This document is a Request for Proposal (RFP) solicitation for the construction of a 21,464 SF Security Forces Training Facility at Dobbins Air Reserve Base in Georgia. The project will involve reinforced concrete foundation, concrete slab, reinforced masonry or concrete walls, energy efficient roofing, electrical, HVAC, plumbing/restrooms, site improvements, access road/parking, fire detection/protection, communications/MNS, and all necessary supporting facilities and utilities. The contract duration is estimated at 810 calendar days. This is a Total Small Business Set-Aside with a Firm-Fixed-Price contract under NAICS code 236220 - Commercial and Institutional Building Construction. The proposals will be evaluated using a Best Value Trade-Off source selection process, with past performance and technical factors considered approximately equal to price. The solicitation is available electronically on SAM.gov and PIEE, and amendments will be posted to these sites. Offerors must have an active SAM registration to be eligible for award.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D A
T E
US Army Corps of Engineers ®
SOLICITATION NO.:
CONTRACT NO.:
ISSUE DATE:
VOLUME:
M A
R K
D E
S C
R
IP
T
IO
N
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
G-001
C O
V E
R S
H E
E T
D O
B B
IN
S
A
IR
R E
S E
R V
E B
A S
E G
A
L O
U
IS
V
IL
L E
D
IS
T R
IC
T
D
R M
A R
T
IN
L U
T H
E R
K
IN
G J R
P
L A
C E
L O
U
IS
V
IL
L E
K
Y
J H
U N
S U
C K
E R
A P
E R
E Z
-B E
R M
U D
E Z
Q B
IA
G
I
J
U N
E
F Y
C E
R T
IF
IE
D F
IN
A
L
F G
W B
-0
S
E C
U R
IT
Y
F O
R C
E S
F A
C
IL
IT
Y
P R
O J E
C T
P
LOUISVILLE DISTRICT
10 JUNE 2024
DOBBINS AIR RESERVE BASE, GA
FGWB 21-0004 SECURITY FORCES FACILITY
PROJECT: P2#504840
STRUCTURAL ARCHITECTURAL CIVIL
FIRE PROTECTION MECHANICAL
SIGNATURES AFFIXED BELOW INDICATE OFFICIAL RECOMMENDATION AND
APPROVAL OF ALL DRAWINGS IN THIS SET AS INDEXED ON G0.01.
REVIEWED BY:*
QUALITY CONTROL DATE
APPROVAL RECOMMENDED:*
PE/A DATE
APPROVED:*
ENGINEERING DIVISION, CHIEF DATE
*THIS PROJECT WAS DESIGNED UNDER THE SUPERVISION OF THE U.S. ARMY CORPS OF
ENGINEERS, LOUISVILLE DISTRICT. INDIVIDUALS WHOSE SIGNATURES AND REGISTRATION
DESIGNATIONS APPEAR ON THESE DOCUMENTS ARE OPERATING WITHIN THE SCOPE OF
THEIR EMPLOYMENT. SIGNATURES ARE REQUIRED BY ER 1110-1-8152.
N
PROJECT SITE LOCATION
ELECTRICAL /
TELECOMMUNICATIONS
02 August 2024
W912QR24R0071
W
2Q R
R
_P la ns _V ol 2-
ARIMS: 200A Disposition: Maintain for 15 yrs after construction.
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
G-002
IN
D
E X
O F
D R
A W
IN
G
S
D O
B B
IN
S
A
IR
R E
S E
R V
E B
A S
E
G A
L O
U
IS
V
IL
L E
D
IS
T R
IC
T
D
R
M A
R T
IN
L
U T
H E
R K
IN
G
J R
P
L A
C E
L O
U
IS
V
IL
L E
K
Y
J
H U
N S
U C
K E
R
A
P E
R E
Z -B
E R
M U
D E
Z
Q B
IA
G
I
J U
N E
F Y
C E
R T
IF
IE
D F
IN
A
L
F G
W B
-0
S E
C U
R
IT
Y F
O R
C E
S F
A C
IL
IT
Y
P R
O J E
C T
P
SHEET NUMBER SHEET TITLE VOLUME
GENERAL
G-001 COVER SHEET VOLUME 1 & 2
G-002 INDEX OF DRAWINGS VOLUME 1 & 2
CIVIL
B-001 BORING PLAN VOLUME 1
B-002 BORING LOGS VOLUME 1
C-001 CIVIL GENERAL NOTES, ABBREVIATIONS, AND LEGEND VOLUME 1
C-002 LOCATION AND VICINITY MAPS VOLUME 1
C-003 PHASING PLAN VOLUME 1
C-004 OVERALL CODE COMPLIANCE SITE PLAN VOLUME 1
C-005 CODE COMPIANCE SITE PLAN VOLUME 1
C-006 CODE COMPLIANCE SITE PLAN VOLUME 1
C-007 CONTRACTOR STAGING, STOCKPILING, AND PARKING VOLUME 1
C-100 OVERALL EXISTING CONDITIONS VOLUME 1
C-101 EXISTING CONDITIONS VOLUME 1
C-102 EXISTING CONDITIONS VOLUME 1
C-103 EXISTING CONDITIONS VOLUME 1
C-104 EXISTING CONDITIONS VOLUME 1
C-501 CONSTRUCTION DETAILS VOLUME 1
C-502 CONSTRUCTION DETAILS VOLUME 1
C-503 CONSTRUCTION DETAILS VOLUME 1
C-504 CONSTRUCTION DETAILS VOLUME 1
C-505 CONSTRUCTION DETAILS VOLUME 1
C-506 CONSTRUCTION DETAILS VOLUME 1
C-507 CONSTRUCTION DETAILS VOLUME 1
C-508 CONSTRUCTION DETAILS VOLUME 1
CD100 OVERALL CIVIL DEMOLITION PLAN VOLUME 1
CD101 CIVIL DEMOLITION PLAN VOLUME 1
CD102 CIVIL DEMOLITION PLAN VOLUME 1
CE001 EROSION AND SEDIMENT CONTROL NOTES VOLUME 1
CE002 EROSION AND SEDIMENT CONTROL NOTES VOLUME 1
CE003 EROSION AND SEDIMENT CONTROL NOTES VOLUME 1
CE004 EROSION AND SEDIMENT CONTROL NOTES VOLUME 1
CE005 EROSION AND SEDIMENT CONTROL NOTES VOLUME 1
CE100 OVERALL EROSION AND SEDIMENT CONTROL PLAN VOLUME 1
CE101 EROSION AND SEDIMENT CONTROL - INITIAL PHASE VOLUME 1
CE102 EROSION AND SEDIMENT CONTROL - INITIAL PHASE VOLUME 1
CE103 STAGING AND STOCKPILING AREA - INITIAL PHASE VOLUME 1
CE111 EROSION AND SEDIMENT CONTROL - INTERMEDIATE PHASE VOLUME 1
CE112 EROSION AND SEDIMENT CONTROL - INTERMEDIATE PHASE VOLUME 1
CE113 STAGING AND STOCKPILING AREA - INTERMEDIATE PHASE VOLUME 1
CE121 EROSION AND SEDIMENT CONTROL - FINAL PHASE VOLUME 1
CE122 EROSION AND SEDIMENT CONTROL - FINAL PHASE VOLUME 1
CE123 STAGING AND STOCKPILING - FINAL PHASE VOLUME 1
CE501 EROSION AND SEDIMENT CONTROL DETAILS VOLUME 1
CE502 EROSION AND SEDIMENT CONTROL DETAILS VOLUME 1
CE503 EROSION AND SEDIMENT CONTROL DETAILS VOLUME 1
CE504 EROSION AND SEDIMENT CONTROL DETAILS VOLUME 1
CE505 EROSION AND SEDIMENT CONTROL DETAILS VOLUME 1
CG100 OVERALL CIVIL GRADING PLAN VOLUME 1
CG101 CIVIL GRADING PLAN VOLUME 1
CG102 CIVIL GRADING PLAN VOLUME 1
CG201 STORM SEWER PROFILES VOLUME 1
CS100 OVERALL CIVIL SITE PLAN VOLUME 1
CS101 CIVIL SITE PLAN VOLUME 1
CS102 CIVIL SITE PLAN VOLUME 1
CS103 STAKING PLAN VOLUME 1
CS104 STAKING PLAN VOLUME 1
CS105 STAKING POINT TABLE VOLUME 1
CU100 OVERALL UTILITY PLAN VOLUME 1
CU101 UTILITY PLAN VOLUME 1
CU102 UTILITY PLAN VOLUME 1
CU201 SANITARY SEWER PROFILE VOLUME 1
GC001 CIVIL DESIGN COVER SHEET VOLUME 1
GE001 EROSION CONTROL COVER SHEET VOLUME 1
V-101 AERIAL PHOTO PLAN VOLUME 1
V-102 AREAL PHOTO PLAN VOLUME 1
STRUCTURAL
S-001 STANDARD ABBREVIATIONS AND SYMBOLS VOLUME 1
S-002 STRUCTURAL GENERAL NOTES - SHEET 1 OF 2 VOLUME 1
S-003 STRUCTURAL GENERAL NOTES - SHEET 2 OF 2 VOLUME 1
S-004 SLAB ON GRADE UNIFORM LIVE LOAD DIAGRAM VOLUME 1
S-005 ROOF SNOW LOAD DIAGRAM VOLUME 1
S-006 OPEN WEB STEEL JOIST GIRDER WIND LOAD DIAGRAM VOLUME 1
S-007 OPEN WEB STEEL JOIST WIND LOAD DIAGRAM VOLUME 1
S-100 COMPOSITE FOUNDATION PLAN VOLUME 1
S-101 FOUNDATION PLAN - AREA A VOLUME 1
S-102 FOUNDATION PLAN - AREA B VOLUME 1
S-110 COMPOSITE SLAB ON GRADE PLAN VOLUME 1
S-111 SLAB ON GRADE PLAN - AREA A VOLUME 1
S-112 SLAB ON GRADE PLAN - AREA B VOLUME 1
S-120 COMPOSITE ROOF FRAMING PLAN VOLUME 1
S-121 ROOF FRAMING PLAN - AREA A VOLUME 1
S-122 ROOF FRAMING PLAN - AREA B VOLUME 1
S-201 STRUCTURAL WALL ELEVATIONS - SHEET 1 OF 2 VOLUME 1
S-202 STRUCTURAL WALL ELEVATIONS - SHEET 2 OF 2 VOLUME 1
S-301 STRUCTURAL BUILDING SECTION VOLUME 1
S-401 ENLARGED PLANS - SHEET 1 OF 2 VOLUME 1
S-402 ENLARGED PLANS - SHEET 2 OF 2 VOLUME 1
S-501 TYPICAL REINFORCEMENT DETAILS VOLUME 1
S-502 TYPICAL CONCRETE DETAILS VOLUME 1
S-503 TYPICAL FOUNDATION DETAILS- SHEET 1 OF 2 VOLUME 1
S-504 TYPICAL FOUNDATION DETAILS- SHEET 2 OF 2 VOLUME 1
S-505 TYPICAL SLAB ON GRADE DETAILS VOLUME 1
S-506 TYPICAL MASONRY DETAILS VOLUME 1
S-507 TYPCIAL BRACING DETAILS FOR NON-LOAD BEARING MASONRY WALLS VOLUME 1
SHEET NUMBER SHEET TITLE VOLUME
S-508 TYPICAL ROOF FRAMING DETAILS - SHEET 1 OF 3 VOLUME 1
S-509 TYPICAL ROOF FRAMING DETAILS - SHEET 2 OF 3 VOLUME 1
S-510 TYPICAL ROOF FRAMING DETAILS - SHEET 3 OF 3 VOLUME 1
S-511 TYPICAL DECKING DETAILS VOLUME 1
S-512 TYPICAL COLUMN DETAILS AND SCHEDULE VOLUME 1
S-513 MISCELLANEOUS DETAILS VOLUME 1
S-701 STAIR PLANS AND DETAILS VOLUME 1
ARCHITECTURAL
A-001 ARCHITECTURAL ABBREVIATIONS AND GENERAL NOTES VOLUME 1
A-002 ARCHITECTURAL STANDARDS VOLUME 1
A-003 ARCHITECTURAL CODE REVIEW VOLUME 1
A-004 ARCHITECTURAL LIFE SAFETY PLAN - COMPOSITE VOLUME 1
A-005 SOUND ISOLATION PLAN VOLUME 1
A-110 ARCHITECTURAL FLOOR PLAN - COMPOSITE VOLUME 1
A-111 ARCHITECTURAL FLOOR PLAN - AREA A VOLUME 1
A-112 ARCHITECTURAL FLOOR PLAN - AREA B VOLUME 1
A-120 ARCHITECTURAL REFLECTED CEILING PLAN - COMPOSITE VOLUME 1
A-121 ARCHITECTURAL REFLECTED CEILING PLAN - AREA A VOLUME 1
A-122 ARCHITECTURAL REFLECTED CEILING PLAN - AREA B VOLUME 1
A-130 ARCHITECTURAL ROOF PLAN - COMPOSITE VOLUME 1
A-131 ARCHITECTURAL ROOF PLAN - AREA A VOLUME 1
A-132 ARCHITECTURAL ROOF PLAN - AREA B VOLUME 1
A-201 EXTERIOR ELEVATIONS VOLUME 1
A-202 EXTERIOR ELEVATIONS VOLUME 1
A-301 ARCHITECTURAL BUILDING SECTIONS VOLUME 1
A-302 ARCHITECTURAL BUILDING SECTIONS VOLUME 1
A-303 ARCHITECTURAL WALL SECTIONS VOLUME 1
A-304 ARCHITECTURAL WALL SECTIONS VOLUME 1
A-305 ARCHITECTURAL SECTIONS DETAILS VOLUME 1
A-306 ARCHITECTURAL SECTION DETAILS VOLUME 1
A-401 ENLARGED PLANS AND INTERIOR ELEVATIONS VOLUME 1
A-402 ENLARGED PLANS AND INTERIOR ELEVATIONS VOLUME 1
A-403 ENLARGED COUNTERTOP PLANS AND DETAILS VOLUME 1
A-501 ARCHITECTURAL PARTITION DETAILS VOLUME 1
A-502 ARCHITECTURAL PARTITION DETAILS VOLUME 1
A-503 ARCHITECTURAL PARTITION DETAILS VOLUME 1
A-504 ARCHITECTURAL ROOF DETAILS VOLUME 1
A-505 ARCHITECTURAL DETAILS VOLUME 1
A-506 ARCHITECTURAL DETAILS VOLUME 1
A-507 ARCHITECTURAL DETAILS VOLUME 1
A-508 ARCHITECTURAL DETAILS VOLUME 1
A-601 DOOR SCHEDULES AND DETAILS VOLUME 1
A-602 WINDOW SCHEDULES AND DETAILS VOLUME 1
A-603 DOOR DETAILS VOLUME 1
A-701 AIR BARRIER VOLUME 1
INTERIORS
I-101 COMPOSITE FURNITURE PLAN VOLUME 1
I-102 FURNITURE PLAN - AREA A VOLUME 1
I-103 FURNITURE PLAN -AREA B VOLUME 1
I-104 FINISH TRANSITION PLAN - AREA A VOLUME 1
I-105 FINISH TRANSITION PLAN - AREA B VOLUME 1
I-106 SIGNAGE PLAN - AREA A VOLUME 1
I-107 SIGNAGE PLAN - AREA B VOLUME 1
I-501 FURNTURE TYPICALS VOLUME 1
I-502 FURNITURE TYPICALS VOLUME 1
I-503 FURNITURE TYPICALS VOLUME 1
I-504 FURNITURE TYPICALS VOLUME 1
I-601 FINISH SCHEDULES VOLUME 1
I-602 SIGNAGE SCHEUDLE & TYPICALS VOLUME 1
FIRE PROTECTION
F-001 GENERAL NOTES VOLUME 2
F-101 SITE PLAN VOLUME 2
F-102 FLOOR PLAN - OVERALL VOLUME 2
F-103 FLOOR PLAN - AREA A VOLUME 2
F-104 FLOOR PLAN - AREA B VOLUME 2
F-105 ISOMETRIC DRAWING VOLUME 2
F-301 BUILDING SECTIONS VOLUME 2
F-302 BUILDING SECTIONS VOLUME 2
F-501 DETAILS VOLUME 2
FA-001 GENERAL NOTES VOLUME 2
FA-002 GENERAL NOTES VOLUME 2
FA-101 FLOOR PLAN VOLUME 2
FA-102 FLOOR PLAN - AREA A VOLUME 2
FA-103 FLOOR PLAN - AREA B VOLUME 2
FA-501 DETAILS VOLUME 2
PLUMBING
P-001 ABBREVIATIONS, LEGEND, & NOTES VOLUME 2
P-101 PLUMBING PRESSURE PIPING PLAN AREA A VOLUME 2
P-102 PLUMBING PRESSURE PIPING PLAN AREA B VOLUME 2
P-103 PLUMBING WASTE AND VENT PLAN AREA A VOLUME 2
P-104 PLUMBING WASTE AND VENT PLAN AREA B VOLUME 2
P-301 ENLARGED PLANS VOLUME 2
P-302 ENLARGED PLANS VOLUME 2
P-501 DETAILS VOLUME 2
P-502 DETAILS VOLUME 2
P-601 SCHEDULES VOLUME 2
P-901 RISER DIAGRAM VOLUME 2
P-902 RISER DIAGRAM VOLUME 2
P-903 RISER DIAGRAM VOLUME 2
MECHANICAL
M-001 ABBREVIATIONS, LEGEND, & DESIGN CONDITIONS VOLUME 2
M-002 GENERAL NOTES VOLUME 2
M-100 MECHANICAL HVAC ZONE PLAN VOLUME 2
M-101 MECHANICAL DUCTWORK PLAN AREA A VOLUME 2
M-102 MECHANICAL DUCTWORK PLAN AREA B VOLUME 2
M-103 MECHANICAL PIPING PLAN AREA A VOLUME 2
SHEET NUMBER SHEET TITLE VOLUME
M-104 MECHANCIAL PIPING PLAN AREA B VOLUME 2
M-105 MECHANCAL BELOW SLAB RADON EXHAUST LAYOUT VOLUME 2
M-301 MECHANICAL ISOMETRIC VIEWS VOLUME 2
M-401 MECHANICAL ENLARGED PLANS VOLUME 2
M-501 MECHANICAL DETAILS VOLUME 2
M-502 MECHANICAL DETAILS VOLUME 2
M-503 MECHANICAL DETAILS VOLUME 2
M-504 MECHANICAL DETAILS VOLUME 2
M-505 MECHANICAL PIPING ISOMETRIC VOLUME 2
M-601 MECHANICAL SCHEDULES VOLUME 2
M-602 MECHANICAL SCHEDULES VOLUME 2
M-701 MECHANICAL CONTROLS LEGEND VOLUME 2
M-702 MECHANICAL CONTROLS INSTRUCTIONS VOLUME 2
M-703 MECHANICAL CONTROLS - CHILLED WATER SYSTEM VOLUME 2
M-704 MECHANICAL CONTROLS - CHILLED WATER SYSTEM (CONT.) VOLUME 2
M-705 MECHANICAL CONTROLS - HOT WATER SYSTEM VOLUME 2
M-706 MECHANICAL CONTROLS - HOT WATER SYSTEM (CONT.) VOLUME 2
M-707 MECHANICAL CONTROLS - VAV AHU VOLUME 2
M-708 MECHANICAL CONTROLS - VAV AHU (CONT.) VOLUME 2
M-709 MECHANICAL CONTROLS - DOAS VOLUME 2
M-710 MECHANICAL CONTROLS - DOAS (CONT.) VOLUME 2
M-711 MECHANICAL CONTROLS - SINGLE DUCT VAV VOLUME 2
M-712 MECHANICAL CONTROLS - SINGLE DUCT VAV (CONT.) VOLUME 2
M-713 MECHANICAL CONTROLS - DUCTLESS SPLIT SYSTEM VOLUME 2
M-714 MECHANICAL CONTROLS - EXHAUST FAN VOLUME 2
M-715 MECHANICAL CONTROLS - UNIT HEATERS VOLUME 2
M-716 MECHANICAL CONTROLS - UTILITY METERS VOLUME 2
M-717 MECHANICAL CONTROLS - DEHUMIDIFIER CONTROLS VOLUME 2
ELECTRICAL
E-001 ELECTRICAL LEGEND, NOTES, AND ABBREVIATIONS VOLUME 2
E-100 ELECTRICAL SITE PLAN VOLUME 2
E-100A ELECTRICAL ENLARGED SITE PLAN VOLUME 2
E-101 ELECTRICAL OVERALL POWER PLAN VOLUME 2
E-102 ELECTRICAL POWER PLAN AREA A VOLUME 2
E-103 ELECTRICAL POWER PLAN AREA B VOLUME 2
E-111 ELECTRICAL OVERALL LIGHTING PLAN VOLUME 2
E-112 ELECTRICAL LIGHTING PLAN AREA A VOLUME 2
E-113 ELECTRICAL LIGHTING PLAN AREA B VOLUME 2
E-121 ELECTRICAL OVERALL GROUNDING PLAN VOLUME 2
E-131 ELECTRICAL OVERALL LIGHTNING PROTECTION PLAN VOLUME 2
E-401 ELECTRICAL ENLARGED PLANS VOLUME 2
E-402 ELECTRICAL ENLARGED PLANS VOLUME 2
E-403 ELECTRICAL ISOMETRIC PLANS VOLUME 2
E-501 ELECTRICAL SCHEDULES VOLUME 2
E-502 ELECTRICAL SCHEDULES VOLUME 2
E-503 IDENTIFICATION DETAILS VOLUME 2
E-504 IDENTIFICATION DETAILS VOLUME 2
E-505 LUMINAIRE MOUNTING DETALS VOLUME 2
E-506 ELECTRICAL DETAILS VOLUME 2
E-507 ELECTRICAL DETAILS VOLUME 2
E-508 ELECTRICAL DETAILS VOLUME 2
E-509 ELECTRICAL DETAILS VOLUME 2
E-510 ELECTRICAL DETAILS VOLUME 2
E-511 ELECTRICAL DETAILS VOLUME 2
E-512 ELECTRICAL DETAILS VOLUME 2
E-513 ELECTRICAL DETAILS VOLUME 2
E-514 ELECTRICAL DETAILS VOLUME 2
E-601 ELECTRICAL RISER DIAGRAM VOLUME 2
E-602 ELECTRICAL PANEL SCHEDULES VOLUME 2
E-603 ELECTRICAL PANEL SCHEDULES VOLUME 2
E-604 ELECTRICAL PANEL SCHEDULES VOLUME 2
E-605 ELECTRICAL PANEL SCHEDULES VOLUME 2
E-606 ELECTRICAL PANEL SCHEDULES VOLUME 2
ED100 ELECTRICAL DEMOLITION SITE PLAN VOLUME 2
TELECOMMUNICATIONS
T-001 TELECOMMUNICATIONS LEGEND, NOTES, AND ABBREVIATIONS VOLUME 2
T-100 TELECOMMUNICATIONS SITE PLAN VOLUME 2
T-101 TELECOMMUNICATIONS PLAN OVERALL VOLUME 2
T-102 TELECOMMUNICATIONS PLAN AREA A VOLUME 2
T-103 TELECOMMUNICATIONS PLAN AREA B VOLUME 2
T-104 TELECOMMUNICATIONS PA PLAN OVERALL VOLUME 2
T-105 TELECOMMUNICATIONS PA PLAN AREA A VOLUME 2
T-106 TELECOMMUNICATIONS PA PLAN AREA B VOLUME 2
T-401 TELECOMMUNICATIONS ENLARGED PLANS VOLUME 2
T-402 TELECOMMUNICATIONS ENLARGED CABLE TRAY PLANS VOLUME 2
T-501 TELECOMMUNICATIONS DETAILS VOLUME 2
T-502 TELECOMMUNICATIONS DETAILS VOLUME 2
T-503 TELECOMMUNICATIONS DETAILS VOLUME 2
T-601 TELECOMMUNICATIONS RISER DIAGRAM VOLUME 2
T-602 TELECOMMUNICATIONS RISER DIAGRAMS VOLUME 2
SECURITY
Y-001 SECURITY LEGEND, ABBREVIATIONS, & NOTES VOLUME 2
Y-101 SECURITY PLAN OVERALL VOLUME 2
Y-102 SECURITY PLAN AREA A VOLUME 2
Y-103 SECURITY PLAN AREA B VOLUME 2
Y-501 SECURITY DETAILS VOLUME 2
Y-601 SECURITY DETAILS AND RISER DIAGRAMS VOLUME 2 W
2Q R
R
_P la ns _V ol 2-
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
T E
T R
A T
E C
H
IN
C
W a rr in g to n W a y
L o u is v ill e
K Y
P h o n e
-5 w w w .t e tr a te c h .c o m
M e d lo ck B ri d g e
R D
S T
E
Jo h n s
C re ek
G A
P h on e (4
-6
F-001
G e n e ra l N o te s
D O
B B
IN
S
A
IR
R E
V E
R V
E B
A S
E G
A
L O
U
IS
V
IL
L E
D
IS
T R
IC
T
D
R M
A R
T
IN
L U
T H
E R
K
IN
G J R
P
L A
C E
L O
U
IS
V
IL
L E
K
Y
R H
E S
P R
IC
H
B K
O T
U L A
R H
E S
P R
IC
H
/1
/2
F Y
C E
R T
IF
IE
D F
IN
A
L
F G
W B
-0
S
E C
U R
IT
Y
F O
R C
E S
F A
C
IL
IT
Y
P R
O J E
C T
P
F ir e P ro te c ti o n
Sheet List Sheet Number Sheet Name
F-001 General Notes
F-101 Site Plan
F-102 Floor Plan - Overall
F-103 Floor Plan - Area A
F-104 Floor Plan - Area B
F-105 Isometric Drawing
F-301 Building Sections
F-302 Building Section
F-501 Details
FA-001 General Notes
FA-002 General Notes
FA-101 Floor Plan
FA-102 Floor Plan - Area A
FA-103 Floor Plan - Area B
FA-501 Details
Hydraulic Demand Areas
Remote Area Number Area of application
Occupancy Classification Design Density
No of calculated sprinklers
System Required Pressure Flow Demand
Inside Hose Streams
Outside Hose Streams Sheet
1 1,097 SqFt Rack Storage 15 @ 22 Psi 15 72.923 Psi 1740.314 GPM 0 GPM 500 GPM F-104
2 1,518 SqFt Light Hazard 0.10 Gpm/SqFt 11 72.088 Psi 519.268 GPM 0 GPM 250 GPM F-103
3 891 SqFt Extra Hazard 0.30 Gpm/SqFt 13 34.591 Psi 1250.844 GPM 341 GPM 500 GPM F-104
Sprinkler Densities
Area Area Name Hazard
Classification
Area of Operation
SqFt.
Density
GPM/SqFt Sprinkler K-factor
System Type Remarks
1 Mechanical Rooms, Electrical Rooms, Janitor, Weapons Clearing, Weapons Cleaning, Evidence Storage, Armory
Ordinary 2,500 0.20 8.0 Wet Pipe Miscellaneous Storage 12 ft or Less
2 Mobility Storage, Room 133 Storage 15 Sprinklers 22 Psi 16.8 Wet Pipe Rack Storage of unexpanded plastics up to 20’-0 in height with a roof height of 17’-10”.
3 Progear, Room 134 Extra Hazard 2,500 0.30 11.2 Wet Pipe Storage of Class I-IV and Group A Plastic products up to 10’-0 in height protected in accordance with Miscellaneous Storage. Ceiling height at 9’-0.
4 Plastic Storage, Room 147 Extra Hazard 2,500 0.30 11.2 Wet Pipe Storage of Class I-IV and Group A Plastic products up to 10’-0 in height protected in accordance with Miscellaneous Storage. Ceiling height at 9’-0.
5 Office Areas, Conference Rooms,Training Rooms, Rest Rooms, Corridors
Light Hazard 1,500 0.10 5.6 Wet Pipe
GENERAL NOTES - FIRE PROTECTION
1. THE INTENT, AND EXTENT OF THESE DESIGNS IS FOR PERFORMANCE ONLY
AND IS DIAGRAMMATIC IN NATURE. SHOP DRAWINGS ARE REQUIRED TO BE
PERFORMED BY THE FIRE SPRINKLER CONTRACTOR.
2. ANY ADDITIONAL MODIFICATIONS REQUIRED FOR PROPER INSTALLATION,
COORDINATION WITH OTHER TRADES, FOR AESTHETICS AND/OR TO
MAINTAIN PROPER CLEARANCES MUST BE PROVIDED FOR A COMPLETE AND
ACCEPTED SYSTEM.
3. NOT ALL PIPING, VALVES AND EQUIPMENT ARE SHOWN ON THESE
DRAWINGS. REFER TO PLAN AND DETAIL SHEETS FOR ADDITIONAL
INFORMATION.
4. CONTRACTOR MUST ADHERE TO AND OBTAIN ALL PERMITS, LICENSES AND
ALL FEDERAL GOVERNMENT APPROVALS.
5. CONTRACTOR MUST SUBMIT COMPLETE SHOP DRAWINGS WITH MATERIAL
SPECIFICATION BROCHURE TO ENGINEER OF RECORD AND COR FOR REVIEW
AND MUST BE APPROVED PRIOR TO COMMENCING FABRICATION AND
INSTALLATION.
6 ALL CONTROL VALVES ON THE FIRE PROTECTION SYSTEM MUST BE
ELECTRICALLY SUPERVISED IAW NFPA 13. COORDINATE THE TYPE AND
EXACT LOCATION OF FLOW AND SUPERVISORY SWITCHES BETWEEN FIRE
PROTECTION AND ELECTRICAL CONTRACTORS. FIRE ALARM SYSTEM,
SUPERVISION AND WIRING MUST BE PROVIDED UNDER THE ELECTRICAL
DIVISION.
7 DO NOT SCALE PLANS FOR THE PURPOSE OF ESTABLISHING DIMENSIONS.
8 FIRE STOP ALL PENETRATIONS OF SMOKE/FIRE PARTITIONS AND BARRIERS.
FIRE STOPPING MUST BE OF UL LISTED ASSEMBLY AND INSTALLED BY A UL
CERTIFIED INSTALLER.
9 SPRINKLER SYSTEM(S) MUST BE DESIGNED FOR A MAXIMUM WORKING
PRESSURE OF 175 PSI IAW NFPA 13.
10 SPRINKLER SYSTEM(S) MUST BE HYDROSTATICALLY TESTED IAW NFPA 13.
11 INSPECTOR TEST CONNECTIONS MUST BE PROVIDED SO THAT THE WATER
FLOW SWITCH, OR PRESSURE MECHANISM, CAN BE TESTED IAW NFPA 13.
CONNECTION SHALL BE LOCATED AS SHOWN ON DRAWING SHEETS.
12 PROVIDE SIGNAGE OF ALL CONTROL VALVES IAW NFPA 13.
13 HANGER MATERIAL, SPACING AND METHOD OF ATTACHMENT MUST BE IAW
NFPA 13 AND MANUFACTURER'S REQUIREMENTS.
14 MAINTAIN A MINIMUM OF 18" CLEARANCE BELOW SPRINKLER DEFLECTOR(S)
AND ANY PERMANENT OR TEMPORARY OBSTRUCTION(S) IAW NFPA 13.
15 FIRE SPRINKLER CONTRACTOR MUST INSTALL SYSTEM PIPING AND
COMPONENTS IN A WORKMANSHIP LIKE MANNER. CHANGES IN
INSTALLATION AS A RESULT OF POOR CRAFTSMANSHIP MUST BE AS
DIRECTED BY THE COR AND SHALL BE AT NO ADDITIONAL COST TO THE COR.
16 ONLY UL LISTED DEVICES AND APPROVED EQUALS (AS ALLOWED BY NFPA 13)
MUST BE INSTALLED IN THE SYSTEM.
17 ALL SPRINKLERS MUST BE INSTALLED ACCORDING TO THEIR LISTED SPACING
AND OBSTRUCTION REQUIREMENTS. EXTENDED COVERAGE SPRINKLERS
ARE NOT PERMITTED.
18 DESIGN AND INSTALLATION ARE IN ACCORDANCE WITH 2022 EDITION OF
NFPA 13, "STANDARD FOR THE INSTALLATION OF SPRINKLER SYSTEMS", AND
UFC 3-600-01, "FIRE PROTECTION FOR FACILITIES" (MAY 2021), UFC 3-600-01
MUST TAKE PRECEDENCE OVER NFPA 13 REQUIREMENT.
19 CONTRACTOR TO START AT LOCATIONS INDICATED ON THE F-100 SERIES OF
FIRE SPRINKLER DRAWINGS.
20 CONTRACTOR MUST COORDINATE INSTALLATION OF ALL FIRE PROTECTION
DEVICES WITH ALL OTHER TRADES.
21 PIPING AND CONTROL VALVES MUST BE ROUTED TO AREAS WITH CLEAR
SPACE FOR ACCESS TO VALVES.
22 CONTRACTOR MUST INSTALL NEW FIRE SPRINKLER HANGERS AS
NECESSARY TO MEET NFPA 13 COMPLIANCE.
23 ALL PIPING 2" AND LESS MUST BE SCHEDULE 40 BLACK STEEL. ALL PIPING
LARGER THAN 2" MUST BE A MINIMUM OF SCHEDULE 10 BLACK STEEL.
24 PIPE SIZES INDICATED ON DRAWINGS ARE FOR REFERENCE ONLY.
CONTRACTOR MUST SIZE PIPING IN ACCORDANCE WITH HYDRAULIC
CALCULATIONS REQUIREMENTS FOUND IN NFPA 13. CONTRACTOR MUST
NOT UTILIZE PIPE SIZES ON DRAWINGS FOR PRICING PURPOSES.
25 SEISMIC BRACING REQUIRED. BRACING MUST BE DESIGNED AND INSTALLED
PER NFPA 13 (2022).
26 PIPING IN FINISHED AREAS AND EXPOSED IN CONDITIONED AREAS MUST BE
IDENTIFIED BY LABELING BANDS AS REQUIRED BY UFC 3-600-01.
27 WET SYSTEM MUST BE PROVIDED WITH AN AUTOMATIC AIR VENT LOCATED
AT THE HIGH POINT OF THE SPRINKLER SYSTEM.
28 SERVER ROOM MUST BE PROVIDED WITH INSPECTOR'S TEST CONNECTION
TO SIMULATE SPRINKLER ACTIVATION. LOCATION OF INSPECTOR'S TEST
VALVE IS FOUND ON DRAWING F-101. INSPECTOR'S TEST VALVE OUTLET
MUST BE PROVIDED WITH PLUG TO PREVENT LEAKAGE FROM VALVE (AS
DIRECTED BY COR).
29 ALL SPRINKLERS LOCATED IN FINISHED GRID STYLE CEILINGS TO BE
CENTERED IN TILES.
APPLICABLE BUILDING CODES
2021 INTERNATIONAL BUILDING CODE (IBC)
2021 NFPA 1 FIRE CODE
2022 NFPA 13 STANDARD FOR INSTALLATION OF SPRINKLER SYSTEMS
2022 NFPA 72 NATIONAL FIRE ALARM & SIGNALING CODE
2021 NFPA 101 SAFETY CODE
2022 NFPA 291 RECOMMENDED PRACTICE FOR FIRE FLOW TESTING AND MARKING OF HYDRANTS
UFC 3-600-01 FIRE PROTECTION ENGINEERING FOR FACILITIES, CHANGE 6, 05-06-2021
UFC 4-021-01 MASS NOTIFICATION SYSTEM, CHANGE 1, 01 JAN 2010
ECB 2018-17 NEW REQUIREMENTS FOR VISUAL NOTIFICATION FOR MASS NOTIFICATION SYSTEMS
W
2Q R
R
_P la ns _V ol 2-
UC UC UC UC UC UC UC UC UC UC UC UC UC UC UC UC UC UC
UC UC UC UC UC UC UC
UC UC UC UC UC UC UC
UC
UC UC UC U
UT UT
UT UT UT
UT UT UT UT UT UT
U T
UT
G G G G G G G G G G G G G G G G G G G
OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE
W W W W W W W W W W W W W W W W W W W
SS
SS
SS
SS
SS
SS
SS
SS
SS
O E
O E
O E
O E
UC
UC
UC
UC
O E
O E
O E
O E
O E
O E
O E
O E
O E
O E
O E
O E
O E
O E
O E
O E
O E
O E
O E
O E
O E
O E
O E
O E
S S
S S
S S
S S
S S
S S
S S
S S
UE
U E
UE
UEX
X X X X X X X X X X
X X
X
X X
X X
X X
X
XXXXXXXXXXXXXX
UC UC UC UC UC UC UC UC UC UC UC UC
UC UC UC UC
UC UC UC UC
U C
UCUC
UC
UC
UC
UC
U C
U C
U C
U C
U C
U C
UC UC UC UC UC UC UC UC UC
U C
U C
UC
U C
U C
U C
U C
C UC UC UC UC UC UC UC
UC
UC
UC
UC
UC UC UC
U C
UC
UC
UC
UC
UC
U C
U C
U C
U C
UC
UC
UE
U E
UE
UE
UE UE
UE
UE
UE
UE
UE
XXXXX
X
G G G G G G G G G G G G
G G
G G
G
G G
X X X X X X X X X
X X X X X X X X X
OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE
W W W W W W W W W W W
W W W W W W W W W W W W W W
W
W W
W W
W W
W
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
X X
X X
X
X
X
X
X
X
SS
G G G G G
G
G G
G G
G
G
G
G
G
W
W
W W
W W
W W
W W
W W
W W
W W
W W
W
U C
U C
UC UC
UC
UC
UC
UC
UC
UC
UC
UC
UC
UC
UC
UC
UC
UC
UC
UC
UC
U C
U C
U C
U C
U C
U C
U C
U C
U C
U C
U C
U C
U C
U C
U C
U C
U C
U C
U C
U C
U C
U C
U C
UC
U C
U C
U C
U C
U C
U C
U C
U C
U C
U C
U C
U C
U C
U C
U C
U C
U C
U C
UC
UC
UC
UC
UC
U C
UC UC
UCUCUC
U C
U C
U C
U C
U C
U C
U C
U C
U C
U C
U C
U C
U C
U C
U C
U C
F M
F M
F M
F M
F M
F M
F M
F M
F M
P R
O P
O S
E D
B U
IL
D
IN
G
B
IO
R E
T E
N T
IO
N
P O
N D
CO
ATLANTIC AVENUE SE
NORTH
R E
F U
E L
IN
G R
O A
D S
E
WYE
UNDISTURBED EARTH (TYP.)
BEARING AREA (TYP.)
POURED CONCRETE BLOCKS (TYP.)
PLACE DOUBLE LAYER
OF TAR PAPER
BETWEEN CONCRETE
BLOCKING AND PLUG TO
PERMIT EASY REMOVAL
FOR FUTURE
EXTENSION OF WATER
MAIN
THRUST BLOCK NOTES :
1. KEEP CONCRETE CLEAR OF JOINT AND
JOINT ACCESSORIES.
2. CONCRETE THRUST BLOCKING SHALL BE
POURED AGAINST UNDISTURBED EARTH.
3. THRUST BLOCKS FOR VERTICAL BENDS
HAVING DOWNWARD RESULTANT THRUSTS
SHALL BE THE SAME AS FOR HORIZONTAL
BENDS.
4. BEARING AREAS, VOLUMES, AND SPECIAL
BLOCKING DETAILS SHOWN ON PLANS TAKE
PRECEDENCE OVER THIS STANDARD.
5. TAPPING VALVES SHALL HAVE THRUST
BLOCKING AS SPECIFIED FOR TEES.
6. CONTRACTOR SHALL PROVIDE RESTRAINT
AT ALL PRESSURE LINE FITTINGS USING
EITHER CONCRETE BLOCKING OR TIE ROD
ASSEMBLIES.
7. CONCRETE FOR THRUST BLOCKS SHALL BE
3000 PSI MINIMUM STRENGTH.
8. ANCHOR BLOCKS FOR VERTICAL BENDS
SHALL BE SIZED AS 90° BENDS
REGARDLESS OF ANGLE.
SEE NOTE 8
VERTICAL BEND
MIN. DEPTH OF BURY
AS SPECIFIED (TYP.)
DOUBLE ANCHOR
GALVANIZED RODS
BITUMASTIC COATED
AND EMBEDDED 30"
IN CONCRETE
0.4 0.7
1.4 2.54.6
6" 8"
1.9
3.3 #6
#4
8" THRU 10"
4" THRU 6"0.7
1.3
2.6
PIPE
FITTING
SIZES TEE & END 90° BEND
45°
BENDS &
WYES
22 1/2°
BEND
11 1/4°
BEND
ANCHOR ROD SIZE
PIPE SIZE ROD SIZE
BEARING AREA OF BLOCK IN SQ.FT.
SITE LOCATION
UG1
TEST
1000' OF EXISTING
12" UNDERGROUND
FLOW TEST PERFORMED ON OCTOBER 19, 2022 BY HD
ENGINEERING UTILIZING HYDRANTS LOCATED NEAR SITE
LOCATION ON ATLANTIC AVE.
STATIC PRESSURE: 122 PSI
RESIDUAL PRESSURE: 108 PSI
FLOW: 1,610 GPM
CALCULATED FLOW AT 20 PSI: +/- 4,705 GPM
THIS FLOW TEST IS FOR BIDDING PURPOSES ONLY.
CONTRACTOR IS RESPONSIBLE FOR PERFORMING THEIR
OWN HYDRANT FLOW TEST PER IAW NFPA 291, TO BE
USED AS THE BASIS FOR SYSTEM DESIGN AND HYDRAULIC
CALCULATIONS.
HYDRANT FLOW TEST:
WET INSPECTOR TEST
CONNECTION PIPED OUTSIDE
TO SPLASH BLOCK BELOW
AUTOMATIC AIR VENT LOCATED
AT SYSTEM HIGH POINT
4" x 2 1/2" x 2 1/2" FDC, WITH
SPLASH BLOCK BELOW
MAIN DRAIN LOCATION, WITH
SPLASH BLOCK BELOW
BACKFLOW FORWARD FLOW
TEST LOCATION, WITH
SPLASH BLOCK BELOW
12 1212
FLOW HYDRANT
1,610 GPM
EXISTING 12" UNDERGROUND MAIN
NEW 8" PVC
SUPPLY
8 6
NEW HYDRANT
NEW HYDRANT
BASE UG1
UG2
1000' OF EXISTING
12" UNDERGROUND
TO "TEST" NODE AT
GAUGE HYDRANT
KNOX BOX LOCATION
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
15' 30' 60'
1"=30'SCALE:
PLAN NORTH
T E
T R
A T
E C
H
IN
C
W a rr in g to n W a y
L o u is v ill e
K Y
P h o n e
-5 w w w .t e tr a te c h .c o m
M e d lo ck B ri d g e
R D
S T
E
Jo h n s
C re ek
P h on e (4
-6
F-101
S it e P la n
D O
B B
IN
S
A
IR
R E
V E
R V
E B
A S
E G
A
L O
U
IS
V
IL
L E
D
IS
T R
IC
T
D
R M
A R
T
IN
L U
T H
E R
K
IN
G J R
P
L A
C E
L O
U
IS
V
IL
L E
K
Y
R H
E S
P R
IC
H
B K
O T
U L A
R H
E S
P R
IC
H
/1
/2
F Y
C E
R T
IF
IE
D F
IN
A
L
F G
W B
-0
S
E C
U R
IT
Y
F O
R C
E S
F A
C
IL
IT
Y
P R
O J E
C T
P
F ir e P ro te c ti o n
SCALE: 12" = 1'-0"
HYDRANT FLOW TEST MAP
1" = 30'-0" 1 Site Plan
NTS2
CONCRETE THRUST BLOCKING
W
2Q R
R
_P la ns _V ol 2-
1 2 3 4 5 6 7
B
C
D
E
F
G
H
I
A134
A140
A139
A127 A126
A135 A137
A138A136
A130 A131
A132
A128
A129
A133
A125
A122
A124
A123
A101
A105
A000
A004
A113A114
A115
A112
A118
A119
A103
A104
A102
A100
A117
A106
A110
A001
A111
A109
A108
A107
A120
A121
A116
A003
A141
A142
A143
¼
½
½
¼
½
½
½
½
½
1½
½
½
½
½
½
½
½
½
½
½
½
½
½
½
½
½
½
½
½
½
½
½
½
1 1 ½
½
½
½
½
½
½
½
½
½
½
1½
½
½
½
½
1½
½
½
½
½
½
½
½1
½
½
½
½
½
½
½
½
½
½
½
½
½
½
1½
½
½
½
½
½
½
½
½
½
1½
½ 1
½
½
½
½
½
½
½
½
½
½
½
1½
REMOTE AREA
REMOTE AREA
½
½
2½2½ 2½ 2½
½
2½ 2½
½
2½
1 1
1½ 1½1½
2½
¼
¼
2½
½
2½
½
½
½
½
2½
½
22 2 2 2 2 2 2 2
½1 ½
½ 1
½
½
½
½
½
½
½
½
½
½
½
1½
½
½
1 1
1½
½ 1
½
½4
½
1½
1½
½
½
½
½
½
1½ 1½
½
½
½
½
2½
1½
1½
½
½
½
½
1½
½
½
½
½
½
½
½
½
A002
A002
A002
¼
½
½2 ½
½
½
½
½
½
½
½
½
½2 ½
6 6 6 6 6 6 6
½
½ 2 ½ 2 ½
½
½
A147
½
½
½
1½
½
½
½
6 666
½1 ½
½
½
½
½1 ½1
½
LIGHT HAZARD - 0.10 GPM/SQFT. OVER 1,500 SQFT.
250 GPM HOSE STREAM. MINIMUM K-5.6 SPRINKLERS
WITH MAXIMUM SPACING OF 225 SQFT.
ORDINARY HAZARD - 0.20 GPM/SQFT. OVER 2,500 SQFT.
250 GPM HOSE STREAM. MINIMUM K-8.0 SPRINKLERS
WITH MAXIMUM SPACING OF 130 SQFT.
Hazard Classification:
EXTRA HAZARD - 0.30 GPM/SQFT. OVER 2,500 SQFT.
MINIMUM K-11.2 SPRINKLERS WITH MAXIMUM SPACING OF
100 SQFT. CEILING SPRINKLERS ONLY, NO IN-RACK
SPRINKLERS.
RACK STORAGE - 15 K-16.8 CMSA SPRINKLERS @ 22 PSI.
500 GPM HOSE STREAM. MAXIMUM SPACING OF 100 SQFT.
CEILING SPRINKLERS ONLY, NO IN-RACK SPRINKLERS.
1. SEE SHEET F-001 FOR GENERAL NOTES.
2. THE FIRE SPRINKLER SYSTEM MUST BE DESIGNED IN ACCORDANCE
WITH NFPA 13 AND UFC 3-600-01. UFC 3-600-01 MUST TAKE
PRECEDENCE OVER NFPA 13.
3. THE SPRINKLER LOCATIONS MUST BE COORDINATED WITH OTHER
TRADES PRIOR TO CONSTRUCTION. ALL SPINKLERS SHALL BE
LOCATED CENTER OF TILE.
4. FIRE SPRINKLER GUARDS MUST BE INSTALLED ON SPRINKLERS
WHERE DAMAGE IS POSSIBLE DUE TO HEIGHT OF SPRINKLER OR
ACTIVITIES OF OCCUPANTS.
5. SPRINKLER MUST BE SPACED ACCORDING TO THE REQUIREMENTS IN
NFPA 13.
6. QUICK RESPONSE SPRINKLER SHALL BE USED IN AREAS AS REQUIRED
BY NFPA 13.
7. ALL PIPE LENGTHS SHOWN ARE CENTER TO CENTER.
8. PROVIDE PIPE HANGERS, SEISMIC BRACING, FLEXIBLE AND RIGID
COUPLINGS WHERE REQUIRED ON ALL SPRINKLER SYSTEM WET PIPE
PER NFPA 13.
9. AUXILIARY DRAINS MUST BE INSTALLED IN ACCORDANCE WITH NFPA 13
TO DRAIN THE SPRINKLER SYSTEM PIPING TO THE EXTERIOR OF THE
BUILDING.
10. SPLASH BLOCKS MUST BE PROVIDED FOR ALL DRAINS (AUXILIARY
DRAINS, MAIN DRAINS AND FDC CONNECTIONS) THAT ARE PIPED TO
THE EXTERIOR OF THE BUILDING.
11. THE SYSTEM MUST BE HYDROSTATICALLY TESTED AT 200PSI IN
ACCORDANCE WITH NFPA 13.
12. THE SUBCONTRACTOR MUST BE RESPONSIBLE FOR MAINTAINING A
CLEAN WORK AREA AND BE RESPONSIBLE FOR REMOVING ALL DEBRIS
AND MATERIAL CAUSED DURING CONSTRUCTION.
13. THE SUBCONTRACTOR MUST NOTIFY THE FIRE DEPARTMENT PRIOR
TO ANY OUTAGES SO THAT AN EFFECTIVE FIRE WATCH PLAN CAN BE
PUT INTO PLACE.
14. MOBILITY STORAGE TO HAVE RACK STORAGE OF UNEXPANDED
PLASTICS UP TO 20’-0 IN HEIGHT WITH A ROOF HEIGHT OF 17’-10”.
15. PROGEAR TO HAVE STORAGE OF CLASS I-IV AND GROUP A PLASTIC
PRODUCTS UP TO 10’-0 IN HEIGHT PROTECTED IN ACCORDANCE WITH
MISCELLANEOUS STORAGE. CEILING HEIGHT AT 9’-0.
16. CONTRACTOR TO PROVIDE AND INSTALL KNOX BOX LOCATED AT
ENTRANCE, USE APPROVED MODEL KNOXVAULT 4400 OR KNOXBOX
3200 ONLY.
17. PLEASE NOTE: THESE DRAWINGS ARE FOR REFERENCE ONLY.
CONTRACTOR MUST NOT ASSUME SIZES, QUANTITIES, LOCATIONS OR
MATERIALS ARE TO BE INSTALLED IN THIS MANNER. THIS SUBMITTAL
SET IS A PERFORMANCE SET OF DRAWINGS AND SHOULD ONLY BE
USED AS A REFERENCE.
GENERAL NOTES:
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
3/32"=1'-0SCALE:
4' 8' 16' 24'
PLAN NORTH
T E
T R
A T
E C
H
IN
C
W a rr in g to n W a y
L o u is v ill e
K Y
P h o n e
-5 w w w .t e tr a te c h .c o m
AREA A
AREA B
COMPOSITE KEY PLAN
M e d lo ck B ri d g e
R D
S T
E
Jo h n s
C re ek
P h on e (4
-6
F-102
F lo o r
P la n
O v e ra ll
D O
B B
IN
S
A
IR
R E
V E
R V
E B
A S
E G
A
L O
U
IS
V
IL
L E
D
IS
T R
IC
T
D
R M
A R
T
IN
L U
T H
E R
K
IN
G J R
P
L A
C E
L O
U
IS
V
IL
L E
K
Y
R H
E S
P R
IC
H
B K
O T
U L A
R H
E S
P R
IC
H
/1
/2
F Y
C E
R T
IF
IE
D F
IN
A
L
F G
W B
-0
S
E C
U R
IT
Y
F O
R C
E S
F A
C
IL
IT
Y
P R
O J E
C T
P
F ir e P ro te c ti o n
Sprinkler Schedule - Overall No. of
Sprklrs Description K-Factor Orifice
Size Temp Finish Escutcheon NPT
124 Quick Response Recessed Pendent 5.6 1/2" 155 °F Chrome Chrome 1/2"
1 Quick Response Upright 5.6 1/2" 155 °F Brass NA 1/2"
16 Quick Response Recessed Pendent 8 3/4" 155 °F Chrome Chrome 3/4"
15 Quick Response Upright 8 3/4" 155 °F Brass NA 3/4"
10 Quick Response Upright 8 3/4" 286 °F Brass NA 3/4"
14 Standard Response Pendent 11.2 3/4" 212 °F Brass Chrome - Flat 3/4"
18 CMSA Standard Response Upright 16.8 3/4" 212 °F Brass NA 3/4"
Total No. of Sprinklers: 198
3/32" = 1'-0" 1 Finished Floor - Overall
ROOM SCHEDULE
Number NAME
A000 ENTRY VESTIBULE
A001 LOBBY
A002 CORRIDOR
A003 CORRIDOR
A004 VESTIBULE
A100 COMMAND SUITE
A101 CSS
A102 SQUADRON SUPERINTENDENT
A103 FIRST SERGEANT
A104 SQUADRON COMMANDER
A105 CONFERENCE
A106 OPERATIONS SUITE
A107 TESTING ROOM
A108 DO OPERATIONS OFFICER
A109 OPS HUDDLE
A110 CHIEF SUITE
A111 CHIEF HUDDLE
A112 BDOC / ECC
A113 BDOC COMM
A114 TOILET
A115 TOILET
A116 JANITOR
A117 COMM
A118 S-5 SUITE
A119 SIPR
A120 TRAINING OFFICE SUITE
A121 TRAINING HUDDLE
A122 TRAINING ROOM
A123 HOME STATION EQ. STORAGE
A124 TABLES / CHAIRS STORAGE
A125 REPORT WRITING
A126 WORKSTATION
A127 INTERVIEW
A128 BREAK
A129 HUDDLE
A130 WEAPONS CLEARING
A131 WEAPONS CLEANING
A132 ARMORY
A133 MOBILITY STORAGE
A134 PROGEAR
A135 WOMENS RR
A136 WOMENS SHOWER / LOCKER
A137 MENS RR
A138 MENS SHOWER / LOCKER
A139 ELECTRICAL
A140 MECHANICAL
A141 EVIDENCE STORAGE
A142 TRAINING HUDDLE
A143 ATO
A147 PLASTIC STORAGE
W
2Q R
R
_P la ns _V ol 2-
B
C
D
E
A123
A101
A105
A000
A113
A114
A115
A112
A118
A119
A103
A104
A102 A100
A117
A106
A110
A001
A111
A109
A108
A107
A120
A116
A143
F-302
19' - 4" 14' - 8" 29' - 4" 9' - 0" 25' - 0" 8' - 0"
105' - 4"
½
½
1 1 ½
½
½
½
½
½
½
½
½
½
½
½
½
½
½
½
½
½
½
½
½
½
½
½
½
½
½
½
1½
½
½
½
½
1½
½
½
½
½
1½
½
Up 1
Up 1
Up 1
Up 1
Up 1
Up 1
Up 1
Up 1
Up 1
Up 1
Up 1
Up 1
Up 1
Up 1
Up 1
Up 1
Up 1
Up 1
Up 1
Up 1
Up 1
Up 1
Up 1
Up 1
Up 1
Up 1
Up 1
Up 1
Up 1
Up 1
Up 1
Up 1
Up 1
Up 1
F-301
SEE: 1 / F-104SEE: 1 / F-104
A002
A002
½
½
½
½
½
2 2
½
½
½
½
1½
1½
1½
½
½
½
½
½
1½
½
½
½
½
1½1½
½
½
½
½
1½
½
½
½
½
½
1 1
½
½
1½
½
1½
½
½
½
½
½
½1½
½
½
½
½
2 2
1 1
Up 1
Up 1
Up 1
Up 1
Up 1
Up 1
Up 1
Up 1
Up 1
Up 1
Up 1
Up 1
Up 1
Up 1
Up 1
Up 1
Up 1
Up 1
Up 1
Up 1
Up 1 Up 1
Up 1
Up 1
Up 1 Up 1
Up 1
Up 1
Up 1
Up 1
Up 1
Up 1
Up 1 Up 1
Up 1
Up 1 Up 1
Up 1
Up 1
Up 1
Up 1
M305
BL04
BL01
M300
M301 M303M302
BL05
BL03
H209 209
H204204
H201
H200
H202 202 H207
H206
H205
Remote area number:
Occupancy classification:
Density:
Area of application:
Total water required (including hose streams):
@ a required system pressure of:
Fire Protection System Demand:
No. of sprinklers calculated:
Inside Hose Streams:
Outside Hose Streams:
Light Hazard
0.10 Gpm/SqFt
1,518 SqFt
519.268 GPM
72.088 Psi
0 GPM
250 GPM
BL02
H210
A F
F
A F
F
A F
F
A F
F
A F
F
A F
F
A F
F
A F
F
A F
F
A F
F
9' - 9" AFF
A F
F
15' - 3" AFF
A F
F
A F
F
A F
F
A F
F
A F
F
A F
F
A F
F
A F
F
9' - 9" AFF 9' - 9" AFF
KNOX BOX LOCATION
Up 1
½
½
½
Up 1
Up 1 Up 1
H203 H208
M304
Up 1
½
½
½
1. SEE SHEET F-001 FOR GENERAL NOTES.
2. THE FIRE SPRINKLER SYSTEM MUST BE DESIGNED IN ACCORDANCE
WITH NFPA 13 AND UFC 3-600-01. UFC 3-600-01 MUST TAKE
PRECEDENCE OVER NFPA 13.
3. THE SPRINKLER LOCATIONS MUST BE COORDINATED WITH OTHER
TRADES PRIOR TO CONSTRUCTION. ALL SPINKLERS SHALL BE
LOCATED CENTER OF TILE.
4. FIRE SPRINKLER GUARDS MUST BE INSTALLED ON SPRINKLERS
WHERE DAMAGE IS POSSIBLE DUE TO HEIGHT OF SPRINKLER OR
ACTIVITIES OF OCCUPANTS.
5. SPRINKLER MUST BE SPACED ACCORDING TO THE REQUIREMENTS IN
NFPA 13.
6. QUICK RESPONSE SPRINKLER SHALL BE USED IN AREAS AS REQUIRED
BY NFPA 13.
7. ALL PIPE LENGTHS SHOWN ARE CENTER TO CENTER.
8. PROVIDE PIPE HANGERS, SEISMIC BRACING, FLEXIBLE AND RIGID
COUPLINGS WHERE REQUIRED ON ALL SPRINKLER SYSTEM WET PIPE
PER NFPA 13.
9. AUXILIARY DRAINS MUST BE INSTALLED IN ACCORDANCE WITH NFPA 13
TO DRAIN THE SPRINKLER SYSTEM PIPING TO THE EXTERIOR OF THE
BUILDING.
10. SPLASH BLOCKS MUST BE PROVIDED FOR ALL DRAINS (AUXILIARY
DRAINS, MAIN DRAINS AND FDC CONNECTIONS) THAT ARE PIPED TO
THE EXTERIOR OF THE BUILDING.
11. THE SYSTEM MUST BE HYDROSTATICALLY TESTED AT 200PSI IN
ACCORDANCE WITH NFPA 13.
12. THE SUBCONTRACTOR MUST BE RESPONSIBLE FOR MAINTAINING A
CLEAN WORK AREA AND BE RESPONSIBLE FOR REMOVING ALL DEBRIS
AND MATERIAL CAUSED DURING CONSTRUCTION.
13. THE SUBCONTRACTOR MUST NOTIFY THE FIRE DEPARTMENT PRIOR
TO ANY OUTAGES SO THAT AN EFFECTIVE FIRE WATCH PLAN CAN BE
PUT INTO PLACE.
14. MOBILITY STORAGE TO HAVE RACK STORAGE OF UNEXPANDED
PLASTICS UP TO 20’-0 IN HEIGHT WITH A ROOF HEIGHT OF 17’-10”.
15. PROGEAR TO HAVE STORAGE OF CLASS I-IV AND GROUP A PLASTIC
PRODUCTS UP TO 10’-0 IN HEIGHT PROTECTED IN ACCORDANCE WITH
MISCELLANEOUS STORAGE. CEILING HEIGHT AT 9’-0.
16. CONTRACTOR TO PROVIDE AND INSTALL KNOX BOX LOCATED AT
ENTRANCE, USE APPROVED MODEL KNOXVAULT 4400 OR KNOXBOX
3200 ONLY.
17. PLEASE NOTE: THESE DRAWINGS ARE FOR REFERENCE ONLY.
CONTRACTOR MUST NOT ASSUME SIZES, QUANTITIES, LOCATIONS OR
MATERIALS ARE TO BE INSTALLED IN THIS MANNER. THIS SUBMITTAL
SET IS A PERFORMANCE SET OF DRAWINGS AND SHOULD ONLY BE
USED AS A REFERENCE.
GENERAL NOTES:
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
4' 8' 16'
1/8"=1'-0SCALE:
PLAN NORTH
T E
T R
A T
E C
H
IN
C
W a rr in g to n W a y
L o u is v ill e
K Y
P h o n e
-5 w w w .t e tr a te c h .c o m
AREA A
AREA B
AREA A KEY PLAN
M e d lo ck B ri d g e
R D
S T
E
Jo h n s
C re ek
P h on e (4
-6
F-103
F lo o r
P la n
A re a A
D O
B B
IN
S
A
IR
R E
V E
R V
E B
A S
E G
A
L O
U
IS
V
IL
L E
D
IS
T R
IC
T
D
R M
A R
T
IN
L U
T H
E R
K
IN
G J R
P
L A
C E
L O
U
IS
V
IL
L E
K
Y
R H
E S
P R
IC
H
B K
O T
U L A
R H
E S
P R
IC
H
/1
/2
F Y
C E
R T
IF
IE
D F
IN
A
L
F G
W B
-0
S
E C
U R
IT
Y
F O
R C
E S
F A
C
IL
IT
Y
P R
O J E
C T
P
F ir e P ro te c ti o n
Sprinkler Schedule - Area A No. of
Sprklrs Description K-Factor Orifice
Size Temp Finish Escutcheon NPT
74 Quick Response Recessed Pendent 5.6 1/2" 155 °F Chrome Chrome 1/2"
1 Quick Response Upright 5.6 1/2" 155 °F Brass NA 1/2"
1 Quick Response Recessed Pendent 8 3/4" 155 °F Chrome Chrome 3/4"
5 Quick Response Upright 8 3/4" 155 °F Brass NA 3/4"
Area A: 81
Total No. of Sprinklers: 81
1/8" = 1'-0" 1 Finished Floor - Area A
ROOM SCHEDULE
Number NAME
A000 ENTRY VESTIBULE
A001 LOBBY
A002 CORRIDOR
A003 CORRIDOR
A004 VESTIBULE
A100 COMMAND SUITE
A101 CSS
A102 SQUADRON SUPERINTENDENT
A103 FIRST SERGEANT
A104 SQUADRON COMMANDER
A105 CONFERENCE
A106 OPERATIONS SUITE
A107 TESTING ROOM
A108 DO OPERATIONS OFFICER
A109 OPS HUDDLE
A110 CHIEF SUITE
A111 CHIEF HUDDLE
A112 BDOC / ECC
A113 BDOC COMM
A114 TOILET
A115 TOILET
A116 JANITOR
A117 COMM
A118 S-5 SUITE
A119 SIPR
A120 TRAINING OFFICE SUITE
A121 TRAINING HUDDLE
A122 TRAINING ROOM
A123 HOME STATION EQ. STORAGE
A124 TABLES / CHAIRS STORAGE
A125 REPORT WRITING
A126 WORKSTATION
A127 INTERVIEW
A128 BREAK
A129 HUDDLE
A130 WEAPONS CLEARING
A131 WEAPONS CLEANING
A132 ARMORY
A133 MOBILITY STORAGE
A134 PROGEAR
A135 WOMENS RR
A136 WOMENS SHOWER / LOCKER
A137 MENS RR
A138 MENS SHOWER / LOCKER
A139 ELECTRICAL
A140 MECHANICAL
A141 EVIDENCE STORAGE
A142 TRAINING HUDDLE
A143 ATO
A147 PLASTIC STORAGE
W
2Q R
R
_P la ns _V ol 2-
A.F.F.9' - 0"
A.F.F.9' - 0"
1 2 3 4 5 6 7
E
F
G
H
I
A134
A140
A139
A127 A126
A135 A137
A138A136
A130 A131
A132
A128
A129
A133
A125
A122
A124
A123
A004
A118
A121
A003
A141
A142
F-301
F-302
F-501
Remote area number:
Occupancy classification:
Density:
Area of application:
Total water required (including hose streams):
@ a required system pressure of:
Fire Protection System Demand:
No. of sprinklers calculated:
Inside Hose Streams:
Outside Hose Streams:
Rack Storage
15 @ 22 Psi
1,097 SqFt
1740.314 GPM
72.923 Psi
0 GPM
500 GPM
F-501
M201
M205 M204
M403M402M401
M202
M203
M200
¼
½
¼
¼
½
2½ 2½ 2½
2½
½
½
½
½
½
½
½
½
½
½
½
½
½
1½1½1½
½
½
½
½
½
½
½
½
½
½
½
½
½
½
½
½
1½
½
½
½
½
½
½
½
½
½
½
½
½
½
½
½
1½
½
½
½
½
½
1½
½
½
½
½
2½ 1 ½
2½
½
½
½
½
½
½
1½
½
½
½
½
½
½
½
2½ 2½ 2½
2½
2½
½
2½
1½
¼
Up 1
Up 1
Up 1
Up 1
Up 1
Up 1
Up 1
Up 1
Up 1
Up 1
Up 1
Up 1 Up 1
Up 1
Up 1
Up 1
Up 1 Up 1
Up 1
Up 1
Up 1
Up 1
Up 1
Up 1
Up 1
Up 1
Up 1
Up 1
Up 1
Up 1
Up 1
Up 1
Up 1
Up 1
Up 1
Up 1
Up 1
Up 1
Up 1
Up 1
Up 1
Up 1
Up 1
Up 1
Up 1
Up 1
Up 1
Up 1
Up 1
Up 1
Up 1 Up 1
Up 1
Up 1
Up 1
Up 1
Up 1
Up 1
Up 1
Up 1
Up 1
Up 1
Up 1
Up 1
Up 1
Up 1
Up 1
Up 1 ½
Up 1 ½
AUTOMATIC AIR VENT LOCATED
AT SYSTEM HIGH POINT
SEE: 1 / F-103SEE: 1 / F-103
F-501
4Dn 4
4" x 2 1/2" x 2 1/2" FDC, WITH
SPLASH BLOCK BELOW
MAIN DRAIN LOCATION, WITH
SPLASH BLOCK BELOW
BACKFLOW FORWARD FLOW
TEST LOCATION, WITH
SPLASH BLOCK BELOW
A002
½
½
1½
½
½
1½
½
1 1 Up 1
Up 1
Up 1
Up 1 Up 1
BL04
M400
¼
½
Up 1½
A F
F
/2
A F
F
/2
A F
F
A F
F
9' - 2 1/2" AFF
9' - 9" AFF
A F
F
A F
F
A F
F
A F
F
A F
F
A F
F
A F
F
A F
F
A F
F
A F
F
A F
F
Up 1
½
½
Up 1
½
½
2½
Dn 2 ½
Dn 6
/2
A F
F
/2
A F
F
¼
½
¼
Up 2
Up 1
Up 2 2½
1½
½
1½
½Up 1
½
Up 1 ½
2½
A F
F
A F
F
BASE
BFV
M111
TOR
H413 H409 H406
H405
H402
H401
H400H404
H414
H410 H407
H403
M109
H415
H113
H412
½2 ½
½
½ 2 ½
½
½ 2 ½
½
½
½
½
M110
M206
2" FLOW
SWITCH
2" CHECK
VALVE
2" BUTTERFLY
VALVE WITH
TAMPER
SWITCH
WET INSPECTOR TEST
CONNECTION
Up 8
½
Dn 1
Up 1 Up 1
Up 1
Up 3
½
6Up 3
½
6 Up 3
½
6 Up 3
½
Up 3
½
66 6Up 3
½
M502
M504
M501
M500
M503
M505 R502R504 R501 R500R503
A F
F
A F
F
13' - 4 1/2" AFF
/2
A F
F
/2
A F
F
/2
A F
F
A F
F
13' - 8 1/2" AFF
/2
A F
F
Dn 4
66 66
1½
666 Up 61 ½
½
½
½
½
½
½
½
½
½
½
½
½
½
½
½
½
½
½
½
½
½
½
½
Dn 1
Dn 1
Dn 1
Dn 1
Dn 1
Dn 1
Dn 1
Dn 1
Dn 1
Dn 1 Dn 1
Dn 1
Dn 1
Dn 1
A147
10' - 1 1/2" AFF
/2
A F
F
/2
A F
F
M601 M600M602M603
612 609 606
Remote area number:
Occupancy classification:
Density:
Area of application:
Total water required (including hose streams):
@ a required system pressure of:
Fire Protection System Demand:
No. of sprinklers calculated:
Inside Hose Streams:
Outside Hose Streams:
Extra Hazard
0.30 Gpm/SqFt
891 SqFt
1250.844 GPM
34.591 Psi
341 GPM
500 GPM
H610
H611
H612
H607
H608
H609
H603
H604
H606
H600
H601
H602
H605
1. SEE SHEET F-001 FOR GENERAL NOTES.
2. THE FIRE SPRINKLER SYSTEM MUST BE DESIGNED IN ACCORDANCE
WITH NFPA 13 AND UFC 3-600-01. UFC 3-600-01 MUST TAKE
PRECEDENCE OVER NFPA 13.
3. THE SPRINKLER LOCATIONS MUST BE COORDINATED WITH OTHER
TRADES PRIOR TO CONSTRUCTION. ALL SPINKLERS SHALL BE
LOCATED CENTER OF TILE.
4. FIRE SPRINKLER GUARDS MUST BE INSTALLED ON SPRINKLERS
WHERE DAMAGE IS POSSIBLE DUE TO HEIGHT OF SPRINKLER OR
ACTIVITIES OF OCCUPANTS.
5. SPRINKLER MUST BE SPACED ACCORDING TO THE REQUIREMENTS IN
NFPA 13.
6. QUICK RESPONSE SPRINKLER SHALL BE USED IN AREAS AS REQUIRED
BY NFPA 13.
7. ALL PIPE LENGTHS SHOWN ARE CENTER TO CENTER.
8. PROVIDE PIPE HANGERS, SEISMIC BRACING, FLEXIBLE AND RIGID
COUPLINGS WHERE REQUIRED ON ALL SPRINKLER SYSTEM WET PIPE
PER NFPA 13.
9. AUXILIARY DRAINS MUST BE INSTALLED IN ACCORDANCE WITH NFPA 13
TO DRAIN THE SPRINKLER SYSTEM PIPING TO THE EXTERIOR OF THE
BUILDING.
10. SPLASH BLOCKS MUST BE PROVIDED FOR ALL DRAINS (AUXILIARY
DRAINS, MAIN DRAINS AND FDC CONNECTIONS) THAT ARE PIPED TO
THE EXTERIOR OF THE BUILDING.
11. THE SYSTEM MUST BE HYDROSTATICALLY TESTED AT 200PSI IN
ACCORDANCE WITH NFPA 13.
12. THE SUBCONTRACTOR MUST BE RESPONSIBLE FOR MAINTAINING A
CLEAN WORK AREA AND BE RESPONSIBLE FOR REMOVING ALL DEBRIS
AND MATERIAL CAUSED DURING CONSTRUCTION.
13. THE SUBCONTRACTOR MUST NOTIFY THE FIRE DEPARTMENT PRIOR
TO ANY OUTAGES SO THAT AN EFFECTIVE FIRE WATCH PLAN CAN BE
PUT INTO PLACE.
14. MOBILITY STORAGE TO HAVE RACK STORAGE OF UNEXPANDED
PLASTICS UP TO 20’-0 IN HEIGHT WITH A ROOF HEIGHT OF 17’-10”.
15. PROGEAR TO HAVE STORAGE OF CLASS I-IV AND GROUP A PLASTIC
PRODUCTS UP TO 10’-0 IN HEIGHT PROTECTED IN ACCORDANCE WITH
MISCELLANEOUS STORAGE. CEILING HEIGHT AT 9’-0.
16. CONTRACTOR TO PROVIDE AND INSTALL KNOX BOX LOCATED AT
ENTRANCE, USE APPROVED MODEL KNOXVAULT 4400 OR KNOXBOX
3200 ONLY.
17. PLEASE NOTE: THESE DRAWINGS ARE FOR REFERENCE ONLY.
CONTRACTOR MUST NOT ASSUME SIZES, QUANTITIES, LOCATIONS OR
MATERIALS ARE TO BE INSTALLED IN THIS MANNER. THIS SUBMITTAL
SET IS A PERFORMANCE SET OF DRAWINGS AND SHOULD ONLY BE
USED AS A REFERENCE.
GENERAL NOTES:
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
4' 8' 16'
1/8"=1'-0SCALE:
PLAN NORTH
T E
T R
A T
E C
H
IN
C
W a rr in g to n W a y
L o u is v ill e
K Y
P h o n e
-5 w w w .t e tr a te c h .c o m
AREA A
AREA B
AREA B KEY PLAN
M e d lo ck B ri d g e
R D
S T
E
Jo h n s
C re ek
P h on e (4
-6
F-104
F lo o r
P la n
A re a B
D O
B B
IN
S
A
IR
R E
V E
R V
E B
A S
E G
A
L O
U
IS
V
IL
L E
D
IS
T R
IC
T
D
R M
A R
T
IN
L U
T H
E R
K
IN
G J R
P
L A
C E
L O
U
IS
V
IL
L E
K
Y
R H
E S
P R
IC
H
B K
O T
U L A
R H
E S
P R
IC
H
/1
/2
F Y
C E
R T
IF
IE
D F
IN
A
L
F G
W B
-0
S
E C
U R
IT
Y
F O
R C
E S
F A
C
IL
IT
Y
P R
O J E
C T
P
F ir e P ro te c ti o n
1/8" = 1'-0" 1 Finished Floor - Area B
Sprinkler Schedule - Area B No. of
Sprklrs Description K-Factor Orifice
Size Temp Finish Escutcheon NPT
50 Quick Response Recessed Pendent 5.6 1/2" 155 °F Chrome Chrome 1/2"
15 Quick Response Recessed Pendent 8 3/4" 155 °F Chrome Chrome 3/4"
10 Quick Response Upright 8 3/4" 155 °F Brass NA 3/4"
10 Quick Response Upright 8 3/4" 286 °F Brass NA 3/4"
14 Standard Response Pendent 11.2 3/4" 212 °F Brass Chrome - Flat 3/4"
18 CMSA Standard Response Upright 16.8 3/4" 212 °F Brass NA 3/4"
Area B: 117
Total No. of Sprinklers: 117
ROOM SCHEDULE
Number NAME
A000 ENTRY VESTIBULE
A001 LOBBY
A002 CORRIDOR
A003 CORRIDOR
A004 VESTIBULE
A100 COMMAND SUITE
A101 CSS
A102 SQUADRON SUPERINTENDENT
A103 FIRST SERGEANT
A104 SQUADRON COMMANDER
A105 CONFERENCE
A106 OPERATIONS SUITE
A107 TESTING ROOM
A108 DO OPERATIONS OFFICER
A109 OPS HUDDLE
A110 CHIEF SUITE
A111 CHIEF HUDDLE
A112 BDOC / ECC
A113 BDOC COMM
A114 TOILET
A115 TOILET
A116 JANITOR
A117 COMM
A118 S-5 SUITE
A119 SIPR
A120 TRAINING OFFICE SUITE
A121 TRAINING HUDDLE
A122 TRAINING ROOM
A123 HOME STATION EQ. STORAGE
A124 TABLES / CHAIRS STORAGE
A125 REPORT WRITING
A126 WORKSTATION
A127 INTERVIEW
A128 BREAK
A129 HUDDLE
A130 WEAPONS CLEARING
A131 WEAPONS CLEANING
A132 ARMORY
A133 MOBILITY STORAGE
A134 PROGEAR
A135 WOMENS RR
A136 WOMENS SHOWER / LOCKER
A137 MENS RR
A138 MENS SHOWER / LOCKER
A139 ELECTRICAL
A140 MECHANICAL
A141 EVIDENCE STORAGE
A142 TRAINING HUDDLE
A143 ATO
A147 PLASTIC STORAGE
W
2Q R
R
_P la ns _V ol 2-
M201
M205
M204
M403
M402
M401
M202
M203
M200
M305
BL04
BL01
M300
M301
M303
M302
BL05
BL03
H209
H204
M400
H201
H200
H202202
H207
H206
H205
H210
BL02
UG1
TOR M111
H203
H208
M304
BOR
ACV
H415
H413
H409
H406
H405 H402
H401
H400
H404
H414
H113
H412
H410
H407H403
M109
M110
BASE
BFV
M206
R500
M500
M501
R501
M502
R502
M503
R503
M504
R504
M505
M601
M600
M602
M603
606 605
H610
H611
H612
H607
H608
H609
H603
H604
H606
H600
H601
H602
H605
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
T E
T R
A T
E C
H
IN
C
W a rr in g to n W a y
L o u is v ill e
K Y
P h o n e
-5 w w w .t e tr a te c h .c o m
M e d lo ck B ri d g e
R D
S T
E
Jo h n s
C re ek
P h on e (4
-6
F-105
Is o m e tr ic D ra w in g
D O
B B
IN
S
A
IR
R E
V E
R V
E B
A S
E G
A
L O
U
IS
V
IL
L E
D
IS
T R
IC
T
D
R M
A R
T
IN
L U
T H
E R
K
IN
G J R
P
L A
C E
L O
U
IS
V
IL
L E
K
Y
R H
E S
P R
IC
H
B K
O T
U L A
R H
E S
P R
IC
H
/1
/2
F Y
C E
R T
IF
IE
D F
IN
A
L
F G
W B
-0
S
E C
U R
IT
Y
F O
R C
E S
F A
C
IL
IT
Y
P R
O J E
C T
P
F ir e P ro te c ti o n
System ISO
W
2Q R
R
_P la ns _V ol 2-
Finished Floor 0' - 0"
Level 2 12' - 8"
1 2 3 4 5 6 7
F-302
' - 1
' - 7
/2
6' - 0" 6' - 0"
4' - 8"
19' - 4" 14' - 8" 29' - 4" 9' - 0" 25' - 0" 8' - 0"
105' - 4"
CMSA K-16.8 UPRIGHT (TYP)
1/2" / 1'-0"
1/2" / 1'-0"
' - 0
' - 1
/2
49' - 5"34' - 8"
MECHANICAL
A140
PROGEAR
A134
MOBILITY
STORAGE
A133
3/4" QR UPRIGHT (TYP)
' - 6
' - 9
' - 9
' - 9
' - 9
' - 7
' - 1
/2
/2
/2
1 1
Finished Floor 0' - 0"
Level 2 12' - 8"
1 2 3 4 5 6 7
F-302
105' - 4"
19' - 4" 14' - 8" 29' - 4" 9' - 0" 25' - 0" 8' - 0"
1/2" QR RECESSED PENDANT
ON RETURN BEND (TYP)
2 1 2
1 2
1 2
12 2 2 2
1/2" / 1'-0"
1/2" / 1'-0"
CHIEF SUITE
A110
CHIEF HUDDLE
A111
OPERATIONS
SUITE
A106
TESTING ROOM
A107
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
T E
T R
A T
E C
H
IN
C
W a rr in g to n W a y
L o u is v ill e
K Y
P h o n e
-5 w w w .t e tr a te c h .c o m
M e d lo ck B ri d g e
R D
S T
E
Jo h n s
C re ek
P h on e (4
-6
F-301
B u ild in g S e c ti o n s
D O
B B
IN
S
A
IR
R E
V E
R V
E B
A S
E G
A
L O
U
IS
V
IL
L E
D
IS
T R
IC
T
D
R M
A R
T
IN
L U
T H
E R
K
IN
G J R
P
L A
C E
L O
U
IS
V
IL
L E
K
Y
R H
E S
P R
IC
H
B K
O T
U L A
R H
E S
P R
IC
H
/1
/2
F Y
C E
R T
IF
IE
D F
IN
A
L
F G
W B
-0
S
E C
U R
IT
Y
F O
R C
E S
F A
C
IL
IT
Y
P R
O J E
C T
P
F ir e P ro te c ti o n
1/4" = 1'-0" 1 Section 1
1/4" = 1'-0" 2 Section 2
W
2Q R
R
_P la ns _V ol 2-
Finished Floor 0' - 0"
Level 2 12' - 8"
A B C D E F G H I
F-301
F-301
2½
1¼
1½1½1½1½1½1½1½ 1½1½
206' - 0"
3' - 4" 36' - 0" 29' - 8" 26' - 4" 42' - 8" 42' - 1" 20' - 7" 5' - 4"
1½1½1½1½1½1
1 1 1 1
1 1
1 1
1½
1½
"CHIEF HUDDLE
A111
OPS HUDDLE
A109
CORRIDOR
A002 BDOC COMM
A113
BDOC / ECC
A112
CONFERENCE
A105
S-5 SUITE
A118
TRAINING ROOM
A122
CORRIDOR
A002
CORRIDOR
A003
MOBILITY
STORAGE
A133
2½
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
T E
T R
A T
E C
H
IN
C
W a rr in g to n W a y
L o u is v ill e
K Y
P h o n e
-5 w w w .t e tr a te c h .c o m
M e d lo ck B ri d g e
R D
S T
E
Jo h n s
C re ek
P h on e (4
-6
F-302
B u ild in g S e c ti o n
D O
B B
IN
S
A
IR
R E
V E
R V
E B
A S
E G
A
L O
U
IS
V
IL
L E
D
IS
T R
IC
T
D
R M
A R
T
IN
L U
T H
E R
K
IN
G J R
P
L A
C E
L O
U
IS
V
IL
L E
K
Y
R H
E S
P R
IC
H
B K
O T
U L A
R H
E S
P R
IC
H
/1
/2
F Y
C E
R T
IF
IE
D F
IN
A
L
F G
W B
-0
S
E C
U R
IT
Y
F O
R C
E S
F A
C
IL
IT
Y
P R
O J E
C T
P
F ir e P ro te c ti o n
1/8" = 1'-0" 1 Section 3
W
2Q R
R
_P la ns _V ol 2-
1 2
H
I
F-301
F-501
¼
½
¼
½
Up 1
½
6 6
2" MAIN DRAIN
BACKFLOW FORWARD FLOW
TEST LOCATION, WITH
SPLASH BLOCK BELOW
8" UNDERGROUND
BOR
BASE
Dn 8
6 BFV
ACV
Up 1 ½
½
Up 1½
M111
Up 6
½
¼
9' - 8" 9' - 8"
6" WALL P.I.V.
3' - 0"
Finished Floor 0' - 0"
½
BASE
BFV BOR
ACV
TOR
/2
3' - 0"16' - 4"
9' - 8"
2' - 4"
1" GLOBE VALVE
1" PIPE-O-LET
MAIN PIPING
SIGN W/CHAIN
AUXILIARY
DRAIN
1" X 0'-4" NIPPLE
1" PLUG
PROVIDE ON END OF EACH CROSS MAIN
DRAINS MUST BE PROVIDED WITH PLUGS AT LOW LEVEL
PIPING AND DROPS
2' x 2'
CEILING
TILE
NOTE:
SPRINKLER HEAD MUST BE CENTERED AT
LOCATION SHOWN IN 2' x 2' CEILING TILE +/- 2".
24"
12"12"
24"
12"
12"
NOTE:
INSTALLATION MUST BE
COORDINATED WITH THE
ROOFING CONTRACTOR PRIOR
TO THE INSTALLATION OF THE
CORRUGATED METAL DECKING.
IT IS RECOMMENDED THAT THE
PIPING BE INSTALLED AFTER
DECKING IS IN PLACE, TO AVOID
CONFLICT.
TOP BEAM CLAMP A.T.R. & RING
HANGER RING
3/8" A.T.R. FOR 1"-4" PIPE
1/2" A.T.R. FOR 6"-8" PIPE
TOP BEAM CLAMP 8" RETRO RETAINING STRAP
4", 6" AND 8" PIPE TO BE ATTACHED WITHIN 6" OF TRUSS PANEL
POINTS AT A MAXIMUM OF 8'-0" ON CENTER.
INSTALLATION NOTE:
PREFER. FROM REMOTE
BRANCH LINE
1" TEST VA. IN
ACCESSIBLE LOCATION
45° EL. W/ CORROSION RES.
OUTLET EQ. TO SPRINKLER
PIPE RING
TRAPEZE MEMBER
1/2" ATR FOR 6"-8" PIPE
MAIN PIPING
PIPE RINGOPEN WEB
STEEL TRUSS
TOP BEAM CLAMP
8" RETRO
RETANING
STRAP
3/8" ATR FOR 2"-4" PIPE
FOR 6" & 8" PIPE USE EXTRA
HEAVY RING FOR 1/2" ROD.
SEE DETAIL HANGER 9/FP-01
FOR DETAILS NOT SHOWN
TRAPEZE LENGTH 8'-0"
3/8"
3"
A.T.R. SIZE
2 1/2" 2 1/2" 2 1/2" 2 1/2"
1/2"1/2"3/8" 3/8" 3/8"
SCH.10 SCH.10 SCH.10 SCH.10 SCH.10 SCH.40TRAPEZE TYPE
2"MAIN DIAMETER 2-1/2" 3" 4" 6" 8"
3"2 1/2" 2 1/2" 2 1/2" 2 1/2" 3"
3"2 1/2" 2 1/2" 3"
7'-0"
6'-0" 2" 2"
3"
NOTE: ATTACH ONLY WITHIN 0'-6" OF (TOP) TRUSS PANEL POINTS AT 8'-0" O.C.
NOTE: PREDRILL HOLE FOR C-CLAMP USING GOOD PRACTICE.
N/A 12-0 12-0 15-0 15-0 15-0 15-0 15-0 15-0 15-0 15-0 15-0
8-0 8-0 10-0 10-0 12-0 12-0 12-0 15-0 15-0 15-0 15-0 15-0
N/A 12-0 12-0 12-0 12-0 12-0 12-0 N/A N/A N/A N/A N/A
3-1/2
Nominal Pipe Size (in.)
Copper Tube
Threaded Lightwall Steel Pipe
HANGER SPACING PER NFPA 13 (2022 EDITION)
1-1/4
Table 17.4.2.1(a) Maximum Distance Between Hangers (ft. - in.)
Steel Pipe Except Threaded Lightwall
Pipe Type 3/4 1 1-1/2 2 2-1/2 3 4 5 6 8
Ductile Iron Pipe N/A N/A N/A N/A N/A N/A 15-0 N/A 15-0 N/A 15-0 15-0
1"-4" Pipe Use 3/8" ROD; 5", 6" & 8" Pipe use 1/2" ROD Note: IPS = Iron Pipe Size; CTS = Copper Tube Size
Finished Floor 0' - 0"
½
½
2' - 1"
0' - 6"
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
T E
T R
A T
E C
H
IN
C
W a rr in g to n W a y
L o u is v ill e
K Y
P h o n e
-5 w w w .t e tr a te c h .c o m
M e d lo ck B ri d g e
R D
S T
E
Jo h n s
C re ek
P h on e (4
-6
F-501
D e ta ils
D O
B B
IN
S
A
IR
R E
V E
R V
E B
A S
E G
A
L O
U
IS
V
IL
L E
D
IS
T R
IC
T
D
R M
A R
T
IN
L U
T H
E R
K
IN
G J R
P
L A
C E
L O
U
IS
V
IL
L E
K
Y
R H
E S
P R
IC
H
B K
O T
U L A
R H
E S
P R
IC
H
/1
/2
F Y
C E
R T
IF
IE
D F
IN
A
L
F G
W B
-0
S
E C
U R
IT
Y
F O
R C
E S
F A
C
IL
IT
Y
P R
O J E
C T
P
F ir e P ro te c ti o n
1/4" = 1'-0" 1 Valve Assembly - Enlarged Plan
1/4" = 1'-0" 2 Valve Assembly
NTS3
Valve Assembly ISO
Valve and Fitting Legend
Item # Item Desription 1 4 1/2" x 2 1/2" x 2 1/2" FDC
2 1/2" Ball Drip Piped Outside
3 4" Grooved Check Valve
4 Splash Block
5 8" Supply Pipe
6 8"x6" Flanged Reducing 90º Elbow
7 6" DCDA Backflow Preventer With OS&Y Valves
8 Pipe Stand
9 6" Flange Tee
10 6" Grooved 90º Drain Elbow
11 6" Grooved Butterfly Valve With Tamper Switch, Normally Closed For Backflow Forward Flow Test
12 2" Drain Piped Outside
13 2" Test And Drain With Pressure Relief Valve
14 6" Alarm Check Valve
15 Water Flow Switch
16 6" Grooved 90º Elbow
17 6" System Riser
18 6" Post Indicator Valve
19 6" x 2 1/2" (6-Way) For Backflow Forward Flow Test
NTS5
AUX DRAIN
NTS6
CENTER OF TILE
NTS7
TOP BEAM CLAMP
NTS8
WET INSPECTORS TEST
NTS9
TRAPEZE HANGER DETAIL
3/8" = 1'-0" 4 FDC Detail
W
2Q R
R
_P la ns _V ol 2-
FIRE ALARM ABBREVIATIONS:
A AMPERES
AC ALTERNATING CURRENT
AF AMPFRAME
AFF ABOVE FINISHED FLOOR
AFG ABOVE FINISHED GRADE
AL ALUMINUM
AM AMMETER
AS AMMETER SELECTOR SWITCH
AIC AMPERE INTERRUPTING CAPACITY
AT AMP TRIP
ASYM ASYMMETRICAL
ATS AUTOMATIC TRANSFER SWITCH
AUTO AUTOMATIC
AWG AUTOMATIC WIRE GAUGE
BCW BARE COPPER WIRE
BFF BELOW FINISHED FLOOR
BFG BELOW FINISHED GRADE
BLDG BUILDING
C CONDUIT
CAT CATEGORY
CB CIRCUIT BREAKER
CFCI CONTRACTOR FURNISHED CONTRACTOR INSTALLED
CKT CIRCUIT
CM CONTROL MODULE
CMH COMMUNICATIONS MANHOLE
CPT CONTROL POWER TRANSFORMER
CLF CURRENT…