W912QR24R0071_Specs_Vol3-0000.pdf
PDF 3 MB Posted
- Attached to
- D/B/B CONSTRUCTION: W912QR24R0071 SECURITY FORCES TRAINING FACILITY, DOBBINS AIR RESERVE BASE, GA
- Solicitation number
- W912QR24R0071
About this file
This document is a solicitation (W912QR24R0071) for the design-bid-build construction of a 21,464 SF Security Forces Training Facility at Dobbins Air Reserve Base in Marietta, Georgia. The project includes a reinforced concrete foundation, concrete slab, reinforced masonry or concrete walls, energy efficient roofing, electrical, HVAC, plumbing, site improvements, access road/parking, fire detection/protection, and communications/MNS systems. This is a total small business set-aside for a firm-fixed-price contract with an estimated 810 calendar day performance period. Proposals will be evaluated using a best value trade-off process considering past performance, technical factors, schedule, price, and other requirements. The North American Industrial Classification System (NAICS) code is 236220 - Commercial and Institutional Building Construction with a $45M size standard. Prospective offerors must have an active SAM.gov registration to be eligible for award.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation For Security Forces Facility, Dobbins Air Reserve Base, Marietta, GA
P2: 504840
Design-Bid-Build
Specifications - Vol. 3 of 3 (DIV 26 - 33)
02 August 2024
W912QR24R0071
Certified Final Design ARIMS: 200A Disposition: Maintain for 15yrs after construction.
W912QR24R0071_Specs_Vol3-0000
(this page intentionally left blank)
504840 DOBBINS AFB SECURITY FORCES FACILITY
Marietta, GA
PROFESSIONAL SEALS PAGE
CERTIFIED FINAL
100818
PROFFESSIONAL SEALS PAGE
SECURITY FORCES FACILITY
Dobbins Air Reserve Base, Marietta, GA
Project No: FGWB210004
P2#: 504840
Design Consultant Tetra Tech, Inc.
2000 Warrington Way, Suite 245
Louisville, Kentucky 40222
Phone (502) 584-5555 / Fax (502) 584-5696
Tt Project No.: 213-11568-23001
STRUCTURAL ARCHITECTURAL CIVIL
FIRE PROTECTION MECHANICAL ELECTRICAL / TELECOMMUNICATIONS
PROJECT TABLE OF CONTENTS
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
00 10 00 02/13 PRICE BREAKOUT SCHEDULE
00 80 00.00 06 04/21 SPECIAL PROVISIONS
DIVISION 01 - GENERAL REQUIREMENTS
01 01 00 GENERAL REQUIREMENTS
01 32 01.00 06 07/18 PROJECT SCHEDULE
01 33 00 08/18, CHG 4: 02/21 SUBMITTAL PROCEDURES
01 33 29.00 06 11/17 SUSTAINABILITY REPORTING
01 35 26.00 06 GOVERNMENT SAFETY REQUIREMENTS
01 42 00 02/19 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00.15 10 11/16 RESIDENT MANAGEMENT SYSTEM CONTRACTOR
MODE (RMS CM)
01 45 04.10 06 CONTRACTOR QUALITY CONTROL
01 45 35 11/20 SPECIAL INSPECTIONS
01 46 00.00 06 04/20 TOTAL BUILDING COMMISSIONING
01 50 00 05/18 TEMPORARY CONSTRUCTION FACILITIES AND
CONTROLS
01 56 00 ENVIRONMENTAL REQUIREMENTS
01 57 19.00 06 04/20 TEMPORARY ENVIRONMENTAL CONTROLS AND
PERMITS
01 74 19 02/19, CHG 3: 11/21 CONSTRUCTION WASTE MANAGEMENT AND
DISPOSAL
01 78 23 08/15, CHG 2: 08/21 OPERATION AND MAINTENANCE DATA
DIVISION 02 - EXISTING CONDITIONS
02 41 00 08/22 DEMOLITION
02 81 00 11/18 TRANSPORTATION AND DISPOSAL OF
HAZARDOUS MATERIALS
02 82 00 11/18, CHG 1: 11/19 ASBESTOS REMEDIATION
02 84 16 11/22 HANDLING OF LIGHTING BALLASTS AND
LAMPS CONTAINING PCBs AND MERCURY
DIVISION 03 - CONCRETE
03 30 00 02/19, CHG 4: 08/22 CAST-IN-PLACE CONCRETE
03 45 00 05/16, CHG 2: 11/21 PRECAST ARCHITECTURAL CONCRETE
DIVISION 04 - MASONRY
04 20 00 11/15, CHG 2: 05/19 UNIT MASONRY
DIVISION 05 - METALS
05 05 20 05/22 POST-INSTALLED CONCRETE AND MASONRY
ANCHORS
05 05 23.16 08/18 STRUCTURAL WELDING
05 12 00 08/18, CHG 2: 05/21 STRUCTURAL STEEL
05 21 00 05/15, CHG 1: 08/18 STEEL JOIST FRAMING
05 30 00 05/15, CHG 2: 08/18 STEEL DECKS
05 40 00 05/15, CHG 1: 08/18 COLD-FORMED METAL FRAMING
05 50 13 05/17, CHG 1: 08/18 MISCELLANEOUS METAL FABRICATIONS
05 52 00 02/18, CHG 1: 02/20 METAL RAILINGS
PROJECT TABLE OF CONTENTS Page 1
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
06 10 00 08/16, CHG 2: 11/18 ROUGH CARPENTRY
06 20 00 08/16, CHG 2: 11/18 FINISH CARPENTRY
06 41 16.00 10 08/10, CHG 1: 11/18 PLASTIC-LAMINATE-CLAD ARCHITECTURAL
CABINETS
06 61 16 08/20 SOLID SURFACING FABRICATIONS
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 05 23 08/19 PRESSURE TESTING AN AIR BARRIER SYSTEM
FOR AIR TIGHTNESS
07 11 13 08/11, CHG 1: 05/17 BITUMINOUS DAMPPROOFING
07 19 00 05/11, CHG 1: 08/17 WATER REPELLENTS
07 21 16 11/11, CHG 4: 08/18 BUILDING INSULATION
07 22 00 02/16, CHG 3: 11/18 ROOF AND DECK INSULATION
07 27 10.00 10 08/19, CHG 1: 02/20 BUILDING AIR BARRIER SYSTEM
07 27 19.01 05/17, CHG 2: 08/20 SELF-ADHERING AIR BARRIERS
07 27 26 05/17, CHG 2: 08/20 FLUID-APPLIED MEMBRANE AIR BARRIERS
07 54 19 02/13, CHG 3: 02/21 POLYVINYL-CHLORIDE ROOFING
07 60 00 05/17, CHG 2: 11/18 FLASHING AND SHEET METAL
07 84 00 05/10, CHG 1: 08/13 FIRESTOPPING
07 92 00 08/16, CHG 3: 11/18 JOINT SEALANTS
DIVISION 08 - OPENINGS
08 11 13 08/20 STEEL DOORS AND FRAMES
08 33 23 08/20, CHG 1: 02/22 OVERHEAD COILING DOORS
08 51 13 05/19 ALUMINUM WINDOWS
08 71 00 02/16, CHG 4: 02/22 DOOR HARDWARE
08 81 00 05/19 GLAZING
DIVISION 09 - FINISHES
09 22 00 02/10, CHG 2: 08/18 SUPPORTS FOR PLASTER AND GYPSUM BOARD
09 29 00 08/16, CHG 4: 02/20 GYPSUM BOARD
09 51 00 08/20 ACOUSTICAL CEILINGS
09 65 00 08/10, CHG 3: 08/18 RESILIENT FLOORING
09 68 00 11/17, CHG 2: 08/20 CARPETING
09 90 00 02/21 PAINTS AND COATINGS
DIVISION 10 - SPECIALTIES
10 14 00.10 08/17, CHG 1: 11/18 EXTERIOR SIGNAGE
10 14 00.20 08/20 INTERIOR SIGNAGE
10 21 13 08/20 TOILET COMPARTMENTS
10 22 13 08/16, CHG 1: 08/18 WIRE MESH PARTITIONS
10 22 39 08/20 FOLDING PANEL PARTITIONS
10 26 00 08/20 WALL AND DOOR PROTECTION
10 28 13 08/20 TOILET ACCESSORIES
10 44 16 11/19 FIRE EXTINGUISHERS
10 51 13 05/11 METAL LOCKERS
DIVISION 12 - FURNISHINGS
12 24 13 08/20 ROLLER WINDOW SHADES
12 36 00 08/16, CHG 2: 08/18 COUNTERTOPS
12 50 00.13 10 08/17, CHG 1: 11/18 FURNITURE AND FURNITURE INSTALLATION
12 59 00 08/17, CHG 1: 08/18 SYSTEMS FURNITURE
PROJECT TABLE OF CONTENTS Page 2
DIVISION 13 - SPECIAL CONSTRUCTION
13 12 50 05/23 ALUMINUM CANOPIES
13 48 73 05/22 SEISMIC CONTROL FOR MISCELLANEOUS
EQUIPMENT
DIVISION 21 - FIRE SUPPRESSION
21 13 13 08/20 WET PIPE SPRINKLER SYSTEMS, FIRE
PROTECTION
DIVISION 22 - PLUMBING
22 00 00 11/15, CHG 4: 05/21 PLUMBING, GENERAL PURPOSE
22 05 48.00 20 04/06, CHG 1: 05/15 MECHANICAL SOUND, VIBRATION, AND
SEISMIC CONTROL
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
23 03 00.00 20 08/10, CHG 3: 08/18 BASIC MECHANICAL MATERIALS AND METHODS
23 05 48.19 05/18, CHG 2: 08/20 SEISMIC BRACING FOR HVAC
23 05 93.00 06 08/16 TESTING, ADJUSTING, AND BALANCING
(TAB) OF HVAC
23 07 00 02/13, CHG 7: 05/20 THERMAL INSULATION FOR MECHANICAL
SYSTEMS
23 09 00 02/19, CHG 3: 05/21 INSTRUMENTATION AND CONTROL FOR HVAC
23 09 13 11/15, CHG 2: 05/21 INSTRUMENTATION AND CONTROL DEVICES
FOR HVAC
23 09 23.02 02/19, CHG 1: 02/20 BACNET DIRECT DIGITAL CONTROL FOR HVAC
AND OTHER BUILDING CONTROL SYSTEMS
23 11 20 05/20 FACILITY GAS PIPING
23 21 13.00 20 04/06, CHG 2: 11/19 LOW TEMPERATURE WATER (LTW) HEATING
SYSTEM
23 23 00 08/21 REFRIGERANT PIPING
23 30 00 05/20, CHG 1: 02/22 HVAC AIR DISTRIBUTION
23 52 43.00 20 05/15, CHG 2: 08/18 LOW PRESSURE WATER HEATING BOILERS
(UNDER 800,000 BTU/HR OUTPUT)
23 64 10 11/16, CHG 2: 08/18 WATER CHILLERS, VAPOR COMPRESSION TYPE
23 64 26 08/09, CHG 6: 11/22 CHILLED, CHILLED-HOT, AND CONDENSER
WATER PIPING SYSTEMS
23 73 13.00 40 05/17 MODULAR INDOOR CENTRAL-STATION
AIR-HANDLING UNITS
23 81 00 05/18, CHG 1: 02/21 DECENTRALIZED UNITARY HVAC EQUIPMENT
23 82 00.00 20 02/16, CHG 1: 08/18 TERMINAL HEATING UNITS
DIVISION 25 - INTEGRATED AUTOMATION
25 05 11 05/21 CYBERSECURITY FOR FACILITY-RELATED
CONTROL SYSTEMS
25 05 11.01 05/21 CYBERSECURITY FOR FACILITY-RELATED
CONTROL SYSTEMS (MECHANICAL BACS)
25 05 11.02 05/21 CYBERSECURITY FOR FACILITY-RELATED
CONTROL SYSTEMS (FIRE PROTECTION)
25 05 11.03 05/21 CYBERSECURITY FOR FACILITY-RELATED
CONTROL SYSTEMS (EMERGENCY POWER)
25 05 11.04 05/21 CYBERSECURITY FOR FACILITY-RELATED
CONTROL SYSTEMS (LIGHTING)
25 08 10 05/21 UTILITY MONITORING AND CONTROL SYSTEM
PROJECT TABLE OF CONTENTS Page 3
TESTING
25 10 10 02/19, CHG 1: 05/21 UTILITY MONITORING AND CONTROL SYSTEM
(UMCS) FRONT END AND INTEGRATION
DIVISION 26 - ELECTRICAL
26 05 48.00 10 10/07 SEISMIC PROTECTION FOR ELECTRICAL
EQUIPMENT
26 05 74 05/23 ARC FLASH PROGRAM
26 08 00 11/22 APPARATUS INSPECTION AND TESTING
26 20 00 08/19, CHG 3: 11/21 INTERIOR DISTRIBUTION SYSTEM
26 27 13.10 30 10/07, CHG 2: 08/18 ELECTRIC METERS
26 28 01.00 10 08/21 COORDINATED POWER SYSTEM PROTECTION
26 29 23 02/20, CHG 1: 05/21 ADJUSTABLE SPEED DRIVE (ASD) SYSTEMS
UNDER 600 VOLTS
26 32 15.00 05/20 ENGINE-GENERATOR SET STATIONARY
15-2500 KW, WITH AUXILIARIES
26 33 53 05/19 STATIC UNINTERRUPTIBLE POWER SUPPLY
(UPS)
26 36 23 05/20, CHG 1: 08/21 AUTOMATIC TRANSFER SWITCHES AND
BY-PASS/ISOLATION SWITCH
26 41 00 11/13 LIGHTNING PROTECTION SYSTEM
26 51 00 05/20, CHG 2: 11/21 INTERIOR LIGHTING
26 56 00 08/21 EXTERIOR LIGHTING
DIVISION 27 - COMMUNICATIONS
27 05 13.43 05/20 TELEVISION DISTRIBUTION SYSTEM
27 10 00 08/11 BUILDING TELECOMMUNICATIONS CABLING
SYSTEM
27 51 23 11/21 INTERCOMMUNICATION SYSTEM
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
28 31 76 08/20 INTERIOR FIRE ALARM AND MASS
NOTIFICATION SYSTEM, ADDRESSABLE
DIVISION 31 - EARTHWORK
31 00 00.00 06 07/18 EARTHWORK
31 21 13 11/18 RADON MITIGATION
31 31 16.13 08/22 CHEMICAL TERMITE CONTROL
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 01 16.71 11/22 COLD MILLING ASPHALT PAVING
32 01 19.61 11/19 SEALING OF JOINTS IN RIGID PAVEMENT
32 05 33 08/17 LANDSCAPE ESTABLISHMENT
32 11 20 05/22 BASE COURSE FOR RIGID PAVING
32 11 23 05/22 AGGREGATE BASE COURSE FOR FLEXIBLE
PAVING
32 12 13 05/17 BITUMINOUS TACK AND PRIME COATS
32 12 16.16 11/20 ROAD-MIX ASPHALT PAVING
32 13 13.06 06 06/18 PORTLAND CEMENT CONCRETE PAVEMENT FOR
ROADS AND SITE FACILITIES
32 16 19 05/18 CONCRETE CURBS, GUTTERS AND SIDEWALKS
32 17 23 08/16, CHG 5: 11/18 PAVEMENT MARKINGS
32 31 13 11/21 CHAIN LINK FENCES AND GATES
32 92 19 08/17, CHG 1: 08/21 SEEDING
PROJECT TABLE OF CONTENTS Page 4
DIVISION 33 - UTILITIES
33 11 00 02/18, CHG 1: 02/22 WATER UTILITY DISTRIBUTION PIPING
33 11 23 11/09, CHG 1: 08/17 NATURAL GAS AND LIQUID PETROLEUM PIPING
33 30 00 05/18 SANITARY SEWERAGE
33 31 23.00 10 08/18 SANITARY SEWER FORCE MAIN PIPING
33 32 16 11/19 PACKAGED UTILITY WASTEWATER PUMPING
STATIONS
33 40 00 11/21 STORMWATER UTILITIES
33 71 02 08/21 UNDERGROUND ELECTRICAL DISTRIBUTION
33 82 00 04/06 TELECOMMUNICATIONS OUTSIDE PLANT (OSP)
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 5
SECTION 26 05 48.00 10
SEISMIC PROTECTION FOR ELECTRICAL EQUIPMENT
10/07
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AMERICAN INSTITUTE OF STEEL CONSTRUCTION (AISC)
AISC 325 (2017) Steel Construction Manual
U.S. DEPARTMENT OF DEFENSE (DOD)
UFC 3-301-01 (2019, with Change 1, 2022) Structural Engineering
UNDERWRITERS LABORATORIES (UL)
UL 1598 (2021; Reprint Jun 2021) Luminaires
1.2 SYSTEM DESCRIPTION
1.2.1 General Requirements
Apply the requirements for seismic protection measures described in this section to the electrical equipment and systems listed below. Structural requirements are in accordance with Section 13 48 73 SEISMIC CONTROL FOR
MISCELLANEOUS EQUIPMENT.
1.2.2 Electrical Equipment
Include the following items to the extent required on the drawings or in other sections of these specifications:
Control Panels Air Handling Units
Pumps with Motors
Light Fixtures
Transformers
1.2.3 Electrical Systems
Install the following electrical systems as required on the drawing s and
SECTION 26 05 48.00 10 Page 1 other sections of these specifications and seismically protect in accordance with this specification: Emergency power systems (critical and life safety), normal power distribution systems, conduit, cable tray, raceway, light fixtures, telecommunication racks, etc.
1.2.4 Contractor Designed Bracing
Submit copies of the Design Calculations with the Drawings. Calculations must be approved, certified, stamped and signed by a Registered Professional Engineer. Verify the capability of structural members to which bracing is attached for carrying the load from the brace. Design the bracing in accordance with UFC 3-301-01 and additional data furnished by the Contracting Officer. Accomplish resistance to lateral forces induced by earthquakes without consideration of friction resulting from gravity loads. UFC 3-301-01 uses parameters for the building, not for the equipment in the building; therefore, corresponding adjustments to the formulas are required. Loadings determined using UFC 3-301-01 are based on strength design; therefore, use AISC 325 for the design. Develop the bracing for the following electrical equipment and systems:
Engine-Generators and base tanks Dry-Type Transformers Free Standing Electric Motors Meter Pedestal Automatic Transfer Switch Uninterruptible Power Supply Telecommunications Racks Cable Tray Antenna Masts Conduit Lighting
1.2.5 Conduits Requiring No Special Seismic Restraints
Seismic restraints may be omitted from electrical conduit less than 2-1/2 inches trade size. Seismically protect all other interior conduit as specified.
1.3 EQUIPMENT REQUIREMENTS
Submit detail drawings along with catalog cuts, templates, and erection and installation details, as appropriate, for the items listed.
Submittals must be complete in detail, indicating thickness, type, grade, class of metal, and dimensions; and must show construction details, reinforcement, anchorage, and installation with relation to the bui lding construction. Submit copies of the design calculations with the detail drawings. Calculations must be stamped by a registered engineer an d must verify the capability of structural members to which bracing is attached for carrying the load from the brace.
1.3.1 Rigidly Mounted Equipment
The following specific items of equipment: List shown at the end o f this subsection to be furnished under this contract must be constructed and assembled to withstand the seismic forces specified in UFC 3-301-01 .
Entirely locate each item of rigid electrical equipment and rigidly attach on one side only of a building expansion joint. Provide items such as piping, electrical conduit, which cross the expansion joint with fl exible joints that are capable of accommodating displacements equal to the full width of the joint in both orthogonal directions.
SECTION 26 05 48.00 10 Page 2
Engine-Generators and base tanks
Dry-Type Transformers
Free Standing Electric Motors Meter Pedestal
Automatic Transfer Switch Uninterruptible Power Supply Telecommunications Racks Cable Tray Antenna Masts Conduit Lighting
1.4 SUBMITTALS
Government approval is required for submittals with a "G" classification.
Submittals not having a "G" classification are for information only. When used, a code following the "G" classification identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-03 Product Data
Lighting Fixtures in Buildings; G
Equipment Requirements; G
Contractor Designed Bracing; G
PART 2 PRODUCTS
2.1 LIGHTING FIXTURE SUPPORTS
Provide lighting fixtures and supports conforming to UL 1598 .
2.2 SWAY BRACING MATERIALS
Provide sway bracing materials (e.g. rods, plates, rope, angles, et c.) as specified in Section 13 48 73 SEISMIC CONTROL FOR MISCELLANEOUS EQU IPMENT.
PART 3 EXECUTION
3.1 SWAY BRACES FOR CONDUIT
Brace conduit as for an equivalent weight pipe in accordance with Section
23 05 48.19 SEISMIC BRACING FOR HVAC.
3.2 LIGHTING FIXTURES IN BUILDINGS
Provide lighting fixtures and supports conforming to the following:
3.2.1 Pendant Fixtures
Provide pendant fixtures conforming to the requirements of UFC 3-301-01 .
SECTION 26 05 48.00 10 Page 3
3.2.2 Ceiling Attached Fixtures
3.2.2.1 Recessed LED Fixtures
Support recessed LED individual or continuous-row mounted fixtures by a seismic-resistant suspended ceiling support system built in accordance with Section 09 51 00 ACOUSTICAL CEILINGS. Provide seismic protection for the fixtures conforming to the requirements of UFC 3-301-01 . Recessed lighting fixtures not over 56 pounds in weight may be supported by and attached directly to the ceiling system runners using screws or bolts, number and size as required by the seismic design. Provide lock or screw attachments for fixture accessories, including louvers, diffusers, and lenses.
3.2.2.2 Surface-Mounted LED Fixtures
Attach surface-mounted fluorescent individual or continuous-row fixtures to a seismic-resistant ceiling support system built in accordance with Section 09 51 00 ACOUSTICAL CEILINGS. Provide seismic protection for the fixtures conforming to the requirements of UFC 3-301-01 .
3.2.3 Assembly Mounted on Outlet Box
Design a supporting assembly, that is intended to be mounted on an outlet box, to accommodate mounting features on 4 inch boxes, plaster rings, and fixture studs.
3.2.4 Wall-Mounted Emergency Light Unit
Design and secure attachments for wall-mounted emergency light units for the worst expected seismic disturbance at the site.
3.2.5 Lateral Force
Provide structural requirements for light fixture bracing in accordance with Section 13 48 73 SEISMIC CONTROL FOR MISCELLANEOUS EQUIPMENT.
-- End of Section --
SECTION 26 05 48.00 10 Page 4
SECTION 26 05 74 Page 1
SECTION 26 05 74
ARC FLASH PROGRAM
PART 1 GENERAL
1.1 RELATED DOCUMENTS:
The General Conditions, Special Conditions, Instruction to Bidders and all applicable portions of Division 26 – Electrical, apply to the work of this section.
1.2 DESCRIPTION:
The Contractor shall provide a Short Circuit Study, Protective Device Evaluation
Study, Protective Device Coordination Study, and Arc Flash Hazard Analysis for the electrical distribution system as shown and/or described on the one-line drawings or narrative scope including their loads.
The intent of the Arc Flash Hazard Analysis is to determine the hazards that exist at all 3-phase equipment in order to supply information which will aid in the protection of individuals, working on the premises, from electrical hazards.
The Contractor shall collect all required data to perform the analysis and shall verify the accuracy of any owner provided one-line electrical power drawings.
The study will include the creation of Arc Flash Hazard Warning labels specific to each individually identified piece of equipment, new or existing if in need of updating. These labels serve as a guide to technicians and others in the selection of proper Personal Protective Equipment (PPE) when working near exposed energized equipment. The Contractor shall provide all labels conforming to NFPA 70E standards or as directed by the COR.
The Arc Flash Hazard Analysis shall consider operation during normal conditions, alternate operations, emergency power conditions, and any other operating condition that could result in maximum arc flash hazard conditions. The Arc
Flash Hazard Warning labels shall list the “worst case” arc flash hazard condition at each location.
1.3 REFERENCES:
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
INTERNATIONAL ELECTRICAL TESTING ASSOCIATES
NETA ATS Latest Edition: Acceptance
NETA MTS Latest Edition: Maintenance Testing Specifications.
NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)
NFPA 70 (2017; era 1-2 2017; TIA 17-1; TIA 17-2; TIA 17-3)
National
Electrical Code.
504840 DOBBINS AFB SECURITY FORCES FACILITY
SECTION 26 05 74 Page 2
NFPA 70B Recommended Practice for Electrical Equipment
Maintenance.
NFPA 70E (2018) Standard for Electrical Safety in the Workplace
OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION (OSHA)
OSHA 29 CFR 1910 Subpart S 1910.331-335
INSTITUTE OF ELECTRICAL AND ELECTRONIC ENGINEERS (IEEE)
IEEE 1584 Guide for Performing Arc-Flash Hazard Calculations
IEEE 141 Red Book
AMERICAN NATIONAL STANDARDS INSTITUTE (ANSI)
ANSI Z535.4 Safety Labels
UNIFIED FACILITIES CRITERIA (UFC)
UFC 3-501-01 Electrical Engineering
UFC 3-520-01 Interior Electrical Systems
1.4 SUBMITTALS:
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the “G” designation identifies the office that will review the submittal for the government. Submit the following in accordance with
Section 01 33 00 SUBMITTAL PROCEDURES:
SD-02 Shop Drawings
Arc Flash Signs/Labels; G
SD-06 Test Reports
Final Study Report; G
Label Verification Report; G
SD-11 Closeout Submittals
Electronic Software Files for all analysis (EasyPower Format); G
1.5 QUALIFICATIONS:
The Arc Flash Program shall be prepared and stamped by an electrical engineer that is a licensed Professional Engineer.
Contractor and Engineer performing the study shall have completed a minimum of six (6) such studies on facilities of similar size, scope.
The Contractor shall employ certified journeyman electrician(s) to perform data
504840 DOBBINS AFB SECURITY FORCES FACILITY
SECTION 26 05 74 Page 3 collection. The contractor is responsible for supplying lifts, ladders or any other required equipment necessary for electrical data collection survey.
Personnel performing the arc flash data collection shall be trained and experienced with apparatus and systems being evaluated. These individuals shall be capable of conducting the tasks of data collection in a safe manner and with complete knowledge of the hazards involved.
This contract work scope shall be performed in compliance with Dobbins ARB safety policies and procedures.
PART 2 PRODUCTS
2.1 ANALYSIS SOFTWARE:
The study shall be performed utilizing the latest version of EasyPower Software or approved alternative. Alternatives must be approved by the Contracting
Officer’s Representative (COR).
2.2 ARC FLASH HAZARD LABELS:
Based on the results of the Arc Flash Study, warning labels shall be produced for each piece of equipment (bus, device, etc.) in accordance with ANSI Z535.4-
2011 (R2017), UFC standards, and the Dobbins ARB design guide. The Electrical
Contractor shall install all field labels and give the COR the option to accompany them during this installation process.
Arc Flash Label Characteristics (Posted information, color, size, and material numbers): The contractor shall coordinate arc flash label, color, size, and materials with the COR prior to beginning work, to comply with existing labels at Dobbins ARB. Posted label information shall match existing labels already present in this facility unless otherwise directed by the COR.
All outdoor labels shall be covered with Clear Polyester Brady B-674 overlayment.
Surface preparation: Use alcohol wipes to clean the surface and then let dry thoroughly before applying the label. If the surface is greasy, use a degreaser first and then go over the area with an alcohol wipe afterwards. Labels should always be applied with firm, even pressure starting at one side of the label and working across the surface of the label with multiple passes. This ensures that the entire adhesive has good contact with the surface. Full adhesion strength will be reached after 24 hours.
The analysis shall be conducted calculating the incident energy using formulas from IEEE-1584. The resulting hazard categories shown on the labels are associated with incident energy levels as defined in IEEE-1584 and NFPA 70E.
PART 3 EXECUTION
3.1 REQUIREMENTS:
3.1.1 Equipment Naming:
Equipment naming shall follow design drawing designations or existing equipment labels.
504840 DOBBINS AFB SECURITY FORCES FACILITY
SECTION 26 05 74 Page 4
3.1.2 Data Collection:
The contractor shall survey the facility electrical power distribution system for the purposes of recording and documenting all data required to complete engineering studies and one-line diagrams.
Survey shall record data such as: utility information, equipment nameplate/ratings, cable sizes/lengths, overcurrent device nameplates, settings, etc. Once the electrical equipment field data is gathered, the contractor shall forward a copy of the data collection sheets to its Engineer for processing and a record copy to the COR. Any discrepancies identified during the data entry shall be field verified and corrected by the contractor. Engineering judgment shall be used for any equipment data that was unable to be collected and/or that is not within the software component library. All engineering judgments or assumptions shall be noted on the one- lines. No general assumptions of overcurrent device types or sizes shall be accepted. Visual inspection and documentation of all overcurrent devices is mandatory unless inaccessible.
A device point can be described as all 3-phase electrical equipment that will receive an Arc-Flash label as described below. Note: Items listed as additional don’t receive a label but are considered as a data point.
Example Electrical Equipment 600V or Less:
Panel Board - Field Disconnect Switch
Main Distribution Panel - Enclosed Circuit Breaker
Sub Distribution Panel - Automatic Transfer Switch
Switchgear - Manual Transfer Switch
Substation - Motor Control Center
Transformer (3-Phase, All Sizes) - Control Panel
Starter (Combination / Manual) - Bus Duct
Generator - VFD Cabinet
Uninterruptable Power Supply
Each Utility Feed (Additional Item)
3-Phase Motors ≥40Hp (Additional Item)
Example Electrical Equipment Above 600V:
Automatic Transfer Switch - Manual Transfer Switch
HV Switch - HV Starter
HV Transformer
Medium or High Voltage Breaker Compartment
3-Phase Motors ≥40Hp (Additional Item)
Fused Cutout (Additional Item)
Reclosure (Additional Item)
Wire-ways, pull-boxes and junction-boxes will not receive a label under normal circumstances (therefore these items are not a data point unless a label is required). Single phase distribution is not included as a data point.
Existing one-line diagrams and building layout drawings to help facilitate the survey are provided, if available. However, the existing one-lines are not guaranteed to be accurate or complete and all information must be verified during the data collection phase.
On newly designed or renovated electrical systems, the project one-line drawings are included with the bid documents.
The data collection may require removal of barriers, opening of front panels, 504840 DOBBINS AFB SECURITY FORCES FACILITY
SECTION 26 05 74 Page 5 etc. while equipment is energized; an energized work permit is required in such cases. Contractor shall supply a barricade such as tapes, cones or A- frame wood or metal structures intended to provide a warning about limited access to a hazardous area. The barricade shall serve as a physical obstruction that is intended to prevent contact with equipment or energized electrical conductors and circuit parts or to prevent unauthorized access to that specific work area.
If data collection work being performed is located over existing equipment, the data collection contractor shall take precautions to limit the exposure of any equipment or production products from falling dirt, dust or other hazards.
While collecting data, the contractor shall document on the data collection sheets, all breaker and fuse positions (section/position) for panelboards, MCCs, and bus ducts whether they are 1-phase, 3-phase, spare or space.
During the field data collection, the contractor shall not deenergize any electrical equipment without written permission from the COR.
3.1.3 System Analysis:
Perform a comprehensive analysis of facility electrical systems for all 3-phase equipment. The studies shall consider operation during normal conditions, alternate, and emergency conditions which could result in a maximum arc flash hazard. Complete the following engineering studies:
a. Short Circuit Study – A short circuit fault current analysis (three phase bolted fault and single line-to-ground fault) shall be performed in accordance with ANSI standard C37 and IEEE standard 141
(Red Book) for each bus location that will be receiving an Arc Flash
Label.
b. Protective Device Evaluation Study – This study shall be performed to determine whether circuit breakers or fuses have an adequate kAIC rating for the available fault current they must withstand.
Appropriate multiplying factors based on system X/R ratios and protective device rating standards shall be applied. Any problem areas or inadequacies in equipment ratings found shall be listed in table format comparing existing AIC rating to the available fault current.
c. Coordination Study – A coordination study for devices flagged as miscoordinated by the software shall be performed in accordance with
IEEE 242 (“Buff” Book) to determine the proper overcurrent device settings that will provide system reliability through selective coordination while minimizing the magnitude of an electrical arc flash hazard incident. Provide time current curves which graphically indicate the coordination of devices. Any devices that are identified as miscoordinated shall be noted in the study report. The miscoordinated device shall be replaced or settings adjusted to obtain the required coordination. All settings for relays and circuit breakers or fuse sizes (including manufacturer and type) shall be listed in tabular format or on the TCC curve. Any recommendations given shall include existing and final settings.
d. Arc Flash Study – An arc flash study shall be done for each bus location (calculation node) as identified in short circuit study. It shall be done in accordance with the applicable standards IEEE 1584-
504840 DOBBINS AFB SECURITY FORCES FACILITY
SECTION 26 05 74 Page 6
2018 - IEEE Guide for Performing Arc Flash Hazard Calculations, as referenced in NFPA 70E, “Standard for Electrical Safety in the
Workplace”, 2018 Revision, in order to quantify the hazard for selection of personal protective equipment (PPE). Tables that assume fault current levels and clearing time for proper PPE selection are not acceptable. Pertinent data, rationale employed and assumptions shall be provided with calculations.
Engineering judgment shall be used for any equipment data that was unable to be collected or that is not within the software component library. All engineering judgments shall be noted on the one-lines and shall also be listed in spreadsheet format in Study Report.
3.1.4 FINAL STUDY REPORT:
Supply a Comprehensive Report with all engineering materials for review that includes:
a. The original field data collection sheets.
b. Report Summary with analysis methodology, findings and recommendations:
* A summary of all assumed components used in the analysis in spreadsheet format or shown on the one-line drawing. Other assumptions made in analysis that are separate from components shall also be listed.
* A summary of all input data for utility source, equipment, protective devices, transformers and cables in spreadsheet format.
* A summary of the Arc Flash Analysis in spreadsheet format which gives at a minimum, the available fault current, incident energy level (cal/cm²), hazard category at each equipment (bus) location and its protective device.
* Overcurrent device coordination curves (TCC).
* The one-line diagram created from the data collected shall be separated to fit onto D-Size drawings and exported to AutoCAD format and PDF. These one-lines will be included in the Final
Study Report on 11 x 17 sheets. (All information shall be legible on 11 x 17 sheets.) Information, including the component or bus name, shall be shown on the one-line diagram.
c. The Contractor shall supply (1) CD which includes all information listed above in item “b”.
d. The Contractor shall provide a copy of the original field data collection sheets.
3.1.5 LABEL VERIFICATION REPORT:
Supply a Report that includes:
a. Photographs of every installed arc flash label, with the label content legible.
b. Installed location of each label on the equipment with room number and floor.
c. Signature sheet with installers’ signatures and verifying engineer’s signature (once verification is complete).
c. The Contractor shall supply (1) CD which includes all information
504840 DOBBINS AFB SECURITY FORCES FACILITY
SECTION 26 057 4 Page 7 listed above in item “a”, “b”, and “c”.
3.3 LABEL INSTALLATION:
The contractor shall clean area on equipment prior to installing label.
The contractor shall install all labels on equipment. For equipment that is outside, the contractor shall install an additional clear laminate to protect the label from UV.
The contractor shall provide verification that all provided labels have been attached to the proper equipment via the Contractor/Engineer Label Verification
Report. The Label Verification Report with all required equipment names will be provided with the “Final Study Report” and shall be completed by the contractor.
The completed Contractor Label Verification Report shall be given to the engineer and owner for insertion into the “Final Study Report”.
The engineering firm that performed the arc flash study shall provide field verification of all provided labels to assure they have been installed on the proper equipment. If labels are found to be installed improperly, the contractor shall review all label locations and replace all misapplied labels. The owner shall not incur any additional costs as a result of misapplied labels.
-- End of Section --
504840 DOBBINS AFB SECURITY FORCES FACILITY
SECTION 26 08 00
APPARATUS INSPECTION AND TESTING
11/22
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
INTERNATIONAL ELECTRICAL TESTING ASSOCIATION (NETA)
NETA ATS (2021) Standard for Acceptance Testing Specifications for Electrical Power Equipment and Systems
1.2 RELATED REQUIREMENTS
Section 26 20 00 INTERIOR DISTRIBUTION SYSTEM applies to this section with additions and modifications specified herein.
1.3 SUBMITTALS
Government approval is required for submittals with a "G" classification.
Submittals not having a "G" classification are for information only. When used, a code following the "G" classification identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-06 Test Reports
Acceptance Tests and Inspections; G
SD-07 Certificates
Qualifications of Organization, and Lead Engineering Technician; G
Acceptance Test and Inspections Procedure; G
1.4 QUALITY ASSURANCE
1.4.1 Qualifications
Engage the services of a qualified testing organization to provide inspection, testing, calibration, and adjustment of the electrical distribution system and generation equipment listed in paragraph ACCEPTANCE TESTS AND INSPECTIONS herein. Organization must be inde pendent of the supplier, manufacturer, and installer of the equipment. The organization must be a first tier subcontractor. No work required by this section of the specification may be performed by a second tier subcontractor.
a. Submit name and qualifications of organization. Organization m ust have been regularly engaged in the testing of electrical materials, devices, installations, and systems for a minimum of 5 years. The
SECTION 26 08 00 Page 1 organization must have a calibration program, and test instruments used must be calibrated in accordance with NETA ATS.
b. Submit name and qualifications of the lead engineering technician performing the required testing services. Include a list of three comparable jobs performed by the technician with specific names and telephone numbers for reference. Testing, inspection, calibration, and adjustments must be performed by an engineering technician, certified by NETA (Level III) or the National Institute for Certification in Engineering Technologies (NICET) with a minimum of 5 years' experience inspecting, testing, and calibrating electrical distribution and generation equipment, systems, and devices.
1.4.2 Acceptance Tests and Inspections Reports
Submit certified copies of inspection reports and test reports. Include certification of compliance with specified requirements, identify deficiencies, and recommend corrective action when appropriate. Type and neatly bind test reports to form a part of the final record. Submit test reports documenting the results of each test not more than 10 days after test is completed.
1.4.3 Acceptance Test and Inspections Procedure
Submit test procedure reports for each item of equipment to be field tested at least 45 days prior to planned testing date. Do not perform testing until after test procedure has been approved.
PART 2 PRODUCTS
Not used.
PART 3 EXECUTION
3.1 ACCEPTANCE TESTS AND INSPECTIONS
Testing organization will perform acceptance tests and inspections. Test methods, procedures, and test values must be performed and evaluated in accordance with NETA ATS, the manufacturer's recommendations, and paragraph FIELD QUALITY CONTROL of each applicable specification section.
Tests identified as optional in NETA ATS are not required unless otherwise specified. Place equipment in service only after completion of req uired tests and evaluation of the test results have been completed. Supp ly to the testing organization complete sets of shop drawings, settings o f adjustable devices, and other information necessary for an accurate test and inspection of the system prior to the performance of any final testing. Notify Contracting Officer at least 14 days in advance of when tests will be conducted by the testing organization. Perform acceptance tests and inspections on applicable equipment and systems specified in the following sections:
a. Section 26 32 15.00 ENGINE-GENERATOR SET STATIONARY 15-2500 KW, WITH AUXILIARIES. Functional engine shutdown tests, vibration base-line test, and load bank test will not be performed by the testing organization, but by the start-up engineer.
i. Section 26 36 23 AUTOMATIC TRANSFER SWITCHES AND BY-PASS/ISOLAT ION
SECTION 26 08 00 Page 2
SWITCH
3.2 SYSTEM ACCEPTANCE
Final acceptance of the system is contingent upon satisfactory completion of acceptance tests and inspections.
3.3 PLACING EQUIPMENT IN SERVICE
A representative of the approved testing organization along with Dobbins CE representative must be present when equipment tested by the organization is initially energized and placed in service.
-- End of Section --
SECTION 26 08 00 Page 3
SECTION 26 20 00
INTERIOR DISTRIBUTION SYSTEM
08/19, CHG 3: 11/21
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AMERICAN NATIONAL STANDARDS INSTITUTE (ANSI)
ANSI C12.1 (2014; Errata 2016) Electric Meters - Code for Electricity Metering
ASTM INTERNATIONAL (ASTM)
ASTM B1 (2013) Standard Specification for Hard-Drawn Copper Wire
ASTM B8 (2011; R 2017) Standard Specification for Concentric-Lay-Stranded Copper Conductors, Hard, Medium-Hard, or Soft
INSTITUTE OF ELECTRICAL AND ELECTRONICS ENGINEERS (IEEE)
IEEE 81 (2012) Guide for Measuring Earth Resistivity, Ground Impedance, and Earth Surface Potentials of a Ground System
IEEE 100 (2000; Archived) The Authoritative Dictionary of IEEE Standards Terms
INTERNATIONAL ELECTRICAL TESTING ASSOCIATION (NETA)
NETA ATS (2021) Standard for Acceptance Testing Specifications for Electrical Power Equipment and Systems
NATIONAL ELECTRICAL CONTRACTORS ASSOCIATION (NECA)
NECA NEIS 1 (2015) Standard for Good Workmanship in Electrical Construction
NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION (NEMA)
ANSI C80.1 (2020) American National Standard for Electrical Rigid Steel Conduit (ERSC)
ANSI C80.3 (2020) American National Standard for Electrical Metallic Tubing (EMT)
ANSI C80.5 (2020) American National Standard for Electrical Rigid Aluminum Conduit
SECTION 26 20 00 Page 1
NEMA 250 (2020) Enclosures for Electrical Equipment (1000 Volts Maximum)
NEMA ICS 1 (2000; R 2015) Standard for Industrial Control and Systems: General Requirements
NEMA ICS 2 (2000; R 2020) Industrial Control and Systems Controllers, Contactors, and Overload Relays Rated 600 V
NEMA ICS 4 (2015) Application Guideline for Terminal Blocks
NEMA ICS 6 (1993; R 2016) Industrial Control and Systems: Enclosures
NEMA KS 1 (2013) Enclosed and Miscellaneous Distribution Equipment Switches (600 V Maximum)
NEMA MG 1 (2021) Motors and Generators
NEMA MG 10 (2017) Energy Management Guide for Selection and Use of Fixed Frequency Medium AC Squirrel-Cage Polyphase Induction Motors
NEMA MG 11 (1977; R 2012) Energy Management Guide for Selection and Use of Single Phase Motors
NEMA RN 1 (2005; R 2013) Polyvinyl-Chloride (PVC) Externally Coated Galvanized Rigid Steel Conduit and Intermediate Metal Conduit
NEMA ST 20 (2014) Dry-Type Transformers for General Applications
NEMA TC 2 (2020) Standard for Electrical Polyvinyl Chloride (PVC) Conduit
NEMA TC 3 (2021) Polyvinyl Chloride (PVC) Fittings for Use With Rigid PVC Conduit and Tubing
NEMA VE 1 (2017) Metal Cable Tray Systems
NEMA WD 1 (1999; R 2020) Standard for General Color Requirements for Wiring Devices
NEMA WD 6 (2021) Wiring Devices Dimensions Specifications
NEMA Z535.4 (2011; R 2017) Product Safety Signs and Labels
NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)
NFPA 70 (2020; TIA 22-1; ERTA 1 2022) National Electrical Code
SECTION 26 20 00 Page 2
NFPA 70E (2021) Standard for Electrical Safety in the Workplace
NFPA 780 (2023) Standard for the Installation of Lightning Protection Systems
TELECOMMUNICATIONS INDUSTRY ASSOCIATION (TIA)
TIA-568.1 (2020e) Commercial Building Telecommunications Infrastructure Standard
TIA-569 (2019e; Add 1 2022) Telecommunications Pathways and Spaces
TIA-607 (2019d) Generic Telecommunications Bonding and Grounding (Earthing) for Customer Premises
U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)
10 CFR 431 Energy Efficiency Program for Certain Commercial and Industrial Equipment
29 CFR 1910.147 The Control of Hazardous Energy (Lock Out/Tag Out)
29 CFR 1910.303 Electrical, General
UNDERWRITERS LABORATORIES (UL)
UL 1 (2005; Reprint Jan 2020) UL Standard for Safety Flexible Metal Conduit
UL 6 (2007; Reprint Sep 2019) UL Standard for Safety Electrical Rigid Metal Conduit-Steel
UL 6A (2008; Reprint Mar 2021) UL Standard for Safety Electrical Rigid Metal Conduit - Aluminum, Red Brass, and Stainless Steel
UL 20 (2018; Reprint Jan 2021) UL Standard for Safety General-Use Snap Switches
UL 44 (2018; Reprint May 2021) UL Standard for Safety Thermoset-Insulated Wires and Cables
UL 50 (2015) UL Standard for Safety Enclosures for Electrical Equipment, Non-Environmental Considerations
UL 67 (2018; Reprint Jul 2020) UL Standard for Safety Panelboards
UL 83 (2017; Reprint Mar 2020) UL Standard for Safety Thermoplastic-Insulated Wires and Cables
UL 360 (2013; Reprint Aug 2021) UL Standard for Safety Liquid-Tight Flexible Metal Conduit
SECTION 26 20 00 Page 3
UL 467 (2022) UL Standard for Safety Grounding and Bonding Equipment
UL 486A-486B (2018; Reprint May 2021) UL Standard for Safety Wire Connectors
UL 486C (2018; Reprint May 2021) UL Standard for Safety Splicing Wire Connectors
UL 489 (2016; Rev 2019) UL Standard for Safety Molded-Case Circuit Breakers, Molded-Case Switches and Circuit-Breaker Enclosures
UL 498 (2017; Reprint Jul 2022) UL Standard for Safety Attachment Plugs and Receptacles
UL 506 (2017; Reprint Jan 2022) UL Standard for Safety Specialty Transformers
UL 508 (2018; Reprint Jul 2021) UL Standard for Safety Industrial Control Equipment
UL 510 (2020) UL Standard for Safety Polyvinyl Chloride, Polyethylene and Rubber Insulating Tape
UL 514A (2013; Reprint Jun 2022) UL Standard for Safety Metallic Outlet Boxes
UL 514B (2012; Reprint May 2020) Conduit, Tubing and Cable Fittings
UL 514C (2014; Reprint Feb 2020) UL Standard for Safety Nonmetallic Outlet Boxes, Flush-Device Boxes, and Covers
UL 651 (2011; Reprint May 2022) UL Standard for Safety Schedule 40, 80, Type EB and A Rigid PVC Conduit and Fittings
UL 797 (2007; Reprint Mar 2021) UL Standard for Safety Electrical Metallic Tubing -- Steel
UL 854 (2020) Standard for Service-Entrance Cables
UL 869A (2006; Reprint Jun 2020) Reference Standard for Service Equipment
UL 943 (2016; Reprint Feb 2018) UL Standard for Safety Ground-Fault Circuit-Interrupters
UL 984 (1996; Reprint Sep 2005) Hermetic Refrigerant Motor-Compressors
UL 1063 (2017; Reprint Jun 2022) UL Standard for Safety Machine-Tool Wires and Cables
UL 1242 (2006; Reprint Apr 2022) UL Standard for
SECTION 26 20 00 Page 4
Safety Electrical Intermediate Metal Conduit -- Steel
UL 1449 (2021) UL Standard for Safety Surge Protective Devices
1.2 DEFINITIONS
Unless otherwise specified or indicated, electrical and electronics terms used in these specifications, and on the drawings, are as defined in
IEEE 100 .
1.3 SUBMITTALS
Government approval is required for submittals with a "G" classification.
Submittals not having a "G" classification are for information only. When used, a code following the "G" classification identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-02 Shop Drawings
Panelboards; G
Transformers; G
Cable Trays; G
Wireways; G
SD-03 Product Data
Receptacles; G
Circuit Breakers; G
Switches; G
Transformers; G
Enclosed Circuit Breakers; G
Motor Controllers; G
Manual Motor Starters; G
CATV Outlets; G
Secondary Bonding Busbar; G
Surge Protective Devices; G
Cable Trays; G
SD-06 Test Reports
600-volt Wiring Test; G
Grounding System Test; G
SECTION 26 20 00 Page 5
Transformer Tests; G
Ground-fault Receptacle Test; G
SD-07 Certificates
SD-09 Manufacturer's Field Reports
SD-10 Operation and Maintenance Data
Electrical Systems, Data Package 5; G
Metering, Data Package 5; G
1.4 QUALITY ASSURANCE
1.4.1 Regulatory Requirements
In each of the publications referred to herein, consider the advisory provisions to be mandatory, as though the word, "must" had been substituted for "should" wherever it appears. Interpret references in these publications to the "COR," or words of similar meaning, to mean the Contracting Officer. Provide equipment, materials, installation, and workmanship in accordance with NFPA 70 unless more stringent requirements are specified or indicated. NECA NEIS 1 shall be considered the minimum standard for workmanship.
1.4.2 Standard Products
Provide materials and equipment that are products of manufacturers regularly engaged in the production of such products which are of equal material, design and workmanship and:
a. Have been in satisfactory commercial or industrial use for 2 years prior to bid opening including applications of equipment and materials under similar circumstances and of similar size.
b. Have been on sale on the commercial market through advertisements, manufacturers' catalogs, or brochures during the 2-year period.
c. Where two or more items of the same class of equipment are requ ired, provide products of a single manufacturer; however, the component parts of the item need not be the products of the same manufacturer unless stated in this section.
1.4.2.1 Alternative Qualifications
Products having less than a 2-year field service record will be acceptable if a certified record of satisfactory field operation for not less than 6000 hours, exclusive of the manufacturers' factory or laboratory t ests, is furnished.
1.4.2.2 Material and Equipment Manufacturing Date
Products manufactured more than 3 years prior to date of delivery t o site are not acceptable.
SECTION 26 20 00 Page 6
1.5 MAINTENANCE
1.5.1 Electrical Systems
Submit operation and maintenance data in accordance with Section 01 78 23, OPERATION AND MAINTENANCE DATA and as specified herein. Submit operation and maintenance manuals for electrical systems that provide basic data relating to the design, operation, and maintenance of the electrical distribution system for the building. Include the following:
a. Single line diagram of the "as-built" building electrical system.
b. Schematic diagram of electrical control system (other than HVAC, covered elsewhere).
c. Manufacturers' operating and maintenance manuals on active electrical equipment.
1.6 WARRANTY
Provide equipment items supported by service organizations that are reasonably convenient to the equipment installation in order to render satisfactory service to the equipment on a regular and emergency basis during the warranty period of the contract.
1.7 SEISMIC REQUIREMENTS
Provide seismic details conforming to Section 13 48 73 SEISMIC CONTROL FOR MISCELLANEOUS EQUIPMENT and to Section 26 05 48.00 10 SEISMIC PROTECTION
FOR ELECTRICAL EQUIPMENT.
PART 2 PRODUCTS
2.1 MATERIALS AND EQUIPMENT
As a minimum, meet requirements of UL, where UL standards are established for those items, and requirements of NFPA 70 for all materials, equipment, and devices.
2.2 CONDUIT AND FITTINGS
Conform to the following:
2.2.1 Rigid Metallic Conduit
2.2.1.1 Rigid, Threaded Zinc-Coated Steel Conduit
ANSI C80.1 , UL 6 .
2.2.1.2 Rigid Aluminum Conduit
ANSI C80.5 , UL 6A .
2.2.2 Rigid Nonmetallic Conduit
PVC Type EPC-40, and EPC-80 in accordance with NEMA TC 2, UL 651 .
SECTION 26 20 00 Page 7
2.2.3 Intermediate Metal Conduit (IMC)
UL 1242 , zinc-coated steel only.
2.2.4 Electrical, Zinc-Coated Steel Metallic Tubing (EMT)
UL 797 , ANSI C80.3 .
2.2.5 Plastic-Coated Rigid Steel and IMC Conduit
NEMA RN 1, Type 40( 40 mils thick).
2.2.6 Flexible Metal Conduit
UL 1 , limited to 6 feet.
2.2.6.1 Liquid-Tight Flexible Metal Conduit, Steel
UL 360 , limited to 6 feet.
2.2.7 Fittings for Metal Conduit, EMT, and Flexible Metal Conduit
UL 514B . Ferrous fittings: cadmium- or zinc-coated in accordance with
UL 514B .
2.2.7.1 Fittings for Rigid Metal Conduit and IMC
Threaded-type. Split couplings unacceptable.
2.2.7.2 Fittings for EMT
Steel compression type.
2.2.8 Fittings for Rigid Nonmetallic Conduit
NEMA TC 3 for PVC and UL 514B .
2.3 CABLE TRAYS
NEMA VE 1. Provide the following:
Submit cable tray design, including dimensional layout, load and se ismic calculations, and fill calculations. Dimensional layout includes c able spacings, cable tray splices, and supports. Fill calculations incl ude an index of cables for each section and identification of the lb/ft, cross sectional area, and insulation voltage class for each cable.
a. Cable trays: form a wireway system, with a nominal depth as indicated.
b. Cable trays: constructed of aluminum.
c. Cable trays: include splice and end plates, dropouts, and miscellaneous hardware.
d. Edges, fittings, and hardware: finished free from burrs and sha rp edges.
e. Fittings: ensure not less than load-carrying ability of straig ht tray sections and have manufacturer's minimum standard radius.
SECTION 26 20 00 Page 8
f. Radius of bends: 12 inches.
2.3.1 Basket-Type Cable Trays
Provide size as indicated with maximum wire mesh spacing of 2 by 4 inch.
2.3.2 Ladder-Type Cable Trays
Provide size as indicated with maximum rung spacing of 6 inches.
2.4 OUTLET BOXES AND COVERS
UL 514A , cadmium- or zinc-coated, if ferrous metal. UL 514C , if nonmetallic.
2.4.1 Floor Outlet Boxes
Provide the following:
a. Boxes: nonadjustable and concrete tight.
b. Each outlet: consisting of nonmetallic or cast-metal body with threaded openings, for conduits, adjustable, brass flange ring, and cover plate with 1 1/4 inch threaded plug.
c. Telecommunications outlets: consisting of flush, aluminum or stainless steel housing with a receptacle as specified and 3/4 inch top opening.
d. Receptacle outlets: consisting of flush aluminum or stainless steel housing with duplex-type receptacle as…