W912QR24R0008_Plans-0002.pdf
PDF 10 MB Posted
- Solicitation number
- W912QR24R0008
About this file
This solicitation is for the construction of a new Ground Transport Equipment Building at Detroit Arsenal in Warren, Michigan. The project has an estimated construction cost between $25-100 million. It is a single-phase design-bid-build procurement conducted by the Department of the Army Corps of Engineers Engineering District Louisville as a full and open competition under NAICS code 236220 with a size standard of $45 million. Offerors must ensure their business size is correctly listed under this NAICS code in the System for Award Management, as that will determine status as a small or other-than-small business. The solicitation requires application of the 10% price evaluation preference for HUBZone small businesses. A site visit was held with related information provided in clause 52.236-27 ALT I. The solicitation number is W912QR24R0008.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E
SHEET ID
US Army Corps of Engineers
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
P2
LO
U
IS
VI
LL
E
D
IS
TR
IC
T
D
R M
AR
TI
N L
U
TH
ER
J
R P
L
LO
U
IS
VI
LL
E, K
Y
SE
PT
EM
BE
R
9, D
ET
R O
IT
A
R
SE
N
AL
, M I
G R
O U
N D
T R
AN
SP
O R
TA
TI
O N
E Q
U
IP
M
EN
T
BU
IL
D
IN
G
FY
Plot Date: File Path:
C
ER
TI
FI
ED
F
IN
AL
S U
BM
IT
TA
L
GENERAL NOTES
1. UNDERGROUND FACILITIES, STRUCTURES AND UTILITIES HAVE BEEN PLOTTED FROM AVAILABLE SURVEYS AND RECORDS. THEREFORE, THEIR LOCATION MUST BE CONSIDERED APPROXIMATE ONLY.
THERE MAY BE OTHERS, THE EXISTENCE OF WHICH IS NOT PRESENTLY KNOWN. BEFORE STARTING ANY WORK, THE CONTRACTOR SHALL POTHOLE TO LOCATE AND PROTECT ALL EXISTING BURIED UTILITY LINES, WHETHER OR NOT SHOWN ON THESE DRAWINGS, DURING THE COURSE OF CONSTRUCTION.
REROUTING, DISCONNECTION, PROTECTION, ETC. OF ANY UTILITIES MUST BE COORDINATED BETWEEN
THE CONTRACTOR, UTILITY COMPANY, AND CONTRACTING OFFICER'S REPRESENTATIVE.
2. PRIOR TO THE START OF CONSTRUCTION THE CONTRACTOR SHALL INSTALL AND MAINTAIN DURING CONSTRUCTION ALL SEDIMENT CONTROL MEASURES AS NECESSARY TO RETAIN SEDIMENTS ON THE
SITE.
3. THE CONTRACTOR SHALL COORDINATE WORK EFFORTS WITH THE GOVERNMENT TO MINIMIZE TRAFFIC
INTERFERENCE AND OPERATIONS OF THE FACILITIES.
4. NO BLASTING OR BURNING IS ALLOWED ON THE PROJECT SITE, UNLESS OTHERWISE NOTED OR
DIRECTED BY THE GOVERNMENT.
DEMOLITION AND CLEARING NOTES:
1. DEMOLITION AND CLEARING OPERATIONS SHALL CONFORM TO APPLICABLE REGULATIONS RELATING TO
ENVIRONMENTAL REQUIREMENTS, DISPOSAL OF DEBRIS, AND USE OF HERBICIDES.
2. DEMOLITION WASTE SHALL BE DISPOSED OF IN A LEGAL MANNER. REMOVE DEMOLITION WASTE MATERIALS FROM PROJECT SITE AND DISPOSE OF WASTE IN AN EPA-APPROVED LANDFILL ACCEPTABLE TO AUTHORITIES HAVING JURISDICTION. DO NOT BURY OR BURN DEMOLITION WASTE ON-SITE.
3. ARRANGE DEMOLITION SCHEDULE SO AS NOT TO INTERFERE WITH GOVERNMENT'S ON-SITE
OPERATIONS OR OPERATIONS OF ADJACENT OCCUPIED BUILDINGS. PROVIDE NOT LESS THAN 72 HOURS
NOTICE OF ACTIVITIES THAT WILL AFFECT OPERATIONS OF ADJACENT OCCUPIED BUILDINGS.
4. PRIOR TO COMMENCEMENT OF SITE CLEARING OPERATIONS, VERIFY THE FOLLOWING:
a. TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES ARE IN PLACE AND IN WORKING ORDER.
b. EXISTING UNDERGROUND UTILITIES HAVE BEEN LOCATED AND MARKED IN THE FIELD.
c. EXISTING SITE IMPROVEMENTS AND UTILITIES TO REMAIN HAVE BEEN PROTECTED.
5. COORDINATE UTILITY DEMOLITION AND ABANDONMENT WITH DETROIT ARSENAL UTILITY GROUPS.
6. CONTRACTOR TO PROVIDE A MINIMUM OF 48-HOUR NOTICE TO ALL DETROIT ARSENAL UTILITY GROUPS
BEFORE DIGGING.
7. COORDINATE ALL SITE DEMOLITION WITH PROPOSED SITE IMPROVEMENTS, AND NEW UNDERGROUND
UTILITIES.
8. CONTRACTOR SHALL REPAIR ANY DAMAGED UTILITY LINES CAUSED BY HIS/HER ACTIVITIES. ALL WORK REQUIRED TO PERMANENTLY REPAIR THE UTILITY TO THE ENGINEER'S SATISFACTION SHALL BE AT THE
CONTRACTORS EXPENSE.
EARTHWORK NOTES:
1. COORDINATE ALL SITE IMPROVEMENTS WITH NEW UNDERGROUND UTILITIES.
2. IN THE EVENT OF ANY UNFORESEEN CONDITIONS THAT ARE ENCOUNTERED AND NOT COVERED BY THESE NOTES DURING GRADING OPERATIONS, THE ENGINEER SHALL BE IMMEDIATELY NOTIFIED FOR
DIRECTION.
3. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO PERFORM ALL NECESSARY CUTS AND FILLS WITHIN THE LIMITS OF THIS PROJECT AND RELATED OFF-SITE WORK SO AS TO ESTABLISH THE DESIRED
SUBGRADE, FINISH GRADES AND SLOPES SPECIFIED WITHIN THE PLANS.
4. ADEQUATE SHORING IS TO BE DESIGNED AND PROVIDED BY THE CONTRACTOR TO PREVENT
UNDERMINING OF ANY ADJACENT FEATURES OR FACILITIES AND/OR CAVING OF THE EXCAVATION. ALL
SHORING AND ASSOCIATED TEMPORARY STRUCTURES SHALL BE DESIGNED BY A LICENSED
PROFESSIONAL AND INSTALLED PURSUANT TO O.S.H.A. REQUIREMENTS.
UTILITY NOTES:
1. WHERE APPLICABLE, THE CONTRACTOR SHALL MAINTAIN ALL FENCING, SIGNS, DETOURS, FLAGMEN, SIGNALS, ETC., FOR ANY OPEN TRENCHES, HOLES OR PITS. ALL TRENCHES, HOLES OR PITS SHALL BE
CLOSED OR PROTECTED BY BARRICADES AT THE END OF THE DAY.
2. THE CONTRACTOR SHALL MAINTAIN RECORD DRAWINGS DURING CONSTRUCTION WHICH SHOW THE
CONSTRUCTED CONDITIONS OF ALL WORK INSTALLED.
EROSION AND SEDIMENTATION CONTROL NOTES:
1. PRIOR TO COMMENCEMENT OF ANY CLEARING AND EXCAVATION WITHIN A WORK AREA, ALL EROSION
AND SEDIMENT CONTROL MEASURES SHALL BE INSTALLED AND IN WORKING ORDER.
2. THE STORMWATER POLLUTION PREVENTION PLAN (SWP3) IS PREPARED IN ACCORDANCE WITH THE STATE AND FEDERAL NATIONAL POLLUTANT DISCHARGE SYSTEM (NPDES) PERMIT AND SHALL OUTLINE “BEST MANAGEMENT PRACTICES” TO BE USED THROUGHOUT THE PROJECT AND WILL BE PROVIDED TO
THE CONTRACTOR.
3. THE “EROSION CONTROL PLAN” CONTAINED WITHIN THIS PLAN SHALL BE ADJUSTED AS REQUIRED DURING THE PHASING AND PERFORMANCE OF THE CONSTRUCTION. ADDITIONAL MEASURES SHALL BE ADDED AS REQUIRED TO ENSURE THE SITE MEETS ALL FEDERAL, STATE, AND LOCAL EROSION AND SEDIMENT CONTROL REQUIREMENTS, AS WELL AS THE APPROPRIATE STATE AND FEDERAL NATIONAL
POLLUTANT DISCHARGE PERMIT (NPDES).
4. THE CONTRACTOR IS RESPONSIBLE FOR MAINTAINING EROSION AND SEDIMENT CONTROL FEATURES TO PREVENT SEDIMENT-LADEN AND OTHER POLLUTANTS FROM LEAVING THE CONSTRUCTION AREAS AND
ENTERING EXISTING STORM WATER FACILITIES AND SURFACE WATERS. ADDITIONAL MEASURES
BEYOND THOSE SHOWN ON THESE PLANS MAY BE NECESSARY DURING CONSTRUCTION, INCLUDING
TEMPORARY VEGETATIVE MEASURES AND INSTALLATION OF OTHER SILT TRAPPING MEASURES.
5. ALL BEST MANAGEMENT CONTROL PRACTICES SHALL BE INSPECTED BY THE SUPERINTENDENT, THE
PERSON RESPONSIBLE FOR THE DAY TO DAY OPERATIONS; OR SOMEONE APPOINTED BY THE
SUPERINTENDENT, AT LEAST EVERY 7 DAYS OR WITHIN 24 HOURS AFTER A PRECIPITATION EVENT THAT RESULTS IN RUNOFF LEAVING THE SITE INCLUDING WEEKEND DAYS REGARDLESS IF THE CONTRACTOR
IS WORKING OR NOT. A WRITTEN LOG SHALL BE MAINTAINED ON SITE OF ALL INSPECTIONS.
6. ALL BEST MANAGEMENT CONTROL MEASURES WILL BE MAINTAINED IN GOOD WORKING ORDER. IF A REPAIR IS NECESSARY, IT WILL BE INITIATED WITHIN 24 HOURS OF REPORTS IDENTIFYING THE PROBLEM
DETAILS OF THE REPAIRS SHALL BE MAINTAINED WITH THE INSPECTION LOG.
7. CONTRACTOR SHALL MAINTAIN AS MUCH OF THE EXISITING VEGETATION AS POSSIBLE IN AREAS OUTSIDE OF THE SCOPE OF WORK AND IN AREAS TO BE DEMOLISHED. VEGETATION TO STAY SHALL BE
PROTECTED DURING CONSTRUCTION. AREAS THAT ARE DISTURBED BY CONSTRUCTION SHALL BE
COVERED AND SEEDED WITHIN 14 DAYS IF NO WORK IN AREA IS PLANNED WITHIN THE NEXT 30 DAYS.
WHEN GRADING IS COMPLETE IN AN AREA, THE AREA SHALL BE SEEDED FOR FINAL STABILIZATION. ALL DISTURBED AREAS SHALL BE SEEDED. THIS INCLUDES, BUT IS NOT LIMITED TO, AREAS AFTER REMOVAL OF TEMPORARY HAUL ROADS, STAGING AND LAYDOWN AREAS, EQUIPMENT STORAGE AREAS, UTILITY TRENCHES, ETC. THE CONTRACTOR SHALL WATER NEW SEED DAILY OR AS NEEDED TO ESTABLISH 95% GROUND COVER PER SECTION 32 92 19 OF THE PROJECT SPECIFICATIONS. CONTRACTOR SHALL MAINTAIN THE SEEDED AREAS UNTIL FINAL ACCEPTANCE OF THE GRASS COVERAGE OF THE DISTURBED AREAS BY THE CONTRACTING OFFICER. NO SODDING IS REQUIRED. THE AREAS WITHIN THE LIMITS OF
CONSTRUCTION SHALL PRESENT A NEAT AND FINISHED APPEARANCE. THE CONTRACTOR SHALL
PROVIDE TEMPORARY WINTER GRASS COVERAGE IN AREAS WHERE SEED IS DELAYED BY THE SEASON.
EXISTING PROPOSED
BOLLARD
FENCE
TREE LINE
SWALE/ DETENTION BASIN TOE
AND TOP OF SLOPE
NATURAL GAS
WATER LINE
SANITARY SEWER
ROOF DRAIN
OVERHEAD ELECTRIC
UNDERGROUND ELECTRIC
UNDERGROUND COMM. LINE
UTILITY POLE
FIRE HYDRANT
VALVE (GAS OR WATER)
STORM DRAIN
FIRE PROTECTION WATER MAIN
LIGHT POLE
TREE
TELEPHONE LINE UGRND.
MANHOLE
X X
G G
W W
SAN SAN
OH OH
UE UE
UC UC
SD
FP
SD
TUG
FMFM
OC OC
LOD
SF
LEGEND
E
REINF REINFORCED, REINFORCING
REQ'D REQUIRED
RES RESILIENT
REV REVISION
RH RIGHT HAND
RHR RIGHT HAND REVERSE
RL RAIN LEADER
RM ROOM
ROW RIGHT OF WAY
RTU ROOFTOP UNIT
RUB RUBBER
S SOUTH
S/A SUPPLY AIR
SC SEALED CONCRETE
SCHED SCHEDULE
SE SOUTHEAST
SECT SECTION
SF SQUARE FOOT
SPECS SPECIFICATIONS
SQ SQUARE
SS SERVICE SINK
SST STAINLESS STEEL
STD STANDARD
STL STEEL
STND STAINED
STOR STORAGE
STRUCT STRUCTURAL
SUSP SUSPENDED
SW SOUTHWEST
SYM SYMMETRICAL
SYS SYSTEM
T TREAD
T&B TOP & BOTTOM
TC TOP OF CURB
TEL TELEPHONE
TEMP TEMPORARY
THK THICK, THICKNESS
TO TOP OF
TOC TOP OF CONCRETE
TOR TOP OF ROOF
TOR(C-R-S
-W)
TOP OF EXISTING (SEE
BELOW)
TOS TOP OF STEEL
TOW TOP OF WALL
TRC TEXTILE REINFORCED CONCRETE
TYP TYPICAL
UC UNDERCUT
UH UNIT HEATER
UNFIN UNFINISHED
UNO UNLESS NOTED OTHERWISE
UON UNLESS OTHERWISE NOTED
UTIL UTILITY
VB VAPOR BARRIER
VERT VERTICAL
VIF VERIFY IN FIELD
VTR VENT THROUGH ROOF
W WIDTH, WEST
W/ WITH
W/O WITHOUT
WC WATER CLOSET, WALL
COVERING
WD WOOD
WGL WIRE GLASS
WH WATER HEATER
WP WATERPROOFING
WT WEIGHT
WWM WELDED WIRE MESH
LLH LONG LEG HORIZONTAL
LLV LONG LEG VERTICAL
LP LOW POINT
LT LIGHT
LTL LINTEL
LVR LOUVER
LW LIGHTWEIGHT
M METER
MAINT MAINTENANCE
MAX MAXIMUM
MECH MECHANICAL
MEZZ MEZZANINE
MFG MANUFACTURING
MFR MANUFACTURER
MH MANHOLE
MIN MINIMUM
MIR MIRRIOR
MISC MISCELLANEOUS
MM MILLIMETER
MNT MOUNT
MO MASONARY OPENING
MTL METAL
MULL MULLION
N NORTH
NE NORTHEAST
NIC NOT IN CONTRACT
NO NUMBER
NOM NOMINAL
NPS NOMINAL PIPE SIZE
NTS NOT TO SCALE
NW NORTHWEST
OA OVERALL
OC ON CENTER
OD OUTSIDE DIAMETER
OFCI OWNER FURNISHED
CONTRACTOR INSTALLED
OFF OFFICE
OFOI OWNER FURNISHED OWNER
INSTALLED
OH OVERHEAD
OPNG OPENING
OPP OPPOSITE
OTO OUT-TO-OUT
PC PRECAST
PL PLATE, PROPERTY LINE
PLAM PLASTIC LAMINATE
PLMBG PLUMBING
PLWD PLYWOOD
PLYWD PLYWOOD
PM PRESSED METAL
PNL PANEL
PNT(D) PAINT(ED)
POL POLISHED
PR PAIR
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PT PRESSURE TREATED
PTN PARTITION
PVC POLYVINYL CHLORIDE
PVG PAVING
R RADIUS, RISER
R/A RETURN AIR
RB RESILIENT BASE
RD ROOF DRAIN
REF REFERENCE
FEC FIRE EXTINGUISHER IN
CABINET
FF FINISHED FLOOR
FFE FINISHED FLOOR ELEVATION
FH FIRE HYDRANT
FHC FIRE HOSE CABINET
FIN FINISH
FL FLOOR, FLOORING
FO FACE OF
FOC FACE OF CONCRETE
FOS FACE OF STUDS
FP FIREPROOF
FR FIRE RATED
FRT FIRE RETARDAINT TREATED
FS FULL SIZE
FT FOOT, FEET
FTG FOOTING
FURN FURNISH
FV FIELD VERIFY
G GAS
GA GAGE
GALV GALVANIZED
GB GRAB BAR
GC GENERAL CONTRACTOR
GD GRADE
GL GLASS
GWB GYPSUM WALL BOARD
GYP GYPSUM
HB HOSE BIB
HC ACCESSIBLEPED, HOLLOW
CORE
HD HAND
HDR HEADER
HDW HARDWARE
HDWD HARDWOOD
HM HOLLOW METAL
HORIZ HORIZONTAL
HP HIGH POINT, HORSE POWER
HR HOUR
HS HEAT STRENGTHENED
HT HEIGHT
HVAC HEATING VENTILATING AIR
CONDITIONING
HW HOT WATER
ID INSIDE DIAMETER
IMP INSULATED METAL PANEL
INSUL INSULATION
INT INTERIOR
INV INVERT
JAN JANITOR
JST JOIST
JT JOINT
KD KNOCKDOWN
KG KILOGRAM
KIT KITCHEN
KO KNOCKOUT
KS KNEE SPACE
LONG, LENGTH
LAB LABORATORY
LAV LAVATORY
LB LOAD BEARING
LBS POUNDS
LEV LEVEL
LH LEFT HAND
LHR LEFT HAND REVERSE
ABBR DESCRIPTION
AND
AT
AIR CONDITIONING
ANCHOR BOLT
ACOUS ACOUSTICAL
ACT ACOUSTICAL CEILING TILE
ABOVE FINISHED FLOOR
AHU AIR HANDLING UNIT
ALTERNATE
ALUM ALUMINUM
APPROX APPROXIMATE
ARCH ARCHITECTURAL
BLDG BUILDING
BLKG BLOCKING
BO BOTTOM OF
BOT BOTTOM
BRG BEARING
BTW BETWEEN
CAB CABINET
CB CATCH BASIN
CF CUBIC FEET
CFM CUBIC FEET PER MINUTE
CFMF COLD - FORMED METAL
FRAMING
CJ CONTROL JOINT
CL CENTERLINE
CLG CEILING
CMU CONCRETE MASONERY UNIT
CO CLEAN OUT
COL COLUMN
CONC CONCRETE
CONST CONSTRUCTION
CONT CONTINUES
CORR CORRIDOR
CW CHILLER WATER
CY CUBIC YARD
D DEEP
DBL DOUBLE
DET DETAIL
DF DRINKING FOUNTAIN
DIA DIAMETER
DIAG DIAGONAL
DIM DIMENSION
DN DOWN
DR DOOR
DS DOWNSPOUT
DWG(S) DRAWING(S)
E EAST
EA EACH
EJ EXPANSION JOINT
EL ELEVATION
ELEC ELECTRICAL
ELEV ELEVATION
EQ EQUAL
EQUIP EQUIPMENT
EW EYE WASH
EWC ELECTRIC WATER COOLER
EWH ELECTRIC WATER HEATER
EXIST EXISTING
EXP EXPANSION, EXPOSED
EXT EXTERIOR
FA FIRE ALARM
FD FLOOR DRAIN
FEB FIRE EXTINGUISHER
BRACKET
MOUNT
ABBREVIATIONS
EXISTING PROPOSED
GUY ANCHOR
POST INDICATOR VALVE
FORCE MAIN
BORE HOLE
SANITARY MANHOLE
FLARED END SECTION
CLEANOUT
OVERHEAD ELEC. & COMM.
LIMIT OF DISTURBANCE
SILT FENCE
CONTOUR LINE
SIGN
UTILITY POLE
ELECTRICAL CONTROL CABINET
TELEPHONE PULL BOX
ELECTRIC PULL BOX
SURVEY CONTROL POINT
BOLLARD
SPOT ELEVATION
ABBR DESCRIPTION ABBR DESCRIPTION ABBR DESCRIPTION ABBR DESCRIPTION ABBR DESCRIPTION
L
ATFP ANTI TERRORISM FORCE
PROTECTION
VOLUME 1 - SHEET INDEX
SHT NO SHEET NAME REV DATE
C-001 COVER SHEET
C-002 GENERAL NOTES AND
ABBREVIATIONS
C-100 EXISTING CONDITIONS
C-101 SURVEY CONTROL PLAN
CD100 SITE DEMOLITION PLAN 0002 02/23/2024
C-102 AERIAL PHOTO PLAN
C-103 SITE PLAN 0002 02/23/2024
C-104 GEOMETRY PLAN 0002 02/23/2024
C-105 UTILITY PLAN
C-106 GRADING PLAN 0002 02/23/2024
C-107 ATFP PLAN
C-108 EROSION CONTROL PLAN
C-109 HAUL ROUTE 0002 02/23/2024
C-110 JOINTING PLAN
C-111 PHOTOGRAPH PLAN
C-112 SITE COORDINATE PLAN
C-113 UTILITY COORDINATE PLAN
C-250 SEWER PROFILES
C-251 SEWER PROFILES
C-500 PAVEMENT DETAILS
C-501 PAVEMENT DETAILS
C-502 UTILITY DETAILS
C-503 UTILITY DETAILS
C-504 STORM & SANITARY SEWER DETAILS
C-505 STORM SEWER DETAILS
C-506 MISCELLANEOUS DETAILS 0002 02/23/2024
C-507 EROSION CONTROL DETAILS
C-508 EROSION CONTROL DETAILS
C-510 BORING LOGS
C-511 BORING LOGS
C-512 BORING LOGS
C-513 BORING LOGS
C-514 BORING LOGS
C-521 SWPPP PLAN
D
RDRD
PIV
3/1/2024 9:53:55 AM \\thehaskellco.net\CORE\PRJ\155_GovDesign\1550017 USACE Detroit Arsenal Building\21DesignWorking\CIVL\05AutoCAD\2Sheets\65526C002.dwg
M . S
M
IT
H
F.
B
AU
ER
F.
B
AU
ER
M . B
U
TL
ER
G
EN
ER
AL
N
O
TE
S
AN
D A
BB
R
EV
IA
TI
O
N S
C
IV
IL
C-002
R
EV
IS
ED
IN
A C
C O
R D
AN
C
E W
IT
H
A M
EN
D
M
EN
T
/2 3/
0002 02/23/2024
W
2Q R
R
_P la ns -0
ARIMS: 200A Disposition: Maintain for 15 yrs after construction.
X
X
X
X
X X
C.B.
RIM=617.65
INV
616.09
GAS
METER
L.P.
L.P.
ELEC.M.H.
RIM=621.12
ELEC.M.H.
RIM=622.53
ELEC.M.H.
RIM=619.79
TELE.M.H.
RIM=618.54
WSV
WSV
WSV
HYD.
FRAME
BLDG.
9.87'
.1
8'
GRAVEL
CONCRETE
BOL.(4)
C O
N C
R
ET
E
HYD.
BOL.(2)
CONCRETE
ASPHALT
ASPHALT
14"
ASPHALT
COM.M.H.
RIM=619.32SIGN
SIGN
SIGN
SIGN
SIGN
SIGN
E
ASPHALT
" C
U
LV
ER
T
FH
BLDG. HGT.= 34.20'
ELEC.
BOX
(7 P
AR
KI
N G
S
PA
C
ES
) (1
PA
R
KI
N
G S
PA
C
ES
(1
PA
R
KI
N
G S
PA
C
ES
BOL.
LOADING DOCK AREA
ELEC.
PANEL
ELEC.
BOX
ELEC.
BOX
PATTON
ELEC.
PANEL SEMI TRAILER
CONCRETE
CONCRETE
C O
N C
R
ET
E
C O
N C
R
ET
E
(1
PA
R
KI
N
G S
PA
C
ES
ELEC.
PANEL
ELEC.
BOX
18"CUL.
INV=615.20
SD
18"(24")STM.
ST
M
"S
TM.
18"(15")STM.
SD
"S
TM
SD
SD
8"
ST
M.
6"STM.
"S
TM
SAN
SAN
SAN
SAN
SA
N
SAN
SAN
SAN
8"SAN.
SD
SD
8"
ST
M
8"
ST
M
4"STM
SD
SD8"(12")STM.
SAN
SAN
SAN
SAN
SAN
SAN
SAN
12"SAN.
SAN
SAN
24"(18")SAN.
SA
N
SD
SD
SD
SD
SD
"S
TM
SD
SD
"S
TM
4"STM
4"
ST
M
SD SDSD SD SD SD12"STM.
8"STM.
SD SD12"STM.
4"
STM
"S
TM
4"
ST
M
W W
W W
W
W
W
W
W
W
W
W
W
W
W W
" W
AT
ER
M
AI
N
W
W
10" WATERMAIN
E E
E E
E
E E
E E
GAS
METER
SD
SD
SD
SD
SD
SD
SAN
SAN
SAN
SAN SAN SAN SAN SAN SAN SAN SAN SAN
SD
SD
SD
4"STM.
"S
TM
GVW
12"(18")SAN.
GVW
GGG
SAN
G G
G G
G G
G
G G
G G
G G
G G
G
G
G
G
G
G G
G G
G G
G G
G
E
E
E
E E
E E
E E
E
E E
E E
E
E E
E
E E E E E E E E E E E E E E
E
E
E E
E E
E E
E
E E
E E
E E
E
E
E
E
E
E E
E E
E E
E E
E E
E E
E E
E
G
G G
G
G
G
G
G G G G G G
G G
G G
G
G
G
G
G
W
W
W W W W W W W
WW
W
E E E E E E E
SD
SD
SD
SD
SD
18" RCP
CB
RIM 618.30
INV 606.20
MH
RIM 622.13
INV 615.58
8" R
D
10" ST
SD
SD
CB
CB
CB
SD
SD
SD
SD
INV 613.0
OUTFALL
RIM 617.00
INV 613.00
CB
RIM 616.45
15" W INV 608.98
12 NE INV 610.71
8" NE INV 610.71
8" S 608.98
24" RCP
18" RCP
CB
RIM 617.90
15" SE INV 613.76
24" W INV 613.66
SUMP 611.66
CB
RIM 618.82
15" NW INV 615.0
10" SW INV 615.14 ST.M.H.
RIM=618.32
12" N INV=614.39
8" NE INV=614.62
4" SE INV=614.57
12" S INV=614.47
4" S INV=614.57
8"(12") SW INV=614.52
C.B.
RIM=618.48
12" E INV=614.78
8" E INV=614.65
8" SW INV=614.65
B.H.C.B.
RIM=618.08
4" N INV=615.09
12" W INV=614.53
B.H.C.B.
RIM=617.95
12" N INV=615.01
12" W INV=615.00
C.B.
RIM=618.13
12" N INV=615.38
6" SE INV=615.38
12" S INV=615.31
8" SW INV=615.75
C.B.
RIM=618.14
8" NE INV=616.20
6" SW INV=616.16
C.B.
RIM=618.48
8" SW INV=614.42
8"(12") NE INV=614.46
C.B.
RIM=618.41
8" NE INV=614.43
4" SE INV=615.86
8" S INV=614.41
C.B.
RIM=618.50
4" NW INV=616.42
C.B.
RIM=618.84
12" NE INV=614.32
12" S INV=614.13
4" W INV=614.84
B.H.C.B.
RIM=618.28
12" N INV=614.33
4" NE INV=614.76
12" E INV=614.17
12" SW INV=614.07
ST.M.H.
RIM=622.42
18"(24")N INV=615.04
18"(15")SE INV=619.60
24 SW INV=614.93
C.B.
RIM=618.23
12" S INV=615.87
SAN.M.H.
RIM=617.85
8" NW FULL/DEBRIS
12"(18") SE INV=611.68
SAN.M.H.
RIM=618.45
12"(18") N INV=599.69
12"(18") SE INV=599.73
24"(18") W INV=599.60
SAN.M.H.
RIM=619.21
12"(18") NW INV=599.82
12"(18") SE INV=599.79
SAN.M.H.
RIM=618.98
12" NW INV=600.48
12" NW INV=606.42
24"(18") NE INV=599.42
24"(18") S INV=599.33
SAN.M.H.
RIM=619.74
8" NW INV=610.42
8" SE INV=610.30
FIRE
DEPT.
CONNECT.
18"(24")S INV=615.38
C.B.
RIM=618.94
18"(15") NW INV=615.92
6" SE INV=616.19
F/F= 619.48
F/F= 623.65 F/F= 623.64 F/F= 623.64
F/F=623.63
COM.M.H.
RIM=618.49
PN#=4
N=367675.1461 E=13480791.7359
D=STP
PN#=3
N=367781.1827 E=13480963.6275
D=STP
DRAIN GRATE
TRANSFORMERS
w/CONC. PAD
STORAGE
CONTAINER
BENCH MARK #1
ELEVATION=619.58
BENCH MARK #4
ELEVATION=622.84
BOLLARD
GUARDRAIL
ASPH. RAMP
A.C. UNITS(2)
FH
COMM COMM COMM COMM
COMM
C O
M M
C O
M M
COMM
COMMCOMM
COMM
COMM COMM
C O
M M
C O
M M
C O
M M
CO
M
M
CO
M
M C
O M
M
COMM
COMM
COMM
X
X X X X X X
X
X
1.
6' x1 .6
D
U C
TB
AN
K
1.6'x1.6' DUCTBANK
10" WATERMAIN
WSV
WSV
WSV
HYD.
HYD.
FH
10" WATERMAIN
" W
AT
ER
M
AI
N
10" WATERMAIN
GVW
FH
10" WATERMAIN
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
E E E E E
E
E E
E E
E E
E E
E E
E
E E E E E E E E E
E E
E E
PP
PP
PP
PP
CB
D
CB
CB
CB
CBSD
SD
SD
SD SD
CB
CB
CB
CB
CB
CB
CB
CB
CB
CB
S
S
S
S
T
T
T
SD
SD
12" CULVERT
INV.:614.89'
D
CB
CB
SD
SD
SD
SD
SD
STORM CB
RIM:616.39'
8" SW INV.:613.04'
CATCH BASIN
RIM:615.65
INV.:UNKNOWN
(PER RECORD)
C.B.
RIM=618.41
8" W INV=614.86
POND
BUILDING #210
PETROLEUM AND
WATER CENTER
SHIPPING AND
RECEIVING
BUILDING #249
MOBILE
SIMULATORS
HARDSTAND
C - LOT
PA
TT
O N
CB
STORM CB
RIM:615.18'
INV.:UNKNOWN
(PER RECORD)
STORM MH
RIM:617.93'
12" W INV.:609.67'
12" E INV.:609.67'
12" N INV.:609.60'
D
SD
SD
E E
E
E
E
E
E
E
E
E E
E
H
ELECTRICAL HH
RIM:618.76'
E
E
E
EE
E
E
FIRE DEPT.
CONNECT.
2" GAS
8"SAN.
SAN
BENCH MARK #2
ELEVATION=621.37
PA
TT
O N
SA
NSA
N
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E
SHEET ID
US Army Corps of Engineers
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
P2
LO
U
IS
VI
LL
E
D
IS
TR
IC
T
D
R M
AR
TI
N L
U
TH
ER
J
R P
L
LO
U
IS
VI
LL
E, K
Y
SE
PT
EM
BE
R
9, R O
IT
A
R
SE
N
AL
, M I
G R
O U
N D
T R
AN
SP
O R
TA
TI
O N
E Q
U
IP
M
EN
T
BU
IL
D
IN
G
FY
Plot Date: File Path:
C
ER
TI
FI
ED
F
IN
AL
S U
BM
IT
TA
L
PLAN
NORTH
30' 60'0
GENERAL SHEET NOTES
1. SAWCUT ASPHALT PAVEMENT TO FULL DEPTH PRIOR TO
REMOVAL.
2. CONCRETE PAVEMENTS WILL BE SAWCUT OR REMOVED TO
NEAREST PAVEMENT JOINT.
3. SEE SHEET C-002 FOR DEMOLITION NOTES.
SHEET KEYNOTES
CALLOUTS
LEGEND
PAVEMENT TO BE REMOVED
COMMUNICATION LINE TO BE REMOVED1
STORM SEWER TO BE REMOVED2
SMOKING PAVILLION TO BE REMOVED BY OTHERS.
FOUNDATION TO BE REMOVED BY CONTRACTOR.
STORM STRUCTURE TO BE REMOVED4
REMOVED AND RELOCATE SECTION OF EX 2" GAS5
ASPHALT OVER CRUSHED STONE/CONCRETE TO BE REMOVED6
LIGHT POLE USE IN PLACE (DO NOT DISTURB)7
TREE TO BE REMOVED8
ELECTRIC LINE TO BE REMOVED.9
FIRE HYDRANT TO BE REMOVED AND RELOCATED10
11 USE IN PLACE
LIGHTING TO BE REMOVED. SEE ELECTRICAL SITE PLAN
SIDEWALK TO BE REMOVED
STORM FLARED END SECTION TO BE REMOVED
UTILITY TO BE REMOVED
15 LIGHT POLE TO BE REMOVED
16 10 CONCRETE WHEEL STOPS TO BE REMOVED, STORED,
AND REINSTALLED
17 NOT USED
CONCRETE PAVEMENT TO BE REMOVED18
SANITARY SEWER TO BE REMOVED19
6" UNDERDRAIN TO BE REMOVED20
12" PIPE TO BE REMOVED AND REPLACED21
OUTFALL TO BE REMOVED AND REPLACED22
EXISTING MANHOLE (USE IN PLACE)23
ELECTRICAL BOX RO BE REMOVED24
SANITARY STRUCTURE TO BE REMOVED25
M
IT
H
F.
B
AU
ER
F.
B
AU
ER
M . B
U
TL
ER
SI
TE
D
EM
O
LI
TI
O N
P
LA
N
C
IV
IL
CD100
2/23/2024 11:56:09 AM \\thehaskellco.net\core\PRJ\155_GovDesign\1550017 USACE Detroit Arsenal Building\21DesignWorking\CIVL\05AutoCAD\2Sheets\655526CD100.dwg
R
EV
IS
ED
IN
A C
C O
R D
AN
C
E W
IT
H
A M
EN
D
M
EN
T
/2 3/
W
2Q R
R
_P la ns -0
X
X
X
X X
GRAVEL
GRAVEL
CONCRETE
14"
ASPHALT
SIGN
SIGN
SIGN
SIGN
SIGN
SIGN
ASPHALT
BLDG. HGT.= 34.20'
(7 P
AR
KI
N G
S
PA
C
ES
) (1
PA
R
KI
N
G S
PA
C
ES
(1
PA
R
KI
N
G S
PA
C
ES
(1
PA
R
KI
N
G S
PA
C
ES
SEMI TRAILER
CONCRETE
CONCRETE
C O
N C
R
ET
E
(1
PA
R
KI
N
G S
PA
C
ES
GAS
METER
GVW
F/F= 619.48
F/F= 623.65 F/F= 623.64 F/F= 623.64
F/F=623.63
ASPH. RAMP
A.C. UNITS(2)
X
X X X X X X
X
X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
POND
BUILDING #210
PETROLEUM AND
WATER CENTER
SHIPPING AND
RECEIVING
BUILDING #249
MOBILE
SIMULATORS
HARDSTAND
C - LOT
PA
TT
O N
PA
TT
O N
FIRE LANE DO NOT BLOCK
NORTH
DETENTION
BASIN
WEST
DETENTION
BASIN
GROUND
TRANSPORTATION
EQUIPMENT BUILDING
10101010
22104
3 3
5'L x 8'W 5'L x 10.33'W
5'L x 5'W 5'L x 5'W
5'L x 5'W
5'L x 5'W
5'L x 9.33'W
5'L x 8'W
5'L x 5'W
135'L x 5'W
13.83'L x 7.42'W
23TWO @ 20'L x 10'W
4.16'L x 2.40'W
5.50'L x 5.23'W
8.17'L x 6.67'W
8.17'L x 6.67'W
5'L x 5'W
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E
SHEET ID
US Army Corps of Engineers
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
P2
LO
U
IS
VI
LL
E
D
IS
TR
IC
T
D
R M
AR
TI
N L
U
TH
ER
J
R P
L
LO
U
IS
VI
LL
E, K
Y
SE
PT
EM
BE
R
9, R O
IT
A
R
SE
N
AL
, M I
G R
O U
N D
T R
AN
SP
O R
TA
TI
O N
E Q
U
IP
M
EN
T
BU
IL
D
IN
G
FY
Plot Date: File Path:
C
ER
TI
FI
ED
F
IN
AL
S U
BM
IT
TA
L
PLAN
NORTH
30' 60'0
GENERAL SHEET NOTES
SHEET KEYNOTES
LEGEND
1. ALL RADII ARE TO THE BACK OF CURB. ALL DIMENSIONS
ARE TO EDGE OF PAVEMENT.
2. MARK AND STRIPE SPACES ACCORDINGLY.
3. SIGNS TO MEET MANUAL ON UNIFORM TRAFFIC CONTROL
AS TO COLOR, LETTERING, AND DIMENSIONS SHALL BE
INSTALLED AT A HEIGHT OF SEVEN FEET.
4. PROVIDE SIDEWALK CONSTRUCTION JOINTS AT EVEN
SPACING AT A DISTANCE APART EQUAL TO THE
SIDEWALK WIDTH AND AS IS TYPICAL IN CONCRETE
CONSTRUCTION.
5. ADJUST EXISTING STRUCTURES TO PROPOSED RIM
ELEVATIONS.
6. PARKING LOT STRIPING SHALL MATCH EXISTING
DIMENSIONS.
PROPOSED PARKING STALLS: 25
ADA ACCESSIBLE STALLS: 1
ACCESSIBLE PATH
ACCESSIBLE PARKING STALL. SEE DETAIL B3 SHEET C-5012
TAPER CURB FROM 6" HIGH TO 0" OVER 6 FEET.
CONCRETE SIDEWALK. SEE DETAIL B1 SHEET C-5013
ASPHALT PAVEMENT. SEE DETAIL A1 SHEET C-5004
CROSSWALK STRIPING. SEE DETAIL B1 SHEET C-5065
UNDERGROUND SECONDARY STORAGE TANK. SEE
DETAIL A1 SHEET C-5066
CONCRETE WHEEL STOP (RELOCATE 10 EXISTING). SEE
DETAIL A2 SHEET C-501
PARKING LOT EXPANSION. 25 ADDITIONAL SPACES.8
GRAVEL EDGE
OVERHEAD DOOR9
BOLLARD. SEE DETAIL A1 SHEET C-50310
FIRE LANE STRIPING AND LETTERING.11
DETECTABLE WARNING SURFACE12
CONCRETE STOOP. SEE STRUCTURAL FOR DETAILS13
GRAVEL MOW STRIP. SEE DETAIL A3 SHEET C-501.14
6" VERTICAL CURB. SEE DETAIL A2 SHEET C-500
CONCRETE PAVEMENT
ASPHALT PAVEMENT
NOT USED16
CONCRETE TRANSFOMER PAD. SEE DETAIL B2 SHEET
C-503. (COORDINATE SIZE WITH ELECTRICAL)17
DETECTABLE WARNING STRIP ONLY. SEE SIMILAR DETAIL
B3 SHEET C-501.18
(3) FUTURE ELECTRICAL CHARGING STATIONS (BY
OTHERS)
ACCESSIBLE PARKING SIGN. SEE DETAIL B2 SHEET C-50120
CONTRACTOR WORK LIMITS
ADA SIDEWALK RAMP. SEE DETAIL A1 SHEET C-50121
NO PARKING / FIRE LANE SIGN. SEE DETAIL B2 SHEET
C-50122
MECHANICAL EQUIPMENT PAD. SEE DETAIL B2 SHEET
C-503. (COORDINATE SIZE WITH MECHANICAL)23
EXTERIOR STAIRS. SEE STRUCTURAL FOR DETAILS24
6" AGGREGATE PAD OVER GEOTEXTILE FABRIC,
SEE DETAIL A3 SHEET C-50025
CONCRETE PAVEMENT. SEE DETAIL A1 SHEET C-50026
CONCRETE HARDSTAND PAVEMENT REPAIR. SEE DETAIL
B2 SHEET C-50027
M
IT
H
F.
B
AU
ER
F.
B
AU
ER
M . B
U
TL
ER
SI
TE
P
LA
N
C
IV
IL
C-103 2/23/2024 12:47:18 PM \\thehaskellco.net\core\PRJ\155_GovDesign\1550017 USACE Detroit Arsenal Building\21DesignWorking\CIVL\05AutoCAD\2Sheets\655526C103.dwg
R
EV
IS
ED
IN
A C
C O
R D
AN
C
E W
IT
H
A M
EN
D
M
EN
T
/2 3/
W
2Q R
R
_P la ns -0
X
X
X
X X
C.B.
RIM=617.65
INV
616.09
GAS
METER
L.P.
ELEC.M.H.
RIM=621.12
ELEC.M.H.
RIM=622.53
ELEC.M.H.
RIM=619.79
TELE.M.H.
RIM=618.54
WSV
WSV
WSV
HYD.
STORAGE
CONTAINER
STORAGE
CONTAINER
BOL.(4)
HYD.
BOL.(2)
BOL.(2)
BOL.(2)
FH
GRAVEL
GRAVEL
CONCRETE
14"
ASPHALT
COM.M.H.
RIM=619.32SIGN
SIGN
SIGN
SIGN
SIGN
SIGN
E
ASPHALT
FH
BLDG. HGT.= 34.20'
ELEC.
BOX
(7 P
AR
KI
N G
S
PA
C
ES
) (1
PA
R
KI
N
G S
PA
C
ES
(1
PA
R
KI
N
G S
PA
C
ES
(1
PA
R
KI
N
G S
PA
C
ES
BOL.
LOADING DOCK AREA
ELEC.
PANEL
ELEC.
BOX
CONSTRUCTION
ELEC.
PANEL SEMI TRAILER
CONCRETE
CONCRETE
C O
N C
R
ET
E
(1
PA
R
KI
N
G S
PA
C
ES
ELEC.
PANEL
ELEC.
BOX
18"(24")STM.
ST
M
"S
TM.
18"(15")STM.
SD
"S
TM
SD
SD
8"
ST
M.
6"STM.
"S
TM
SAN
SAN
SAN
8"SAN.
SD
8"
ST
M
.4"STM
SAN
SAN
SAN
SAN
SAN
SAN
SAN
12"SAN.
SAN
SAN
24"(18")SAN.
SA
N
SD
4"STM
W W
W W
W
W
W
W
W
W
W
W
W
W
W W
" W
AT
ER
M
AI
N
W
W
10" WATERMAIN
10" WATERMAIN
E E
E E
E
E E
E E
E E
GAS
METER
SD
SD
SD
SD
SD
SD
SD
SAN SAN SAN SAN SAN SAN SAN SAN SAN
4"STM.
"S
TM
GVW
12"(18")SAN.
GVW
GGG
SAN
G G
G G
G G
G
G G
G G
G G
G G
G
G
G
G
G
G G
G G
G G
G G
G
E
E
E
E E
E E
E E
E
E
E
E E
E E
E E
E
E E
E E
E E
E
E
E
E
E
E E
E E
E E
E E
E E
E E
E E
G G
G G
G
G
G
G
G G G G G G
G G
G G
G
G
G
G
G
W
W
W
W W W W W W W
WW
W
E E E E E E E E
SD
SD
SD
SD
SD
18" RCP
CB
RIM 618.30
INV 606.20
MH
RIM 622.13
INV 615.58
8" R
D
10" ST
CB
CB
CB
SD
SD
SD
SD
INV 613.0
CB
RIM 616.45
15" W INV 608.98
12 NE INV 610.71
8" NE INV 610.71
8" S 608.98
24" RCP
18" RCP
CB
RIM 617.90
15" SE INV 613.76
24" W INV 613.66
SUMP 611.66
CB
RIM 618.82
15" NW INV 615.0
10" SW INV 615.14
B.H.C.B.
RIM=617.95
12" N INV=615.01
12" W INV=615.00
C.B.
RIM=618.13
12" N INV=615.38
6" SE INV=615.38
12" S INV=615.31
8" SW INV=615.75
C.B.
RIM=618.41
8" NE INV=614.43
4" SE INV=615.86
8" S INV=614.41
C.B.
RIM=618.50
4" NW INV=616.42
C.B.
RIM=618.84
12" NE INV=614.32
12" S INV=614.13
4" W INV=614.84
ST.M.H.
RIM=622.42
18"(24")N INV=615.04
18"(15")SE INV=619.60
24 SW INV=614.93
C.B.
RIM=618.23
12" S INV=615.87
SAN.M.H.
RIM=618.45
12"(18") N INV=599.69
12"(18") SE INV=599.73
24"(18") W INV=599.60
SAN.M.H.
RIM=619.21
12"(18") NW INV=599.82
12"(18") SE INV=599.79
SAN.M.H.
RIM=618.98
12" NW INV=600.48
12" NW INV=606.42
24"(18") NE INV=599.42
24"(18") S INV=599.33
SAN.M.H.
RIM=619.74
8" NW INV=610.42
8" SE INV=610.30
FIRE
DEPT.
CONNECT.
18"(24")S INV=615.38
C.B.
RIM=618.94
18"(15") NW INV=615.92
6" SE INV=616.19
F/F= 619.48
F/F= 623.65 F/F= 623.64 F/F= 623.64
F/F=623.63
COM.M.H.
RIM=618.49
DRAIN GRATE
TRANSFORMERS
w/CONC. PAD
STORAGE
CONTAINER
ASPH. RAMP
A.C. UNITS(2)
COMM COMM COMM COMM
COMM
C O
M M
C O
M M
COMM
COMMCOMM
COMM
COMM COMM
CO
M
M
CO
M
M C
O M
M
COMM
COMM
COMM COMM
X
X X X X X X
X
X
1.
6' x1 .6
D
U C
TB
AN
K
1.6'x1.6' DUCTBANK
10" WATERMAIN
WSV
WSV
WSV
HYD.
HYD.
FH
FH
10" WATERMAIN
" W
AT
ER
M
AI
N
10" WATERMAIN
10" WATERMAIN
GVW
10" WATERMAIN
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
E E E E E
E
E E
E E
E E
E E
E E
E
E E E E E E E E E
E E
E E
PP
PP
PP
PP
CB
SD
SD SD
CB
CB
CB
CB
CB
CB
CB
CB
S
S
S
T
T
T
D
CB
CB
SD
SD
SD
SD
SD
STORM CB
RIM:616.39'
8" SW INV.:613.04'
CATCH BASIN
RIM:615.65
INV.:UNKNOWN
(PER RECORD)
POND
BUILDING #210
PETROLEUM AND
WATER CENTER
SHIPPING AND
RECEIVING
BUILDING #249
MOBILE
SIMULATORS
HARDSTAND
C - LOT
PA
TT
O N
CB
STORM CB
RIM:615.18'
INV.:UNKNOWN
(PER RECORD)
STORM MH
RIM:617.93'
12" W INV.:609.67'
12" E INV.:609.67'
12" N INV.:609.60'
SD
SD
E E
E
E
E
E
E
E
E
E E
E
H
ELECTRICAL HH
RIM:618.76'
E
E
E
EE
E
E
FIRE DEPT.
CONNECT.
2" GAS
SAN
PA
TT
O N
SA
NSA
N
NORTH
DETENTION
BASIN
WEST
DETENTION
BASIN
SAN
U D
SD
SD
SD
SD
SD
SAN
S
SDSDSDSDSDSDSD
2"W 2"W 2"W 2"W
10" FP 10" FP 10" FP
D
U E
U E
MH-C2
CO
U E
UE
UE
SAN
SAN
SAN
CO
D
D
FES-A1b
FES-B1
MH-B2
MH-B3
CO-3
CO-2
UD UD UD
CO
CO-1
SD
UD UD UD UD
U D
SD
SD
SD
OS-A1
FES-C1
FES-A2b
D
2"G
CBD
D
MH-D3
D
SD
MH-D4
GI-D5
HD
CO S SAN S
S
HUB DRAIN
CO-4
MH-3
MH-2
MH-B4
SD
SD
CB GI-D1
CI-D2
SDSDSDSDSDSDSD SDSDSDSDSDSDSD
SDSDSDSDSDSDSD
FES-A2aFES-A2aFES-A2aFES-A2aFES-A2aFES-A2a
FES-A2c FES-A2d
FES-A1a
FES-A1c FES-A1d
SAN
SAN
S
MH-1
UNDERDRAIN HIGHPOINT
SANITARY MH #581
GROUND TRANSPORTATION
EQUIPMENT BUILDING
G
CB
SD
\\T H
EH
AS
KE
LL
C O
.N
ET
\C O
R E\
PR
J\
5_
G O
VD
ES
IG
N
\1
U
SA
C E
D
ET
R O
IT
A
R
SE
N
AL
B U
IL
D
IN
G
\2 1D
ES
IG
N W
O R
KI
N
G \C
IV
L\
AU
TO
C
AD
\2
SH
EE
TS
\6
6C
5.
D
W G
:4
4:
P M
/2
3/
AE
C _N
C S_
4_ M
O N
O .C
TB
G
R
AF
P
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E
SHEET ID
US Army Corps of Engineers
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
P2
LO
U
IS
VI
LL
E
D
IS
TR
IC
T
D
R M
AR
TI
N L
U
TH
ER
J
R P
L
LO
U
IS
VI
LL
E, K
Y
SE
PT
EM
BE
R
9, R O
IT
A
R
SE
N
AL
, M I
G R
O U
N D
T R
AN
SP
O R
TA
TI
O N
E Q
U
IP
M
EN
T
BU
IL
D
IN
G
FY
Plot Date: File Path:
C
ER
TI
FI
ED
F
IN
AL
S U
BM
IT
TA
L
GENERAL SHEET NOTES
SHEET KEYNOTES
CALLOUTS
PROPOSED SANITARY SEWER LINE
LEGEND
SAN
G
W
FP
UE
PROPOSED GAS LINE
PROPOSED DOMESTIC WATER LINE
PROPOSED FIRE PROTECTION LINE
PROPOSED ELECTRIC LINE
COMM PROPOSED COMMUNICATION LINE
ELECTRIC TRANSFORMER PAD. SEE SHEET C-103 FOR
PAD SIZES AND COORDINATE WITH ELECTRICAL.1
SEE ELECTRICAL DRAWINGS FOR ADDITIONAL DETAIL2
ADJUST TO GRADE3
UNDERGROUND SECONDARY STORAGE TANK. SEE
DETAIL A1 SHEET C-5064
RELOCATED FIRE HYDRANT LOCATION (PROVIDE
BOLLARDS PER DETAIL A1 ON SHEET C-503)5
RELOCATED 8" SANITARY LINE6
6" SANITARY SEWER LATERAL. SEE SHEET C-250 FOR
SANITARY PROFILE7
STORM LINE A. SEE SHEET C-250 FOR STORM PROFILE8
STORM LINE B. SEE SHEET C-251 FOR STORM PROFILE9
STORM LINE C. SEE SHEET C-251 FOR STORM PROFILE10
RELOCATED 2" GAS LINE12
D PROPOSED STORM MANHOLE
PROPOSED CLEANOUT
CONTRACTOR WORK LIMITS
MECHANICAL EQUIPMENT PAD. SEE SHEET C-103 FOR
PAD SIZES AND COORDINATE WITH MECHANICAL13
CONNECT EXISTING SANITARY LATERAL TO NEW
MANHOLE W/ OUTSIDE DROP. SEE DETAIL B1 SHEET C-50414
UNDERDRAIN PIPE. 4" PERFORATED PIPE IN A TRENCH
TO DRAIN AGGREGATE. SLOPE AT 0.2%17
UD PROPOSED UNDERDRAIN SYSTEM
POST INDICATOR VALVE. SEE DETAIL A1 SHEET C-502
PROVIDE BOLLARDS PER DETAIL A1 SHEET C-50318
OUTFALL STRUCTURE. SEE DETAIL A2 SHEET C-50519
CO
G
W
SAN
E
FUEL
COMM
SD PROPOSED STORM SEWER
EXISTING GAS LINE
EXISTING WATER
EXISTING SANITARY SEWER
EXISTING STORM SEWER
EXISTING ELECTRIC LINE
EXISTING FUEL LINE
EXISTING COMMUNICATION LINE
HUB DRAIN. SEE DETAIL B1 SHEET C-50320
CONNECT NEW 6" UNDERDRAIN TO
EX 6" UNDERDRAIN @ ELEV. 617.73±21
NEW 6" UNDERDRAIN (45' @ 0.50% & CAP UPSTREAM END)22
FP
PROPOSED OUTFALL STRUCTURE
CONNECT TO EXISTING STORM STRUCTURE
2" GAS SERVICE. COORDINATE NEW GAS SERVICE WITH
MECHANICAL
PLAN
NORTH
30' 60'0
CONNECT 8" INDUSTRIAL WASTE PIPING TO
UNDERGROUND STORAGE TANK.
STORM LINE D. SEE SHEET C-251 FOR STORM PROFILE
PROPOSED CATCH BASIN
M
IT
H
F.
B
AU
ER
F.
B
AU
ER
M . B
U
TL
ER
U
TI
LI
TY
P
LA
N
C
IV
IL
C-105
24 8" SANITARY LINE
2/23/2024 12:44:33 PM \\thehaskellco.net\core\PRJ\155_GovDesign\1550017 USACE Detroit Arsenal Building\21DesignWorking\CIVL\05AutoCAD\2Sheets\655526C105.dwg
25 NEW OUTSIDE DROP MANHOLE. SEE DETAIL B1
SHEET C-504
R
EV
IS
ED
IN
A C
C O
R D
AN
C
E W
IT
H
A M
EN
D
M
EN
T
/2 3/
W
2Q R
R
_P la ns -0
X
X
X
X X
L.P.
STORAGE
CONTAINER
STORAGE
CONTAINER
BOL.(4)
BOL.(2)
BOL.(2)
BOL.(2)
GRAVEL
GRAVEL
CONCRETE
14"
ASPHALT
SIGN
SIGN
SIGN
SIGN
SIGN
SIGN
ASPHALT
BLDG. HGT.= 34.20'
(7 P
AR
KI
N G
S
PA
C
ES
) (1
PA
R
KI
N
G S
PA
C
ES
(1
PA
R
KI
N
G S
PA
C
ES
(1
PA
R
KI
N
G S
PA
C
ES
BOL.
LOADING DOCK AREA
AREA UNDER
CONSTRUCTION
SEMI TRAILER
CONCRETE
CONCRETE
C O
N C
R
ET
E
(1
PA
R
KI
N
G S
PA
C
ES
SD
SD
SD
SD
SD
GAS
METER
SD
SD
SD
SD
SD
SD
SD
GVW
SD
SD
SD
SD
SD
CB
CB
CB
SD
SD
SD
SD
F/F= 619.48
F/F= 623.65 F/F= 623.64 F/F= 623.64
F/F=623.63
STORAGE
CONTAINER
ASPH. RAMP
A.C. UNITS(2)
X
X X X X X X
X
X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
PP
PP
PP
PP
CB
SD
SD SD
CB
CB
CB
CB
CB
CB
CB
CB
S
S
S
T
T
T
D
CB
CB
SD
SD
SD
SD
SD
POND
BUILDING #210
PETROLEUM AND
WATER CENTER
SHIPPING AND
RECEIVING
BUILDING #249
MOBILE
SIMULATORS
HARDSTAND
621622
621620619
620 619
8 61 9 62
C - LOT
PA
TT
O N
CB
SD
SD
H
PA
TT
O N
U D
SD
SD
SD
SD
SD
S
SDSDSDSDSDSDSD
D
MH-C2
CO
CO
D
D
FES-A1b
FES-B1
MH-B2
MH-B3
CO-3
CO-2
UD UD UD
CO
CO-1
SD
UD UD UD UD
U D
SD
SD
SD
OS-A1
FES-C1
FES-A2b
D
CBD
D
MH-D3
D
SD
MH-D4
GI-D5
HD
CO S S
S
HUB DRAIN
CO-4
MH-3
MH-2
MH-B4
SD
SD
CB GI-D1
CI-D2
SDSDSDSDSDSDSD SDSDSDSDSDSDSD
SDSDSDSDSDSDSD
FES-A2aFES-A2aFES-A2aFES-A2aFES-A2aFES-A2a
FES-A2c FES-A2d
FES-A1a
FES-A1c FES-A1d
S
MH-1
UNDERDRAIN HIGHPOINT
NORTH
DETENTION
BASIN
WEST
DETENTION
BASIN
618.87
618.24 620.34
618.82
618.62
619.20
-5.00%
-5.16%
-4.20%
-5.00%-6.78%
-2 .7
0%
-1.86%
-1.46% -0.99%
-6.67%
0.55%
-4 .6
2%
618.31
-2 .0
0%
618.72
-5.12%
-4.26%
-1.74%
617.93
618.19
-4 .0
0:
(T
YP
-1
.9 2%
619.90
619.85
619.03 619.05
619.18
618.65
618.64
618.79
618.82
618.88
618.87
618.69
618.63
618.90
618.89
618.50
618.44 -0.30%
-1.99%
0.
-5.00%
-1.80% -2
.6 8%
-1 .7
9%
610.37
620.68
620.68 620.68 619.70
619.28
620.18
620.68
620.31
620.49
620.68
620.20
619.20
618.69
619.40
619.01
618.50 619.32
619.86
619.43
618.63
619.31
620.68
620.68
620.68
620.68 620.68 620.68 620.68
620.68
620.68
620.68
619.93
619.85
619.04
619.18 619.23
620.20
620.49
620.20
619.29
620.58
622.04
621.71
618.95
618.47
618.90
620.68
620.68
618.22 618.41
619.69
620.06 619.64
619.84 619.95
620.16
620.68
619.82 619.92
619.83
620.03
619.80
621.81
-1 .06
-3.05%
-4.51%
-4.12%
-0 .5
0%
620.68
PROPOSED GROUND
TRANSPORTATION
EQUIPMENT BUILDING
FF = 620.70
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E
SHEET ID
US Army Corps of Engineers
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
P2
LO
U
IS
VI
LL
E
D
IS
TR
IC
T
D
R M
AR
TI
N L
U
TH
ER
J
R P
L
LO
U
IS
VI
LL
E, K
Y
SE
PT
EM
BE
R
9, R O
IT
A
R
SE
N
AL
, M I
G R
O U
N D
T R
AN
SP
O R
TA
TI
O N
E Q
U
IP
M
EN
T
BU
IL
D
IN
G
FY
Plot Date: File Path:
C
ER
TI
FI
ED
F
IN
AL
S U
BM
IT
TA
L
GENERAL SHEET NOTES
SHEET KEYNOTES
CALLOUTS
EXISTING CONTOUR 1FT INTERVAL
LEGEND
EXISTING CONTOUR 5FT INTERVAL
PROPOSED CONTOUR 1FT
INTERVAL
PROPOSED CONTOUR 5FT
INTERVAL
1 NEW STORM SEWER CATCH BASIN. SEE DETAIL C2
SHEET C-505
OVERFLOW WEIR
619.00 EXISTING SPOT ELEVATION
PROPOSED SPOT ELEVATION620.00
CONTRACTOR WORK LIMITS
3 NEW CURB INLET. SEE DETAIL C1 SHEET C-505
4 NEW FLARED END SECTION. SEE DETAIL B2
SHEET C-505
5 NEW FLARED END SECTION STEEL BARRIER
MANPROOFING. SEE DETAIL A1 SHEET C-505
6 OUTLET PROTECTION. SEE DETAIL A2 SHEET C-508
7 PRECAST STORM MANHOLE. SEE DETAIL A3
SHEET C-504
8 CONNECTION TO EXISTING MANHOLE. SEE DETAIL A3
SHEET C-504
9 NOT USED1
10 OUTFALL STRUCTURE. SEE DETAIL A2 SHEET C-505
PLAN
NORTH
30' 60'0
SEE DETAIL B2 SHEET C-506
FOR ENLARGED GRADING PLAN
M
IT
H
F.
B
AU
ER
F.
B
AU
ER
M . B
U
TL
ER
G
R
AD
IN
G
P
LA
N
C
IV
IL
C-106 2/23/2024 12:42:12 PM \\thehaskellco.net\core\PRJ\155_GovDesign\1550017 USACE Detroit Arsenal Building\21DesignWorking\CIVL\05AutoCAD\2Sheets\655526C106.dwg
R
EV
IS
ED
IN
A C
C O
R D
AN
C
E W
IT
H
A M
EN
D
M
EN
T
/2 3/
W
2Q R
R
_P la ns -0
PA
TT
O N
D R
IV
E
GROUND TRANSPORTATION
EQUIPMENT BUILDING
CONTRACTOR
LAYDOWN
AREA
CONTRACTOR
HAUL ROUTE
EXISTING GATE
(GOVERMENT GATE
ACCESS SHALL BE
MAINTAINED FOR MILITARY
MISSION TRAFFIC)
BLDG
BLDG
BLDG
C LOT
M O
U N
D R
D
ARSENAL AVENUE
AB
R
AM
S
D R
IV
E
EI
SE
N H
O W
ER
D
R
IV
E
TRACK
BLDG 200A
BLDG
200C
BLDG
200B
BLDG
200D
BL
D
G
0E
H LOT
J LOT
BRIDGE
CANOPY
CANOPY
BLDG
BLDG
BLDG
N
BLDG
G
BLDG
BLDG
BLDG
BLDG
BLDG
BLDG
M
M1 LOT
L1 LOT
L LOT
E LOT
K LOT
BLDG
BLDG
M
AC
AR
TH
ER
D
R
IV
E
PA
TT
O N
D R
CONTRACTOR
TRAILER
BASE ACCESS
CONTROL
GATE
NOTE: THIS IS ANTICIPATED HAUL ROUTE, UNLESS
BASE REQUIRES A DIFFERENT ROUTE
CONTRACTOR WORKING LIMITS
PE
R
IM
ET
ER
R
O
AD
U.P.
U.P.
U.P.
U.P.
U.P.
U.P.
U.P.
CONCRETE
GRAVEL
STORAGE
CONTAINER
STORAGE
CONTAINER
GRAVEL
BOL.(4)
BOL.(2)
BOL.(2)
BOL.(2)
GRAVEL
GRAVEL
CONCRETE
ASPHALT
SIGN
SIGN
SIGN
SIGN
SIGN
SIGN
ASPHALT
(7 P
AR
KI
N G
S
PA
C
ES
(1
PA
R
KI
N
G S
PA
C
ES
(1
PA
R
KI
N
G S
PA
C
ES
(1
PA
R
KI
N
G S
PA
C
ES
BOL.
LOADING DOCK AREA
AREA UNDER
CONSTRUCTION
AREA UNDER
CONSTRUCTION
PATTON
CONCRETE
CONCRETE
C O
N C
R
ET
E
(1
PA
R
KI
N
G S
PA
C
ES
GAS
METER
GVW
CB
CB
CB
ASPH. RAMP
T
T
T
PATTON
H
PATTON
CWL1
CWL2
CWL3
CWL4
CWL5
CWL6
CWL7
CWL8
CWL9CWL10
CWL11
CWL12
CWL13
CWL14
CWL15
CWL16CWL17
CWL18
CWL19
CWL20
CWL21
CWL22
CWL23
CWL24
CWL25
CWL26
CWL27
CWL28
CWL29
CWL30
CWL31
CWL32
CWL33
CWL34
CWL35
CWL36
CWL37
CWL38
CWL39
CWL40
CWL41
CWL42
CLA1CLA2
CLA3 CLA4 CT3 CT4
CT2 CT1
COOLING
TOWER AREA
SOIL AMENDMENT
AREA (0.60 ACRES)
CWL43
CWL44
SF SF
PROPOSED HAUL ROUTE
CONTRACTOR LAYDOWN AREA
CONTRACTOR WORKING LIMITS
SF SILT FENCE
SITE POINT TABLE
Point
Number
CLA1
CLA2
CLA3
CLA4
CT1
CT2
CT3
CT4
CWL1
CWL2
CWL3
CWL4
CWL5
CWL6
CWL7
CWL8
CWL9
Description
CONTRACTOR LAYDOWN AREA
CONTRACTOR LAYDOWN AREA
CONTRACTOR LAYDOWN AREA
CONTRACTOR LAYDOWN AREA
CONTRACTOR TRAILER
CONTRACTOR TRAILER
CONTRACTOR TRAILER
CONTRACTOR TRAILER
CONTRACTOR WORKING LIMITS
CONTRACTOR WORKING LIMITS
CONTRACTOR WORKING LIMITS
CONTRACTOR WORKING LIMITS
CONTRACTOR WORKING LIMITS
CONTRACTOR WORKING LIMITS
CONTRACTOR WORKING LIMITS
CONTRACTOR WORKING LIMITS
CONTRACTOR WORKING LIMITS
Northing
367300.84
367297.53
367317.51
367320.81
367304.61
367301.31
367321.29
367324.59
367714.14
367713.64
367728.68
367724.71
367800.53
367804.50
367857.74
367857.25
367860.08
Easting
13480433.51
13480363.59
13480362.65
13480432.57
13480513.42
13480443.50
13480442.56
13480512.48
13481093.14
13481083.07
13481082.35
13480998.91
13480995.44
13481097.53
13481095.37
13480989.62
13480989.49
SITE POINT TABLE
Point
Number
CWL10
CWL11
CWL12
CWL13
CWL14
CWL15
CWL16
CWL17
CWL18
CWL19
CWL20
CWL21
CWL22
CWL23
CWL24
CWL25
CWL26
CWL27
Description
CONTRACTOR WORKING LIMITS
CONTRACTOR WORKING LIMITS
CONTRACTOR WORKING LIMITS
CONTRACTOR WORKING LIMITS
CONTRACTOR WORKING LIMITS
CONTRACTOR WORKING LIMITS
CONTRACTOR WORKING LIMITS
CONTRACTOR WORKING LIMITS
CONTRACTOR WORKING LIMITS
CONTRACTOR WORKING LIMITS
CONTRACTOR WORKING LIMITS
CONTRACTOR WORKING LIMITS
CONTRACTOR WORKING LIMITS
CONTRACTOR WORKING LIMITS
CONTRACTOR WORKING LIMITS
CONTRACTOR WORKING LIMITS
CONTRACTOR WORKING LIMITS
CONTRACTOR WORKING LIMITS
Northing
367857.44
367852.06
367850.43
367848.97
367877.06
367875.23
367929.84
367929.84
368116.82
367891.03
367786.57
367682.11
367662.98
367608.50
367647.74
367647.74
367746.57
367751.38
Easting
13480924.90
13480770.53
13480745.03
13480712.54
13480711.27
13480670.52
13480670.52
13480567.31
13480567.31
13480439.16
13480438.85
13480438.55
13480394.32
13480394.32
13480485.02
13480587.95
13480587.95
13480683.73
SITE POINT TABLE
Point
Number
CWL28
CWL29
CWL30
CWL31
CWL32
CWL33
CWL34
CWL35
CWL36
CWL37
CWL38
CWL39
CWL40
CWL41
CWL42
CWL43
CWL44
Description
CONTRACTOR WORKING LIMITS
CONTRACTOR WORKING LIMITS
CONTRACTOR WORKING LIMITS
CONTRACTOR WORKING LIMITS
CONTRACTOR WORKING LIMITS
CONTRACTOR WORKING LIMITS
CONTRACTOR WORKING LIMITS
CONTRACTOR WORKING LIMITS
CONTRACTOR WORKING LIMITS
CONTRACTOR WORKING LIMITS
CONTRACTOR WORKING LIMITS
CONTRACTOR WORKING LIMITS
CONTRACTOR WORKING LIMITS
CONTRACTOR WORKING LIMITS
CONTRACTOR WORKING LIMITS
CONTRACTOR WORKING LIMITS
CONTRACTOR WORKING LIMITS
Northing
367713.52
367714.43
367686.06
367498.11
367460.62
367449.49
367461.58
367462.63
367436.21
367436.44
367513.22
367519.18
367539.22
367586.36
367620.84
367891.03
367955.07
Easting
13480685.63
13480706.03
13480707.46
13480716.46
13480744.01
13480807.49
13480807.01
13480819.53
13480819.85
13480845.52
13480897.45
13481028.94
13481099.91
13481098.01
13481096.62
13480386.98
13480386.98
GENERAL SHEET NOTES
SHEET KEYNOTES
1. POWER FOR CONTRACTOR'S TRAILER MAY BE
OBTAINED FROM SPARE 100 AMP DISCONNECT NAMED
"MCE TEMP POWER SKID" IN DISTRIBUTION PANEL MCC 4
LOCATED AT THE EAST END OF THE COOLING TOWER.
2. CONTRACTOR'S COMMUNICATIONS MAY NOT CONNECT
TO GOVERNMENT SOURCES AND MUST BE
STANDALONE, CELLULAR, WIRELESS, ETC.
3. CONTRACTOR SHALL MAINTAIN PERIMETER FENCE
SECURITY PER LOCAL PROCEDURES FOR THE
DURATION OF THE PROJECT.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E
SHEET ID
US Army Corps of Engineers
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
P2
LO
U
IS
VI
LL
E
D
IS
TR
IC
T
D
R M
AR
TI
N L
U
TH
ER
J
R P
L
LO
U
IS
VI
LL
E, K
Y
SE
PT
EM
BE
R
9, R O
IT
A
R
SE
N
AL
, M I
G R
O U
N D
T R
AN
SP
O R
TA
TI
O N
E Q
U
IP
M
EN
T
BU
IL
D
IN
G
FY
Plot Date: File Path:
C
ER
TI
FI
ED
F
IN
AL
S U
BM
IT
TA
L
100' 200'0
CALLOUTS
LEGEND
PLAN
NORTH
M
IT
H
F.
B
AU
ER
F.
B
AU
ER
M . B
U
TL
ER
H
AU
L
R O
U
TE
C
IV
IL
C-109 2/23/2024 1:00:07 PM \\thehaskellco.net\CORE\PRJ\155_GovDesign\1550017 USACE Detroit Arsenal Building\21DesignWorking\CIVL\05AutoCAD\2Sheets\655526C109.dwg
1. SILT FENCING (SEE DETAIL A1, SHEET C-507)
R
EV
IS
ED
IN
A C
C O
R D
AN
C
E W
IT
H
A M
EN
D
M
EN
T
/2 3/
W
2Q R
R
_P la ns -0
DETAIL NOT TO SCALE
A1 SECONDARY STORAGE TANK (30,000 GALLON)
30"
C.C.
6' C
.C
12" WIDE WHITE
PAINTED STRIPES CURB
CURB
69" MIN
75" MAX
1 3/8"
1/
4"
GALVANIZED STRAP EYE
18'-8-3/4"
POSITION STRAP CLIPS
TO STRADDLE TANK TOP
DEADMAN PER
MANUFACTURER
RECOMMENDATIONS
DETAIL NOT TO SCALE
A2 TANK HOLD DOWN STRAP DETAIL
PCC PAVEMENT
DEPTH VARIES
TRAFFIC RATED
LID ACCESS COVER
4" EXTENTION AND CAP
FOR MONITORING
TANK LEVEL AND
PUMPING OUT TANK
CONTRACTOR TO SUBMIT SHOP DRAWING
OF PROPOSED TANK FOR APPROVAL
6" PIPE IN PER
MANUFACTURER'S
SPECIFICATIONS
DRAIN PIPE FROM INTERIOR TRENCH 6" DIAMETER
FLOW LINE 613 AT BUILDING LINE
ITEM QTY DESCRIPTION
1 4" NPT MONITOR FITTING
1 OPTIONAL 18" DIA. HYDROSTATIC MONITORING RESERVOIR WITH 4" NPT FITTING
1 22" DIA MANWAY WITH 3-4" NPT FITTINGS IN COVER & 4-12"X12" STRIKER PLATES
6 LIFTING LUG
18 HOLD DOWN STRAP LOCATION
A
B
C
D
CROSS WALK STRIPING DETAIL
DETAIL
B1
NOT TO SCALE
DOUBLE-WALLED
FIBERGLASS TANK
SEMI TRAILER
CONCRETE
CONCRETE
SD
SD
CB
CB
S
MOBILE
SIMULATORS
HARDSTAND
SAN
SAN
SD
SD
SD
D
HD
SAN
CO SAN S SAN SAN SAN SAN S
620.68
620.68 620.68
619.00
620.10
620.20620.20
619.76
619.32
619.22
619.74
619.76 620.20
619.68
619.85
620.06
620.10
620.10
620.10
620.10 619.98 619.83
619.95
619.83
619.79
-0 .4
3%
-0.60%
620.10
619.09
620.68 620.68
620.20
620.20
620.04
619.95
619.93
620.20
620.20
620.20
619.56 619.65
620.02 619.60
619.69
619.75620.22
619.82
TOP OF PAD
= 620.22
TOP OF PAD
= 620.02
TOP OF PAD
= 620.40
TOP OF PAD
= 620.40
TOP OF PAD
= 620.37
TOP OF PAD
= 619.79
619.94
619.78 619.26
619.82 619.93
618.45
619.83
618.07
618.41618.43 618.57
618.42
619.82
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E
SHEET ID
US Army Corps of Engineers
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
P2
LO
U
IS
VI
LL
E
D
IS
TR
IC
T
D
R M
AR
TI
N L
U
TH
ER
J
R P
L
LO
U
IS
VI
LL
E, K
Y
SE
PT
EM
BE
R
9, R O
IT
A
R
SE
N
AL
, M I
G R
O U
N D
T R
AN
SP
O R
TA
TI
O N
E Q
U
IP
M
EN
T
BU
IL
D
IN
G
FY
Plot Date: File Path:
C
ER
TI
FI
ED
F
IN
AL
S U
BM
IT
TA
L
ENLARGED GRADING PLAN
DETAIL
B2
SCALE: 1"=10'
M
IT
H
F.
B
AU
ER
F.
B
AU
ER
M . B
U
TL
ER
M
IS
C
EL
LA
N
EO
U S
D
ET
AI
LS
C
IV
IL
C-506 2/23/2024 12:41:04 PM \\thehaskellco.net\CORE\PRJ\155_GovDesign\1550017 USACE Detroit Arsenal Building\21DesignWorking\CIVL\05AutoCAD\2Sheets\655526C-506.dwg
R
EV
IS
ED
IN
A C
C O
R D
AN
C
E W
IT
H
A M
EN
D
M
EN
T
/2 3/
W
2Q R
R
_P la ns -0
SHEET ID
E
S
IG
N B
Y
D R
A W
N B
Y
C H
E C
K E
D B
Y
S U
B M
IT
T
E D
B Y
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
L O
U
IS
V
IL
L E
D
IS
T R
IC
T
D
R M
A R
T
IN
L U
T H
E R
J R
P L
L O
U
IS
V
IL
L E
K
E N
T U
C K
Y
A
D E
T R
O
IT
A R
S E
N A
L, M
I G
R O
U N
D T
R A
N S
P O
R T
A T
IO
N
E Q
U
IP
M E
N T
B U
IL
D
IN
G
F Y
P
2# : 5
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
B
C
D
E
F
G
H
J
K
L
M
N
P
File Path:Plot Date:
US Army Corps of Engineers ®
IS
S
U E
D A
T E
S O
L
IC
IT
A
T
IO
N N
O
C O
N T
R A
C T
N O
S
IZ
E
A N
S I D
BIM 360://1550017 USACE Detroit Arsenal GTEB_R2020/1550017_ARCH_CR20.rvt2/29/2024 2:57:55 PM
G-002
M N
O B
E R
T
M D
A L L
A B
A T
T
IS
T A
G P
A R
K E
R
M B
U T
L E
R S
H E
E T
IN
D
E X
C E
R T
IF
IE
D F
IN
A
L S
U B
M
IT
T A
L
S E
P T
E M
B E
R
G E
N E
R A
L
SHT No SHEET NAME REV DATE
09 - INTERIORS
I-111 FIRST FLOOR FINISH PLAN - SECTOR 1
I-112 FIRST FLOOR FINISH PLAN - SECTOR 2
I-113 FIRST FLOOR FINISH PLAN - SECTOR 3
IF-111 FIRST FLOOR FURNITURE PLAN - SECTOR 1 1 02/23/2024
IF-112 FIRST FLOOR FURNITURE PLAN - SECTOR 2 1 02/23/2024
IF-113 FIRST FLOOR FURNITURE PLAN - SECTOR 3 1 02/23/2024
IG-111 FIRST FLOOR SIGNAGE PLAN - SECTOR 1
IG-112 FIRST FLOOR SIGNAGE PLAN - SECTOR 2
IG-113 FIRST FLOOR SIGNAGE PLAN - SECTOR 3
IG-340 SIGNAGE SCHEDULE AND DETAILS
IA-111 FIRST FLOOR ACOUSTICAL CEILING PANEL PLAN - SECTOR 1 1 02/23/2024
IA-112 FIRST FLOOR ACOUSTICAL CEILING PANEL PLAN - SECTOR 2 1 02/23/2024
IA-113 FIRST FLOOR ACOUSTICAL CEILING PANEL PLAN - SECTOR 3
I-401 ENLARGED PLANS AND ELEVATIONS
I-402 INTERIOR ELEVATIONS
I-403 INTERIOR ELEVATIONS
I-601 FINISH SCHEDULE AND LEGEND 1 02/23/2024
11 - FIRE PROTECTION
FA001 FIRE ALARM LEGEND AND NOTES
FA111 FIRE ALARM PLAN - SECTOR 1
FA112 FIRE ALARM PLAN - SECTOR 2
FA113 FIRE ALARM PLAN - SECTOR 3
FA600 FIRE ALARM AND MNS INPUT/OUTPUT MATRIX
FA601 FIRE ALARM AND MNS RISER DIAGRAM
FA602 FIRE ALARM & MASS NOTIFICATION - AUDIBLE AND VISUAL MESSAGES
FX001 FIRE SUPPRESSION SYSTEMS LEGEND AND NOTES
FX110 FIRE SUPPRESSION PLAN
FX400 ENLARGED FIRE PUMP ROOM PLAN
FX600 FIRE PUMP DIAGRAM, SCHEDULE, AND DETAIL
Grand total: 167
SHT No SHEET NAME REV DATE
08 - ARCHITECTURAL
A-002 PROJECT NOTES
A-003 LEGENDS
A-004 LEGENDS
A-005 LEGENDS
A-006 LEGENDS
A-011 ACCESSIBILITY
A-012 ACCESSIBILITY
A-013 ACCESSIBILITY PLAN
A-021 AIR BARRIER PLAN
A-022 AIR BARRIER SECTIONS
A-023 AIR BARRIER SECTIONS
A-024 AIR BARRIER SECTIONS
A-031 UL ASSEMBLIES PLAN
A-032.1 UL ASSEMBLIES - DESIGN NO. U419
A-032.2 UL ASSEMBLIES - DESIGN NO. U419
A-032.3 UL ASSEMBLIES - DESIGN NO. U419
A-033.1 UL ASSEMBLIES - DESIGN NO. U905
A-034.1 UL ASSEMBLIES - DESIGN NO. D902
A-034.2 UL ASSEMBLIES - DESIGN NO D902
A-034.3 UL ASSEMBLIES - DESIGN NO D902
A-036.1 UL ASSEMBLIES - DESIGN NO. X829
A-037.1 UL ASSEMBLIES - DESIGN NO. X827
A-071 AREA TABULATIONS PLAN
A-091 EQUIPMENT PLAN
A-110 FIRST FLOOR PLAN - COMPOSITE
A-111 FIRST FLOOR PLAN - SECTOR 1
A-112 FIRST FLOOR PLAN - SECTOR 2 1 02/23/2024
A-113 FIRST FLOOR PLAN - SECTOR 3
A-120 ROOF PLAN - COMPOSITE
A-121 ROOF PLAN - SECTOR 1
A-122 ROOF PLAN - SECTOR 2
A-123 ROOF PLAN - SECTOR 3
A-201 BUILDING ELEVATIONS
A-301 BUILDING SECTIONS
A-302 BUILDING SECTIONS
A-303 BUILDING SECTIONS
A-311 WALL SECTIONS
A-312 WALL SECTIONS
A-313 WALL SECTIONS
A-314 WALL SECTIONS
A-401 ENLARGED PLANS AND ELEVATIONS
A-402 ENLARGED PLANS AND ELEVATIONS
A-403 ENLARGED PLANS AND ELEVATIONS
A-404 ENLARGED PLANS AND ELEVATIONS
A-501 DETAILS 1 02/23/2024
A-502 DETAILS
A-503 DETAILS
A-504 DETAILS
A-505 DETAILS
A-506 DETAILS
A-507 DETAILS
A-508 DETAILS
A-509 DETAILS
A-510 DETAILS
A-511 DETAILS
A-512 DETAILS
A-513 DETAILS 1 02/07/2024
A-514 DETAILS
A-515 DETAILS
A-516 DETAILS
A-519 DETAILS
A-520 DETAILS
A-521 DETAILS
A-522 DETAILS
A-523 DETAILS
A-524 DETAILS
A-531 DETAILS 1 02/23/2024
A-601 PARTITION SCHEDULE
A-602 PARTITION SCHEDULE
A-603 PARTITION SCHEDULE
A-604 PARTITION SCHEDULE DETAILS
A-611 DOOR SCHEDULE 1 02/23/2024
A-612 WINDOW AND LOUVER SCHEDULE 1 02/23/2024
A-710 FIRST FLOOR REFLECTED CEILING PLAN
A-711 FIRST FLOOR REFLECTED CEILING PLAN - SECTOR 1
A-712 FIRST FLOOR REFLECTED CEILING PLAN - SECTOR 2
A-713 FIRST FLOOR REFLECTED CEILING PLAN - SECTOR 3
A-901 ISOMETRIC VIEWS
SHT No SHEET NAME REV DATE
00 - GENERAL
G-001 COVER SHEET
G-002 SHEET INDEX 1 02/23/2024
G-003 SHEET INDEX 1 02/23/2024
GI001 CODE ANALYSIS
GI002 CODE ANALYSIS
GI003 FPLS CODE REVIEW FORM
GI101 CODE COMPLIANCE SITE PLAN
GI110 LIFE SAFETY PLAN
GI200 ELECTRICAL HAZARDOUS CLASSIFICATION PLAN
GI300 DAMPER SCHEDULE
GI400 HAZARDOUS MATERIAL PLAN
07 - STRUCTURAL
S-001 GENERAL STRUCTURAL NOTES
S-002 GENERAL STRUCTURAL NOTES
S-003 GENERAL STRUCTURAL NOTES
S-004 GENERAL STRUCTURAL NOTES
S-005 GENERAL STRUCTURAL NOTES 1 02/23/2024
S-006 STRUCTURAL ABBREVIATIONS AND SYMBOLS
S-010 TYPICAL DETAILS - CONCRETE SLAB-ON-GRADE
S-011 TYPICAL DETAILS - CONCRETE DETAILS AND SCHEDULES 1 02/23/2024
S-012 TYPICAL PRECAST CONCRETE WALL PANEL ELEVATIONS
S-013 TYPICAL DETAILS - CONCRETE MASONRY
S-014 TYPICAL DETAILS - STEEL
S-015 TYPICAL DETAILS - STEEL
S-020 COMPONENTS AND CLADDING WIND PRESSURE DIAGRAMS
S-021 SNOW LOAD AND DRIFT DIAGRAM
S-100 FOUNDATION PLAN - COMPOSITE
S-101 FOUNDATION PLAN - SECTOR 1
S-102 FOUNDATION PLAN - SECTOR 2
S-103 FOUNDATION PLAN - SECTOR 3
S-110 INTERMEDIATE FRAMING PLAN - COMPOSITE
S-111 INTERMEDIATE FRAMING PLAN - SECTOR 1
S-112 INTERMEDIATE FRAMING PLAN - SECTOR 2
S-113 INTERMEDIATE FRAMING PLAN - SECTOR 3
S-120 ROOF FRAMING PLAN - COMPOSITE
S-121 ROOF FRAMING PLAN - SECTOR 1
S-122 ROOF FRAMING PLAN - SECTOR 2
S-123 ROOF FRAMING PLAN - SECTOR 3
S-200 VERTICAL BRACED FRAME ELEVATIONS
S-201 VERTICAL BRACED FRAME ELEVATIONS
S-202 VERTICAL BRACED FRAME ELEVATIONS
S-203 VERTICAL BRACED FRAME ELEVATIONS
S-204 EXTERIOR WALL FRAMING AND CMU WALL ELEVATIONS
S-205 EXTERIOR WALL FRAMING ELEVATIONS
S-206 EXTERIOR WALL FRAMING ELEVATIONS
S-207 INTERIOR PARTITION WALL FRAMING AND CMU WALL ELEVATIONS
S-400 TEST PIT FOUNDATION PLAN AND SECTIONS 1 02/23/2024
S-500 FOUNDATION SECTIONS AND DETAILS
S-501 FOUNDATION SECTIONS AND DETAILS
S-502 FOUNDATION SECTIONS AND DETAILS 1 02/23/2024
S-503 FOUNDATION SECTIONS AND DETAILS
S-504 FOUNDATION SECTIONS AND DETAILS
S-510 CRANE FRAMING SECTIONS AND DETAILS
S-520 FRAMING SECTIONS AND DETAILS
S-521 FRAMING SECTIONS AND DETAILS
S-522 FRAMING SECTIONS AND DETAILS
S-523 FRAMING SECTIONS AND DETAILS
S-525 STEEL BRACED FRAME CONNECTION DETAILS
S-600 FOUNDATION SCHEDULES AND DETAILS
S-601 FOUNDATION PEDESTAL PLAN DETAILS
S-610 COLUMN BASE PLATE SCHEDULES AND DETAILS
S-900 STRUCTURAL ISOMETRIC VIEWS
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E A
P P
R
R
E V
IS
E
D I N
A C
C O
R D
A N
C E
W
IT
H A
M E
N D
M E
N T
/2 /2
M B
W
2Q R
R
_P la ns -0
E
S
IG
N B
Y
D R
A W
N B
Y
C H
E C
K E
D B
Y
S U
B M
IT
T
E D
B Y
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
L O
U
IS
V
IL
L E
D
IS
T R
IC
T
D
R M
A R
T
IN
L U
T H
E R
J R
P L
L O
U
IS
V
IL
L E
K
E N
T U
C K
Y
A
D E
T R
O
IT
A R
S E
N A
L, M
I G
R O
U N
D T
R A
N S
P O
R T
A T
IO
N
E Q
U
IP
M E
N T
B U
IL
D
IN
G
F Y
P
2# : 5
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
B
C
D
E
F
G
H
J
K
L
M
N
P
File Path:Plot Date:
US Army Corps of Engineers ®
IS
S
U E
D A
T E
S O
L
IC
IT
A
T
IO
N N
O
C O
N T
R A
C T
N O
S
IZ
E
A N
S I D
BIM 360://1550017 USACE Detroit Arsenal GTEB_R2020/1550017_ARCH_CR20.rvt2/29/2024 2:57:58 PM
G-003
M N
O B
E R
T
M D
A L L
A B
A T
T
IS
T A
G P
A R
K E
R
M B
U T
L E
R S
H E
E T
IN
D
E X
C E
R T
IF
IE
D F
IN
A
L S
U B
M
IT
T A
L
S E
P T
E M
B E
R
G E
N E
R A
L
SHT No SHEET NAME REV DATE
15 - ELECTRICAL
E-001 LEGEND AND ABBREVIATIONS
ES101 ELECTRICAL SITE PLAN
EG110 GROUNDING PLAN
EG120 LIGHTNING PROTECTION PLAN
EG501 GROUNDING DETAILS
EG502 LIGHTNING PROTECTION DETAILS
EG503 LIGHTNING PROTECTION ROOF DETAILS
EP101 POWER PLAN SECTOR 1
EP102 POWER PLAN SECTOR 2
EP103 POWER PLAN SECTOR 3 1 02/23/2024
EP104 POWER PLAN ROOF
EP401 ENLARGED POWER PLANS 1 02/23/2024
EP501 POWER DETAILS
EP502 POWER DETAILS
EP600 MECHANICAL EQUIPMENT CONNECTION SCHEDULE
EL001 LIGHTING LEGEND AND SCHEDULES
EL101 LIGHTING PLAN SECTOR 1
EL102 LIGHTING PLAN SECTOR 2
EL103 LIGHTING PLAN SECTOR 3
EL501 LIGHTING DETAILS
EL502 LIGHTING DETAILS
EL503 LIGHTING DETAILS 1 02/23/2024
EL601 LIGHTING CONTROL DIAGRAM
DONTUS
E-000
DO NOT USE THIS COMPOSITE ELECTRICAL ONE-LINE 1 02/23/2024
E-601 MSWBDC ELECTRICAL ONE-LINE
E-602 MSWBDA AND MSWBDB ELECTRICAL ONE-LINE 1 02/23/2024
E-603 SCHEDULES
E-610 PANEL SCHEDULES 1 02/23/2024
E-611 PANEL SCHEDULES
E-612 PANEL SCHEDULES
E-613 PANEL SCHEDULES
E-614 PANEL SCHEDULES
16 - TELECOMMUNICATIONS
T-000 NOTES, SYMBOLS & ABBREVIATIONS
T-100 TELECOM SITE PLAN
T-101 TELECOM ENLARGED SITE PLAN
T-200 TELECOM OVERALL
T-201 TELECOM PATHWAYS PLAN
T-201.11 FIRST FLOOR TELECOM PLAN (NIPR) - AREA 1
T-201.12 FIRST FLOOR TELECOM PLAN (NIPR) - AREA 2
T-201.13 FIRST FLOOR TELECOM PLAN (NIPR) - AREA 3
T-201.31 FIRST FLOOR TELECOM PLAN (DATACQ) - AREA 1
T-201.32 FIRST FLOOR TELECOM PLAN (DATACQ) - AREA 2
T-201.33 FIRST FLOOR TELECOM PLAN (DATACQ) - AREA 3
T-400 ENLARGED TELECOM ROOM PLANS - COMM 101 1 02/23/2024
T-401 ENLARGED SERVER ROOM PLANS - COMM 106
T-402 RACK ELEVATIONS 1 02/23/2024
T-500 TELECOM DETAILS
T-501 TELECOM DETAILS
T-700 TELECOM SCHEDULES
17- SYSTEMS
TI000 SYSTEMS GENERAL NOTES, SYMBOLS & ABBREVIATIONS 1 02/23/2024
TI200 SYSTEMS OVERALL
TI201.1 FIRST FLOOR SYSTEMS PLAN - AREA 1
TI400 ENLARGED CONFERENCE ROOM PLANS
TI502 AV DETAILS
TI503 AV DETAILS
TI601.A AV SINGLE-LINE DIAGRAM - CONFERENCE ROOM 118
TI601.C AV SINGLE-LINE - 101
TI601.E AV SINGLE-LINE DIAGRAM - CONFERENCE ROOM 118
TI700 AV RACK ELEVATIONS 1 02/23/2024
18 - SECURITY
TY000 SECURITY SYMBOLS & ABBREVIATIONS
TY200 SECURITY OVERALL
TY201.1 FIRST FLOOR SECURITY PLAN - AREA 1
TY201.2 FIRST FLOOR SECURITY PLAN - AREA 2
TY201.3 FIRST FLOOR SECURITY PLAN - AREA 3
TY500 DOOR DETAILS
TY501 DOOR DETAILS
TY502 DOOR DETAILS
TY503 DOOR DETAILS
TY605 SECURITY CAMERA MOUNTING DETAILS
Grand total: 128
SHT No SHEET NAME REV DATE
12 - PLUMBING
P-001 LEGEND AND ABBREVATIONS
P-110 PLUMBING PIPING PLAN - FIRST FLOOR - COMPOSITE 1 02/23/2024
P-111 PLUMBING PIPING PLAN - FIRST FLOOR - SECTOR 1 1 02/23/2024
P-112 PLUMBING PIPING PLAN - FIRST FLOOR - SECTOR 2
P-113 PLUMBING PIPING PLAN - FIRST FLOOR - SECTOR 3
P-401 PLUMBING ENLARGED PLAN - BATHROOM GROUP 1 02/23/2024
P-501 PLUMBING DETAILS 1 02/23/2024
P-502 PLUMBING DETAILS
P-503 PLUMBING DETAILS
P-601 PLUMBING SCHEDULES 1 02/23/2024
P-901 WASTE RISER DIAGRAM - SANITARY, VENT, AND INDUSTRIAL WASTE 1 02/23/2024
P-902 WASTE RISER DIAGRAM - STORM AND CONDENSATE
P-903 DOMESTIC WATER RISER DIAGRAM
14 - MECHANICAL
M-001 LEGEND AND ABBREVIATIONS
MH110 HVAC PLAN - FIRST FLOOR - COMPOSITE
MH111 HVAC PLAN - FIRST FLOOR - SECTOR 1
MH112 HVAC PLAN - FIRST FLOOR - SECTOR 2
MH113 HVAC PLAN - FIRST FLOOR - SECTOR 3
MH120 HVAC PLAN - LOW ROOF AND HIGH BAY COMPOSITE
MH121 HVAC PLAN - LOW ROOF AND HIGH BAY SECTOR 1
MH122 HVAC PLAN - LOW ROOF AND HIGH BAY SECTOR 2
MH123 HVAC PLAN - LOW ROOF AND HIGH BAY SECTOR 3
MH130 HVAC PLAN - HIGH ROOF COMPOSITE
MP110 MECHANICAL PIPING PLAN - LEVEL 1 COMPOSITE
MP111 MECHANICAL PIPING PLAN - FIRST FLOOR - SECTOR 1 2 02/23/2024
MP112 MECHANICAL PIPING PLAN - FIRST FLOOR - SECTOR 2 2 02/23/2024
MP113 MECHANICAL PIPING PLAN - FIRST FLOOR - SECTOR 3 2 02/23/2024
MP120 MECHANICAL PIPING PLAN - ROOF COMPOSITE
M-201 MECHANICAL SECTIONS
M-401 MECHANICAL ENLARGED PLAN - MECHANICAL ROOM
M-501 MECHANICAL DETAILS
M-502 MECHANICAL DETAILS
M-503 MECHANICAL DETAILS
M-504 MECHANICAL DETAILS
M-505 MECHANICAL DETAILS
M-506 MECHANICAL DIAGRAMS
M-601 MECHANICAL…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .