Rough river DAM safety modification phase II: new outlet works and cutoff wall project

Closed Pre-Solicitation Posted

Solicitation number
W912QR24R0048
Agency
Responses due
Set-aside
No set-aside

Opportunity facts

Place of performance
Falls of Rough, Kentucky 40119, United States

Notice details come from SAM.gov. Updated .

About this opportunity

The U.S. Army Corps of Engineers, Louisville District intends to issue a solicitation for the construction of the Rough River Dam Safety Modification Phase II: New Outlet Works and Cutoff Wall Project. The proposed work involves furnishing specialized equipment, materials, and labor to construct a new outlet works and excavate and place a cutoff wall at the Rough River Dam. The contractor must have the capability to meet construction deadlines and ensure continuity of the cutoff wall segments. The contract will be a Firm Fixed Price award based on a best value tradeoff. The solicitation will include extensive geological and geotechnical data to enable offerors to thoroughly understand the site conditions. The anticipated draft solicitation release date is mid-September 2024, with the final solicitation expected in late November 2024.

This is a full and open procurement that requires a HubZone 10% price evaluation preference. All large businesses must submit a subcontracting plan. The North American Industry Classification System (NAICS) code for this project is 237990 - Other Heavy and Civil Engineering Construction. Payment will be made via Electronic Funds Transfer. There are no incumbent contractors identified, and the government has not provided any estimated award values or budget ranges for this project.

Notice text

The Louisville District intends to issue a Solicitation for the Construction of Rough River Dam Safety Modification Phase II: New Outlet Works and Cutoff Wall Project.

The contractor shall furnish the equipment, materials, manpower required, and perform the work in accordance with the terms of the contract. The proposed work involves specialized site-specific equipment capable of constructing a new outlet works and excavation and placement of a cutoff wall based on the geology at Rough River Dam. The contractor must have the capability to meet construction deadlines and working in confirmed sites. The ability to ensure continuity of the cutoff wall segments is essential to the success of the project. In order to minimize the technical risk, the contract specifications will include extensive geological and geotechnical engineering data to enable offerors to acquire a thorough understanding of the site conditions.

The Contract type is a Firm Fixed Price Contract. The contract award will be based on a best value tradeoff.

This is a full and open procurement. This project requires the HubZone 10% price evaluation. All Large businesses shall submit a subcontracting plan.

North American industry Classification System (NAICS): 237990

This NAICS code shall be listed on the contractor’s “ACTIVE” SAM account prior to submitting a quote.

Method of Payment under this contract will be Electronic Funds Transfer (EFT) to a commercial bank account specified by the Contractor.

The offeror shall complete the price breakout for the actual solicitation. The total evaluated price will be determined by adding the total of all line items from the price breakout schedule. Award will not be made to offerors who do not provide reasonable and realistic prices for all line items listed in the price breakout schedule.

ANTICIPATED “DRAFT” SOLICITATION RELEASE DATE: Mid September.

ANTICIPATED “FINAL” SOLICITATION RELEASE DATE: Late November.

Point of Contact: The point of contact for this procurement is Contract Specialist Andrew Fleming at Andrew.J.Fleming@usace.army.mil

This announcement serves as the advance notice for this project. Responses to this synopsis are not required.

Files

File Type Posted
ProjNET - Question and Answers.pdf PDF
W912QR24R0048_FIO_Vol6_PH1B_DrillGroutCCR_9of9_5-0000.pdf PDF
W912QR24R0048_FIO_Vol6_PH1B_DrillGroutCCR_4of9_2C-0000.pdf PDF
W912QR24R0048_FIO_Vol6_PH1B_DrillGroutCCR_8of9_4C-0000.pdf PDF
W912QR24R0048_FIO_Vol6_PH1B_DrillGroutCCR_7of9_4B-0000.pdf PDF
W912QR24R0048_FIO_Vol6_PH1B_DrillGroutCCR_2of9_2A-0000.pdf PDF
W912QR24R0048_FIO_Vol6_ProjGIR_16of16_I-0000.pdf PDF
W912QR24R0048_FIO_Vol6_PH1B_DrillGroutCCR_6of9_4A-0000.pdf PDF
W912QR24R0048_FIO_Vol6_ProjGIR_15of16_H-0000.pdf PDF
W912QR24R0048_FIO_Vol6_ProjGIR_14of16_G-0000.pdf PDF
W912QR24R0048_FIO_Vol6_PH1B_DrillGroutCCR_5of9_3-0000.pdf PDF
W912QR24R0048_FIO_Vol6_ProjGIR_13of16_F-0000.pdf PDF
W912QR24R0048_FIO_Vol6_ProjGIR_10bof16_C2b-0000.pdf PDF
W912QR24R0048_FIO_Vol6_PH1B_DrillGroutCCR_1of9-0000.pdf PDF
W912QR24R0048_FIO_Vol6_ProjGIR_11of16_D-0000.pdf PDF
W912QR24R0048_FIO_Vol6_ProjGIR_8of16_B6-0000.pdf PDF
W912QR24R0048_FIO_Vol6_ProjGIR_12of16_E-0000.pdf PDF
W912QR24R0048_FIO_Vol6_ProjGIR_10aof16_C2a-0000.pdf PDF
W912QR24R0048_FIO_Vol6_ProjGIR_4of16_B2-0000.pdf PDF
W912QR24R0048_FIO_Vol6_ProjGIR_9bof16_C1b-0000.pdf PDF
W912QR24R0048_FIO_Vol6_ProjGIR_6of16_B4-0000.pdf PDF
W912QR24R0048_FIO_Vol6_1953_DesignMemo1-0000.pdf PDF
W912QR24R0048_FIO_Vol6_ProjGIR_5of16_B3-0000.pdf PDF
W912QR24R0048_FIO_Vol6_PH1B_VerificationBoringLog-0000.pdf PDF
W912QR24R0048_FIO_V2_OTW_Plans-0000.pdf PDF
W912QR24R0048_FIO_Vol6_ProjGIR_2of16_A-0000.pdf PDF
W912QR24R0048_FIO_Vol6_PH1B_UpstreamBoringLog-0000.pdf PDF
W912QR24R0048_FIO_Vol5_TunnelGDR_27of28_D8-0000.pdf PDF
W912QR24R0048_FIO_Vol6_ProjGIR_1of16-0000.pdf PDF
W912QR24R0048_FIO_Vol6_1941_GeoReport-0000.pdf PDF
W912QR24R0048_FIO_Vol5_TunnelGDR_25of28_D6-0000.pdf PDF
W912QR24R0048_FIO_Vol6_PH1B_DownstreamBoringLog-0000.pdf PDF
W912QR24R0048_FIO_V3_CTW_STR_Plans-0000.pdf PDF
W912QR24R0048_FIO_Vol5_TunnelGDR_24of28_D5-0000.pdf PDF
W912QR24R0048_FIO_Vol6_1956_DesignMemo3-0000.pdf PDF
W912QR24R0048_FIO_Vol5_TunnelGDR_22of28_D3-0000.pdf PDF
W912QR24R0048_FIO_Vol5_TunnelGDR_11of28_A10-0000.pdf PDF
W912QR24R0048_FIO_Vol6_1953_DesignMemo2-0000.pdf PDF
W912QR24R0048_FIO_Vol5_TunnelGDR_21of28_D2-0000.pdf PDF
W912QR24R0048_FIO_Vol5_TunnelGDR_8of28_A7-0000.pdf PDF
W912QR24R0048_FIO_V1A_OTW_Plans-0000.pdf PDF
W912QR24R0048_FIO_Vol5_TunnelGDR_18of28_B4-0000.pdf PDF
W912QR24R0048_FIO_Vol5_TunnelGDR_7of28_A6-0000.pdf PDF
W912QR24R0048_FIO_Vol5_TunnelGDR_28of28_E-0000.pdf PDF
W912QR24R0048_FIO_Vol5_TunnelGDR_14of28_A13-0000.pdf PDF
W912QR24R0048_FIO_Vol5_TunnelGDR_4of28_A3-0000.pdf PDF
W912QR24R0048_FIO_Vol5_TunnelGDR_19of28_C-0000.pdf PDF
W912QR24R0048_FIO_Vol5_TunnelGDR_6of28_A5-0000.pdf PDF
W912QR24R0048_FIO_Vol5_TunnelGDR_1of28_MainReport-0000.pdf PDF
W912QR24R0048_FIO_Vol5_TunnelGDR_17of28_B3-0000.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

Similar open opportunities

Opportunity Agency Set-aside Responses due
Design-Bid-Build - Rough River Lake Axtel Wastewater Treatment Plant (WWTP) NAICS 237110 ENDIST Louisville No set-aside
Pre-Solicitation Notice for Indefinite Delivery Contract (IDC) for Regional Dredge Multiple Award Task Order (MATOC) - USACE Huntington District - W91237-27-R-A003 NAICS 237990 ENDIST Huntington No set-aside
Upper mississippi river restoration (UMRR) pool 12 floodplain forest stage one (1) - habitat rehabilitation and enhancement project (HREP) Mississippi River Basin Pool 12, from Lock and Dam 12 near Bellevue, Iowa, to Lock and Dam 11 in Dubuque, Iowa and Jo Davies County, Illinois 52001 · NAICS 237990 ENDIST Rock Island No set-aside
JP Murtha Float Mooring Bitts Retrofit JP Murtha Locks and DamMonongahela River BasinGibsonton Road, Monessen, PA 15062 15062 · NAICS 237990 ENDIST Pittsburgh No set-aside

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors