W912QR25R0052_Plans-0003.pdf

PDF 23 MB Posted

Attached to
DTA Manned/Unmanned Tactical Vehicle Lab
Solicitation number
W912QR25R0052
Issued by

About this file

The provided file is a comprehensive set of architectural, engineering, and technical design drawings for the Manned/Unmanned Tactical Vehicle Lab project at the Detroit Arsenal. The project involves constructing a single-story, approximately 31,800 square foot research and development facility designed for testing ground transport equipment. The building will feature a high bay and lower bay configuration, with specialized spaces including research test beds, bridge cranes, control and observation rooms, administrative areas, vehicle access zones, and mechanical/electrical support spaces.

Key design elements include intricate infrastructure provisions such as hydraulic systems, specialized equipment foundations with vibration-isolation and seismic mass considerations, utility access points, and advanced mechanical systems. The facility will incorporate self-contained heating and cooling systems, an Intrusion Detection System (IDS), and Energy Monitoring Control Systems (EMCS). Supporting site developments include utilities, lighting, paving, storm drainage, information systems, landscaping, and signage. The project is being executed through the U.S. Army Corps of Engineers Louisville District, with a solicitation number W912QR25R0052 and a certified final submittal date of September 20, 2024.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SHEET ID

D E

S

IG

N B

Y

D R

A W

N B

Y

C H

E C

K E

D B

Y

S U

B M

IT

T

E D

B Y

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

L O

U

IS

V

IL

L E

D

IS

T R

IC

T

D

R M

A R

T

IN

L U

T H

E R

J R

P L

L O

U

IS

V

IL

L E

K

E N

T U

C K

Y

A

D E

T R

O

IT

A R

S E

N A

L M

I

M A

N N

E D

U

N M

A N

N E

D T

A C

T

IC

A L

V E

H

IC

L E

L A

B

F Y

P

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

B

C

D

E

F

G

H

J

K

L

M

N

P

F ile

P a th

P lo t D a te

US Army Corps of Engineers ®

IS

S

U E

D A

T E

S O

L

IC

IT

A

T

IO

N N

O

C O

N T

R A

C T

N O

S

IZ

E

A N

S I D

A u to d e s k D o c s /1

U

S A

C E

D e tr o it A rs e n a l M

U M

T J

V R

/1

A

R C

H R

.r v t

/2

/2

:3

:3

P

M

G-002.1

R

D

IC

K M

A N

D

R

ID

E N

O U

R

L

W H

IT

N

E Y

M B

U T

L E

R

C E

R T

IF

IE

D F

IN

A

L S

U B

M

IT

T A

L

S E

P T

E M

B E

R

G E

N E

R A

L S

H E

E T

I N

D E

X

V O

L U

M E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E A

P P

R

R

E V

IS

E

D I N

A C

C O

R D

A N

C E

W

IT

H A

M E

N D

M E

N T

/2 /2

R

E V

IS

E

D I N

A C

C O

R D

A N

C E

W

IT

H A

M E

N D

M E

N T

/2 /2

SHEET LIST - VOLUME 1

SHEET

NUMBER SHEET NAME REV DATE

GENERAL

G-001.1 COVER SHEET - VOLUME 1

G-002.1 SHEET INDEX - VOLUME 1 2 06/25/2025

G-003 GENERAL NOTES, ABBREVIATIONS

G-004 CODE ANALYSIS

G-005 FPLS CODE REVIEW FORM

G-101 CODE COMPLIANCE SITE PLAN

G-102 LIFE SAFETY PLAN

G-103 FIRE BARRIER DETAIL

CIVIL

GI101 PROJECT LOCATION MAPS

GC101 HAUL ROUTE PLAN 1 06/25/2025

GC102 PROPOSED PROJECT STAGING AREAS AND FENCING 1 06/25/2025

GR101 SITE PHOTO LOCATIONS 1 06/25/2025

GR102 SITE PHOTOS

VF101 OVERALL EXISTING CONDITIONS PLAN

VF102 EXISTING CONDITIONS PLAN

VF103 EXISTING CONDITIONS PLAN

VF104 SURVEY CONTROL PLAN

VF601 EXISTING STORM AND SANITARY STRUCTURE TABLES

VS101 STAKING PLAN 1 06/25/2025

BB101 BORING PLAN 1 06/25/2025

BB102 BORING LOGS

BB103 BORING LOGS

BB104 BORING LOSS

BB105 BORING LOGS

CD101 OVERALL SITE DEMOLITION PLAN 1 06/25/2025

CD102 SITE DEMOLITION PLAN 1 06/25/2025

CD103 SITE DEMOLITION PLAN

CS101 AERIAL SITE PLAN 1 06/25/2025

CG101 OVERALL SITE GRADING PLAN 2 06/25/2025

CG102 SITE GRADING PLAN 2 06/25/2025

CG103 SITE GRADING PROFILES 1 05/29/2025

CG104 STORMWATER DRY POND PLAN AND PROFILE 1 05/29/2025

CG105 OVERALL EROSION CONTROL PLAN 2 06/25/2025

CG106 EROSION CONTROL PLAN 2 06/25/2025

CG501 EROSION CONTROL DETAILS

CG502 EROSION CONTROL DETAILS

CG503 EROSION CONTROL DETAILS

CG504 EROSION CONTROL DETAILS

CG505 EROSION CONTROL DETAILS 1 05/29/2025

CG601 STORMWATER CALCULATIONS 1 05/29/2025

CP101 OVERALL SITE PLAN 1 06/25/2025

CP102 SITE PLAN 2 06/25/2025

CP103 SITE PLAN

CP501 SITE DETAILS 1 06/25/2025

CP502 SITE DETAILS 1 06/25/2025

CU101 OVERALL SITE UTILITY PLAN 2 06/25/2025

CU102 SITE UTILITY PLAN 2 06/25/2025

CU121 SANITARY SEWER PLAN AND PROFILE 1 05/29/2025

CU141 STORM DRAIN PLAN AND PROFILE 2 06/25/2025

CU142 STORM DRAIN PLAN AND PROFILE 1 05/29/2025

CU501 SITE UTILITY DETAILS

CU502 SITE UTILITY DETAILS 1 05/29/2025

CU503 SITE UTILITY DETAILS

LS101 LANDSCAPE SITE PLAN 1 06/25/2025

LS501 LANDSCAPE DETAILS

DR

M C

B

M C

B

W

2Q R

R

_P la ns -0

BOLLARDS

ST

O R

Y

PA

R

KI

N G

G

AR

AG

E

STOP STOP

STOP

ST

O

P

ST

O P

STO

P

LADDER

STO

P

GATE

#200 D

EX. BLDG.

METAL

OVERHANG

C.O. C.O.

#2

EX

IS

TI

N

G B

U

IL

D

IN

G

ELECTRIC

BOX

CART

CHARGING

PANEL

LADDER

ELECTRIC MH

RIM=616.96

ELECTRIC MH

RIM=617.50

TRANSFORMER

CONCRETE PAD

ELECTRICBOX

CONCRETE PAD

TRANSFORMER

CONCRETE PADELECTRICBOX

ELECTRIC

MH

RIM=617.10

ELECTRICBOX

ACCESS

PANEL

ELECTRIC MH

RIM=617.67

ELECTRIC MH

RIM=617.54

ELECTRIC MH

RIM=617.54

TRANSFORMER

CONCRETE PAD

TRANSFORMER

CONCRETE PAD

M.H.

RIM=616.98

FULL/WATER

ELEC

CONTROL

BOX

BR

AD

LE

Y

D R

IV

E

SF

C O

N F.

R O

O M

SF

C O

N F.

R O

O M

SF

C O

M M

SF

BR

EA

K R

M

S

F

VE

ST

IB

U

LE

SF

D

IV

. C H

IE

F

SF

D

IV

H

EA

D

SF

D

IV

H

EA

D

SF

BR

AN

C H

C H

IE

F

SF

BR

AN

C H

C H

IE

F

SF

BR

AN

C H

C H

IE

F

SF

BR

AN

C H

C H

IE

F

SF

D

IV

. C H

IE

F

SF

D

IV

C H

IE

F

SF

D

IV

C H

IE

F

SF

D

IV

H

EA

D

SF

FI

R

E

PU

M P

S

F

VE

ST

IB

U

LE

S F

C O

R R

ID

O

R

2B

SF

W O

M

EN

S

F

VE

ST

SF

JA

N

C

LO

SE

T

S

F

VE

ST

SF

M

EN 14

SF

N U

R

SI

N G

M O

TH

ER

SF

EL

EC

SF

BR

AN

C H

C H

IE

F

SF

BR

AN

C H

C H

IE

F

SF

BR

AN

C H

C H

IE

F

SF

BR

AN

C H

C H

IE

F

SF

C O

PY

R

M

SF

C O

M M

S F

ST

O

R

AG

E A

R

EA

SF

BR

AN

C H

C H

IE

F

SF

BR

AN

C H

C H

IE

F

SF

BR

AN

C H

C H

IE

F

SF

BR

AN

C H

C H

IE

F

3 17

SF

D

IV

C H

IE

F

SF

D

IV

C H

IE

F

SF

C O

PY

R

O O

M

SF

BR

AN

C H

C H

IE

F

SF

D

IV

C H

IE

F

SF

BR

AN

C H

C H

IE

F

S F

O

PE

N O

FF

IC

E

S F

O

PE

N O

FF

IC

E

SF

M

EC

H

SF

EL

EC

SF

BR

AN

C H

C H

IE

F

SF

BR

AN

C H

C H

IE

F

SF

BR

AN

C H

C H

IE

F

S

F

LO

C

KE

R

S

7A

SF

C O

R R

ID

O

R

2A

SF

C O

R R

ID

O

R

7B

SF

C O

R R

ID

O

R

7C

TACTICAL VEHICLE LAB

FFE = 618.49

BB

B B

BB

B B

B B

CONNECTOR

FFE = 618.18

MOUND RD

EISENHOWER DRIVE

BASE ACCESS CONTROL GATE

J LOT

PARKING

GARAGE

200C

200D

TRACK 1

TACTICAL

VEHICLE LAB

AR

SE

N

AL

A

VE

N U

E

602 CANOPY

605 CANOPY

ABRAMS DRIVE

SHEET ID

D

ES

IG

N

B Y:

D R

AW

N

B Y:

C H

EC

KE

D B

Y:

SU

BM

IT

TE

D B

Y:

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

LO

U

IS

VI

LL

E

D

IS

TR

IC

T

D

R M

AR

TI

N L

U

TH

ER

J

R P

L

LO

U

IS

VI

LL

E, K

EN

TU

C

KY

A

DE

TR

OI

T

AR

SE

NA

L, MI

CH

IG

AN

MA

NN

ED

/ U

NM

AN

NE

D

TA

CT

IC

AL

V

EH

IC

LE

LA

B

FY

P2

# 5

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

B

C

D

E

F

G

H

J

K

L

M

N

P

Fi le

P at h:

X

:\3

\2

7.

\T

EC

H

\C

AD

\5

4_

G C

1.

D W

G Pl ot D at e:

/2

4/

IS

SU

E D

AT

E:

SO

LI

C

IT

AT

IO

N N

O

C O

N

TR

AC

T

N O

SI

ZE

AN

SI

D

C

ER

TI

FI

ED

F

IN

AL

S U

BM

IT

TA

L

A.

A

N D

ER

SO

N

C . J

O N

ES

SE

PT

EM

BE

R

0, M &H

P R

O

JE

C T

N O

R

0-

.0

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E

A.

S

KO

G

M . B

U

TL

ER

KEY PLAN

US Army Corps of Engineers

H

AU

L R

O U

TE

P

LA

N

GC101

HAUL or TRAFFIC ROUTE

PROPOSED CONTRACTOR STAGING AREA

AND

STOCKPILE LOCATION

1. ALL CONTRACTOR PERSONNEL AND VEHICLES MAY BE SUBJECT TO

INSPECTION AT ENTRANCE GATE PRIOR TO ENTERING PROPERTY.

2. IT IS THE CONTRACTOR'S RESPONSIBILITY TO ENSURE ALL

GOVERNMENT PROPERTY INCLUDING PAVEMENT, FENCING AND

UTILITIES ARE IN EQUIVALENT OR BETTER CONDITION AFTER

COMPLETION OF THE PROJECT THAN BEFORE THE START OF

CONSTRUCTION.

3. PROPOSED STAGING AREA IS WITHIN PROJECT CONSTRUCTION LIMITS.

PROPOSED SIDEWALK, STORM SEWER AND TURF AREAS ARE TO BE

PHASED SUCH THAT THEY ARE NOT DAMAGED DURING CONSTRUCTION

OF BUILDING AND SURROUNDING PAVEMENT.

4. EROSION CONTROL SHALL BE MAINTAINED THROUGHOUT PROJECT. ALL

EXISTING AND PROPOSED STORM SEWER STRUCTURES ARE TO BE

PROTECTED THROUGHOUT CONSTRUCTION. ANY WASTE SITES OR

MATERIAL STOCKPILES ARE TO BE CONTAINED IN DESIGNATED AREAS.

5. ALL EXCESS SOIL AND CONSTRUCTION WASTE SHALL GO TO A STATE

CERTIFIED LANDFILL. NO SOIL DISPOSAL OR BORROW SITE IS LOCATED

AT THE DETROIT ARSENAL.

TR

U

E N

O R

TH

SHEET LEGEND

HAUL ROUTE GENERAL SHEET NOTES

100' 200'0SCALE: 1"=100'-0"

HAUL ROUTE PLANA1

R

EV

IS

ED

IN

A C

C O

R D

AN

C

E W

IT

H

A M

EN

D

M

EN

T

/2 5/

W

2Q R

R

_P la ns -0

STOP STOP

STOP

ST

O

P

ST

O P

STO

P

LADDER

METAL

OVERHANG

LADDER

BR

AD

LE

Y

D R

IV

E

BLDG 200D

EISENHOWER DRIVE

SF

C O

N F.

R O

O M

SF

C O

N F.

R O

O M

SF

C O

M M

SF

BR

EA

K R

M

S

F

VE

ST

IB

U

LE

SF

D

IV

. C H

IE

F

SF

D

IV

H

EA

D

SF

D

IV

H

EA

D

SF

BR

AN

C H

C H

IE

F

SF

BR

AN

C H

C H

IE

F

SF

BR

AN

C H

C H

IE

F

SF

BR

AN

C H

C H

IE

F

SF

D

IV

. C H

IE

F

SF

D

IV

C H

IE

F

SF

D

IV

C H

IE

F

SF

D

IV

H

EA

D

SF

FI

R

E

PU

M P

S

F

VE

ST

IB

U

LE

S F

C O

R R

ID

O

R

2B

SF

W O

M

EN

S

F

VE

ST

SF

JA

N

C

LO

SE

T

S

F

VE

ST

SF

M

EN 14

SF

N U

R

SI

N G

M O

TH

ER

SF

EL

EC

SF

BR

AN

C H

C H

IE

F

SF

BR

AN

C H

C H

IE

F

SF

BR

AN

C H

C H

IE

F

SF

BR

AN

C H

C H

IE

F

SF

C O

PY

R

M

SF

C O

M M

S F

ST

O

R

AG

E A

R

EA

SF

BR

AN

C H

C H

IE

F

SF

BR

AN

C H

C H

IE

F

SF

BR

AN

C H

C H

IE

F

SF

BR

AN

C H

C H

IE

F

3 17

SF

D

IV

C H

IE

F

SF

D

IV

C H

IE

F

SF

C O

PY

R

O O

M

SF

BR

AN

C H

C H

IE

F

SF

D

IV

C H

IE

F

SF

BR

AN

C H

C H

IE

F

S F

O

PE

N O

FF

IC

E

S F

O

PE

N O

FF

IC

E

SF

M

EC

H

SF

EL

EC

SF

BR

AN

C H

C H

IE

F

SF

BR

AN

C H

C H

IE

F

SF

BR

AN

C H

C H

IE

F

S

F

LO

C

KE

R

S

7A

SF

C O

R R

ID

O

R

2A

SF

C O

R R

ID

O

R

7B

SF

C O

R R

ID

O

R

7C

TACTICAL VEHICLE LAB

FFE = 618.49

BB

B B

BB

B B

B B

CONNECTOR

FFE = 618.18

TACTICAL VEHICLE LAB

BLDG 200C

HH

CB

CB

PIV

S

W V

W V

FDC

W V

W V

CB

CB

CB

CB

C B

W M

HH

CO

CO

CB

C B

N = 365857.16 E = 13480557.64

BLDG 219

LOT H2

PROPOSED STAGING AREA

PROPOSED

STOCKPILE LOCATION

N = 366109.18 E = 13480556.50

N = 366107.07 E = 13480506.87

N = 365969.10 E = 13480562.43

N = 365967.00 E = 13480512.81

N = 365956.88 E = 13480553.41

N = 365958.20 E = 13480584.68

N = 365858.49 E = 13480588.90 x x xx x x x x x x x x x x x x x x xx xx xx xx x x xx xx xx xxxxxxxxxxxxxx xx

SHEET ID

D

ES

IG

N

B Y:

D R

AW

N

B Y:

C H

EC

KE

D B

Y:

SU

BM

IT

TE

D B

Y:

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

LO

U

IS

VI

LL

E

D

IS

TR

IC

T

D

R M

AR

TI

N L

U

TH

ER

J

R P

L

LO

U

IS

VI

LL

E, K

EN

TU

C

KY

A

DE

TR

OI

T

AR

SE

NA

L, MI

CH

IG

AN

MA

NN

ED

/ U

NM

AN

NE

D

TA

CT

IC

AL

V

EH

IC

LE

LA

B

FY

P2

# 5

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

B

C

D

E

F

G

H

J

K

L

M

N

P

Fi le

P at h:

X

:\3

\2

7.

\T

EC

H

\C

AD

\5

4_

G C

2.

D W

G Pl ot D at e:

/2

4/

IS

SU

E D

AT

E:

SO

LI

C

IT

AT

IO

N N

O

C O

N

TR

AC

T

N O

SI

ZE

AN

SI

D

C

ER

TI

FI

ED

F

IN

AL

S U

BM

IT

TA

L

A.

A

N D

ER

SO

N

C . J

O N

ES

SE

PT

EM

BE

R

0, M &H

P R

O

JE

C T

N O

R

0-

.0

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E

A.

S

KO

G

M . B

U

TL

ER

KEY PLAN

US Army Corps of Engineers

PR

O

PO

SE

D P

R O

JE

C

T

ST

AG

IN

G A

R

EA

S

AN

D F

EN

C

IN

G

GC102

CONTRACTOR WORK LIMIT

PROPOSED CONTRACTOR STAGING AREA AND

STOCKPILE LOCATION

TEMPORARY CHAINLINK FENCING BOUNDARYx x

SHEET LEGEND

GENERAL SHEET NOTES

1. IT IS THE CONTRACTOR'S RESPONSIBILITY TO ENSURE ALL

GOVERNMENT PROPERTY INCLUDING PAVEMENT, FENCING AND

UTILITIES ARE IN EQUIVALENT OR BETTER CONDITION AFTER

COMPLETION OF THE PROJECT THAN BEFORE THE START OF

CONSTRUCTION.

2. PROPOSED STAGING AREA IS WITHIN PROJECT CONSTRUCTION LIMITS.

PROPOSED SIDEWALK, STORM SEWER AND TURF AREAS ARE TO BE

PHASED SUCH THAT THEY ARE NOT DAMAGED DURING CONSTRUCTION

OF BUILDING AND SURROUNDING PAVEMENT.

TR

U

E N

O R

TH

SCALE: 1"=40'-0"

PROPOSED PROJECT STAGING AREAS AND FENCINGA1

R

EV

IS

ED

IN

A C

C O

R D

AN

C

E W

IT

H

A M

EN

D

M

EN

T

/2 5/

W

2Q R

R

_P la ns -0

BOLLARDS

L.P.

L.P.

L.P.

L.P.

L.P.L.P.

ST

O R

Y

PA

R

KI

N G

G

AR

AG

E

STOP STOP

STOP

ST

O

P

ST

O P

STO

P

LADDER

STO

P

GATE

#200 D

EX. BLDG.

METAL

OVERHANG

C.O. C.O.

L.P.

#2

EX

IS

TI

N

G B

U

IL

D

IN

G

ELECTRIC

BOX

L.P.

CART

CHARGING

PANEL

LADDER

GAS

METER

GAS

PIPELINE

GAS

METER

GAS

METER

ELEC

CONTROL

BOX

BR

AD

LEY D

R

IVE

SF

C O

N F.

R O

O M

SF

C O

N F.

R O

O M

SF

C O

M M

SF

BR

EA

K R

M

S

F

VE

ST

IB

U

LE

SF

D

IV

. C H

IE

F

SF

D

IV

H

EA

D

SF

D

IV

H

EA

D

SF

BR

AN

C H

C H

IE

F

SF

BR

AN

C H

C H

IE

F

SF

BR

AN

C H

C H

IE

F

SF

BR

AN

C H

C H

IE

F

SF

D

IV

. C H

IE

F

SF

D

IV

C H

IE

F

SF

D

IV

C H

IE

F

SF

D

IV

H

EA

D

SF

FI

R

E

PU

M P

S

F

VE

ST

IB

U

LE

S F

C O

R R

ID

O

R

2B

SF

W O

M

EN

S

F

VE

ST

SF

JA

N

C

LO

SE

T

S

F

VE

ST

SF

M

EN 14

SF

N U

R

SI

N G

M O

TH

ER

SF

EL

EC

SF

BR

AN

C H

C H

IE

F

SF

BR

AN

C H

C H

IE

F

SF

BR

AN

C H

C H

IE

F

SF

BR

AN

C H

C H

IE

F

SF

C O

PY

R

M

SF

C O

M M

S F

ST

O

R

AG

E A

R

EA

SF

BR

AN

C H

C H

IE

F

SF

BR

AN

C H

C H

IE

F

SF

BR

AN

C H

C H

IE

F

SF

BR

AN

C H

C H

IE

F

3 17

SF

D

IV

C H

IE

F

SF

D

IV

C H

IE

F

SF

C O

PY

R

O O

M

SF

BR

AN

C H

C H

IE

F

SF

D

IV

C H

IE

F

SF

BR

AN

C H

C H

IE

F

S F

O

PE

N O

FF

IC

E

S F

O

PE

N O

FF

IC

E

SF

M

EC

H

SF

EL

EC

SF

BR

AN

C H

C H

IE

F

SF

BR

AN

C H

C H

IE

F

SF

BR

AN

C H

C H

IE

F

S

F

LO

C

KE

R

S

7A

SF

C O

R R

ID

O

R

2A

SF

C O

R R

ID

O

R

7B

SF

C O

R R

ID

O

R

7C

TACTICAL VEHICLE LAB

FFE = 618.49

BB

B B

BB

B B

B B

CONNECTOR

FFE = 618.18

EISENHOWER DRIVE

200C

200D

TACTICAL

VEHICLE LAB

PARKING

GARAGE

LOT H2

LOT H1

LOT H

CONTRACTOR WORK LIMITS

K2

GR102

F2

GR102

A2

GR102

K12

GR102

E12

GR102

SHEET ID

D

ES

IG

N

B Y:

D R

AW

N

B Y:

C H

EC

KE

D B

Y:

SU

BM

IT

TE

D B

Y:

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

LO

U

IS

VI

LL

E

D

IS

TR

IC

T

D

R M

AR

TI

N L

U

TH

ER

J

R P

L

LO

U

IS

VI

LL

E, K

EN

TU

C

KY

A

DE

TR

OI

T

AR

SE

NA

L, MI

CH

IG

AN

MA

NN

ED

/ U

NM

AN

NE

D

TA

CT

IC

AL

V

EH

IC

LE

LA

B

FY

P2

# 5

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

B

C

D

E

F

G

H

J

K

L

M

N

P

Fi le

P at h:

X

:\3

\2

7.

\T

EC

H

\C

AD

\5

4_

G R

1.

D W

G Pl ot D at e:

/2

4/

IS

SU

E D

AT

E:

SO

LI

C

IT

AT

IO

N N

O

C O

N

TR

AC

T

N O

SI

ZE

AN

SI

D

C

ER

TI

FI

ED

F

IN

AL

S U

BM

IT

TA

L

A.

A

N D

ER

SO

N

C . J

O N

ES

SE

PT

EM

BE

R

0, M &H

P R

O

JE

C T

N O

R

0-

.0

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E

A.

S

KO

G

M . B

U

TL

ER

KEY PLAN

US Army Corps of Engineers

SI

TE

P H

O

TO

L O

C

AT

IO

N

S

GR101

GENERAL SHEET NOTES

PHOTO LOCATION AND DIRECTION

SHEET LEGEND

XX

XXX

40' 80'0

TR

U

E N

O R

TH

SCALE: 1"=40'-0"

SITE PHOTO LOCATIONSA1

1. FOR SITE PHOTOS, SEE GR102.

R

EV

IS

ED

IN

A C

C O

R D

AN

C

E W

IT

H

A M

EN

D

M

EN

T

/2 5/

W

2Q R

R

_P la ns -0

ST

O

P

ST

O P

STO

P

LADDER

LADDER

BR

AD

LE

Y

D R

IV

E

BLDG 200D

EISENHOWER DRIVE

SF

C O

N F.

R O

O M

SF

C O

N F.

R O

O M

SF

C O

M M

SF

BR

EA

K R

M

S

F

VE

ST

IB

U

LE

SF

D

IV

. C H

IE

F

SF

D

IV

H

EA

D

SF

D

IV

H

EA

D

SF

BR

AN

C H

C H

IE

F

SF

BR

AN

C H

C H

IE

F

SF

BR

AN

C H

C H

IE

F

SF

BR

AN

C H

C H

IE

F

SF

D

IV

. C H

IE

F

SF

D

IV

C H

IE

F

SF

D

IV

C H

IE

F

SF

D

IV

H

EA

D

SF

FI

R

E

PU

M P

S

F

VE

ST

IB

U

LE

S F

C O

R R

ID

O

R

2B

SF

W O

M

EN

S

F

VE

ST

SF

JA

N

C

LO

SE

T

S

F

VE

ST

SF

M

EN 14

SF

N U

R

SI

N G

M O

TH

ER

SF

EL

EC

SF

BR

AN

C H

C H

IE

F

SF

BR

AN

C H

C H

IE

F

SF

BR

AN

C H

C H

IE

F

SF

BR

AN

C H

C H

IE

F

SF

C O

PY

R

M

SF

C O

M M

S F

ST

O

R

AG

E A

R

EA

SF

BR

AN

C H

C H

IE

F

SF

BR

AN

C H

C H

IE

F

SF

BR

AN

C H

C H

IE

F

SF

BR

AN

C H

C H

IE

F

3 17

SF

D

IV

C H

IE

F

SF

D

IV

C H

IE

F

SF

C O

PY

R

O O

M

SF

BR

AN

C H

C H

IE

F

SF

D

IV

C H

IE

F

SF

BR

AN

C H

C H

IE

F

S F

O

PE

N O

FF

IC

E

S F

O

PE

N O

FF

IC

E

SF

M

EC

H

SF

EL

EC

SF

BR

AN

C H

C H

IE

F

SF

BR

AN

C H

C H

IE

F

SF

BR

AN

C H

C H

IE

F

S

F

LO

C

KE

R

S

7A

SF

C O

R R

ID

O

R

2A

SF

C O

R R

ID

O

R

7B

SF

C O

R R

ID

O

R

7C

TACTICAL VEHICLE LAB

FFE = 618.49

BB

B B

BB

B B

B B

CONNECTOR

FFE = 618.18

TACTICAL VEHICLE LAB

STORMWATER DRY POND

BLDG 200C

HH

CB

CB

PIV

S

W V

W V

FDC

W V

W V

CB

CB

CB

CB

C B

W M

HH

CO

CO

CB

C B

3 10

203 20

224 22

230 231

2 23

246 24

271 272

285 286

0 311

BLDG 219

LOT H2

PARKING

GARAGE

9 29

STAKING

No.

DESCRIPTION

BC

BC

BC

BC

BC

BC

BC

BC

BC

BC

CONC

CONC

CONC

CONC

CONC

CONC

CONC

CONC

CONC

CONC

CONC

CONC

CONC

CONC

CONC

CONC

CONC

CONC

CONC

CONC

CONC

CONC

CONC

CONC

CONC

CONC

CONC

CONC

CONC

CONC

CONC

CONC

CONC

CONC

CONC

CONC

CONC

CONC

CONC

CONC

CONC

CONC

CONC

CONC

CONC

NORTHING

366,158.77

365,890.18

365,888.60

365,856.62

365,855.04

365,841.22

365,838.10

366,152.52

366,155.41

366,156.10

366,170.26

366,166.67

366,171.52

366,166.48

366,156.00

366,150.48

366,149.10

366,149.21

366,126.70

366,120.71

366,126.09

366,117.77

366,124.55

366,113.95

366,125.66

366,115.56

366,110.94

366,110.54

366,108.05

366,048.38

366,049.78

366,049.53

366,024.12

365,951.75

365,917.83

365,941.12

365,922.90

365,920.89

365,959.24

365,840.70

365,835.68

365,843.11

365,834.08

365,777.90

365,783.64

365,776.92

365,776.71

365,773.02

365,772.71

365,753.03

365,752.72

365,774.16

365,773.91

365,841.12

365,836.76

EASTING

13,480,440.10

13,480,451.48

13,480,414.18

13,480,415.53

13,480,378.23

13,480,378.82

13,480,305.22

13,480,291.90

13,480,360.92

13,480,376.27

13,480,380.64

13,480,414.07

13,480,452.42

13,480,451.52

13,480,489.60

13,480,489.83

13,480,494.99

13,480,500.99

13,480,490.94

13,480,491.19

13,480,446.49

13,480,446.84

13,480,515.53

13,480,515.88

13,480,552.63

13,480,552.57

13,480,556.92

13,480,561.46

13,480,559.62

13,480,521.46

13,480,505.21

13,480,499.21

13,480,517.69

13,480,519.34

13,480,527.66

13,480,512.16

13,480,504.99

13,480,511.43

13,480,517.67

13,480,561.48

13,480,562.64

13,480,566.97

13,480,568.72

13,480,571.10

13,480,564.85

13,480,547.97

13,480,542.97

13,480,548.17

13,480,543.20

13,480,598.65

13,480,589.43

13,480,578.98

13,480,569.73

13,480,427.06

13,480,431.19

STAKING

No.

DESCRIPTION

CONC

CONC

CONC

CONC

CONC

CONC

CONC

CONC

CONC

CONC

CONC

CONC

CONC

CONC

CONC

CONC

CONC

CONC

CONC

CONC

CONC

CONC

CONC

CONC

CONC

CONC

CONC

CONC

CONC

AP

AP

CONC

CONC

AP

AP

CONC

CONC

CONC

CONC

CONC

CONC

AP

AP

CONC

CONC

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

NORTHING

365,834.67

365,828.69

365,833.77

365,838.56

365,850.43

365,838.30

365,833.10

365,827.91

365,822.03

365,835.58

365,835.44

365,835.26

365,805.64

365,801.41

365,803.94

365,799.33

365,794.44

365,788.34

365,782.86

365,787.92

365,773.13

365,767.13

365,850.05

365,796.67

365,786.84

365,795.32

365,786.41

366,037.75

366,029.75

366,035.99

366,027.98

366,131.87

366,123.88

366,130.92

366,122.93

366,169.33

366,172.52

366,164.70

366,159.71

366,169.19

366,160.86

366,017.93

366,025.92

366,131.91

366,115.93

365,816.91

365,802.51

365,779.21

365,777.14

365,822.79

365,830.91

365,903.81

365,907.78

365,842.36

365,832.18

EASTING

13,480,413.17

13,480,413.84

13,480,391.97

13,480,386.77

13,480,387.44

13,480,380.77

13,480,375.99

13,480,253.67

13,480,256.60

13,480,248.33

13,480,242.34

13,480,238.19

13,480,249.81

13,480,252.10

13,480,246.41

13,480,248.81

13,480,256.78

13,480,262.04

13,480,262.25

13,480,257.32

13,480,315.70

13,480,315.99

13,480,378.45

13,480,218.41

13,480,218.48

13,480,208.89

13,480,208.98

13,480,229.50

13,480,229.84

13,480,189.45

13,480,189.25

13,480,225.46

13,480,225.71

13,480,203.76

13,480,204.11

13,480,223.85

13,480,291.38

13,480,291.54

13,480,291.75

13,480,355.33

13,480,355.68

13,479,959.82

13,479,959.31

13,480,495.72

13,480,496.40

13,480,272.79

13,480,268.20

13,480,301.11

13,480,312.56

13,480,413.26

13,480,430.77

13,480,527.37

13,480,507.74

13,480,552.16

13,480,554.32

STAKING

No.

DESCRIPTION

SW

SW

DS

DS

DS

CH

HYD

DS

DS

DS

DS

HYD

PIV

SS

DS

CH

NORTHING

365,802.25

365,788.58

365,806.28

366,100.83

366,008.60

365,824.24

365,785.38

365,805.67

365,841.56

365,947.19

366,041.74

366,161.48

366,156.22

366,022.02

366,139.58

366,150.64

EASTING

13,480,555.01

13,480,541.65

13,480,397.20

13,480,522.70

13,480,537.80

13,480,559.01

13,480,286.46

13,480,447.16

13,480,252.76

13,480,250.42

13,480,245.03

13,480,232.15

13,480,247.75

13,479,961.73

13,480,473.41

13,480,450.13

SHEET ID

D

ES

IG

N

B Y:

D R

AW

N

B Y:

C H

EC

KE

D B

Y:

SU

BM

IT

TE

D B

Y:

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

LO

U

IS

VI

LL

E

D

IS

TR

IC

T

D

R M

AR

TI

N L

U

TH

ER

J

R P

L

LO

U

IS

VI

LL

E, K

EN

TU

C

KY

A

DE

TR

OI

T

AR

SE

NA

L, MI

CH

IG

AN

MA

NN

ED

/ U

NM

AN

NE

D

TA

CT

IC

AL

V

EH

IC

LE

LA

B

FY

P2

# 5

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

B

C

D

E

F

G

H

J

K

L

M

N

P

Fi le

P at h:

X

:\3

\2

7.

\T

EC

H

\C

AD

\5

4_

VS

1.

D

W G

Pl ot

D at e:

/2 4/

IS

SU

E D

AT

E:

SO

LI

C

IT

AT

IO

N N

O

C O

N

TR

AC

T

N O

SI

ZE

AN

SI

D

C

ER

TI

FI

ED

F

IN

AL

S U

BM

IT

TA

L

A.

A

N D

ER

SO

N

C . J

O N

ES

SE

PT

EM

BE

R

0, M &H

P R

O

JE

C T

N O

R

0-

.0

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E

A.

S

KO

G

M . B

U

TL

ER

US Army Corps of Engineers

SHEET LEGEND:

AP ASPHALT

BC BUILDING CORNER

CH COMM HANDHOLE

CONC CONCRETE

DS DRAINAGE STRUCTURE

HYD HYDRANT

PIV PI VALVE

SS SANITARY STRUCTURE

SW STORMWATER DRY POND

CONTRACTOR WORK LIMIT

ST

AK

IN

G

P

LA

N

VS10140' 80'0

TR

U

E N

O R

TH

SCALE: 1"=40'-0"

STAKING PLANA1

R

EV

IS

ED

IN

A C

C O

R D

AN

C

E W

IT

H

A M

EN

D

M

EN

T

/2 5/

W

2Q R

R

_P la ns -0

STO

P

SF

C O

N F.

R O

O M

SF

C O

N F.

R O

O M

SF

C O

M M

SF

BR

EA

K R

M

S

F

VE

ST

IB

U

LE

SF

D

IV

. C H

IE

F

SF

D

IV

H

EA

D

SF

D

IV

H

EA

D

SF

BR

AN

C H

C H

IE

F

SF

BR

AN

C H

C H

IE

F

SF

BR

AN

C H

C H

IE

F

SF

BR

AN

C H

C H

IE

F

SF

D

IV

. C H

IE

F

SF

D

IV

C H

IE

F

SF

D

IV

C H

IE

F

SF

D

IV

H

EA

D

SF

FI

R

E

PU

M P

S

F

VE

ST

IB

U

LE

S F

C O

R R

ID

O

R

2B

SF

W O

M

EN

S

F

VE

ST

SF

JA

N

C

LO

SE

T

S

F

VE

ST

SF

M

EN 14

SF

N U

R

SI

N G

M O

TH

ER

SF

EL

EC

SF

BR

AN

C H

C H

IE

F

SF

BR

AN

C H

C H

IE

F

SF

BR

AN

C H

C H

IE

F

SF

BR

AN

C H

C H

IE

F

SF

C O

PY

R

M

SF

C O

M M

S F

ST

O

R

AG

E A

R

EA

SF

BR

AN

C H

C H

IE

F

SF

BR

AN

C H

C H

IE

F

SF

BR

AN

C H

C H

IE

F

SF

BR

AN

C H

C H

IE

F

3 17

SF

D

IV

C H

IE

F

SF

D

IV

C H

IE

F

SF

C O

PY

R

O O

M

SF

BR

AN

C H

C H

IE

F

SF

D

IV

C H

IE

F

SF

BR

AN

C H

C H

IE

F

S F

O

PE

N O

FF

IC

E

S F

O

PE

N O

FF

IC

E

SF

M

EC

H

SF

EL

EC

SF

BR

AN

C H

C H

IE

F

SF

BR

AN

C H

C H

IE

F

SF

BR

AN

C H

C H

IE

F

S

F

LO

C

KE

R

S

7A

SF

C O

R R

ID

O

R

2A

SF

C O

R R

ID

O

R

7B

SF

C O

R R

ID

O

R

7C

TACTICAL VEHICLE LAB

FFE = 618.49

BB

B B

BB

B B

B B

CONNECTOR

FFE = 618.18

BR

AD

LE

Y

D R

IV

E

BLDG 200D

BL

D

G

C

SIDEWALK

EXISTING DRIVE TO REMAIN

EISENHOWER DRIVE

SI

D

EW

AL

K

EX

IS

TI

N

G A

SP

H

AL

T

SI

D

EW

AL

K

SI

D

EW

AL

K

SI

D

EW

AL

K

SI

D

EW

AL

K

T1

T2

T3

T4

T5

T10

T9

T8

T7

T6

B7

B8

B6

B4

B5

B3

B1

B2

STORMWATER DRY POND

SHEET ID

D

ES

IG

N

B Y:

D R

AW

N

B Y:

C H

EC

KE

D B

Y:

SU

BM

IT

TE

D B

Y:

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

LO

U

IS

VI

LL

E

D

IS

TR

IC

T

D

R M

AR

TI

N L

U

TH

ER

J

R P

L

LO

U

IS

VI

LL

E, K

EN

TU

C

KY

A

DE

TR

OI

T

AR

SE

NA

L, MI

CH

IG

AN

MA

NN

ED

/ U

NM

AN

NE

D

TA

CT

IC

AL

V

EH

IC

LE

LA

B

FY

P2

# 5

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

B

C

D

E

F

G

H

J

K

L

M

N

P

Fi le

P at h:

X

:\3

\2

7.

\T

EC

H

\C

AD

\5

4_

BB

1.

D

W G

Pl ot

D at e:

/2 4/

IS

SU

E D

AT

E:

SO

LI

C

IT

AT

IO

N N

O

C O

N

TR

AC

T

N O

SI

ZE

AN

SI

D

C

ER

TI

FI

ED

F

IN

AL

S U

BM

IT

TA

L

A.

A

N D

ER

SO

N

C . J

O N

ES

SE

PT

EM

BE

R

0, M &H

P R

O

JE

C T

N O

R

0-

.0

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E

A.

S

KO

G

M . B

U

TL

ER

KEY PLAN

US Army Corps of Engineers

BO

R

IN

G

P

LA

N

BB101

SOIL BORING

CONTRACTOR WORK LIMIT

SHEET LEGEND

GENERAL SHEET NOTES

1. SOIL BORINGS PERFORMED IN JANUARY AND FEBRUARY OF 2023 BY

TESTING ENGINEERS AND CONSULTANTS, INC.

TR

U

E N

O R

TH

SCALE: 1"=20'-0"

BORING PLANA1 20' 40'0

R

EV

IS

ED

IN

A C

C O

R D

AN

C

E W

IT

H

A M

EN

D

M

EN

T

/2 5/

W

2Q R

R

_P la ns -0

//FNC// //FNC//

CB-14

BOLLARDS

GSV

L.

P

L.P.

L.P.

L.P.

L.P.

L.P.

L.P.

L.P.

L.P.

L.P.

L.P.

L.P.

L.P.

L.P.

L.P.

L.P.L.P.

WSV

WSV

WSV

WSV

WSV

HYD.

HYD.

L.P.

FF=

618.48

FF=

618.47

FF=

618.51

FF=

618.34

BUILDING

SIGN

A .C

.U N

IT

HYD.

HYD.

SI

G

N

ST

O

R

AG

E C

O N

TA

IN

ER

ST

O

R

AG

E C

O N

TA

IN

ER

ST

O

R

AG

E C

O N

TA

IN

ER

SI

G

N

STOP STOP

FF=

619.20

STOP

ST

O

P

ST

O P

STONE

LANDSCAPE

FF=

618.41

SI

G

N

SI

G N

STO

P

D U

M

PS

TE

R

DUMPSTER

ST

O

R

AG

E C

O N

TA

IN

ER

D U

M

PS

TE

R

L.P.

D U

M

PS

TE

R

D U

M

PS

TE

R

D U

M

PS

TE

R

D U

M

PS

TE

R

D U

M

PS

TE

R

BOULDER

HYD.

ST

O

R

AG

E C

O N

TA

IN

ER

ST

O R

AG

E

C O

N

TA

IN

ER

ST

O

R

AG

E C

O N

TA

IN

ER

ST

O R

AG

E

C O

N

TA

IN

ER

ST

O

R

AG

E C

O N

TA

IN

ER

ST

O R

AG

E

C O

N

TA

IN

ER

A.C.UNIT

ST

O

R

AG

E C

O N

TA

IN

ER

ST

O R

AG

E

C O

N

TA

IN

ER

LADDER

MUELLER

PIV

SI

G

N

SI

G

N

SI

G N

SI

G

N

SI

G N

SI

G

N

SI

G N

SI

G

N

STO

P

SI

G

N

SI

G

N

SI

G

N

SI

G

N

GATE

SI

G N

SI

G

N

SI

G

N

SI

G

N

SI

G

N

SI

G

N

SI

G

N

SI

G

N

SI

G

N

SI

G

N SI

G

N

P O

R

TA

B

LE

SH

EL

TE

R

BLOCK

BARRIERS

M U

EL

LE

R

SI

G

N

ST

O

R

AG

E C

O N

TA

IN

ER

METAL

OVERHANG

C.O. C.O.

SI

G

N

S

TR

E E

T

SI

G

N SIGN

L.P.

L.P.

//S D

//S D

//S

D

//SD////SD//

"S

D

6"SD.

"S

D

4"SD.

"S

D

//S D

//SD//6"

S

D

12"SD

//SD//

//SD//

//SD//

6"SD.

//W

//W

//W

//W

//W

//E//

//E//

//E//

//E// //E//

//E// //E//

//E

//E

//E//

FF=

618.50

ELECTRIC

BOX

FF=

618.49

FF=

618.43

FF=

618.47

FF=

618.47

FF=

618.51

FF=

618.49

HYD.

L.P.

L.P.

SI

G

N

SI

G N

SI

G

N

SI

G N

SI

G

N

BUMPER

BLOCKS

A .C

.U N

IT

S

FF=

618.37

FF=

617.88

W

SV

SI

G

N

//S D

//S

D

"S

D

4"SD.

FF=

618.52

FF=

617.99

FF=

617.98

FF=

618.54

FF=

618.46

SI

G

N

CART

CHARGING

PANEL

FF=

618.49

CB-27

CB-28

CB-29

CB-7

CB-30

CULVERT-32

CB-43

LADDER

ELECTRIC MH

RIM=616.96

ELECTRIC MH

RIM=617.50

FIRE DEPT.

CONNECTION

TRANSFORMER

CONCRETE PAD

ELECTRICBOX

CONCRETE PAD

GVW #34

RIM=617.70

FULL/WATER

TRANSFORMER

CONCRETE PADELECTRICBOX

2"P.V.C.

PIPE

GVW

RIM=618.04

T/P=611.64

ELECTRIC

MH

RIM=617.10

ELECTRICBOX

GVW

RIM=617.17

T/P=609.05

GVW

RIM=616.96

T/P=610.14

#33

GVW

RIM=617.35

FULL/WATER

ACCESS

PANEL

ELECTRIC MH

RIM=617.67

ELECTRIC MH

RIM=617.54

GVW

RIM=618.08

T/P=611.38

ELECTRIC MH

RIM=617.54

TRANSFORMER

CONCRETE PAD

TRANSFORMER

CONCRETE PAD

M.H.

RIM=616.98

FULL/WATER

FIRE DEPT.

CONNECTION

CB-1

CB-15

CB-18

CB-19

CB-44

CB-31

CB-4

C.O.

GAS

METER

MH-17

MH-16

SS MH-5

SS MH-1206

SS MH-1207

SS MH-1208

MH-39

MH-37

MH-38MH-41

MH-6

MH-10 MH-8

MH-2

MH-23

MH-25

T MH

RIM=617.75

T MH

RIM=617.67

T MH

RIM=617.64

CB-36

CB-40

CB-33

CB-22

MH-26

CB-24

CB-13CB-9

CB-11

CB-5

CB-3

GAS

PIPELINE

C.O.

12"SS

12"SS

6"SD

6" S

D

6" S

D

"S

D

"S

D

30"SD

30"SD

12"SS

"S

"S

6"SD

12"SD

"S

D

54"SD

54"SD

15"SD

12"SD

18"SD18"SD

"S

D

54"SD

54"SD

"S

D

"S

D

"S

D

24"S D

10"SD

"S

D

6" S

D6"SD 6"SD

"S

D

"S

D

15"SD

6"SD

6"SS

4" S

S

"S

D

4"S D

12"SD

"S

D "S

D

18"SD

15"SD

15"SD

"S

D

18"SD

"S

D

12"SS

"S

D

15"SD

18"SD

"S

D "S

D

4"SD

"S

D

15"SD

"S

D "S

D

MH-42

12"SD

CB-12

SS M-4

CB-35

4"S D

"S

D

MH-21

CB-20

CB-34

GAS

METER

GAS

METER

BLOCK

BARRIERS

BLOCK

BARRIERS

BLOCK

BARRIERS

ELEC

CONTROL

BOX

BR

AD

LE

Y

D R

IV

E

BLDG

200D

EISENHOWER DRIVE

BLDG 200C

CLEAR AND GRUB

EXISTING ASPHALT,

SANITARY SEWER TRENCH

CONTRACTOR

WORK LIMIT

CONTRACTOR TO

VERIFY 6" STORM

PIPE IS ACTIVE

EXISTING POST INDICATOR

VALVE TO REMAIN,

CONNECT TO RELOCATED WATERMAIN

REMOVE BOLLARDS AND STEEL

POSTS AROUND

ELECTRICAL EQUIPMENT

(SEE E SHEETS FOR ELECTRICAL DEMOLITION)

SHEET ID

D

ES

IG

N

B Y:

D R

AW

N

B Y:

C H

EC

KE

D B

Y:

SU

BM

IT

TE

D B

Y:

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

LO

U

IS

VI

LL

E

D

IS

TR

IC

T

D

R M

AR

TI

N L

U

TH

ER

J

R P

L

LO

U

IS

VI

LL

E, K

EN

TU

C

KY

A

DE

TR

OI

T

AR

SE

NA

L, MI

CH

IG

AN

MA

NN

ED

/ U

NM

AN

NE

D

TA

CT

IC

AL

V

EH

IC

LE

LA

B

FY

P2

# 5

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

B

C

D

E

F

G

H

J

K

L

M

N

P

Fi le

P at h:

X

:\3

\2

7.

\T

EC

H

\C

AD

\5

4_

C D

1.

D W

G Pl ot D at e:

/2

4/

IS

SU

E D

AT

E:

SO

LI

C

IT

AT

IO

N N

O

C O

N

TR

AC

T

N O

SI

ZE

AN

SI

D

C

ER

TI

FI

ED

F

IN

AL

S U

BM

IT

TA

L

A.

A

N D

ER

SO

N

C . J

O N

ES

SE

PT

EM

BE

R

0, M &H

P R

O

JE

C T

N O

R

0-

.0

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E

A.

S

KO

G

M . B

U

TL

ER

KEY PLAN

US Army Corps of Engineers

O

VE

R

AL

L

SI

TE

D

EM

O

LI

TI

O N

P

LA

N

CD101

REMOVE

REMOVE FENCE

REMOVE STORM SEWER

REMOVE ELECTRIC, UNDERGROUND

REMOVE WATER LINE

ASPHALT REMOVAL

CONCRETE REMOVAL

CONTRACTOR WORK LIMIT

//FNC//

//SD//

//E//

//W//

SHEET LEGEND

GENERAL SHEET NOTES

1. CONTRACTOR SHALL PROTECT ALL ITEMS NOT SHOWN FOR

DEMOLITION.

2. CONTRACTOR SHALL SAW CUT AT ALL PAVEMENT REMOVAL LIMITS.

TEMPORARY GRAVEL MAY BE REQUIRED FOR OPEN TRAFFIC OR FOR

GENERAL SAFETY.

40' 80'0

TR

U

E N

O R

TH

SCALE: 1"=40'-0"

OVERALL SITE DEMOLITION PLANA1

R

EV

IS

ED

IN

A C

C O

R D

AN

C

E W

IT

H

A M

EN

D

M

EN

T

/2 5/

W

2Q R

R

_P la ns -0

//FN

C

//FNC// //FNC// //FNC// //FNC//

CB-14

BOLLARDS

GSV

L.P.

L.P.

L.P.

L.P.

L.P.L.P.

WSV

WSV

WSV

HYD.

HYD. SI

G

N

STOP

STO

P

ST

O

R

AG

E C

O N

TA

IN

ER

ST

O R

AG

E

C O

N

TA

IN

ER

LADDER

MUELLER

PIV

SI

G

N

SI

G

N

SI

G N

SI

G

N

SI

G N

SI

G

N

SI

G N

SI

G

N

STO

P

SI

G

N

SI

G

N

SI

G

N

SI

G

N

//FNC//GATE

SI

G

N

SI

G

N

SI

G

N

SI

G

N

SI

G

N

SI

G

N

SI

G

N

SI

G

N

SI

G

N

SI

G

N SI

G

N

P O

R

TA

B

LE

SH

EL

TE

R

BLOCK

BARRIERS

M U

EL

LE

R

SI

G

N

C.O. C.O.

SI

G

N

L.P.

//S D

//S

D

//S D

//S D

//S

D

//S D

//S

D

//S D

//S D

//SD//

//SD//

//SD//

//SD//

"S

D

6"SD.

"S

D

4"SD.

"S

D

//S D

//S

D

//SD//

//SD//

6" S

D

12"SD

//SD//

//SD//

//SD//

//SD//

//SD//

//SD//

//SD//

6"SD.

//W

//W

//W

//W

//W

//W

//W

//W

//W

//W

//W

//W

//E// //E// //E//

//E//

//E//

//E//

//E//

//E// //E// //E// //E// //E// //E//

//E// //E// //E//

//E// //E// //E//

//E

//E

//E

//E

//E// //E//

//E

FF=

618.50

ELECTRIC

BOX

FF=

618.49 HYD.

L.P.

SI

G

N

SI

G N

SI

G

N

SI

G N

SI

G

N

BUMPER

BLOCKS

A .C

.U N

IT

S

FF=

617.88

W

SV

SI

G

N

//S D

//S

D

//S D

//S

D

"S

D

4"SD.

FF=

618.52

FF=

617.99

FF=

617.98

FF=

618.54

FF=

618.46

SI

G

N

CART

CHARGING

PANEL

FF=

618.49

CB-27

CB-28

CB-29

CB-7

CB-30

CULVERT-32

CB-43

LADDER

GVW #34

RIM=617.70

FULL/WATER

#33

GVW

RIM=617.35

FULL/WATER

ACCESS

PANEL

ELECTRIC MH

RIM=617.67

ELECTRIC MH

RIM=617.54

GVW

RIM=618.08

T/P=611.38

ELECTRIC MH

RIM=617.54

TRANSFORMER

CONCRETE PAD

TRANSFORMER

CONCRETE PAD

FIRE DEPT.

CONNECTION

CB-4

SS MH-5

MH-37

MH-38MH-41

MH-23

T MH

RIM=617.64

CB-36

CB-33

CB-24

GAS

PIPELINE

C.O.

18"SD18"SD

"S

D

54"SD

54"SD

"S

D

"S

D

24"S D

10"SD

"S

D

6"SD

6"SD

6"SS

4" S

S

"S

D

4"S D

12"SD

"S

D

"S

D "S

D

4"SD

MH-42

12"SD

SS M-4

CB-35

4"S D

"S D

MH-21

GAS

METER

GAS

METER

BLOCK

BARRIERS

BLOCK

BARRIERS

BLOCK

BARRIERS

ELEC

CONTROL

BOX

BR

AD

LE

Y

D R

IV

E

BLDG 200D

EXISTING ASPHALT

TO REMAIN

DEMOLISH EXISTING CONCRETE

DEMOLISH EXISTING CONCRETE

DEMOLISH EXISTING ASPHALT

DEMOLISH EXISTING ASPHALT

DEMOLISH EXISTING ASPHALT

DEMOLISH EXISTING CONCRETE

EX

IS

TI

N

G A

SP

H

AL

T

TO

R

EM

AI

N

CLEAR AND GRUB

EXISTING CONCRETE

COMMUNICATIONS

TRENCH

EXISTING STRUCTURE,

(SMOKING SHELTER) TO

BE RELOCATED BY GOVERNMENT

CONCRETE BARRIERS TO BE

RELOCATED BY DETROIT ARSENAL

DEMOLISH UNDERGROUND ELECTRICAL

AND LIGHT POLES

DEMOLISH CULVERT

REMOVE TREE

REMOVE WATERMAIN, VALVE

AND HYDRANT

DEMOLISH CATCH BASIN AND

STORM PIPESDEMOLISH

FENCE AND GATE

DEMOLISH CLEANOUTS

REPLACE STORM

STRUCTURE

EXISTING ASPHALT,

STORM PIPE TRENCH

REMOVE TREE

DEMOLISH

CART CHARGER

AND SIGN

DEMOLISH EXISTING CONCRETE

CONCRETE BARRIERS TO BE

RELOCATED BY DETROIT ARSENAL

CONCRETE BARRIERS TO BE

RELOCATED BY DETROIT ARSENAL

REPLACE STORM

STRUCTURE

DEMOLISH CONCRETE SLAB

BELOW SHELTER

DEMOLISH CONCRETE

FILLED CATCH BASIN

CONTRACTOR

WORK LIMIT

ABANDON, CUT AND

CAP EXISTING 12" STORM

ABANDON, CUT AND CAP

EXISTING 8" STORM

CONTRACTOR TO

VERIFY 6" STORM

PIPE IS ACTIVE

REMOVE

WATERMAIN,

HYDRANT

AND VALVES

REMOVE TREE

SAW CUT CONCRETE

CONCRETE TO REMAIN

EXISTING PIV

TO REMAIN,

CONNECT TO

RELOCATED

WATERMAIN

REMOVE BOLLARDS AND STEEL

POSTS AROUND

ELECTRICAL EQUIPMENT

(SEE E SHEETS FOR

ELECTRICAL DEMOLITION)

SHEET ID

D

ES

IG

N

B Y:

D R

AW

N

B Y:

C H

EC

KE

D B

Y:

SU

BM

IT

TE

D B

Y:

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

LO

U

IS

VI

LL

E

D

IS

TR

IC

T

D

R M

AR

TI

N L

U

TH

ER

J

R P

L

LO

U

IS

VI

LL

E, K

EN

TU

C

KY

A

DE

TR

OI

T

AR

SE

NA

L, MI

CH

IG

AN

MA

NN

ED

/ U

NM

AN

NE

D

TA

CT

IC

AL

V

EH

IC

LE

LA

B

FY

P2

# 5

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

B

C

D

E

F

G

H

J

K

L

M

N

P

Fi le

P at h:

X

:\3

\2

7.

\T

EC

H

\C

AD

\5

4_

C D

2.

D W

G Pl ot D at e:

/2

4/

IS

SU

E D

AT

E:

SO

LI

C

IT

AT

IO

N N

O

C O

N

TR

AC

T

N O

SI

ZE

AN

SI

D

C

ER

TI

FI

ED

F

IN

AL

S U

BM

IT

TA

L

A.

A

N D

ER

SO

N

C . J

O N

ES

SE

PT

EM

BE

R

0, M &H

P R

O

JE

C T

N O

R

0-

.0

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E

A.

S

KO

G

M . B

U

TL

ER

KEY PLAN

US Army Corps of Engineers

SI

TE

D

EM

O

LI

TI

O

N P

LA

N

CD102

REMOVE

REMOVE FENCE

REMOVE STORM SEWER

REMOVE ELECTRIC, UNDERGROUND

REMOVE WATER LINE

ASPHALT REMOVAL

CONCRETE REMOVAL

CONTRACTOR WORK LIMIT

//FNC//

//SD//

//E//

//W//

SHEET LEGEND

GENERAL SHEET NOTES

1. CONTRACTOR SHALL PROTECT ALL ITEMS NOT SHOWN FOR

DEMOLITION.

2. CONTRACTOR SHALL SAW CUT AT ALL PAVEMENT REMOVAL LIMITS.

TEMPORARY GRAVEL MAY BE REQUIRED FOR OPEN TRAFFIC OR FOR

GENERAL SAFETY.

MATCH LINE - SEE SHEET CD103

20' 40'0

TR

U

E N

O R

TH

SCALE: 1"=20'-0"

SITE DEMOLITION PLANA1

R

EV

IS

ED

IN

A C

C O

R D

AN

C

E W

IT

H

A M

EN

D

M

EN

T

/2 5/

W

2Q R

R

_P la ns -0

CB-14

BOLLARDS

L.P.

L.P.

L.P.

L.P.

L.P.L.P.

WSVHYD.

ST

O R

Y

PA

R

KI

N G

G

AR

AG

E

STOP STOP

STOP

ST

O

P

ST

O P

STO

P

LADDER

STO

P

GATE

#200 D

EX. BLDG.

METAL

OVERHANG

C.O. C.O.

L.P.

"S

D

6"SD.

"S

D

4"SD.

"S

D

6" S

D

12"SD

6"SD.

#2

EX

IS

TI

N

G B

U

IL

D

IN

G

ELECTRIC

BOX

HYD.

L.P.

"S

D

4"SD.

CART

CHARGING

PANEL

CB-27

CB-28

CB-29

CB-7

CB-30

CULVERT-32

CB-43

LADDER

#33

GVW

RIM=617.35

FULL/WATER

GAS

METER

CB-24

GAS

PIPELINE

"S

D

"S

D

GAS

METER

GAS

METER

ELEC

CONTROL

BOX

BR

AD

LEY D

R

IVE

SF

C O

N F.

R O

O M

SF

C O

N F.

R O

O M

SF

C O

M M

SF

BR

EA

K R

M

S

F

VE

ST

IB

U

LE

SF

D

IV

. C H

IE

F

SF

D

IV

H

EA

D

SF

D

IV

H

EA

D

SF

BR

AN

C H

C H

IE

F

SF

BR

AN

C H

C H

IE

F

SF

BR

AN

C H

C H

IE

F

SF

BR

AN

C H

C H

IE

F

SF

D

IV

. C H

IE

F

SF

D

IV

C H

IE

F

SF

D

IV

C H

IE

F

SF

D

IV

H

EA

D

SF

FI

R

E

PU

M P

S

F

VE

ST

IB

U

LE

S F

C O

R R

ID

O

R

2B

SF

W O

M

EN

S

F

VE

ST

SF

JA

N

C

LO

SE

T

S

F

VE

ST

SF

M

EN 14

SF

N U

R

SI

N G

M O

TH

ER

SF

EL

EC

SF

BR

AN

C H

C H

IE

F

SF

BR

AN

C H

C H

IE

F

SF

BR

AN

C H

C H

IE

F

SF

BR

AN

C H

C H

IE

F

SF

C O

PY

R

M

SF

C O

M M

S F

ST

O

R

AG

E A

R

EA

SF

BR

AN

C H

C H

IE

F

SF

BR

AN

C H

C H

IE

F

SF

BR

AN

C H

C H

IE

F

SF

BR

AN

C H

C H

IE

F

3 17

SF

D

IV

C H

IE

F

SF

D

IV

C H

IE

F

SF

C O

PY

R

O O

M

SF

BR

AN

C H

C H

IE

F

SF

D

IV

C H

IE

F

SF

BR

AN

C H

C H

IE

F

S F

O

PE

N O

FF

IC

E

S F

O

PE

N O

FF

IC

E

SF

M

EC

H

SF

EL

EC

SF

BR

AN

C H

C H

IE

F

SF

BR

AN

C H

C H

IE

F

SF

BR

AN

C H

C H

IE

F

S

F

LO

C

KE

R

S

7A

SF

C O

R R

ID

O

R

2A

SF

C O

R R

ID

O

R

7B

SF

C O

R R

ID

O

R

7C

TACTICAL VEHICLE LAB

FFE = 618.49

BB

B B

BB

B B

B B

CONNECTOR

FFE = 618.18

EISENHOWER DRIVE

200C

200D

TACTICAL

VEHICLE LAB

5 STORY

PARKING

GARAGE

LOT H1

LOT H2

CONTRACTOR WORK LIMITS

SHEET ID

D

ES

IG

N

B Y:

D R

AW

N

B Y:

C H

EC

KE

D B

Y:

SU

BM

IT

TE

D B

Y:

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

LO

U

IS

VI

LL

E

D

IS

TR

IC

T

D

R M

AR

TI

N L

U

TH

ER

J

R P

L

LO

U

IS

VI

LL

E, K

EN

TU

C

KY

A

DE

TR

OI

T

AR

SE

NA

L, MI

CH

IG

AN

MA

NN

ED

/ U

NM

AN

NE

D

TA

CT

IC

AL

V

EH

IC

LE

LA

B

FY

P2

# 5

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

B

C

D

E

F

G

H

J

K

L

M

N

P

Fi le

P at h:

X

:\3

\2

7.

\T

EC

H

\C

AD

\5

4_

C S1

.D

W G

Pl ot

D at e:

/2 4/

IS

SU

E D

AT

E:

SO

LI

C

IT

AT

IO

N N

O

C O

N

TR

AC

T

N O

SI

ZE

AN

SI

D

C

ER

TI

FI

ED

F

IN

AL

S U

BM

IT

TA

L

A.

A

N D

ER

SO

N

C . J

O N

ES

SE

PT

EM

BE

R

0, M &H

P R

O

JE

C T

N O

R

0-

.0

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E

A.

S

KO

G

M . B

U

TL

ER

KEY PLAN

US Army Corps of Engineers

AE

R

IA

L

SI

TE

P

LA

N

CS101

CONTRACTOR WORK LIMIT

SHEET LEGEND

GENERAL SHEET NOTES

1. AERIAL IMAGE DATED JULY 2022.

40' 80'0

TR

U

E N

O R

TH

SCALE: 1"=40'-0"

AERIAL SITE PLANA1

R

EV

IS

ED

IN

A C

C O

R D

AN

C

E W

IT

H

A M

EN

D

M

EN

T

/2 5/

W

2Q R

R

_P la ns -0

BR

AD

LE

Y

D R

IV

E

EISENHOWER DRIVE

TACTICAL

VEHICLE LAB

SI

D

EW

AL

K

SF

C O

N F.

R O

O M

SF

C O

N F.

R O

O M

SF

C O

M M

SF

BR

EA

K R

M

S

F

VE

ST

IB

U

LE

SF

D

IV

. C H

IE

F

SF

D

IV

H

EA

D

SF

D

IV

H

EA

D

SF

BR

AN

C H

C H

IE

F

SF

BR

AN

C H

C H

IE

F

SF

BR

AN

C H

C H

IE

F

SF

BR

AN

C H

C H

IE

F

SF

D

IV

. C H

IE

F

SF

D

IV

C H

IE

F

SF

D

IV

C H

IE

F

SF

D

IV

H

EA

D

SF

FI

R

E

PU

M P

S

F

VE

ST

IB

U

LE

S F

C O

R R

ID

O

R

2B

SF

W O

M

EN

S

F

VE

ST

SF

JA

N

C

LO

SE

T

S

F

VE

ST

SF

M

EN 14

SF

N U

R

SI

N G

M O

TH

ER

SF

EL

EC

SF

BR

AN

C H

C H

IE

F

SF

BR

AN

C H

C H

IE

F

SF

BR

AN

C H

C H

IE

F

SF

BR

AN

C H

C H

IE

F

SF

C O

PY

R

M

SF

C O

M M

S F

ST

O

R

AG

E A

R

EA

SF

BR

AN

C H

C H

IE

F

SF

BR

AN

C H

C H

IE

F

SF

BR

AN

C H

C H

IE

F

SF

BR

AN

C H

C H

IE

F

3 17

SF

D

IV

C H

IE

F

SF

D

IV

C H

IE

F

SF

C O

PY

R

O O

M

SF

BR

AN

C H

C H

IE

F

SF

D

IV

C H

IE

F

SF

BR

AN

C H

C H

IE

F

S F

O

PE

N O

FF

IC

E

S F

O

PE

N O

FF

IC

E

SF

M

EC

H

SF

EL

EC

SF

BR

AN

C H

C H

IE

F

SF

BR

AN

C H

C H

IE

F

SF

BR

AN

C H

C H

IE

F

S

F

LO

C

KE

R

S

7A

SF

C O

R R

ID

O

R

2A

SF

C O

R R

ID

O

R

7B

SF

C O

R R

ID

O

R

7C

TACTICAL VEHICLE LAB

FFE = 618.49

BB

B B

BB

B B

B B

CONNECTOR

FFE = 618.18

SI

D

EW

AL

K

FF=

618.48

FF=

618.47

FF=

618.51

FF=

618.34

STOP STOP

FF=

619.20

STOP

ST

O

P

ST

O P

FF=

618.41

STO

P

LADDER

METAL

OVERHANG

FF=

618.50

FF=

618.49

FF=

618.43

FF=

618.47

FF=

618.47

FF=

618.51

FF=

618.49

FF=

618.37

FF=

617.88

FF=

618.52

FF=

617.99

FF=

617.98

FF=

618.54

FF=

618.46

FF=

618.49

LADDER

ELECTRIC MH

RIM=616.96

ELECTRIC MH

RIM=617.50

TRANSFORMER

CONCRETE PAD

ELECTRICBOX

CONCRETE PAD

TRANSFORMER

CONCRETE PADELECTRICBOX

ELECTRIC

MH

RIM=617.10

ELECTRICBOX

ACCESS

PANEL

ELECTRIC MH

RIM=617.67

ELECTRIC MH

RIM=617.54

ELECTRIC MH

RIM=617.54

TRANSFORMER

CONCRETE PAD

TRANSFORMER

CONCRETE PAD

M.H.

RIM=616.98

FULL/WATER

CB-1

CB-15

CB-18

CB-19

CB-44

CB-31

CB-4

C.O.

MH-17

MH-16

SS MH-5

SS MH-1206

SS MH-1207

SS MH-1208

MH-39

MH-37

MH-38MH-41

MH-6

MH-10 MH-8

MH-2

MH-23

MH-25

CB-36

CB-40

CB-33

CB-22

MH-26

CB-13CB-9

CB-11

CB-5

CB-3

C.O.

MH-42

CB-12

SS M-4

CB-35

MH-21

CB-20

CB-34

613614

HH

SD

SD

SD

SD

CB

CB SD SD

PIV

S

W V

W V

FDC

W V

W V

CB

CB

CB

CB

SD

SD

SD

C B

W M

HH

U

D U

D

CO

SD

SD

SD

CO

CB

SD

SD

SD

C B

1+00 2+00

3+00

4+

5+00 5+19.98

10+00 11+00 12+00 13+00

14+00 14+32.80

WEST GRADING PROFILE,

(SEE CG103)

EAST GRADING PROFILE

(SEE CG103)

STORMWATER

DRY POND

(SEE CG104)

BLDG 200D

TACTICAL VEHICLE LAB

FFE = 618.49

BLDG 200C 1+00 1+73.68

+0

+0

+0

13+00

13+77.49

STORMWATER DRY

POND PROFILE

(SEE CG104)

STORMWATER DRY POND SECTION

(SEE CG104)

SHEET ID

D

ES

IG

N

B Y:

D R

AW

N

B Y:

C H

EC

KE

D B

Y:

SU

BM

IT

TE

D B

Y:

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

LO

U

IS

VI

LL

E

D

IS

TR

IC

T

D

R M

AR

TI

N L

U

TH

ER

J

R P

L

LO

U

IS

VI

LL

E, K

EN

TU

C

KY

A

DE

TR

OI

T

AR

SE

NA

L, MI

CH

IG

AN

MA

NN

ED

/ U

NM

AN

NE

D

TA

CT

IC

AL

V

EH

IC

LE

LA

B

FY

P2

# 5

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

B

C

D

E

F

G

H

J

K

L

M

N

P

Fi le

P at h:

X

:\3

\2

7.

\T

EC

H

\C

AD

\5

4_

C G

1.

D W

G Pl ot D at e:

/2

4/

IS

SU

E D

AT

E:

SO

LI

C

IT

AT

IO

N N

O

C O

N

TR

AC

T

N O

SI

ZE

AN

SI

D

C

ER

TI

FI

ED

F

IN

AL

S U

BM

IT

TA

L

A.

A

N D

ER

SO

N

C . J

O N

ES

SE

PT

EM

BE

R

0, M &H

P R

O

JE

C T

N O

R

0-

.0

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E

A.

S

KO

G

M . B

U

TL

ER

KEY PLAN

US Army Corps of Engineers

O

VE

R

AL

L

SI

TE

G

R

AD

IN

G

P

LA

N

CG101

EXISTING CONTOUR LINES

PROPOSED CONTOUR LINES

GRADING LIMITS

FINISHED / PROPOSED SPOT ELEVATION

FINISHED / PROPOSED SLOPE

xxx.x xxx.x xxx(.xx) xxx(.xx)

XXX.XX

2%

3:1

SHEET LEGEND

GENERAL SHEET NOTES

40' 80'0

TR

U

E N

O R

TH

SCALE: 1"=40'-0"

OVERALL SITE GRADING PLANA1

1. FOR SITE SLOPES, SEE CG102.

2. FOR SITE PROFILES, SEE CG103.

3. FOR POND PROFILES, SEE CG104.

R

EV

IS

ED

IN

A C

C O

R D

AN

C

E W

IT

H

A M

EN

D

M

EN

T

/2 9/

R

EV

IS

ED

IN

A

C C

O R

D

AN

C E

W

IT

H A

M

EN

D M

EN

T

/2

5/

W

2Q R

R

_P la ns -0

BR

AD

LE

Y

D R

IV

E

BLDG 200C

EXISTING DRIVE

EISENHOWER DRIVE

TACTICAL VEHICLE LAB

SI

D

EW

AL

K

SF

C O

N F.

R O

O M

SF

C O

N F.

R O

O M

SF

C O

M M

SF

BR

EA

K R

M

S

F

VE

ST

IB

U

LE

SF

D

IV

. C H

IE

F

SF

D

IV

H

EA

D

SF

D

IV

H

EA

D

SF

BR

AN

C H

C H

IE

F

SF

BR

AN

C H

C H

IE

F

SF

BR

AN

C H

C H

IE

F

SF

BR

AN

C H

C H

IE

F

SF

D

IV

. C H

IE

F

SF

D

IV

C H

IE

F

SF

D

IV

C H

IE

F

SF

D

IV

H

EA

D

SF

FI

R

E

PU

M P

S

F

VE

ST

IB

U

LE

S F

C O

R R

ID

O

R

2B

SF

W O

M

EN

S

F

VE

ST

SF

JA

N

C

LO

SE

T

S

F

VE

ST

SF

M

EN 14

SF

N U

R

SI

N G

M O

TH

ER

SF

EL

EC

SF

BR

AN

C H

C H

IE

F

SF

BR

AN

C H

C H

IE

F

SF

BR

AN

C H

C H

IE

F

SF

BR

AN

C H

C H

IE

F

SF

C O

PY

R

M

SF

C O

M M

S F

ST

O

R

AG

E A

R

EA

SF

BR

AN

C H

C H

IE

F

SF

BR

AN

C H

C H

IE

F

SF

BR

AN

C H

C H

IE

F

SF

BR

AN

C H

C H

IE

F

3 17

SF

D

IV

C H

IE

F

SF

D

IV

C H

IE

F

SF

C O

PY

R

O O

M

SF

BR

AN

C H

C H

IE

F

SF

D

IV

C H

IE

F

SF

BR

AN

C H

C H

IE

F

S F

O

PE

N O

FF

IC

E

S F

O

PE

N O

FF

IC

E

SF

M

EC

H

SF

EL

EC

SF

BR

AN

C H

C H

IE

F

SF

BR

AN

C H

C H

IE

F

SF

BR

AN

C H

C H

IE

F

S

F

LO

C

KE

R

S

7A

SF

C O

R R

ID

O

R

2A

SF

C O

R R

ID

O

R

7B

SF

C O

R R

ID

O

R

7C

TACTICAL VEHICLE LAB

FFE = 618.49

BB

B B

BB

B B

B B

CONNECTOR

FFE = 618.18

SI

D

EW

AL

K

SI

D

EW

AL

K

STOP

STO

P

LADDER

FF=

618.50

FF=

618.49

FF=

617.88

FF=

618.52

FF=

617.99

FF=

617.98

FF=

618.54

FF=

618.46

FF=

618.49

LADDER

ACCESS

PANEL

ELECTRIC MH

RIM=617.67

ELECTRIC MH

RIM=617.54

ELECTRIC MH

RIM=617.54

TRANSFORMER

CONCRETE PAD

TRANSFORMER

CONCRETE PAD

CB-31

CB-4

SS MH-5

MH-37

MH-38MH-41

MH-10

MH-23

C.O.

MH-42

SS M-4

CB-35

MH-21

EX

IS

TI

N

G A

SP

H

AL

T

617.49

618.18

618.10

617.58

617.82

617.82

617.82

617.23

617.82

618.18

617.99

HH

SD

SD

SD

SD

SD

SD

SD

SD

SD

CB

CB SD SD SD SD

PIV

W V

W V

FDC

W V

W V

CB

CB

CB

CB

SD SD SD

SD

SD

SD

SD

C B

W M

HH

U D

U D

U D

U D

UD

CO

SD

SD

SD

SD

SD

SD

SD

CO

CB

SD

SD

SDSD

SD

SD

SD

SD

C

B

BLDG 200D

618.49

618.43 618.43618.49

617.64

617.72 617.93617.88

618.18

617.88

617.82

617.91

617.51

617.28

617.00

617.55

617.55

616.50

617.65

617.55 617.45

617.40617.47

617.64

617.60

617.54

617.57

617.67

617.34

617.66

619.05

619.11

618.95

618.73

617.35

617.25

617.45 617.50

617.82618.06

618.43

618.43 618.49

618.25

618.49

617.83

617.54

617.50

617.43

617.41

617.46

617.24

617.30

617.61617.61

-25.00%

-25.00%

-2 4.

-25.00%

-1 8.

-1 9.

-2 2.

-1 7.

-1.91%

-4 .6

5%

-3.64%

-6 .6

6%

-8 .2

8%

-5 .5

1%

-4.95%

-2 .1

4%

-6 .5

2%

-25 .00

-2.24%

-2.

-5.40%

-2 .6

6%-2 .3

1%

-3 .4

3%

-2 .3

7%

-2 .6

6%

-2 .4

2%

618.49

617.48

617.55

619.00

617.95

618.00

617.98 618.49

618.06

618.43

618.13

618.13618.18

618.13

618.13

618.00

618.00 618.38

618.18

618.06

617.56617.31

616.57

617.50

616.83

617.16

-4.96%

-2.15%

-2.77%

-1 .9

9% -1 .6

9%

-3 .6

7%

618.41

618.04

617.67

617.47

617.35

617.69

617.78 617.46

617.18

617.80

618.22 618.22

617.80

618.16

618.15

618.15

617.60

618.16

617.97618.18 618.21618.06

618.06

618.22

617.68

618.22618.06 618.06

618.06

618.12

618.21618.12

618.06618.18 618.18

618.18

617.83

618.15

617.10

617.87 617.87

618.14

617.78

7.

617.42

618.05

617.14 617.28

617.23

617.24

617.17

617.03

617.50

617.52

617.73

617.08

617.15

617.49

617.87

617.95617.63

617.63617.82

617.22

617.95

617.95

617.48

617.81

617.29

617.19

617.24

618.35 618.34

618.60

617.45

617.30

617.70

617.91

618.39

617.50

617.21

617.66

617.57

617.53

617.50

617.46

617.38

617.43

617.66

617.59

617.51

617.43

617.82

617.82

617.36

617.41

617.45

617.43

617.34

617.64

617.50

617.28

WEST

GRADING

PROFILE,

(SEE CG103)

EAST

GRADING

PROFILE

(SEE CG103)

617.00

616.00

617.37

613.11

616.87

617.61 617.17

618.01

617.20

612.50

617.87

612.86

-2 3.

-2.52%

-1 .7

0%

-1.67%

-1.80%

-3.32%

-0 .8

4%

-3 .1

9%

-8 .7

0%

-1 7.

-4 .9

6%

STORMWATER DRY POND

(SEE CG104)

617.74

617.67

617.62

617.62

617.44

617.37

617.29

617.21

617.18

617.19

617.26

617.35

617.44

617.53

617.62

617.38 617.28

617.19 617.09

616.99 616.89

616.83 616.90

616.96

617.11

617.18

617.28

617.39

617.49

617.53

617.69

617.66

617.63

617.92

617.89

617.59

617.85

617.83

617.52 617.55

617.27 617.31

617.36 617.40

617.49

617.65

617.66

617.67 617.62

617.57 617.56

617.58 617.61

617.64

617.67 617.68617.57

617.96

617.44

-2 .8

8%

-1 .2

0%

-2.20%

-3 .4

2%

-1 .1

2%

611612613614

615.00

615.00

617.69

619.11

SHEET ID

D

ES

IG

N

B Y:

D R

AW

N

B Y:

C H

EC

KE

D B

Y:

SU

BM

IT

TE

D B

Y:

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

LO

U

IS

VI

LL

E

D

IS

TR

IC

T

D

R M

AR

TI

N L

U

TH

ER

J

R P

L

LO

U

IS

VI

LL

E, K

EN

TU

C

KY

A

DE

TR

OI

T

AR

SE

NA

L, MI

CH

IG

AN

MA

NN

ED

/ U

NM

AN

NE

D

TA

CT

IC

AL

V

EH

IC

LE

LA

B

FY

P2

# 5

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

B

C

D

E

F

G

H

J

K

L

M

N

P

Fi le

P at h:

X

:\3

\2

7.

\T

EC

H

\C

AD

\5

4_

C G

2.

D W

G Pl ot D at e:

/2

4/

IS

SU

E D

AT

E:

SO

LI

C

IT

AT

IO

N N

O

C O

N

TR

AC

T

N O

SI

ZE

AN

SI

D

C

ER

TI

FI

ED

F

IN

AL

S U

BM

IT

TA

L

A.

A

N D

ER

SO

N

C . J

O N

ES

SE

PT

EM

BE

R

0, M &H

P R

O

JE

C T

N O

R

0-

.0

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E

A.

S

KO

G

M . B

U

TL

ER

KEY PLAN

US Army Corps of Engineers

SI

TE

G R

AD

IN

G P

LA

N

CG102

EXISTING CONTOUR LINES

PROPOSED CONTOUR LINES

GRADING LIMITS

FINISHED / PROPOSED SPOT ELEVATION

FINISHED / PROPOSED SLOPE

xxx.x xxx.x xxx(.xx) xxx(.xx)

XXX.XX

2%

3:1

SHEET LEGEND

GENERAL SHEET NOTES

1. FOR SITE PROFILES, SEE CG103.

2. FOR POND PROFILES, SEE CG104.

20' 40'0

TR

U

E N

O R

TH

SCALE: 1"=20'-0"

SITE GRADING PLANA1

R

EV

IS

ED

IN

A C

C O

R D

AN

C

E W

IT

H

A M

EN

D

M

EN

T

/2 9/

R

EV

IS

ED

IN

A

C C

O R

D

AN

C E

W

IT

H A

M

EN

D M

EN

T

/2

5/

W

2Q R

R

_P la ns -0

STOP STOP

STOP

ST

O

P

ST

O P

STO

P

LADDER

METAL

OVERHANG

LADDER

ELECTRIC MH

RIM=616.96

ELECTRIC MH

RIM=617.50

TRANSFORMER

CONCRETE PAD

ELECTRICBOX

CONCRETE PAD

TRANSFORMER

CONCRETE PADELECTRICBOX

ELECTRIC

MH

RIM=617.10

ELECTRICBOX

ACCESS

PANEL

ELECTRIC MH

RIM=617.67

ELECTRIC MH

RIM=617.54

ELECTRIC MH

RIM=617.54

TRANSFORMER

CONCRETE PAD

TRANSFORMER

CONCRETE PAD

M.H.

RIM=616.98

FULL/WATER

CB-1

CB-15

CB-18

CB-19

CB-44

CB-31

CB-4

C.O.

MH-17

MH-16

SS MH-5

SS MH-1206

SS MH-1207

SS MH-1208

MH-39

MH-37

MH-38MH-41

MH-6

MH-10 MH-8

MH-2

MH-23

MH-25

CB-36

CB-40

CB-33

CB-22

MH-26

CB-13CB-9

CB-11

CB-5

CB-3

C.O.

MH-42

CB-12

SS M-4

CB-35

MH-21

CB-20

CB-34

SF

C O

N F.

R O

O M

SF

C O

N F.

R O

O M

SF

C O

M M

SF

BR

EA

K R

M

S

F

VE

ST

IB

U

LE

SF

D

IV

. C H

IE

F

SF

D

IV

H

EA

D

SF

D

IV

H

EA

D

SF

BR

AN

C H

C H

IE

F

SF

BR

AN

C H

C H

IE

F

SF

BR

AN

C H

C H

IE

F

SF

BR

AN

C H

C H

IE

F

SF

D

IV

. C H

IE

F

SF

D

IV

C H

IE

F

SF

D

IV

C H

IE

F

SF

D

IV

H

EA

D

SF

FI

R

E

PU

M P

S

F

VE

ST

IB

U

LE

S F

C O

R R

ID

O

R

2B

SF

W O

M

EN

S

F

VE

ST

SF

JA

N

C

LO

SE

T

S

F

VE

ST

SF

M

EN 14

SF

N U

R

SI

N G

M O

TH

ER

SF

EL

EC

SF

BR

AN

C H

C H

IE

F

SF

BR

AN

C H

C H

IE

F

SF

BR

AN

C H

C H

IE

F

SF

BR

AN

C H

C H

IE

F

SF

C O

PY

R

M

SF

C O

M M

S F

ST

O

R

AG

E A

R

EA

SF

BR

AN

C H

C H

IE

F

SF

BR

AN

C H

C H

IE

F

SF

BR

AN

C H

C H

IE

F

SF

BR

AN

C H

C H

IE

F

3 17

SF

D

IV

C H

IE

F

SF

D

IV

C H

IE

F

SF

C O

PY

R

O O

M

SF

BR

AN

C H

C H

IE

F

SF

D

IV

C H

IE

F

SF

BR

AN

C H

C H

IE

F

S F

O

PE

N O

FF

IC

E

S F

O

PE

N O

FF

IC

E

SF

M

EC

H

SF

EL

EC

SF

BR

AN

C H

C H

IE

F

SF

BR

AN

C H

C H

IE

F

SF

BR

AN

C H

C H

IE

F

S

F

LO

C

KE

R

S

7A

SF

C O

R R

ID

O

R

2A

SF

C O

R R

ID

O

R

7B

SF

C O

R R

ID

O

R

7C

TACTICAL VEHICLE LAB

FFE = 618.49

BB

B B

BB

B B

B B

CONNECTOR

FFE = 618.18

61761861

615 611612613614616617

HH

SD

SD

SD

SD

CB

CB SD SD

PIV

S

W V

W V

FDC

W V

W V

CB

CB

CB

CB

SD

SD

SD

C B

W M

HH

CO

SD

SD

SD

CO

CB

SD

SD

SD

C B

BR

AD

LE

Y

D R

IV

E

CONCRETE

APRON

EISENHOWER DRIVE

SI

D

EW

AL

K

SI

D

EW

AL

K

H16

CG504

H16

CG504

H16

CG504

H16

CG504

H16

CG504

H16

CG504

H16

CG504

H1

CG503

H1

CG504

H1

CG503

H1

CG503

STORMWATER

DRY POND

SS

S

S S

S

H1

CG503

A1

CG503

BLDG 200D

TACTICAL VEHICLE LAB

FFE = 618.49

BLDG 200C

STABILIZED CONSTRUCTION ENTRANCE

FILTER ROLL

8 S

S S

S

H1

CG503

S S S

S

H16

CG504

H16

CG504

SILT FENCE

MULCH BLANKETH1

CG502

H1

CG505

SHEET ID

D

ES

IG

N

B Y:

D R

AW

N

B Y:

C H

EC

KE

D B

Y:

SU

BM

IT

TE

D B

Y:

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

LO

U

IS

VI

LL

E

D

IS

TR

IC

T

D

R M

AR

TI

N L

U

TH

ER

J

R P

L

LO

U

IS

VI

LL

E, K

EN

TU

C

KY

A

DE

TR

OI

T

AR

SE

NA

L, MI

CH

IG

AN

MA

NN

ED

/ U

NM

AN

NE

D

TA

CT

IC

AL

V

EH

IC

LE

LA

B

FY

P2

# 5

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

B

C

D

E

F

G

H

J

K

L

M

N

P

Fi le

P at h:

X

:\3

\2

7.

\T

EC

H

\C

AD

\5

4_

C G

5.

D W

G Pl ot D at e:

/2

4/

IS

SU

E D

AT

E:

SO

LI

C

IT

AT

IO

N N

O

C O

N

TR

AC

T

N O

SI

ZE

AN

SI

D

C

ER

TI

FI

ED

F

IN

AL

S U

BM

IT

TA

L

A.

A

N D

ER

SO

N

C . J

O N

ES

SE

PT

EM

BE

R

0, M &H

P R

O

JE

C T

N O

R

0-

.0

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E

A.

S

KO

G

M . B

U

TL

ER

KEY PLAN

US Army Corps of Engineers

O

VE

R

AL

L

ER

O

SI

O N

C O

N

TR

O L

PL

AN

CG105

EROSION CONTROL NOTES

40' 80'0

TR

U

E N

O R

TH

SCALE: 1"=40'-0"

OVERALL EROSION CONTROL PLANA1

R

EV

IS

ED

IN

A C

C O

R D

AN

C

E W

IT

H

A M

EN

D

M

EN

T

/2 9/

INLET PROTECTION H16/CG504

SILT FENCE H1/CG505

EXISTING CONTOUR LINES

PROPOSED CONTOUR LINES

FILTER ROLL A1/CG503

STABILIZED CONSTRUCTION ENTRANCE

H1/CG504

MULCH BLANKET H1/CG502

CONTRACTOR WORK LIMIT

xxx.x xxx.x xxx(.xx) xxx(.xx)

SSSSSSSSSSSSSSS

SHEET LEGEND

1. ALL WORK SHALL COMPLY WITH THE APPLICABLE SOIL EROSION AND

SEDIMENTATION CONTROL (SESC) RULES AND REGULATIONS (SOIL EROSION

AND SEDIMENTATION CONTROL – 1994 PA 451, PART 91, AS AMENDED, MCL

324.9101 ET SEQ.).

2. ALL EARTH CHANGES OF ONE ACRE OR MORE OR WITHIN 500 FEET OF

WATERS OF THE STATE REQUIRE A SESC PERMIT. IF A SESC PERMIT IS

REQUIRED THE PROFESSIONAL SERVICES CONTRACTOR (DESIGN

CONSULTANT) SHALL PREPARE AN SESC PLAN. THE SESC PLAN SHALL

ADDRESS BOTH WIND AND WATER EROSION AND SEDIMENTATION.

3. THE CONTRACTOR SHALL REVIEW THE DESIGN CONSULTANT’S SESC PLAN IN

ORDER TO PREPARE AND ISSUE FOR APPROVAL AN “SESC IMPLEMENTATION

PLAN”, WHICH INDICATES THE CONTRACTOR’S INTENDED IMPLEMENTATION OF

THE SESC PLAN FOR THE PROJECT, INCLUDING A SCHEDULE.

4. THE DTMB SESC PROGRAM, UPON APPROVAL OF THE IMPLEMENTATION PLAN,

WILL ISSUE THE CONTRACTOR AN “AUTHORIZATION TO PROCEED WITH EARTH

CHANGE”, WHICH IS TO BE POSTED AT THE JOB SITE. THIS DOCUMENT IS

ISSUED IN LIEU OF A PERMIT FROM THE COUNTY OR OTHER LOCAL

ENFORCING AGENCY.

5. THE CONTRACTOR SHALL IMPLEMENT SOIL EROSION AND SEDIMENTATION

CONTROL MEASURES AS REQUIRED BY THE PROJECT’S SESC PLAN, SESC

IMPLEMENTATION PLAN, DTMB’S SOIL EROSION AND SEDIMENTATION

CONTROL GUIDEBOOK, DATED FEBRUARY 2005, AND AS DIRECTED BY THE

PROFESSIONAL SERVICES CONTRACTOR, DTMB SESC INSPECTOR, AND/OR

DTMB PROJECT DIRECTOR. THE DTMB SESC INSPECTOR SHALL INSPECT THE

SITE WEEKLY AND AFTER SIGNIFICANT RAIN EVENTS.

6. THE CONTRACTOR SHALL INSTALL TEMPORARY EROSION AND

SEDIMENTATION CONTROL MEASURES PRIOR TO OR UPON COMMENCEMENT

TO EARTHWORK ACTIVITIES.

7. THE CONTRACTOR WILL PERFORM SWEEPING AS NEEDED TO REMOVE ANY

SEDIMENT TRACKED OFF SITE. FREQUENCY OF SWEEPING WILL BE BASED ON

SITE CONDITIONS.

8. THE CONTRACTOR WILL PERFORM DUST CONTROL AS NEEDED BASED ON

SITE CONDITIONS.

9. DISTURBED AREAS THAT WILL REMAIN IDLE DURING CONSTRUCTION MUST BE

TEMPORARILY STABILIZED, INCLUDING SOIL STOCKPILES, USING DTMB SESC

BEST MANAGEMENT PRACTICES.

10. THE CONTRACTOR SHALL MAINTAIN AND INSPECT SESC MEASURES

THROUGHOUT THE COURSE OF THE PROJECT. RECOMMEND INSPECTING AND

MAINTAINING EROSION AND SEDIMENTATION CONTROLS ON A DAILY BASIS. AT

A MINIMUM, THE CONTRACTOR SHALL INSPECT AND MAINTAIN SESC

MEASURES ONCE A WEEK AND AFTER RAIN EVENTS.

11. THE CONTRACTOR SHALL CORRECT NON-CONFORMING SESC MEASURES

WITHIN 24 HOURS, IF WATERS OF THE STATE ARE BEING IMPACTED OR WITHIN

48 HOURS FOR ROUTINE MAINTENANCE ITEMS. OTHER SESC MAINTENANCE

SHALL BE COMPLETED AS SOON AS POSSIBLE BUT NEVER MORE THAN FIVE (5)

DAYS AFTER DETECTION.

12. THE CONTRACTOR SHALL COMPLETE PERMANENT SOIL EROSION CONTROL

MEASURES FOR ANY DISTURBED LAND AREA WITHIN 5 CALENDAR DAYS

AFTER FINAL GRADING OR THE FINAL EARTH CHANGE HAS BEEN COMPLETED.

THE CONTRACTOR SHALL MAINTAIN TEMPORARY CONTROL MEASURES UNTIL

PERMANENT SOIL EROSION CONTROL MEASURES ARE IN PLACE AND THE

AREA IS STABILIZED.

13. THE CONTRACTOR SHALL REMOVE TEMPORARY EROSION CONTROL

MEASURES AFTER PERMANENT SOIL EROSION MEASURES ARE IN PLACE AND

THE AREA IS STABILIZED. CARE SHALL BE TAKEN DURING REMOVAL TO

PREVENT SOIL EROSION AND SEDIMENTATION.

14. AFTER THE COMPLETION OF THE PROJECT, PERMANENT SESC MEASURES

WILL BE MAINTAINED BY THE PROPERTY OWNER.

15. STORMWATER DRY POND SHALL NOT BE PUT INTO USE UNTIL THE SITE IS

STABILIZED.

PROJECT SEQUENCE:

1) INSTALL INLET PROTECTION AND SEDIMENT LOG BARRIER.

2) PIPE DEMOLITION AND UTILITY INSTALLATION.

3) INSTALL INLET PROTECTION ON NEW INLETS.

4) REMOVE PAVEMENT, INSTALL STABILIZED CONSTRUCTION ENTRANCE, MASS

GRADING, AND INSTALLATION OF BUILDING FOUNDATION. TEMPORARY SEED

IF SITE IS LEFT MORE THAN 5 DAYS.

4) ROUGH GRADE.

5) FINISH GRADE SITE, INSTALLATION OF SEED AND MULCH BLANKET ON ALL

DISTURBED TURF AREAS.

6) INSTALL SEDIMENT LOG ON THE TOE OF THE SLOPE AND RIP RAP AT PIPE

OUTFALLS.

7) ONCE VEGETATION IS ESTABLISHED, REMOVE SEDIMENT LOGS, SILT FENCE,

INLET PROTECTION AND RESTORE AS NEEDED.

SITE DATA:

ACREAGE DISTURBED = 3.50 ACRES

NEAREST WATERCOURSE = 925 FEET FROM BEAR CREEK

SOIL TYPES = LEWANEE SILTY CLAY LOAM

R

EV

IS

ED

IN

A

C C

O R

D

AN

C E

W

IT

H A

M

EN

D M

EN

T

/2

5/

W

2Q R

R

_P la ns -0

P

LADDER

LADDER

ACCESS

PANEL

ELECTRIC MH

RIM=617.67

ELECTRIC MH

RIM=617.54

ELECTRIC MH

RIM=617.54

TRANSFORMER

CONCRETE PAD

TRANSFORMER

CONCRETE PAD

CB-31

CB-4

SS MH-5

MH-37

MH-38MH-41

MH-23

CB-36

CB-33

C.O.

MH-42

SS M-4

CB-35

MH-21

SF

C O

N F.

R O

O M

SF

C O

N F.

R O

O M

SF

C O

M M

SF

BR

EA

K R

M

S

F

VE

ST

IB

U

LE

SF

D

IV

. C H

IE

F

SF

D

IV

H

EA

D

SF

D

IV

H

EA

D

SF

BR

AN

C H

C H

IE

F

SF

BR

AN

C H

C H

IE

F

SF

BR

AN

C H

C H

IE

F

SF

BR

AN

C H

C H

IE

F

SF

D

IV

. C H

IE

F

SF

D

IV

C H

IE

F

SF

D

IV

C H

IE

F

SF

D

IV

H

EA

D

SF

FI

R

E

PU

M P

S

F

VE

ST

IB

U

LE

S F

C O

R R

ID

O

R

2B

SF

W O

M

EN

S

F

VE

ST

SF

JA

N

C

LO

SE

T

S

F

VE

ST

SF

M

EN 14

SF

N U

R

SI

N G

M O

TH

ER

SF

EL

EC

SF

BR

AN

C H

C H

IE

F

SF

BR

AN

C H

C H

IE

F

SF

BR

AN

C H

C H

IE

F

SF

BR

AN

C H

C H

IE

F

SF

C O

PY

R

M

SF

C O

M M

S F

ST

O

R

AG

E A

R

EA

SF

BR

AN

C H

C H

IE

F

SF

BR

AN

C H

C H

IE

F

SF

BR

AN

C H

C H

IE

F

SF

BR

AN

C H

C H

IE

F

3 17

SF

D

IV

C H

IE

F

SF

D

IV

C H

IE

F

SF

C O

PY

R

O O

M

SF

BR

AN

C H

C H

IE

F

SF

D

IV

C H

IE

F

SF

BR

AN

C H

C H

IE

F

S F

O

PE

N O

FF

IC

E

S F

O

PE

N O

FF

IC

E

SF

M

EC

H

SF

EL

EC

SF

BR

AN

C H

C H

IE

F

SF

BR

AN

C H

C H

IE

F

SF

BR

AN

C H

C H

IE

F

S

F

LO

C

KE

R

S

7A

SF

C O

R R

ID

O

R

2A

SF

C O

R R

ID

O

R

7B

SF

C O

R R

ID

O

R

7C

TACTICAL VEHICLE LAB

FFE = 618.49

BB

B B

BB

B B

B B

CONNECTOR

FFE = 618.18

HH

CB

CB

PIV

W V

W V

FDC

W V

W V

CB

CB

CB

CB

C B

W M

HH

CO

CO

CB

C B

BR

AD

LE

Y

D R

IV

E

BLDG 200C

CONCRETE APRON

EXISTING DRIVE

EISENHOWER DRIVE

SI

D

EW

AL

K

SI

D

EW

AL

K

SI

D

EW

AL

K

EX

IS

TI

N

G A

SP

H

AL

T

BLDG 200D

H16

CG504

H16

CG504

H16

CG504

H16

CG504

H16

CG504

H16

CG504

H16

CG504

H16

CG504

H1

CG503

H1

CG504

H1

CG503

H1

CG503

STORMWATER DRY POND

H1

CG503

A1

CG503

FILTER ROLL

STABILIZED CONSTRUCTION ENTRANCE

SSSSS

S

S S

S

SSS

A1

CG503

FILTER ROLL

H1

CG503

3 61

SSSSS

S

S S

S

SSS

S S SSS

S

S S

H16

CG504

SILT

FENCE

H1

CG505

MULCH BLANKETH1

CG502

SHEET ID

D

ES

IG

N

B Y:

D R

AW

N

B Y:

C H

EC

KE

D B

Y:

SU

BM

IT

TE

D B

Y:

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

LO

U

IS

VI

LL

E

D

IS

TR

IC

T

D

R M

AR

TI

N L

U

TH

ER

J

R P

L

LO

U

IS

VI

LL

E, K

EN

TU

C

KY

A

DE

TR

OI

T

AR

SE

NA

L, MI

CH

IG

AN

MA

NN

ED

/ U

NM

AN

NE

D

TA

CT

IC

AL

V

EH

IC

LE

LA

B

FY

P2

# 5

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

B

C

D

E

F

G

H

J

K

L

M

N

P

Fi le

P at h:

X

:\3

\2

7.

\T

EC

H

\C

AD

\5

4_

C G

6.

D W

G Pl ot D at e:

/2

4/

IS

SU

E D

AT

E:

SO

LI

C

IT

AT

IO

N N

O

C O

N

TR

AC

T

N O

SI

ZE

AN

SI

D

C

ER

TI

FI

ED

F

IN

AL

S U

BM

IT

TA

L

A.

A

N D

ER

SO

N

C . J

O N

ES

SE

PT

EM

BE

R

0, M &H

P R

O

JE

C T

N O

R

0-

.0

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E

A.

S

KO

G

M . B

U

TL

ER

KEY PLAN

US Army Corps of Engineers

ER

O

SI

O

N C

O N

TR

O

L

PL

AN

CG106

INLET PROTECTION H16/CG504

SILT FENCE H1/CG505

EXISTING CONTOUR LINES

PROPOSED CONTOUR LINES

FILTER ROLL A1/CG503

STABILIZED CONSTRUCTION ENTRANCE

H1/CG504

MULCH BLANKET H1/CG502

CONTRACTOR WORK LIMIT

xxx.x xxx.x xxx(.xx) xxx(.xx)

SSSSSSSSSSSSSSS

SHEET LEGEND

20' 40'0

TR

U

E N

O R

TH

SCALE: 1"=20'-0"

EROSION CONTROL PLANA1

R

EV

IS

ED

IN

A C

C O

R D

AN

C

E W

IT

H

A M

EN

D

M

EN

T

/2 9/

1. ALL WORK SHALL COMPLY WITH THE APPLICABLE SOIL EROSION AND

SEDIMENTATION CONTROL (SESC) RULES AND REGULATIONS (SOIL EROSION

AND SEDIMENTATION CONTROL – 1994 PA 451, PART 91, AS AMENDED, MCL

324.9101 ET SEQ.).

2. ALL EARTH CHANGES OF ONE ACRE OR MORE OR WITHIN 500 FEET OF

WATERS OF THE STATE REQUIRE A SESC PERMIT. IF A SESC PERMIT IS

REQUIRED THE PROFESSIONAL SERVICES CONTRACTOR (DESIGN

CONSULTANT) SHALL PREPARE AN SESC PLAN. THE SESC PLAN SHALL

ADDRESS BOTH WIND AND WATER EROSION AND SEDIMENTATION.

3. THE CONTRACTOR SHALL REVIEW THE DESIGN CONSULTANT’S SESC PLAN IN

ORDER TO PREPARE AND ISSUE FOR APPROVAL AN “SESC IMPLEMENTATION

PLAN”, WHICH INDICATES THE CONTRACTOR’S INTENDED IMPLEMENTATION OF

THE SESC PLAN FOR THE PROJECT, INCLUDING A SCHEDULE.

4. THE DTMB SESC PROGRAM, UPON APPROVAL OF THE IMPLEMENTATION PLAN,

WILL ISSUE THE CONTRACTOR AN “AUTHORIZATION TO PROCEED WITH EARTH

CHANGE”, WHICH IS TO BE POSTED AT THE JOB SITE. THIS DOCUMENT IS

ISSUED IN LIEU OF A PERMIT FROM THE COUNTY OR OTHER LOCAL

ENFORCING AGENCY.

5. THE CONTRACTOR SHALL IMPLEMENT SOIL EROSION AND SEDIMENTATION

CONTROL MEASURES AS REQUIRED BY THE PROJECT’S SESC PLAN, SESC

IMPLEMENTATION PLAN, DTMB’S SOIL EROSION AND SEDIMENTATION

CONTROL GUIDEBOOK, DATED FEBRUARY 2005, AND AS DIRECTED BY THE

PROFESSIONAL SERVICES CONTRACTOR, DTMB SESC INSPECTOR, AND/OR

DTMB PROJECT DIRECTOR. THE DTMB SESC INSPECTOR SHALL INSPECT THE

SITE WEEKLY AND AFTER SIGNIFICANT RAIN EVENTS.

6. THE CONTRACTOR SHALL INSTALL TEMPORARY EROSION AND

SEDIMENTATION CONTROL MEASURES PRIOR TO OR UPON COMMENCEMENT

TO EARTHWORK ACTIVITIES.

7. THE CONTRACTOR WILL PERFORM SWEEPING AS NEEDED TO REMOVE ANY

SEDIMENT TRACKED OFF SITE. FREQUENCY OF SWEEPING WILL BE BASED ON

SITE CONDITIONS.

8. THE CONTRACTOR WILL PERFORM DUST CONTROL AS NEEDED BASED ON

SITE CONDITIONS.

9. DISTURBED AREAS THAT WILL REMAIN IDLE DURING CONSTRUCTION MUST BE

TEMPORARILY STABILIZED, INCLUDING SOIL STOCKPILES, USING DTMB SESC

BEST MANAGEMENT PRACTICES.

10. THE CONTRACTOR SHALL MAINTAIN AND INSPECT SESC MEASURES

THROUGHOUT THE COURSE OF THE PROJECT. RECOMMEND INSPECTING AND

MAINTAINING EROSION AND SEDIMENTATION CONTROLS ON A DAILY BASIS. AT

A MINIMUM, THE CONTRACTOR SHALL INSPECT AND MAINTAIN SESC

MEASURES ONCE A WEEK AND AFTER RAIN EVENTS.

11. THE CONTRACTOR SHALL CORRECT NON-CONFORMING SESC MEASURES

WITHIN 24 HOURS, IF WATERS OF THE STATE ARE BEING IMPACTED OR WITHIN

48 HOURS FOR ROUTINE MAINTENANCE ITEMS. OTHER SESC MAINTENANCE

SHALL BE COMPLETED AS SOON AS POSSIBLE BUT NEVER MORE THAN FIVE (5)

DAYS AFTER DETECTION.

12. THE CONTRACTOR SHALL COMPLETE PERMANENT SOIL EROSION CONTROL

MEASURES FOR ANY DISTURBED LAND AREA WITHIN 5 CALENDAR DAYS

AFTER FINAL GRADING OR THE FINAL EARTH CHANGE HAS BEEN COMPLETED.

THE CONTRACTOR SHALL MAINTAIN TEMPORARY CONTROL MEASURES UNTIL

PERMANENT SOIL EROSION CONTROL MEASURES ARE IN PLACE AND THE

AREA IS STABILIZED.

13. THE CONTRACTOR SHALL REMOVE TEMPORARY EROSION CONTROL

MEASURES AFTER PERMANENT SOIL EROSION MEASURES ARE IN PLACE AND

THE AREA IS STABILIZED. CARE SHALL BE TAKEN DURING REMOVAL TO

PREVENT SOIL EROSION AND SEDIMENTATION.

14. AFTER THE COMPLETION OF THE PROJECT, PERMANENT SESC MEASURES

WILL BE MAINTAINED BY THE PROPERTY OWNER.

15. STORMWATER DRY POND SHALL NOT BE PUT INTO USE UNTIL THE SITE IS

STABILIZED.

PROJECT SEQUENCE:

1) INSTALL INLET PROTECTION AND SEDIMENT LOG BARRIER.

2) PIPE DEMOLITION AND UTILITY INSTALLATION.

3) INSTALL INLET PROTECTION ON NEW INLETS.

4) REMOVE PAVEMENT, INSTALL STABILIZED CONSTRUCTION ENTRANCE, MASS

GRADING, AND INSTALLATION OF BUILDING FOUNDATION. TEMPORARY SEED

IF SITE IS LEFT MORE THAN 5 DAYS.

4) ROUGH GRADE.

5) FINISH GRADE SITE, INSTALLATION OF SEED AND MULCH BLANKET ON ALL

DISTURBED TURF AREAS.

6) INSTALL SEDIMENT LOG ON THE TOE OF THE SLOPE AND RIP RAP AT PIPE

OUTFALLS.

7) ONCE VEGETATION IS ESTABLISHED, REMOVE SEDIMENT LOGS, SILT FENCE,

INLET PROTECTION AND RESTORE AS NEEDED.

SITE DATA:

ACREAGE DISTURBED = 3.50 ACRES

NEAREST WATERCOURSE = 925 FEET FROM BEAR CREEK

SOIL TYPES = LEWANEE SILTY CLAY LOAM

EROSION CONTROL NOTES

R

EV

IS

ED

IN

A

C C

O R

D

AN

C E

W

IT

H A

M

EN

D M

EN

T

/2

5/

W

2Q R

R

_P la ns -0

FF=

618.48

FF=

618.47

FF=

618.51

FF=

618.34

STOP STOP

FF=

619.20

STOP

ST

O

P

ST

O P

FF=

618.41

STO

P

METAL

OVERHANG

FF=

618.50

FF=

618.49

FF=

618.43

FF=

618.47

FF=

618.47

FF=

618.51

FF=

618.49

FF=

618.37

FF=

617.88

FF=

618.52

FF=

617.99

FF=

617.98

FF=

618.54

FF=

618.46

FF=

618.49

ELECTRIC MH

RIM=616.96

ELECTRIC MH

RIM=617.50

TRANSFORMER

CONCRETE PAD

ELECTRICBOX

CONCRETE PAD

TRANSFORMER

CONCRETE PADELECTRICBOX

ELECTRIC

MH

RIM=617.10

ELECTRICBOX

ACCESS

PANEL

ELECTRIC MH

RIM=617.67

ELECTRIC MH

RIM=617.54

ELECTRIC MH

RIM=617.54

TRANSFORMER

CONCRETE PAD

TRANSFORMER

CONCRETE PAD

M.H.

RIM=616.98

FULL/WATER

CB-1

CB-15

CB-18

CB-19

CB-44

CB-31

CB-4

C.O.

GAS

METER

MH-17

MH-16

SS MH-5

SS MH-1206

SS MH-1207

SS MH-1208

MH-39

MH-37

MH-38MH-41

MH-6

MH-10 MH-8

MH-2

MH-23

MH-25

CB-36

CB-40

CB-33

CB-22

MH-26

CB-13CB-9

CB-11

CB-5

CB-3

GAS

PIPELINE

C.O.

MH-42

CB-12

SS M-4

CB-35

MH-21

CB-20

CB-34

GAS

METER

GAS

METER

SF

C O

N F.

R O

O M

SF

C O

N F.

R O

O M

SF

C O

M M

SF

BR

EA

K R

M

S

F

VE

ST

IB

U

LE

SF

D

IV

. C H

IE

F

SF

D

IV

H

EA

D

SF

D

IV

H

EA

D

SF

BR

AN

C H

C H

IE

F

SF

BR

AN

C H

C H

IE

F

SF

BR

AN

C H

C H

IE

F

SF

BR

AN

C H

C H

IE

F

SF

D

IV

. C H

IE

F

SF

D

IV

C H

IE

F

SF

D

IV

C H

IE

F

SF

D

IV

H

EA

D

SF

FI

R

E

PU

M P

S

F

VE

ST

IB

U

LE

S F

C O

R R

ID

O

R

2B

SF

W O

M

EN

S

F

VE

ST

SF

JA

N

C

LO

SE

T

S

F

VE

ST

SF

M

EN 14

SF

N U

R

SI

N G

M O

TH

ER

SF

EL

EC

SF

BR

AN

C H

C H

IE

F

SF

BR

AN

C H

C H

IE

F

SF

BR

AN

C H

C H

IE

F

SF

BR

AN

C H

C H

IE

F

SF

C O

PY

R

M

SF

C O

M M

S F

ST

O

R

AG

E A

R

EA

SF

BR

AN

C H

C H

IE

F

SF

BR

AN

C H

C H

IE

F

SF

BR

AN

C H

C H

IE

F

SF

BR

AN

C H

C H

IE

F

3 17

SF

D

IV

C H

IE

F

SF

D

IV

C H

IE

F

SF

C O

PY

R

O O

M

SF

BR

AN

C H

C H

IE

F

SF

D

IV

C H

IE

F

SF

BR

AN

C H

C H

IE

F

S F

O

PE

N O

FF

IC

E

S F

O

PE

N O

FF

IC

E

SF

M

EC

H

SF

EL

EC

SF

BR

AN

C H

C H

IE

F

SF

BR

AN

C H

C H

IE

F

SF

BR

AN

C H

C H

IE

F

S

F

LO

C

KE

R

S

7A

SF

C O

R R

ID

O

R

2A

SF

C O

R R

ID

O

R

7B

SF

C O

R R

ID

O

R

7C

TACTICAL VEHICLE LAB

FFE = 618.49

BB

B B

BB

B B

B B

CONNECTOR

FFE = 618.18

HH

CB

CB

PIV

S

W V

W V

FDC

W V

W V

CB

CB

CB

CB

C B

W M

HH

CO

CO

CB

C B

BR

AD

LE

Y

D R

IV

E

SIDEWALK

EXISTING

DRIVE

TURF

TURF

TURF

EISENHOWER

DRIVE

EX

IS

TI

N

G

AS

PH

AL

T

SI

D

EW

AL

K

SI

D

EW

AL

K

SI

D

EW

AL

K

SI

D

EW

AL

K

TURF

TURF

TURF

TURF

TU

R

F

BLDG 200D

TACTICAL VEHICLE LAB

FFE = 618.49

BLDG 200C

STORMWATER DRY POND

(SEE CG104)

SHEET ID

D

ES

IG

N

B Y:

D R

AW

N

B Y:

C H

EC

KE

D B

Y:

SU

BM

IT

TE

D B

Y:

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

LO

U

IS

VI

LL

E

D

IS

TR

IC

T

D

R M

AR

TI

N L

U

TH

ER

J

R P

L

LO

U

IS

VI

LL

E, K

EN

TU

C

KY

A

DE

TR

OI

T

AR

SE

NA

L, MI

CH

IG

AN

MA

NN

ED

/ U

NM

AN

NE

D

TA

CT

IC

AL

V

EH

IC

LE

LA

B

FY

P2

# 5

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

B

C

D

E

F

G

H

J

K

L

M

N

P

Fi le

P at h:

X

:\3

\2

7.

\T

EC

H

\C

AD

\5

4_

C P1

.D

W G

Pl ot

D at e:

/2 4/

IS

SU

E D

AT

E:

SO

LI

C

IT

AT

IO

N N

O

C O

N

TR

AC

T

N O

SI

ZE

AN

SI

D

C

ER

TI

FI

ED

F

IN

AL

S U

BM

IT

TA

L

A.

A

N D

ER

SO

N

C . J

O N

ES

SE

PT

EM

BE

R

0, M &H

P R

O

JE

C T

N O

R

0-

.0

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E

A.

S

KO

G

M . B

U

TL

ER

KEY PLAN

US Army Corps of Engineers

O

VE

R

AL

L

SI

TE

P

LA

N

CP101

ASPHALT

CONCRETE

CONTRACTOR WORK LIMIT

SHEET LEGEND

GENERAL SHEET NOTES

1. CONTRACTOR SHALL REPLACE ALL PAVEMENT DISTURBED BY PROJECT.

CARE SHALL BE TAKEN TO PROTECT PAVEMENT OUTSIDE OF THE

PROJECT LIMIT BOUNDARY.

2. CONTRACTOR SHALL PHASE CONCRETE AND PAVING TO AVOID TRAFFIC

DELAYS TO THE EXTENT PRACTICAL.

3. FOR PAVEMENT PATCHING, CONTRACTOR SHALL MATCH PAVEMENT

TYPE AND DEPTH OF EXISTING PAVEMENT AS WELL AS COURSE.

4. CONCRETE SIDEWALK JOINTING SHALL BE 5' MINIMUM.

5. ALL PAVEMENT STRIPING DISTURBED SHALL BE RE-ESTABLISHED TO

MATCH EXISTING PAINT TYPE AND MARKINGS.

40' 80'0

TR

U

E N

O R

TH

SCALE: 1"=40'-0"

OVERALL SITE PLANA1

R

EV

IS

ED

IN

A

C C

O R

D

AN

C E

W

IT

H A

M

EN

D M

EN

T

/2

5/

W

2Q R

R

_P la ns -0

P

FF=

618.50

FF=

618.49

FF=

617.88

FF=

618.52

FF=

617.99

FF=

617.98

FF=

618.54

FF=

618.46

FF=

618.49

ACCESS

PANEL

ELECTRIC MH

RIM=617.67

ELECTRIC MH

RIM=617.54

ELECTRIC MH

RIM=617.54

TRANSFORMER

CONCRETE PAD

TRANSFORMER

CONCRET…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .