W912QR21R0065_Plans-0003.pdf

PDF 946 KB Posted

Attached to
Replacement of Hot Temperature Hot Water (HTHW) Line D at WPAFB
Solicitation number
W912QR21R0065
Issued by

About this file

This document includes a federal contract opportunity solicitation and related engineering drawings. The U.S. Army Corps of Engineers Louisville District is seeking proposals for a firm-fixed-price contract to replace portions of the existing High-Temperature Hot Water heating system serving multiple facilities at Wright-Patterson Air Force Base in Ohio. The scope of work involves installing new gas-fired boilers and associated piping, valves, controls and equipment to provide heating for 22 buildings, along with demolishing and capping portions of the existing steam and HTHW distribution systems. The contract duration is 730 calendar days with an anticipated value between $5-10 million. Proposals will be evaluated on past performance, technical approach, small business participation, and price using a best value tradeoff process. Discussions are not planned but may be held at the government's discretion. The North American Industry Classification System code is 238220.

The engineering drawings show floor plans and fire alarm plans for several facilities involved in the project work. Details include locations of new and existing mechanical equipment, fire alarm devices, and notes describing scope items like replacing control panels and interfacing new and existing alarm systems.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

A-101R

B1

OFFICE

MEN

HALL

WOMEN

SHOP

PARTS

MECH RM

VEHICLE

SERVICE

BAYS

VEST

PRE-FAB

SHELTER

MECH RM

PRE-FAB

SHELTER

SHOP

MEN

10' - 0"12' - 0"

155155

ALIGN

MIN

2' - 8 1/2"

TYP

PLAN LEGEND

PROJECT AREA

(NO HATCHING)

OUTSIDE OF

PROJECT AREA

A R

C H

IT

E

C T

U R

E E

N G

IN

E

E R

IN

G

G E

O S

P A

T

IA

L

SHEET KEYNOTES:

1 2 3 4 5

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

B

Y

S

IZ

E

F

IL

E N

A M

E

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

C K

E C

K E

D B

Y

US Army Corps of

Engineers ®

A N

S I

'D

D

C

B

A

F

IL

E N

U M

B E

R

SHEET ID

B

IM

W P

A F

B

H T

H W

L in e D

/0 B

L D

G A

R C

H R

.r vt

/1

/2

:1 :3

A

M W R

IG

H

T -P

A T

T E

R S

O N

A

IR

F O

R C

E B

A S

E

W P

A F

B

O H

IO

R

E P

A

IR

S T

E A

M

H T

H W

L

IN

E D

P

H A

S E

I

(B U

IL

D

IN

G

P N

Z H

T V

F

Y P

JU

N

E

LOUISVILLE DISTRICT

J.

E

L D

E R

G

R O

D D

Y

J.

E

L D

E R

B L

D G

A

R C

H

R

.r vt

A-101R

L O

U

IS

V

IL

L E

D

IS

T R

IC

T

L O

U

IS

V

IL

L E

K

E N

T U

C K

Y

J.

S

T E

W A

R T

F A

C

IL

IT

Y

F

L O

O R

P L A

N S

CERTIFIED FINAL - JUNE 2021

30151

PLAN NORTH

101 SEE MECHANICAL AND PLUMBING DRAWINGS FOR NEW

MECHANICAL EQUIPMENT. SEE ELECTRICAL DRAWINGS

FOR EXIT SIGNS, LIGHTING & EMERGENCY LIGHTING

(WHERE APPLICABLE). SEE LIFE SAFETY DRAWINGS FOR

FIRE EXTINGUISHERS (WHERE APPLICABLE).

112 APPROXIMATE LOCATION WHERE EXISTING STEAM LINES

ENTER BUILDING. REFERENCE ONLY.

116 PREPARE CONCRETE FLOOR AND CONCRETE PADS AND

APPLY CLEAN COATING SURFACE SYSTEM TO FLOORS AND

TO ENTIRE SURFACE OF ALL (NEW AND EXISTING)

CONCRETE PADS, ONLY IN ROOMS NOTED. SEE

SPECIFICATIONS SECTION 096723.

139 SEE MECHANICAL DRAWINGS FOR WORK IN THIS ROOM.

140 MAINTAIN NON-RATED SMOKE PARTITION(S). FIRESTOP OR

SEAL NEW AND EXISTING PENETRATIONS TO RESTRICT THE

PASSAGE OF SMOKE. REFER TO LIFE SAFETY DRAWINGS.

153 PRE-FABRICATED METAL BOILER SHELTER WITH 2"

STUDS/JOISTS WITH EXPANDED POLYSTRENE (EPS)

INSULATION (MINIMUM INSULATION VALUE OF R10). SIZE AS

SHOWN WITH CLEAR HEIGHT OF 10'-0". INSTALLED ON

CONCRETE PAD. SEE STRUCTURAL DRAWINGS. ANCHOR

SHELTER TO PAD PER MFR INSTRUCTIONS. BASIS FOR

DESIGN: C-TYPE METAL SHELTER FROM LONE*STAR

SHELTER MANUFACTURING. CONTRACTOR SHALL CONFIRM

BUILDING IDENTIFICATION NUMBER WITH CONTRACTING

OFFICER.

154 PRE-FABRICATED METAL 6'-0" WIDE DOUBLE SHELTER

DOOR, PER MFR INSTRUCTIONS. LOCKING HARDWARE

SHALL BE PROVIDED.

155 NEW GAS-FIRED BOILER UNIT(S) WITH CONCRETE PAD.

CONCRETE PADS TO EXTEND 6" BEYOND EACH SIDE OF

BOILER/FURNACE UNIT AND BE 4" HIGH. SEE MECHANICAL

DRAWINGS.

171 PRE-FABRICATED METAL 3'-0" WIDE SINGLE SHELTER DOOR,

PER MFR INSTRUCTIONS. LOCKING HARDWARE SHALL BE

PROVIDED.

173 EXISTING CONCRETE (OR CMU) WALLS TO BE PATCHED IN

KIND (INTERIOR AND EXTERIOR) WHERE STEAM PIPING HAS

BEEN REMOVED. PAINT TO MATCH EXISTING FINISH. SEE

DETAIL A1 / A-501.

701 APPROXIMATE LOCATION OF NEW NATURAL GAS SERVICE

METER AND REGULATOR SETTING. SEE MECHANICAL AND

PLUMBING DRAWINGS.

1/8" = 1'-0"A1

FACILITY 30151 - OVERALL FIRST FLOOR PLAN

KEY PLAN - AREA A

30151

4'0 8' 16'

1/4" = 1'-0"B1

ENLARGED PLAN MECH RM 101 & BOILER SHELTER 102

PLAN NORTH

0 2' 4' 8'

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E A

P P

R

A m d t

D a te

A m d t

D a te

W

2Q R

R

-0

FA101H

C1

FA101H

C3

GARAGE

MECH RM

MECH RM

GARAGE

701702

CO

912 912 912

912912

912 912

OUTDOOR STO.

OUTDOOR STO.

FACP

E

CO

MECH RM

CO

S

RTS

CO

CO

MECH RM

S

RTS

FIRE ALARM LEGEND

PROJECT AREA

(NO HATCHING)

OUTSIDE OF

PROJECT AREA

NEW CARBON MONOXIDE

(CO) DETECTORCO

S

RTS

NEW DUCT SMOKE

DETECTOR

NEW DUCT SMOKE

DETECTOR REMOTE TEST

AND INDICATOR

FIRE ALARM CONTROL PANEL

E = EXISTING

FACP

A R

C H

IT

E

C T

U R

E E

N G

IN

E

E R

IN

G

G E

O S

P A

T

IA

L

SHEET KEYNOTES:

1 2 3 4 5

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

B

Y

S

IZ

E

F

IL

E N

A M

E

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

LI

C

IT

A

T

IO

N N

O

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

C K

E C

K E

D B

Y

US Army Corps of

Engineers ®

A N

S I '

D

D

C

B

A

F

IL

E N

U M

B E

R

SHEET ID

B

IM

6 0

W

P A

F B

H

T H

W L in e

D /0

8 0

B

LD

G

_3 0 0

_M

E P

F _R

2 0 .r vt

8/

/2

:3 9:

A

M W R

IG

H

T -P

A T

T E

R S

O N

A

IR

F O

R C

E B

A S

E

W P

A F

B

O H

IO

R

E P

A

IR

S T

E A

M

H T

H W

L

IN

E D

P

H A

S E

I I)

(B U

IL

D

IN

G

P N

Z H

T V

F

Y P

JU

N

E

W

2Q R

-X X

-X -X

X X

X

W

2Q R

-X X

-X -X

X X

X

LOUISVILLE DISTRICT

J.

M

U S

G R

O V

E

P . B

U T

T

J.

M

U S

G R

O V

E

FA101H

LO

U

IS

V

IL

LE

D

IS

T R

IC

T

LO

U

IS

V

IL

LE

, K E

N T

U C

K Y

J.

Z

IM

M

E R

M A

N

F A

C

IL

IT

Y

F

IR

E

A L A

R M

P L A

N

CERTIFIED FINAL - JUNE 2021

30029

KEY PLAN - AREA A

30029

SCALE : 1/16" = 1'-0"A1 FACILITY 30029 - OVERALL FIRE ALARM PLAN

PLAN NORTH

0 8' 16' 32'

SCALE : 1/4" = 1'-0"C1 ENLARGED MECHANICAL RM 102

SCALE : 1/8" = 1'-0"C3 ENLARGED MECHANICAL RM 103

PLAN NORTH

0 2' 4' 8'

PLAN NORTH

0 2' 4' 8'

APPLICABLE CODES AND STANDARDS

• UFC 3-600-01, FIRE PROTECTION ENGINEERING FOR FACILITIES

(CHANGE 5, 24 SEPTEMBER 2020)

• NFPA 70, NATIONAL ELECTRIC CODE (2020)

• NFPA 72, NATIONAL FIRE ALARM AND SIGNALING CODE (2019)

FIRE ALARM SHEET NOTES

1. THE LAYOUT OF DEVICES, APPLIANCES, AND OTHER SYSTEM

COMPONENTS ON THESE DRAWINGS SHOWS THE MINIMUM

NUMBER OF COMPONENTS. THE CONTRACTOR IS RESPONSIBLE

FOR PROVIDING ADDITIONAL SYSTEM COMPONENTS AS

REQUIRED TO COMPLY WITH THE APPLICABLE CODES,

STANDARDS, PROJECT SPECIFICATIONS, AND DESIGN CRITERIA.

2. CONTRACTOR SHALL RETAIN THE SERVICES OF A QUALIFIED

FIRE PROTECTION ENGINEER (QFPE), AS REQUIRED IN

SPECIFICATION SECTION 28 31 76. THE QUALIFIED FIRE

PROTECTION ENGINEER (QFPE) SHALL REVIEW AND APPROVE

ALL SHOP DRAWINGS AND SUBMITTAL INFORMATION PRIOR TO

SUBMITTAL TO THE GOVERNMENT. THE QUALIFIED FIRE

PROTECTION ENGINEER (QFPE) SHALL WITNESS ALL

PRELIMINARY AND FINAL TESTING AND SHALL SIGN THE

TESTING REPORTS. SEE SECTION 28 31 76 FOR ADDITIONAL

SUBMITTAL AND TESTING REQUIREMENTS.

3. CONTRACTOR SHALL SUBMIT AS-BUILT DRAWINGS SHOWING

FINAL SYSTEM CONFIGURATION DURING PROJECT CLOSEOUT.

THE SCOPE OF THE AS-BUILT DRAWINGS SHALL BE LIMITED TO

THE PROJECT AREA AND SHALL INCLUDE ANY MODIFICATIONS

MADE TO THE EXISTING SYSTEM UNDER THIS CONTRACT.

701 NO FIRE ALARM SYSTEM WORK REQUIRED IN PROJECT AREA.

EXISTING HEAT DETECTION AND ALARM NOTIFICATION

APPLIANCES TO REMAIN.

702 CARBON MONOXIDE DETECTION NOT REQUIRED IN PROJECT

AREA AS LARGE OPEN SPACE WITH CEILING HEIGHT

GREATER THAN 12 FEET PER UFC 3-600-01, 9-19.2.3.

707 EXISTING FIRE ALARM NOTIFICATION APPLIANCES TO REMAIN

IN PROJECT AREA.

717 REPLACE EXISTING FIRE ALARM CONTROL PANEL WITH A

NEW ADDRESSABLE FIRE ALARM CONTROL PANEL.

INTERFACE ALL NEW AND EXISTING INITIATING AND/OR

INDICATING DEVICES INTO NEW FIRE ALARM CONTROL

PANEL. PROVIDE MONITOR OR CONTROL MODULES AS

NECCESSARY.

912 THIS AREA IS CONSIDERED PART OF THE PROJECT AREA

ONLY AS SUPPORT FOR THE WORK OCCURING WHERE

MECHANICAL EQUIPMENT IS BEING PROVIDED AT OTHER

LOCATIONS IN THE BUILDING. EVALUATIONS OF LIFE SAFETY,

FIRE ALARM AND OR FIRE SUPPRESSION SYSTEMS ARE NOT

BEING PROVIDED UNDER THIS SCOPE OF WORK.

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E A

P P

R

A m en dm e n t 0

.1 2.

W

2Q R

R

-0

COCO

S

S

RTS

RTS

MECH RM

FIRE ALARM LEGEND

PROJECT AREA

(NO HATCHING)

OUTSIDE OF

PROJECT AREA

NEW CARBON MONOXIDE (CO)

DETECTOR

CO

FIRE ALARM CONTROL PANEL

E = EXISTING

FACP

S

RTS

NEW DUCT SMOKE

DETECTOR

NEW DUCT SMOKE

DETECTOR REMOTE TEST

AND INDICATOR

A R

C H

IT

E

C T

U R

E E

N G

IN

E

E R

IN

G

G E

O S

P A

T

IA

L

SHEET KEYNOTES:

1 2 3 4 5

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

B

Y

S

IZ

E

F

IL

E N

A M

E

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

LI

C

IT

A

T

IO

N N

O

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

C K

E C

K E

D B

Y

US Army Corps of

Engineers ®

A N

S I '

D

D

C

B

A

F

IL

E N

U M

B E

R

SHEET ID

B

IM

6 0

W

P A

F B

H

T H

W L in e

D /0

8 0

B

LD

G

_3 0 1

_M

E P

F _R

2 0 .r vt

8/

/2

:4 0:

A

M W R

IG

H

T -P

A T

T E

R S

O N

A

IR

F O

R C

E B

A S

E

W P

A F

B

O H

IO

R

E P

A

IR

S T

E A

M

H T

H W

L

IN

E D

P

H A

S E

I I)

(B U

IL

D

IN

G

P N

Z H

T V

F

Y P

JU

N

E

W

2Q R

-X X

-X -X

X X

X

W

2Q R

-X X

-X -X

X X

X

LOUISVILLE DISTRICT

J.

M

U S

G R

O V

E

P . B

U T

T

J.

M

U S

G R

O V

E

FA101N

LO

U

IS

V

IL

LE

D

IS

T R

IC

T

LO

U

IS

V

IL

LE

, K E

N T

U C

K Y

J.

Z

IM

M

E R

M A

N

F A

C

IL

IT

Y

F

IR

E

A L A

R M

P L A

N

CERTIFIED FINAL - JUNE 2021

30138

KEY PLAN - AREA A

30138

SCALE : 1/8" = 1'-0"A1 FACILITY 30138 - FIRE ALARM PLAN

PLAN NORTH

4'0 8' 16'

708 EXISTING FIRE ALARM INITIATING DEVICES TO REMAIN IN

PROJECT AREA.

717 REPLACE EXISTING FIRE ALARM CONTROL PANEL WITH A NEW

ADDRESSABLE FIRE ALARM CONTROL PANEL. INTERFACE ALL

NEW AND EXISTING INITIATING AND/OR INDICATING DEVICES INTO

NEW FIRE ALARM CONTROL PANEL. PROVIDE MONITOR OR

CONTROL MODULES AS NECCESSARY.

APPLICABLE CODES AND STANDARDS

• UFC 3-600-01, FIRE PROTECTION ENGINEERING FOR FACILITIES

(CHANGE 5, 20 AUGUST 2020)

• NFPA 70, NATIONAL ELECTRIC CODE (2020)

• NFPA 72, NATIONAL FIRE ALARM AND SIGNALING CODE (2019)

FIRE ALARM SHEET NOTES

1. THE LAYOUT OF DEVICES, APPLIANCES, AND OTHER SYSTEM

COMPONENTS ON THESE DRAWINGS SHOWS THE MINIMUM

NUMBER OF COMPONENTS. THE CONTRACTOR IS RESPONSIBLE

FOR PROVIDING ADDITIONAL SYSTEM COMPONENTS AS

REQUIRED TO COMPLY WITH THE APPLICABLE CODES,

STANDARDS, PROJECT SPECIFICATIONS, AND DESIGN CRITERIA.

2. CONTRACTOR SHALL RETAIN THE SERVICES OF A QUALIFIED

FIRE PROTECTION ENGINEER (QFPE), AS REQUIRED IN

SPECIFICATION SECTION 28 31 76. THE QUALIFIED FIRE

PROTECTION ENGINEER (QFPE) SHALL REVIEW AND APPROVE

ALL SHOP DRAWINGS AND SUBMITTAL INFORMATION PRIOR TO

SUBMITTAL TO THE GOVERNMENT. THE QUALIFIED FIRE

PROTECTION ENGINEER (QFPE) SHALL WITNESS ALL

PRELIMINARY AND FINAL TESTING AND SHALL SIGN THE

TESTING REPORTS. SEE SECTION 28 31 76 FOR ADDITIONAL

SUBMITTAL AND TESTING REQUIREMENTS.

3. CONTRACTOR SHALL SUBMIT AS-BUILT DRAWINGS SHOWING

FINAL SYSTEM CONFIGURATION DURING PROJECT CLOSEOUT.

THE SCOPE OF THE AS-BUILT DRAWINGS SHALL BE LIMITED TO

THE PROJECT AREA AND SHALL INCLUDE ANY MODIFICATIONS

MADE TO THE EXISTING SYSTEM UNDER THIS CONTRACT.

SUMMARY OF EXISTING FIRE ALARM SYSTEM

CONTROL PANEL TYPE: AUTOCALL

CONNECTION TO THE EXISTING REPORTING SYSTEM

1. EXISTING FIRE ALARM SYSTEM REPORTING SHALL REMAIN

2. CARBON MONOXIDE (CO) ALARM AND TROUBLE SIGNALS

SHALL BE TRANSMITTED TO THE BASE FIRE DEPARTMENT

CENTRAL REPORTING STATION AS SEPARATE ZONES.

PROVIDE TWO NEW SETS OF CONTACTS IN THE FIRE

ALARM CONTROL PANEL; OPEN FOR THE CO ALARM AND

CLOSED FOR THE CO TROUBLE/SUPERVISORY. PROVIDE

DEDICATED CONDUCTORS FROM THE FIRE ALARM

CONTROL PANEL TO THE SAME COMMUNICATIONS ROOM

WHERE EXISTING FIRE ALARM SIGNALS ARE TRANSMITTED.

CONTRACTOR SHALL ACQUIRE DEDICATED PHONE LINE

CONNECTIONS TO THE BASE FIRE DEPARTMENT CENTRAL

REPORTING STATION. CONTRACTOR SHALL COORDINATE

PHONE LINE CONNECTIONS WITH BASE COMMUNICATIONS

DEPARTMENT. CONTRACTOR SHALL ALSO COORDINATE

PROGRAMMING OF THE CENTRAL REPORTING

STATIONWITH THE FIRE DEPARTMENT CENTRAL

REPORTING STATION.

FACP

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E A

P P

R

A m en dm e n t

.0 6.

A m en dm e n t 0

.1 2.

A m en dm e n t 0

W

2Q R

R

-0

F A

C P

E

CO

SECURE STORAGE

Space

MECH RM

Space

FIRE ALARM LEGEND

PROJECT AREA

(NO HATCHING)

OUTSIDE OF

PROJECT AREA

NEW CARBON MONOXIDE

(CO) DETECTORCO

FIRE ALARM CONTROL PANEL

E = EXISTING

FACP

A R

C H

IT

E

C T

U R

E E

N G

IN

E

E R

IN

G

G E

O S

P A

T

IA

L

SHEET KEYNOTES:

1 2 3 4 5

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

B

Y

S

IZ

E

F

IL

E N

A M

E

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

LI

C

IT

A

T

IO

N N

O

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

C K

E C

K E

D B

Y

US Army Corps of

Engineers ®

A N

S I '

D

D

C

B

A

F

IL

E N

U M

B E

R

SHEET ID

B

IM

6 0

W

P A

F B

H

T H

W L in e

D /0

8 0

B

LD

G

_3 0 1

_M

E P

F _R

2 0 .r vt

8/

/2

:4 0:

A

M W R

IG

H

T -P

A T

T E

R S

O N

A

IR

F O

R C

E B

A S

E

W P

A F

B

O H

IO

R

E P

A

IR

S T

E A

M

H T

H W

L

IN

E D

P

H A

S E

I

(B U

IL

D

IN

G

P N

Z H

T V

F

Y P

JU

N

E

W

2Q R

-X X

-X -X

X X

X

W

2Q R

-X X

-X -X

X X

X

LOUISVILLE DISTRICT

J.

M

U S

G R

O V

E

P . B

U T

T

J.

M

U S

G R

O V

E

FA101O

LO

U

IS

V

IL

LE

D

IS

T R

IC

T

LO

U

IS

V

IL

LE

, K E

N T

U C

K Y

J.

Z

IM

M

E R

M A

N

F A

C

IL

IT

Y

F

IR

E

A L A

R M

P L A

N

CERTIFIED FINAL - JUNE 2021

30140

KEY PLAN - AREA A

30140

PLAN NORTH

4'0 8' 16'SCALE : 1/8" = 1'-0"A2 FACILITY 30140 - FIRE ALARM PLAN

APPLICABLE CODES AND STANDARDS

• UFC 3-600-01, FIRE PROTECTION ENGINEERING FOR FACILITIES

(CHANGE 5, 24 SEPTEMBER 2020)

• NFPA 70, NATIONAL ELECTRIC CODE (2020)

• NFPA 72, NATIONAL FIRE ALARM AND SIGNALING CODE (2019)

FIRE ALARM SHEET NOTES

1. THE LAYOUT OF DEVICES, APPLIANCES, AND OTHER SYSTEM

COMPONENTS ON THESE DRAWINGS SHOWS THE MINIMUM

NUMBER OF COMPONENTS. THE CONTRACTOR IS RESPONSIBLE

FOR PROVIDING ADDITIONAL SYSTEM COMPONENTS AS

REQUIRED TO COMPLY WITH THE APPLICABLE CODES,

STANDARDS, PROJECT SPECIFICATIONS, AND DESIGN CRITERIA.

2. CONTRACTOR SHALL RETAIN THE SERVICES OF A QUALIFIED

FIRE PROTECTION ENGINEER (QFPE), AS REQUIRED IN

SPECIFICATION SECTION 28 31 76. THE QUALIFIED FIRE

PROTECTION ENGINEER (QFPE) SHALL REVIEW AND APPROVE

ALL SHOP DRAWINGS AND SUBMITTAL INFORMATION PRIOR TO

SUBMITTAL TO THE GOVERNMENT. THE QUALIFIED FIRE

PROTECTION ENGINEER (QFPE) SHALL WITNESS ALL

PRELIMINARY AND FINAL TESTING AND SHALL SIGN THE

TESTING REPORTS. SEE SECTION 28 31 76 FOR ADDITIONAL

SUBMITTAL AND TESTING REQUIREMENTS.

3. CONTRACTOR SHALL SUBMIT AS-BUILT DRAWINGS SHOWING

FINAL SYSTEM CONFIGURATION DURING PROJECT CLOSEOUT.

THE SCOPE OF THE AS-BUILT DRAWINGS SHALL BE LIMITED TO

THE PROJECT AREA AND SHALL INCLUDE ANY MODIFICATIONS

MADE TO THE EXISTING SYSTEM UNDER THIS CONTRACT.

SUMMARY OF EXISTING FIRE ALARM SYSTEM

CONTROL PANEL TYPE: SIMPLEX 4002

CONNECTION TO THE EXISTING REPORTING SYSTEM

1. EXISTING FIRE ALARM SYSTEM REPORTING SHALL REMAIN

2. CARBON MONOXIDE (CO) ALARM AND TROUBLE SIGNALS

SHALL BE TRANSMITTED TO THE BASE FIRE DEPARTMENT

CENTRAL REPORTING STATION AS SEPARATE ZONES.

PROVIDE TWO NEW SETS OF CONTACTS IN THE FIRE

ALARM CONTROL PANEL; OPEN FOR THE CO ALARM AND

CLOSED FOR THE CO TROUBLE/SUPERVISORY. PROVIDE

DEDICATED CONDUCTORS FROM THE FIRE ALARM

CONTROL PANEL TO THE SAME COMMUNICATIONS ROOM

WHERE EXISTING FIRE ALARM SIGNALS ARE TRANSMITTED.

CONTRACTOR SHALL ACQUIRE DEDICATED PHONE LINE

CONNECTIONS TO THE BASE FIRE DEPARTMENT CENTRAL

REPORTING STATION. CONTRACTOR SHALL COORDINATE

PHONE LINE CONNECTIONS WITH BASE COMMUNICATIONS

DEPARTMENT. CONTRACTOR SHALL ALSO COORDINATE

PROGRAMMING OF THE CENTRAL REPORTING

STATIONWITH THE FIRE DEPARTMENT CENTRAL

REPORTING STATION.

704 EXISTING FIRE ALARM INITIATING DEVICES AND NOTIFICATION

APPLIANCES TO REMAIN IN PROJECT AREA.

717 REPLACE EXISTING FIRE ALARM CONTROL PANEL WITH A NEW

ADDRESSABLE FIRE ALARM CONTROL PANEL. INTERFACE ALL

NEW AND EXISTING INITIATING AND/OR INDICATING DEVICES

INTO NEW FIRE ALARM CONTROL PANEL. PROVIDE MONITOR

OR CONTROL MODULES AS NECCESSARY.

912 THIS AREA IS CONSIDERED PART OF THE PROJECT AREA

ONLY AS SUPPORT FOR THE WORK OCCURING WHERE

MECHANICAL EQUIPMENT IS BEING PROVIDED AT OTHER

LOCATIONS IN THE BUILDING. EVALUATIONS OF LIFE SAFETY,

FIRE ALARM AND OR FIRE SUPPRESSION SYSTEMS ARE NOT

BEING PROVIDED UNDER THIS SCOPE OF WORK.

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E A

P P

R

A m en dm e n t 0

.1 2.

W

2Q R

R

-0

Sheets
A-101R - FACILITY 30151 FLOOR PLANS
FA101H - FACILITY 30029 - OVERALL FIRE ALARM PLAN
FA101N - FACILITY 30138 - FIRE ALARM PLAN
FA101O - FACILITY 30140 - FIRE ALARM PLAN
FA101H - FACILITY 30029 - OVERALL FIRE ALARM PLAN
FA101N - FACILITY 30138 - FIRE ALARM PLAN
FA101O - FACILITY 30140 - FIRE ALARM PLAN