This document provides details for a federal construction contract opportunity. The U.S. Army Corps of Engineers Engineering District Louisville is soliciting proposals for the construction of a new Ground Transport Equipment Building at Detroit Arsenal in Warren, Michigan. The estimated cost of construction is between $25 million and $100 million. The project involves a single-phase design-bid-build approach. The NAICS code is 236220 with a size standard of $45 million. Proposals are due in accordance with FAR Clause 52.236-27 ALT I. The solicitation requires the HUBZone 10% price evaluation preference.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E
SHEET ID
US Army Corps of Engineers
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
P2
LO
U
IS
VI
LL
E
D
IS
TR
IC
T
D
R M
AR
TI
N L
U
TH
ER
J
R P
L
LO
U
IS
VI
LL
E, K
Y
SE
PT
EM
BE
R
9, D
ET
R O
IT
A
R
SE
N
AL
, M I
G R
O U
N D
T R
AN
SP
O R
TA
TI
O N
E Q
U
IP
M
EN
T
BU
IL
D
IN
G
FY
Plot Date: File Path:
C
ER
TI
FI
ED
F
IN
AL
S U
BM
IT
TA
L
GENERAL NOTES
1. UNDERGROUND FACILITIES, STRUCTURES AND UTILITIES HAVE BEEN PLOTTED FROM AVAILABLE SURVEYS AND RECORDS. THEREFORE, THEIR LOCATION MUST BE CONSIDERED APPROXIMATE ONLY.
THERE MAY BE OTHERS, THE EXISTENCE OF WHICH IS NOT PRESENTLY KNOWN. BEFORE STARTING ANY WORK, THE CONTRACTOR SHALL POTHOLE TO LOCATE AND PROTECT ALL EXISTING BURIED UTILITY LINES, WHETHER OR NOT SHOWN ON THESE DRAWINGS, DURING THE COURSE OF CONSTRUCTION.
REROUTING, DISCONNECTION, PROTECTION, ETC. OF ANY UTILITIES MUST BE COORDINATED BETWEEN
THE CONTRACTOR, UTILITY COMPANY, AND CONTRACTING OFFICER'S REPRESENTATIVE.
2. PRIOR TO THE START OF CONSTRUCTION THE CONTRACTOR SHALL INSTALL AND MAINTAIN DURING CONSTRUCTION ALL SEDIMENT CONTROL MEASURES AS NECESSARY TO RETAIN SEDIMENTS ON THE
SITE.
3. THE CONTRACTOR SHALL COORDINATE WORK EFFORTS WITH THE GOVERNMENT TO MINIMIZE TRAFFIC
INTERFERENCE AND OPERATIONS OF THE FACILITIES.
4. NO BLASTING OR BURNING IS ALLOWED ON THE PROJECT SITE, UNLESS OTHERWISE NOTED OR
DIRECTED BY THE GOVERNMENT.
DEMOLITION AND CLEARING NOTES:
1. DEMOLITION AND CLEARING OPERATIONS SHALL CONFORM TO APPLICABLE REGULATIONS RELATING TO
ENVIRONMENTAL REQUIREMENTS, DISPOSAL OF DEBRIS, AND USE OF HERBICIDES.
2. DEMOLITION WASTE SHALL BE DISPOSED OF IN A LEGAL MANNER. REMOVE DEMOLITION WASTE MATERIALS FROM PROJECT SITE AND DISPOSE OF WASTE IN AN EPA-APPROVED LANDFILL ACCEPTABLE TO AUTHORITIES HAVING JURISDICTION. DO NOT BURY OR BURN DEMOLITION WASTE ON-SITE.
3. ARRANGE DEMOLITION SCHEDULE SO AS NOT TO INTERFERE WITH GOVERNMENT'S ON-SITE
OPERATIONS OR OPERATIONS OF ADJACENT OCCUPIED BUILDINGS. PROVIDE NOT LESS THAN 72 HOURS
NOTICE OF ACTIVITIES THAT WILL AFFECT OPERATIONS OF ADJACENT OCCUPIED BUILDINGS.
4. PRIOR TO COMMENCEMENT OF SITE CLEARING OPERATIONS, VERIFY THE FOLLOWING:
a. TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES ARE IN PLACE AND IN WORKING ORDER.
b. EXISTING UNDERGROUND UTILITIES HAVE BEEN LOCATED AND MARKED IN THE FIELD.
c. EXISTING SITE IMPROVEMENTS AND UTILITIES TO REMAIN HAVE BEEN PROTECTED.
5. COORDINATE UTILITY DEMOLITION AND ABANDONMENT WITH DETROIT ARSENAL UTILITY GROUPS.
6. CONTRACTOR TO PROVIDE A MINIMUM OF 48-HOUR NOTICE TO ALL DETROIT ARSENAL UTILITY GROUPS
BEFORE DIGGING.
7. COORDINATE ALL SITE DEMOLITION WITH PROPOSED SITE IMPROVEMENTS, AND NEW UNDERGROUND
UTILITIES.
8. CONTRACTOR SHALL REPAIR ANY DAMAGED UTILITY LINES CAUSED BY HIS/HER ACTIVITIES. ALL WORK REQUIRED TO PERMANENTLY REPAIR THE UTILITY TO THE ENGINEER'S SATISFACTION SHALL BE AT THE
CONTRACTORS EXPENSE.
EARTHWORK NOTES:
1. COORDINATE ALL SITE IMPROVEMENTS WITH NEW UNDERGROUND UTILITIES.
2. IN THE EVENT OF ANY UNFORESEEN CONDITIONS THAT ARE ENCOUNTERED AND NOT COVERED BY THESE NOTES DURING GRADING OPERATIONS, THE ENGINEER SHALL BE IMMEDIATELY NOTIFIED FOR
DIRECTION.
3. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO PERFORM ALL NECESSARY CUTS AND FILLS WITHIN THE LIMITS OF THIS PROJECT AND RELATED OFF-SITE WORK SO AS TO ESTABLISH THE DESIRED
SUBGRADE, FINISH GRADES AND SLOPES SPECIFIED WITHIN THE PLANS.
4. ADEQUATE SHORING IS TO BE DESIGNED AND PROVIDED BY THE CONTRACTOR TO PREVENT
UNDERMINING OF ANY ADJACENT FEATURES OR FACILITIES AND/OR CAVING OF THE EXCAVATION. ALL
SHORING AND ASSOCIATED TEMPORARY STRUCTURES SHALL BE DESIGNED BY A LICENSED
PROFESSIONAL AND INSTALLED PURSUANT TO O.S.H.A. REQUIREMENTS.
UTILITY NOTES:
1. WHERE APPLICABLE, THE CONTRACTOR SHALL MAINTAIN ALL FENCING, SIGNS, DETOURS, FLAGMEN, SIGNALS, ETC., FOR ANY OPEN TRENCHES, HOLES OR PITS. ALL TRENCHES, HOLES OR PITS SHALL BE
CLOSED OR PROTECTED BY BARRICADES AT THE END OF THE DAY.
2. THE CONTRACTOR SHALL MAINTAIN RECORD DRAWINGS DURING CONSTRUCTION WHICH SHOW THE
CONSTRUCTED CONDITIONS OF ALL WORK INSTALLED.
EROSION AND SEDIMENTATION CONTROL NOTES:
1. PRIOR TO COMMENCEMENT OF ANY CLEARING AND EXCAVATION WITHIN A WORK AREA, ALL EROSION
AND SEDIMENT CONTROL MEASURES SHALL BE INSTALLED AND IN WORKING ORDER.
2. THE STORMWATER POLLUTION PREVENTION PLAN (SWP3) IS PREPARED IN ACCORDANCE WITH THE STATE AND FEDERAL NATIONAL POLLUTANT DISCHARGE SYSTEM (NPDES) PERMIT AND SHALL OUTLINE “BEST MANAGEMENT PRACTICES” TO BE USED THROUGHOUT THE PROJECT AND WILL BE PROVIDED TO
THE CONTRACTOR.
3. THE “EROSION CONTROL PLAN” CONTAINED WITHIN THIS PLAN SHALL BE ADJUSTED AS REQUIRED DURING THE PHASING AND PERFORMANCE OF THE CONSTRUCTION. ADDITIONAL MEASURES SHALL BE ADDED AS REQUIRED TO ENSURE THE SITE MEETS ALL FEDERAL, STATE, AND LOCAL EROSION AND SEDIMENT CONTROL REQUIREMENTS, AS WELL AS THE APPROPRIATE STATE AND FEDERAL NATIONAL
POLLUTANT DISCHARGE PERMIT (NPDES).
4. THE CONTRACTOR IS RESPONSIBLE FOR MAINTAINING EROSION AND SEDIMENT CONTROL FEATURES TO PREVENT SEDIMENT-LADEN AND OTHER POLLUTANTS FROM LEAVING THE CONSTRUCTION AREAS AND
ENTERING EXISTING STORM WATER FACILITIES AND SURFACE WATERS. ADDITIONAL MEASURES
BEYOND THOSE SHOWN ON THESE PLANS MAY BE NECESSARY DURING CONSTRUCTION, INCLUDING
TEMPORARY VEGETATIVE MEASURES AND INSTALLATION OF OTHER SILT TRAPPING MEASURES.
5. ALL BEST MANAGEMENT CONTROL PRACTICES SHALL BE INSPECTED BY THE SUPERINTENDENT, THE
PERSON RESPONSIBLE FOR THE DAY TO DAY OPERATIONS; OR SOMEONE APPOINTED BY THE
SUPERINTENDENT, AT LEAST EVERY 7 DAYS OR WITHIN 24 HOURS AFTER A PRECIPITATION EVENT THAT RESULTS IN RUNOFF LEAVING THE SITE INCLUDING WEEKEND DAYS REGARDLESS IF THE CONTRACTOR
IS WORKING OR NOT. A WRITTEN LOG SHALL BE MAINTAINED ON SITE OF ALL INSPECTIONS.
6. ALL BEST MANAGEMENT CONTROL MEASURES WILL BE MAINTAINED IN GOOD WORKING ORDER. IF A REPAIR IS NECESSARY, IT WILL BE INITIATED WITHIN 24 HOURS OF REPORTS IDENTIFYING THE PROBLEM
DETAILS OF THE REPAIRS SHALL BE MAINTAINED WITH THE INSPECTION LOG.
7. CONTRACTOR SHALL MAINTAIN AS MUCH OF THE EXISITING VEGETATION AS POSSIBLE IN AREAS OUTSIDE OF THE SCOPE OF WORK AND IN AREAS TO BE DEMOLISHED. VEGETATION TO STAY SHALL BE
PROTECTED DURING CONSTRUCTION. AREAS THAT ARE DISTURBED BY CONSTRUCTION SHALL BE
COVERED AND SEEDED WITHIN 14 DAYS IF NO WORK IN AREA IS PLANNED WITHIN THE NEXT 30 DAYS.
WHEN GRADING IS COMPLETE IN AN AREA, THE AREA SHALL BE SEEDED FOR FINAL STABILIZATION. ALL DISTURBED AREAS SHALL BE SEEDED. THIS INCLUDES, BUT IS NOT LIMITED TO, AREAS AFTER REMOVAL OF TEMPORARY HAUL ROADS, STAGING AND LAYDOWN AREAS, EQUIPMENT STORAGE AREAS, UTILITY TRENCHES, ETC. THE CONTRACTOR SHALL WATER NEW SEED DAILY OR AS NEEDED TO ESTABLISH 95% GROUND COVER PER SECTION 32 92 19 OF THE PROJECT SPECIFICATIONS. CONTRACTOR SHALL MAINTAIN THE SEEDED AREAS UNTIL FINAL ACCEPTANCE OF THE GRASS COVERAGE OF THE DISTURBED AREAS BY THE CONTRACTING OFFICER. NO SODDING IS REQUIRED. THE AREAS WITHIN THE LIMITS OF
CONSTRUCTION SHALL PRESENT A NEAT AND FINISHED APPEARANCE. THE CONTRACTOR SHALL
PROVIDE TEMPORARY WINTER GRASS COVERAGE IN AREAS WHERE SEED IS DELAYED BY THE SEASON.
EXISTING PROPOSED
BOLLARD
FENCE
TREE LINE
SWALE/ DETENTION BASIN TOE
AND TOP OF SLOPE
NATURAL GAS
WATER LINE
SANITARY SEWER
ROOF DRAIN
OVERHEAD ELECTRIC
UNDERGROUND ELECTRIC
UNDERGROUND COMM. LINE
UTILITY POLE
FIRE HYDRANT
VALVE (GAS OR WATER)
STORM DRAIN
FIRE PROTECTION WATER MAIN
LIGHT POLE
TREE
TELEPHONE LINE UGRND.
MANHOLE
X X
G G
W W
SAN SAN
OH OH
UE UE
UC UC
SD
FP
SD
TUG
FMFM
OC OC
LOD
SF
LEGEND
E
REINF REINFORCED, REINFORCING
REQ'D REQUIRED
RES RESILIENT
REV REVISION
RH RIGHT HAND
RHR RIGHT HAND REVERSE
RL RAIN LEADER
RM ROOM
ROW RIGHT OF WAY
RTU ROOFTOP UNIT
RUB RUBBER
S SOUTH
S/A SUPPLY AIR
SC SEALED CONCRETE
SCHED SCHEDULE
SE SOUTHEAST
SECT SECTION
SF SQUARE FOOT
SPECS SPECIFICATIONS
SQ SQUARE
SS SERVICE SINK
SST STAINLESS STEEL
STD STANDARD
STL STEEL
STND STAINED
STOR STORAGE
STRUCT STRUCTURAL
SUSP SUSPENDED
SW SOUTHWEST
SYM SYMMETRICAL
SYS SYSTEM
T TREAD
T&B TOP & BOTTOM
TC TOP OF CURB
TEL TELEPHONE
TEMP TEMPORARY
THK THICK, THICKNESS
TO TOP OF
TOC TOP OF CONCRETE
TOR TOP OF ROOF
TOR(C-R-S
-W)
TOP OF EXISTING (SEE
BELOW)
TOS TOP OF STEEL
TOW TOP OF WALL
TRC TEXTILE REINFORCED CONCRETE
TYP TYPICAL
UC UNDERCUT
UH UNIT HEATER
UNFIN UNFINISHED
UNO UNLESS NOTED OTHERWISE
UON UNLESS OTHERWISE NOTED
UTIL UTILITY
VB VAPOR BARRIER
VERT VERTICAL
VIF VERIFY IN FIELD
VTR VENT THROUGH ROOF
W WIDTH, WEST
W/ WITH
W/O WITHOUT
WC WATER CLOSET, WALL
COVERING
WD WOOD
WGL WIRE GLASS
WH WATER HEATER
WP WATERPROOFING
WT WEIGHT
WWM WELDED WIRE MESH
LLH LONG LEG HORIZONTAL
LLV LONG LEG VERTICAL
LP LOW POINT
LT LIGHT
LTL LINTEL
LVR LOUVER
LW LIGHTWEIGHT
M METER
MAINT MAINTENANCE
MAX MAXIMUM
MECH MECHANICAL
MEZZ MEZZANINE
MFG MANUFACTURING
MFR MANUFACTURER
MH MANHOLE
MIN MINIMUM
MIR MIRRIOR
MISC MISCELLANEOUS
MM MILLIMETER
MNT MOUNT
MO MASONARY OPENING
MTL METAL
MULL MULLION
N NORTH
NE NORTHEAST
NIC NOT IN CONTRACT
NO NUMBER
NOM NOMINAL
NPS NOMINAL PIPE SIZE
NTS NOT TO SCALE
NW NORTHWEST
OA OVERALL
OC ON CENTER
OD OUTSIDE DIAMETER
OFCI OWNER FURNISHED
CONTRACTOR INSTALLED
OFF OFFICE
OFOI OWNER FURNISHED OWNER
INSTALLED
OH OVERHEAD
OPNG OPENING
OPP OPPOSITE
OTO OUT-TO-OUT
PC PRECAST
PL PLATE, PROPERTY LINE
PLAM PLASTIC LAMINATE
PLMBG PLUMBING
PLWD PLYWOOD
PLYWD PLYWOOD
PM PRESSED METAL
PNL PANEL
PNT(D) PAINT(ED)
POL POLISHED
PR PAIR
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PT PRESSURE TREATED
PTN PARTITION
PVC POLYVINYL CHLORIDE
PVG PAVING
R RADIUS, RISER
R/A RETURN AIR
RB RESILIENT BASE
RD ROOF DRAIN
REF REFERENCE
FEC FIRE EXTINGUISHER IN
CABINET
FF FINISHED FLOOR
FFE FINISHED FLOOR ELEVATION
FH FIRE HYDRANT
FHC FIRE HOSE CABINET
FIN FINISH
FL FLOOR, FLOORING
FO FACE OF
FOC FACE OF CONCRETE
FOS FACE OF STUDS
FP FIREPROOF
FR FIRE RATED
FRT FIRE RETARDAINT TREATED
FS FULL SIZE
FT FOOT, FEET
FTG FOOTING
FURN FURNISH
FV FIELD VERIFY
G GAS
GA GAGE
GALV GALVANIZED
GB GRAB BAR
GC GENERAL CONTRACTOR
GD GRADE
GL GLASS
GWB GYPSUM WALL BOARD
GYP GYPSUM
HB HOSE BIB
HC ACCESSIBLEPED, HOLLOW
CORE
HD HAND
HDR HEADER
HDW HARDWARE
HDWD HARDWOOD
HM HOLLOW METAL
HORIZ HORIZONTAL
HP HIGH POINT, HORSE POWER
HR HOUR
HS HEAT STRENGTHENED
HT HEIGHT
HVAC HEATING VENTILATING AIR
CONDITIONING
HW HOT WATER
ID INSIDE DIAMETER
IMP INSULATED METAL PANEL
INSUL INSULATION
INT INTERIOR
INV INVERT
JAN JANITOR
JST JOIST
JT JOINT
KD KNOCKDOWN
KG KILOGRAM
KIT KITCHEN
KO KNOCKOUT
KS KNEE SPACE
LONG, LENGTH
LAB LABORATORY
LAV LAVATORY
LB LOAD BEARING
LBS POUNDS
LEV LEVEL
LH LEFT HAND
LHR LEFT HAND REVERSE
ABBR DESCRIPTION
AND
AT
AIR CONDITIONING
ANCHOR BOLT
ACOUS ACOUSTICAL
ACT ACOUSTICAL CEILING TILE
ABOVE FINISHED FLOOR
AHU AIR HANDLING UNIT
ALTERNATE
ALUM ALUMINUM
APPROX APPROXIMATE
ARCH ARCHITECTURAL
BLDG BUILDING
BLKG BLOCKING
BO BOTTOM OF
BOT BOTTOM
BRG BEARING
BTW BETWEEN
CAB CABINET
CB CATCH BASIN
CF CUBIC FEET
CFM CUBIC FEET PER MINUTE
CFMF COLD - FORMED METAL
FRAMING
CJ CONTROL JOINT
CL CENTERLINE
CLG CEILING
CMU CONCRETE MASONERY UNIT
CO CLEAN OUT
COL COLUMN
CONC CONCRETE
CONST CONSTRUCTION
CONT CONTINUES
CORR CORRIDOR
CW CHILLER WATER
CY CUBIC YARD
D DEEP
DBL DOUBLE
DET DETAIL
DF DRINKING FOUNTAIN
DIA DIAMETER
DIAG DIAGONAL
DIM DIMENSION
DN DOWN
DR DOOR
DS DOWNSPOUT
DWG(S) DRAWING(S)
E EAST
EA EACH
EJ EXPANSION JOINT
EL ELEVATION
ELEC ELECTRICAL
ELEV ELEVATION
EQ EQUAL
EQUIP EQUIPMENT
EW EYE WASH
EWC ELECTRIC WATER COOLER
EWH ELECTRIC WATER HEATER
EXIST EXISTING
EXP EXPANSION, EXPOSED
EXT EXTERIOR
FA FIRE ALARM
FD FLOOR DRAIN
FEB FIRE EXTINGUISHER
BRACKET
MOUNT
ABBREVIATIONS
EXISTING PROPOSED
GUY ANCHOR
POST INDICATOR VALVE
FORCE MAIN
BORE HOLE
SANITARY MANHOLE
FLARED END SECTION
CLEANOUT
OVERHEAD ELEC. & COMM.
LIMIT OF DISTURBANCE
SILT FENCE
CONTOUR LINE
SIGN
UTILITY POLE
ELECTRICAL CONTROL CABINET
TELEPHONE PULL BOX
ELECTRIC PULL BOX
SURVEY CONTROL POINT
BOLLARD
SPOT ELEVATION
ABBR DESCRIPTION ABBR DESCRIPTION ABBR DESCRIPTION ABBR DESCRIPTION ABBR DESCRIPTION
L
ATFP ANTI TERRORISM FORCE
PROTECTION
VOLUME 1 - SHEET INDEX
SHT NO SHEET NAME REV DATE
C-001 COVER SHEET
C-002 GENERAL NOTES AND
ABBREVIATIONS 0003 03/08/2024
C-100 EXISTING CONDITIONS
C-101 SURVEY CONTROL PLAN
CD100 SITE DEMOLITION PLAN 0002 02/23/2024
C-102 AERIAL PHOTO PLAN
C-103 SITE PLAN 0002 02/23/2024
C-104 GEOMETRY PLAN 0002 02/23/2024
C-105 UTILITY PLAN
C-106 GRADING PLAN 0002 02/23/2024
C-107 ATFP PLAN
C-108 EROSION CONTROL PLAN
C-109 HAUL ROUTE 0002 02/23/2024
C-110 JOINTING PLAN
C-111 PHOTOGRAPH PLAN
C-112 SITE COORDINATE PLAN
C-113 UTILITY COORDINATE PLAN
C-250 SEWER PROFILES
C-251 SEWER PROFILES
C-500 PAVEMENT DETAILS 0003 03/08/2024
C-501 PAVEMENT DETAILS
C-502 UTILITY DETAILS
C-503 UTILITY DETAILS
C-504 STORM & SANITARY SEWER DETAILS
C-505 STORM SEWER DETAILS
C-506 MISCELLANEOUS DETAILS 0002 02/23/2024
C-507 EROSION CONTROL DETAILS
C-508 EROSION CONTROL DETAILS
C-510 BORING LOGS
C-511 BORING LOGS
C-512 BORING LOGS
C-513 BORING LOGS
C-514 BORING LOGS
C-521 SWPPP PLAN
D
RDRD
PIV
3/5/2024 10:11:07 AM \\thehaskellco.net\CORE\PRJ\155_GovDesign\1550017 USACE Detroit Arsenal Building\21DesignWorking\CIVL\05AutoCAD\2Sheets\65526C002.dwg
M . S
M
IT
H
F.
B
AU
ER
F.
B
AU
ER
M . B
U
TL
ER
G
EN
ER
AL
N
O
TE
S
AN
D A
BB
R
EV
IA
TI
O
N S
C
IV
IL
C-002
R
EV
IS
ED
IN
A C
C O
R D
AN
C
E W
IT
H
A M
EN
D
M
EN
T
/2 3/
R
EV
IS
ED
IN
A C
C O
R D
AN
C
E W
IT
H
A M
EN
D
M
EN
T
/0 8/
W
2Q R
R
_P la ns -0
ARIMS: 200A Disposition: Maintain for 15 yrs after construction.
MDOT 21AA AGGREGATE BASE
COURSE (TO BE
CONSTRUCTED IN TWO LIFTS)
9" 8"
COMPACTED
SUBGRADE
DETAIL NOT TO SCALE
A1 PAVEMENT SECTIONS
DETAIL NOT TO SCALE
A3 AGGREGATE DETAIL
PAVEMENT JOINT DETAILS
DETAIL NOT TO SCALE
B1
TYPE I
PORTLAND CEMENT
CONCRETE PAVEMENT
BACKER ROD
JOINT SEALER
USED AT JUNCTIONS WITH THE
FOLLOWING STRUCTURE ELEMENTS
-WALLS
-COLUMNS
-EQUIPMENT FOUNDATIONS
-FOOTINGS
-DRAINAGE/SANITARY STRUCTURES
NON EXTRUDED
PREMOULDED
JOINT FILLER
D
TYPICAL CONCRETE PAVEMENT SECTION
TYPICAL ASPHALT PAVEMENT SECTION
2" ASPHALTIC CONCRETE SURFACE COURSE (MDOT 5E1 OR 4E1)
3" ASPHALTIC CONCRETE BINDER COURSE (MDOT 4E1)
TACK COATPRIME COAT
12" COMPACTED
SUBGRADE
3/8"
T/
1- 1/
2" M
IN
5/
8"
1/ 8"
T
YP
1/16" to 1/4"
SAWED
CONTRACTION JOINT
3/ 4" to
3"
T
3/4"
1/ 8"
T
YP
ELASTOMERIC
JOINT SEALANT
BACKER ROD
PREFORMED
BITUMINOUS
FIBER MATERIAL
BOARDS OR
EQUIVALENT
FORMED
EXPANSION JOINT
ELASTOMERIC
JOINT
SEALANT
BACKER ROD
INITIAL SAW
CUT
T
3/8"
VERIFY DEPTH
WITH SPECS
PREMOLDED STRIP OR JOINT
SEALER WHEN SAWED, FLUSH
WITH SURFACE
BACKER ROD
TYPE F
CONSTRACTION JOINT
LONGITUDINAL OR TRANSVERSE JOINT
ISOLATION JOINT
DRILL & EPOXY GROUT
INTO EXISTING
CONCRETE PAVEMENT
DOWELED CONSTRUCTION JOINT
TYPE A
T/
1" DIA SMOOTH DOWEL
18" LONG @ 12" CTRS
EXISTING
CONCRETE
PAVEMENT
SEE FORMED EXPANSION
JOINT DETAIL THIS SHEET
GREASE
DOWEL
12" - MDOT 21AA AGGREGATE BASE
COURSE
(TO BE CONSTRUCTED IN TWO LIFTS)
NOTES:
1. MICHIGAN DOT STANDARD SPECIFICATIONS FOR HIGHWAY AND STRUCTURE,
LATEST ADDITION, INCLUDING SUPPLEMENTAL SPECIFICATIONS.
2. COMPACTION REQUIREMENTS:
-BITUMINOUS CONCRETE: REFER TO DIVISION 5
-BASE COURSE: REFER TO SECTION 32 11 20 OF THE PROJECT SPECIFICATIONS.
DETAIL NOT TO SCALE
A2 CONCRETE CURB DETAIL
6"
6"
1"
NOTE:
1. MAXIMUM SPACING OF 3/4" EXPANSION JOINTS TO BE 100' O.C.
2. CONTRACTION JOINTS SHALL ALIGN W/ ADJACENT CONCRETE
PAVEMENT JOINTS.
3. SEE DETAIL B2 ON SHEET C-501 FOR FIRE LANE PAINTING OF
CURBING.
1"R
2"R 1/4"R
CONCRETE
PAVEMENT
9"
CURB TRANSITION
TOP OF 6"
VERTICAL
CURB
TOP OF
PAVEMENT
6'
MDOT 21AA AGGREGATE
BASE COURSE
PC CONCRETE,
NON-REINFORCED
9" 8"
COMPACTED
SUBGRADE
EDGE UNDERDRAIN FOR CONCRETE PAVEMENT
3' -6
M
IN
4" PERFORATED
UNDERDRAIN
6"
6" 6"
GEOTEXTILE FABRIC
RAPID DRAINING AGGREGATE
(SEE SECTION 32 11 20 OF THE
PROJECT SPECIFICATIONS)
GEOTEXTILE FABRIC
PC CONCRETE,
NON-REINFORCED
RAPID DRAINING AGGREGATE
(SEE SECTION 32 11 20 OF THE
PROJECT SPECIFICATIONS)
GEOTEXTILE FABRIC
4"
4"
AGGREGATE SURFACE COURSE (SEE
SECTION 32 15 00 OF THE PROJECT
SPECIFICATIONS)
6"
COMPACTED
SUBGRADE
NON-WOVEN
GEOTEXTILE FABRIC
DETAIL NOT TO SCALE
B2 HARDSTAND PAVEMENT REPAIR DETAILS
T
T
5'
1.
T
CONCRETE
PAVEMENTCONCRETE PAVEMENT
3/8"PREMOLDED STRIP OR JOINT
SEALER WHEN SAWED, FLUSH
WITH SURFACE
BACKER ROD
5'
VERIFY DEPTH
WITH SPECS
THICKENED EDGE BUTT JOINT
BUTT
JOINT
T
5'
1.
T
CONCRETE
PAVEMENT
CONCRETE PAVEMENT
3/4"
5'
VERIFY DEPTH
WITH SPECS
THICKENED EDGE EXPANSION JOINT
SEE FORMED EXPANSION
JOINT DETAIL THIS SHEET
5/8" DIA. DOWEL DRILL
AND GROUT INTO EXIST.
SLAB @ 12" O.C.
3"
UNDISTURBED SOIL
6"
1/8" RADIUS
EXISTING
6 X 6 X W2.9
(FLAT SHEETS)
TOC
VARIES
SEE PLAN
MDOT 21AA
AGGREGATE BASE
6" MINIMUM
1"Ø x 1"-3" LOF DOWELS
@ 12" O.C. GREASE AND
CAP ONE END
3"
6"
SAWCUT JOINT 1/4" WIDE X 2-1/2"
DEEP 3 TO 12 HOURS AFTER
SLAB HAS HARDENED
6 X 6 X W2.9
(FLAT SHEETS)
TOC
VARIES
SEE PLAN
MDOT 21AA
AGGREGATE BASE
6" MINIMUM
CONTROL JOINT
DOWELED CONSTRUCTION JOINT
MDOT 21AA AGGREGATE
BASE COURSE
6" 6"
HARDSTAND CONCRETE PAVEMENT SECTION
PC CONCRETE
6 X 6 X W2.9
(FLAT SHEETS)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E
SHEET ID
US Army Corps of Engineers
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
P2
LO
U
IS
VI
LL
E
D
IS
TR
IC
T
D
R M
AR
TI
N L
U
TH
ER
J
R P
L
LO
U
IS
VI
LL
E, K
Y
SE
PT
EM
BE
R
9, ET
R O
IT
A
R
SE
N
AL
, M I
G R
O U
N D
T R
AN
SP
O R
TA
TI
O N
E Q
U
IP
M
EN
T
BU
IL
D
IN
G
FY
Plot Date: File Path:
C
ER
TI
FI
ED
F
IN
AL
S U
BM
IT
TA
L
M . S
M
IT
H
F.
B
AU
ER
F.
B
AU
ER
M . B
U
TL
ER
PA
VE
M
EN
T
D
ET
AI
LS
C
IV
IL
C-500 3/5/2024 10:11:49 AM \\thehaskellco.net\CORE\PRJ\155_GovDesign\1550017 USACE Detroit Arsenal Building\21DesignWorking\CIVL\05AutoCAD\2Sheets\655526C-500.dwg
R
EV
IS
ED
IN
A C
C O
R D
AN
C
E W
IT
H
A M
EN
D
M
EN
T
/0 8/
W
2Q R
R
_P la ns -0
SHEET ID
E
S
IG
N B
Y
D R
A W
N B
Y
C H
E C
K E
D B
Y
S U
B M
IT
T
E D
B Y
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
L O
U
IS
V
IL
L E
D
IS
T R
IC
T
D
R M
A R
T
IN
L U
T H
E R
J R
P L
L O
U
IS
V
IL
L E
K
E N
T U
C K
Y
A
D E
T R
O
IT
A R
S E
N A
L, M
I G
R O
U N
D T
R A
N S
P O
R T
A T
IO
N
E Q
U
IP
M E
N T
B U
IL
D
IN
G
F Y
P
2# : 5
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
B
C
D
E
F
G
H
J
K
L
M
N
P
File Path:Plot Date:
US Army Corps of Engineers ®
IS
S
U E
D A
T E
S O
L
IC
IT
A
T
IO
N N
O
C O
N T
R A
C T
N O
S
IZ
E
A N
S I D
BIM 360://1550017 USACE Detroit Arsenal GTEB_R2020/1550017_ARCH_CR20.rvt3/8/2024 3:23:31 PM
G-002
M N
O B
E R
T
M D
A L L
A B
A T
T
IS
T A
G P
A R
K E
R
M B
U T
L E
R S
H E
E T
IN
D
E X
C E
R T
IF
IE
D F
IN
A
L S
U B
M
IT
T A
L
S E
P T
E M
B E
R
G E
N E
R A
L
SHT No SHEET NAME REV DATE
09 - INTERIORS
I-111 FIRST FLOOR FINISH PLAN - SECTOR 1
I-112 FIRST FLOOR FINISH PLAN - SECTOR 2
I-113 FIRST FLOOR FINISH PLAN - SECTOR 3
IF-111 FIRST FLOOR FURNITURE PLAN - SECTOR 1 1 02/23/2024
IF-112 FIRST FLOOR FURNITURE PLAN - SECTOR 2 1 02/23/2024
IF-113 FIRST FLOOR FURNITURE PLAN - SECTOR 3 1 02/23/2024
IG-111 FIRST FLOOR SIGNAGE PLAN - SECTOR 1
IG-112 FIRST FLOOR SIGNAGE PLAN - SECTOR 2
IG-113 FIRST FLOOR SIGNAGE PLAN - SECTOR 3
IG-340 SIGNAGE SCHEDULE AND DETAILS
IA-111 FIRST FLOOR ACOUSTICAL CEILING PANEL PLAN - SECTOR 1 1 02/23/2024
IA-112 FIRST FLOOR ACOUSTICAL CEILING PANEL PLAN - SECTOR 2 1 02/23/2024
IA-113 FIRST FLOOR ACOUSTICAL CEILING PANEL PLAN - SECTOR 3
I-401 ENLARGED PLANS AND ELEVATIONS
I-402 INTERIOR ELEVATIONS
I-403 INTERIOR ELEVATIONS
I-601 FINISH SCHEDULE AND LEGEND 1 02/23/2024
11 - FIRE PROTECTION
FA001 FIRE ALARM LEGEND AND NOTES
FA111 FIRE ALARM PLAN - SECTOR 1
FA112 FIRE ALARM PLAN - SECTOR 2
FA113 FIRE ALARM PLAN - SECTOR 3
FA600 FIRE ALARM AND MNS INPUT/OUTPUT MATRIX
FA601 FIRE ALARM AND MNS RISER DIAGRAM
FA602 FIRE ALARM & MASS NOTIFICATION - AUDIBLE AND VISUAL MESSAGES
FX001 FIRE SUPPRESSION SYSTEMS LEGEND AND NOTES
FX110 FIRE SUPPRESSION PLAN
FX400 ENLARGED FIRE PUMP ROOM PLAN
FX600 FIRE PUMP DIAGRAM, SCHEDULE, AND DETAIL
Grand total: 167
SHT No SHEET NAME REV DATE
08 - ARCHITECTURAL
A-002 PROJECT NOTES
A-003 LEGENDS
A-004 LEGENDS
A-005 LEGENDS
A-006 LEGENDS
A-011 ACCESSIBILITY
A-012 ACCESSIBILITY
A-013 ACCESSIBILITY PLAN
A-021 AIR BARRIER PLAN
A-022 AIR BARRIER SECTIONS
A-023 AIR BARRIER SECTIONS
A-024 AIR BARRIER SECTIONS
A-031 UL ASSEMBLIES PLAN
A-032.1 UL ASSEMBLIES - DESIGN NO. U419
A-032.2 UL ASSEMBLIES - DESIGN NO. U419
A-032.3 UL ASSEMBLIES - DESIGN NO. U419
A-033.1 UL ASSEMBLIES - DESIGN NO. U905
A-034.1 UL ASSEMBLIES - DESIGN NO. D902
A-034.2 UL ASSEMBLIES - DESIGN NO D902
A-034.3 UL ASSEMBLIES - DESIGN NO D902
A-036.1 UL ASSEMBLIES - DESIGN NO. X829
A-037.1 UL ASSEMBLIES - DESIGN NO. X827
A-071 AREA TABULATIONS PLAN
A-091 EQUIPMENT PLAN
A-110 FIRST FLOOR PLAN - COMPOSITE 1 03/08/2024
A-111 FIRST FLOOR PLAN - SECTOR 1
A-112 FIRST FLOOR PLAN - SECTOR 2 1 02/23/2024
A-113 FIRST FLOOR PLAN - SECTOR 3
A-120 ROOF PLAN - COMPOSITE
A-121 ROOF PLAN - SECTOR 1
A-122 ROOF PLAN - SECTOR 2
A-123 ROOF PLAN - SECTOR 3
A-201 BUILDING ELEVATIONS
A-301 BUILDING SECTIONS
A-302 BUILDING SECTIONS 1 03/08/2024
A-303 BUILDING SECTIONS 1 03/08/2024
A-311 WALL SECTIONS 1 03/08/2024
A-312 WALL SECTIONS
A-313 WALL SECTIONS 1 03/08/2024
A-314 WALL SECTIONS
A-401 ENLARGED PLANS AND ELEVATIONS
A-402 ENLARGED PLANS AND ELEVATIONS
A-403 ENLARGED PLANS AND ELEVATIONS
A-404 ENLARGED PLANS AND ELEVATIONS
A-501 DETAILS 1 02/23/2024
A-502 DETAILS
A-503 DETAILS
A-504 DETAILS
A-505 DETAILS
A-506 DETAILS
A-507 DETAILS
A-508 DETAILS
A-509 DETAILS 1 03/08/2024
A-510 DETAILS
A-511 DETAILS
A-512 DETAILS 1 03/08/2024
A-513 DETAILS 1 02/07/2024
A-514 DETAILS
A-515 DETAILS
A-516 DETAILS
A-519 DETAILS
A-520 DETAILS
A-521 DETAILS
A-522 DETAILS
A-523 DETAILS
A-524 DETAILS
A-531 DETAILS 1 02/23/2024
A-601 PARTITION SCHEDULE
A-602 PARTITION SCHEDULE
A-603 PARTITION SCHEDULE
A-604 PARTITION SCHEDULE DETAILS
A-611 DOOR SCHEDULE 2 03/08/2024
A-612 WINDOW AND LOUVER SCHEDULE 2 03/08/2024
A-710 FIRST FLOOR REFLECTED CEILING PLAN
A-711 FIRST FLOOR REFLECTED CEILING PLAN - SECTOR 1 1 03/08/2024
A-712 FIRST FLOOR REFLECTED CEILING PLAN - SECTOR 2
A-713 FIRST FLOOR REFLECTED CEILING PLAN - SECTOR 3 1 03/08/2024
A-901 ISOMETRIC VIEWS
SHT No SHEET NAME REV DATE
00 - GENERAL
G-001 COVER SHEET
G-002 SHEET INDEX 2 03/08/2024
G-003 SHEET INDEX 2 03/08/2024
GI001 CODE ANALYSIS
GI002 CODE ANALYSIS
GI003 FPLS CODE REVIEW FORM
GI101 CODE COMPLIANCE SITE PLAN
GI110 LIFE SAFETY PLAN
GI200 ELECTRICAL HAZARDOUS CLASSIFICATION PLAN
GI300 DAMPER SCHEDULE
GI400 HAZARDOUS MATERIAL PLAN
07 - STRUCTURAL
S-001 GENERAL STRUCTURAL NOTES
S-002 GENERAL STRUCTURAL NOTES 1 03/08/2024
S-003 GENERAL STRUCTURAL NOTES
S-004 GENERAL STRUCTURAL NOTES
S-005 GENERAL STRUCTURAL NOTES 1 02/23/2024
S-006 STRUCTURAL ABBREVIATIONS AND SYMBOLS
S-010 TYPICAL DETAILS - CONCRETE SLAB-ON-GRADE
S-011 TYPICAL DETAILS - CONCRETE DETAILS AND SCHEDULES 1 02/23/2024
S-012 TYPICAL PRECAST CONCRETE WALL PANEL ELEVATIONS
S-013 TYPICAL DETAILS - CONCRETE MASONRY
S-014 TYPICAL DETAILS - STEEL
S-015 TYPICAL DETAILS - STEEL
S-020 COMPONENTS AND CLADDING WIND PRESSURE DIAGRAMS
S-021 SNOW LOAD AND DRIFT DIAGRAM
S-100 FOUNDATION PLAN - COMPOSITE
S-101 FOUNDATION PLAN - SECTOR 1
S-102 FOUNDATION PLAN - SECTOR 2
S-103 FOUNDATION PLAN - SECTOR 3
S-110 INTERMEDIATE FRAMING PLAN - COMPOSITE
S-111 INTERMEDIATE FRAMING PLAN - SECTOR 1
S-112 INTERMEDIATE FRAMING PLAN - SECTOR 2
S-113 INTERMEDIATE FRAMING PLAN - SECTOR 3
S-120 ROOF FRAMING PLAN - COMPOSITE
S-121 ROOF FRAMING PLAN - SECTOR 1
S-122 ROOF FRAMING PLAN - SECTOR 2
S-123 ROOF FRAMING PLAN - SECTOR 3
S-200 VERTICAL BRACED FRAME ELEVATIONS
S-201 VERTICAL BRACED FRAME ELEVATIONS
S-202 VERTICAL BRACED FRAME ELEVATIONS
S-203 VERTICAL BRACED FRAME ELEVATIONS
S-204 EXTERIOR WALL FRAMING AND CMU WALL ELEVATIONS
S-205 EXTERIOR WALL FRAMING ELEVATIONS
S-206 EXTERIOR WALL FRAMING ELEVATIONS
S-207 INTERIOR PARTITION WALL FRAMING AND CMU WALL ELEVATIONS
S-400 TEST PIT FOUNDATION PLAN AND SECTIONS 1 02/23/2024
S-500 FOUNDATION SECTIONS AND DETAILS
S-501 FOUNDATION SECTIONS AND DETAILS
S-502 FOUNDATION SECTIONS AND DETAILS 1 02/23/2024
S-503 FOUNDATION SECTIONS AND DETAILS
S-504 FOUNDATION SECTIONS AND DETAILS
S-510 CRANE FRAMING SECTIONS AND DETAILS
S-520 FRAMING SECTIONS AND DETAILS
S-521 FRAMING SECTIONS AND DETAILS
S-522 FRAMING SECTIONS AND DETAILS
S-523 FRAMING SECTIONS AND DETAILS
S-525 STEEL BRACED FRAME CONNECTION DETAILS
S-600 FOUNDATION SCHEDULES AND DETAILS
S-601 FOUNDATION PEDESTAL PLAN DETAILS
S-610 COLUMN BASE PLATE SCHEDULES AND DETAILS
S-900 STRUCTURAL ISOMETRIC VIEWS
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E A
P P
R
R
E V
IS
E
D I N
A C
C O
R D
A N
C E
W
IT
H A
M E
N D
M E
N T
/2 /2
M B
R
E V
IS
E
D I N
A C
C O
R D
A N
C E
W
IT
H A
M E
N D
M E
N T
/0 /2
M B
W
2Q R
R
_P la ns -0
E
S
IG
N B
Y
D R
A W
N B
Y
C H
E C
K E
D B
Y
S U
B M
IT
T
E D
B Y
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
L O
U
IS
V
IL
L E
D
IS
T R
IC
T
D
R M
A R
T
IN
L U
T H
E R
J R
P L
L O
U
IS
V
IL
L E
K
E N
T U
C K
Y
A
D E
T R
O
IT
A R
S E
N A
L , M
I G
R O
U N
D T
R A
N S
P O
R T
A T
IO
N
E Q
U
IP
M E
N T
B U
IL
D
IN
G
F Y
P
2# : 5
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
B
C
D
E
F
G
H
J
K
L
M
N
P
File Path:Plot Date:
US Army Corps of Engineers ®
IS
S
U E
D A
T E
S O
L
IC
IT
A
T
IO
N N
O
C O
N T
R A
C T
N O
S
IZ
E
A N
S I D
BIM 360://1550017 USACE Detroit Arsenal GTEB_R2020/1550017_ARCH_CR20.rvt3/11/2024 9:02:17 AM
G-003
M N
O B
E R
T
M D
A L L
A B
A T
T
IS
T A
G P
A R
K E
R
M B
U T
L E
R S
H E
E T
IN
D
E X
C E
R T
IF
IE
D F
IN
A
L S
U B
M
IT
T A
L
S E
P T
E M
B E
R
G E
N E
R A
L
SHT No SHEET NAME REV DATE
15 - ELECTRICAL
E-001 LEGEND AND ABBREVIATIONS
ES101 ELECTRICAL SITE PLAN
EG110 GROUNDING PLAN
EG120 LIGHTNING PROTECTION PLAN
EG501 GROUNDING DETAILS
EG502 LIGHTNING PROTECTION DETAILS
EG503 LIGHTNING PROTECTION ROOF DETAILS
EP101 POWER PLAN SECTOR 1 1 03/08/2024
EP102 POWER PLAN SECTOR 2 1 03/08/2024
EP103 POWER PLAN SECTOR 3 1 02/23/2024
EP104 POWER PLAN ROOF
EP401 ENLARGED POWER PLANS 1 02/23/2024
EP501 POWER DETAILS
EP502 POWER DETAILS
EP600 MECHANICAL EQUIPMENT CONNECTION SCHEDULE
EL001 LIGHTING LEGEND AND SCHEDULES
EL101 LIGHTING PLAN SECTOR 1
EL102 LIGHTING PLAN SECTOR 2
EL103 LIGHTING PLAN SECTOR 3
EL501 LIGHTING DETAILS
EL502 LIGHTING DETAILS 2 03/08/2024
EL503 LIGHTING DETAILS 2 03/08/2024
EL601 LIGHTING CONTROL DIAGRAM
E-601 MSWBDC ELECTRICAL ONE-LINE
E-602 MSWBDA AND MSWBDB ELECTRICAL ONE-LINE 1 02/23/2024
E-603 SCHEDULES 1 03/08/2024
E-610 PANEL SCHEDULES 1 02/23/2024
E-611 PANEL SCHEDULES
E-612 PANEL SCHEDULES
E-613 PANEL SCHEDULES
E-614 PANEL SCHEDULES
16 - TELECOMMUNICATIONS
T-000 NOTES, SYMBOLS & ABBREVIATIONS
T-100 TELECOM SITE PLAN
T-101 TELECOM ENLARGED SITE PLAN
T-200 TELECOM OVERALL
T-201 TELECOM PATHWAYS PLAN
T-201.11 FIRST FLOOR TELECOM PLAN (NIPR) - AREA 1
T-201.12 FIRST FLOOR TELECOM PLAN (NIPR) - AREA 2
T-201.13 FIRST FLOOR TELECOM PLAN (NIPR) - AREA 3
T-201.31 FIRST FLOOR TELECOM PLAN (DATACQ) - AREA 1
T-201.32 FIRST FLOOR TELECOM PLAN (DATACQ) - AREA 2
T-201.33 FIRST FLOOR TELECOM PLAN (DATACQ) - AREA 3
T-400 ENLARGED TELECOM ROOM PLANS - COMM 101 1 02/23/2024
T-401 ENLARGED SERVER ROOM PLANS - COMM 106
T-402 RACK ELEVATIONS 1 02/23/2024
T-500 TELECOM DETAILS
T-501 TELECOM DETAILS
T-700 TELECOM SCHEDULES
17- SYSTEMS
TI000 SYSTEMS GENERAL NOTES, SYMBOLS & ABBREVIATIONS 1 02/23/2024
TI200 SYSTEMS OVERALL
TI201.1 FIRST FLOOR SYSTEMS PLAN - AREA 1
TI400 ENLARGED CONFERENCE ROOM PLANS
TI502 AV DETAILS
TI503 AV DETAILS
TI601.A AV SINGLE-LINE DIAGRAM - CONFERENCE ROOM 118
TI601.C AV SINGLE-LINE - 101
TI601.E AV SINGLE-LINE DIAGRAM - CONFERENCE ROOM 118
TI700 AV RACK ELEVATIONS 1 02/23/2024
18 - SECURITY
TY000 SECURITY SYMBOLS & ABBREVIATIONS
TY200 SECURITY OVERALL
TY201.1 FIRST FLOOR SECURITY PLAN - AREA 1
TY201.2 FIRST FLOOR SECURITY PLAN - AREA 2
TY201.3 FIRST FLOOR SECURITY PLAN - AREA 3
TY500 DOOR DETAILS
TY501 DOOR DETAILS
TY502 DOOR DETAILS
TY503 DOOR DETAILS
TY605 SECURITY CAMERA MOUNTING DETAILS
Grand total: 127
SHT No SHEET NAME REV DATE
12 - PLUMBING
P-001 LEGEND AND ABBREVATIONS
P-110 PLUMBING PIPING PLAN - FIRST FLOOR - COMPOSITE 1 02/23/2024
P-111 PLUMBING PIPING PLAN - FIRST FLOOR - SECTOR 1 1 02/23/2024
P-112 PLUMBING PIPING PLAN - FIRST FLOOR - SECTOR 2
P-113 PLUMBING PIPING PLAN - FIRST FLOOR - SECTOR 3
P-401 PLUMBING ENLARGED PLAN - BATHROOM GROUP 1 02/23/2024
P-501 PLUMBING DETAILS 1 02/23/2024
P-502 PLUMBING DETAILS
P-503 PLUMBING DETAILS
P-601 PLUMBING SCHEDULES 1 02/23/2024
P-901 WASTE RISER DIAGRAM - SANITARY, VENT, AND INDUSTRIAL WASTE 1 02/23/2024
P-902 WASTE RISER DIAGRAM - STORM AND CONDENSATE
P-903 DOMESTIC WATER RISER DIAGRAM
14 - MECHANICAL
M-001 LEGEND AND ABBREVIATIONS
MH110 HVAC PLAN - FIRST FLOOR - COMPOSITE
MH111 HVAC PLAN - FIRST FLOOR - SECTOR 1
MH112 HVAC PLAN - FIRST FLOOR - SECTOR 2
MH113 HVAC PLAN - FIRST FLOOR - SECTOR 3
MH120 HVAC PLAN - LOW ROOF AND HIGH BAY COMPOSITE
MH121 HVAC PLAN - LOW ROOF AND HIGH BAY SECTOR 1
MH122 HVAC PLAN - LOW ROOF AND HIGH BAY SECTOR 2
MH123 HVAC PLAN - LOW ROOF AND HIGH BAY SECTOR 3
MH130 HVAC PLAN - HIGH ROOF COMPOSITE
MP110 MECHANICAL PIPING PLAN - LEVEL 1 COMPOSITE
MP111 MECHANICAL PIPING PLAN - FIRST FLOOR - SECTOR 1 3 03/08/2024
MP112 MECHANICAL PIPING PLAN - FIRST FLOOR - SECTOR 2 3 03/08/2024
MP113 MECHANICAL PIPING PLAN - FIRST FLOOR - SECTOR 3 3 03/08/2024
MP120 MECHANICAL PIPING PLAN - ROOF COMPOSITE
M-201 MECHANICAL SECTIONS
M-401 MECHANICAL ENLARGED PLAN - MECHANICAL ROOM
M-501 MECHANICAL DETAILS
M-502 MECHANICAL DETAILS
M-503 MECHANICAL DETAILS
M-504 MECHANICAL DETAILS
M-505 MECHANICAL DETAILS
M-506 MECHANICAL DIAGRAMS
M-601 MECHANICAL SCHEDULES 3 03/08/2024
M-602 MECHANICAL SCHEDULES 1 02/23/2024
M-603 MECHANICAL SCHEDULES 1 02/23/2024
M-701 MECHANICAL CONTROLS GENERAL NOTES
M-702 POINT SCHEDULE NOTES INSTRUCTIONS
M-703 DDC SYSTEM ARCHITECTURE
M-704 DDC CONTROLS - COOLING TOWER DIAGRAM AND SEQUENCE
M-705 DDC CONTROLS - COOLING TOWER CONTROL POINTS
M-706 DDC CONTROLS - CHILLED WATER DIAGRAM AND SEQUENCE
M-707 DDC CONTROLS - CHILLED WATER POINTS LIST
M-708 DDC CONTROLS - HEATING HOT WATER SYSTEM DIAGRAM
M-709 DDC CONTROLS - DX DOAS DIAGRAM AND SEQUENCE
M-710 DDC CONTROLS - DOAS POINTS LIST
M-711 DDC CONTROLS - SPLIT SYSTEM CRAC UNITS AND MINI SPLIT
M-712 DDC CONTROLS - MULTIZONE VAV RTU-01
M-713 DDC CONTROLS - VAV TERMINAL UNIT
M-714 DDC CONTROLS - SINGLE ZONE RTU-02, RTU-03, AND RTU-06
M-715 DDC CONTROLS - SINGLE ZONE RTU-04 AND RTU-05
M-716 DDC CONTROLS - SINGLE ZONE AHU POINTS LIST
M-717 DDC CONTROLS - HVLS, ESB, AND METER CONTROLS
M-718 DDC CONTROLS - UNIT HEATER AND VENTILATION
M-719 DDC CONTROLS - DOMESTIC HOT WATER
M-720 DDC CONTROLS - MONITORING SYSTEMS 1 02/23/2024
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E A
P P
R
R
E V
IS
E
D I N
A C
C O
R D
A N
C E
W
IT
H A
M E
N D
M E
N T
/2 /2
M B
R
E V
IS
E
D I N
A C
C O
R D
A N
C E
W
IT
H A
M E
N D
M E
N T
/0 /2
M B
W
2Q R
R
_P la ns -0
E
S
IG
N B
Y
D R
A W
N B
Y
C H
E C
K E
D B
Y
S U
B M
IT
T
E D
B Y
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
L O
U
IS
V
IL
L E
D
IS
T R
IC
T
D
R M
A R
T
IN
L U
T H
E R
J R
P L
L O
U
IS
V
IL
L E
K
E N
T U
C K
Y
A
D E
T R
O
IT
A R
S E
N A
L, M
I G
R O
U N
D T
R A
N S
P O
R T
A T
IO
N
E Q
U
IP
M E
N T
B U
IL
D
IN
G
F
Y
P 2#
: 5
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
B
C
D
E
F
G
H
J
K
L
M
N
P
File Path:Plot Date:
US Army Corps of Engineers ®
IS
S
U E
D A
T E
S O
L
IC
IT
A
T
IO
N N
O
C O
N T
R A
C T
N O
S
IZ
E
A N
S I D
BIM 360://1550017 USACE Detroit Arsenal GTEB_R2020/1550017_STRUC_CR20.rvt3/7/2024 3:02:06 PM
S-002
C
S E
R V
O S
S
P
M O
R G
A N
D
S W
Y D
E N
M B
U T
L E
R G
E N
E R
A L
S T
R U
C T
U R
A L
N O
T E
S
C E
R T
IF
IE
D F
IN
A
L S
U B
M
IT
T A
L
A U
G U
S T
S T
R U
C T
U R
A L
D. PRECAST CONCRETE
1. THE PRECAST CONCRETE SYSTEMS AND MEMBERS THEREOF INDICATED ON THE CONTRACT
DOCUMENTS SHALL BE PROVIDED BY THE CONTRACTOR AS A DELEGATED ENGINEERED
SYSTEM. THE DELEGATED ENGINEERED SYSTEM SHALL BE DESIGNED AND DETAILED BY THE
CONTRACTOR’S AND/OR PRECAST CONCRETE MANUFACTURER’S QUALIFIED DELEGATED
ENGINEER. THE QUALIFIED DELEGATED ENGINEER SHALL HAVE A MINIMUM OF FIVE YEARS
PREVIOUS EXPERIENCE IN THE DESIGN AND DETAILING OF THE TYPE OF DELEGATED
ENGINEERED SYSTEM INDICATED ON THE CONTRACT DOCUMENTS AND SHALL BE A
PROFESSIONAL ENGINEER REGISTERED IN THE STATE WHERE THE PROJECT IS LOCATED.
THE QUALIFIED DELEGATED ENGINEER SHALL PREPARE AND SUBMIT SIGNED AND SEALED
SHOP DRAWINGS AND CALCULATIONS FOR THE DELEGATED ENGINEERED SYSTEM. ALL
SUBMITTALS FROM THE QUALIFIED DELEGATED ENGINEER MUST BE APPROVED BY THE
STRUCTURAL ENGINEER OF RECORD PRIOR TO THE START OF FABRICATION OF THE SYSTEM
OR COMPONENT PART AND PRIOR TO ANY FIELD CONSTRUCTION THAT MAY BE AFFECTED BY
THE SYSTEM OR COMPONENT PART.
PRECAST CONCRETE ITEMS TO BE DESIGNED AND PROVIDED AS A DELEGATED ENGINEERED
SYSTEM INCLUDE THE FOLLOWING:
A. ARCHITECTURAL PRECAST CONCRETE INSULATED (SANDWICH) WALL PANELS, INCLUDING
CONNECTIONS TO THE BUILDING STRUCTURE AND EMBEDDED ITEMS IN THE FOUNDATIONS.
2. ARCHITECTURAL PRECAST CONCRETE PRODUCTS SHALL BE DESIGNED AND CONSTRUCTED IN
ACCORDANCE WITH THE “BUILDING CODE”, ACI 318, PCI MNL-122 “ARCHITECTURAL PRECAST
CONCRETE”, PCI MNL-120 “PCI DESIGN HANDBOOK”, EIGHTH EDITION, PCI MNL-117 “MANUAL FOR
QUALITY CONTROL FOR PLANTS AND PRODUCTION OF ARCHITECTURAL PRECAST CONCRETE
PRODUCTS”, PCI MNL-135 “TOLERANCE MANUAL FOR PRECAST AND PRESTRESSED CONCRETE
CONSTRUCTION”, AND THE CONTRACT DOCUMENTS. REFER TO SPECIFICATION 03 45 00
“PRECAST ARCHITECTURAL CONCRETE” FOR ADDITIONAL INFORMATION AND REQUIREMENTS.
3. THE PLANT FOR THE ARCHITECTURAL PRECAST CONCRETE MANUFACTURER MUST BE
CERTIFIED IN THE PRECAST / PRESTRESSED CONCRETE INSTITUTE (PCI) PLANT CERTIFICATION
PROGRAM. THE ARCHITECTURAL PRECAST CONCRETE MANUFACTURER MUST PARTICIPATE IN
PCI’S PLANT CERTIFICATION PROGRAM AT THE TIME OF BIDDING AND SHALL BE DESIGNATED A
PCI-CERTIFIED PLANT FOR CATEGORY AC ARCHITECTURAL PRECAST CONCRETE.
4. THE USE OF PRESTRESSED PRECAST CONCRETE IS PERMITTED IF REQUIRED BY THE
DELEGATED DESIGN ENGINEER.
5. PRECAST CONCRETE MATERIALS SHALL MEET THE FOLLOWING REQUIREMENTS -
A. REFER TO THE “CONCRETE MIXTURE REQUIREMENTS SCHEDULE” FOR ASSIGNED
EXPOSURE CATEGORIES, MINIMUM SPECIFIED CONCRETE COMPRESSIVE STRENGTHS,
MATERIAL PROPERTIES, AND REQUIREMENTS FOR PRECAST CONCRETE.
B. BLENDED HYDRAULIC CEMENTS MUST CONFORM TO ASTM C595. PORTLAND CEMENT SHALL
MEET THE REQUIREMENTS OF ASTM C150. SEE “CONCRETE MIXTURE REQUIREMENTS
SCHEDULE” AND SPECIFICATIONS FOR ADDITIONAL INFORMATION AND REQUIREMENTS.
C. FLY ASH AND NATURAL POZZOLANS USED AS ADMIXTURES SHALL CONFORM TO ASTM C618,
CLASS F.
D. THE USE OF CALCIUM CHLORIDE, ADMIXTURES CONTAINING CHLORIDES AND OTHER
CHLORIDE CONTAINING AGENTS IN PRECAST CONCRETE IS PROHIBITED.
E. CONCRETE COVER OVER REINFORCING SHALL BE IN ACCORDANCE WITH ACI 318 SECTION
20.6.
6. GROUT SHALL BE NONSHRINK, NONMETALILIC, NONCORROSIVE, NONSTAINING GROUT
CONFORMING TO ASTM C1107.
7. STEEL REINFORCING BARS SHALL CONFORM TO THE REQUIREMENTS OF ASTM A615 GRADE 60.
STEEL REINFORCING BARS REQUIRED TO BE WELDED SHALL CONFORM TO THE REQUIREMENTS
OF ASTM A706 GRADE 60. WELDING OF STEEL REINFORCING BARS SHALL BE IN ACCORDANCE
WITH AWS D1.4-17 “STRUCTURAL WELDING CODE — REINFORCING STEEL INCLUDING METAL
INSERTS AND CONNECTIONS IN REINFORCED CONCRETE CONSTRUCTION”. WELDING OF STEEL
REINFORCING OTHER THAN SPECIFIED IS PROHIBITED. SHOP DRAWINGS SHALL CLEARLY
DENOTE ALL WELDING REQUIREMENTS FOR REVIEW AND APPROVAL.
8. PLAIN WELDED WIRE FABRIC REINFORCING SHALL CONFORM TO THE REQUIREMENTS OF ASTM
A1064 WITH A MINIMUM YIELD STRENGTH, FY = 65 KSI. DEFORMED WELDED WIRE FABRIC
REINFORCING SHALL CONFORM TO THE REQUIREMENTS OF ASTM A1064 WITH A MINIMUM YIELD
STRENGTH, FY = 70 KSI. WELDED WIRE FABRIC SHALL BE FABRICATED IN FLAT SHEETS. THE USE
OF ROLLED WELDED WIRE FABRIC IS PROHIBITED.
9. PRESTRESSING STRANDS, WIRES, AND BARS SHALL CONFORM TO THE MATERIAL PROPERTIES
LISTED IN ACI 318. PRESTRESSING STRANDS SHALL BE SEVEN WIRE STRANDS (STRESS-
RELIEVED AND LOW-RELAXATION) CONFORMING TO THE REQUIREMENTS OF ASTM A416, WITH A
MAXIMUM SPECIFIED TENSILE STRENGTH, Fpu = 270 KSI.
10. ADDITIONAL DESIGN REQUIREMENTS -
A. DESIGN OF PRECAST CONCRETE SYSTEMS AND MEMBERS THEREOF AND THEIR
CONNECTIONS SHALL BE THE SOLE RESPONSIBILITY OF THE CONTRACTOR AND THE
SELECTED PRECAST CONCRETE MANUFACTURER. SUBMIT SHOP DRAWINGS,
CALCULATIONS, DESIGN LOAD DATA AND SUPPORT REACTIONS FOR THE PRECAST
CONCRETE MEMBERS AND THEIR CONNECTIONS.
B. PRECAST CONCRETE SYSTEMS AND MEMBERS THEREOF AND THEIR CONNECTIONS SHALL
BE DESIGNED FOR THE DESIGN CRITERIA AND LOADS INDICATED ON THE GENERAL
STRUCTURAL NOTES AND STRUCTURAL DRAWINGS, INCLUDING MEMBER SELF-WEIGHT,
LOADS DUE TO ATTACHED ITEMS (I.E. WINDOWS, DOORS, LOUVERS, ETC.), AND THE LOAD
EFFECTS RESULTING FROM FABRICATION, LIFTING, HANDLING, AND ERECTION.
C. ALL PRECAST CONCRETE MEMBERS AND CONNECTIONS SHALL BE DESIGNED FOR FORCES
AND MOVEMENTS DUE TO VOLUMETRIC CHANGES RESULTING FROM TEMPERATURE
CHANGE, ELASTIC DEFORMATIONS, CREEP AND SHRINKAGE.
D. PRECAST CONCRETE (CONTINUED)
D. DESIGN OF PRECAST CONCRETE MEMBERS SHALL INCLUDE THE EFFECTS OF TORSION
PRODUCED BY ECCENTRIC APPLICATION OF LOADS AND ANY UNBALANCED LOADS WHICH
MAY OCCUR DURING CONSTRUCTION.
E. THE PRECAST CONCRETE SUPPLIER SHALL DESIGN, FURNISH, AND INSTALL ALL
CONNECTIONS REQUIRED TO ATTACH AND SUPPORT PRECAST MEMBERS TO THE BUILDING
STRUCTURE AND FOUNDATION, INCLUDING EMBEDDED COMPONENTS IN CAST-IN-PLACE
CONCRETE, UNLESS NOTED OTHERWISE.
F. PRECAST CONCRETE WALL PANEL SIZES, LOCATIONS, ELEVATIONS AND CONFIGURATIONS
SHALL BE AS SHOWN ON THE ARCHITECTURAL DRAWINGS. REFER TO THE “TYPICAL
PRECAST CONCRETE WALL PANEL ELEVATIONS” ON THE STRUCTURAL DRAWINGS FOR
TYPICAL WALL PANEL SUPPORT LOCATIONS, CONNECTION REQUIREMENTS, AND
ADDITIONAL INFORMATION. CONNECT THE PRECAST CONCRETE WALL PANEL MEMBERS TO
THE BUILDING STRUCTURE AND FOUNDATION WITH THE TYPES OF CONNECTIONS (BEARING,
TIE-BACK, AND LATERAL CONNECTIONS) AND AT THE LOCATIONS INDICATED ON THE
DRAWINGS. ALL PRECAST CONCRETE WALL PANEL CONNECTIONS SHALL BE CAPABLE OF
TRANSFERRING OUT-OF PLANE WIND AND SEISMIC PANEL FORCES TO THE BUILDING
STRUCTURE AND FOUNDATION.
G. PRECAST CONCRETE SYSTEMS AND MEMBERS THEREOF SHALL BE DESIGNED TO HAVE
ADEQUATE STIFFNESS TO LIMIT OUT-OF-PLANE DEFLECTIONS AS INDICATED IN IBC 2018,
TABLE 1604.3 AS MODIFIED BY UFC 3-301-01 AND SHALL NOT EXCEED DEFLECTIONS
PERMITTED BY ACI 318.
H. PRECAST CONCRETE SYSTEMS, MEMBERS AND THEIR CONNECTIONS SHALL BE DESIGNED
TO ACCOMMODATE A BUILDING STORY LATERAL DRIFT DUE TO WIND LOADING OF 3/8 INCH
(MIN) PER STORY. PRECAST CONCRETE SYSTEMS, MEMBERS AND THEIR CONNECTIONS
SHALL BE DESIGNED TO ACCOMMODATE A BUILDING DRIFTS LIMITS APPLICABLE TO
EARTHQUAKE LOADING IN ACCORDANCE WITH THE “BUILDING CODE” AND ASCE 7.
I. DESIGN ALL PRECAST CONCRETE WALL PANEL CONNECTIONS TO THE ELEVATED BUILDING
STRUCTURE TO ALLOW FOR A MINIMUM VERTICAL MOVEMENT OF THE ROOF AND FLOOR
BEAMS AS FOLLOWS:
1. TRANSIENT LOADS (ROOF LIVE LOAD, LIVE LOAD, SNOW LOAD, WIND LOAD) = BEAM SPAN
/ 360
2. TOTAL LOAD = BEAM SPAN / 240
NOTE: BEAM SPAN IN INCHES.
11. PROVIDE BRACING AND OTHER TEMPORARY SUPPORTS AS REQUIRED TO ENSURE STABILITY
OF THE STRUCTURE. WHERE TEMPORARY CONNECTIONS ARE TO BE USED, THEY SHOULD BE
NOTED ON THE SHOP DRAWINGS ALONG WITH THE ANTICIPATED FORCES.
12. PRECAST CONCRETE MEMBERS AND THEIR CONNECTIONS SHALL NOT TRANSFER TORSION
(MOMENTS AND FORCES) RESULTING FROM THE ECCENTRIC LOADING OF THE PRECAST
CONCRETE MEMBERS TO THE BUILDING STRUCTURE. IF REQUIRED, SUPPLEMENTAL
SECONDARY BRACING SHALL BE DESIGNED AND PROVIDED BY THE PRECAST SUPPLIER TO
ELIMINATE THE TRANSFER OF TORSION TO THE BUILDING STRUCTURE.
13. DO NOT INSTALL PRECAST CONCRETE MEMBERS UNTIL THE CONCRETE HAS ATTAINED THE
FULL 28-DAY SPECIFIED CONCRETE COMPRESSIVE STRENGTH.
14. PRECAST CONCRETE WALL PANELS SHALL NOT BE SUPPORTED BY OR ATTACHED TO THE
SUPPORTING BUILDING STRUCTURE (FOUNDATION AND ELEVATED FRAMING) UNTIL THE
CONCRETE FOR THE BUILDING STRUCTURE HAS REACHED THE FULL 28-DAY SPECIFIED
CONCRETE COMPRESSIVE STRENGTH.
15. ALL PRECAST CONCRETE WALL PANEL MEMBERS SUPPORTED ON FOUNDATIONS SHALL HAVE
THE HORIZONTAL JOINT BETWEEN BOTTOM OF THE PRECAST MEMBER AND THE TOP OF THE
FOUNDATION FILLED WITH GROUT. GROUT SHALL HAVE A 28-DAY SPECIFIED COMPRESSIVE
STRENGTH THAT IS AT LEAST 1000 PSI GREATER THAN THAT OF THE SUPPORTED PRECAST
CONCRETE MEMBERS.
16. EXPOSED STEEL SHAPES, PLATES AND CONNECTIONS REQUIRED IN CAST-IN-PLACE AND
PRECAST CONCRETE MEMBERS SHALL BE HOT-DIPPED GALVANIZED UNLESS NOTED
OTHERWISE. GALVANIZED CONNECTIONS WHICH ARE SUBSEQUENTLY FIELD WELDED SHALL BE
TOUCHED UP WITH ZINC-RICH PAINT AFTER WELDING.
17. PROVIDE PROTECTIVE BITUMINOUS COATING OR EQUAL AROUND ALL PRECAST CONCRETE
STEEL CONNECTIONS BELOW GRADE THAT ARE IN CONTACT WITH SOIL.
18. THE PRECAST CONCRETE SUPPLIER SHALL PROVIDE ALL OPENINGS, BLOCKOUTS, INSERTS, ETC, REQUIRED IN PRECAST CONCRETE MEMBERS.
19. THE CONTRACTOR SHALL COORDINATE AND VERIFY ALL DIMENSIONS, SLOPES AND OPENING
SIZES AND LOCATIONS WITH ARCHITECTURAL, MECHANICAL, ELECTRICAL, AND
COMMUNICATIONS DRAWINGS AND SHALL VERIFY LOCATION OF ALL PLATES, ANCHORS, ETC. IN
PRECAST CONCRETE MEMBERS REQUIRED BY OTHER TRADES PRIOR TO FABRICATION OF THE
PRECAST CONCRETE MEMBERS.
20. SEE ARCHITECTURAL, MECHANICAL, ELECTRICAL, PLUMBING, COMMUNICATIONS, AND
STRUCTURAL DRAWINGS AND SPECIFICATIONS FOR ADDITIONAL INFORMATION AND
REQUIREMENTS.
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E A
P P
R
R
E V
IS
E
D I N
A C
C O
R D
A N
C E
W
IT
H A
M E
N D
M E
N T
/0 /2
M C
B
C. CAST-IN-PLACE CONCRETE
1. ALL STRUCTURAL CAST-IN-PLACE CONCRETE HAS BEEN DESIGNED AND SHALL BE
CONSTRUCTED IN ACCORDANCE WITH THE “BUILDING CODE” AND ACI 318-14 “BUILDING CODE
REQUIREMENTS FOR STRUCTURAL CONCRETE AND COMMENTARY”.
2. CONCRETE REQUIREMENTS -
A. REFER TO THE “CONCRETE MIXTURE REQUIREMENTS SCHEDULE” FOR ASSIGNED
EXPOSURE CLASSES, MINIMUM SPECIFIED CONCRETE COMPRESSIVE STRENGTHS,
MATERIAL PROPERTIES AND REQUIREMENTS FOR CAST-IN-PLACE CONCRETE.
B. BLENDED HYDRAULIC CEMENTS MUST CONFORM TO ASTM C595. PORTLAND CEMENT SHALL
MEET THE REQUIREMENTS OF ASTM C150. SEE “CONCRETE MIXTURE REQUIREMENTS
SCHEDULE” AND SPECIFICATIONS FOR ADDITIONAL INFORMATION AND REQUIREMENTS.
C. FLY ASH AND NATURAL POZZOLAN USED AS ADMIXTURES SHALL CONFORM TO ASTM C618.
D. PROVIDE CONCRETE AGGREGATES CONFORMING TO ASTM C33 FOR NORMAL-WEIGHT
CONCRETE.
E. WATER USED IN MIXING CONCRETE SHALL BE POTABLE AND CONFORM TO ASTM C1602.
F. AIR ENTRAINING ADMIXTURES SHALL CONFORM TO ASTM C260.
G. THE USE OF CALCIUM CHLORIDE, ADMIXTURES CONTAINING CHLORIDES AND OTHER
CHLORIDE CONTAINING AGENTS IN CAST-IN-PLACE STRUCTURAL CONCRETE IS PROHIBITED.
H. CONCRETE ADMIXTURES CONTAINING CHLORIDE SALTS OR OTHER SUBSTANCES THAT ARE
CORROSIVE OR OTHERWISE DELETERIOUS TO THE STEEL REINFORCING, STEEL DECK AND
EMBEDDED ITEMS ARE PROHIBITED.
I. CAST-IN-PLACE NONPRESTRESSED CONCRETE MEMBERS SHALL HAVE SPECIFIED
CONCRETE COVER OVER REINFORCEMENT IN ACCORDANCE WITH ACI 318, AS LISTED
BELOW UNLESS NOTED OTHERWISE.
CONCRETE EXPOSURE MEMBER REINFORCEMENT
SPECIFIED
COVER
(IN)
CAST AGAINST AND
PERMANENTLY IN
CONTACT WITH
GROUND
ALL ALL 3
EXPOSED TO WEATHER
OR IN CONTACT WITH
GROUND
ALL
#6 THROUGH #18 BARS 2
#5 BAR, W31 OR D31 WIRE,
AND SMALLER
1-1/2
NOT EXPOSED TO
WEATHER OR IN
CONTACT WITH
GROUND
SLABS, JOISTS, AND
WALLS
#14 AND #18 BARS 1-1/2
#11 BAR AND SMALLER 3/4
BEAMS, COLUMNS,
PEDESTALS, AND
TENSION TIES
PRIMARY REINFORCEMENT,
STIRRUPS, TIES, SPIRALS,
AND HOOPS
1-1/2
3. CONCRETE REINFORCING SHALL MEET THE FOLLOWING -
A. STEEL REINFORCING BARS SHALL CONFORM TO THE REQUIREMENTS OF ASTM A615 GRADE
60. STEEL REINFORCING BARS REQUIRED TO BE WELDED SHALL CONFORM TO THE
REQUIREMENTS OF ASTM A706 GRADE 60. WELDING OF STEEL REINFORCING BARS SHALL
BE IN ACCORDANCE WITH AWS D1.4-17 “STRUCTURAL WELDING CODE — REINFORCING
STEEL INCLUDING METAL INSERTS AND CONNECTIONS IN REINFORCED CONCRETE
CONSTRUCTION”. WELDING OF REINFORCING OTHER THAN SPECIFIED IS PROHIBITED.
STEEL REINFORCEMENT SHOP DRAWINGS SHALL CLEARLY DENOTE ALL WELDING
REQUIREMENTS FOR REVIEW AND APPROVAL.
B. ALL REINFORCING SHALL BE CONTINUOUS UNLESS NOTED OR INDICATED OTHERWISE. LAP
SPLICES AND EMBEDMENT LENGTHS FOR REINFORCING SHALL BE IN ACCORDANCE WITH
THE “REINFORCEMENT SPLICE AND EMBEDMENT SCHEDULE” AND THE “ACI STANDARD 90-
AND 180-DEGREE HOOK REINFORCEMENT EMBEDMENT SCHEDULE” UNLESS NOTED
OTHERWISE. WHERE REINFORCING BARS OF DIFFERENT SIZES LAP, PROVIDE A LAP SPLICE
LENGTH FOR THE LARGER REINFORCING BAR SIZE.
C. PROVIDE CORNER BARS IN OUTSIDE FACE OF ALL GRADE BEAMS AND WALLS EQUAL IN SIZE
AND SPACING TO MAIN HORIZONTAL REINFORCING. EXTEND INSIDE FACE REINFORCING OF
ALL GRADE BEAMS AND WALLS TO THE OUTSIDE FACE AND BEND TO A STANDARD 90
DEGREE HOOK UNLESS NOTED OTHERWISE.
D. PROVIDE 2-#5 EACH SIDE OF EACH OPENING THROUGH WALLS OR SLABS UNLESS NOTED
OTHERWISE. REINFORCING BARS SHALL EXTEND 24 INCHES PAST THE OPENING.
E. PLAIN WELDED WIRE FABRIC REINFORCING SHALL CONFORM TO THE REQUIREMENTS OF
ASTM A1064 WITH A MINIMUM YIELD STRENGTH, FY = 65 KSI. DEFORMED WELDED WIRE
FABRIC REINFORCING SHALL CONFORM TO THE REQUIREMENTS OF ASTM A1064 WITH A
MINIMUM YIELD STRENGTH, FY = 70 KSI.
F. WELDED WIRE FABRIC SHALL BE PROVIDED IN FLAT SHEETS. THE USE OF ROLLED WELDED
WIRE FABRIC IS PROHIBITED. WELDED WIRE FABRIC MUST HAVE END LAPS AND EDGE LAPS
OF ONE FULL MESH AND SHALL BE HELD IN PLACE BY WIRING ALL LAPS SECURELY
TOGETHER.
G. STEEL REINFORCEMENT SHOP DRAWINGS SHALL BE SUBMITTED WITH REINFORCING STEEL
DETAILED IN ACCORDANCE WITH ACI PUBLICATION SP-66(04) “ACI DETAILING MANUAL —
2004”.
H. ALL STEEL REINFORCEMENT SHOWN TO HAVE A 90- OR 180-DEGREE LEG SHALL CONFORM
TO THE REQUIREMENTS OF A STANDARD ACI 90 OR 180 DEGREE HOOK RESPECTIVELY
UNLESS NOTED OTHERWISE.
C. CAST-IN-PLACE CONCRETE (CONTINUED)
4. FORMING AND EMBEDMENTS SHALL MEET THE FOLLOWING -
A. ALL EXTERIOR CORNERS AND EXPOSED EDGES OF CONCRETE SHALL BE CHAMFERED 3/4
INCH INSIDE FORMS OR TOOLED TO 3/8 INCH RADIUS ON SLABS UNLESS NOTED OTHERWISE.
B. SLABS-ON-GRADE SHALL HAVE CONSTRUCTION JOINTS AND CONTROL JOINTS (SAWED
JOINTS) LOCATED AS SHOWN ON THE DRAWINGS. SHOULD THE CONTRACTOR DESIRE TO
DEVIATE FROM THE SLAB-ON-GRADE JOINT LAYOUT SHOWN, THE CONTRACTOR SHALL
SUBMIT FOR APPROVAL AN ALTERNATE JOINT LAYOUT AS PART OF THE REQUIRED SLAB-ON-
GRADE CONCRETE PLACEMENT, JOINTING, AND CURING PLAN REQUIRED BY GENERAL
STRUCTURAL NOTE C.6. THE ALTERNATE JOINT LAYOUT AND SPACING SHALL BE IN
ACCORDANCE WITH THE RECOMMENDATIONS OF ACI 302.1R “GUIDE FOR CONCRETE FLOOR
AND SLAB CONSTRUCTION”, LATEST EDITION. THE CONTRACTOR SHALL LOCATE AND
DIMENSION ALL SLAB-ON-GRADE JOINTS ON THE STEEL REINFORCEMENT SHOP DRAWINGS.
C. PROVIDE CONSTRUCTION JOINTS IN STRUCTURAL CONCRETE MEMBERS IN ACCORDANCE
WITH ACI 318. WHERE NECESSARY, VERTICAL CONSTRUCTION JOINTS IN STRUCTURAL
CONCRETE MEMBERS SHALL BE LOCATED WITHIN THE CENTER ONE-THIRD OF THE SPAN.
ALL JOINTS SHALL BE THOROUGHLY CLEANED AND PURPOSELY ROUGHENED TO 1/4 INCH
AMPLITUDE AND COATED WITH AN APPROVED EPOXY BONDING AGENT PRIOR TO PLACING
ADJACENT CONCRETE. CONSTRUCTION JOINTS IN EXPOSED STRUCTURAL CONCRETE
MEMBERS SHALL HAVE A MAXIMUM SPACING OF 50 FEET. NO HORIZONTAL CONSTRUCTION
JOINTS WILL BE PERMITTED IN STRUCTURAL CONCRETE BEAMS, JOISTS, WALLS, SLABS,
AND FOUNDATIONS UNLESS SPECIFICALLY SHOWN ON THE DRAWINGS OR APPROVED BY
THE ARCHITECT, CONTRACTING OFFICER, AND THE STRUCTURAL ENGINEER OF RECORD
PRIOR TO CONSTRUCTION.
D. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE DESIGN OF ALL FORMING, TEMPORARY
BRACING, AND SHORING.
E. NO ALUMINUM SHALL BE EMBEDDED IN CONCRETE. CONDUITS AND PIPING RUNNING
HORIZONTALLY SHALL NOT BE EMBEDDED IN CONCRETE SLABS-ON-GRADE, ELEVATED
CONCRETE STRUCTURAL SLABS OR WALLS, OR ELEVATED CONCRETE SLABS ON STEEL
DECK. VERTICAL PENETRATIONS THRU ELEVATED SLABS SHALL BE COORDINATED NOT TO
CONFLICT WITH REINFORCING AND SHALL BE LOCATED AND DIMENSIONED ON THE STEEL
REINFORCEMENT AND STEEL DECK SHOP DRAWINGS. PENETRATIONS SHALL NOT
PENETRATE SLAB DROP PANELS OR BEAMS. VERTICAL PENETRATIONS THRU ELEVATED
SLABS SHALL BE SLEEVED OR FORMED ONLY. CORE DRILLING WILL NOT BE ALLOWED. ALL
SLEEVED PENETRATIONS SHALL BE COORDINATED BY THE CONTRACTOR AND LOCATED
AND DIMENSIONED ON THE STEEL REINFORCEMENT AND STEEL DECK SHOP DRAWINGS.
THE NUMBER AND SPACING OF ADJACENT SLEEVED OR FORMED OPENINGS SHALL BE
COORDINATED WITH THE STRUCTURAL ENGINEER OF RECORD PRIOR TO INSTALLATION TO
PREVENT ANY IMPACT ON STRUCTURAL CAPACITY OR PERFORMANCE.
5. CURING FOR CONCRETE SURFACES NOT IN CONTACT WITH FORMS. ONE OF THE FOLLOWING
PROCEDURES SHALL BE APPLIED IMMEDIATELY AFTER COMPLETION OF CONCRETE
PLACEMENT AND FINISHING. ALL CONCRETE SLABS-ON-GRADE, MAT/ SLAB FOUNDATIONS, AND
SEISMIC REACTION MASS MAT FOUNDATIONS SHALL BE CURED USING MOISTURE RETAINING
COVER MATERIAL INDICATED IN ITEM “A” BELOW.
A. APPLICATION OF MOISTURE RETAINING CURING COVER MATERIALS CONSISTING OF BURLAP
BACKED WHITE WATERPROOF SHEET MATERIALS, CONFORMING TO ASTM C171 "STANDARD
SPECIFICATION FOR SHEET MATERIALS FOR CURING CONCRETE". CURING SHALL BE
CONTINUED AT LEAST 7 DAYS.
B. APPLICATION OF A CURING COMPOUND CONFORMING TO ASTM C309 "STANDARD
SPECIFICATION FOR LIQUID MEMBRANE-FORMING COMPOUNDS FOR CURING CONCRETE".
THE COMPOUND SHALL BE APPLIED IN ACCORDANCE WITH THE RECOMMENDATIONS OF THE
MANUFACTURER IMMEDIATELY AFTER ANY WATER SHEEN WHICH MAY DEVELOP AFTER
FINISHING HAS DISAPPEARED FROM THE CONCRETE SURFACE. IT SHALL NOT BE USED ON
ANY SURFACE AGAINST WHICH ADDITIONAL CONCRETE OR SUBSEQUENTLY APPLIED FINISH
MATERIAL OF SYSTEM IS TO BE BONDED UNLESS IT IS PROVEN THAT THE CURING
COMPOUND WILL NOT PREVENT PROPER BOND, OR UNLESS POSITIVE MEASURES ARE
TAKEN TO REMOVE IT COMPLETELY FROM AREAS TO RECEIVE BONDED APPLICATIONS.
CURING SHALL BE CONTINUED AT LEAST 7 DAYS.
C. APPLICATION OF ABSORPTIVE MATS OR FABRIC KEPT CONTINUOUSLY MOIST.
6. CONTRACTOR SHALL SUBMIT FOR REVIEW AND COMMENT, A CONCRETE PLACEMENT, JOINTING, AND CURING PLAN 28 DAYS PRIOR TO BEGINNING ANY CONCRETE CONSTRUCTION. THE PLAN
SHALL INCLUDE AS A MINIMUM THE LOCATION, SEQUENCE, AND SCHEDULE FOR EACH
CONCRETE PLACEMENT. THE CONCRETE JOINTING LOCATIONS, TYPE, AND MATERIALS SHALL
BE IDENTIFIED AND COORDINATED WITH THE PLACEMENT PLAN AND THE CONCRETE CURING
MATERIALS AND DURATIONS SHALL BE IDENTIFIED AND COORDINATED WITH THE PLACEMENT
AND JOINTING PLANS.
7. ALL INTERIOR CONCRETE SLABS-ON-GRADE AND ELEVATED SLABS ON STEEL DECK SHALL
RECEIVE A STEEL TROWEL FINISH UNLESS NOTED OTHERWISE, SPECIFIED, OR REQUIRED BY A
SUBSEQUENT FLOOR FINISH SYSTEM OR MATERIAL. APPLY ONE APPLICATION OF CURE-
DENSIFIER-HARDENER TO THE TOP OF CONCRETE SLABS-ON-GRADE, PEDESTALS,
FOUNDATIONS THAT WILL REMAIN EXPOSED TO VIEW.
8. EXTERIOR CONCRETE SLABS-ON-GRADE, CONCRETE STOOPS, AND ELEVATED STRUCTURAL
CONCRETE SLABS SHALL RECEIVE A LIGHT BROOM FINISH BRUSHED PARALLEL TO THE SLOPE
OF THE SLAB.
9. CONTRACTOR SHALL SUBMIT NEOPRENE TYPE VIBRATION ISOLATION MATERIAL FOR REVIEW
PRIOR TO BEGINNING CONCRETE CONSTRUCTION.
W
2Q R
R
_P la ns -0
S SS S S S S S S S S S S S S
S S
S S
S S
S S
S
SS S
S S
S
S
GENERAL NOTES
1. THESE DRAWINGS ARE NOT TO BE SCALED. REFER TO DIMENSIONS
INDICATED ON DIMENSION PLANS, SHOP DRAWINGS, OR ESTABLISHED
FIELD DIMENSIONS. WHERE NO DIMENSIONS OR METHOD OF DETERMINING
A LOCATION IS GIVEN, VERIFY WITH ARCHITECT PRIOR TO PROCEEDING.
KEYED PLAN
A-201
D1
A-201
H1
A-201
A1
A-201
L1
AA
BB
CC
DD
EE
CONFERENCE
ROOM
BREAK ROOM
ELECTRICAL
MECHANICAL
OFFICE
OFFICE
MOTHERS
ENTRY
CONTROL ROOM
COMM_1
HIGH BAY AREA
JAN / RECYCLE
LOCKER AND
SHOWER
VESTIBULE
MENS RESTROOM
VESTIBULE
OPEN OFFICE
CORRIDOR
FIRE
PROTECTION
20' - 1" 20' - 4" 20' - 4" 20' - 4" 20' - 4" 20' - 4" 20' - 4" 20' - 4" 20' - 6" 20' - 0" 20' - 0" 20' - 0" 20' - 0" 19' - 9"
186' - 8" 100' - 0"
5'
O U
T T
O O
U T
O F
B U
IL
D
IN
G
286' - 8" (OUT TO OUT OF BUILDING)
2' - 0" 282' - 8" (OUT TO OUT OF GRID LINES) 2' - 0"
20' - 1" 20' - 4" 20' - 4" 20' - 4" 20' - 4" 20' - 4" 20' - 4" 20' - 4" 20' - 6" 20' - 0" 20' - 0" 20' - 0" 20' - 0" 19' - 9"
2' - 0" 282' - 8" (OUT TO OUT OF GRID LINES) 2' - 0"
2'
0"
0'
O U
T T
O O
U T
O F
G R
ID
L
IN
E
S
1'
0"
0"
2'
0"
0'
O U
T T
O O
U T
O F
G R
ID
L
IN
E
S
1'
0"
0"
PUMP ROOM
286' - 8" (OUT TO OUT OF BUILDING)
5'
O U
T T
O O
U T
O F
B U
IL
D
IN
G
SHAKER ROOM
R
E F
E R
A
A -1
R
E F
E R
A
A -1
R
E F
E R
A
A -1
R
E F
E…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .