This document is an amendment to Solicitation W912QR24R0008 for the construction of a new Ground Transport Equipment Building (GTEB) for the Ground Vehicle Systems Center at Detroit Arsenal (DTA) in Warren, MI. The key details are:
The solicitation has been modified to replace several specification sections and drawings in their entirety. The wage determinations MI20240065 and MI20240091 have also been updated with the latest revisions. The submission date for proposals remains April 10, 2024 at 2:00 pm ET. The estimated construction cost for this project is between $25,000,000 and $100,000,000. This is a 100% full and open (unrestricted) procurement that requires the HUBZone 10% price evaluation preference.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Solicitation W912QR24R0008 for the Construction of a new Ground Transport Equipment Building (GTEB) for the Ground Vehicle Systems Center at Detroit Arsenal (DTA), located in Warren, MI is hereby modif ied as follows:
SEE CONTINUATION PAGE
1. CONTRACT ID CODE PAGE OF PAGES
1 19
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912QR24R0008
X 9B. DATED (SEE ITEM 11)
11-Jan-2024
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO.
5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
05-Apr-2024
CODE
U. S. ARMY ENGINEER DISTRICT, LOUISVILLE
600 DR. MARTIN LUTHER KING, JR. PLACE
ROOM 821
LOUISVILLE KY 40202-2239
W912QR 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912QR24R0008_Specs-0005
W912QR24R0008
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
AMENDMENT 0005
Solicitation W912QR24R0008 for the Construction of a new Ground Transport Equipment Building (GTEB) for the Ground Vehicle Systems Center at Detroit Arsenal (DTA), located in Warren, MI is hereby modified as follows:
a. The following Specification sections have been replaced in their entirety:
03 30 00 CAST-IN-PLACE CONCRETE
07 11 13 BITUMINOUS DAMPPROOFING
b. The following Drawings have been replaced in their entirety:
Drawing No. Drawing Name
G-002 SHEET INDEX
GI001 CODE ANALYSIS
c. Wage Determination MI20240065, 1/5/2024, Revision 0 is hereby replaced in its entirety with the current revision dated 4/5/2024, Revision 1 and must be adhered to.
d. Wage Determination MI20240091, 1/19/2024, Revision 1 is hereby replaced in its entirety with the current revision dated 4/5/2024, Revision 2 and must be adhered to.
e. The submission date remains the same, 10 April 2024 at 2:00 pm ET. Acknowledgment of receipt of this amendment and proposals are due at that time.
SECTION 00 73 00 - SUPPLEMENTARY CONDITIONS
The following have been modified:
WAGE RATES - MI20240065 HEAVY
"General Decision Number: MI20240065 04/05/2024
Superseded General Decision Number: MI20230065
State: Michigan
Construction Type: Heavy
County: Macomb County in Michigan.
Heavy, Includes Water and Sewer Lines, Excavation (Excludes Hazardous Waste Removal; Coal, Oil, Gas, Duct and other similar Pipeline Construction)
Note: Contracts subject to the Davis-Bacon Act are generally required to pay at least the applicable minimum wage rate required under Executive Order 14026 or Executive Order 13658.
Please note that these Executive Orders apply to covered contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but do not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(1).
|If the contract is entered |. Executive Order 14026 | |into on or after January 30, | generally applies to the | |2022, or the contract is | contract. | |renewed or extended (e.g., an |. The contractor must pay | |option is exercised) on or | all covered workers at | |after January 30, 2022: | least $17.20 per hour (or | | | the applicable wage rate | | | listed on this wage | | | determination, if it is | | | higher) for all hours | | | spent performing on the | | | contract in 2024. | |If the contract was awarded on|. Executive Order 13658 | |or between January 1, 2015 and| generally applies to the | |January 29, 2022, and the | contract. | |contract is not renewed or |. The contractor must pay all| |extended on or after January | covered workers at least | |30, 2022: | $12.90 per hour (or the | | | applicable wage rate listed| | | on this wage determination,| | | if it is higher) for all | | | hours spent performing on | | | that contract in 2024. |
The applicable Executive Order minimum wage rate will be adjusted annually. If this contract is covered by one of the Executive Orders and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must still submit a conformance request.
Additional information on contractor requirements and worker protections under the Executive Orders is available at http://www.dol.gov/whd/govcontracts.
Modification Number Publication Date 0 01/05/2024 1 04/05/2024
* BOIL0169-003 01/01/2024
Rates Fringes
BOILERMAKER......................$ 39.65 35.68
CARP0687-008 06/01/2023
Rates Fringes
CARPENTER, Includes Form Work....$ 38.48 30.22
PILEDRIVERMAN....................$ 34.20 28.82
ELEC0017-003 06/01/2023
Rates Fringes
LINE CONSTRUCTION:
Linemen/Cable Splicer............$ 52.02 7.20+29%
ELEC0058-007 06/28/2022
Rates Fringes
ELECTRICIAN......................$ 48.52 26.11
ENGI0325-019 09/01/2023
POWER EQUIPMENT OPERATORS: Underground Construction (Including Sewer)
Rates Fringes
POWER EQUIPMENT OPERATOR
GROUP 1.....................$ 41.08 25.25
GROUP 2.....................$ 36.25 25.25
GROUP 3.....................$ 35.52 25.25
GROUP 4.....................$ 34.95 25.25
POWER EQUIPMENT OPERATOR CLASSIFICATIONS
GROUP 1: Backhoe/ Excavator, Boring Machine, Bulldozer, Crane, Grader/ Blade, Loader, Roller, Scraper, Trencher (over 8 ft. digging capacity)
GROUP 2: Trencher (8-ft digging capacity and smaller)
GROUP 3: Boom Truck (non-swinging, non- powered type boom)
GROUP 4: Broom/ Sweeper, Fork Truck, Tractor, Bobcat/ Skid Steer /Skid Loader
ENGI0326-008 06/01/2023
EXCLUDES UNDERGROUND CONSTRUCTION
Rates Fringes
OPERATOR: Power Equipment
GROUP 1....................$ 47.79 25.35
GROUP 2....................$ 46.29 25.35
GROUP 3....................$ 44.79 25.35
GROUP 4....................$ 44.49 25.35
GROUP 5....................$ 43.67 25.35
GROUP 6....................$ 42.81 25.35
GROUP 7....................$ 41.84 25.35
GROUP 8....................$ 40.13 25.35
GROUP 9....................$ 31.79 25.35
FOOTNOTES: Tower cranes: to be paid the crane operator rate determined by the combined length of the mast and the boom.
POWER EQUIPMENT OPERATOR CLASSIFICATIONS
GROUP 1: Crane with boom & jib or leads 400' or longer
GROUP 2: Crane with boom & jib or leads 300' or longer
GROUP 3: Crane with boom & jib or leads 220' or longer
GROUP 4: Crane with boom & jib or leads 140' or longer
GROUP 5: Crane with boom & jib or leads 120' or longer
GROUP 6: Regular crane operator
GROUP 7: Backhoe/Excavator, Bobcat/Skid Loader, Boring Machine, Broom/Sweeper, Bulldozer, Grader/Blade, Loader, Roller, Scraper, Tractor, Trencher
GROUP 8: Forklift
GROUP 9: Oiler
IRON0025-006 06/01/2023
Rates Fringes
IRONWORKER
Reinforcing.................$ 31.43 34.77 Structural..................$ 34.85 40.42
LABO0334-009 06/01/2023
EXCLUDES OPEN CUT CONSTRUCTION
Rates Fringes
Landscape Laborer
GROUP 1.....................$ 25.97 8.60
GROUP 2.....................$ 23.75 8.60
LANDSCAPE LABORER CLASSIFICATIONS
GROUP 1: Landscape specialist, including air, gas and diesel equipment operator, lawn sprinkler installer and skidsteer (or equivalent)
GROUP 2: Landscape laborer: small power tool operator, material mover, truck driver and lawn sprinkler installer tender
* LABO0334-021 09/01/2022
SCOPE OF WORK:
OPEN CUT CONSTRUCTION: Excavation of earth and sewer, utilities, and improvements, including underground piping/conduit (including inspection, cleaning, restoration, and relining)
LABORER
(1) Common or General.......$ 23.87 16.95
(2) Mason Tender- Cement/Concrete.............$ 23.98 16.95
(4) Grade Checker...........$ 24.11 16.95
(5) Pipelayer...............$ 24.17 16.95
(7) Landscape...............$ 16.79 ** 16.80
LABO1191-004 06/01/2023
EXCLUDES OPEN CUT CONSTRUCTION
Rates Fringes
Laborers:
Common or General; Grade Checker; Mason Tender - Cement/Concrete; Pipelayer..$ 32.95 16.95
PAIN0022-005 07/01/2008
Rates Fringes
PAINTER
Brush & Roller..............$ 25.06 14.75 Spray.......................$ 25.86 14.75
PLAS0067-002 04/01/2014
Rates Fringes
CEMENT MASON/CONCRETE FINISHER...$ 30.63 14.07
PLUM0098-005 06/01/2019
Rates Fringes
PLUMBER..........................$ 35.77 35.13
PLUM0636-002 06/05/2017
Rates Fringes
PIPEFITTER.......................$ 40.41 29.35
TEAM0007-006 06/01/2023
Rates Fringes
TRUCK DRIVER
Dump Truck under 8 cu.
yds.; Tractor Haul Truck....$ 31.40 .75 + a+b Dump Truck, 8 cu. yds. and over........................$ 31.50 .75 + a+b Lowboy/Semi-Trailer Truck...$ 31.65 .75+ a+b
FOOTNOTE:
a. $470.70 per week.
b. $68.70 daily.
SUMI2010-063 11/09/2010
Rates Fringes
TRUCK DRIVER: Off the Road Truck............................$ 20.82 3.69
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
** Workers in this classification may be entitled to a higher minimum wage under Executive Order 14026 ($17.20) or 13658 ($12.90). Please see the Note at the top of the wage determination for more information. Please also note that the minimum wage requirements of Executive Order 14026 are not currently being enforced as to any contract or subcontract to which the states of Texas, Louisiana, or Mississippi, including their agencies, are a party.
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at https://www.dol.gov/agencies/whd/government-contracts.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (iii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or ""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.
Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.
Survey Rate Identifiers
Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a new survey is conducted.
Union Average Rate Identifiers
Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.
A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour National Office because National Office has responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION"
WAGE RATES MI20240091 - BLDG
"General Decision Number: MI20240091 04/05/2024
Superseded General Decision Number: MI20230091
State: Michigan
Construction Type: Building
County: Macomb County in Michigan.
BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).
Note: Contracts subject to the Davis-Bacon Act are generally required to pay at least the applicable minimum wage rate required under Executive Order 14026 or Executive Order 13658.
Please note that these Executive Orders apply to covered contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but do not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(1).
|If the contract is entered |. Executive Order 14026 | |into on or after January 30, | generally applies to the | |2022, or the contract is | contract. | |renewed or extended (e.g., an |. The contractor must pay | |option is exercised) on or | all covered workers at | |after January 30, 2022: | least $17.20 per hour (or | | | the applicable wage rate | | | listed on this wage | | | determination, if it is | | | higher) for all hours | | | spent performing on the | | | contract in 2024. | |If the contract was awarded on|. Executive Order 13658 | |or between January 1, 2015 and| generally applies to the | |January 29, 2022, and the | contract. | |contract is not renewed or |. The contractor must pay all| |extended on or after January | covered workers at least | |30, 2022: | $12.90 per hour (or the | | | applicable wage rate listed| | | on this wage determination,| | | if it is higher) for all | | | hours spent performing on | | | that contract in 2024. |
The applicable Executive Order minimum wage rate will be adjusted annually. If this contract is covered by one of the Executive Orders and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must still submit a conformance request.
Additional information on contractor requirements and worker protections under the Executive Orders is available at http://www.dol.gov/whd/govcontracts.
Modification Number Publication Date 0 01/05/2024 1 01/19/2024 2 04/05/2024
* ASBE0025-002 06/01/2023
Rates Fringes
ASBESTOS WORKER/HEAT & FROST
INSULATOR........................$ 37.98 34.27
* BOIL0169-001 01/01/2024
Rates Fringes
BOILERMAKER......................$ 39.65 35.68
BRMI0001-001 06/01/2022
Rates Fringes
BRICKLAYER.......................$ 38.87 25.18
TILE FINISHER....................$ 30.75 22.67
TILE SETTER......................$ 37.88 22.67
CARP0687-003 06/01/2023
Rates Fringes
CARPENTER (Including Acoustical Ceiling Installation, Drywall Hanging, Form Work, Metal Stud Installation & Scaffold Building)........................$ 40.98 30.22
CARP1045-001 06/01/2023
Rates Fringes
CARPENTER (Floor Layer - Carpet, Resilient, & Vinyl Flooring)........................$ 34.00 27.53
CARP1102-002 06/01/2023
MILLWRIGHT.......................$ 35.47 39.24
ELEC0058-001 07/21/2022
Rates Fringes
ELECTRICIAN (Low Voltage Wiring and Installation of Alarms) Installer...................$ 30.12 14.57 Technician..................$ 39.33 14.95
ELECTRICIAN......................$ 48.52 26.11
ELEV0036-002 01/01/2023
Rates Fringes
ELEVATOR MECHANIC................$ 59.82 37.335+a+b
FOOTNOTES:
A. PAID HOLIDAYS: New Years Day; Memorial Day; Independence Day; Labor Day; Veterans' Day; Thanksgiving Day; the Friday after Thanksgiving Day; and Christmas Day.
B. Employer contributes 8% basic hourly rate for 5 years or more of service of 6% basic hourly rate for 6 months to 5 years of service as vacation pay credit.
ENGI0324-017 06/01/2023
Rates Fringes
OPERATOR: Power Equipment
GROUP 1....................$ 47.49 25.35
GROUP 2....................$ 46.29 25.35
GROUP 3....................$ 44.79 25.35
GROUP 4....................$ 44.49 25.35
GROUP 5....................$ 43.67 25.35
GROUP 6....................$ 42.81 25.35
GROUP 7....................$ 41.84 25.35
GROUP 8....................$ 40.13 25.35
GROUP 9....................$ 31.79 25.35
FOOTNOTES:
Tower cranes: to be paid the crane operator rate determined by the combined length of the mast and the boom. If the worker must climb 50 ft. or more to the work station, $.25 per hour additional.
Derrick and cranes where the operator must climb 50 ft. or more to the work station, $.25 per hour additional to the applicable crane operator rate.
POWER EQUIPMENT OPERATOR CLASSIFICATIONS
GROUP 1: Crane with boom and jib or leads 400' or longer
GROUP 2: Crane with boom and jib or leads 300' or longer
GROUP 3: Crane with boom and jib or leads 220' or longer
GROUP 4: Crane with boom and jib or leads 140' or longer
GROUP 5: Crane with boom and jib or leads 120' or longer
GROUP 6: Regular crane operator, and concrete pump with boom operator
GROUP 7: Backhoe/Excavator/Trackhoe, bobcat/skid Loader, broom/sweeper, bulldozer, grader/blade, highlift, hoist, loader, roller, scraper, tractor & trencher
GROUP 8: Forklift & extend-a-boom forklift
GROUP 9: Oiler
IRON0025-019 06/01/2022
Rates Fringes
IRONWORKER
REINFORCING.................$ 31.43 34.77
STRUCTURAL..................$ 34.85 40.42
IRON0025-022 06/01/2022
Rates Fringes
IRONWORKER STRUCTURAL (Metal Building Erection Only)..........$ 25.81 26.43
LABO0259-002 08/01/2023
Rates Fringes
LABORER: Asbestos Abatement (Removal from Floors, Walls & Ceilings)........................$ 34.53 15.47
LABO0334-005 06/01/2023
Rates Fringes
LABORER: Landscape & Irrigation
GROUP 1.....................$ 25.97 8.60
GROUP 2.....................$ 23.75 8.60
CLASSIFICATIONS
GROUP 1: Landscape specialist, including air, gas and diesel equipment operator, lawn sprinkler installer, skidsteer (or equivalent)
GROUP 2: Landscape laborer: small power tool operator, material mover, truck driver and lawn sprinkler installer tender
LABO1191-002 06/01/2023
Rates Fringes
LABORER
Common or General; Grade Checker; Mason Tender - Brick/Cement/Concrete;
Pipelayer; Sandblaster......$ 32.95 16.95
PAIN0022-003 06/01/2022
Rates Fringes
PAINTER: Brush and Roller.......$ 32.85 20.41 PAINTER: Drywall Finishing/Taping.................$ 32.85 20.41 PAINTER: Spray..................$ 26.86 17.66
PAIN0357-002 06/01/2023
Rates Fringes
GLAZIER..........................$ 38.66 20.98
PAID HOLIDAYS: New Year's Day, Decoration Day, Fourth of July, Labor Day, Thanksgiving Day and Christmas Day;
provided that the employee has worked the last full regular scheduled work day prior to the holiday, and the first full regular scheduled work day following the holiday, provided the employee is physically able to work.
PLAS0067-001 04/01/2014
Rates Fringes
CEMENT MASON/CONCRETE FINISHER...$ 30.63 14.07
PLAS0067-004 04/01/2014
Rates Fringes
PLASTERER........................$ 30.63 14.07
PLUM0098-001 06/01/2023
Rates Fringes
PLUMBER, Excludes HVAC Pipe and Unit Installation............$ 35.79 28.28
PLUM0636-003 06/05/2023
PIPEFITTER, Includes HVAC Pipe and Unit Installation.......$ 44.70 35.37
ROOF0149-001 07/01/2021
Rates Fringes
ROOFER...........................$ 38.16 25.91
SFMI0704-001 08/01/2023
Rates Fringes
SPRINKLER FITTER (Fire Sprinklers)......................$ 49.16 32.86
SHEE0080-004 06/01/2022
Rates Fringes
SHEET METAL WORKER (Including HVAC Duct Installation;
Excluding HVAC System Installation)....................$ 47.64 26.15
TEAM0247-002 06/01/2023
Rates Fringes
TRUCK DRIVER
GROUP 1
Dump; Flatbed; Pickup......$ 29.82 0.70+a+b
GROUP 2
Semi.......................$ 29.97 0.70+a+b
GROUP 3
Lowboy.....................$ 30.07 0.70+a+b
PAID HOLIDAYS: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day and Christmas Day. If any of the above holidays fall on a Sunday, the following Monday shall be considered the holiday and, if work is performed, the rate shall be double time.
FOOTNOTE:
a. $456.70 per week, plus $67.10 per day.
* SUMI2011-016 02/01/2011
INSTALLER - OVERHEAD DOOR........$ 27.98 0.00
IRONWORKER, ORNAMENTAL...........$ 18.48 7.93
TRUCK DRIVER: Tractor Haul Truck............................$ 13.57 ** 1.18
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
** Workers in this classification may be entitled to a higher minimum wage under Executive Order 14026 ($17.20) or 13658 ($12.90). Please see the Note at the top of the wage determination for more information. Please also note that the minimum wage requirements of Executive Order 14026 are not currently being enforced as to any contract or subcontract to which the states of Texas, Louisiana, or Mississippi, including their agencies, are a party.
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at https://www.dol.gov/agencies/whd/government-contracts.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (iii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or ""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.
Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.
Survey Rate Identifiers
Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a new survey is conducted.
Union Average Rate Identifiers
Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.
A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour National Office because National Office has responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION"
(End of Summary of Changes)
P2#: 500060 - Ground Transportation Equipment Building Detroit Arsenal, MI
SECTION 03 30 00
CAST-IN-PLACE CONCRETE
02/19, CHG 3: 11/21
Amendment 0005 03 April 2024
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AMERICAN CONCRETE INSTITUTE (ACI)
ACI 117 (2010; Errata 2011) Specifications for Tolerances for Concrete Construction and Materials and Commentary
ACI 121R (2008) Guide for Concrete Construction Quality Systems in Conformance with ISO
ACI 301 (2016) Specifications for Structural Concrete
ACI 302.1R (2015) Guide for Concrete Floor and Slab Construction
ACI 304.2R (2017) Guide to Placing Concrete by Pumping Methods
ACI 304R (2000; R 2009) Guide for Measuring, Mixing, Transporting, and Placing Concrete
ACI 305.1 (2014) Specification for Hot Weather Concreting
ACI 305R (2020) Guide to Hot Weather Concreting
ACI 306.1 (1990; R 2002) Standard Specification for Cold Weather Concreting
ACI 306R (2016) Guide to Cold Weather Concreting
ACI 308.1 (2011) Specification for Curing Concrete
ACI 347R (2014; Errata 1 2017) Guide to Formwork for Concrete
ACI SP-2 (2007; Abstract: 10th Edition) ACI Manual of Concrete Inspection
ACI SP-15 (2011) Field Reference Manual: Standard Specifications for Structural Concrete ACI 301-05 with Selected ACI References
SECTION 03 30 00 Page 1 Certified Final Submittal-Amendment 0005
AMERICAN HARDBOARD ASSOCIATION (AHA)
AHA A135.4 (1995; R 2004) Basic Hardboard
AMERICAN WELDING SOCIETY (AWS)
AWS D1.4/D1.4M (2011) Structural Welding Code - Reinforcing Steel
ASTM INTERNATIONAL (ASTM)
ASTM A36/A36M (2019) Standard Specification for Carbon Structural Steel
ASTM A184/A184M (2019) Standard Specification for Welded Deformed Steel Bar Mats for Concrete Reinforcement
ASTM A615/A615M (2020) Standard Specification for Deformed and Plain Carbon-Steel Bars for Concrete Reinforcement
ASTM A706/A706M (2016) Standard Specification for Low-Alloy Steel Deformed and Plain Bars for Concrete Reinforcement
ASTM A934/A934M (2016) Standard Specification for Epoxy-Coated Prefabricated Steel Reinforcing Bars
ASTM A970/A970M (2018) Standard Specification for Headed Steel Bars for Concrete Reinforcement
ASTM A1044/A1044M (2016a) Standard Specification for Steel Stud Assemblies for Shear Reinforcement of Concrete
ASTM A1064/A1064M (2017) Standard Specification for Carbon-Steel Wire and Welded Wire Reinforcement, Plain and Deformed, for Concrete
ASTM C31/C31M (2021a) Standard Practice for Making and Curing Concrete Test Specimens in the Field
ASTM C33/C33M (2018) Standard Specification for Concrete Aggregates
ASTM C39/C39M (2021) Standard Test Method for Compressive Strength of Cylindrical Concrete Specimens
ASTM C42/C42M (2020) Standard Test Method for Obtaining and Testing Drilled Cores and Sawed Beams of Concrete
ASTM C78/C78M (2021) Standard Test Method for Flexural Strength of Concrete (Using Simple Beam
SECTION 03 30 00 Page 2 with Third-Point Loading)
ASTM C94/C94M (2021a) Standard Specification for Ready-Mixed Concrete
ASTM C136/C136M (2019) Standard Test Method for Sieve Analysis of Fine and Coarse Aggregates
ASTM C138/C138M (2017a) Standard Test Method for Density (Unit Weight), Yield, and Air Content (Gravimetric) of Concrete
ASTM C143/C143M (2020) Standard Test Method for Slump of Hydraulic-Cement Concrete
ASTM C150/C150M (2021) Standard Specification for Portland Cement
ASTM C172/C172M (2017) Standard Practice for Sampling Freshly Mixed Concrete
ASTM C173/C173M (2016) Standard Test Method for Air Content of Freshly Mixed Concrete by the Volumetric Method
ASTM C231/C231M (2017a) Standard Test Method for Air Content of Freshly Mixed Concrete by the Pressure Method
ASTM C260/C260M (2010a; R 2016) Standard Specification for Air-Entraining Admixtures for Concrete
ASTM C311/C311M (2018) Standard Test Methods for Sampling and Testing Fly Ash or Natural Pozzolans for Use in Portland-Cement Concrete
ASTM C494/C494M (2019) Standard Specification for Chemical Admixtures for Concrete
ASTM C567/C567M (2019) Determining Density of Structural Lightweight Concrete
ASTM C595/C595M (2021) Standard Specification for Blended Hydraulic Cements
ASTM C618 (2019) Standard Specification for Coal Fly Ash and Raw or Calcined Natural Pozzolan for Use in Concrete
ASTM C873/C873M (2015) Standard Test Method for Compressive Strength of Concrete Cylinders Cast in Place in Cylindrical Molds
ASTM C920 (2018) Standard Specification for Elastomeric Joint Sealants
ASTM C989/C989M (2018a) Standard Specification for Slag Cement for Use in Concrete and Mortars
SECTION 03 30 00 Page 3
ASTM C1017/C1017M (2013; E 2015) Standard Specification for Chemical Admixtures for Use in Producing Flowing Concrete
ASTM C1074 (2019) Standard Practice for Estimating Concrete Strength by the Maturity Method
ASTM C1077 (2017) Standard Practice for Agencies Testing Concrete and Concrete Aggregates for Use in Construction and Criteria for Testing Agency Evaluation
ASTM C1107/C1107M (2020) Standard Specification for Packaged Dry, Hydraulic-Cement Grout (Nonshrink)
ASTM C1218/C1218M (2020c) Standard Test Method for Water-Soluble Chloride in Mortar and Concrete
ASTM C1260 (2021) Standard Test Method for Potential Alkali Reactivity of Aggregates (Mortar-Bar Method)
ASTM C1293 (2008; R 2015) Standard Test Method for Determination of Length Change of Concrete Due to Alkali-Silica Reaction
ASTM C1567 (2021) Standard Test Method for Potential Alkali-Silica Reactivity of Combinations of Cementitious Materials and Aggregate (Accelerated Mortar-Bar Method)
ASTM C1602/C1602M (2018) Standard Specification for Mixing Water Used in Production of Hydraulic Cement Concrete
ASTM C1778 (2016) Standard Guide for Reducing the Risk of Deleterious Alkali-Aggregate Reaction in Concrete
ASTM D412 (2016) Standard Test Methods for Vulcanized Rubber and Thermoplastic Elastomers - Tension
ASTM D471 (2016a) Standard Test Method for Rubber Property - Effect of Liquids
ASTM D1751 (2018) Standard Specification for Preformed Expansion Joint Filler for Concrete Paving and Structural Construction (Nonextruding and Resilient Bituminous Types)
ASTM D2628 (1991; R 2016) Standard Specification for Preformed Polychloroprene Elastomeric Joint Seals for Concrete Pavements
ASTM D2835 (1989; R 2017) Standard Specification for Lubricant for Installation of Preformed
SECTION 03 30 00 Page 4
Compression Seals in Concrete Pavements
ASTM D5759 (2012; R 2020) Characterization of Coal Fly Ash and Clean Coal Combustion Fly Ash for Potential Uses
ASTM D6690 (2015) Standard Specification for Joint and Crack Sealants, Hot Applied, for Concrete and Asphalt Pavements
ASTM D6866 (2022) Standard Test Methods for Determining the Biobased Content of Solid, Liquid, and Gaseous Samples Using Radiocarbon Analysis
ASTM E96/E96M (2016) Standard Test Methods for Water Vapor Transmission of Materials
ASTM E329 (2021) Standard Specification for Agencies Engaged in Construction Inspection, Testing, or Special Inspection
ASTM E1155 (2020) Standard Test Method for Determining Floor Flatness and Floor Levelness Numbers
ASTM E1643 (2018a) Standard Practice for Selection, Design, Installation, and Inspection of Water Vapor Retarders Used in Contact with Earth or Granular Fill Under Concrete Slabs
ASTM E1745 (2017) Standard Specification for Water Vapor Retarders Used in Contact with Soil or Granular Fill under Concrete Slabs
CONCRETE REINFORCING STEEL INSTITUTE (CRSI)
CRSI 10MSP (2018) Manual of Standard Practice
CRSI RB4.1 (2016) Supports for Reinforcement Used in Concrete
FOREST STEWARDSHIP COUNCIL (FSC)
FSC STD 01 001 (2015) Principles and Criteria for Forest Stewardship
NATIONAL INSTITUTE OF STANDARDS AND TECHNOLOGY (NIST)
NIST PS 1 (2009) DOC Voluntary Product Standard PS 1-07, Structural Plywood
U.S. ARMY CORPS OF ENGINEERS (USACE)
COE CRD-C 104 (1980) Method of Calculation of the Fineness Modulus of Aggregate
COE CRD-C 513 (1974) Corps of Engineers Specifications for Rubber Waterstops
SECTION 03 30 00 Page 5
COE CRD-C 572 (1974) Corps of Engineers Specifications for Polyvinylchloride Waterstops
U.S. GENERAL SERVICES ADMINISTRATION (GSA)
FS SS-S-200 (Rev E; Am 1; Notice 1) Sealant, Joint, Two-Component, Jet-Blast-Resistant, Cold-Applied, for Portland Cement Concrete Pavement
U.S. GREEN BUILDING COUNCIL (USGBC)
LEED v4 BDC Ref Guide (2013; R 2020) USGBC LEED Reference Guide for Building Design and Construction, v4
LEED v4.1 BDC Ref Guide (2023) LEED v4.1 Building Design and Construction Reference Guide
1.2 DEFINITIONS
a. "Cementitious material" as used herein must include all portland cement, pozzolan, fly ash, and slag cement.
b. "Exposed to public view" means situated so that it can be seen from eye level from a public location after completion of the building. A public location is accessible to persons not responsible for operation or maintenance of the building.
c. "Chemical admixtures" are materials in the form of powder or fluids that are added to the concrete to give it certain characteristics not obtainable with plain concrete mixes.
d. "Supplementary cementing materials" (SCM) include coal fly ash, slag cement, natural or calcined pozzolans, and ultra-fine coal ash when used in such proportions to replace the portland cement that result in improvement to sustainability and durability and reduced cost.
e. "Design strength" (f'c) is the specified compressive strength of concrete at time(s) specified in this section to meet structural design criteria.
f. "Mass Concrete" is any concrete system that approaches a maximum temperature of 158 degrees F within the first 72 hours of placement.
In addition, it includes all concrete elements with a section thickness of 3 feet or more regardless of temperature.
g. "Mixture proportioning" is the process of designing concrete mixture proportions to enable it to meet the strength, service life and constructability requirements of the project while minimizing the initial and life-cycle cost.
h. "Mixture proportions" are the masses or volumes of individual ingredients used to make a unit measure (cubic meter or cubic yard) of concrete.
i. "Pozzolan" is a siliceous or siliceous and aluminous material, which in itself possesses little or no cementitious value but will, in finely divided form and in the presence of moisture, chemically react
SECTION 03 30 00 Page 6 with calcium hydroxide at ordinary temperatures to form compounds possessing cementitious properties.
j. "Workability (or consistence)" is the ability of a fresh (plastic) concrete mix to fill the form/mould properly with the desired work (vibration) and without reducing the concrete's quality. Workability depends on water content, chemical admixtures, aggregate (shape and size distribution), cementitious content and age (level of hydration).
1.3 SUSTAINABILITY REPORTING
Work of this section is intended to contribute to the achievement of, or compliance with, the requirements of the Guiding Principles Validation and LEED Prerequisites and attempted Credits. Refer to Section 01 33 29.00 06 SUSTAINABILITY REPORTING for specific documentation requirements and list of Prerequisites, attempted Credits and LEED version.
Comply with product, material content, performance criteria, activity, documentation, and other technical requirements as described in the LEED v4 BDC Ref Guide or LEED v4.1 BDC Ref Guide as applicable.
Collect, organize, and submit product data, drawings, diagrams, photos and cost information necessary to demonstrate compliance with LEED v4 BDC Ref Guide or LEED v4.1 BDC Ref Guide requirements as applicable.
Data collection shall commence with the notice to proceed and will only be deemed complete upon acceptance of the Final Sustainability Notebook and LEED Online submission by the Contracting Officer, the LEED Project Administrator, and the Green Building Certification Institute.
Amdt. #0005******************************************************************
1.4 SUBMITTALS
Government approval is required for submittals with a "G" or "S" classification. Submittals not having a "G" or "S" classification are for information only. When used, a code following the "G" classification identifies the office that will review the submittal for the Government.
Submit the following in accordance with Section 01 33 00 SUBMITTAL
PROCEDURES:
SD-01 Preconstruction Submittals
Concrete Placement, Jointing And Curing Plan; G
Quality Control Plan; G
Quality Control Personnel Certifications; G
Quality Control Organizational Chart
Laboratory Accreditation; G
Form Removal Schedule; G Maturity Method Data
SD-02 Shop Drawings
Formwork
SECTION 03 30 00 Page 7
Reinforcing Steel; G, AE
SD-03 Product Data
Joint Sealants; S
Joint Filler; G, AE, Formwork Materials
Cementitious Materials; S
Vapor Retarder System
Concrete Curing Materials
Reinforcement; S
Liquid Chemical Floor Hardeners and Sealers; S
Admixtures
Mechanical Reinforcing Bar Connectors
Waterstops
Biodegradable Form Release Agent
Pumping Concrete
Finishing Plan
Nonshrink Grout
Environmental Product Declarations; S
Embodied Carbon Optimization Report/Action Plan; S
Extended Producer Responsibility; S
Bio-Based Materials; S
Recycled Content Materials; S
Local/Regional Materials; S
Low-Emitting Materials; S
Material Ingredient Reporting; S
Epoxy Bonding Agent; G, AE
SD-04 Samples
Slab Finish Sample
SD-05 Design Data
SECTION 03 30 00 Page 8
Concrete Mix Design; G, AE
Formwork Calculations
T-Bed Flooring System Design Package; G, AE
SD-06 Test Reports
Concrete Mix Design; G, AE
Fly Ash
Pozzolan
Slag Cement
Aggregates
Tolerance Report; G
Compressive Strength Tests; G, AE
Unit Weight of Structural Concrete
Chloride Ion Concentration
Air Content
Slump Tests
Water
SD-07 Certificates
Reinforcing Bars
Welder Qualifications
VOC Content for Form Release Agents, Curing Compounds, and Concrete Penetrating Sealers; S
Safety Data Sheets
Certified Wood; S
Field Testing Technician and Testing Agency
SD-08 Manufacturer's Instructions
Liquid Chemical Floor Hardeners and Sealers
Joint Sealants
Curing Compound
******************************************************************Amdt. #0005
SECTION 03 30 00 Page 9
1.5 MODIFICATION OF REFERENCES
Accomplish work in accordance with ACI publications except as modified herein. Consider the advisory or recommended provisions to be mandatory.
Interpret reference to the "Building Official," the "Structural Engineer," and the "Architect/Engineer" to mean the Contracting Officer.
1.6 DELIVERY, STORAGE, AND HANDLING
Follow ACI 301 , ACI 304R and ASTM A934/A934M requirements and recommendations. Do not deliver concrete until vapor retarder system, forms, reinforcement, embedded items, and chamfer strips are in place and ready for concrete placement. Do not store concrete curing compounds or sealers with materials that have a high capacity to adsorb volatile organic compound (VOC) emissions. Do not store concrete curing compounds or sealers in occupied spaces.
1.6.1 Reinforcement
Store reinforcement of different sizes and shapes in separate piles or racks raised above the ground to avoid excessive rusting. Protect from contaminants such as grease, oil, and dirt. Ensure bar sizes can be accurately identified after bundles are broken and tags removed.
1.7 QUALITY ASSURANCE
1.7.1 Design Data
1.7.1.1 Formwork Calculations
ACI 347R . Include design calculations indicating arrangement of forms, sizes and grades of supports (lumber), panels, and related components.
Furnish drawings and calculations of shoring and re-shoring methods proposed for floor and roof slabs, spandrel beams, and other horizontal concrete members. Calculations must indicate concrete pressure with both live and dead loads, along with material types.
1.7.1.2 Concrete Mix Design
Sixty days minimum prior to concrete placement, submit a mix design for each strength and type of concrete. Submit a complete list of materials including type; brand; source and amount of cement, supplementary cementitious materials, , and admixtures; and applicable reference specifications. Submit mill test and all other test for cement, supplementary cementitious materials, aggregates, and admixtures. Provide documentation of maximum nominal aggregate size, gradation analysis, percentage retained and passing sieve, and a graph of percentage retained verses sieve size. Provide mix proportion data using at least three different water-cementitious material ratios for each type of mixture, which produce a range of strength encompassing those required for each type of concrete required. If source material changes, resubmit mix proportion data using revised source material. Provide only materials that have been proven by trial mix studies to meet the requirements of this specification, unless otherwise approved in writing by the Contracting Officer. Indicate clearly in the submittal where each mix design is used when more than one mix design is submitted. Resubmit data on concrete components if the qualities or source of components changes.
For previously approved concrete mix designs used within the past twelve months, the previous mix design may be re-submitted without further trial
SECTION 03 30 00 Page 10 batch testing if accompanied by material test data conducted within the last six months. Obtain mix design approval from the contracting officer prior to concrete placement.
1.7.2 Shop Drawings
1.7.2.1 Formwork
Drawings showing details of formwork…