W912QR24R0008_Plans-0004.pdf
PDF 7 MB Posted
- Solicitation number
- W912QR24R0008
About this file
This document is a Request for Proposals (RFP) for the construction of a new Ground Transport Equipment Building (GTEB) at the Detroit Arsenal in Warren, Michigan. The estimated construction cost is between $25,000,000 and $100,000,000. This is a single-phase, Design/Bid/Build, 100% Full and Open (Unrestricted) procurement with a HUBZone 10% price evaluation preference. The solicitation number is W912QR24R0008 and the NAICS code is 236220 with a $45,000,000 size standard. The U.S. Army Corps of Engineers, Louisville District is the procuring agency. The contract requires the construction of a new ground transportation equipment facility, including civil, structural, architectural, mechanical, electrical, and fire protection systems. A site visit is required in accordance with FAR Clause 52.236-27 ALT I.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E
SHEET ID
US Army Corps of Engineers
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
P2
LO
U
IS
VI
LL
E
D
IS
TR
IC
T
D
R M
AR
TI
N L
U
TH
ER
J
R P
L
LO
U
IS
VI
LL
E, K
Y
SE
PT
EM
BE
R
9, D
ET
R O
IT
A
R
SE
N
AL
, M I
G R
O U
N D
T R
AN
SP
O R
TA
TI
O N
E Q
U
IP
M
EN
T
BU
IL
D
IN
G
FY
Plot Date: File Path:
C
ER
TI
FI
ED
F
IN
AL
S U
BM
IT
TA
L
GENERAL NOTES
1. UNDERGROUND FACILITIES, STRUCTURES AND UTILITIES HAVE BEEN PLOTTED FROM AVAILABLE SURVEYS AND RECORDS. THEREFORE, THEIR LOCATION MUST BE CONSIDERED APPROXIMATE ONLY.
THERE MAY BE OTHERS, THE EXISTENCE OF WHICH IS NOT PRESENTLY KNOWN. BEFORE STARTING ANY WORK, THE CONTRACTOR SHALL POTHOLE TO LOCATE AND PROTECT ALL EXISTING BURIED UTILITY LINES, WHETHER OR NOT SHOWN ON THESE DRAWINGS, DURING THE COURSE OF CONSTRUCTION.
REROUTING, DISCONNECTION, PROTECTION, ETC. OF ANY UTILITIES MUST BE COORDINATED BETWEEN
THE CONTRACTOR, UTILITY COMPANY, AND CONTRACTING OFFICER'S REPRESENTATIVE.
2. PRIOR TO THE START OF CONSTRUCTION THE CONTRACTOR SHALL INSTALL AND MAINTAIN DURING CONSTRUCTION ALL SEDIMENT CONTROL MEASURES AS NECESSARY TO RETAIN SEDIMENTS ON THE
SITE.
3. THE CONTRACTOR SHALL COORDINATE WORK EFFORTS WITH THE GOVERNMENT TO MINIMIZE TRAFFIC
INTERFERENCE AND OPERATIONS OF THE FACILITIES.
4. NO BLASTING OR BURNING IS ALLOWED ON THE PROJECT SITE, UNLESS OTHERWISE NOTED OR
DIRECTED BY THE GOVERNMENT.
DEMOLITION AND CLEARING NOTES:
1. DEMOLITION AND CLEARING OPERATIONS SHALL CONFORM TO APPLICABLE REGULATIONS RELATING TO
ENVIRONMENTAL REQUIREMENTS, DISPOSAL OF DEBRIS, AND USE OF HERBICIDES.
2. DEMOLITION WASTE SHALL BE DISPOSED OF IN A LEGAL MANNER. REMOVE DEMOLITION WASTE MATERIALS FROM PROJECT SITE AND DISPOSE OF WASTE IN AN EPA-APPROVED LANDFILL ACCEPTABLE TO AUTHORITIES HAVING JURISDICTION. DO NOT BURY OR BURN DEMOLITION WASTE ON-SITE.
3. ARRANGE DEMOLITION SCHEDULE SO AS NOT TO INTERFERE WITH GOVERNMENT'S ON-SITE
OPERATIONS OR OPERATIONS OF ADJACENT OCCUPIED BUILDINGS. PROVIDE NOT LESS THAN 72 HOURS
NOTICE OF ACTIVITIES THAT WILL AFFECT OPERATIONS OF ADJACENT OCCUPIED BUILDINGS.
4. PRIOR TO COMMENCEMENT OF SITE CLEARING OPERATIONS, VERIFY THE FOLLOWING:
a. TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES ARE IN PLACE AND IN WORKING ORDER.
b. EXISTING UNDERGROUND UTILITIES HAVE BEEN LOCATED AND MARKED IN THE FIELD.
c. EXISTING SITE IMPROVEMENTS AND UTILITIES TO REMAIN HAVE BEEN PROTECTED.
5. COORDINATE UTILITY DEMOLITION AND ABANDONMENT WITH DETROIT ARSENAL UTILITY GROUPS.
6. CONTRACTOR TO PROVIDE A MINIMUM OF 48-HOUR NOTICE TO ALL DETROIT ARSENAL UTILITY GROUPS
BEFORE DIGGING.
7. COORDINATE ALL SITE DEMOLITION WITH PROPOSED SITE IMPROVEMENTS, AND NEW UNDERGROUND
UTILITIES.
8. CONTRACTOR SHALL REPAIR ANY DAMAGED UTILITY LINES CAUSED BY HIS/HER ACTIVITIES. ALL WORK REQUIRED TO PERMANENTLY REPAIR THE UTILITY TO THE ENGINEER'S SATISFACTION SHALL BE AT THE
CONTRACTORS EXPENSE.
EARTHWORK NOTES:
1. COORDINATE ALL SITE IMPROVEMENTS WITH NEW UNDERGROUND UTILITIES.
2. IN THE EVENT OF ANY UNFORESEEN CONDITIONS THAT ARE ENCOUNTERED AND NOT COVERED BY THESE NOTES DURING GRADING OPERATIONS, THE ENGINEER SHALL BE IMMEDIATELY NOTIFIED FOR
DIRECTION.
3. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO PERFORM ALL NECESSARY CUTS AND FILLS WITHIN THE LIMITS OF THIS PROJECT AND RELATED OFF-SITE WORK SO AS TO ESTABLISH THE DESIRED
SUBGRADE, FINISH GRADES AND SLOPES SPECIFIED WITHIN THE PLANS.
4. ADEQUATE SHORING IS TO BE DESIGNED AND PROVIDED BY THE CONTRACTOR TO PREVENT
UNDERMINING OF ANY ADJACENT FEATURES OR FACILITIES AND/OR CAVING OF THE EXCAVATION. ALL
SHORING AND ASSOCIATED TEMPORARY STRUCTURES SHALL BE DESIGNED BY A LICENSED
PROFESSIONAL AND INSTALLED PURSUANT TO O.S.H.A. REQUIREMENTS.
UTILITY NOTES:
1. WHERE APPLICABLE, THE CONTRACTOR SHALL MAINTAIN ALL FENCING, SIGNS, DETOURS, FLAGMEN, SIGNALS, ETC., FOR ANY OPEN TRENCHES, HOLES OR PITS. ALL TRENCHES, HOLES OR PITS SHALL BE
CLOSED OR PROTECTED BY BARRICADES AT THE END OF THE DAY.
2. THE CONTRACTOR SHALL MAINTAIN RECORD DRAWINGS DURING CONSTRUCTION WHICH SHOW THE
CONSTRUCTED CONDITIONS OF ALL WORK INSTALLED.
EROSION AND SEDIMENTATION CONTROL NOTES:
1. PRIOR TO COMMENCEMENT OF ANY CLEARING AND EXCAVATION WITHIN A WORK AREA, ALL EROSION
AND SEDIMENT CONTROL MEASURES SHALL BE INSTALLED AND IN WORKING ORDER.
2. THE STORMWATER POLLUTION PREVENTION PLAN (SWP3) IS PREPARED IN ACCORDANCE WITH THE STATE AND FEDERAL NATIONAL POLLUTANT DISCHARGE SYSTEM (NPDES) PERMIT AND SHALL OUTLINE “BEST MANAGEMENT PRACTICES” TO BE USED THROUGHOUT THE PROJECT AND WILL BE PROVIDED TO
THE CONTRACTOR.
3. THE “EROSION CONTROL PLAN” CONTAINED WITHIN THIS PLAN SHALL BE ADJUSTED AS REQUIRED DURING THE PHASING AND PERFORMANCE OF THE CONSTRUCTION. ADDITIONAL MEASURES SHALL BE ADDED AS REQUIRED TO ENSURE THE SITE MEETS ALL FEDERAL, STATE, AND LOCAL EROSION AND SEDIMENT CONTROL REQUIREMENTS, AS WELL AS THE APPROPRIATE STATE AND FEDERAL NATIONAL
POLLUTANT DISCHARGE PERMIT (NPDES).
4. THE CONTRACTOR IS RESPONSIBLE FOR MAINTAINING EROSION AND SEDIMENT CONTROL FEATURES TO PREVENT SEDIMENT-LADEN AND OTHER POLLUTANTS FROM LEAVING THE CONSTRUCTION AREAS AND
ENTERING EXISTING STORM WATER FACILITIES AND SURFACE WATERS. ADDITIONAL MEASURES
BEYOND THOSE SHOWN ON THESE PLANS MAY BE NECESSARY DURING CONSTRUCTION, INCLUDING
TEMPORARY VEGETATIVE MEASURES AND INSTALLATION OF OTHER SILT TRAPPING MEASURES.
5. ALL BEST MANAGEMENT CONTROL PRACTICES SHALL BE INSPECTED BY THE SUPERINTENDENT, THE
PERSON RESPONSIBLE FOR THE DAY TO DAY OPERATIONS; OR SOMEONE APPOINTED BY THE
SUPERINTENDENT, AT LEAST EVERY 7 DAYS OR WITHIN 24 HOURS AFTER A PRECIPITATION EVENT THAT RESULTS IN RUNOFF LEAVING THE SITE INCLUDING WEEKEND DAYS REGARDLESS IF THE CONTRACTOR
IS WORKING OR NOT. A WRITTEN LOG SHALL BE MAINTAINED ON SITE OF ALL INSPECTIONS.
6. ALL BEST MANAGEMENT CONTROL MEASURES WILL BE MAINTAINED IN GOOD WORKING ORDER. IF A REPAIR IS NECESSARY, IT WILL BE INITIATED WITHIN 24 HOURS OF REPORTS IDENTIFYING THE PROBLEM
DETAILS OF THE REPAIRS SHALL BE MAINTAINED WITH THE INSPECTION LOG.
7. CONTRACTOR SHALL MAINTAIN AS MUCH OF THE EXISITING VEGETATION AS POSSIBLE IN AREAS OUTSIDE OF THE SCOPE OF WORK AND IN AREAS TO BE DEMOLISHED. VEGETATION TO STAY SHALL BE
PROTECTED DURING CONSTRUCTION. AREAS THAT ARE DISTURBED BY CONSTRUCTION SHALL BE
COVERED AND SEEDED WITHIN 14 DAYS IF NO WORK IN AREA IS PLANNED WITHIN THE NEXT 30 DAYS.
WHEN GRADING IS COMPLETE IN AN AREA, THE AREA SHALL BE SEEDED FOR FINAL STABILIZATION. ALL DISTURBED AREAS SHALL BE SEEDED. THIS INCLUDES, BUT IS NOT LIMITED TO, AREAS AFTER REMOVAL OF TEMPORARY HAUL ROADS, STAGING AND LAYDOWN AREAS, EQUIPMENT STORAGE AREAS, UTILITY TRENCHES, ETC. THE CONTRACTOR SHALL WATER NEW SEED DAILY OR AS NEEDED TO ESTABLISH 95% GROUND COVER PER SECTION 32 92 19 OF THE PROJECT SPECIFICATIONS. CONTRACTOR SHALL MAINTAIN THE SEEDED AREAS UNTIL FINAL ACCEPTANCE OF THE GRASS COVERAGE OF THE DISTURBED AREAS BY THE CONTRACTING OFFICER. NO SODDING IS REQUIRED. THE AREAS WITHIN THE LIMITS OF
CONSTRUCTION SHALL PRESENT A NEAT AND FINISHED APPEARANCE. THE CONTRACTOR SHALL
PROVIDE TEMPORARY WINTER GRASS COVERAGE IN AREAS WHERE SEED IS DELAYED BY THE SEASON.
EXISTING PROPOSED
BOLLARD
FENCE
TREE LINE
SWALE/ DETENTION BASIN TOE
AND TOP OF SLOPE
NATURAL GAS
WATER LINE
SANITARY SEWER
ROOF DRAIN
OVERHEAD ELECTRIC
UNDERGROUND ELECTRIC
UNDERGROUND COMM. LINE
UTILITY POLE
FIRE HYDRANT
VALVE (GAS OR WATER)
STORM DRAIN
FIRE PROTECTION WATER MAIN
LIGHT POLE
TREE
TELEPHONE LINE UGRND.
MANHOLE
X X
G G
W W
SAN SAN
OH OH
UE UE
UC UC
SD
FP
SD
TUG
FMFM
OC OC
LOD
SF
LEGEND
E
REINF REINFORCED, REINFORCING
REQ'D REQUIRED
RES RESILIENT
REV REVISION
RH RIGHT HAND
RHR RIGHT HAND REVERSE
RL RAIN LEADER
RM ROOM
ROW RIGHT OF WAY
RTU ROOFTOP UNIT
RUB RUBBER
S SOUTH
S/A SUPPLY AIR
SC SEALED CONCRETE
SCHED SCHEDULE
SE SOUTHEAST
SECT SECTION
SF SQUARE FOOT
SPECS SPECIFICATIONS
SQ SQUARE
SS SERVICE SINK
SST STAINLESS STEEL
STD STANDARD
STL STEEL
STND STAINED
STOR STORAGE
STRUCT STRUCTURAL
SUSP SUSPENDED
SW SOUTHWEST
SYM SYMMETRICAL
SYS SYSTEM
T TREAD
T&B TOP & BOTTOM
TC TOP OF CURB
TEL TELEPHONE
TEMP TEMPORARY
THK THICK, THICKNESS
TO TOP OF
TOC TOP OF CONCRETE
TOR TOP OF ROOF
TOR(C-R-S
-W)
TOP OF EXISTING (SEE
BELOW)
TOS TOP OF STEEL
TOW TOP OF WALL
TRC TEXTILE REINFORCED CONCRETE
TYP TYPICAL
UC UNDERCUT
UH UNIT HEATER
UNFIN UNFINISHED
UNO UNLESS NOTED OTHERWISE
UON UNLESS OTHERWISE NOTED
UTIL UTILITY
VB VAPOR BARRIER
VERT VERTICAL
VIF VERIFY IN FIELD
VTR VENT THROUGH ROOF
W WIDTH, WEST
W/ WITH
W/O WITHOUT
WC WATER CLOSET, WALL
COVERING
WD WOOD
WGL WIRE GLASS
WH WATER HEATER
WP WATERPROOFING
WT WEIGHT
WWM WELDED WIRE MESH
LLH LONG LEG HORIZONTAL
LLV LONG LEG VERTICAL
LP LOW POINT
LT LIGHT
LTL LINTEL
LVR LOUVER
LW LIGHTWEIGHT
M METER
MAINT MAINTENANCE
MAX MAXIMUM
MECH MECHANICAL
MEZZ MEZZANINE
MFG MANUFACTURING
MFR MANUFACTURER
MH MANHOLE
MIN MINIMUM
MIR MIRRIOR
MISC MISCELLANEOUS
MM MILLIMETER
MNT MOUNT
MO MASONARY OPENING
MTL METAL
MULL MULLION
N NORTH
NE NORTHEAST
NIC NOT IN CONTRACT
NO NUMBER
NOM NOMINAL
NPS NOMINAL PIPE SIZE
NTS NOT TO SCALE
NW NORTHWEST
OA OVERALL
OC ON CENTER
OD OUTSIDE DIAMETER
OFCI OWNER FURNISHED
CONTRACTOR INSTALLED
OFF OFFICE
OFOI OWNER FURNISHED OWNER
INSTALLED
OH OVERHEAD
OPNG OPENING
OPP OPPOSITE
OTO OUT-TO-OUT
PC PRECAST
PL PLATE, PROPERTY LINE
PLAM PLASTIC LAMINATE
PLMBG PLUMBING
PLWD PLYWOOD
PLYWD PLYWOOD
PM PRESSED METAL
PNL PANEL
PNT(D) PAINT(ED)
POL POLISHED
PR PAIR
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PT PRESSURE TREATED
PTN PARTITION
PVC POLYVINYL CHLORIDE
PVG PAVING
R RADIUS, RISER
R/A RETURN AIR
RB RESILIENT BASE
RD ROOF DRAIN
REF REFERENCE
FEC FIRE EXTINGUISHER IN
CABINET
FF FINISHED FLOOR
FFE FINISHED FLOOR ELEVATION
FH FIRE HYDRANT
FHC FIRE HOSE CABINET
FIN FINISH
FL FLOOR, FLOORING
FO FACE OF
FOC FACE OF CONCRETE
FOS FACE OF STUDS
FP FIREPROOF
FR FIRE RATED
FRT FIRE RETARDAINT TREATED
FS FULL SIZE
FT FOOT, FEET
FTG FOOTING
FURN FURNISH
FV FIELD VERIFY
G GAS
GA GAGE
GALV GALVANIZED
GB GRAB BAR
GC GENERAL CONTRACTOR
GD GRADE
GL GLASS
GWB GYPSUM WALL BOARD
GYP GYPSUM
HB HOSE BIB
HC ACCESSIBLEPED, HOLLOW
CORE
HD HAND
HDR HEADER
HDW HARDWARE
HDWD HARDWOOD
HM HOLLOW METAL
HORIZ HORIZONTAL
HP HIGH POINT, HORSE POWER
HR HOUR
HS HEAT STRENGTHENED
HT HEIGHT
HVAC HEATING VENTILATING AIR
CONDITIONING
HW HOT WATER
ID INSIDE DIAMETER
IMP INSULATED METAL PANEL
INSUL INSULATION
INT INTERIOR
INV INVERT
JAN JANITOR
JST JOIST
JT JOINT
KD KNOCKDOWN
KG KILOGRAM
KIT KITCHEN
KO KNOCKOUT
KS KNEE SPACE
LONG, LENGTH
LAB LABORATORY
LAV LAVATORY
LB LOAD BEARING
LBS POUNDS
LEV LEVEL
LH LEFT HAND
LHR LEFT HAND REVERSE
ABBR DESCRIPTION
AND
AT
AIR CONDITIONING
ANCHOR BOLT
ACOUS ACOUSTICAL
ACT ACOUSTICAL CEILING TILE
ABOVE FINISHED FLOOR
AHU AIR HANDLING UNIT
ALTERNATE
ALUM ALUMINUM
APPROX APPROXIMATE
ARCH ARCHITECTURAL
BLDG BUILDING
BLKG BLOCKING
BO BOTTOM OF
BOT BOTTOM
BRG BEARING
BTW BETWEEN
CAB CABINET
CB CATCH BASIN
CF CUBIC FEET
CFM CUBIC FEET PER MINUTE
CFMF COLD - FORMED METAL
FRAMING
CJ CONTROL JOINT
CL CENTERLINE
CLG CEILING
CMU CONCRETE MASONERY UNIT
CO CLEAN OUT
COL COLUMN
CONC CONCRETE
CONST CONSTRUCTION
CONT CONTINUES
CORR CORRIDOR
CW CHILLER WATER
CY CUBIC YARD
D DEEP
DBL DOUBLE
DET DETAIL
DF DRINKING FOUNTAIN
DIA DIAMETER
DIAG DIAGONAL
DIM DIMENSION
DN DOWN
DR DOOR
DS DOWNSPOUT
DWG(S) DRAWING(S)
E EAST
EA EACH
EJ EXPANSION JOINT
EL ELEVATION
ELEC ELECTRICAL
ELEV ELEVATION
EQ EQUAL
EQUIP EQUIPMENT
EW EYE WASH
EWC ELECTRIC WATER COOLER
EWH ELECTRIC WATER HEATER
EXIST EXISTING
EXP EXPANSION, EXPOSED
EXT EXTERIOR
FA FIRE ALARM
FD FLOOR DRAIN
FEB FIRE EXTINGUISHER
BRACKET
MOUNT
ABBREVIATIONS
EXISTING PROPOSED
GUY ANCHOR
POST INDICATOR VALVE
FORCE MAIN
BORE HOLE
SANITARY MANHOLE
FLARED END SECTION
CLEANOUT
OVERHEAD ELEC. & COMM.
LIMIT OF DISTURBANCE
SILT FENCE
CONTOUR LINE
SIGN
UTILITY POLE
ELECTRICAL CONTROL CABINET
TELEPHONE PULL BOX
ELECTRIC PULL BOX
SURVEY CONTROL POINT
BOLLARD
SPOT ELEVATION
ABBR DESCRIPTION ABBR DESCRIPTION ABBR DESCRIPTION ABBR DESCRIPTION ABBR DESCRIPTION
L
ATFP ANTI TERRORISM FORCE
PROTECTION
VOLUME 1 - SHEET INDEX
SHT NO SHEET NAME REV DATE
C-001 COVER SHEET
C-002 GENERAL NOTES AND
ABBREVIATIONS 0003 03/08/2024
C-100 EXISTING CONDITIONS
C-101 SURVEY CONTROL PLAN
CD100 SITE DEMOLITION PLAN 0002 02/23/2024
C-102 AERIAL PHOTO PLAN
C-103 SITE PLAN 0002 02/23/2024
C-104 GEOMETRY PLAN 0002 02/23/2024
C-105 UTILITY PLAN
C-106 GRADING PLAN 0002 02/23/2024
C-107 ATFP PLAN
C-108 EROSION CONTROL PLAN
C-109 HAUL ROUTE 0003 03/22/2024
C-110 JOINTING PLAN
C-111 PHOTOGRAPH PLAN
C-112 SITE COORDINATE PLAN
C-113 UTILITY COORDINATE PLAN
C-250 SEWER PROFILES
C-251 SEWER PROFILES
C-500 PAVEMENT DETAILS 0003 03/08/2024
C-501 PAVEMENT DETAILS
C-502 UTILITY DETAILS
C-503 UTILITY DETAILS
C-504 STORM & SANITARY SEWER DETAILS
C-505 STORM SEWER DETAILS
C-506 MISCELLANEOUS DETAILS 0002 02/23/2024
C-507 EROSION CONTROL DETAILS
C-508 EROSION CONTROL DETAILS
C-510 BORING LOGS
C-511 BORING LOGS
C-512 BORING LOGS
C-513 BORING LOGS
C-514 BORING LOGS
C-521 SWPPP PLAN
D
RDRD
PIV
3/20/2024 3:31:07 PM P:\155_GovDesign\1550017 USACE Detroit Arsenal Building\21DesignWorking\CIVL\05AutoCAD\2Sheets\65526C002.dwg
M .S
M
IT
H
F.
BA
U
ER
F.
BA
U
ER
M .B
U
TL
ER
G
EN
ER
AL
N
O
TE
S
AN
D A
BB
R
EV
IA
TI
O
N S
C
IV
IL
C-002
R
EV
IS
ED
IN
A C
C O
R D
AN
C
E W
IT
H
A M
EN
D
M
EN
T
/2 3/
R
EV
IS
ED
IN
A C
C O
R D
AN
C
E W
IT
H
A M
EN
D
M
EN
T
/0 8/
R
EV
IS
ED
IN
A C
C O
R D
AN
C
E W
IT
H
A M
EN
D
M
EN
T
/2 2/
W
2Q R
R
_P la ns -0
ARIMS: 200A Disposition: Maintain for 15 yrs after construction.
PA
TT
O N
D R
IV
E
GROUND TRANSPORTATION
EQUIPMENT BUILDING
CONTRACTOR
LAYDOWN
AREA
CONTRACTOR
HAUL ROUTE
EXISTING GATE
(GOVERMENT GATE
ACCESS SHALL BE
MAINTAINED FOR MILITARY
MISSION TRAFFIC)
BLDG
BLDG
BLDG
C LOT
M O
U N
D R
D
ARSENAL AVENUE
AB
R
AM
S
D R
IV
E
EI
SE
N H
O W
ER
D
R
IV
E
TRACK
BLDG 200A
BLDG
200C
BLDG
200B
BLDG
200D
BL
D
G
0E
H LOT
J LOT
BRIDGE
CANOPY
CANOPY
BLDG
BLDG
BLDG
N
BLDG
G
BLDG
BLDG
BLDG
BLDG
BLDG
BLDG
M
M1 LOT
L1 LOT
L LOT
E LOT
K LOT
BLDG
BLDG
M
AC
AR
TH
ER
D
R
IV
E
PA
TT
O N
D R
CONTRACTOR
TRAILER
BASE ACCESS
CONTROL
GATE
NOTE: THIS IS ANTICIPATED HAUL ROUTE, UNLESS
BASE REQUIRES A DIFFERENT ROUTE
CONTRACTOR WORKING LIMITS
PE
R
IM
ET
ER
R
O
AD
U.P.
U.P.
U.P.
U.P.
U.P.
U.P.
U.P.
CONCRETE
GRAVEL
STORAGE
CONTAINER
STORAGE
CONTAINER
GRAVEL
BOL.(4)
BOL.(2)
BOL.(2)
BOL.(2)
GRAVEL
GRAVEL
CONCRETE
ASPHALT
SIGN
SIGN
SIGN
SIGN
SIGN
SIGN
ASPHALT
(7 P
AR
KI
N G
S
PA
C
ES
(1
PA
R
KI
N
G S
PA
C
ES
(1
PA
R
KI
N
G S
PA
C
ES
(1
PA
R
KI
N
G S
PA
C
ES
BOL.
LOADING DOCK AREA
AREA UNDER
CONSTRUCTION
AREA UNDER
CONSTRUCTION
PATTON
CONCRETE
CONCRETE
C O
N C
R
ET
E
(1
PA
R
KI
N
G S
PA
C
ES
GAS
METER
GVW
CB
CB
CB
ASPH. RAMP
T
T
T
PATTON
H
PATTON
CWL1
CWL2
CWL3
CWL4
CWL5
CWL6
CWL7
CWL8
CWL9CWL10
CWL11
CWL12
CWL13
CWL14
CWL15
CWL16CWL17
CWL18
CWL19
CWL20
CWL21
CWL22
CWL23
CWL24
CWL25
CWL26
CWL27
CWL28
CWL29
CWL30
CWL31
CWL32
CWL33
CWL34
CWL35
CWL36
CWL37
CWL38
CWL39
CWL40
CWL41
CWL42
CLA1CLA2
CLA3 CLA4 CT3 CT4
CT2 CT1
COOLING
TOWER AREA
SOIL AMENDMENT
AREA (0.60 ACRES)
CWL43
CWL44
SF SF
PROPOSED HAUL ROUTE
CONTRACTOR LAYDOWN AREA
CONTRACTOR WORKING LIMITS
SF SILT FENCE
SITE POINT TABLE
Point
Number
CLA1
CLA2
CLA3
CLA4
CT1
CT2
CT3
CT4
CWL1
CWL2
CWL3
CWL4
CWL5
CWL6
CWL7
CWL8
CWL9
Description
CONTRACTOR LAYDOWN AREA
CONTRACTOR LAYDOWN AREA
CONTRACTOR LAYDOWN AREA
CONTRACTOR LAYDOWN AREA
CONTRACTOR TRAILER
CONTRACTOR TRAILER
CONTRACTOR TRAILER
CONTRACTOR TRAILER
CONTRACTOR WORKING LIMITS
CONTRACTOR WORKING LIMITS
CONTRACTOR WORKING LIMITS
CONTRACTOR WORKING LIMITS
CONTRACTOR WORKING LIMITS
CONTRACTOR WORKING LIMITS
CONTRACTOR WORKING LIMITS
CONTRACTOR WORKING LIMITS
CONTRACTOR WORKING LIMITS
Northing
367300.84
367297.53
367317.51
367320.81
367304.61
367301.31
367321.29
367324.59
367714.14
367713.64
367728.68
367724.71
367800.53
367804.50
367857.74
367857.25
367860.08
Easting
13480433.51
13480363.59
13480362.65
13480432.57
13480513.42
13480443.50
13480442.56
13480512.48
13481093.14
13481083.07
13481082.35
13480998.91
13480995.44
13481097.53
13481095.37
13480989.62
13480989.49
SITE POINT TABLE
Point
Number
CWL10
CWL11
CWL12
CWL13
CWL14
CWL15
CWL16
CWL17
CWL18
CWL19
CWL20
CWL21
CWL22
CWL23
CWL24
CWL25
CWL26
CWL27
Description
CONTRACTOR WORKING LIMITS
CONTRACTOR WORKING LIMITS
CONTRACTOR WORKING LIMITS
CONTRACTOR WORKING LIMITS
CONTRACTOR WORKING LIMITS
CONTRACTOR WORKING LIMITS
CONTRACTOR WORKING LIMITS
CONTRACTOR WORKING LIMITS
CONTRACTOR WORKING LIMITS
CONTRACTOR WORKING LIMITS
CONTRACTOR WORKING LIMITS
CONTRACTOR WORKING LIMITS
CONTRACTOR WORKING LIMITS
CONTRACTOR WORKING LIMITS
CONTRACTOR WORKING LIMITS
CONTRACTOR WORKING LIMITS
CONTRACTOR WORKING LIMITS
CONTRACTOR WORKING LIMITS
Northing
367857.44
367852.06
367850.43
367848.97
367877.06
367875.23
367929.84
367929.84
368116.82
367891.03
367786.57
367682.11
367662.98
367608.50
367647.74
367647.74
367746.57
367751.38
Easting
13480924.90
13480770.53
13480745.03
13480712.54
13480711.27
13480670.52
13480670.52
13480567.31
13480567.31
13480439.16
13480438.85
13480438.55
13480394.32
13480394.32
13480485.02
13480587.95
13480587.95
13480683.73
SITE POINT TABLE
Point
Number
CWL28
CWL29
CWL30
CWL31
CWL32
CWL33
CWL34
CWL35
CWL36
CWL37
CWL38
CWL39
CWL40
CWL41
CWL42
CWL43
CWL44
Description
CONTRACTOR WORKING LIMITS
CONTRACTOR WORKING LIMITS
CONTRACTOR WORKING LIMITS
CONTRACTOR WORKING LIMITS
CONTRACTOR WORKING LIMITS
CONTRACTOR WORKING LIMITS
CONTRACTOR WORKING LIMITS
CONTRACTOR WORKING LIMITS
CONTRACTOR WORKING LIMITS
CONTRACTOR WORKING LIMITS
CONTRACTOR WORKING LIMITS
CONTRACTOR WORKING LIMITS
CONTRACTOR WORKING LIMITS
CONTRACTOR WORKING LIMITS
CONTRACTOR WORKING LIMITS
CONTRACTOR WORKING LIMITS
CONTRACTOR WORKING LIMITS
Northing
367713.52
367714.43
367686.06
367498.11
367460.62
367449.49
367461.58
367462.63
367436.21
367436.44
367513.22
367519.18
367539.22
367586.36
367620.84
367891.03
367955.07
Easting
13480685.63
13480706.03
13480707.46
13480716.46
13480744.01
13480807.49
13480807.01
13480819.53
13480819.85
13480845.52
13480897.45
13481028.94
13481099.91
13481098.01
13481096.62
13480386.98
13480386.98
GENERAL SHEET NOTES
SHEET KEYNOTES
1. POWER FOR CONTRACTOR'S TRAILER MAY BE
OBTAINED FROM SPARE 100 AMP DISCONNECT NAMED
"MCE TEMP POWER SKID" IN DISTRIBUTION PANEL MCC 4
LOCATED AT THE EAST END OF THE COOLING TOWER.
2. CONTRACTOR'S COMMUNICATIONS MAY NOT CONNECT
TO GOVERNMENT SOURCES AND MUST BE
STANDALONE, CELLULAR, WIRELESS, ETC.
3. CONTRACTOR SHALL MAINTAIN PERIMETER FENCE
SECURITY PER LOCAL PROCEDURES FOR THE
DURATION OF THE PROJECT.
4. THE EXISTING PARKING LOT MUST REMAIN OPEN FOR
GOVERNMENT EMPLOYEE PARKING. REQUESTS FOR A
PARTIAL CLOSURE SHALL BE SUBMITTED TO DPW FOR
APPROVAL.
5. PERIMETER ROAD MUST REMAIN OPEN FOR
GOVERNMENT USE/OPERATIONS. CONSTRUCTION
ACTIVITIES THAT DISRUPT GOVERNMENT OPERATIONS
MUST BE APPROVED THROUGH A CONSTRUCTION
IMPACT NOTIFICATION. COORDINATE WITH DPW.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E
SHEET ID
US Army Corps of Engineers
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
P2
LO
U
IS
VI
LL
E
D
IS
TR
IC
T
D
R M
AR
TI
N L
U
TH
ER
J
R P
L
LO
U
IS
VI
LL
E, K
Y
SE
PT
EM
BE
R
9, D
ET
R O
IT
A
R
SE
N
AL
, M I
G R
O U
N D
T R
AN
SP
O R
TA
TI
O N
E Q
U
IP
M
EN
T
BU
IL
D
IN
G
FY
Plot Date: File Path:
C
ER
TI
FI
ED
F
IN
AL
S U
BM
IT
TA
L
100' 200'0
CALLOUTS
LEGEND
PLAN
NORTH
M . S
M
IT
H
F.
B
AU
ER
F.
B
AU
ER
M . B
U
TL
ER
H
AU
L
R O
U
TE
C
IV
IL
C-109 3/18/2024 11:19:02 AM \\thehaskellco.net\CORE\PRJ\155_GovDesign\1550017 USACE Detroit Arsenal Building\21DesignWorking\CIVL\05AutoCAD\2Sheets\655526C109.dwg
1. SILT FENCING (SEE DETAIL A1, SHEET C-507)
R
EV
IS
ED
IN
A C
C O
R D
AN
C
E W
IT
H
A M
EN
D
M
EN
T
/2 3/
R
EV
IS
ED
IN
A C
C O
R D
AN
C
E W
IT
H
A M
EN
D
M
EN
T
/2 2/
W
2Q R
R
_P la ns -0
SHEET ID
E
S
IG
N B
Y
D R
A W
N B
Y
C H
E C
K E
D B
Y
S U
B M
IT
T
E D
B Y
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
L O
U
IS
V
IL
L E
D
IS
T R
IC
T
D
R M
A R
T
IN
L U
T H
E R
J R
P L
L O
U
IS
V
IL
L E
K
E N
T U
C K
Y
A
D E
T R
O
IT
A R
S E
N A
L , M
I G
R O
U N
D T
R A
N S
P O
R T
A T
IO
N
E Q
U
IP
M E
N T
B U
IL
D
IN
G
F Y
P
2# : 5
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
B
C
D
E
F
G
H
J
K
L
M
N
P
File Path:Plot Date:
US Army Corps of Engineers ®
IS
S
U E
D A
T E
S O
L
IC
IT
A
T
IO
N N
O
C O
N T
R A
C T
N O
S
IZ
E
A N
S I D
BIM 360://1550017 USACE Detroit Arsenal GTEB_R2020/1550017_ARCH_CR20.rvt3/22/2024 3:31:57 PM
G-002
M N
O B
E R
T
M D
A L L
A B
A T
T
IS
T A
G P
A R
K E
R
M B
U T
L E
R S
H E
E T
IN
D
E X
C E
R T
IF
IE
D F
IN
A
L S
U B
M
IT
T A
L
S E
P T
E M
B E
R
G E
N E
R A
L
SHT No SHEET NAME REV DATE
09 - INTERIORS
I-111 FIRST FLOOR FINISH PLAN - SECTOR 1 1 03/22/2024
I-112 FIRST FLOOR FINISH PLAN - SECTOR 2 1 03/22/2024
I-113 FIRST FLOOR FINISH PLAN - SECTOR 3 1 03/22/2024
IF-111 FIRST FLOOR FURNITURE PLAN - SECTOR 1 1 02/23/2024
IF-112 FIRST FLOOR FURNITURE PLAN - SECTOR 2 1 02/23/2024
IF-113 FIRST FLOOR FURNITURE PLAN - SECTOR 3 1 02/23/2024
IG-111 FIRST FLOOR SIGNAGE PLAN - SECTOR 1
IG-112 FIRST FLOOR SIGNAGE PLAN - SECTOR 2
IG-113 FIRST FLOOR SIGNAGE PLAN - SECTOR 3
IG-340 SIGNAGE SCHEDULE AND DETAILS
IA-111 FIRST FLOOR ACOUSTICAL CEILING PANEL PLAN - SECTOR 1 1 02/23/2024
IA-112 FIRST FLOOR ACOUSTICAL CEILING PANEL PLAN - SECTOR 2 1 02/23/2024
IA-113 FIRST FLOOR ACOUSTICAL CEILING PANEL PLAN - SECTOR 3
I-401 ENLARGED PLANS AND ELEVATIONS
I-402 INTERIOR ELEVATIONS
I-403 INTERIOR ELEVATIONS 1 03/22/2024
I-601 FINISH SCHEDULE AND LEGEND 1 02/23/2024
11 - FIRE PROTECTION
FA001 FIRE ALARM LEGEND AND NOTES
FA111 FIRE ALARM PLAN - SECTOR 1 1 03/22/2024
FA112 FIRE ALARM PLAN - SECTOR 2
FA113 FIRE ALARM PLAN - SECTOR 3
FA600 FIRE ALARM AND MNS INPUT/OUTPUT MATRIX
FA601 FIRE ALARM AND MNS RISER DIAGRAM 1 03/22/2024
FA602 FIRE ALARM & MASS NOTIFICATION - AUDIBLE AND VISUAL MESSAGES
FX001 FIRE SUPPRESSION SYSTEMS LEGEND AND NOTES
FX110 FIRE SUPPRESSION PLAN
FX400 ENLARGED FIRE PUMP ROOM PLAN
FX600 FIRE PUMP DIAGRAM, SCHEDULE, AND DETAIL
Grand total: 167
SHT No SHEET NAME REV DATE
08 - ARCHITECTURAL
A-002 PROJECT NOTES
A-003 LEGENDS
A-004 LEGENDS
A-005 LEGENDS
A-006 LEGENDS
A-011 ACCESSIBILITY
A-012 ACCESSIBILITY
A-013 ACCESSIBILITY PLAN
A-021 AIR BARRIER PLAN
A-022 AIR BARRIER SECTIONS
A-023 AIR BARRIER SECTIONS
A-024 AIR BARRIER SECTIONS
A-031 UL ASSEMBLIES PLAN
A-032.1 UL ASSEMBLIES - DESIGN NO. U419
A-032.2 UL ASSEMBLIES - DESIGN NO. U419
A-032.3 UL ASSEMBLIES - DESIGN NO. U419
A-033.1 UL ASSEMBLIES - DESIGN NO. U905
A-034.1 UL ASSEMBLIES - DESIGN NO. D902
A-034.2 UL ASSEMBLIES - DESIGN NO D902
A-034.3 UL ASSEMBLIES - DESIGN NO D902
A-036.1 UL ASSEMBLIES - DESIGN NO. X829
A-037.1 UL ASSEMBLIES - DESIGN NO. X827
A-071 AREA TABULATIONS PLAN
A-091 EQUIPMENT PLAN
A-110 FIRST FLOOR PLAN - COMPOSITE 1 03/08/2024
A-111 FIRST FLOOR PLAN - SECTOR 1
A-112 FIRST FLOOR PLAN - SECTOR 2 1 02/23/2024
A-113 FIRST FLOOR PLAN - SECTOR 3
A-120 ROOF PLAN - COMPOSITE
A-121 ROOF PLAN - SECTOR 1
A-122 ROOF PLAN - SECTOR 2
A-123 ROOF PLAN - SECTOR 3
A-201 BUILDING ELEVATIONS
A-301 BUILDING SECTIONS
A-302 BUILDING SECTIONS 1 03/08/2024
A-303 BUILDING SECTIONS 1 03/08/2024
A-311 WALL SECTIONS 1 03/08/2024
A-312 WALL SECTIONS
A-313 WALL SECTIONS 1 03/08/2024
A-314 WALL SECTIONS
A-401 ENLARGED PLANS AND ELEVATIONS 1 03/22/2024
A-402 ENLARGED PLANS AND ELEVATIONS 1 03/22/2024
A-403 ENLARGED PLANS AND ELEVATIONS 1 03/22/2024
A-404 ENLARGED PLANS AND ELEVATIONS
A-501 DETAILS 1 02/23/2024
A-502 DETAILS
A-503 DETAILS
A-504 DETAILS
A-505 DETAILS
A-506 DETAILS
A-507 DETAILS
A-508 DETAILS
A-509 DETAILS 1 03/08/2024
A-510 DETAILS
A-511 DETAILS
A-512 DETAILS 1 03/08/2024
A-513 DETAILS 1 02/07/2024
A-514 DETAILS
A-515 DETAILS
A-516 DETAILS
A-519 DETAILS
A-520 DETAILS
A-521 DETAILS
A-522 DETAILS
A-523 DETAILS
A-524 DETAILS
A-531 DETAILS 1 02/23/2024
A-601 PARTITION SCHEDULE
A-602 PARTITION SCHEDULE
A-603 PARTITION SCHEDULE
A-604 PARTITION SCHEDULE DETAILS
A-611 DOOR SCHEDULE 2 03/08/2024
A-612 WINDOW AND LOUVER SCHEDULE 2 03/08/2024
A-710 FIRST FLOOR REFLECTED CEILING PLAN
A-711 FIRST FLOOR REFLECTED CEILING PLAN - SECTOR 1 1 03/08/2024
A-712 FIRST FLOOR REFLECTED CEILING PLAN - SECTOR 2
A-713 FIRST FLOOR REFLECTED CEILING PLAN - SECTOR 3 1 03/08/2024
A-901 ISOMETRIC VIEWS
SHT No SHEET NAME REV DATE
00 - GENERAL
G-001 COVER SHEET
G-002 SHEET INDEX 3 03/22/2024
G-003 SHEET INDEX 3 03/22/2024
GI001 CODE ANALYSIS
GI002 CODE ANALYSIS
GI003 FPLS CODE REVIEW FORM
GI101 CODE COMPLIANCE SITE PLAN
GI110 LIFE SAFETY PLAN
GI200 ELECTRICAL HAZARDOUS CLASSIFICATION PLAN
GI300 DAMPER SCHEDULE
GI400 HAZARDOUS MATERIAL PLAN
07 - STRUCTURAL
S-001 GENERAL STRUCTURAL NOTES 1 03/22/2024
S-002 GENERAL STRUCTURAL NOTES 1 03/08/2024
S-003 GENERAL STRUCTURAL NOTES
S-004 GENERAL STRUCTURAL NOTES
S-005 GENERAL STRUCTURAL NOTES 2 03/22/2024
S-006 STRUCTURAL ABBREVIATIONS AND SYMBOLS
S-010 TYPICAL DETAILS - CONCRETE SLAB-ON-GRADE
S-011 TYPICAL DETAILS - CONCRETE DETAILS AND SCHEDULES 1 02/23/2024
S-012 TYPICAL PRECAST CONCRETE WALL PANEL ELEVATIONS
S-013 TYPICAL DETAILS - CONCRETE MASONRY
S-014 TYPICAL DETAILS - STEEL
S-015 TYPICAL DETAILS - STEEL
S-020 COMPONENTS AND CLADDING WIND PRESSURE DIAGRAMS
S-021 SNOW LOAD AND DRIFT DIAGRAM
S-100 FOUNDATION PLAN - COMPOSITE
S-101 FOUNDATION PLAN - SECTOR 1
S-102 FOUNDATION PLAN - SECTOR 2
S-103 FOUNDATION PLAN - SECTOR 3
S-110 INTERMEDIATE FRAMING PLAN - COMPOSITE
S-111 INTERMEDIATE FRAMING PLAN - SECTOR 1
S-112 INTERMEDIATE FRAMING PLAN - SECTOR 2
S-113 INTERMEDIATE FRAMING PLAN - SECTOR 3
S-120 ROOF FRAMING PLAN - COMPOSITE
S-121 ROOF FRAMING PLAN - SECTOR 1
S-122 ROOF FRAMING PLAN - SECTOR 2
S-123 ROOF FRAMING PLAN - SECTOR 3
S-200 VERTICAL BRACED FRAME ELEVATIONS
S-201 VERTICAL BRACED FRAME ELEVATIONS
S-202 VERTICAL BRACED FRAME ELEVATIONS
S-203 VERTICAL BRACED FRAME ELEVATIONS
S-204 EXTERIOR WALL FRAMING AND CMU WALL ELEVATIONS
S-205 EXTERIOR WALL FRAMING ELEVATIONS
S-206 EXTERIOR WALL FRAMING ELEVATIONS
S-207 INTERIOR PARTITION WALL FRAMING AND CMU WALL ELEVATIONS
S-400 TEST PIT FOUNDATION PLAN AND SECTIONS 2 03/22/2024
S-500 FOUNDATION SECTIONS AND DETAILS
S-501 FOUNDATION SECTIONS AND DETAILS
S-502 FOUNDATION SECTIONS AND DETAILS 1 02/23/2024
S-503 FOUNDATION SECTIONS AND DETAILS
S-504 FOUNDATION SECTIONS AND DETAILS
S-510 CRANE FRAMING SECTIONS AND DETAILS
S-520 FRAMING SECTIONS AND DETAILS
S-521 FRAMING SECTIONS AND DETAILS
S-522 FRAMING SECTIONS AND DETAILS
S-523 FRAMING SECTIONS AND DETAILS
S-525 STEEL BRACED FRAME CONNECTION DETAILS
S-600 FOUNDATION SCHEDULES AND DETAILS
S-601 FOUNDATION PEDESTAL PLAN DETAILS
S-610 COLUMN BASE PLATE SCHEDULES AND DETAILS
S-900 STRUCTURAL ISOMETRIC VIEWS
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E A
P P
R
R
E V
IS
E
D I N
A C
C O
R D
A N
C E
W
IT
H A
M E
N D
M E
N T
/2 /2
M B
R
E V
IS
E
D I N
A C
C O
R D
A N
C E
W
IT
H A
M E
N D
M E
N T
/0 /2
M B
R
E V
IS
E
D I N
A C
C O
R D
A N
C E
W
IT
H A
M E
N D
M E
N T
/2 /2
M B
W
2Q R
R
_P la ns -0
E
S
IG
N B
Y
D R
A W
N B
Y
C H
E C
K E
D B
Y
S U
B M
IT
T
E D
B Y
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
L O
U
IS
V
IL
L E
D
IS
T R
IC
T
D
R M
A R
T
IN
L U
T H
E R
J R
P L
L O
U
IS
V
IL
L E
K
E N
T U
C K
Y
A
D E
T R
O
IT
A R
S E
N A
L , M
I G
R O
U N
D T
R A
N S
P O
R T
A T
IO
N
E Q
U
IP
M E
N T
B U
IL
D
IN
G
F Y
P
2# : 5
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
B
C
D
E
F
G
H
J
K
L
M
N
P
File Path:Plot Date:
US Army Corps of Engineers ®
IS
S
U E
D A
T E
S O
L
IC
IT
A
T
IO
N N
O
C O
N T
R A
C T
N O
S
IZ
E
A N
S I D
BIM 360://1550017 USACE Detroit Arsenal GTEB_R2020/1550017_ARCH_CR20.rvt3/22/2024 3:31:57 PM
G-003
M N
O B
E R
T
M D
A L L
A B
A T
T
IS
T A
G P
A R
K E
R
M B
U T
L E
R S
H E
E T
IN
D
E X
C E
R T
IF
IE
D F
IN
A
L S
U B
M
IT
T A
L
S E
P T
E M
B E
R
G E
N E
R A
L
SHT No SHEET NAME REV DATE
15 - ELECTRICAL
E-001 LEGEND AND ABBREVIATIONS
ES101 ELECTRICAL SITE PLAN
EG110 GROUNDING PLAN
EG120 LIGHTNING PROTECTION PLAN
EG501 GROUNDING DETAILS
EG502 LIGHTNING PROTECTION DETAILS
EG503 LIGHTNING PROTECTION ROOF DETAILS
EP101 POWER PLAN SECTOR 1 1 03/08/2024
EP102 POWER PLAN SECTOR 2 1 03/08/2024
EP103 POWER PLAN SECTOR 3 1 02/23/2024
EP104 POWER PLAN ROOF
EP401 ENLARGED POWER PLANS 1 02/23/2024
EP501 POWER DETAILS
EP502 POWER DETAILS
EP600 MECHANICAL EQUIPMENT CONNECTION SCHEDULE
EL001 LIGHTING LEGEND AND SCHEDULES
EL101 LIGHTING PLAN SECTOR 1
EL102 LIGHTING PLAN SECTOR 2
EL103 LIGHTING PLAN SECTOR 3
EL501 LIGHTING DETAILS
EL502 LIGHTING DETAILS 1 03/08/2024
EL503 LIGHTING DETAILS 2 03/08/2024
EL601 LIGHTING CONTROL DIAGRAM
E-601 MSWBDC ELECTRICAL ONE-LINE
E-602 MSWBDA AND MSWBDB ELECTRICAL ONE-LINE 2 03/22/2024
E-603 SCHEDULES 1 03/08/2024
E-610 PANEL SCHEDULES 2 03/22/2024
E-611 PANEL SCHEDULES
E-612 PANEL SCHEDULES
E-613 PANEL SCHEDULES
E-614 PANEL SCHEDULES
16 - TELECOMMUNICATIONS
T-000 NOTES, SYMBOLS & ABBREVIATIONS
T-100 TELECOM SITE PLAN 1 03/22/2024
T-101 TELECOM ENLARGED SITE PLAN 1 03/22/2024
T-200 TELECOM OVERALL
T-201 TELECOM PATHWAYS PLAN
T-201.11 FIRST FLOOR TELECOM PLAN (NIPR) - AREA 1
T-201.12 FIRST FLOOR TELECOM PLAN (NIPR) - AREA 2
T-201.13 FIRST FLOOR TELECOM PLAN (NIPR) - AREA 3
T-201.31 FIRST FLOOR TELECOM PLAN (DATACQ) - AREA 1
T-201.32 FIRST FLOOR TELECOM PLAN (DATACQ) - AREA 2
T-201.33 FIRST FLOOR TELECOM PLAN (DATACQ) - AREA 3
T-400 ENLARGED TELECOM ROOM PLANS - COMM 101 1 02/23/2024
T-401 ENLARGED SERVER ROOM PLANS - COMM 106
T-402 RACK ELEVATIONS 1 02/23/2024
T-500 TELECOM DETAILS
T-501 TELECOM DETAILS
T-700 TELECOM SCHEDULES
17- SYSTEMS
TI000 SYSTEMS GENERAL NOTES, SYMBOLS & ABBREVIATIONS 1 02/23/2024
TI200 SYSTEMS OVERALL
TI201.1 FIRST FLOOR SYSTEMS PLAN - AREA 1
TI400 ENLARGED CONFERENCE ROOM PLANS
TI502 AV DETAILS
TI503 AV DETAILS
TI601.A AV SINGLE-LINE DIAGRAM - CONFERENCE ROOM 118
TI601.C AV SINGLE-LINE - 101
TI601.E AV SINGLE-LINE DIAGRAM - CONFERENCE ROOM 118
TI700 AV RACK ELEVATIONS 1 02/23/2024
18 - SECURITY
TY000 SECURITY SYMBOLS & ABBREVIATIONS
TY200 SECURITY OVERALL
TY201.1 FIRST FLOOR SECURITY PLAN - AREA 1
TY201.2 FIRST FLOOR SECURITY PLAN - AREA 2
TY201.3 FIRST FLOOR SECURITY PLAN - AREA 3
TY500 DOOR DETAILS
TY501 DOOR DETAILS
TY502 DOOR DETAILS
TY503 DOOR DETAILS
TY605 SECURITY CAMERA MOUNTING DETAILS
Grand total: 127
SHT No SHEET NAME REV DATE
12 - PLUMBING
P-001 LEGEND AND ABBREVATIONS
P-110 PLUMBING PIPING PLAN - FIRST FLOOR - COMPOSITE 1 02/23/2024
P-111 PLUMBING PIPING PLAN - FIRST FLOOR - SECTOR 1 1 02/23/2024
P-112 PLUMBING PIPING PLAN - FIRST FLOOR - SECTOR 2
P-113 PLUMBING PIPING PLAN - FIRST FLOOR - SECTOR 3
P-401 PLUMBING ENLARGED PLAN - BATHROOM GROUP 1 02/23/2024
P-501 PLUMBING DETAILS 1 02/23/2024
P-502 PLUMBING DETAILS
P-503 PLUMBING DETAILS
P-601 PLUMBING SCHEDULES 1 02/23/2024
P-901 WASTE RISER DIAGRAM - SANITARY, VENT, AND INDUSTRIAL WASTE 1 02/23/2024
P-902 WASTE RISER DIAGRAM - STORM AND CONDENSATE
P-903 DOMESTIC WATER RISER DIAGRAM
14 - MECHANICAL
M-001 LEGEND AND ABBREVIATIONS
MH110 HVAC PLAN - FIRST FLOOR - COMPOSITE
MH111 HVAC PLAN - FIRST FLOOR - SECTOR 1
MH112 HVAC PLAN - FIRST FLOOR - SECTOR 2
MH113 HVAC PLAN - FIRST FLOOR - SECTOR 3
MH120 HVAC PLAN - LOW ROOF AND HIGH BAY COMPOSITE
MH121 HVAC PLAN - LOW ROOF AND HIGH BAY SECTOR 1
MH122 HVAC PLAN - LOW ROOF AND HIGH BAY SECTOR 2
MH123 HVAC PLAN - LOW ROOF AND HIGH BAY SECTOR 3
MH130 HVAC PLAN - HIGH ROOF COMPOSITE
MP110 MECHANICAL PIPING PLAN - LEVEL 1 COMPOSITE
MP111 MECHANICAL PIPING PLAN - FIRST FLOOR - SECTOR 1 3 03/08/2024
MP112 MECHANICAL PIPING PLAN - FIRST FLOOR - SECTOR 2 3 03/08/2024
MP113 MECHANICAL PIPING PLAN - FIRST FLOOR - SECTOR 3 3 03/08/2024
MP120 MECHANICAL PIPING PLAN - ROOF COMPOSITE
M-201 MECHANICAL SECTIONS
M-401 MECHANICAL ENLARGED PLAN - MECHANICAL ROOM
M-501 MECHANICAL DETAILS
M-502 MECHANICAL DETAILS
M-503 MECHANICAL DETAILS
M-504 MECHANICAL DETAILS
M-505 MECHANICAL DETAILS
M-506 MECHANICAL DIAGRAMS
M-601 MECHANICAL SCHEDULES 4 03/22/2024
M-602 MECHANICAL SCHEDULES 1 02/23/2024
M-603 MECHANICAL SCHEDULES 1 02/23/2024
M-701 MECHANICAL CONTROLS GENERAL NOTES
M-702 POINT SCHEDULE NOTES INSTRUCTIONS
M-703 DDC SYSTEM ARCHITECTURE
M-704 DDC CONTROLS - COOLING TOWER DIAGRAM AND SEQUENCE
M-705 DDC CONTROLS - COOLING TOWER CONTROL POINTS
M-706 DDC CONTROLS - CHILLED WATER DIAGRAM AND SEQUENCE
M-707 DDC CONTROLS - CHILLED WATER POINTS LIST
M-708 DDC CONTROLS - HEATING HOT WATER SYSTEM DIAGRAM
M-709 DDC CONTROLS - DX DOAS DIAGRAM AND SEQUENCE
M-710 DDC CONTROLS - DOAS POINTS LIST
M-711 DDC CONTROLS - SPLIT SYSTEM CRAC UNITS AND MINI SPLIT
M-712 DDC CONTROLS - MULTIZONE VAV RTU-01
M-713 DDC CONTROLS - VAV TERMINAL UNIT
M-714 DDC CONTROLS - SINGLE ZONE RTU-02, RTU-03, AND RTU-06
M-715 DDC CONTROLS - SINGLE ZONE RTU-04 AND RTU-05
M-716 DDC CONTROLS - SINGLE ZONE AHU POINTS LIST
M-717 DDC CONTROLS - HVLS, ESB, AND METER CONTROLS
M-718 DDC CONTROLS - UNIT HEATER AND VENTILATION
M-719 DDC CONTROLS - DOMESTIC HOT WATER
M-720 DDC CONTROLS - MONITORING SYSTEMS 1 02/23/2024
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E A
P P
R
R
E V
IS
E
D I N
A C
C O
R D
A N
C E
W
IT
H A
M E
N D
M E
N T
/2 /2
M B
R
E V
IS
E
D I N
A C
C O
R D
A N
C E
W
IT
H A
M E
N D
M E
N T
/0 /2
M B
R
E V
IS
E
D I N
A C
C O
R D
A N
C E
W
IT
H A
M E
N D
M E
N T
/2 /2
M B
W
2Q R
R
_P la ns -0
E
S
IG
N B
Y
D R
A W
N B
Y
C H
E C
K E
D B
Y
S U
B M
IT
T
E D
B Y
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
L O
U
IS
V
IL
L E
D
IS
T R
IC
T
D
R M
A R
T
IN
L U
T H
E R
J R
P L
L O
U
IS
V
IL
L E
K
E N
T U
C K
Y
A
D E
T R
O
IT
A R
S E
N A
L, M
I G
R O
U N
D T
R A
N S
P O
R T
A T
IO
N
E Q
U
IP
M E
N T
B U
IL
D
IN
G
F
Y
P 2#
: 5
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
B
C
D
E
F
G
H
J
K
L
M
N
P
File Path:Plot Date:
US Army Corps of Engineers ®
IS
S
U E
D A
T E
S O
L
IC
IT
A
T
IO
N N
O
C O
N T
R A
C T
N O
S
IZ
E
A N
S I D
BIM 360://1550017 USACE Detroit Arsenal GTEB_R2020/1550017_STRUC_CR20.rvt3/21/2024 10:54:02 AM
S-001
C
S E
R V
O S
S
P
M O
R G
A N
D
S W
Y D
E N
M B
U T
L E
R G
E N
E R
A L
S T
R U
C T
U R
A L
N O
T E
S
C E
R T
IF
IE
D F
IN
A
L S
U B
M
IT
T A
L
A U
G U
S T
S T
R U
C T
U R
A L
A. DESIGN CRITERIA - CONTINUED
4. SNOW LOADS DETERMINED IN ACCORDANCE WITH THE “BUILDING CODE”.
SNOW LOAD PARAMETERS
GROUND SNOW LOAD Pg = 25 PSF (UFC 3-301-01, STRUCTURAL LOAD DATA TOOL)
TERRAIN CATEGORY C (ASCE 7, SECTION 26.7.3, EXPOSURE C)
SNOW EXPOSURE FACTOR Ce = 1.0 (ASCE 7, TABLE 7.3.1, PARTIALLY EXPOSED)
SNOW THERMAL FACTOR Ct = 1.0 (ASCE 7, TABLE 7.3.2, ALL STRUCTURES UNO)
SLOPE FACTOR CS = 1.0 (ASCE 7, FIG. 7.4-1, WARM ROOF)
RISK CATEGORY II (UFC 3-301-01, TABLE 2-2)
SNOW IMPORTANCE FACTOR Is = 1.0 (UFC 3-301-01, TABLE 2-2)
FLAT ROOF SNOW LOAD Pf = 17.5 PSF (ASCE 7, SECTION 7.3)
MINIMUM ROOF SNOW LOAD Pm = 20 PSF (ASCE 7, SECTION 7.3.4)
RAIN-ON-SNOW SURCHARGE LOAD 0 PSF (ASCE 7, SECTION 7.10)
SEE “SNOW LOAD AND SNOW DRIFT DIAGRAM” FOR SNOW LOADS, MAXIMUM SNOW DRIFT SURCHARGE LOADS, AND
WIDTHS OF SNOW DRIFTS.
5. WIND LOADS DETERMINED IN ACCORDANCE WITH THE “BUILDING CODE”.
WIND LOAD PARAMETERS
RISK CATEGORY II (UFC 3-301-01, TABLE 2-2)
BASIC DESIGN WIND SPEED V = 108 MPH (UFC 3-301-01, STRUCTURAL LOAD DATA TOOL)
ALLOWABLE STRESS DESIGN WIND SPEED Vasd = 84 MPH (IBC 2018, TABLE 1609.3.1)
WIND EXPOSURE CATEGORY C (IBC 2018, SECTION 1609.4)
INTERNAL PRESSURE COEFFICIENT GCpi = +/-0.18 (ASCE 7, TABLE 26.13-1, ENCLOSED BLDG.)
EXTERIOR COMPONENTS AND CLADDING MATERIALS INDICATED ON THE CONTRACT DOCUMENTS TO BE PROVIDED BY THE CONTRACTOR AS A DELEGATED ENGINEERED SYSTEM SHALL BE DESIGNED TO RESIST COMPONENTS AND CLADDING WIND PRESSURES. SEE “COMPONENTS AND CLADDING WIND PRESSURE DIAGRAMS” FOR COMPONENTS
AND CLADDING DESIGN WIND PRESSURES.
6. SEISMIC LOADS DETERMINED IN ACCORDANCE WITH THE “BUILDING CODE”.
DESCRIPTION OF THE STRUCTURE AND LATERAL FORCE RESISTING SYSTEM: ALL LATERAL LOAD RESISTANCE AND STABILITY OF THE BUILDING IN THE COMPLETED STRUCTURE IS PROVIDED BY THE STRUCTURAL STEEL MOMENT FRAMES IN THE NORTH-SOUTH DIRECTION AND STRUCTURAL STEEL BRACED FRAMES IN THE EAST-WEST DIRECTION.
CONCRETE SLABS ON COMPOSITE STEEL DECK SERVE AS HORIZONTAL DIAPHRAGMS THAT DISTRIBUTE THE LATERAL WIND AND SEISMIC LOADS HORIZONTALLY TO THE VERTICAL MOMENT FRAMES AND BRACED FRAMES. THE VERTICAL MOMENT FRAMES AND BRACED FRAMES CARRY THE APPLIED LOADS TO THE BUILDING FOUNDATIONS.
SEISMIC DESIGN PARAMETERS
RISK CATEGORY II (UFC 3-301-01, TABLE 2-2)
SEISMIC IMPORTANCE FACTOR IE = 1.0 (UFC 3-301-01, TABLE 2-2)
MAPPED SPECTRAL RESPONSE ACCELERATION AT
SHORT PERIOD
SS = 0.096g
(UFC 3-301-01, STRUCTURAL
LOAD DATA TOOL)
MAPPED SPECTRAL RESPONSE ACCELERATION. AT A
PERIOD OF 1 SECOND
S1 = 0.045g
(UFC 3-301-01, STRUCTURAL
LOAD DATA TOOL)
SITE CLASSIFICATION CLASS D*
(PER GEOTECHNICAL
REPORT)
DESIGN SPECTRAL RESPONSE ACCELERATION AT
SHORT PERIOD
SDS = 0.102g (CALCULATED)
DESIGN SPECTRAL RESPONSE ACCELERATION AT A
PERIOD OF 1 SECOND
SD1 = 0.072g (CALCULATED)
SEISMIC DESIGN CATEGORY B (CALCULATED)
RESPONSE MODIFICATION COEFFICIENT R = 3** (UFC 3-301-01, TABLE 3-1)
SEISMIC RESPONSE COEFFICIENT CS = 0.034 (CALCULATED)
EFFECTIVE SEISMIC WEIGHT W = 4,110 KIPS (ASCE 7, SECTION 12.7.2)
TOTAL SEISMIC DESIGN BASE SHEAR V = 139.7 KIPS (CALCULATED)
OVERSTRENGTH FACTOR =O = 3** (UFC 3-301-01, TABLE 3-1)
DEFLECTION AMPLIFICATION FACTOR Cd = 3** (UFC 3-301-01, TABLE 3-1)
ANALYSIS PROCEDURE USED ELF
(ASCE 7, SECTION 12.6,
EQUIVALENT LATERAL
FORCE PROCEDURE)
* SITE CLASSIFICATION “CLASS D” DETERMINED FROM A SITE-SPECIFIC GEOTECHNICAL INVESTIGATION AND
GEOTECHNICAL REPORT.
** THE BASIC SEISMIC FORCE-RESISTING SYSTEM, IN ACCORDANCE WITH THE “BUILDING CODE” IS A “STEEL SYSTEM
NOT SPECIFICALLY DETAILED FOR SEISMIC RESISTANCE”.
7. RAIN LOADS DETERMINED IN ACCORDANCE WITH THE “BUILDING CODE”.
RAIN LOAD DESIGN PARAMETERS
RAIN INTENSITY i = 2.8 IN./HR.
(IBC 2018, FIG. 1611.1, 100
YR)
8. LOAD COMBINATIONS IN ACCORDANCE WITH THE “BUILDING CODE” (IBC 2018, SECTION 1605 AS MODIFIED BY UFC 3-301-01).
9. NO PROVISIONS FOR ANY FUTURE BUILDING EXTENSIONS OR ADDITIONS HAVE BEEN MADE IN THE STRUCTURAL
DESIGN.
10. ANTITERRORISM FORCE PROTECTION (ATFP)
THE BUILDING IS DESIGNED TO MEET THE APPLICABLE ANTITERRORISM FORCE PROTECTION REQUIREMENTS OF UFC 4-010-01. THE BUILDING IS CLASSIFIED AS AN “INHABITED” BUILDING WITHIN A CONTROLLED PERIMETER. THE NEW FACILITY IS LOCATED ON THE SITE TO PROVIDE A 50 FOOT (MINIMUM) SETBACK FROM THE SECURE PERIMETER OF THE INSTALLATION AND A 33 FOOT (MINIMUM) CLEAR ZONE AROUND THE PERIMETER OF THE BUILDING.
A. DESIGN CRITERIA
1. “BUILDING CODE” - “INTERNATIONAL BUILDING CODE 2018” (IBC 2018) AS MODIFIED BY UFC 1-200-01 “DOD BUILDING CODE” (8 OCTOBER 2019, CHANGE 1, 1 OCTOBER 2020) AND UFC 3-301-01 “STRUCTURAL ENGINEERING” (1 OCTOBER 2019) AND SUPPLEMENTED BY ASCE 7 “MINIMUM DESIGN LOADS FOR BUILDINGS AND OTHER STRUCTURES” (2016).
AT/FP CRITERIA — UFC 4-010-01 ?DoD MINIMUM ANTITERRORISM STANDARDS FOR BUILDINGSO (12 DECEMBER 2018, CHANGE 1 19 AUGUST 2020).
2. LIVE LOADS DETERMINED IN ACCORDANCE WITH THE “BUILDING CODE”.
LOCATION
MINIMUM
UNIFORMLY
DISTRIBUTED LIVE
LOAD*
MINIMUM
CONCENTRATED LIVE
LOAD
OFFICE BUILDINGS:
LOBBIES & FIRST FLOOR CORRIDORS 100 PSF 2000 LB.**
OFFICES 50 PSF 2000 LB.**
MECHANICAL EQUIPMENT ROOM (GENERAL) 100 PSF
MECHANICAL EQUIPMENT ROOM (HVAC) 125 PSF
RESTROOMS (LATRINES) 75 PSF
COMMUNICATION ROOMS 150 PSF
TRANSFORMER ROOMS 200 PSF
MAT/SLAB FOUNDATION — SHAKER ROOM 500 PSF
MAT/SLAB FOUNDATION — PUMP ROOM 250 PSF
PARTITION ALLOWANCE 15 PSF*
ROOFS (MINIMUM, SUBJECT TO MAINTENANCE WORKERS) 20 PSF 300 LB.**
FORKLIFT ALLOWANCE (10,000 LB CAPACITY) 33000 LB AXLE
* PARTITION ALLOWANCE UNIFORMLY DISTRIBUTED LIVE LOAD IS ADDITIVE TO SPECIFIED UNIFORMLY DISTRIBUTED LIVE LOADS APPLICABLE TO FLOORS UNLESS THE MINIMUM SPECIFIED UNIFORMLY DISTRIBUTED LIVE LOAD IS 80 PSF
OR GREATER.
** UNLESS OTHERWISE SPECIFIED, THE INDICATED MINIMUM CONCENTRATED LIVE LOADS ASSUMED TO BE UNIFORMLY DISTRIBUTED OVER AN AREA OF 2.5 FEET BY 2.5 FEET AND LOCATED SO AS TO PRODUCE THE MAXIMUM LOAD EFFECTS IN THE STRUCTURAL MEMBERS. THE 300 LB. MINIMUM CONCENTRATED LIVE LOAD ON STAIR TREADS
APPLIED ON AN AREA OF 2 INCHES BY 2 INCHES.
THE MINIMUM UNIFORMLY DISTRIBUTED LIVE LOAD FOR ROOFS HAVE NOT BEEN REDUCED IN ACCORDANCE WITH
THE “BUILDING CODE” (IBC 2018, SECTION 1607.13.2).
3. CRANE LOADS:
A. THE BUILDING STRUCTURE CRANE SUPPORTS ARE BASED ON THE MAXIMUM LOADS INDICATED BELOW. THE CONTRACTOR SHALL COORDINATE AND DETERMINE THE ACTUAL LOADS FOR THE SELECTED CRANE WITH THE CRANE MANUFACTURER. THE CONTRACTING OFFICER AND THE STRUCTURAL ENGINEER OF RECORD SHALL BE NOTIFIED IF THE ACTUAL LOADS FOR THE SELECTED CRANE EXCEED THE MAXIMUM LOADS INDICATED BELOW.
SEE SPECIFICATION 41 22 13.14 FOR ADDITIONAL CRANE INFORMATION AND REQUIREMENTS.
B. DESIGN LOADS FOR THE 20-TON (MAXIMUM RATED LOAD CAPACITY) TOP RUNNING DOUBLE BOX GIRDER BRIDGE CRANES (REMOTE OPERATED, CMAA 70 SERVICE CLASSIFICATION D) IN THE HIGH BAY / TOOL ROOM:
MAXIMUM TOTAL WEIGHT OF BRIDGE CRANE, END TRUCKS, AND TROLLEY = 31,428 LBS.
MAXIMUM WHEEL LOAD (WITHOUT IMPACT FACTOR) = 29,000 LBS (2 WHEELS EACH END TRUCK)
MAXIMUM TOTAL REACTION AT ONE END OF BRIDGE CRANE GIRDER DUE TO THE BRIDGE CRANE GIRDER, END
TRUCKS, TROLLEY, AND LOAD (WITHOUT IMPACT FACTOR) = 58,000 LBS.
END TRUCK LENGTH = 15’-4N, END TRUCK WHEELBASE (SPACING) = 13’-1N
BUILDING STRUCTURE IN THE HIGH BAY / TOOL ROOM AREA DESIGNED FOR TWO 20-TON BRIDGE CRANES (END
TRUCK TO END TRUCK) MOVING IN TANDUM IN ANY SINGLE FRAMING BAY.
C. DESIGN LOADS FOR THE SINGLE 10-TON (MAXIMUM RATED LOAD CAPACITY) TOP RUNNING DOUBLE GIRDER BRIDGE CRANE (REMOTE OPERATED, CMAA 70 SERVICE CLASSIFICATION C) IN THE SHAKER ROOM:
MAXIMUM TOTAL WEIGHT OF BRIDGE CRANE, END TRUCKS, AND TROLLEY = 9,876 LBS.
MAXIMUM WHEEL LOAD (WITHOUT IMPACT FACTOR) = 12,800 LBS (2 WHEELS EACH END TRUCK)
MAXIMUM TOTAL REACTION AT ONE END OF BRIDGE CRANE GIRDER DUE TO THE BRIDGE CRANE GIRDER, END
TRUCKS, TROLLEY, AND LOAD (WITHOUT IMPACT FACTOR) = 25,600 LBS.
END TRUCK LENGTH = 9'-7", END TRUCK WHEELBASE (SPACING) = 8’-2N
D. DESIGN LOADS FOR THE SINGLE 7.5-TON (MAXIMUM RATED LOAD CAPACITY) TOP RUNNING DOUBLE GIRDER BRIDGE CRANE (REMOTE OPERATED, CMAA 70 SERVICE CLASSIFICATION C) IN THE PUMP ROOM:
MAXIMUM TOTAL WEIGHT OF BRIDGE CRANE, END TRUCKS, AND TROLLEY = 8,548 LBS.
MAXIMUM WHEEL LOAD (WITHOUT IMPACT FACTOR) = 9,900 LBS (2 WHEELS EACH END TRUCK)
MAXIMUM TOTAL REACTION AT ONE END OF BRIDGE CRANE GIRDER DUE TO THE BRIDGE CRANE GIRDER, END
TRUCKS, TROLLEY, AND LOAD (WITHOUT IMPACT FACTOR) = 19,800 LBS.
END TRUCK LENGTH = 9'-6", END TRUCK WHEELBASE (SPACING) = 8’-2N
E. CONTRACTOR SHALL COORDINATE ALL CRANE ACCESSORIES TO INCLUDE, BUT NOT LIMITED TO, OPERATOR CONTROLS, CRANE STOPS AND ANTI-COLLISION COMPONENTS WITH THE CONTRACTING OFFICER / END USER.
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E A
P P
R
R
E V
IS
E
D I N
A C
C O
R D
A N
C E
W
IT
H A
M E
N D
M E
N T
/2 /2
M C
B
B. SOIL PREPARATION AND FOUNDATIONS
1. FOUNDATIONS HAVE BEEN DESIGNED IN ACCORDANCE WITH THE RECOMMENDATIONS CONTAINED IN THE FINAL GEOTECHNICAL INVESTIGATION REPORT PREPARED FOR THIS PROJECT BY TESTING ENGINEERS & CONSULTANTS, INC., DATED MARCH 20, 2023 (TEC REPORT: 62517Rev1).
A. THE CONTRACTOR MAY NOT RELY UPON NON-TECHNICAL DATA, OPINIONS, OR INTERPRETATIONS FOUND IN THE GEOTECHNICAL REPORT IDENTIFIED ABOVE NOR UPON THE COMPLETENESS THEREOF FOR CONTRACTOR’S PURPOSES. COPIES OF THE AFOREMENTIONED GEOTECHNICAL REPORT ARE NOT INCLUDED WITH THE BIDDING DOCUMENTS. THE GEOTECHNICAL REPORT IS NOT PART OF THE CONTRACT DOCUMENTS, BUT THE TECHNICAL DATA CONTAINED THEREIN UPON WHICH THE CONTRACTOR IS ENTITLED TO RELY IS INCORPORATED INTO THE
CONTRACT DOCUMENTS.
2. ALL EXCAVATION, FILL, COMPACTION, AND GRADING OF THE SITE SHALL COMPLY WITH THE MORE STRINGENT RESTRICTIONS OF THE CONTRACT DOCUMENT DRAWINGS AND SPECIFICATIONS, THE BUILDING CODE, EM 385-1-1, AND OSHA REQUIREMENTS. ALL EXISTING FILL SHALL BE REMOVED AND REPLACED PRIOR TO BEGINNING
FOUNDATION CONSTRUCTION.
3. SOIL SUPPORTED SPREAD FOOTING AND MAT FOUNDATIONS -
A. DESIGN ALLOWABLE BEARING PRESSURE (NET) IS 3000 PSF FOR SPREAD FOOTING SHALLOW FOUNDATIONS BEARING ON COMPACTED NATIVE SOILS OR APPROVED ENGINEERED FILL MATERIAL. THE DESIGN MODULUS OF SUBGRADE REACTION (k) IS 40 PCI FOR SPREAD FOOTING SHALLOW FOUNDATIONS BEARING ON COMPACTED SILTY CLAY NATIVE SOILS OR APPROVED ENGINEERED FILL MATERIAL OVER FIRM NATIVE SILTY CLAY. BEARING MATERIALS SHALL BE VERIFIED AND APPROVED BY THE CONTRACTOR’S QUALIFIED LICENSED GEOTECHNICAL
ENGINEER AND THE CONTRACTING OFFICER.
B. DESIGN ALLOWABLE BEARING PRESSURE (NET) IS 1000 PSF FOR MAT FOUNDATIONS BEARING ON COMPACTED NATIVE STIFF CLAY SOILS OR APPROVED ENGINEERED FILL MATERIAL. IF ANY FILL IS ENCOUNTERED AT THE SEISMIC REACTION MASS MAT FOUNDATION (SUPPORTING THE T-BED FLOOR SYSTEM) SUBGRADE LEVEL IT SHOULD BE REMOVED AND REPLACED WITH MDOT 21AA AGGREGATE. THE DESIGN MODULUS OF SUBGRADE REACTION (k) IS 40 PCI FOR MAT FOUNDATIONS BEARING ON COMPACTED STIFF CLAY NATIVE SOILS OR APPROVED ENGINEERED FILL MATERIAL. BEARING MATERIALS SHALL BE VERIFIED AND APPROVED BY THE CONTRACTOR’S QUALIFIED LICENSED GEOTECHNICAL ENGINEER AND THE CONTRACTING OFFICER.
C. CAST-IN-PLACE CONCRETE ISOLATED SPREAD FOOTINGS AND CONTINUOUS FOOTING FOUNDATIONS SUPPORTING THE BUILDING STRUCTURE MAY BE EARTH FORMED. CAST-IN-PLACE CONCRETE STEM WALLS, PEDESTALS, WALLS, SEISMIC REACTION MASS MAT FOUNDATION, AND MAT/SLAB FOUNDATIONS SHALL HAVE
FORMED SIDES.
D. FOUNDATION REINFORCING SHALL BE SUPPORTED FROM ABOVE OR FROM BELOW WITH 3 INCH BAR SUPPORTS
AT 4 FEET ON CENTER (MAX.) WHILE DEPOSITING CONCRETE IN FORMS.
E. MOISTURE CONTENT AND COMPACTION IN FOUNDATION EXCAVATIONS SHALL BE MAINTAINED UNTIL FOUNDATIONS ARE PLACED. FOUNDATIONS SHALL BE POURED AS SOON AS PRACTICAL AFTER EXCAVATIONS
ARE COMPLETED.
4. THE DESIGN MODULUS OF SUBGRADE REACTION (k) IS 100 PCI FOR BUILDING CONCRETE SLABS-ON-GRADE BEARING
ON COMPACTED SUBGRADE SOILS.
5. DO NOT BACKFILL AGAINST BUILDING FOUNDATION AND RETAINING WALLS UNTIL THE RESTRAINING CONCRETE SLABS ARE IN PLACE AND HAVE ATTAINED SPECIFIED 28-DAY COMPRESSIVE STRENGTH OR ADEQUATE BRACING ARE IN PLACE. ALL BACKFILL SHALL BE PLACED AND COMPACTED IN ACCORDANCE WITH THE SPECIFICATIONS.
6. DO NOT BACKFILL AGAINST CONCRETE CANTILEVER RETAINING WALLS UNTIL THE CONCRETE HAS ATTAINED ITS SPECIFIED 28-DAY COMPRESSIVE STRENGTH (f’c). ALL BACKFILL SHALL BE PLACED AND COMPACTED IN
ACCORDANCE WITH THE SPECIFICATIONS.
7. EXTERIOR CONCRETE SLABS-ON-GRADE AND STOOPS SHALL SLOPE AWAY FROM THE STRUCTURE A MINIMUM OF 1/4
INCH PER FOOT UNLESS NOTED OTHERWISE.
W
2Q R
R
_P la ns -0
E
S
IG
N B
Y
D R
A W
N B
Y
C H
E C
K E
D B
Y
S U
B M
IT
T
E D
B Y
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
L O
U
IS
V
IL
L E
D
IS
T R
IC
T
D
R M
A R
T
IN
L U
T H
E R
J R
P L
L O
U
IS
V
IL
L E
K
E N
T U
C K
Y
A
D E
T R
O
IT
A R
S E
N A
L, M
I G
R O
U N
D T
R A
N S
P O
R T
A T
IO
N
E Q
U
IP
M E
N T
B U
IL
D
P 2#
: 5
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
B
C
D
E
F
G
H
J
K
L
M
N
P
File Path:Plot Date:
US Army Corps of Engineers ®
IS
S
U E
D A
T E
S O
L
IC
IT
A
T
IO
N N
O
C O
N T
R A
C T
N O
S
IZ
E
A N
S I D
BIM 360://1550017 USACE Detroit Arsenal GTEB_R2020/1550017_STRUC_CR20.rvt3/21/2024 10:54:02 AM
S-005
C
S E
R V
O S
S
P
M O
R G
A N
D
S W
Y D
E N
M B
U T
L E
R G
E N
E R
A L
S T
R U
C T
U R
A L
N O
T E
S
C E
R T
IF
IE
D F
IN
A
L S
U B
M
IT
T A
L
A U
G U
S T
S T
R U
C T
U R
A L
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E A
P P
R
R
E V
IS
E
D I N
A C
C O
R D
A N
C E
W
IT
H A
M E
N D
M E
N T
/2 /2
M C
B
R
E V
IS
E
D I N
A C
C O
R D
A N
C E
W
IT
H A
M E
N D
M E
N T
/2 /2
M C
B
L. T-BED FLOOR SYSTEM
1. THE BI-DIRECTIONAL T-BED FLOOR SYSTEM INDICATED ON THE CONTRACT DOCUMENTS SHALL
BE PROVIDED BY THE CONTRACTOR AS A DELEGATED ENGINEERED SYSTEM. THE DELEGATED
ENGINEERED SYSTEM SHALL BE DESIGNED AND DETAILED BY THE CONTRACTOR’S QUALIFIED
DELEGATED ENGINEER. THE QUALIFIED DELEGATED ENGINEER SHALL HAVE A MINIMUM OF FIVE
YEARS PREVIOUS EXPERIENCE IN THE DESIGN AND DETAILING OF THE TYPE OF DELEGATED
ENGINEERED SYSTEM INDICATED ON THE CONTRACT DOCUMENTS AND SHALL BE A
PROFESSIONAL ENGINEER REGISTERED IN THE STATE WHERE THE PROJECT IS LOCATED.
THE QUALIFIED DELEGATED ENGINEER SHALL PREPARE AND SUBMIT SIGNED AND SEALED SHOP
DRAWINGS AND CALCULATIONS FOR THE DELEGATED ENGINEERED SYSTEM. ALL SUBMITTALS
FROM THE QUALIFIED DELEGATED ENGINEER MUST BE APPROVED BY THE STRUCTURAL
ENGINEER OF RECORD PRIOR TO THE START OF FABRICATION OF THE SYSTEM OR COMPONENT
PART AND PRIOR TO ANY FIELD CONSTRUCTION THAT MAY BE AFFECTED BY THE SYSTEM OR
COMPONENT PART. REFER TO SPECIFICATION 03 30 00, CAST-IN-PLACE CONCRETE, FOR
ADDITIONAL SUBMITTAL REQUIREMENTS.
2. THE T-BED FLOOR SYSTEM MANUFACTURER SHALL COORDINATE THE DESIGN OF THE T-BED
FLOOR SYSTEM AND THE ANCHORAGE OF THE SYSTEM WITH THE SEISMIC REACTION MASS MAT
FOUNDATION REINFORCING STEEL AND GVCS SELECTED EQUIPMENT REQUIREMENTS. THE SIZE
OF THE SEISMIC REACTION MASS MAT FOUNDATION WAS PROVIDED BY THE GOVERNMENT TO
BE 121-’4” LONG X 50’-0” WIDE X 7’-3” THICK BELOW THE T-BED FLOOR SYSTEM. THE SEISMIC
REACTION MASS MAT FOUNDATION WILL BE PLACED OVER A 3” THICK CONCRETE MUD SLAB.
REFER TO THE FOUNDATION PLANS AND SHEET S-600 FOR ADDITIONAL INFORMATION AND
REQUIREMENTS. THE T-BED FLOOR SYSTEM SHALL BE A MINIMUM OF 10 INCHES DEEP WITH A 1”
THICKNESS OF NON-SHRINK NON-METALLIC HIGH STRENGTH GROUT BELOW FOR A TOTAL
MINIMUM THICKNESS OF 11” FOR THE T-BED FLOOR SYSTEM.
3. THE T-BED FLOOR SYSTEM MANUFACTURER SHALL DESIGN AND INSTALL THE T-BED FLOOR
SYSTEM AND ANCHORAGE TO THE SEISMIC REACTION MASS MAT FOUNDATION. THE T-BED
FLOOR SYSTEM SHALL BE FABRICATED USING CAST IRON IN ACCORDANCE WITH ASTM A48‐76
CLASS 35. THE T-BED FLOOR SYSTEM SHALL HAVE MACHINED BI-DIRECTIONAL T‐ SLOTS
SPACED AT 12.00000 INCHES ON CENTER EACH DIRECTION. THE TOP OF THE T-BED FLOOR
SYSTEM PLATE SHALL BE MACHINED TO A 63 MICRO‐ FINISH WITH A FLATNESS OF +/- 0.005”.
THE SIDES AND ENDS OF THE T-BED FLOOR SYSTEM PLATES AND SHALL BE MACHINED TO A 125
MICRO‐ FINISH. THE T‐ SLOTS SHALL BE MACHINED FROM THE SOLID CAST IRON PLATE. THE T‐
SLOTS FOR THE PLATES SHALL BE 1.06250 INCH MACHINED T‐ SLOTS (THROAT WIDTH: 1.06250 INCH, THROAT DEPTH: 1.25000 INCH, WELL WIDTH: 2.25000 INCH, WELL DEPTH: 1.00”) RUNNING LONGITUDINALLY AND LATERALLY AT 12.00000 INCHES ON CENTER EACH WAY STARTING 6" IN
FROM THE EDGE OF EACH PLATE. A DRAIN ARRANGEMENT SHALL BE PROVIDED FOR EACH T-
BED FLOOR SYSTEM PLATE.
4. THE T-BED FLOOR SYSTEM PLATES SHALL BE PROVIDED WITH A LEVELING AND ANCHORAGE
SYSTEM. EACH T-BED FLOOR SYSTEM PLATE SHALL HAVE ADEQUATE ANCHORING AND
LEVELING POINTS THAT ARE SYMMETRICALLY DISTRIBUTED. THERE SHALL BE MINIMUM OF 864 LEVELING -ANCHOR BOLTS FOR THE T-BED FLOOR SYSTEM. THE ANCHOR BOLTS SHALL BE CAST
IN THE SEISMIC REACTION MASS MAT FOUNDATION AND LOCATED USING TEMPLATES TO
ENSURE THE ANCHOR BOLT ASSEMBLIES ARE PLUMB OVER THE LENGTH OF ANCHOR BOLT AND
SUPPORTING ANCHOR CAN. THE ANCHOR BOLT/CAN ASSEMBLIES SHALL MEET THE T-BED
FLOOR SYSTEM MANUFACTURER’S TOLERANCES. EACH ANCHOR BOLT POCKET IN THE T-BED
FLOOR SYSTEM SHALL BE MACHINED TO ACCEPT A FLUSH MOUNTED COVER SUPPLIED BY THE
T-BED FLOOR SYSTEM MANUFACTURER. THE LEVELING AND ANCHORAGE SYSTEM SHALL
ALLOW CO-AXIAL LEVELING AND ANCHORING AND SHALL ELIMINATE THE POSSIBILITY FOR THE
BUILDING UP OF RESIDUAL STRESSES WITHIN THE T-BED FLOOR SYSTEM PLATES DURING
INSTALLATION AND ANCHORING TO ENSURE THE INSTALLED SYSTEM IS FUNCTIONAL AND
STABLE WITH A RELIABLE PLATE SURFACE. THE ANCHOR BOLTS FOR THE T-BED FLOOR SYSTEM
PLATES SHALL BE HEAVY DUTY ADJUSTABLE ANCHORS DESIGNED BY THE T-BED FLOOR
SYSTEM MANUFACTURER FOR A POST TENSIONING APPLICATION AND SHALL INCLUDE POST
TENSION LOAD SPACERS. THE EMBEDMENT LENGTH INTO THE SEISMIC REACTION MASS MAT
FOUNDATION FOR THE T-BED FLOOR SYSTEM PLATE ANCHOR BOLTS SHALL BE A MINIMUM OF
36”. THE T-BED FLOOR SYSTEM MANUFACTURER SHALL DESIGN THE ANCHORAGE SYSTEM WITH
A LONGER EMBEDMENT DEPTH IF NEEDED BY THEIR DESIGN CALCULATIONS. STEEL TEMPLATES
WITH BRACING SHALL BE PROVIDED FOR INSTALLATION TO LOCATE THE ANCHOR BOLTS WITHIN
THE REQUIRED TOLERANCES AND MAINTAIN TOLERANCES DURING CONCRETE PLACEMENT,
FINISHING AND CURING OPERATIONS. THE ANCHOR BOLT LOCATIONS SHALL BE COORDINATED
WITH THE SEISMIC REACTION MASS MAT FOUNDATION REINFORCING STEEL. THE LOCATION OF
THE REINFORCING STEEL MAY BE ADJUSTED SLIGHTLY TO ELIMINATE CONFLICTS WITH ANCHOR
BOLTS IF THE MAXIMUM SPACING FOR THE REINFORCING STEEL IS MAINTAINED AND THE
ADJUSTMENTS ARE SHOWN ON THE CONCRETE REINFORCING SHOP DRAWING SUBMITTALS.
5. THE T-BED FLOOR SYSTEM, ANCHORS AND GROUT SHALL BE INSTALLED BY THE T-BED FLOOR
SYSTEM MANUFACTURER. THE SETTING AND HANDLING OF THE T-BED FLOOR SYSTEM PLATES
SHALL ENSURE NO PERMANENT DISTORTION, BREAKING OR CRACKING OF THE PLATES. T-BED
FLOOR SYSTEM PLATE INSTALLATION SHALL MAINTAIN A CONSISTENT OVERALL SURFACE
FLATNESS FOR THE PLATES.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .