W912QR23R0033_SID-0000.pdf

PDF 4 MB Posted

Attached to
SRM WPAFB AFRL Rapid Reaction Lab
Solicitation number
W912QR23R0033
Issued by

About this file

This solicitation is for the renovation of the Rapid Reaction Laboratory at Wright-Patterson Air Force Base in Ohio. The estimated construction cost is between $5-10 million. The work includes interior finishes, casework, signage, and flooring. Responses are due through the ProjNet system by the specified date. The winning bidder will be selected using a combination of technical evaluation and price, with an emphasis on promoting opportunities for HUBZone small businesses. The Army Corps of Engineers district office in Louisville is the contracting agency.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation For B652 Renovation Rapid Reaction Laboratory WPAFB, Dayton, OH

P2: 495449

Design-Bid-Build

Specifications - SID Certified Final Design

03 May 2023

W912QR23R0033

ARIMS: 200A

Disposition: Maintain for 15yrs after construction

W912QR23R0033_SID-0000

6 7 8 9 10

G

Fb

8.77.3

F.9

F.1

F.3

7.8 8.5

G.2

G.4

8.8 9.4

HI-BAY

OTS

OTS

OTS

6 7 8 9 10

G

Fb

8.77.3

F.9

F.1

LAB

G18A

LAB

G18

F.3

7.8 8.5

G.2

G.4

8.8 9.4

HI-BAY

LOW-BAY

OTS

OTS

OTS

OTS

CEILING LEGEND

ACT-1 ACOUSTICAL LAY-IN

CEILING - 2'x2'

SUSPENDED GYPSUM

BOARD CEILING OR SOFFIT

EXPOSED STRUCTURE

ABOVE, PAINTED

SERVICE PANEL

LAY-IN EMERGENCY

LIGHT FIXTURE - 2x2

RECESSED LIGHT FIXTURE

AIR DEVICE - SUPPLY

AIR DEVICE - RETURN

AIR DEVICE - LINEAR

SUSPENDED LIGHT FIXTURE

LAY-IN LIGHT FIXTURE - 2x2

OTS

EXIT LIGHT

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

C H

E C

K E

D B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

IT

R

R E

V

IE

W B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

R E

N O

V A

T E

R E

S E

A R

C H

L A

B F

O R

R A

P

ID

R E

A C

T

IO

N

W P

A F

B B

U

IL

D

IN

G

W R

IG

H

T P

A T

T E

R S

O N

A F

B O

H

IO

Z H

T V

L O

U

IS

V

IL

L E

D

IS

T R

IC

T

L O

U

IS

V

IL

L E

K

E N

T U

C K

Y

B

R O

A D

W A

Y S

T R

E E

T

C

IN

C

IN

N A

T I, O

H

IO

KEY PLAN

SEAL

W Q

R -1

-D

-0

W Q

R -2

-F

-0

12-22-22

A-111

G R

O U

N D

F L O

O R

A N

D M

E Z

Z A

N

IN

E C

E

IL

IN

G

P L A

N

J P

E S

S E

L L

M A

L B

E R

S

G H

U T

Z E

L

R S

C H

M

IT

Z

-1

-2

CERTIFIED FINAL - MAR 16, 2023

1/8" = 1'-0"A-111

01 MEZZANINE CEILING PLAN

1/8" = 1'-0"A-111

02 GROUND FLOOR CEILING PLAN

N

16'4' 8'

SCALE: 1/8"=1'-0"

A ALL CEILINGS TO BE 9'-10" ABOVE FINISH FLOOR UNLESS

INDICATED OTHERWISE

B NOTIFY CONTRACTING OFFICER OF ANY DISCREPANCIES OR

UN-IDENTIFIED CEILING HEIGHTS OR TYPES PRIOR TO

PROCEEDING WITH THE WORK

C CENTER TILE / GRID LAYOUT IN SPACE AS SHOWN ON PLANS

UNLESS INDICATED OTHERWISE

D ALL CEILING DEVICES ARE TO BE CENTERED IN THE CEILING

TILE IN WHICH THEY OCCUR UNLESS OTHERWISE INDICATED

E ANY NON-DIMENSIONED LIGHT FIXTURES AND OTHER

CEILING DEVICES LOCATED IN GYPSUM BOARD CEILINGS

SHALL BE DIMENSIONED AND COORDINATED PRIOR TO

CONSTRUCTION

E REFERENCE MECHANICAL AND ELECTRICAL DRAWINGS FOR

MOUNTING LOCATIONS OF ITEMS IN SPACES WHERE NO

CEILING IS INDICATED.

F REFERENCE FIRE PROTECTION DRAWINGS FOR SPRINKLER

HEAD LOCATIONS NOT INDICATED ON THE CEILING PLANS

G WHERE MINOR DISCREPANCIES OCCUR BETWEEN

MECHANICAL. PLUMBING, OR ELECTRICAL DOCUMENTS AND

THE ARCHITECTURAL CEILING PLAN, THE ARCHITECTURAL

PLAN SHALL GOVERN.

H IN THE CASE OF MAJOR DISCREPANCIES, THE

CONTRACTING OFFICER SHALL BE NOTIFIED AS SOON AS

THE DISCREPANCY IS DISCOVERED PRIOR TO PROCEEDING

WITH THE WORK

J COORDINATE WITH MEP CONTRACTORS FOR ACCESS

PANELS IN GYPSUM BOARD CEILINGS NOT INDICATED ON

THE CEILING PLANS

K REFER TO INTERIORS DRAWINGS FOR ACT-1 FINISH

SPECIFICATION

GENERAL NOTES

LINEWORK LEGEND

EXISTING

NEW WORK

6 7 8 9 10 11 12 13 14 15

L

J

G

FAILURE

ANALYSIS

LAB

ENVIRONMENTAL

TEST LAB

THERMOGRAPHY/

SHEAROGRAPHY

49 UT/EC

FPI/MPI

RADIOGRAPHY

X RAY

40B

UT/EC

FAILURE

ANALYSIS

LAB

STORAGE

29 FAILURE

ANALYSIS

LAB

FAILURE

ANALYSIS

LAB

LAB

30A

C05

C03

UTILITY

SHAFT 1

UTILITY

SHAFT 2

UTILITY

SHAFT 3

UTILITY

SHAFT 4

6 7 8 9 10

L

J

G

LAB

LAB

C02

C01

C03

C03

C04

C04

C04

C04 3"

3"

UTILITY

SHAFT 1

UTILITY

SHAFT 2

KEY PLAN

KEY PLAN

CEILING LEGEND

ACT-1 ACOUSTICAL LAY-IN

CEILING - 2'x2'

SUSPENDED GYPSUM

BOARD CEILING OR SOFFIT

EXPOSED STRUCTURE

ABOVE, PAINTED

SERVICE PANEL

LAY-IN EMERGENCY

LIGHT FIXTURE - 2x2

RECESSED LIGHT FIXTURE

AIR DEVICE - SUPPLY

AIR DEVICE - RETURN

AIR DEVICE - LINEAR

SUSPENDED LIGHT FIXTURE

LAY-IN LIGHT FIXTURE - 2x2

OTS

EXIT LIGHT

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

C H

E C

K E

D B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

IT

R

R E

V

IE

W B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

R E

N O

V A

T E

R E

S E

A R

C H

L A

B F

O R

R A

P

ID

R E

A C

T

IO

N

W P

A F

B B

U

IL

D

IN

G

W R

IG

H

T P

A T

T E

R S

O N

A F

B O

H

IO

Z H

T V

L O

U

IS

V

IL

L E

D

IS

T R

IC

T

L O

U

IS

V

IL

L E

K

E N

T U

C K

Y

B

R O

A D

W A

Y S

T R

E E

T

C

IN

C

IN

N A

T I, O

H

IO

SEAL

W Q

R -1

-D

-0

W Q

R -2

-F

-0

12-22-22

A-112

F

IR

S T

A N

D S

E C

O N

D F

L O

O R

C E

IL

IN

G P

L A

N S

J P

E S

S E

L L

M A

L B

E R

S

G H

U T

Z E

L

R S

C H

M

IT

Z

-1

-2

CERTIFIED FINAL - MAR 16, 2023

1/8" = 1'-0"A-112

01 FIRST FLOOR CEILING PLAN

1/8" = 1'-0"A-112

02 SECOND FLOOR CEILING PLAN

N

16'4' 8'

SCALE: 1/8"=1'-0"

A ALL CEILINGS TO BE 9'-10" ABOVE FINISH FLOOR UNLESS

INDICATED OTHERWISE

B NOTIFY CONTRACTING OFFICER OF ANY DISCREPANCIES OR

UN-IDENTIFIED CEILING HEIGHTS OR TYPES PRIOR TO

PROCEEDING WITH THE WORK

C CENTER TILE / GRID LAYOUT IN SPACE AS SHOWN ON PLANS

UNLESS INDICATED OTHERWISE

D ALL CEILING DEVICES ARE TO BE CENTERED IN THE CEILING

TILE IN WHICH THEY OCCUR UNLESS OTHERWISE INDICATED

E ANY NON-DIMENSIONED LIGHT FIXTURES AND OTHER

CEILING DEVICES LOCATED IN GYPSUM BOARD CEILINGS

SHALL BE DIMENSIONED AND COORDINATED PRIOR TO

CONSTRUCTION

E REFERENCE MECHANICAL AND ELECTRICAL DRAWINGS FOR

MOUNTING LOCATIONS OF ITEMS IN SPACES WHERE NO

CEILING IS INDICATED.

F REFERENCE FIRE PROTECTION DRAWINGS FOR SPRINKLER

HEAD LOCATIONS NOT INDICATED ON THE CEILING PLANS

G WHERE MINOR DISCREPANCIES OCCUR BETWEEN

MECHANICAL. PLUMBING, OR ELECTRICAL DOCUMENTS AND

THE ARCHITECTURAL CEILING PLAN, THE ARCHITECTURAL

PLAN SHALL GOVERN.

H IN THE CASE OF MAJOR DISCREPANCIES, THE

CONTRACTING OFFICER SHALL BE NOTIFIED AS SOON AS

THE DISCREPANCY IS DISCOVERED PRIOR TO PROCEEDING

WITH THE WORK

J COORDINATE WITH MEP CONTRACTORS FOR ACCESS

PANELS IN GYPSUM BOARD CEILINGS NOT INDICATED ON

THE CEILING PLANS

K REFER TO INTERIORS DRAWINGS FOR ACT-1 FINISH

SPECIFICATION

GENERAL NOTES

DRAWING NOTES

C01 ACCORDION FOLDING DOOR HARDWARE, REFER TO

HEAD H03 ON SHEET A-601

C02 LOCATION OF DROP-DOWN MONITOR. REFER TO

DETAILS ON SHEET A-510

C03 START CEILING GRID

C04 UTILITY PANEL, REFER TO MEP FOR CONNECTIONS

C05 OWNER-PROVIDED, CONTRACTOR-INSTALLED LIGHT

SUPPORT SYSTEM. COORDINATE WITH

DEPARTMENT PERSONNEL

LINEWORK LEGEND

EXISTING

NEW WORK

GROUND FLOOR

100'-0"

FIRST FLOOR

118'-8"

8 9 10

EX. MEZZANINE

111'-0"

NEW MEZZANINE

110'-0"

8.77.3

EXISTING CONCRETE FLOOR

EXISTING CMU WALL

EXISTING CONCRETE SLAB

EXISTING WALL

/8

A-3017.8 8.5

/2

8.8 9.4

AUTOCLAVE

TO REMAIN

A-701

OPEN BEYOND

OPEN BEYOND

G18A

HI-BAY

LOW-BAY

MEZZANINE DECK - SEE STRUCTURAL

GROUND FLOOR

100'-0"

FIRST FLOOR

118'-8"

GFb

EX. MEZZANINE

111'-0"

NEW MEZZANINE

110'-0"

F.9F.1

/2

/2

/8

G.2 G.49.5

MEZZANINE DECK - SEE STRUCTURAL

AUTOCLAVE TO REMAIN

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

C H

E C

K E

D B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

IT

R

R E

V

IE

W B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

R E

N O

V A

T E

R E

S E

A R

C H

L A

B F

O R

R A

P

ID

R E

A C

T

IO

N

W P

A F

B B

U

IL

D

IN

G

W R

IG

H

T P

A T

T E

R S

O N

A F

B O

H

IO

Z H

T V

L O

U

IS

V

IL

L E

D

IS

T R

IC

T

L O

U

IS

V

IL

L E

K

E N

T U

C K

Y

B

R O

A D

W A

Y S

T R

E E

T

C

IN

C

IN

N A

T I, O

H

IO

KEY PLAN

SEAL

W Q

R -1

-D

-0

W Q

R -2

-F

-0

12-22-22

A-301

W A

L L S

E C

T

IO

N S

J P

E S

S E

L L

M A

L B

E R

S

G H

U T

Z E

L

R S

C H

M

IT

Z

-1

-2

CERTIFIED FINAL - MAR 16, 2023

3/8" = 1'-0"A-301

01 WALL SECTION

3/8" = 1'-0"A-301

02 WALL SECTION

SCALE: 3/8"=1'-0"

2' 6'4'

LINE OF STRUCTURE

METAL RUNNER

METAL STUD

5/8" GYPSUM BD

EACH SIDE

SEALANT - EACH SIDE

SCHEDULED CEILING

CEILING

PLAN

BASE

B3C W= 4 7/8"

METAL RUNNER

20 GA METAL STUD

DIAGONAL BRACING

TO STRUCTURE ABOVE

AT 48" O.C. MAX

SOUND ATTENUATION

BLANKETS

EXTEND BLANKETS 4'-0"

EACH SIDE OF PARTITION

PARTITION TYPE B_C

W

NON-RATED OR

SMOKE RESISTANT

CONCRETE FLOOR OR ROOF DECK

/4

LONG LEG DEFLECTION

TRACK (20 GA) - FASTEN

TO DECK

CONCRETE FLOOR OR ROOF DECK

M A

X

M

IN

NON-RATED

1/2"

BOLTS TO

DECK

4"x12"x3/16" BENT PLATE 4"

LONG ALTERNATING EACH

SIDE OF CMU AT 4'-0" OC

BOND BEAM - SEE

STRUCTURAL DWGS

M A

X

M

IN

M A

X

M

IN

M A

X

M

IN

M A

X

M

IN

SEALANT

LONG LEG SLOTTED

DEFLECTION TRACK

3" MINIMUM

#8 WAFERHEAD

SCREW INTO SLOTS

DRYWALL SCREWS

INTO STUDS

/4

DEFLECTION TRACK

" SEALANT EACH SIDE

A3F

TYPE

WIDTH HEIGHT

NON-RATED WALLS

2 1/2" METAL STUD

3 5/8" METAL STUD

4" METAL STUD, 4" CMU

6" METAL STUD, 6" CMU

7/8" METAL HAT CHANNELS

WIDTH

FULL HEIGHT TO STRUCTURE ABOVE

4" ABOVE FINISH CEILING

PARTIAL HEIGHT AS INDICATED

F

C

P

HEIGHT

8 8" CMU

2A3

FIRE RATING

TYPE WIDTH

PARTITION TYPE LEGEND

RATED WALLS

1 5/8" METAL STUD

FIRE RATING

2 HOUR

1 HOUR

LINE OF STRUCTURE

LINE OF EXISTING LINTEL

SCHEDULED CEILING

HEAD

CEILING

PLAN

BASE

M8F W= 7 5/8"

MORTAR JOINT

W

CONCRETE MASONRY

UNIT WITH HORIZONTAL

JOINT REINFORCEMENT

AT 1'-4" OC VERTICALLY

REFER TO

PARTITION

HEAD DETAILS

PARTITION TYPE B_FPARTITION TYPE M_F

LINE OF STRUCTURE

METAL RUNNER

METAL STUD

5/8" GYPSUM BD

SEALANT

SCHEDULED CEILING

CEILING

PLAN

BASE

H3C W= 4 1/4"

METAL RUNNER

20 GA METAL STUD

DIAGONAL BRACING

TO STRUCTURE ABOVE

AT 48" O.C. MAX

SOUND ATTENUATION

BLANKETS

PARTITION TYPE H_C

LINE OF STRUCTURE

METAL RUNNER

METAL STUD

5/8" GYPSUM BD

EACH SIDE

LINE OF STRUCTURE

DEFLECTION TRACK

SEALANT - EACH SIDE

SCHEDULED CEILING

HEAD

CEILING

PLAN

BASE

B3F W= 4 7/8"

SOUND ATTENUATION

BLANKETS

SEALANT - EACH SIDE

REFER TO

PARTITION

HEAD DETAILS

PARTITION TYPE B_F

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

C H

E C

K E

D B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

IT

R

R E

V

IE

W B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

R E

N O

V A

T E

R E

S E

A R

C H

L A

B F

O R

R A

P

ID

R E

A C

T

IO

N

W P

A F

B B

U

IL

D

IN

G

W R

IG

H

T P

A T

T E

R S

O N

A F

B O

H

IO

Z H

T V

L O

U

IS

V

IL

L E

D

IS

T R

IC

T

L O

U

IS

V

IL

L E

K

E N

T U

C K

Y

B

R O

A D

W A

Y S

T R

E E

T C

IN

C

IN

N

A T

I, O

H

IO

SEAL

W Q

R -1

-D

-0

W Q

R -2

-F

-0

12-22-22 A-501

P A

R T

IT

IO

N T

Y P

E S

A N

D I

N T

E R

IO

R

D E

T A

IL

S

J P

E S

S E

L L

M A

L B

E R

S

G H

U T

Z E

L

R S

C H

M

IT

Z

-1

-2

CERTIFIED FINAL - MAR 16, 2023

DN

G

Fb

A-701

A-701 04

A-701

8.7

F.9

F.1

A-701

1 1/4" NOMINAL PIPE GUARDRAIL, 42" HIGH

(2) 3'-0" WIDE REMOVABLE SECTIONS OF GUARDRAIL

3'-8" EOD

F.3

E O

D

/2

17 TREADS AT 11" EACH = 15'-7" 1'-0"

NEW 4'-0" WIDE OPENING IN EXISTING CMU WALL

1'-0" MIN.

CENTER

ON W8

BEAM

BELOW

CORNER GUARD POST AT STAIR PLATE STRINGER FULL

HEIGHT TO 42" ABOVE MEZZANINE FLOOR

FIXED GUARDRAIL, 3 EQUALLY SPACED POSTS

/2

E O

D

5'-8 1/4" EOD

6"

GROUND FLOOR

100'-0"

NEW MEZZANINE

110'-0"

8.78.5

1 1/4" NOM. PIPE GUARDRAIL AT 42"

1 1/4" NOM. PIPE POSTS AT 42"

O.C. MAX.

1 1/4" NOM. PIPE HANDRAIL AT 36".

1'-0" EXTENSION AT TOP AND

BOTTOM OF STAIR.

19" MAX. CLEARANCE BETWEEN

HORIZONTAL RAILS

CONCRETE FILLED STEEL PAN

TREADS WITH STEEL RISERS

R

IS

E

R S

A T

.6

E A

C H

NOTE: STEEL STAIRS,

RAILINGS AND MEZZANINE

STRUCTURE TO BE PAINTED

4"

STEEL PLATE STRINGER

CORNER GUARD POST AT STAIR

PLATE STRINGER FULL HEIGHT TO 42"

ABOVE MEZZANINE FLOOR

A-701

A-701

A-701

NEW MEZZANINE

110'-0"

F.9 F.1

1 1/4" NOM. PIPE RAIL

1 1/4" NOM. PIPE

RAIL POSTS

F.3

REMOVABLE

RAILING SECTIONS

3"

TOE KICK, TYP.

NEW MEZZANINE

110'-0"

8.7

2'-7"

6"

1 1/4" NOMINAL

PIPE GUARDRAIL

TOE KICK

FIRST FLOOR

118'-8"

G

EX. MEZZANINE

111'-0"

NEW MEZZANINE

110'-0"

F.9

NEW 4'-0"

WIDE OPENING

IN EXISTING

CMU WALL

EXISTING

CONCRETE

FLOOR

EXISTING CMU

WALL

1 1/4" NOMINAL

PIPE HANDRAIL

G.2 G.4

A-701

1 1/4" NOM. PIPE POST

STEEL PLATE STRINGER

CONCRETE FILLED PAN

TREAD

1 1/4" NOM. PIPE

GUARDRAIL

1 1/4" NOM. PIPE

GUARDRAIL

1 1/4" NOM. PIPE

HANDRAIL

1 1/4" NOM. PIPE POST

REFER TO 12/S-501 FOR

CONNECTION DETAIL

1 1/4" NOM. PIPE

GUARDRAIL

1 1/4" NOM. PIPE

GUARDRAIL

BENT PLATE TOE KICK,

WELD TO POSTS AND

RAILS

NEW MEZZANINE

110'-0"

1 1/4" NOM.

PIPE POST

5 1/2" X 5 1/2" X

1/4" STEEL

PLATE

(4) 3/4" THRU

BOLTS

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

C H

E C

K E

D B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

IT

R

R E

V

IE

W B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

R E

N O

V A

T E

R E

S E

A R

C H

L A

B F

O R

R A

P

ID

R E

A C

T

IO

N

W P

A F

B B

U

IL

D

IN

G

W R

IG

H

T P

A T

T E

R S

O N

A F

B O

H

IO

Z H

T V

L O

U

IS

V

IL

L E

D

IS

T R

IC

T

L O

U

IS

V

IL

L E

K

E N

T U

C K

Y

B

R O

A D

W A

Y S

T R

E E

T C

IN

C

IN

N

A T

I, O

H

IO

KEY PLAN

SEAL

W Q

R -1

-D

-0

W Q

R -2

-F

-0

12-22-22 A-701

S T

A

IR

P L A

N S

S

E C

T

IO

N S

A

N D

D E

T A

IL

S

J P

E S

S E

L L

M A

L B

E R

S

G H

U T

Z E

L

R S

C H

M

IT

Z

-1

-2

CERTIFIED FINAL - MAR 16, 2023

1/2" = 1'-0"A-701

01 MEZZANINE STAIR PLAN

1/2" = 1'-0"A-701

02 STAIR SECTION

N

1' 2' 4'

SCALE: 1/2"=1'-0"

1/2" = 1'-0"A-701

04 ELEVATION

1/2" = 1'-0"A-701

05 ELEVATION

3/8" = 1'-0"A-701

03 SECTION

DESIGN STAIRS TO SUSTAIN A LIVE LOAD OF NOT LESS THAN

100 POUNDS PER SQUARE FOOT, OR A CONCENTRATED

LOAD OF 300 APPLIED WHERE IT IS MOST CRITICAL. DESIGN

HANDRAILS TO RESIST A CONCENTRATED LOAD OF 200 LB IN

ANY DIRECTION AT ANY POINT OF THE TOP OF THE RAIL OR

50 LB PER FOOT APPLIED HORIZONTALLY TO THE TOP OF

THE RAIL, WHICHEVER IS MORE SEVERE. NAAMM AMP 521,

PROVIDE THE SAME SIZE RAIL AND POST. PROVIDE PIPE

COLLARS OF THE SAME MATERIAL AND FINISH AS THE

HANDRAIL AND POSTS.

1 1/2" = 1'-0"A-701

06 STAIR DETAIL

1 1/2" = 1'-0"A-701

07 GUARDRAIL DETAIL

1 1/2" = 1'-0"A-701

08 POST DETAIL

INTERIOR FINISH SPECIFICATIONS

P-1

PAINT (P)

RB-1

RESILIENT BASE (RB)

EPC-1

EPOXY COUNTER TOPS (EPC)

ACT-1

ACOUSTICAL CEILING TILE (ACT)

P-4

SC-1

SEALED/STAINED CONCRETE (SC)

SEALED CONCRETE

PENETRATING SEALER

SEE SPECIFICATIONS 09 67 23.14

MFR: ROPPE

STYLE: PINNACLE P-100

COLOR: 100 BLACK

SIZE: 4" HIGH COVED

MFR: SHERWIN WILLIAMS

COLOR: DOVER WHITE SW 6385

FINISH: EGGSHELL

MFR: KEWAUNEE

STYLE: EPOXY RESIN WORK TOP

COLOR: BLACK

SIZE: 1 INCH THICK, 4 INCH HIGH CURB

BACK

REFERENCE 'Q SERIES' ENLARGED PLANS

AND ELEVATIONS DRAWINGS FOR

LOCATIONS

MFR: SHERWIN WILLIAMS

COLOR: EXTRA WHITE SW 7006

FINISH: FLAT

LOCATION: CEILING

MFR: ARMSTRONG CEILINGS

STYLE: CLEANROOM #1715B (FOR FIELD TILES)

/ #1720B (FOR BORDER TILES)

HUMIGUARD PLUS

COLOR: WHITE

SIZE: 24 X 24 X 3/4 INCHES

GRID: PRELUDE XL SQUARE LAY-IN 15/16"

SOUND RATING: (#1715B) MIN. 0.55 NRC, (#1720B) MIN. 0.35 CAC

EPX-1

EPOXY FLOOR (EPX)

EPX-2 MFR: DUR-A-FLEX / TORGINOL

STYLE: DUR-A-CHIP

COLOR: B-506B (NO FLAKES)

TOP COAT: 3 MIL ARMOR TOP

THICKNESS: 1/4 INCH

GROUT: COATED WITH DUR-A-GLAZE

DCOF: >.06

P-3 MFR: SHERWIN WILLIAMS

COLOR: REFUGE SW 6228

FINISH: SEMI GLOSS

LOCATION: DOORS & FRAMES

MFR: DUR-A-FLEX / TORGINOL

STYLE: DUR-A-CHIP / DECO FLAKE

COLOR: B-506B RAPIDS- 1/4" FLAKES

TOP COAT: 3 MIL ARMOR TOP

GROUT: COATED WITH DUR-A-GLAZE

DCOF: >.06

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

C H

E C

K E

D B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

IT

R

R E

V

IE

W B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

R E

N O

V A

T E

R E

S E

A R

C H

L A

B F

O R

R A

P

ID

R E

A C

T

IO

N

W P

A F

B B

U

IL

D

IN

G

W R

IG

H

T P

A T

T E

R S

O N

A F

B O

H

IO

Z H

T V

L O

U

IS

V

IL

L E

D

IS

T R

IC

T

L O

U

IS

V

IL

L E

K

E N

T U

C K

Y

B

R O

A D

W A

Y S

T R

E E

T C

IN

C

IN

N

A T

I, O

H

IO

SEAL

W Q

R -1

-D

-0

W Q

R -2

-F

-0

12-22-22 I-001

IN

T

E R

IO

R

S P

E C

IF

IC

A T

IO

N

S

M K

E L L Y

B G

IL

L E

S

G H

U T

Z E

L

M K

E L L E

Y

-1

-2

CERTIFIED FINAL - MAR 16, 2023

INTERIOR FINISH ABBREVIATIONS

ACT ACOUSTICAL CEILING TILE

EPC EPOXY COUNTER TOPS

EPX EPOXY FLOORING

EXP EXPOSED

MFR MANUFACTURER

P PAINT

RB RESILIENT BASE

SC SEALED / STAINED CONCRETE

A REFERENCE ELEVATIONS FOR ALL MILLWORK

FINISHES.

B REFERENCE REFLECTED CEILING PLANS AND

SCHEDULE FOR CEILING TYPES. PAINT ALL GYP.

BD. CEILINGS, SOFFITS, AND BULKHEADS P-4,

UNLESS NOTED OTHERWISE ON FINISH PLANS.

C ALL WALLS ARE TO BE PAINTED P-1, UNLESS NOTED

OTHERWISE ON FINISH PLANS. ANY

DISCREPENCIES ARE TO BE BROUGHT TO THE

DESIGNERS ATTENTION PRIOR TO PAINTING.

D ALL ACCESS PANELS OR DIFFUSERS ARE TO BE

PAINTED A SEMI-GLOSS FINISH TO MATCH

ADJACENT WALL FINISH UNLESS NOTED

OTHERWISE.

E CONTINUE SPECIFIED PAINT ABOVE AND BELOW

ALL MILLWORK COUNTERS AND CABINETS.

F ALL BASE BUILDING HOLLOW METAL DOORS AND

DOOR FRAMES TO BE PAINTED P-3, UNLESS NOTED

OTHERWISE.

G ALL COLUMNS ARE TO BE PAINTED P-1, UNLESS

NOTED OTHERWISE.

H PAINT ALL EXPOSED PIPING, CONDUIT, ELECTRICAL

DEVICES, DUCTWORK, ETC. TO MATCH ADJACENT

WALL FINISH

I INSTALL FLOORING UNDER ALL BASE CABINETS

AND INSTALL SCHEDULED BASE ON TOEKICK OF

ALL BASE CABINETS, UNLESS NOTED OTHERWISE

ON THE ELEVATION, FINISH PLAN, OR DETAILS.

J REFERENCE I-501 FOR TYPICAL FLOOR

TRANSITIONS AND DETAILS.

K ALL CHANGES IN FLOORING, BETWEEN ROOMS, IS

TO OCCUR AT CENTERLINE OF DOOR.

L ALL TRIM AND BASE TO TERMINATE INTO NEAREST

INSIDE CORNER, UNLESS NOTED OTHERWISE.

M FINISH HATCH GRAPHIC DOES NOT NECESSARILY

INDICATE MATERIAL PATTERN OR ACTUAL

PRODUCT. REFER TO MATERIAL DIRECTION.

N EXISTING FIRST AND SECOND FLOOR SLABS ARE

APPROXIMATELY 2" THICK. CONTRACTOR SHALL

TAKE NECESSARY PRECAUTIONS TO AVOID

PENETRATING FINISHED FLOOR ABOVE WHEN

PENETRATING CONCRETE FLOOR SLABS WHILE

INSTALLING HANGERS, SUPPORTS, ETC.

GENERAL NOTES

UP

UP

UP

MEZZANINE

G18M

16'4' 8'

SCALE: 1/8"=1'-0"

N

F02 F06

ELEV

LAB

G18A

LAB

G18

16'4' 8'

SCALE: 1/8"=1'-0"

N

F01

F02

F02

F04

F04

F04

F03

F04

FLOORING LEGEND

EPOXY FLOOR (EPX-1)

NOT IN SCOPE

EPOXY FLOOR (EPX-2)

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

C H

E C

K E

D B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

IT

R

R E

V

IE

W B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

R E

N O

V A

T E

R E

S E

A R

C H

L A

B F

O R

R A

P

ID

R E

A C

T

IO

N

W P

A F

B B

U

IL

D

IN

G

W R

IG

H

T P

A T

T E

R S

O N

A F

B O

H

IO

Z H

T V

L O

U

IS

V

IL

L E

D

IS

T R

IC

T

L O

U

IS

V

IL

L E

K

E N

T U

C K

Y

B

R O

A D

W A

Y S

T R

E E

T C

IN

C

IN

N

A T

I, O

H

IO

KEY PLAN

SEAL

W Q

R -1

-D

-0

W Q

R -2

-F

-0

12-22-22 I-101

G R

O U

N D

F L O

O R

A N

D M

E Z

Z A

N

IN

E F

IN

IS

H P

L A

N

M K

E L L Y

B G

IL

L E

S

G H

U T

Z E

L

M K

E L L E

Y

-1

-2

CERTIFIED FINAL - MAR 16, 2023

1/8" = 1'-0"I-101

1 GROUND FLOOR MEZZANINE FINISH PLAN

1/8" = 1'-0"I-101

2 GROUND FLOOR FINISH PLAN

GENERAL NOTES

DRAWING NOTES

F01 PROVIDE APPROPRIATE FLOORING TRANSITION IF ADJACENT FLOORING IS

NOT THE SAME. REFER TO INTERIOR FINISH SCHEDULE FOR FLOORING

FINISHES AND TYPICAL TRANSITION DETAILS FOR SPECIFIED FLOORING

TRANSITION.

F02 REFERENCE ENLARGED PLANS, Q-300 SERIES, AND Q-400 ELEVATIONS FOR

CASEWORK DETAILS.

F03 THIS IS A FIXED PIECE OF EQUIPMENT TO REMAIN WHILE FLOORING IS

INSTALLED. NEW FLOORING WILL NOT GO UNDERNEATH THIS EQUIPMENT.

F04 NEW FLOORING TO ABUT THE FIXED EQUIPMENT'S PLATFORM BASE.

F06 CONCRETE SEALER AT STAIR TREADS, PAINT STEEL STAIRS, RAILINGS AND

MEZZANINE STRUCTURE, P-3. REFERENCE DRAWING SECTION 02/A-701.

A REFERENCE SHEET I-001 FOR FINISH SPECIFICATIONS.

B REFERENCE SHEET I-601 FOR FINISH SCHEDULE.

C REFERENCE SHEET I-501 FOR DETAILS.

UP

DN

UP

DNUP

ELEV

FAILURE

ANALYSIS

LAB

ENVIRONMENTAL

TEST LAB

THERMOGRAPHY/

SHEAROGRAPHY

UT/EC

FPI/MPI

RADIOGRAPHY

40 X RAY

40B

UT/EC

FAILURE

ANALYSIS

LAB

STORAGE

FAILURE

ANALYSIS

LAB

FAILURE

ANALYSIS

LAB

LAB

30A

F01 F01

F01

F01 F01 F01F01

F01F01F01

F02 F02

F02

F02

F02

F02

F02

F02

F02

F02 F02

F02

F05

F05

UTILITY

SHAFT 1

UTILITY

SHAFT 3

FLOORING LEGEND

EPOXY FLOOR (EPX-1)

NOT IN SCOPE

EPOXY FLOOR (EPX-2)

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

C H

E C

K E

D B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

IT

R

R E

V

IE

W B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

R E

N O

V A

T E

R E

S E

A R

C H

L A

B F

O R

R A

P

ID

R E

A C

T

IO

N

W P

A F

B B

U

IL

D

IN

G

W R

IG

H

T P

A T

T E

R S

O N

A F

B O

H

IO

Z H

T V

L O

U

IS

V

IL

L E

D

IS

T R

IC

T

L O

U

IS

V

IL

L E

K

E N

T U

C K

Y

B

R O

A D

W A

Y S

T R

E E

T C

IN

C

IN

N

A T

I, O

H

IO

KEY PLAN

SEAL

W Q

R -1

-D

-0

W Q

R -2

-F

-0

12-22-22 I-102

F

IR

S T

F L O

O R

F

IN

IS

H

P L A

N

M K

E L L Y

B G

IL

L E

S

G H

U T

Z E

L

M K

E L L E

Y

-1

-2

CERTIFIED FINAL - MAR 16, 2023

GENERAL NOTES

DRAWING NOTES

1/8" = 1'-0"I-102

1 FIRST FLOOR FINISH PLAN

N 16'4' 8'

SCALE: 1/8"=1'-0"

F01 PROVIDE APPROPRIATE FLOORING TRANSITION IF ADJACENT FLOORING IS

NOT THE SAME. REFER TO INTERIOR FINISH SCHEDULE FOR FLOORING

FINISHES AND TYPICAL TRANSITION DETAILS FOR SPECIFIED FLOORING

TRANSITION.

F02 REFERENCE ENLARGED PLANS, Q-300 SERIES, AND Q-400 ELEVATIONS FOR

CASEWORK DETAILS.

F05 NO NEW FLOORING IN THIS ROOM.

A REFERENCE SHEET I-001 FOR FINISH SPECIFICATIONS.

B REFERENCE SHEET I-601 FOR FINISH SCHEDULE.

C REFERENCE SHEET I-501 FOR DETAILS.

DN

STAIR

ELEV

LAB

LAB

F02

F02

FLOORING LEGEND

EPOXY FLOOR (EPX-1)

NOT IN SCOPE

EPOXY FLOOR (EPX-2)

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

C H

E C

K E

D B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

IT

R

R E

V

IE

W B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

R E

N O

V A

T E

R E

S E

A R

C H

L A

B F

O R

R A

P

ID

R E

A C

T

IO

N

W P

A F

B B

U

IL

D

IN

G

W R

IG

H

T P

A T

T E

R S

O N

A F

B O

H

IO

Z H

T V

L O

U

IS

V

IL

L E

D

IS

T R

IC

T

L O

U

IS

V

IL

L E

K

E N

T U

C K

Y

B

R O

A D

W A

Y S

T R

E E

T C

IN

C

IN

N

A T

I, O

H

IO

KEY PLAN

SEAL

W Q

R -1

-D

-0

W Q

R -2

-F

-0

12-22-22 I-103

S E

C O

N D

F L O

O R

F

IN

IS

H

P L A

N

M K

E L L Y

B G

IL

L E

S

G H

U T

Z E

L

M K

E L L E

Y

-1

-2

CERTIFIED FINAL - MAR 16, 2023

1/8" = 1'-0"I-103

1 SECOND FLOOR FINISH PLAN

N 16'4' 8'

SCALE: 1/8"=1'-0"

GENERAL NOTES

DRAWING NOTES

A REFERENCE SHEET I-001 FOR FINISH SPECIFICATIONS.

B REFERENCE SHEET I-601 FOR FINISH SCHEDULE.

C REFERENCE SHEET I-501 FOR DETAILS.

F02 REFERENCE ENLARGED PLANS, Q-300 SERIES, AND

Q-400 ELEVATIONS FOR CASEWORK DETAILS.

UP

DN

UP

DNUP

ELEV

FAILURE

ANALYSIS

LAB

ENVIRONMENTAL

TEST LAB

THERMOGRAPHY/

SHEAROGRAPHY

UT/EC

FPI/MPI

RADIOGRAPHY

X RAY

40B

UT/EC

FAILURE

ANALYSIS

LAB

STORAGE

FAILURE

ANALYSIS

LAB

30 FAILURE

ANALYSIS

LAB

LAB

30A

ST1(3)

ST1

ST2

ST3

ST3

WB1

AC1

AC1

ST1

UTILITY

SHAFT 1

UTILITY

SHAFT 3

FLOORING LEGEND

NOT IN SCOPE

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

C H

E C

K E

D B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

IT

R

R E

V

IE

W B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

R E

N O

V A

T E

R E

S E

A R

C H

L A

B F

O R

R A

P

ID

R E

A C

T

IO

N

W P

A F

B B

U

IL

D

IN

G

W R

IG

H

T P

A T

T E

R S

O N

A F

B O

H

IO

Z H

T V

L O

U

IS

V

IL

L E

D

IS

T R

IC

T

L O

U

IS

V

IL

L E

K

E N

T U

C K

Y

B

R O

A D

W A

Y S

T R

E E

T C

IN

C

IN

N

A T

I, O

H

IO

KEY PLAN

SEAL

W Q

R -1

-D

-0

W Q

R -2

-F

-0

12-22-22 I-112

F

IR

S T

F L O

O R

F U

R N

IT

U

R E

P L A

N

M K

E L L Y

B G

IL

L E

S

G H

U T

Z E

L

M K

E L L E

Y

-1

-2

CERTIFIED FINAL - MAR 16, 2023

N 16'4' 8'

SCALE: 1/8"=1'-0"

A TAGGED FURNITURE IS SHOWN FOR REFERENCE ONLY AND

IS DETAILED IN A SEPARATE FF&E CONTRACT.

GENERAL NOTES

1/8" = 1'-0"I-112

1 FIRST FLOOR FURNITURE PLAN

UPDN

ELEV

LAB

G18A

LAB

G18

16'4' 8'

SCALE: 1/8"=1'-0"

N

S4

LEGEND

NOT IN SCOPE

MEZZANINE

G18M

16'4' 8'

SCALE: 1/8"=1'-0"

N

S3

S3

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

C H

E C

K E

D B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

IT

R

R E

V

IE

W B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

R E

N O

V A

T E

R E

S E

A R

C H

L A

B F

O R

R A

P

ID

R E

A C

T

IO

N

W P

A F

B B

U

IL

D

IN

G

W R

IG

H

T P

A T

T E

R S

O N

A F

B O

H

IO

Z H

T V

L O

U

IS

V

IL

L E

D

IS

T R

IC

T

L O

U

IS

V

IL

L E

K

E N

T U

C K

Y

B

R O

A D

W A

Y S

T R

E E

T

C

IN

C

IN

N A

T I, O

H

IO

KEY PLAN

SEAL

W Q

R -1

-D

-0

W Q

R -2

-F

-0

12-22-22 I-121

G R

O U

N D

F L O

O R

S

IG

N A

G E

P L A

N

M K

E L L Y

B G

IL

L E

S

G H

U T

Z E

L

M K

E L L E

Y

-1

-2

CERTIFIED FINAL - MAR 16, 2023

1/8" = 1'-0"I-121

01 GROUND FLOOR SIGNAGE PLAN

1 REFERENCE DRAWING I-621 FOR SIGNAGE

SCHEDULE AND NOTES.

2 COORDINATE LOCATION OF FIRE EVACUATION

SIGNS WITH LOCAL

FIRE DEPARTMENT AND LIFE SAFETY.

3 REFERENCE DRAWING I-511 FOR SIGNAGE

DETAILS.

GENERAL NOTES

1/8" = 1'-0"I-121

2 GROUND FLOOR MEZZANINE SIGNAGE PLAN

UP

DN

UP

DNUP

ELEV

FAILURE

ANALYSIS

LAB

ENVIRONMENTAL

TEST LAB

THERMOGRAPHY/

SHEAROGRAPHY

UT/EC

FPI/MPI

RADIOGRAPHY

X RAY

40B

UT/EC

FAILURE

ANALYSIS

LAB

STORAGE

29 FAILURE

ANALYSIS

LAB

FAILURE

ANALYSIS

LAB

LAB

30A

S4S4S4S4

S4 S4 S4 S4

S4 S4

S1

S3

S1 S1

S1

S1

S1

S1

S1

S1

S5

FLOORING LEGEND

NOT IN SCOPE

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

C H

E C

K E

D B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

IT

R

R E

V

IE

W B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

R E

N O

V A

T E

R E

S E

A R

C H

L A

B F

O R

R A

P

ID

R E

A C

T

IO

N

W P

A F

B B

U

IL

D

IN

G

W R

IG

H

T P

A T

T E

R S

O N

A F

B O

H

IO

Z H

T V

L O

U

IS

V

IL

L E

D

IS

T R

IC

T

L O

U

IS

V

IL

L E

K

E N

T U

C K

Y

B

R O

A D

W A

Y S

T R

E E

T

C

IN

C

IN

N A

T I, O

H

IO

KEY PLAN

SEAL

W Q

R -1

-D

-0

W Q

R -2

-F

-0

12-22-22 I-122

F

IR

S T

F L O

O R

S

IG

N A

G E

F L O

O R

P L A

N

M K

E L L Y

B G

IL

L E

S

G H

U T

Z E

L

M K

E L L E

Y

-1

-2

CERTIFIED FINAL - MAR 16, 2023

GENERAL NOTES

16'4' 8'

SCALE: 1/8"=1'-0"

N

1/8" = 1'-0"I-122

01 FIRST FLOOR SIGNAGE PLAN

1 REFERENCE DRAWING I-621 FOR SIGNAGE

SCHEDULE AND NOTES.

2 COORDINATE LOCATION OF FIRE

EVACUATION SIGNS WITH LOCAL

FIRE DEPARTMENT AND LIFE SAFETY.

3 REFERENCE DRAWING I-511 FOR SIGNAGE

DETAILS.

DN

STAIR

ELEV

LAB

LAB

S4

S4

LEGEND

NOT IN SCOPE

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

C H

E C

K E

D B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

IT

R

R E

V

IE

W B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

R E

N O

V A

T E

R E

S E

A R

C H

L A

B F

O R

R A

P

ID

R E

A C

T

IO

N

W P

A F

B B

U

IL

D

IN

G

W R

IG

H

T P

A T

T E

R S

O N

A F

B O

H

IO

Z H

T V

L O

U

IS

V

IL

L E

D

IS

T R

IC

T

L O

U

IS

V

IL

L E

K

E N

T U

C K

Y

B

R O

A D

W A

Y S

T R

E E

T

C

IN

C

IN

N A

T I, O

H

IO

KEY PLAN

SEAL

W Q

R -1

-D

-0

W Q

R -2

-F

-0

12-22-22 I-123

S E

C O

N D

F L O

O R

S

IG

N A

G E

F L O

O R

P L A

N

M K

E L L Y

B G

IL

L E

S

G H

U T

Z E

L

M K

E L L E

Y

-1

-2

CERTIFIED FINAL - MAR 16, 2023

1/8" = 1'-0"I-123

01 SECOND FLOOR SIGNAGE PLAN

1 REFERENCE DRAWING I-621 FOR SIGNAGE

SCHEDULE AND NOTES.

2 COORDINATE LOCATION OF FIRE

EVACUATION SIGNS WITH LOCAL

FIRE DEPARTMENT AND LIFE SAFETY.

3 REFERENCE DRAWING I-511 FOR SIGNAGE

DETAILS.

RESILIENT

TRANSITION STRIP: JOHNSONITE

REDUCER RRS-XX-D, COLOR: ALUMINUM

CONCRETE FLOOR

CONCRETE SLAB

EPOXY FLOORING

EPOXY FLOORING

CONCRETE SLAB

TRANSITION STRIP: SCHLUTER,

SCHIENE, OR APPROVED EQUAL

ALUMINUM

CONCRETE TOPPING

EPOXY FLOORING

CONCRETE SLAB

TRANSITION STRIP: SCHLUTER,

SCHIENE, OR APPROVED EQUAL

ALUMINUM

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

C H

E C

K E

D B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

IT

R

R E

V

IE

W B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

R E

N O

V A

T E

R E

S E

A R

C H

L A

B F

O R

R A

P

ID

R E

A C

T

IO

N

W P

A F

B B

U

IL

D

IN

G

W R

IG

H

T P

A T

T E

R S

O N

A F

B O

H

IO

Z H

T V

L O

U

IS

V

IL

L E

D

IS

T R

IC

T

L O

U

IS

V

IL

L E

K

E N

T U

C K

Y

B

R O

A D

W A

Y S

T R

E E

T

C

IN

C

IN

N A

T I, O

H

IO

SEAL

W Q

R -1

-D

-0

W Q

R -2

-F

-0

12-22-22 I-501

D E

T A

IL

S

M K

E L L Y

B G

IL

L E

S

G H

U T

Z E

L

M K

E L L E

Y

-1

-2

CERTIFIED FINAL - MAR 16, 2023

12" = 1'-0"I-501

3 RESILIENT TO CONCRETE TRANSITION

12" = 1'-0"I-501

1 EPOXY TO EPOXY TRANSITION

12" = 1'-0"I-501

2 CONCRETE TO EPOXY TRANSITION

M

IN

IM

U

M

SIGN

TYPE

3"

RAISED CHARACTERS SHALL BE 48 INCHES MINIMUM ABOVE THE FLOOR,

MEASURED TO THE BASELINE OF THE LOWEST RAISED CHARACTER AND

60 INCHES MAXIMUM ABOVE THE FLOOR, MEASURED TO THE BASELINE OF

THE HIGHEST RAISED CHARACTER. PER ABAAS GUIDE LINES.

M A

X

SIGN TYPE

S5

1'-6"1'-0"

D O

O R

F R

A M

E H

E

IG

H T

BUILDING-MOUNTED ENTRY

SIGN PLACEMENT

WALL MOUNTED INTERIOR

SIGN PLACEMENT

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

C H

E C

K E

D B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

IT

R

R E

V

IE

W B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

R E

N O

V A

T E

R E

S E

A R

C H

L A

B F

O R

R A

P

ID

R E

A C

T

IO

N

W P

A F

B B

U

IL

D

IN

G

W R

IG

H

T P

A T

T E

R S

O N

A F

B O

H

IO

Z H

T V

L O

U

IS

V

IL

L E

D

IS

T R

IC

T

L O

U

IS

V

IL

L E

K

E N

T U

C K

Y

B

R O

A D

W A

Y S

T R

E E

T

C

IN

C

IN

N A

T I, O

H

IO

SEAL

W Q

R -1

-D

-0

W Q

R -2

-F

-0

12-22-22 I-511

S

IG

N A

G E

D E

T A

IL

S

M K

E L L Y

B G

IL

L E

S

G H

U T

Z E

L

M K

E L L E

Y

-1

-2

CERTIFIED FINAL - MAR 16, 2023

GENERAL NOTES

NTSI-511

1 INTERIOR SIGNAGE DETAIL - S1

NTSI-511

2 INTERIOR SIGNAGE DETAIL - S2

NTSI-511

3 INTERIOR SIGNAGE DETAIL - S3

NTSI-511

4 INTERIOR SIGNAGE DETAIL - S4

A REFERENCE DRAWING I-621 FOR SIGNAGE

SCHEDULE AND NOTES.

NTSI-511

5 SIGN MOUNTING HEIGHT

NTSI-511

6 INTERIOR SIGNAGE DETAIL- S5

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

C H

E C

K E

D B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

IT

R

R E

V

IE

W B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

R E

N O

V A

T E

R E

S E

A R

C H

L A

B F

O R

R A

P

ID

R E

A C

T

IO

N

W P

A F

B B

U

IL

D

IN

G

W R

IG

H

T P

A T

T E

R S

O N

A F

B O

H

IO

Z H

T V

L O

U

IS

V

IL

L E

D

IS

T R

IC

T

L O

U

IS

V

IL

L E

K

E N

T U

C K

Y

B

R O

A D

W A

Y S

T R

E E

T C

IN

C

IN

N

A T

I, O

H

IO

KEY PLANKEY PLANKEY PLAN

SEAL

W Q

R -1

-D

-0

W Q

R -2

-F

-0

12-22-22 I-601

F

IN

IS

H

S C

H E

D U

L E

M K

E L L Y

B G

IL

L E

S

G H

U T

Z E

L

M K

E L L E

Y

-1

-2

CERTIFIED FINAL - MAR 16, 2023

ROOM FINISH SCHEDULE

NO. ROOM NAME North Wall East Wall South Wall West Wall Base Finish Floor Finish Ceiling Finish Comments

19 FAILURE ANALYSIS LAB P-1 P-1 P-1 P-1 --- EPX-2 ACT-1 1

20 ENVIRONMENTAL TEST LAB P-1 P-1 P-1 P-1 --- EPX-1 ACT-1 1

27 UT/EC P-1 P-1 P-1 P-1 --- EPX-1 ACT-1 1

28 FAILURE ANALYSIS LAB P-1 P-1 P-1 P-1 --- EPX-2 ACT-1 1

29 STORAGE P-1 P-1 P-1 P-1 --- --- ACT-1

30 FAILURE ANALYSIS LAB P-1 P-1 P-1 P-1 --- EPX-2 ACT-1 1

30A LAB P-1 P-1 P-1 P-1 --- EPX-1 ACT-1

31 FAILURE ANALYSIS LAB P-1 P-1 P-1 P-1 --- EPX-2 ACT-1 1

38 UT/EC P-1 P-1 P-1 P-1 EPX-1 ACT-1 1

39 FPI/MPI P-1 P-1 P-1 P-1 --- EPX-2 ACT-1 1

40 RADIOGRAPHY P-1 P-1 P-1 P-1 --- EPX-1 ACT-1

40B X RAY P-1 P-1 P-1 P-1 --- --- ---

40C DARK ROOM --- --- --- --- --- --- --- 3

49 THERMOGRAPHY/

SHEAROGRAPHY

P-1 P-1 P-1 P-1 --- EPX-1 ACT-1 1

117 LAB P-1 P-1 P-1 P-1 --- EPX-1 ACT-1 1

145 LAB P-1 P-1 P-1 P-1 --- EPX-1 --- 1

G17B OFFICE --- --- --- --- --- --- --- 2

G18 LAB P-1 P-1 P-1 P-1 RB-1 EPX-1 EXP-1 1

G18A LAB P-1 P-1 P-1 P-1 RB-1 EPX-1 ACT-1

G18M MEZZANINE P-1 P-1 P-1 P-1 RB-1 EPX-1 EXP-1 INTERIOR FINISH ABBREVIATIONS

ACT ACOUSTICAL CEILING TILE

EPC EPOXY COUNTER TOPS

EPX EPOXY FLOORING

EXP EXPOSED

MFR MANUFACTURER

P PAINT

RB RESILIENT BASE

SC SEALED / STAINED CONCRETE

A REFERENCE SHEET I-001 FOR FINISH SPECIFICATIONS.

B REFERENCE SHEET I-601 FOR FINISH SCHEDULE.

C REFERENCE SHEET I-501 FOR DETAILS.

GENERAL NOTES

COMMENTS

1 CASEWORK COUNTER TOPS TO RECEIVE EPC-1.

COORDINATE WITH 'Q SERIES' EQUIPMENT PLANS.

2 THIS ROOM IS NOT IN SCOPE, NO FINISHES.

3 THIS ROOM IS NOTED ON SCHEDULE ONLY FOR DEMO

DRAWING PURPOSES.

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

C H

E C

K E

D B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

IT

R

R E

V

IE

W B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

R E

N O

V A

T E

R E

S E

A R

C H

L A

B F

O R

R A

P

ID

R E

A C

T

IO

N

W P

A F

B B

U

IL

D

IN

G

W R

IG

H

T P

A T

T E

R S

O N

A F

B O

H

IO

Z H

T V

L O

U

IS

V

IL

L E

D

IS

T R

IC

T

L O

U

IS

V

IL

L E

K

E N

T U

C K

Y

B

R O

A D

W A

Y S

T R

E E

T

C

IN

C

IN

N A

T I, O

H

IO

KEY PLANKEY PLANKEY PLAN

SEAL

W Q

R -1

-D

-0

W Q

R -2

-F

-0

12-22-22 I-621

S

IG

N A

G E

S C

H E

D U

L E

M K

E L L Y

B G

IL

L E

S

G H

U T

Z E

L

M K

E L L E

Y

-1

-2

CERTIFIED FINAL - MAR 16, 2023

A ALL SIGNS TO FOLLOW ADAAG GUIDELINES,

CONTRACTORS TO VERIFY THESE GUIDELINES.

REFERENCE SPECIFICATION SECTION 10 14 02 FOR

DETAILS.

B REFERENCE DRAWING I-511 FOR SIGN

GRAPHICS/DETAILS. SIGNAGE DETAILS TO FOLLOW

AIRFORCE SIGN STANDARDS UFC 3-120-01.

C CONTRACTOR TO VERIFY WITH BASE ANY FACILITY

STANDARDS OR ORGANIZATIONAL

EMBLEMS/SYMBOLS TO BE USED.

D ALL SIGNS TO BE LOCATED 3" FROM LATCH SIDE OF

DOOR, MOUNTED 60 INCHES A.F.F TO THE

CENTERLINE OF SIGN. IF THERE IS INSUFFICIENT

ROOM ON THE LATCH SIDE OF THE DOOR

TO INSTALL THE SIGN, THEN SIGNS ARE TO BE

POSITIONED TO THE NEAREST ADJACENT WALL

OF THE DOOR LATCH.

E ANY SIGN PLAQUE MOUNTED TO WINDOW GLAZING

IS TO HAVE A BLANK SIGN PLAQUE WITH

MATCHING FINISHES MOUNTED TO BACK SIDE OF

THE GLASS.

F MOUNTING HEIGHTS IDENTIFYING ROOMS MUST

BE MOUNTED SO THAT THE BOTTOM OF THE

RAISED CHARACTERS ARE BETWEEN 48 INCHES

AND 60 INCHES ABOVE THE FLOOR. SEE

MOUNTING DETAIL ON I-511.

G OVERHEAD SIGNS TO BE MOUNTED 80 INCHES

MINIMUM FROM FLOOR TO BOTTOM OF SIGN.

H SIGN FINISHES - COPY/TEXT TO BE BLACK CO101,

BACKGROUND COLOR TO BE CHEMETAL 450

CYCLONE.

I SIGNAGE PLACED ON CMU WALLS TO USE WALL

SHIMS ORDERED FROM SIGN MANUFACTURER.

ROOM SIGNAGE SCHEDULE

ROOM

NUMBER ROOM NAME SIGN TYPE

TACTILE RM

NUMBER SIGN TEXT LINE 1 SIGN TEXT LINE 2

SIGN TEXT

LINE 3

MOUNTING

TYPE

SYMBOL

TYPE BRAILLE COMMENTS

S3 G18M MAXIMUM LOAD 74,000 LBS WEST WALL YES

S3 G18M MAXIMUM LOAD 15,000 LBS EAST WALL YES

19 FAILURE ANALYSIS LAB S1 19 - WALL YES

19 FAILURE ANALYSIS LAB S4 19 FAILURE ANALYSIS LAB WALL YES

20 ENVIRONMENTAL TEST LAB S4 20 ENVIRONMENTAL TEST LAB WALL YES

27 UT/EC S4 27 UT/EC WALL YES

28 FAILURE ANALYSIS LAB S1 - FAILURE ANALYSIS

LAB

WALL YES

28 FAILURE ANALYSIS LAB S4 28 FAILURE ANALYSIS LAB WALL YES

29 STORAGE S3 - STORAGE WALL YES

30 FAILURE ANALYSIS LAB S1 - FAILURE ANALYSIS

LAB

WALL YES

30 FAILURE ANALYSIS LAB S1 30 - WALL YES

30 FAILURE ANALYSIS LAB S4 30 FAILURE ANALYSIS LAB WALL YES

30A LAB S1 30A - WALL YES

30A LAB S1 30A - WALL YES

30A LAB S1 30A - WALL YES

31 FAILURE ANALYSIS LAB S1 31 - WALL YES

31 FAILURE ANALYSIS LAB S4 31 FAILURE ANALYSIS LAB WALL YES

38 UT/EC S4 38 UT/EC WALL YES

39 FPI/MPI S4 39 FPI/MPI WALL YES

40 RADIOGRAPHY S4 40 RADIOGRAPHY WALL YES

40B X RAY S5 40B X-RAY VAULT WALL YES

49 THERMOGRAPHY/

SHEAROGRAPHY

S1 49 - WALL YES

49 THERMOGRAPHY/

SHEAROGRAPHY

S4 49 RAPID PROTOTYPING WALL YES

117 LAB S4 117 LAB WALL YES

145 LAB S4 145 LAB WALL YES

G18 LAB S4 - LAB WALL YES

Wright Patterson AFB Rapid Reaction Lab Renov.

Final BackCheck December 22, 2022

ROOM TYPE: G18A LAB (Page 1 of 1)

TAG / SPEC

SAMPLES

SHERWIN WILLIAMS

COLOR: DOVER WHITE

SW 6385

FINISH: EGGSHELL

Location:

General Wall Paint

P-3

COLOR: REFUGE SW 6228

FINISH: SEMIGLOSS

Door Frames

RB-1

ROPPE

RUBBER COVE BASE

SIZE: 4" (100MM)

HIGH, COVE

COLOR: BLACK

Resilient Wall Base

SC-1

SEALED CONCRETE

PENETRATING SEALER

SEE SPECIFICATIONS

09 67 23.14

Flooring

ROOM TYPE: LABS 20, 27, 30A, 38, 40, 49, 117, 145, G18, G18A, G18M (Page 1 of 1)

COLOR: DOVER WHITE

SW 6385

FINISH: EGGSHELL

COLOR: REFUGE SW 6228

FINISH: SEMIGLOSS

EPX-1

DUR-A-FLEX / TORGINOL

STYLE: DUR-A-CHIP /

DECO FLAKE

COLOR: B-506B RAPIDS-

1/4" FLAKES

TOP COAT: ARMOR TOP

GROUT: COATED WITH

DUR-A-GLAZE

DCOF: >.06

Flooring

EPC-1

MFR: KEWAUNEE

STYLE: EPOXY RESIN

WORK TOP

COLOR: BLACK

SIZE: 1 INCH THICK, 4-

INCH-HIGH CURB BACK

Countertops

ROOM TYPE: FPI / MPI / FAILURE ANALYSIS (Page 1 of 1)

COLOR: DOVER WHITE

SW 6385

FINISH: EGGSHELL

COLOR: REFUGE SW 6228

FINISH: SEMIGLOSS

EPX-2

DUR-A-FLEX / TORGINOL

STYLE: DUR-A-CHIP

COLOR: B-506B (NO

FLAKES)

TOP COAT: ARMOR TOP

GROUT: COATED WITH

DUR-A-GLAZE

DCOF: >.06

EPC-1

MFR: KEWAUNEE

STYLE: EPOXY RESIN

WORK TOP

COLOR: BLACK

SIZE: 1 INCH THICK, 4-

INCH-HIGH CURB BACK

Countertops

ROOM TYPE: STORAGE (Page 1 of 2)

COLOR: DOVER

WHITE SW 6385

FINISH: EGGSHELL

COLOR: REFUGE SW

FINISH: SEMIGLOSS

ROOM TYPE: CEILINGS (Page 1 of 2)

ACT-1

ARMSTRONG CLEAN

ROOM

#1715B HUMIGUARD

PLUS

#1720 (BORDER

TILES)

COLOR: WHITE

24” X 24” X ¾”

PRELUDE XL

SQUARE LAY-IN

15/16”

P-4

COLOR: EXTRA

WHITE SW 7006

FINISH: FLAT

File details come from the government source that posted it. Updated .