This is a Request for Proposal (RFP) for the IN ANG Small Indoor Arms Range project in Terre Haute, IN, issued exclusively to seven pre-selected Small Business MATOC contractors: A&H Ambica JV, LLC; Butt Construction Company, Inc.; Howard W. Pence, Inc.; KUNJ Construction Corp.; SES Construction and Fuel Services, LLC; FUTRON, Inc.; and HDD JV. The project is being managed by the Department of the Army Corps of Engineers Engineering District Louisville.
The RFP calls for Design/Build Construction Services with an estimated cost exceeding $10,000,000. Proposals are due by 11:00 AM ET on February 14, 2025, and must be submitted via email to Stephanie Drees. The award will be based on lowest evaluated price, and offerors must be actively registered in SAM at the time of proposal submission. Payment and Performance Bonds are required, and questions must be submitted through ProjNet using the bidder inquiry key MS8IMR-FU4CHT. The government reserves the right to award based on initial proposals without discussion, and offers must provide at least 60 calendar days for government acceptance.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation For Indoor Small Arms Range, Hulman Air National Guard (ANG), Terre Haute, IN P2: 500352 Design-Build
Specifications
16 January 2025
W912QR-22002077A
Corrected Final Design
05 February 2025
W912QR-2202077A-0001
Certified Final
ARIMS: 200A
Disposition: Maintain for 15yrs after construction
W912QR-22002077A_CERTFinal_Specs-0001
REPLY TO
ATTENTION OF
DEPARTMENT OF THE ARMY
LOUISVILLE DISTRICT, CORPS OF ENGINEERS
P.O. BOX 59
LOUISVILLE,KENTUCKY 40201-0059
Contracting Division 05 February 2025
A&H Ambica JV, LLC
Butt Construction Company, Inc.
Howard W. Pence, Inc.
KUNJ Construction Corp.
SES Construction and Fuel Services, LLC
FUTRON, Inc.
HDD JV
Dear MATOC Contractors:
Reference is made to Solicitation Number W912QR-22002077A for the IN ANG Small Indoor
Arms Range at Terre Haute, IN.
• See the attached Summary of Changes for Amendment 0001.
The proposal due date remains 11:00 AM ET on 17 February 2025. Submit your proposal by email to Stephanie Drees at Stephanie.N.Drees@usace.army.mil. Proposals not received by the stated date/time will not be considered. Please acknowledge receipt of this RFP amendment by signing below in the space provided and returning it with your proposal.
Please contact Stephanie Drees at Stephanie.N.Drees@usace.army.mil with any remaining questions. If an Offeror believes that the requirements in the RFP contain an error, omission, or are otherwise unsound; the offeror shall immediately notify the Contract Specialist in writing with supporting rationale. The Offeror is reminded that the Government reserves the right to award this RFP based on the initial proposals, as received, without discussion.
Sincerely, WESTGATE.JOSHUA.K.15
21895124
2025.02.05 07:25:53
-05'00'
Joshua K. Westgate
Contracting Officer
W912QR-22002077A_CERTFinal_Specs-0001 mailto:Stephanie.N.Drees@usace.army.mil mailto:Stephanie.N.Drees@usace.army.mil
-2-
W912QR-22002077A AMENDMENT 0001 ACKNOWLEDGEMENT:
(Signature) (Date)
(Printed Name)
(Firm Name)
-3-
SUMMARY OF CHANGES – AMENDMENT 0001
SUMMARY OF CHANGES
All Specifications and Plans are being replaced in their entirety with this Certified Final.
These items were included in changes from Corrected to Certified Final:
00 80 50.00 06 SPECIAL PROVISIONS
- Attachment Submittal Register title block revised.
01 02 10.00 PROJECT DESCRIPTION AND DESIGN REQUIREMENTS
- Paragraph 4.8.4 revised.
- Paragraph 11.2.1 revised.
Wage Determination IN20250003 dated 01/03/2025 is hereby revised and replaced in its entirety with IN20250003 Revision 2, dated 01/31/2025.
-4-
"General Decision Number: IN20250003 01/31/2025
Superseded General Decision Number: IN20240003
State: Indiana
Construction Type: Building
Counties: Clay, Gibson, Greene, Owen, Parke, Posey, Putnam, Sullivan, Vanderburgh, Vermillion, Vigo and Warrick Counties in
Indiana.
BUILDING CONSTRUCTION PROJECTS (does not include residential construction consisting of single family homes and apartments up to and including 4 stories)
Note: Contracts subject to the Davis-Bacon Act are generally required to pay at least the applicable minimum wage rate required under Executive Order 14026 or Executive Order 13658.
Please note that these Executive Orders apply to covered contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but do not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(1).
|If the contract is entered |. Executive Order 14026 |
|into on or after January 30, | generally applies to the |
|2022, or the contract is | contract. |
|renewed or extended (e.g., an |. The contractor must pay |
|option is exercised) on or | all covered workers at |
|after January 30, 2022: | least $17.75 per hour (or |
| | the applicable wage rate |
| | listed on this wage |
| | determination, if it is |
| | higher) for all hours |
| | spent performing on the |
| | contract in 2025. |
|If the contract was awarded on|. Executive Order 13658 |
|or between January 1, 2015 and| generally applies to the |
|January 29, 2022, and the | contract. |
|contract is not renewed or |. The contractor must pay all|
|extended on or after January | covered workers at least |
|30, 2022: | $13.30 per hour (or the |
| | applicable wage rate listed|
| | on this wage determination,|
-5-
| | if it is higher) for all |
| | hours spent performing on |
| | that contract in 2025. |
The applicable Executive Order minimum wage rate will be adjusted annually. If this contract is covered by one of the
Executive Orders and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must still submit a conformance request.
Additional information on contractor requirements and worker protections under the Executive Orders is available at http://www.dol.gov/whd/govcontracts.
Modification Number Publication Date 0 01/03/2025
1 01/17/2025 2 01/31/2025
ASBE0018-003 06/01/2024
CLAY, GREENE, OWEN, PARKE, PUTNAM, VERMILLION AND VIGO COUNTIES
Rates Fringes
ASBESTOS WORKER/HEAT & FROST
INSULATOR (includes application of all insulating materials protective coverings, coatings and finishes to all types of mechancial systems).............. $ 38.55 23.53
HAZARDOUS MATERIAL HANDLER
(includes preparation, wettings stripping, removal, scrapping, vacuuming, bagging
& disposing of all insulation materials, whether they contain asbestos or not, from mechanical systems).............. $ 23.00 14.40
ASBE0037-002 04/02/2023
GIBSON, POSEY, SULLIVAN, VANDERBURGH AND WARRICK COUNTIES
http://www.dol.gov/whd/govcontracts
-6-
ASBESTOS WORKER/HEAT & FROST
INSULATOR (includes application of all insulating materials protective coverings, coatings an finishes to all types of mechanical systems. Also the application of firestopping material openings and penetrations in walls, floors, ceilings, curtain walls and all lead abatement).......................$ 32.00 21.84
BOIL0374-002 01/01/2024
Rates Fringes
BOILERMAKER......................$ 42.41 35.72
BRIN0001-001 06/01/2023
EVANSVILLE
POSEY, VANDERBURGH and WARRICK COUNTIES
Rates Fringes
Bricklayer, Stonemason...........$ 34.17 20.14
Marble, Tile & Terrazzo
Finisher.........................$ 22.09 16.34
Marble, Tile & Terrazzo
Workers..........................$ 28.49 16.46
BRIN0004-012 06/01/2024
BLOOMINGTON
OWEN COUNTY
Bricklayer, Stonemason. ......... $ 35.21 18.19
TERRAZZO FINISHER ............... $ 25.33 14.19
TERRAZZO WORKER/SETTER ........... $ 37.97 18.06
Tile & Marble Finisher........... $ 25.33 14.19
Tile, Marble Setter. ............ $ 37.22 18.05
-7-
BRIN0005-001 09/21/2023
TERRE HAUTE CLAY, GIBSON, REENE, PARKE, SULLIVAN, VERMILLION
and VIGO COUNTIES
BRICKLAYER
BRICKLAYER, STONE MASON
and POINTER/CLEANER/CAULKER.$ 30.13 11.65
CEMENT MASON (GREENE and
SULLIVAN COUNTIES). ......... $ 27.78 11.02
CEMENT MASON (REMAINING
COUNTIES)...................$ 27.93 11.02
TERRAZZO FINISHER. ..........$ 23.38 1315
TERRAZZO....................$ 27.50 15.20
TILE and MARBLE FINISHER .... $ 19.83 6.32
TILE, MARBLE, MOSAIC ....... $ 35.63 17.23
CARP0088-001 10/01/2024
CLAY, OWEN, PARKE, PUTNAM, VERMILLION AND VIGO COUNTIES
Carpenters:
Carpenters, Drywall
Installers, Piledrivers.....$ 35.55 23.80
Millwright..................$ 36.94 25.42
Soft Floor Layers...........$ 34.45 21.08
CARP0224-004 04/01/2024
POSEY, VANDERBURGH AND WARRICK COUNTIES
CARPENTER
Carpenter...................$ 31.49 25.46
Piledriver..................$ 32.49 25.36
CARP0224-005 04/01/2024
GREENE, GIBSON and SULLIVAN COUNTIES
-8-
CARPENTER
Carpenter...................$ 31.48 25.46
Piledriver..................$ 28.71 22.45
CARP1080-002 04/01/2024
MILLWRIGHT
ZONE 1
POSEY, VANDERBURGH and
WARRICK COUNTIES...........$ 34.40 27.61
ZONE 2
GIBSON, GREENE AND
SULLIVAN COUNTIES..........$ 33.10 28.57
ELEC0016-004 04/01/2024
GIBSON, POSEY, VANDERBURGH AND WARRICK COUNTIES
ELECTRICIAN......................$ 43.51 20.92
ELEC0481-001 05/31/2024
PUTNAM COUNTY
ELECTRICIAN......................$ 42.15 26.88
* ELEC0538-002 06/01/2024
VERMILLION COUNTY
ELECTRICIAN......................$ 40.00 26.01
ELEC0725-003 10/01/2024
CLAY, GREENE, OWEN, PARKE, SULLIVAN AND VIGO COUNTIES
ELECTRICIAN......................$ 43.30 25.32
-9-
ELEC0725-010 06/01/2022
CLAY, GREENE, OWEN, PARKE, SULLIVAN AND VIGO COUNTIES
Communication Technician.........$ 30.00 18.07
Includes the installation, operation, inspection, maintenance, repair and service of radio, television, recording, voice sound and vision production and reproduction apparatus, equipment and appliances used for domestic, commercial, education, entertainment and private telephone systems.
ELEV0003-002 01/01/2023
GIBSON, POSEY, VANDERBURGH and WARRICK COUNTIES
ELEVATOR MECHANIC................$ 57.69 37.335+a+b
FOOTNOTES:
a) Employer contributes as a vacation pay credit 8% basic hourly rate for more than 5 years of service and 6% basic hourly rate for less than 5 years of service.
b) Eight Paid Holidays: Thanksgiving Day; New Year's Day;
Memorial Day; Independence Day; Labor Day; Veteran's Day, Thanksgiving Day, the Friday after Thanksgiving Day and
Christmas Day.
ELEV0034-002 01/01/2024
CLAY, GREENE, OWEN, PARKE, PUTNAM, SULLIVAN, VERMILLION and
VIGO COUNTIES
ELEVATOR MECHANIC................$ 57.68 37.885+a+b
a) PAID HOLIDAYS: New Year's Day, Memorial Day, Independence
Day, Labor Day, Vetern's Day, Thanksgiving Day, the Friday
-10-after Thanksgiving, and Christmas Day.
b) Employer contributes 8% of regular hourly rate to vacation pay credit for employee with more than 5 years of service;
6% for less than 5 years' service.
ENGI0181-013 04/01/2024
GIBSON, POSEY, VANDERBURGH, and WARRICK COUNTIES
Power equipment operators:
GROUP A.....................$ 41.28 19.72
GROUP B.....................$ 33.15 19.72
POWER EQUIPMENT OPERATOR CLASSIFICATIONS
GROUP A: A-Frame Winch Truck, Articulating dump, autograde
(CMI), auto patrol, ballast regulator (RR), batcher plant
(electrical control concrete), bending machine (pipe), bituminous plant (engineer), bituminous plant, bituminous mixer travel plant, bituminous paver, bituminous roller, boring machine, buck hoist, bull dozer, cable way, Chicago boom, chimney hoist, clamshell, concrete mixer (21 cu. ft.
or over), concrete paver, concrete pump (crete), construction elevator (Allmac or similar) crane, craneman, crawler backhoe, crawler high-lift, crusher plant, derrick, derrick boat, dinkey, directional/boring machine, dope pots
(pipeline), double drum tugger (electric or air), dragline, dredge operator, dredge engineer, drill operator, elevating grader, extendable boom forklift, formless paver, gantry crane, gator (or similar type tiller), gradeall, grader, grademan, greaser ( on grease facility servicing heavy equipment), G.P.S System (on equipment with the classifications), grout pump, head greaser, helicopter crew, Hetherington paver, hoist (motorized, gas or diesel), hydraulic crane, hydro blaster, Industrial type forklift
(over 9,000 lbs), laser concrete screed, laser or remote contrlled equipment (within the classifications), locomotive crane, locomotive, mechanic, mobile mixer, motor crane, mucking machine, multiple tamping machine (RR) overhead crane, pile driver, pulls, push dozer, push boats, roller (sheep foot), rough terrain crane, R.T. backhoe, R.T. endloader, Ross carrier, scoop, shovel, side boom, skidstter loader (obcat or similar type), swing crane, tail boom, tar machine (pipeline), tower crane, trench machine, -11-welder (heavey duty), truck mounted concrete pump, truck-mounted drill, vacuum truck, well point whirleys.
GROUP B: Air Compressor (1 or more, 600 cfm and over), air compressor with throttle valve, bituminous distrubtor, brakeman, bullfloat, cement gun, concrete mixer, concrete mixer, concrete saw, concrete spreader or puddlers, conveyor, deck hand oiler, deck engine, drill helper, earth roller, electric vibrator compactor (earth or rock), elevator (in-plant, automatic), finishing machine, fireman, form grader, generator, guard-rail driver, heater, oiler, Industrial type forklift (9,000 lbs and under), material pump, motor boats, paving joint machine, post hole digger, power broom, power traffic signals, rock roller, rock spreader, Roller (earth or rock), spike machine (RR), steam jenny, sub grader, tamping machine, truck crane oiler, truck mounted drill oiler, Tugger (one-drum, air or electric) vibrator, vibro-piling hammer-hydraulic hammer or auger, water pump, widener (apsco or similar type) welding machine, JLG lifts and scissor lifts or similar machine.
ENGI0841-001 04/01/2023
REMAINING COUNTIES
Power equipment operators:
GROUP 1.....................$ 33.90 23.00
GROUP 2.....................$ 26.75 23.00
GROUP 1: Power Cranes, Draglines, Derricks, Shovels, Gradalls, Mechanics, Tractor Highlift, Tournadozer, Concrete Mixers with Skip, Tournamixer, Two-Drum Machine, One-Drum Hoist with Tower or Boom, Cableways, Tower
Machines, Motor Patrol, Boom Tractor, Boom or Winch Truck, Winch or Hydraulic Boom Truck, Truck Crane, Tournapull, Tractor Operating Scoops, Bulldozer, Push Tractor, Asphalt
Planer, Finishing Machine on Asphalt, Large Rollers on
Earth, Rollers on Asphalt Mix, Ross Carrier or Similar
Machine, Gravel Processing Machine, Asphalt Plant Engineer, Paver Operator, Farm Tractor with Half Yard Bucket and/or
Backhoe Attachments, Dredge Engineer, or Dredge Operator, Central Mix Plant Engineer, CMI or Similar Type Machine, Truck or Skid Mounted Concrete Pump, Tower Crane, Engine or
Rock Crusher Plant, Concrete Plant Engineer, Ditching
Machine with Dual Attachment, Tractor Mounted Loaders, -12-
Cherry Picker, Hydro Crane, Standard or Dinkey Locomotives, Scoopmobiles, Euclid Loader, Soil Cement Machine, Back
Filler, Elevating Machine, Power Blade, Drilling Machines
Including Well Testing, Caissons, Shaft or Any Similar Type
Drilling Machines, Motor Driven Paint Machine, Pipe
Cleaning Machine, Pipe Wrapping Machine, Pipe Bending
Machine, Apsco Paver, Boring Machine, (Equipment Greased), Barber-Greene Loaders, Formless Paver, (Well Point System), Concrete Spreader, Hydra Ax, Span Saw and Similar Types, Marine Scoops, Brush Mulcher, Brush Burner, Mesh Placer, Tree Mover, Helicopter Crew (3), Piledriver - Skid or
Crawler, Stump Remover, Root Rake, Tug Boat Operator, Refrigerating Machine, Freezing Operator, Chair Cart-Self
Propelled, Hydra Seeder, Straw Blower Power Sub Grader, Bull Float, Finishing Machine, Self-Propelled Pavement
Breaker (Backhoe Attached), Lull (or Similar Type Machine), Two Air Compressors, Compressors Hooked in Maifold, Overhead Crane, Chip Spreader, Mud Cat, Sull-Air Fork Lifts
(Except When Used For Landscaping Work), Soil Stabilazer
(Seaman Tiller, Bo Mag, Rago Gator and Similar Types or
Equipment), Tube Float, Spray Machine, Curing Machine, Concrete or Asphalt Milling Machine, Snooper Truck Operator.
GROUP 2: Concrete Mixers Without Skips, Rock Crusher, Ditching Machine Under 6', Curbing Machine, One Drum
Machines without Tower or Boom, Air Tugger, Self-Propelled
Concrete Saw, Machine-Mounted Post Hole Digger, Two to Four
Generators, Water Pumps, or Welding Machines within 400 ft., Air Compressor 600 cu. ft. and Under, Rollers on
Aggregate and Seal Coat Surfaces, Fork Lifts (When Used For
Landscaping Work, Concrete and Blacktop Curb Machine, Farm
Tractor with less than Half Yard Bucket, One Water Pump, Iolers, Air Valves or Steam Valves, One Welding Machine, Truck Jack, Mud Jack, Gunnite Machine, House Elevators when used for Hoisting Material, Engine Tenders, Wagon Drill, Flex Plane, Conveyor, Siphons and Pulsometer, Switchman, Fireman on Paint Pots, Fireman on Asphalt Plants, Distributor Operators on Trucks, Tampers, Self-Propelled
Power Broom, Striping Machine (Motor Driven), Form Tamper, Bulk Cement Plan Equipment Greaser, Deck Hands, Truck Crane
Oiler Driver, Cement Blimps, Form Grader, Temporary Heat, Throttle Valve, Farm Tractor, Super Sucker (And Similar
Type of Equipment).
FOOTNOTE: Employees operating booms from 149 ft. to 199 ft.
including jib, shall receive an additional seventy five cents (.75) per hour above the rate. Employees operating booms over 199 ft. including jib, shall receive an
-13-additional one dollar and twenty five cents ($1.25) per hour above the regular rate.
IRON0022-003 06/01/2024
CLAY, DAVIESS, GREENE, KNOX, LAWRENCE, MARTIN, MONROE,
MONTGOMERY, OWEN, PARKE, PUTNAM, SULLIVAN, VERMILLION AND VIGO
COUNTIES
Rates Fringes
IRONWORKER.......................$ 36.70 26.09
The following holidays shall be observed: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day and the day after Thanksgiving and Christmas Day. Any holiday which occurs on a Sunday shall be observed the following Monday, unless the legal observance of these holidays is changed by law.
IRON0103-003 04/01/2024
IRONWORKER.......................$ 35.34 25.75
LABO0204-002 06/01/2024
CLAY, GREENE, OWEN, PARKE, PUTNAM, SULLIVAN, VERMILLION, and
Laborers:
Caisson and Tunnel Work in
Compressed and Free Air
GROUP 1....................$ 23.18 16.00
GROUP 2....................$ 23.93 16.00
GROUP 3....................$ 24.18 16.00
GROUP 4....................$ 24.18 16.00
LABORERS
GROUP 1....................$ 26.93 18.00
-14-
GROUP 2....................$ 27.68 18.00
GROUP 3....................$ 28.43 18.00
LABORER CLASSIFICATIONS
GROUP1: Building and construction laborers; Scaffold builders (other than for masons or plasterers); Mechanic tenders; Flag & signal person; Window washers & cleaners;
Waterboys & toolhousemen; Railroad workers; Masonry wall washers (interior & exterior); Curing compound; All portable water pumps with discharge up to 3 inches;
Waterproofing; Handling of creosote lumber or like treated material (excluding railroad material); Asphalt rakers & lutemen; Kettlemen; Air tool operators and all pneumatic tool operators; Air & electric vibrators & chipping hammer operators: Earth compactors; Jackmen & sheet men working ditches deeper than 6 ft. in depth; Laborers working ditches 6 ft. in depth or deeper; Assembly of unicrete pump; Tile layers (sewer or field) & sewer pipe layer
(metallic or non-metallic); Motor-driven wheelbarrows & concrete buggies; Hyster operators; Pumpcrete assemblers;
Core drill operator; Cement, lime or silia clay handlers
(bulk or bag); Handling of toxic materials damaging to clothing; Pneumatic spikers; Deck engine & winch operators:
Water main & cable ducking (metallic/non-metallic); Screed man or screw operator on asphalt paver; Chain saw and demolition saw operators; Concrete conveyor assemblers;
Asbestos removal; Hazardous waste removal.
GROUP 2: Plasterers' tenders; Mortar mixers; Welders
(acetylene or electric); Cutting torch or burner; Cement nozzle laborers; Cement gun operators; Scaffold builders when working for plasterers and for masons; Water blast machine operators.
GROUP 3: Dynamite men; Mason Tenders; Drillers-air track or wagon drilling for explosives
LABORERS CLASSIFICATIONS For CAISSON And TUNNEL WORK In
COMPRESSED And FREE AIR
GROUP 1: Cage Tenders, Dump Men, Flagman, Signalman, Top
Laborers, Rod Men
GROUP 2: Concrete Repairmen, Lock Tenders (pressure side), Motor men, Muckers, Grout Machine, Track Layers, Air Hoist, Key Board, Agitator Car, Car Pushers, Concrete Laborers, -15-
Grout Laborers, Lock Tenders (free air side), Steel
Setters, Tuggers, Tuggers, Switchmen.
GROUP 3: Mucking Machine, Laser Beam, Liner Plate & Ring
Setter, Shield Drivers, Power Knife, Welders Burners, Pipe
Jacking Machine, Skinners, Maintenance Technician, Miner, Bricklayer Tenders, Concrete Blowers, Drillers, Erectors, Form Men, Jackhammermen, Mining Machine.
GROUP 4: Dynamite Men, Drillers air track or wagon drilling for explosives.
LABO0561-005 04/01/2023
GIBSON, POSEY, VANDERBURGH and WARRICK COUNTIES
Laborers:
GROUP 1.....................$ 27.12 18.10
GROUP 2.....................$ 27.42 18.10
GROUP 3.....................$ 28.62 18.10
GROUP 4.....................$ 28.87 18.10
LABORER CLASSIFICATIONS
GROUP 1: Building & Construction Laborers; Scaffold Builders
(other than for Masons or Plasterers); Ironworker Tender;
Mechanic Tender; Civil Engineer Tender; Rodmen and
Chainmen; Signalmen and Flagman, Window Washer & Cleaner;
Waterboy and Toolhouseman; Roofer Tender; Railroad Worker;
Masonry Wall Washer (Interior & Exterior); Cement Finisher
Tender; Carpenter Tender; All Other Tenders not listed;
Portable Water Pump with discharge up to 3""; Wiremesh; Fire
Prevention; Fire Watch; Fire Stop Tender
GROUP 2: Waterproofing; Handling of creosote Lumber or like treated material (Excluding Railroad Material); Asphalt
Raker & Luteman; Kettleman; handling and removal Hazardous materials damaging to clothing; Air Tool Operator;
Vibrator; Chipping Hammer Operator and all pneumatic tool operator and earth compactor; Jack Man & Sheeting Man
Working in Ditches 6 Feet in depth or deeper; Laborers working ditches six (6) feet in depth or deeper; Assembly of Unicrete Pump; Chain Saw Operator; Water line layers, five (5) feet outside the building foundation; Tile layers
(Sewer or Field); Sewer Pipe Layer (Metallic and
-16-
Non-metallic) five (5) feet outside the building; Motor
Driven Wheelbarrow & Concrete Buggy; Hyster Operator; Grout pump operator; Pump crete Assembler; Conveyor Assembler;
Core Drill Operator; Cement/Lime/Silica Clay Handler (Bulk or Bar); Pneumatic Spiker; Deck/Engine/Winch Operator;
Water Main & Cable Decking (Metallic or Non-metallic);
Remote Controlled Compactor
GROUP 3: Plasterer Tender; Mason Tender; Mortar Mixer; Welder
(Acetylene or Electric); Cutting Torch or Burner; Cement
Gun Operator; Scaffold Builder (When working for Plasterer or Mason)
GROUP 4: Dynamite Man
PAIN0156-002 04/01/2024
Painters:
BRUSH & ROLLER..............$ 29.62 18.32
DRYWALL FINISHERS...........$ 30.37 19.32
SPRAY, SANDBLAST, POWER
TOOLS, WATERBLAST & STEAM
CLEANING....................$ 30.62 19.32
FOOTNOTE A:
All Structures over 40? $0.75/ hour above base wage
All Structures over 75? $1.50/ hour above base wage
All Structures over 100? $2.50/ hour above base wage
PAIN0197-002 06/01/2024
CLAY, GREENE, OWEN, PARKE, PUTNAM, SULLIVAN, VERMILLION AND
VIGO COUNTIES:
Painters:
Brush & Roller..............$ 30.25 15.50
Drywall & Paper hangers
(with tools)................$ 31.25 15.50
Sandblasting................$ 32.25 15.50
-17-
Spray & Pot Man.............$ 30.75 15.50
FOOTNOTE A: $1.00 premium for work on structures over 40 ft.
above floor/ground level
$2.00 premium for work on structures over 100 ft above floor/ground level
PAIN1165-007 06/01/2024
GIBSON, POSEY, VANDERBURGH, WARRICK COUNTIES
Rates Fringes
GLAZIER..........................$ 32.86 19.34
PAIN1165-012 01/01/2024
CLAY; GREENE; OWEN; PARKE; PUTNAM; SULLIVAN; VERMILLION and
VIGO COUNTIES
GLAZIER..........................$ 34.03 20.05
PLAS0075-001 06/01/2017
CLAY, OWEN, PARKE, PUTNAM, VERMILLION AND VIGO COUNTIES:
CEMENT MASON/CONCRETE FINISHER...$ 25.75 13.50
PLAS0075-002 06/01/2017
GREENE and SULLIVAN COUNTIES
CEMENT MASON/CONCRETE FINISHER...$ 28.50 13.50
PLAS0566-001 04/01/2018
-18-
CEMENT MASON/CONCRETE FINISHER...$ 26.30 16.91
PLAS0692-001 06/01/2024
AREA #46
CLAY, GIBSON, GREENE, OWEN, PARKE, POSEY, PUTNAM, SULLIVAN,
VANDERBURGH, VERMILLION, VIGO and WARRICK COUNTIES
Rates Fringes
PLASTERER........................$ 30.50 17.62
PLUM0136-002 04/01/2024
REMAINING COUNTIES
Plumbers and Pipefitters.........$ 43.67 21.35
PLUM0157-001 01/01/2025
CLAY, GREENE, PARKE, PUTNAM (Part), SULLIVAN, VERMILLION and
Plumbers and Pipefitters.........$ 45.45 22.50
PLUM0440-001 06/04/2024
PUTNAM COUNTY (EAST OF ROAD 43 EXCEPT TERRITORY ON A EAST MILE
RADIUS FROM THE COURT HOUSE)
Plumbers and Pipefitters.........$ 46.50 19.89
ROOF0106-001 04/01/2023
REMAINING COUNTIES:
-19-
Roofers:
COMPOSITION.................$ 31.60 19.43
SLATE & TILE................$ 31.60 19.43
ROOF0119-001 09/01/2024
PUTNAM COUNTY
Roofers:.........................$ 31.00 14.21
ROOF0150-002 07/01/2024
CLAY, GREENE, OWEN, PARKE, SULLIVAN, VERMILLION AND VIGO
COUNTIES
Rates Fringes
ROOFER...........................$ 30.00 18.30
SFIN0669-002 04/01/2024
SPRINKLER FITTER.................$ 45.40 27.29
SHEE0020-018 07/01/2023
CLAY, GREENE, OWEN, PARKE, PUTNAM, SULLIVAN, VERMILLION, and
Sheet metal worker...............$ 39.53 22.92
HVAC Duct Work
SHEE0020-019 07/01/2023
GIBSON, POSEY, VANDERBURGH, and WARRICK COUNTIES
Sheet metal worker...............$ 34.58 29.98
HVAC Duct Work
-20-
TEAM0135-006 04/01/2024
CLAY, GREENE OWEN, PARKE, PUTNAM, SULLIVAN, VERMILLION, and
Truck drivers:
GROUP 1.....................$ 32.10 .42+a+b
GROUP 2.....................$ 32.60 .42+a+b
GROUP 3.....................$ 32.80 .42+a+b
GROUP 4.....................$ 32.95 .42+a+b
GROUP 5.....................$ 33.45 .42+a+b
A: $36.40 PER DAY & 450.00 PER WEEK.
TRUCK DRIVER CLASSIFICATIONS:
GROUP 1: Single Axle Trucks seven (7) cu.yds. or less than ten and 0ne-half (10 1/2) tons, dumpsters, scoop-mobiles five (5) cu. yds. and under or less than seven and one-half
(7 1/2) tons, mixer trucks three (3) cu.yds. and under, air compressors and welding machines, including those pulled by separate units, batch trucks-wet or dry-2""34-E batches or less, truck driver helpers, warehousemen, mechanic's helpers, greasers and tiremen, all pick-up trucks and other vehicles. Drivers on dumpsters or similar dumpsters, mounted on four
(4) wheel truck rated two (2) cu.yds. or less, and small pallet type fork-lift operator and drivers on pallet jacks or similar type equipment.
GROUP 2: Drivers on tandem axle eighteen (18) cu.yds.or twenty- four (24) tons gross, six (6) wheel trucks, Koehring or similar dumpsters, tract trucks, Euclids, hug bottom dumps, tournapulls, tournatrailers, tournarockers, or similar equipment when used for transportation purposes under nine (9) cu.yds. or less than thirteen and one-half
(13 1/2) tons, tandems and semi-trailer service trucks, mixer trucks over three (3) cu. yds. and including six and one-half (6
1/2) cu.yds., fork lift, four (4) wheel A frame trucks when used for transportation purposes, four (4) wheel winch trucks, pavement breakers, batch trucks - wet or dry - over
2 up to and including 4-""34-E"" batches two (2) men oil distributors, fork-lift under four (4) ton and vacuum trucks.
-21-
GROUP 3: Koehring or similar dumpsters, tract trucks, semi-trailer water trucks, Euclids, hug bottom dumps, tournapulls, tournatrailers, tournarockers, tractor trailers, tandems Q frame winch trucks, hydrolift trucks or similar equipment when used for transportation purposes, mixer trucks over six and one-half (6 1/2) cu.yds. batch trucks wet or dry over 4-""34-E"" batches single axle low boy trailers, and Contractor's mechanics when working on equipment operated by employees within this Bargaining
Unit. Six (6) wheel pole trailers and one (1) man oil distributors, fork- lift over four (4) ton and mobile mixers.
GROUP 4: Drivers on heavy equipment over sixteen (16) cu.yds. or twenty-four ton, such as Koehring or similar dumpsters, tract trucks, Euclids, hug bottom dumps, tournapulls, tournarockers or similar equipment wen used for transportation purposes, pole trailers over six (6) wheels, water pulls, low-boy trailers tandem axles, quad axle or more no-weight limitation, diseal and/or heavy equipment mechanics when working on equipment operated by employees with this Bargaining Unit.
GROUP 5: Mechanic furnishing his own tools.
TEAM0215-005 04/01/2024
GIBSON, POSEY, VANDERBURGH AND WARRICK COUNTIES:
Truck drivers:
GROUP 1.....................$ 27.08 21.45
GROUP 2.....................$ 27.54 21.45
GROUP 3.....................$ 27.76 21.45
GROUP 1 - Pickup Trucks, Winch Trucks, Warehouseman, Mechanic, Street sweepers, Single axle trucks
GROUP 2 - Tandem Trucks or Dump Trucks; Farm Tractor Pulling trailer; Bituminous Distributors, Pavement Breakers
GROUP 3 - Mixer Trucks, all types; Lowboys, all types; Semi-trucks, all types; All Tri-axle Dump Trucks; Articulated
End Dumps; End Dumps; Heavy Equipment Type Water Wagons;
Hazardous Waste Warehouseman; Hazardous Waste Driver; and
-22-
Drivers on equipment when not self-loaded or pusher loaded, such as Koehring or similar dumpsters, track trucks, Euclid bottom dump and hug bottom dump, Tournatrailers, Tournarockers or similar equipment.
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the
Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at https://www.dol.gov/agencies/whd/government-contracts.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses
(29CFR 5.5 (a) (1) (iii)).
The body of each wage determination lists the classifications and wage rates that have been found to be prevailing for the type(s) of construction and geographic area covered by the wage determination. The classifications are listed in alphabetical order under rate identifiers indicating whether the particular rate is a union rate (current union negotiated rate), a survey rate, a weighted union average rate, a state adopted rate, or a supplemental classification rate.
http://www.dol.gov/agencies/whd/government-contracts
-23-
Union Rate Identifiers
A four-letter identifier beginning with characters other than
""SU"", ""UAVG"", ?SA?, or ?SC? denotes that a union rate was prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2024. PLUM is an identifier of the union whose collectively bargained rate prevailed in the survey for this classification, which in this example would be Plumbers.
0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. The date, 07/01/2024 in the example, is the effective date of the most current negotiated rate.
Union prevailing wage rates are updated to reflect all changes over time that are reported to WHD in the rates in the collective bargaining agreement (CBA) governing the classification.
Union Average Rate Identifiers
The UAVG identifier indicates that no single rate prevailed for those classifications, but that 100% of the data reported for the classifications reflected union rates. EXAMPLE:
UAVG-OH-0010 01/01/2024. UAVG indicates that the rate is a weighted union average rate. OH indicates the State of Ohio.
The next number, 0010 in the example, is an internal number used in producing the wage determination. The date, 01/01/2024 in the example, indicates the date the wage determination was updated to reflect the most current union average rate.
A UAVG rate will be updated once a year, usually in January, to reflect a weighted average of the current rates in the collective bargaining agreements on which the rate is based.
Survey Rate Identifiers
The ""SU"" identifier indicates that either a single non-union rate prevailed (as defined in 29 CFR 1.2) for this classification in the survey or that the rate was derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As a weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SUFL2022-007
6/27/2024. SU indicates the rate is a single non-union prevailing rate or a weighted average of survey data for that classification. FL indicates the State of Florida. 2022 is the
-24-year of the survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. The date, 6/27/2024 in the example, indicates the survey completion date for the classifications and rates under that identifier.
?SU? wage rates typically remain in effect until a new survey is conducted. However, the Wage and Hour Division (WHD) has the discretion to update such rates under 29 CFR 1.6(c)(1).
State Adopted Rate Identifiers
The ""SA"" identifier indicates that the classifications and prevailing wage rates set by a state (or local) government were adopted under 29 C.F.R 1.3(g)-(h). Example: SAME2023-007
01/03/2024. SA reflects that the rates are state adopted. ME refers to the State of Maine. 2023 is the year during which the state completed the survey on which the listed classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination.
The date, 01/03/2024 in the example, reflects the date on which the classifications and rates under the ?SA? identifier took effect under state law in the state from which the rates were adopted.
WAGE DETERMINATION APPEALS PROCESS
1) Has there been an initial decision in the matter? This can be:
a) a survey underlying a wage determination
b) an existing published wage determination
c) an initial WHD letter setting forth a position on a wage determination matter
d) an initial conformance (additional classification and rate) determination
On survey related matters, initial contact, including requests for summaries of surveys, should be directed to the WHD Branch of Wage Surveys. Requests can be submitted via email to davisbaconinfo@dol.gov or by mail to:
Branch of Wage Surveys
Wage and Hour Division
U.S. Department of Labor
200 Constitution Avenue, N.W.
mailto:davisbaconinfo@dol.gov
-25-
Washington, DC 20210
Regarding any other wage determination matter such as conformance decisions, requests for initial decisions should be directed to the WHD Branch of Construction Wage Determinations.
Requests can be submitted via email to BCWD-Office@dol.gov or by mail to:
Branch of Construction Wage Determinations
Wage and Hour Division
U.S. Department of Labor
200 Constitution Avenue, N.W.
2) If an initial decision has been issued, then any interested party (those affected by the action) that disagrees with the decision can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7).
Requests for review and reconsideration can be submitted via email to dba.reconsideration@dol.gov or by mail to:
Wage and Hour Administrator
U.S. Department of Labor
The request should be accompanied by a full statement of the interested party's position and any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative
Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board
U.S. Department of Labor
Washington, DC 20210.
END OF GENERAL DECISION"
W912QR-22002077A_CERTFinal_Specs-0001 mailto:BCWD-Office@dol.gov mailto:dba.reconsideration@dol.gov
P2#: 500352 Indiana Air National Guard Small Arms Range Terre Haute, IN
THIS PAGE INTENTIONALLY LEFT BLANK
Certified Final Submittal
PROJECT TABLE OF CONTENTS
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
00 80 50.00 06 05/2023 SPECIAL PROVISIONS
DIVISION 01 - GENERAL REQUIREMENTS
01 02 10.00 06 09/17 PROJECT DESCRIPTION AND DESIGN
REQUIREMENTS
01 03 00.00 06 DESIGN SUBMISSION REQUIREMENTS AFTER
AWARD
01 20 00.00 06 SUMMARY OF WORK
01 33 29.00 06 11/17 SUSTAINABILITY REPORTING
01 42 00 02/19 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00.15 10 11/16, CHG 2: 08/19 RESIDENT MANAGEMENT SYSTEM CONTRACTOR
MODE (RMS CM)
01 46 00.00 06 04/20 TOTAL BUILDING COMMISSIONING
01 57 19.00 06 04/20 TEMPORARY ENVIRONMENTAL CONTROLS AND
PERMITS
01 74 19 02/19, CHG 3: 11/21 CONSTRUCTION WASTE MANAGEMENT AND
DISPOSAL
ATTACHMENTS:
ATTACHMENT 1 - CONCEPTUAL PLANS
ATTACHMENT 2 - ROOM DATA SHEETS
ATTACHMENT 3 - PRELIMINARY GEOTECHNICAL REPORT
ATTACHMENT 4 - TOPOGRAPHICAL SURVEY
ATTACHMENT 5 - FLOW TEST REPORT
ATTACHMENT 6 - AIR NATIONAL GUARD ENGINEERING TECHNICAL LETTER 24-02
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 1
THIS PAGE INTENTIONALLY LEFT BLANK
PROJECT TABLE OF CONTENTS Page 2
SECTION 00 80 50.00 06
SPECIAL PROVISIONS
05/2023
PART 1 GENERAL
This section is a supplement to section 00 80 50.00 06 in the base contract. This document will provide additional information or revise base contract requirements for this task order only.
Attachments to this specification are as follows:
Project Submittal Register
Project Sign Details
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
U.S. ARMY (DA)
AR 530-1 Operation Security
U.S. ARMY CORPS OF ENGINEERS (USACE)
EM 385-1-1 (2014) Safety -- Safety and Health Requirements Manual
ER 415-1-15 (2014) Safety and Health Requirements Manual
U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)
29 CFR 1926.59 Hazard Communication
1.2 SUBMITTALS
Government approval/acceptance is required for submittals with a "G" designation; submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. The following shall be submitted in accordance with LRL Section 01 33 00.00 06
SUBMITTAL PROCEDURES:
SD-02 Shop Drawings
Mechanical/Electrical Room Layout; G,
1.3 NOT USED
1.4 NATIVE FILES FOR PROPOSAL DEVELOPMENT ON DESIGN/BUILD PROJECT
a.Included, in addition to the drawings that are part of the solicitation, DOCUMENT 00 80 50.00 06 Page 1 are Native CAD files in one and only one format that contain limited preliminary notional design concepts and site characteristics that were created during the solicitation development process and are not necessarily all inclusive.
1.5 NOT USED
1.6 NOT USED
1.7 NOT USED
1.8 AS-BUILT DOCUMENTS FOR DESIGN BUILD PROJECTS
1.8.1 General
It is the scope of this section to provide guidance to the Contractor on preparing as-built drawings for design-build projects. An as-built drawing is a contract construction drawing revised to reflect the final as-built conditions of the project because of modifications, changes, corrections to the project design required during construction, submittals and extensions of design. The terms "drawings," "contract drawings," "drawing files," "working as-built drawings" and "final as-built drawings" refer to contract drawings that are revised to be used for the "RECORD DRAWING AS-BUILTS". As-built drawings shall be in accordance with MATOC Section 00 80 00.00 06
1.9 EQUIPMENT DATA, O&M, & REPAIR MANUALS WITH FIELD TRAINING REQUIREMENTS
1.9.1 O&M and Repair Manuals
O&M and Repair Manuals shall be in accordance with MATOC Section 00 80 00.00 06
1.10 AVAILABILITY OF UTILITIES
a. Availability and Use of Utility Services
The Government will not furnish any utilities or sanitary facilities to the contractor for their use even if available at the work site. The contractor is responsible for procuring and/or providing these items themselves or obtaining them from a private entity (utility company). The Contractor shall furnish at no additional cost all utilities, including HVAC, lighting and electrical power, during furniture and IT/Telecom equipment installation and until the facility is turned over to the Government.
b. Additional Requirements
(1) Drinking Water may not be obtained from existing outlets by Contractor personnel.
1.10.1 Alterations to Utilities
Where changes and relocations of utility lines are noted to be performed by others, the Contractor shall give the Contracting Officer at least thirty (30) calendar days written notice in advance of the time that the change or relocation is required. In the event that, after the expiration of thirty (30) calendar days after the receipt of such notice by the Contracting Officer, such utility lines have not been changed or relocated
DOCUMENT 00 80 50.00 06 Page 2 and delay is occasioned to the completion of the work under contract, the Contractor may be entitled to a time extension equal to the period of time lost by the Contractor after the expiration of said thirty (30) calendar day period.
Interruptions of Utilities
a. No utility services shall be interrupted by the Contractor to make connections, to relocate, or for any purpose without approval of the Contracting Officer.
b. Request for Permission to shut down services shall be submitted in writing to the Contracting Officer not less than seventeen (17) working days before date of proposed interruption. The request shall give the following information:
(1) Nature of Utility. (Gas, L.P. or H.P., Water, etc.)
(2) Size of line and location of shutoff.
(3) Buildings and services affected .
(4) Hours and date of shutoff.
(5) Estimated length of time services will be interrupted.
c. Services shall not be shut off until receipt of approval of the proposed hours and date from the Contracting Officer.
d. Shutoffs which will cause interruption of Government work operations as determined by the Contracting Officer shall be accomplished during regular non-work hours or on non-work days of the Using Agency without any additional cost to the Government.
e. Operation of valves on water mains will be by persons of that utility. Where shutoff of water lines interrupts service to fire hydrants or fire sprinkler systems, the Contractor shall arrange his operations and have sufficient material and personnel available to complete the work without undue delay or to restore service without delay in event of emergency.
f. Flow in gas mains which have been shut off shall not be restored until the Government inspector has determined that all items serviced by the gas line have been shut off.
1.11 NOT USED
1.12 NOT USED
1.13 NOT USED
1.14 NOT USED
1.15 NOT USED
1.16 PROJECT SIGN
Version 2:
a. General. The Contractor shall furnish and erect one project sign at the location directed by the Contracting Officer. The panel sizes and graphic formats have been standardized for visual consistency throughout all Corps operations.
DOCUMENT 00 80 50.00 06 Page 3
b. Materials. Panels are fabricated using HDO plywood with dimensional lumber uprights and bracing.
c. Erection. The signs shall be erected at the designated location(s). Signs shall be plumb and backfill of post holes shall be well tamped to properly support the signs in position throughout the life of the contract.
d. Maintenance. The signs shall be maintained in good condition until completion of the contract, shall remain the property of the Contractor, and shall be removed from the site upon completion of work under the contract.
e. Logos. The Corps of Engineers logo and the local sponsor's logo will be provided by the Contracting Officer.
f. Payment. No separate payment will be made for furnishing and erecting the project signs as specified and costs thereof shall be considered a subsidiary obligation of the Contractor.
1.17 TIME EXTENSIONS FOR UNUSUALLY SEVERE WEATHER
This provision specifies the procedure for the determination of time extensions for unusually severe weather in accordance with the FAR 52.249-10 "Default (Fixed-Price Construction)". Guidance can also be found in ER 415-1-15 , "Construction Time Extensions for Weather". In order for the Contracting Officer to award a time extension under this clause, the following conditions must be satisfied:
a. The weather experienced at the project site during the contract period must be found to be unusually severe, that is, more severe than the adverse weather anticipated for the project location during any given month.
b. Indicate the location of the National Weather Service office closest to the site. See: https://www.weather.gov/srh/nwsoffices The Contractor shall make his own investigations and determinations as to weather conditions at the site. Data may be obtained from various National Weather Service offices located generally at airports of principal cities, the nearest to this project being: Terre Haute.
c. The unusually severe weather must actually cause a delay to the completion of the project. The delay must be beyond the control and without the fault or negligence of the Contractor.
The following schedule of monthly anticipated adverse weather delays is based on National Oceanic and Atmospheric Administration (NOAA) or similar data for the project location and will constitute the base line for monthly weather time evaluations. The Contractor's progress schedule must reflect these anticipated adverse weather delays in weather dependent activities.
MONTHLY ANTICIPATED ADVERSE WEATHER DELAY
WORK DAYS BASED ON (5) DAY WORK WEEK
JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC
10 8 6 5 6 5 4 4 4 4 4 6
DOCUMENT 00 80 50.00 06 Page 4
Upon acknowledgment of the Notice to Proceed (NTP) and continuing throughout the contract, the Contractor will record on the daily CQC report, the occurrence of adverse weather and resultant impact to normally scheduled work. Actual adverse weather delay days must prevent work on critical activities for 50 percent or more of the Contractor's scheduled work day. The number of actual adverse weather delay days shall include days impacted by actual adverse weather (even if adverse weather occurred in previous month), be calculated chronologically from the first to the last day of each month, and be recorded as full days. If the number of actual adverse weather delay days exceeds the number of days anticipated listed above, the Contracting Officer will convert any qualifying delays to calendar days, giving full consideration for equivalent fair weather work days, and issue a modification in accordance with the FAR 52.249-10 "Default (Fixed-Price Construction)".
1.18 NOT USED
1.19 INTERFERENCE WITH TRAFFIC AND PUBLIC AND PRIVATE PROPERTY
a. The Contractor at all times shall dispose his plant and conduct the work in such manner as to cause as little interference as possible with private and public travel. Damage (other than that resulting from normal wear and tear) to roads, shall be repaired to as good a condition as they were prior to the beginning of work and to the satisfaction of the Contracting Officer.
b. The Contractor shall provide and maintain as may be required by the State of Indiana, Department of Transportation, County of Vigo, City of Terre Haute. Contractor shall provide proper barricades, fences, danger signals and lights, provide a sufficient number of watchmen, and take such other precautions as may be necessary to protect life, property and structures, and shall be responsible for all damages to persons or property that occur as a result of the Contractor's fault or negligence in accordance with clause 52.236-7 Permits and Responsibilities, in Section 00 70 00.
c. It is the Contractor's responsibility to coordinate the submittal of all Notices to Airman (NOTAM) with the installation and airfield managers prior to and during Construction as necessary to not impede current airfield operations.
1.20 NOT USED
1.21 GOVERNMENT FIELD OFFICE FACILITIES AND SERVICES
A Government field office facilities is not required for this task order.
1.22 COMPLIANCE WITH POST/BASE REGULATIONS
Refer to the base MATOC contract for compliance requirements that apply to all Military projects located on military installations.
1.23 CONTRACTOR SECURITY TRAINING/FACILITY ACCESS REQUIREMENTS
1). All contractor employees, to include subcontractor employees, shall be briefed on the local iWATCH program (training standards provided by the requiring activity ATO) by the contractor and all associated subcontractors. This local developed training will be used to inform
DOCUMENT 00 80 50.00 06 Page 5 employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR. The training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR. The training shall be completed within 7 calendar days after commencing work on the site with the results reported to the COR NLT 7 calendar days after completion of training.
2). All contractor employees, to include subcontractor employees, shall comply with applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative). The contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by FAR 52.243-4 - Changes of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes.
3). Per AR 530-1 , Operations Security, all contractor employees and associated subcontractor employees must complete Level 1 OPSEC Training within 30 calendar days of commencing work. Additionally, all contractor employees and associated subcontractor employees must complete annual OPSEC awareness training.
4). Refer to FAR 52.222-54: Employment Eligibility Verification in Section 00 70 00 for e-Verify requirements.
1.24 NOT USED
1.25 AVAILABILITY OF SAFETY AND HEALTH REQUIREMENTS MANUAL (EM 385-1-1)
As covered by clause 52.236-13 "Accident Prevention" in Section 00 70 00, compliance with EM 385-1-1 is a requirement for this contract. Copies may be downloaded from the following website:
https://www.publicat…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .