This solicitation is for the renovation of the Rapid Reaction Laboratory at Wright-Patterson Air Force Base in Ohio. The estimated construction cost is between $5-10 million. The scope of work includes demolition and construction of new and renovated laboratory spaces for various rooms. Options are provided to exercise additional spaces by September 2023 without extending the period of performance. The Department of the Army Corps of Engineers is the contracting agency. The NAICS code is 236220 and businesses must meet the $45 million size standard. This is a full and open competition requiring price evaluations in accordance with FAR provisions. Technical questions must be submitted through ProjNet. Site visits are also available per the provided FAR clause. The wage determination was modified to include the current rates. Photos of the existing chilled water system were attached for reference.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CIVIL/OPS/ENVIRONMENTAL BR
ATTN: AMY M PHILLIPS
600 DR M L KING JR PL RM 821
LOUISVILLE KY 40202-2236
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Solicitation W912QR23R0033 for the Renovation of the Rapid Reaction Laboratory at Wright-Patterson Air Force Base (WPAFB), OH, is hereby modified as follows:
SEE BLOCK 14 CONTINUATION PAGE: "ADMT 0001 - SUMMARY OF CHANGES"
1. CONTRACT ID CODE PAGE OF PAGES
1 14
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912QR23R0033
X 9B. DATED (SEE ITEM 11)
03-May-2023
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO.
5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
30-May-2023
CODE
U. S. ARMY ENGINEER DISTRICT, LOUISVILLE
600 DR. MARTIN LUTHER KING, JR. PLACE
ROOM 821
LOUISVILLE KY 40202-2239
W912QR 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE W912QR
FACILITY CODECODE
EMAIL:TEL:
W912QR23R0033-0001
W912QR23R0033
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
ADMT 0001 - SUMMARY OF CHANGES
A) AMENDED SECTIONS: The following Sections have been revised. The revised sections are enclosed hereunder and replace the previously furnished sections.
a. 00 10 00 Price Breakout Schedule: revisions are marked ***ADMT 0001*** and are highlighted in yellow.
b. 00 21 00 ProjNet Instructions: revisions are marked ***ADMT 0001*** and are highlighted in yellow.
c. 00 73 00 Supplementary Conditions: Wage Determination OH20230081 has been revised to the current modification dated 05/26/2023, Mod. No. 5, and must be adhered to.
B) In response to ProjNet Inquiry ID 10268800: The following attachments have been added FOR
REFERENCE ONLY and are enclosed hereunder.
a. Three (3) Pictures of Existing Chilled Water Feeder System
C) The due date for receipt of offer is not extended as a result of this amendment.
D) All amendments must be acknowledged at the time offers are due.
SECTION 00 10 00 - SOLICITATION
The following have been modified:
PRICE BREAKOUT SCHEDULE
**SAFETY PAYS**
WPAFB AFRL Renovations
PROPOSER’S NAME: ____________________________________________________________
Item Description Unit Amount
BASE PROPOSAL
0001 Laboratory Renovations Job $________
Total Base Proposal $________
OPTIONS
0002 Option 1 – Lab 39 Job $________
0003 Option 2 – Labs 27 and 38 Job $________
0004 Option 3 – Labs 30 and 31 Job $________
0005 Option 4 – Labs 28 and 29 Job $________
0006 Option 5 – Electric Vehicle Charging Station Job $________
Option Total $________
Base + ALL Options Total $________
NOTES FOR PRICE BREAKOUT SCHEDULE
1. The company name should be indicated on the face of the Price Breakout Schedule to preclude being misplaced.
2. Offerors must insert a price on all numbered items (including options) of the Price Breakout Schedule. Failure to do so may result in the offer being unacceptable.
3. Description of Proposal Items – The general outline of the principal features of each item as listed below does not in any way limit the responsibility of the offeror for making a thorough investigation of the drawings and the specifications to determine the scope of work including each item of the Price Breakout Schedule.
************************ADMT 0001************************
DESCRIPTION OF BASE PROPOSAL ITEMS
a) Item No. 0001 – “Laboratory Renovations” includes all construction work for demolition of existing spaces and construction of new, renovated laboratory spaces for the following rooms: G18, G18A, 19, 20, 30A, 40, 40E, 40C, 49, 145 and 117. The base bid shall include the wall between 39 and 40, the replacement of doors to the interior stair and the door hardware replacement and fire-stopping of utility shaft 1-4, first and second floor.
RX-Net Controls installation. Installation of automatic chemical feed system for process chiller water system.
************************ADMT 0001************************
DESCRIPTION OF OPTION PROPOSAL ITEMS
a) Item No. 0002 – All construction work for demolition of existing spaces and construction of new, renovated laboratory space for Lab 39. Option can be exercised by 30-SEP-2023, exercising this Option will not extend the Period of Performance (POP)
b) Item No. 0003 – All construction work for demolition of existing spaces and construction of new, renovated laboratory space for Labs 27 and 38. Option can be exercised by 30-SEP-2023, exercising this Option will not extend the POP.
c) Item No. 0004 – All construction work for demolition of existing spaces and construction of new, renovated laboratory space for Labs 30 and 31. Option can be exercised by 30-SEP-2023, exercising this Option will not extend the POP.
d) Item No. 0005 – All construction work for demolition of existing spaces and construction of new, renovated laboratory space for Labs 28 and 29. Option can be exercised by 30-SEP-2023, exercising this Option will not extend the POP.
e) Item No. 0006 – All construction work for the electric vehicle charging station. Option can be exercised by 30- SEP-2023, exercising this Option will not extend the POP.
SECTION 00 21 00 - INSTRUCTIONS
PROJNET INSTRUCTIONS
OFFEROR'S QUESTIONS AND COMMENTS
Technical inquiries and questions relating to proposal procedures or bonds are to be submitted via Bidder Inquiry in ProjNet at http://www.ProjNet.org/ProjNet. As noted below, offerors shall not submit their proposals via ProjNet.
Offerors shall submit their proposals in accordance with the provisions stated in the solicitation.
To submit and review bid inquiry items, bidders will need to be a current registered user or self-register into system.
The Solicitation Number is: W912QR23R0033 The Bidder Inquiry Key is: G3D96D-9C3F6J
Specific Instructions for ProjNet Bid Inquiry Access:
1. From the ProjNet home page linked above, click on Quick Add on the upper right side of the screen.
2. Identify the Agency. This should be marked as USACE.
3. Key. Enter the Bidder Inquiry Key listed above.
4. Email. Enter the email address you would like to use for communication.
5. Select Continue. A page will then open stating a user account was not found and will ask you to create one using the provided form.
6. Enter your First Name, Last Name, Company, City, State, Phone, Email, Secret Question, Secret Answer, and Time Zone. Make sure to remember your Secret Question and Answer as they will be used from this point on to access the ProjNet system.
7. Select Add User. Once this is completed you are now registered within ProjNet and are currently logged into the system.
Specific Instructions for Future ProjNet Bid Inquiry Access:
1. For future access to ProjNet, you will not be emailed any type of password. You will utilize your Secret Question and Secret Answer to log in.
2. From the ProjNet home page linked above, click on Quick Add on the upper right side of the screen.
3. Identify the Agency. This should be marked as USACE.
4. Key. Enter the Bidder Inquiry Key listed above.
5. Email. Enter the email address you used to register previously in ProjNet.
6. Select Continue. A page will then open asking you to enter the answer to your SecretQuestion.
7. Enter your Secret Answer and click Login. Once this is completed you are now logged into the system.
From this page you may view all bidder inquiries or add an inquiry.
Bidders will receive an acknowledgement of their question via email, followed by an answer to their question after it has been processed by our technical team.
Offerors are requested to review the specification in its entirety and to review the Bidder Inquiry System for answers to questions prior to submission of a new inquiry.
The call center operates weekdays from 8AM to 5PM U.S. Central Time Zone (Chicago). The telephone number for the Call Center is 800-428-HELP.
Offers will NOT be publicly opened. Information concerning the status of the evaluation and/ornaward will NOT be available after receipt of proposals.
NOTES:
1. Offerors shall not submit their proposals via ProjNet, but in accordance with the provisions stated in the solicitation. Any questions regarding acceptable means of submitting offers shall be made directly to the Contract Specialist identified in thesolicitation.
2. Government responses to technical inquiries and questions relating to proposal procedures or bonds that are submitted to ProjNet in accordance with the procedures above are not binding on the Government unless an amendment is issued on Standard Form 30. In the case of any conflicts, the solicitation governs. Any changes or revisions to the solicitation will be made by formal amendment. Government responses will be limited to: (a) Notice that an amendment will be issued; (b) Reference to an existing requirement contained in the solicitation; or (c) Notice that a response is not necessary.
****************************************ADMT 0001***************************************
3. The ability to enter technical inquiries and questions relating to proposal procedures or bonds will be disabled five (5) calendar days prior to the closing date stated in the solicitation. No Government responses will be entered into the ProjNet system within two (2) calendar days prior to the closing date stated in the solicitation.
****************************************ADMT 0001***************************************
SECTION 00 73 00 - SUPPLEMENTARY CONDITIONS
WAGE DETERMINATION
"General Decision Number: OH20230081 05/26/2023
Superseded General Decision Number: OH20220081
State: Ohio
Construction Type: Building
County: Greene County in Ohio.
BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).
Note: Contracts subject to the Davis-Bacon Act are generally required to pay at least the applicable minimum wage rate required under Executive Order 14026 or Executive Order 13658.
Please note that these Executive Orders apply to covered contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but do not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60).
|If the contract is entered |. Executive Order 14026 | |into on or after January 30, | generally applies to the | |2022, or the contract is | contract. | |renewed or extended (e.g., an |. The contractor must pay | |option is exercised) on or | all covered workers at | |after January 30, 2022: | least $16.20 per hour (or | | | the applicable wage rate | | | listed on this wage | | | determination, if it is | | | higher) for all hours | | | spent performing on the | | | contract in 2023. | |If the contract was awarded on|. Executive Order 13658 | |or between January 1, 2015 and| generally applies to the | |January 29, 2022, and the | contract. | |contract is not renewed or |. The contractor must pay all| |extended on or after January | covered workers at least | |30, 2022: | $12.15 per hour (or the | | | applicable wage rate listed| | | on this wage determination,| | | if it is higher) for all | | | hours spent performing on | | | that contract in 2023. |
The applicable Executive Order minimum wage rate will be adjusted annually. If this contract is covered by one of the Executive Orders and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must still submit a conformance request.
Additional information on contractor requirements and worker protections under the Executive Orders is available at http://www.dol.gov/whd/govcontracts.
Modification Number Publication Date 0 01/06/2023 1 01/13/2023 2 02/03/2023 3 03/03/2023 4 04/14/2023 5 05/26/2023
ASBE0008-010 03/01/2022
Rates Fringes
ASBESTOS WORKER/HEAT & FROST
INSULATOR........................$ 32.33 20.19
BROH0018-003 06/01/2021
Rates Fringes
BRICKLAYER.......................$ 30.87 15.87
BROH0022-010 07/01/2022
Rates Fringes
TILE FINISHER....................$ 26.36 9.97
TILE SETTER......................$ 28.95 14.85
CARP0002-017 05/01/2017
Rates Fringes
CARPENTER........................$ 25.98 15.98
ELEC0082-004 12/05/2022
Rates Fringes
ELECTRICIAN......................$ 34.25 21.26
ELEV0011-002 01/01/2023
Rates Fringes
ELEVATOR MECHANIC................$ 52.72 37.335+a+b
PAID HOLIDAYS:
a. New Year's Day, Memorial Day, Independence Day, Labor Day, Vetern's Day, Thanksgiving Day, the Friday after Thanksgiving, and Christmas Day.
b. Employer contributes 8% of regular hourly rate to vacation pay credit for employee who has worked in business more than 5 years; 6% for less than 5 years' service.
ENGI0018-034 05/01/2018
Rates Fringes
POWER EQUIPMENT OPERATOR
Crane.......................$ 35.89 15.09
ENGI0066-045 06/01/2017
Rates Fringes
POWER EQUIPMENT OPERATOR
Forklift....................$ 28.87 19.66 Grader/Blade................$ 32.42 19.66 Mechanic....................$ 32.92 19.66
IRON0044-020 06/01/2021
Rates Fringes
IRONWORKER, ORNAMENTAL...........$ 31.32 21.00
IRON0290-006 06/01/2022
Rates Fringes
IRONWORKER (Reinforcing and Structural)......................$ 31.59 23.85
LABO0265-018 05/01/2021
Rates Fringes
LABORER
Mason Tender - Brick........$ 23.05 17.10
* LABO1410-004 04/05/2023
Rates Fringes
LABORER
Common or General;
Asbestos Abatement (Removal from Ceilings, Floors, and Walls)..........$ 30.35 12.65
PAIN0249-005 06/01/2020
Rates Fringes
PAINTER (Brush and Roller).......$ 24.17 11.22
PAIN0387-002 11/01/2022
Rates Fringes
GLAZIER..........................$ 30.33 17.22
PLAS0132-020 06/01/2022
Rates Fringes
CEMENT MASON/CONCRETE FINISHER...$ 29.25 14.69
PLUM0050-009 07/04/2022
Rates Fringes
PIPEFITTER (Excludes HVAC Pipe Installation)...............$ 44.60 28.51
PLUM0162-009 06/01/2022
Rates Fringes
PLUMBER (Includes HVAC Pipe Installation)....................$ 36.47 26.80
ROOF0042-001 08/01/2022
Rates Fringes
ROOFER...........................$ 30.90 18.25
SFOH0669-009 04/01/2021
Rates Fringes
SPRINKLER FITTER (Fire Sprinklers)......................$ 39.25 25.81
* UAVG-OH-0021 01/01/2019
Rates Fringes
OPERATOR: Oiler.................$ 27.56 16.37
* UAVG-OH-0025 01/01/2018
Rates Fringes
SHEET METAL WORKER, Excludes HVAC Duct and Unit
Installation.....................$ 28.10 23.41
* UAVG-OH-0027 01/01/2018
Rates Fringes
OPERATOR:
Backhoe/Excavator/Trackhoe.......$ 34.84 14.76
SUOH2012-083 08/29/2014
Rates Fringes
DRYWALL HANGER AND METAL STUD
INSTALLER........................$ 21.02 4.21
FORM WORKER......................$ 22.41 9.01
LABORER: Mason Tender - Cement/Concrete..................$ 22.95 8.60
LABORER: Pipelayer..............$ 23.98 8.58
OPERATOR: Bobcat/Skid Steer/Skid Loader................$ 30.26 12.58
OPERATOR: Bulldozer.............$ 26.01 4.95
OPERATOR: Loader................$ 29.99 12.80
OPERATOR: Paver (Asphalt, Aggregate, and Concrete).........$ 30.28 13.29
OPERATOR: Roller................$ 28.25 12.61
PAINTER: Spray..................$ 22.78 12.40
SHEET METAL WORKER (HVAC Duct and HVAC Unit Installation Only)............................$ 26.41 17.34
TRUCK DRIVER: Dump (All Types)...$ 22.08 11.51
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at https://www.dol.gov/agencies/whd/government-contracts.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or ""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.
Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.
Survey Rate Identifiers
Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a new survey is conducted.
Union Average Rate Identifiers
Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.
A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour National Office because National Office has responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division
U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISIO"
(End of Summary of Changes)
ADDITIONAL INFORMATION – FOR REFERENCE ONLY
PHOTOS OF EXISTING CHILLED WATER FEEDER SYSTEM
| SF30 |
| SUMMARY OF CHANG |
| 00 10 00 |
| PRICE BREAKOUT SCHEDULE |
| 00 21 00 |
| 00 73 00 |
| PHOTOS FRO |