W912QR24R0048_FIO_Vol6_ProjGIR_14of16_G-0000.pdf

PDF 1 MB Posted

Attached to
ROUGH RIVER DAM SAFETY MODIFICATION PHASE II: NEW OUTLET WORKS AND CUTOFF WALL PROJECT
Solicitation number
W912QR24R0048
Issued by

About this file

This document is the Geotechnical Information Report (GIR) Appendix G for the Rough River Dam Safety Modification Phase II - New Outlet Works and Cutoff Wall project. The GIR provides analyses of the downstream filter for the stilling basin abandonment, including calculations for particle migration and perviousness. The report indicates that multiple layers of graded materials, ranging from concrete sand to No. 23 stone, will be placed in the abandoned stilling basin to satisfy requirements for particle migration and perviousness. The related federal contract opportunity is a pre-solicitation for the construction of the Rough River Dam Safety Modification Phase II project, which will involve specialized site-specific equipment and capabilities to construct a new outlet works and cutoff wall. The contract will be a Firm Fixed Price with a best value tradeoff source selection, and will require HubZone and subcontracting plan participation. The anticipated solicitation release is in late November.

View the file

Other files

File Type Posted
ProjNET - Question and Answers.pdf PDF
W912QR24R0048_FIO_Vol5_TunnelGDR_26of28_D7-0000.pdf PDF
W912QR24R0048_FIO_Vol5_TunnelGDR_16of28_B2-0000.pdf PDF
W912QR24R0048_FIO_Vol6_PH1B_DrillGroutCCR_2of9_2A-0000.pdf PDF
W912QR24R0048_FIO_Vol5_TunnelGBR_MainReport-0000.pdf PDF
W912QR24R0048_FIO_Vol6_PH1B_VerificationBoringLog-0000.pdf PDF
W912QR24R0048_FIO_Vol5_TunnelGDR_1of28_MainReport-0000.pdf PDF
W912QR24R0048_FIO_Vol5_TunnelGDR_8of28_A7-0000.pdf PDF
W912QR24R0048_FIO_Vol6_ProjGIR_4of16_B2-0000.pdf PDF
W912QR24R0048_FIO_Vol6_ProjGIR_11of16_D-0000.pdf PDF
W912QR24R0048_FIO_Vol5_TunnelGDR_5of28_A4-0000.pdf PDF
W912QR24R0048_FIO_Vol5_TunnelGDR_9of28_A8-0000.pdf PDF
W912QR24R0048_FIO_Vol6_ProjGIR_7of16_B5-0000.pdf PDF
W912QR24R0048_FIO_Vol6_ProjGIR_1of16-0000.pdf PDF
W912QR24R0048_FIO_Vol6_PH1B_DrillGroutCCR_7of9_4B-0000.pdf PDF
W912QR24R0048_FIO_Vol6_PH1B_DrillGroutCCR_9of9_5-0000.pdf PDF
W912QR24R0048_FIO_Vol5_TunnelGDR_10of28_A9-0000.pdf PDF
W912QR24R0048_FIO_Vol5_TunnelGDR_20of28_D1-0000.pdf PDF
W912QR24R0048_FIO_V4b_Specs-0000.pdf PDF
W912QR24R0048_FIO_Vol6_PH1B_DrillGroutCCR_6of9_4A-0000.pdf PDF
W912QR24R0048_FIO_Vol6_1956_DesignMemo3-0000.pdf PDF
W912QR24R0048_Soliciation-0000.pdf PDF
W912QR24R0048_FIO_Vol5_TunnelGDR_15of28_B1-0000.pdf PDF
W912QR24R0048_FIO_Vol5_TunnelGDR_17of28_B3-0000.pdf PDF
W912QR24R0048_FIO_Vol5_TunnelGDR_13of28_A12-0000.pdf PDF
W912QR24R0048_FIO_Vol6_ProjGIR_13of16_F-0000.pdf PDF
W912QR24R0048_FIO_Vol6_PH1B_DrillGroutCCR_4of9_2C-0000.pdf PDF
W912QR24R0048_FIO_Vol5_TunnelGDR_18of28_B4-0000.pdf PDF
W912QR24R0048_FIO_Vol5_TunnelGDR_12of28_A11-0000.pdf PDF
W912QR24R0048_FIO_V3_CTW_STR_Plans-0000.pdf PDF
W912QR24R0048_FIO_Vol5_TunnelGDR_6of28_A5-0000.pdf PDF
W912QR24R0048_FIO_Vol6_ProjGIR_6of16_B4-0000.pdf PDF
W912QR24R0048_FIO_Vol6_ProjGIR_9bof16_C1b-0000.pdf PDF
W912QR24R0048_FIO_Vol6_PH1B_DrillGroutCCR_5of9_3-0000.pdf PDF
W912QR24R0048_FIO_Vol6_PH1B_DownstreamBoringLog-0000.pdf PDF
W912QR24R0048_FIO_Vol6_ProjGIR_2of16_A-0000.pdf PDF
W912QR24R0048_FIO_Vol6_PH1B_DrillGroutCCR_3of9_2B-0000.pdf PDF
W912QR24R0048_FIO_V1B_OTW_Plans-0000.pdf PDF
W912QR24R0048_FIO_Vol5_TunnelGDR_28of28_E-0000.pdf PDF
W912QR24R0048_FIO_V4a_Specs-0000.pdf PDF
W912QR24R0048_FIO_Vol6_PH1B_DrillGroutCCR_1of9-0000.pdf PDF
W912QR24R0048_FIO_Vol6_1953_DesignMemo2-0000.pdf PDF
W912QR24R0048_FIO_Vol6_PH1B_UpstreamBoringLog-0000.pdf PDF
W912QR24R0048_FIO_Vol6_ProjGIR_9aof16_C1a-0000.pdf PDF
W912QR24R0048_FIO_Vol5_TunnelGDR_2of28_A1-0000.pdf PDF
W912QR24R0048_FIO_Vol5_TunnelGDR_23of28_D4-0000.pdf PDF
W912QR24R0048_FIO_Vol6_ProjGIR_10aof16_C2a-0000.pdf PDF
W912QR24R0048_FIO_Vol5_TunnelGDR_22of28_D3-0000.pdf PDF
W912QR24R0048_FIO_Vol6_ProjGIR_3of16_B1-0000.pdf PDF
W912QR24R0048_FIO_V4c_Specs-0000.pdf PDF
Show 40 more

Latest 50 of 73 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation For Rough River Dam Safety Modification Project Phase II - New Outlet Works and Cutoff Wall

P2: 145870

Design-Bid-Build

Geotechnical Information Report (GIR) (14 of 16) Appendix G

For Information Only

23 September 2024

W912QR24R0048

ARIMS: 1200

Disposition: Permanent

W912QR24R0048_FIO_Vol6_ProjGIR_14of16_G-0000

Rough River Dam Geotechnical Data Report for Tunnel Construction

Volume 6: Project GIR

Appendix G - Analysis of Downstream Filter (14 of 16)

ROUGH RIVER, FALLS OF ROUGH, KY

LOUISVILLE DISTRICT, LRD DIVISION

DRAFT

ROUGH RIVER, FALLS OF ROUGH, KY

LOUISVILLE DISTRICT, LRD DIVISION

Appendix A

SYNOPSIS OF CONSTRUCTION HISTORY AND PERFORMANCE

Appendix B

BORING LOCATION PLANS AND BORING LOGS

Appendix C

SOIL AND ROCK TESTING AND ANALYSES BY INVESTIGATION

Appendix D

INSTRUMENTATION AND MONITORING

Appendix E

ANALYSES OF THE UPSTREAM FILTER AND DEWATERING

Appendix F

ANALYSES OF THE DOWNSTREAM COFFERDAM AND DEWATERING

Appendix G

ANALYSES OF DOWNSTREAM FILTER FOR STILLING

BASIN ABANDONMENT

Appendix H

ANALYSES OF CUTOFF WALL WORK PLATFORM

Appendix I

ANALYSES OF UPLAND DISPOSAL AREA AND ARCHERY BERM

Project:

Study Type: District: LRL

Calculation Title:

Total Number of Pages (including cover sheet): 5

Prepared by: Office: LRL Date: 10/26/2020

Checked by: Office: LRL Date: 2/4/2021

Description and Purpose

Assumptions for Critical Input Parameters

Remarks, Conclusions, and Results

Revision History

Rev. No. DateDescription of Revision Approved by

The various filter layers satisfy the requirements for particle migration and perviousness.

Check partical migration and perviousness for draped filter materials to be placed in abandoned stilling basin Multiple layers of graded material will be placed, ranging from C33 concrete sand at the base, followed by KYTC No. 57 stone which will be overlain by KYTC No. 23 Stone which will utimately be overlain by engineered fill (shot rock)

Gradations were all obtained from KYTC design specifications. Since the materials that are being compared are all sand and gravel with less than 15% fines, simplified calculations based on the d85 and d15 values of of the relevant base and filter materials were utilized.

Steven Shifflett

Rough River Dam Safety Modification (Phase II) Project

Final Design

Filter Check - Abandoned Outlet Works

Joe Carnall

Calculation Cover Sheet Version 20181017 Page 1 of 5G-1

KYTC C-33

G-2

G-3

Project: Rough River DS Mod Prepared By: Joe Carnall Date: 10/26/2020 Location: Falls of Rough, KY Reviewed By: S. Shifflett Date: 2/4/2021 Status: Draft

Type Base Filter US (in) KYTC Concrete Sand KYTC No.57 d 15 d 85

Metric (mm) KYTC Concrete Sand KYTC No.57 d15 0.288 6 d85 1.8 20

Perviousness: 6mm/0.28mm 20.83

Migration: 6mm/1.8mm 3.33 Should be less than 4

Perviousness and Migration Calculations

C-33 Sand and No. 57 Stone - Perviousness and Migration

Perviousness: d15Filter/d15Base > 3 to 5 (USACE) Migration: d15filter/ d85Base <4 (FEMA) Notes

Should be greater than 3 to 5 1. KYTC Concrete Sand and KYTC No. 57 Stone pass perviousness and migration.

G-4

Project: Rough River DS Mod Prepared By: Joe Carnall Date: 10/26/2020 Location: Falls of Rough, KY Reviewed By: S. Shifflett Date: 2/4/2021 Status: Draft

Type Base Filter US (in) KYTC No. 57 KYTC No.23 d 15 d 85

Metric (mm) KYTC No. 57 KYTC No.23 d15 6 28 d85 20 55

Perviousness: 28mm/6.0mm 4.67

Migration: 20mm/28mm 1.40

Perviousness and Migration Calculations

C-33 Sand and No. 57 Stone - Perviousness and Migration

Perviousness: d15Filter/d15Base >3 to 5 (USACE) Migration: d15filter/ d85Base <4 (FEMA) Notes

1. KYTC No. 23 Stone and KYTC No. 57 Stone pass perviousness and migration.

Should be greater than 3 to 5

Should be less than 4

G-5

COVER VOL 6 G
Appendix G (Analyses of Original Outlet Works Abandonment)