including systems such as walls, fenestration, roofing, roof openings.

***************************************************************Amendment 0003

1.2 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

SECTION 01 46 00.00 06 Page 1

AMERICAN SOCIETY OF HEATING, REFRIGERATING AND AIR-CONDITIONING

ENGINEERS (ASHRAE)

ASHRAE 180 (2018) Standard Practice for Inspection and Maintenance of Commercial Building HVAC Systems

ASHRAE 202 (2018) Commissioning Process for Buildings and Systems

ASSOCIATED AIR BALANCE COUNCIL (AABC)

ACG Commissioning Guideline (2005) Commissioning Guideline

NATIONAL ENVIRONMENTAL BALANCING BUREAU (NEBB)

NEBB Commissioning Standard (2018) Whole Building Technical Commissioning of New Construction

NATIONAL INSTITUTE OF BUILDING SCIENCES (NIBS)

NIBS Guideline 3 (2012) Building Enclosure Commissioning Process BECx

SHEET METAL AND AIR CONDITIONING CONTRACTORS' NATIONAL ASSOCIATION

(SMACNA)

ANSI/SMACNA 014-2013 (2013) HVAC Systems Commissioning Manual, 2nd Edition

US Army Corps of Engineers (USACE)

ER 25-345-1 Regulation No. 25-345-1Military Publications SYSTEMS MANUAL

1.3 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submittals with an "S" are for inclusion in the Sustainability eNotebook, in conformance to Section 01 33 29.00 06 SUSTAINABILITY REPORTING. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

SD-01 Preconstruction Submittals

Commissioning Specialists G, DO

Submit the Commissioning Specialists' certification of qualifications no later than 30 calendar days after Notice to Proceed. Submit one hard copy and an electronic copy. Project Schedule; G, DO

Project construction schedule which includes commissioning milestone activities. Submit within 14 calendar days following the Construction Commissioning Coordination Meeting. Submit one electronic copy.

SECTION 01 46 00.00 06 Page 2

SD-06 Test Reports

Construction Phase Commissioning Plan; G, DO.

Submit no later than 30 calendar days after the Construction Commissioning Coordination Meeting. Submit an electronic copy.

Building Envelope Inspection Checklists; G, DO

Submit the completed and initialed Building Envelope Inspection Checklists no later than 7 calendar days after completion of inspection of all checklists items. Submit an electronic copy.

Pre-Functional Checklists; G, DO

Submit no later than 7 calendar days after completion of all checklist items for each system. Submit an electronic copy.

Issues Log

Submit an electronic copy on the same day each month.

Commissioning Report; G, DO

Submit no later than 14 calendar days following commissioning team acceptance of all Performance Tests. Submit an electronic copy.

Post-Construction Commissioning Report; G, DO

Submit no later than 14 calendar days following completion of all post-construction trend log reviews and building site visit. Submit an electronic copy.

Monthly Monitoring Based Commissioning Update; G, DO

Submit an electronic copy at the same date each month, no later than 7 calendar days following receipt of data.

Monitoring Based…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .