This document includes a federal contract opportunity solicitation and related engineering drawings. The U.S. Army Corps of Engineers Louisville District is seeking proposals for a firm-fixed-price contract to replace portions of the existing High-Temperature Hot Water heating system serving multiple facilities at Wright-Patterson Air Force Base in Ohio. The scope of work involves installing new gas-fired boilers and associated piping, valves, controls and equipment to provide heating for 22 buildings, along with demolishing and capping portions of the existing steam and HTHW distribution systems. The contract duration is 730 calendar days with an anticipated value between $5-10 million. Proposals will be evaluated on past performance, technical approach, small business participation, and price using a best value tradeoff process. Discussions are not planned but may be held at the government's discretion. The North American Industry Classification System code is 238220.
The engineering drawings show floor plans and fire alarm plans for several facilities involved in the project work. Details include locations of new and existing mechanical equipment, fire alarm devices, and notes describing scope items like replacing control panels and interfacing new and existing alarm systems.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
A-101R
B1
OFFICE
MEN
HALL
WOMEN
SHOP
PARTS
MECH RM
VEHICLE
SERVICE
BAYS
VEST
PRE-FAB
SHELTER
MECH RM
PRE-FAB
SHELTER
SHOP
MEN
10' - 0"12' - 0"
155155
ALIGN
MIN
2' - 8 1/2"
TYP
PLAN LEGEND
PROJECT AREA
(NO HATCHING)
OUTSIDE OF
PROJECT AREA
A R
C H
IT
E
C T
U R
E E
N G
IN
E
E R
IN
G
G E
O S
P A
T
IA
L
SHEET KEYNOTES:
1 2 3 4 5
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
B
Y
S
IZ
E
F
IL
E N
A M
E
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
C K
E C
K E
D B
Y
US Army Corps of
Engineers ®
A N
S I
'D
D
C
B
A
F
IL
E N
U M
B E
R
SHEET ID
B
IM
W P
A F
B
H T
H W
L in e D
/0 B
L D
G A
R C
H R
.r vt
/1
/2
:1 :3
A
M W R
IG
H
T -P
A T
T E
R S
O N
A
IR
F O
R C
E B
A S
E
W P
A F
B
O H
IO
R
E P
A
IR
S T
E A
M
H T
H W
L
IN
E D
P
H A
S E
I
(B U
IL
D
IN
G
P N
Z H
T V
F
Y P
JU
N
E
LOUISVILLE DISTRICT
J.
E
L D
E R
G
R O
D D
Y
J.
E
L D
E R
B L
D G
A
R C
H
R
.r vt
A-101R
L O
U
IS
V
IL
L E
D
IS
T R
IC
T
L O
U
IS
V
IL
L E
K
E N
T U
C K
Y
J.
S
T E
W A
R T
F A
C
IL
IT
Y
F
L O
O R
P L A
N S
CERTIFIED FINAL - JUNE 2021
30151
PLAN NORTH
101 SEE MECHANICAL AND PLUMBING DRAWINGS FOR NEW
MECHANICAL EQUIPMENT. SEE ELECTRICAL DRAWINGS
FOR EXIT SIGNS, LIGHTING & EMERGENCY LIGHTING
(WHERE APPLICABLE). SEE LIFE SAFETY DRAWINGS FOR
FIRE EXTINGUISHERS (WHERE APPLICABLE).
112 APPROXIMATE LOCATION WHERE EXISTING STEAM LINES
ENTER BUILDING. REFERENCE ONLY.
116 PREPARE CONCRETE FLOOR AND CONCRETE PADS AND
APPLY CLEAN COATING SURFACE SYSTEM TO FLOORS AND
TO ENTIRE SURFACE OF ALL (NEW AND EXISTING)
CONCRETE PADS, ONLY IN ROOMS NOTED. SEE
SPECIFICATIONS SECTION 096723.
139 SEE MECHANICAL DRAWINGS FOR WORK IN THIS ROOM.
140 MAINTAIN NON-RATED SMOKE PARTITION(S). FIRESTOP OR
SEAL NEW AND EXISTING PENETRATIONS TO RESTRICT THE
PASSAGE OF SMOKE. REFER TO LIFE SAFETY DRAWINGS.
153 PRE-FABRICATED METAL BOILER SHELTER WITH 2"
STUDS/JOISTS WITH EXPANDED POLYSTRENE (EPS)
INSULATION (MINIMUM INSULATION VALUE OF R10). SIZE AS
SHOWN WITH CLEAR HEIGHT OF 10'-0". INSTALLED ON
CONCRETE PAD. SEE STRUCTURAL DRAWINGS. ANCHOR
SHELTER TO PAD PER MFR INSTRUCTIONS. BASIS FOR
DESIGN: C-TYPE METAL SHELTER FROM LONE*STAR
SHELTER MANUFACTURING. CONTRACTOR SHALL CONFIRM
BUILDING IDENTIFICATION NUMBER WITH CONTRACTING
OFFICER.
154 PRE-FABRICATED METAL 6'-0" WIDE DOUBLE SHELTER
DOOR, PER MFR INSTRUCTIONS. LOCKING HARDWARE
SHALL BE PROVIDED.
155 NEW GAS-FIRED BOILER UNIT(S) WITH CONCRETE PAD.
CONCRETE PADS TO EXTEND 6" BEYOND EACH SIDE OF
BOILER/FURNACE UNIT AND BE 4" HIGH. SEE MECHANICAL
DRAWINGS.
171 PRE-FABRICATED METAL 3'-0" WIDE SINGLE SHELTER DOOR,
PER MFR INSTRUCTIONS. LOCKING HARDWARE SHALL BE
PROVIDED.
173 EXISTING CONCRETE (OR CMU) WALLS TO BE PATCHED IN
KIND (INTERIOR AND EXTERIOR) WHERE STEAM PIPING HAS
BEEN REMOVED. PAINT TO MATCH EXISTING FINISH. SEE
DETAIL A1 / A-501.
701 APPROXIMATE LOCATION OF NEW NATURAL GAS SERVICE
METER AND REGULATOR SETTING. SEE MECHANICAL AND
PLUMBING DRAWINGS.
1/8" = 1'-0"A1
FACILITY 30151 - OVERALL FIRST FLOOR PLAN
KEY PLAN - AREA A
30151
4'0 8' 16'
1/4" = 1'-0"B1
ENLARGED PLAN MECH RM 101 & BOILER SHELTER 102
PLAN NORTH
0 2' 4' 8'
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E A
P P
R
A m d t
D a te
A m d t
D a te
W
2Q R
R
-0
FA101H
C1
FA101H
C3
GARAGE
MECH RM
MECH RM
GARAGE
701702
CO
912 912 912
912912
912 912
OUTDOOR STO.
OUTDOOR STO.
FACP
E
CO
MECH RM
CO
S
RTS
CO
CO
MECH RM
S
RTS
FIRE ALARM LEGEND
PROJECT AREA
(NO HATCHING)
OUTSIDE OF
PROJECT AREA
NEW CARBON MONOXIDE
(CO) DETECTORCO
S
RTS
NEW DUCT SMOKE
DETECTOR
NEW DUCT SMOKE
DETECTOR REMOTE TEST
AND INDICATOR
FIRE ALARM CONTROL PANEL
E = EXISTING
FACP
A R
C H
IT
E
C T
U R
E E
N G
IN
E
E R
IN
G
G E
O S
P A
T
IA
L
SHEET KEYNOTES:
1 2 3 4 5
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
B
Y
S
IZ
E
F
IL
E N
A M
E
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
LI
C
IT
A
T
IO
N N
O
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
C K
E C
K E
D B
Y
US Army Corps of
Engineers ®
A N
S I '
D
D
C
B
A
F
IL
E N
U M
B E
R
SHEET ID
B
IM
6 0
W
P A
F B
H
T H
W L in e
D /0
8 0
B
LD
G
_3 0 0
_M
E P
F _R
2 0 .r vt
8/
/2
:3 9:
A
M W R
IG
H
T -P
A T
T E
R S
O N
A
IR
F O
R C
E B
A S
E
W P
A F
B
O H
IO
R
E P
A
IR
S T
E A
M
H T
H W
L
IN
E D
P
H A
S E
I I)
(B U
IL
D
IN
G
P N
Z H
T V
F
Y P
JU
N
E
W
2Q R
-X X
-X -X
X X
X
W
2Q R
-X X
-X -X
X X
X
LOUISVILLE DISTRICT
J.
M
U S
G R
O V
E
P . B
U T
T
J.
M
U S
G R
O V
E
FA101H
LO
U
IS
V
IL
LE
D
IS
T R
IC
T
LO
U
IS
V
IL
LE
, K E
N T
U C
K Y
J.
Z
IM
M
E R
M A
N
F A
C
IL
IT
Y
F
IR
E
A L A
R M
P L A
N
CERTIFIED FINAL - JUNE 2021
30029
KEY PLAN - AREA A
30029
SCALE : 1/16" = 1'-0"A1 FACILITY 30029 - OVERALL FIRE ALARM PLAN
PLAN NORTH
0 8' 16' 32'
SCALE : 1/4" = 1'-0"C1 ENLARGED MECHANICAL RM 102
SCALE : 1/8" = 1'-0"C3 ENLARGED MECHANICAL RM 103
PLAN NORTH
0 2' 4' 8'
PLAN NORTH
0 2' 4' 8'
APPLICABLE CODES AND STANDARDS
• UFC 3-600-01, FIRE PROTECTION ENGINEERING FOR FACILITIES
(CHANGE 5, 24 SEPTEMBER 2020)
• NFPA 70, NATIONAL ELECTRIC CODE (2020)
• NFPA 72, NATIONAL FIRE ALARM AND SIGNALING CODE (2019)
FIRE ALARM SHEET NOTES
1. THE LAYOUT OF DEVICES, APPLIANCES, AND OTHER SYSTEM
COMPONENTS ON THESE DRAWINGS SHOWS THE MINIMUM
NUMBER OF COMPONENTS. THE CONTRACTOR IS RESPONSIBLE
FOR PROVIDING ADDITIONAL SYSTEM COMPONENTS AS
REQUIRED TO COMPLY WITH THE APPLICABLE CODES,
STANDARDS, PROJECT SPECIFICATIONS, AND DESIGN CRITERIA.
2. CONTRACTOR SHALL RETAIN THE SERVICES OF A QUALIFIED
FIRE PROTECTION ENGINEER (QFPE), AS REQUIRED IN
SPECIFICATION SECTION 28 31 76. THE QUALIFIED FIRE
PROTECTION ENGINEER (QFPE) SHALL REVIEW AND APPROVE
ALL SHOP DRAWINGS AND SUBMITTAL INFORMATION PRIOR TO
SUBMITTAL TO THE GOVERNMENT. THE QUALIFIED FIRE
PROTECTION ENGINEER (QFPE) SHALL WITNESS ALL
PRELIMINARY AND FINAL TESTING AND SHALL SIGN THE
TESTING REPORTS. SEE SECTION 28 31 76 FOR ADDITIONAL
SUBMITTAL AND TESTING REQUIREMENTS.
3. CONTRACTOR SHALL SUBMIT AS-BUILT DRAWINGS SHOWING
FINAL SYSTEM CONFIGURATION DURING PROJECT CLOSEOUT.
THE SCOPE OF THE AS-BUILT DRAWINGS SHALL BE LIMITED TO
THE PROJECT AREA AND SHALL INCLUDE ANY MODIFICATIONS
MADE TO THE EXISTING SYSTEM UNDER THIS CONTRACT.
701 NO FIRE ALARM SYSTEM WORK REQUIRED IN PROJECT AREA.
EXISTING HEAT DETECTION AND ALARM NOTIFICATION
APPLIANCES TO REMAIN.
702 CARBON MONOXIDE DETECTION NOT REQUIRED IN PROJECT
AREA AS LARGE OPEN SPACE WITH CEILING HEIGHT
GREATER THAN 12 FEET PER UFC 3-600-01, 9-19.2.3.
707 EXISTING FIRE ALARM NOTIFICATION APPLIANCES TO REMAIN
IN PROJECT AREA.
717 REPLACE EXISTING FIRE ALARM CONTROL PANEL WITH A
NEW ADDRESSABLE FIRE ALARM CONTROL PANEL.
INTERFACE ALL NEW AND EXISTING INITIATING AND/OR
INDICATING DEVICES INTO NEW FIRE ALARM CONTROL
PANEL. PROVIDE MONITOR OR CONTROL MODULES AS
NECCESSARY.
912 THIS AREA IS CONSIDERED PART OF THE PROJECT AREA
ONLY AS SUPPORT FOR THE WORK OCCURING WHERE
MECHANICAL EQUIPMENT IS BEING PROVIDED AT OTHER
LOCATIONS IN THE BUILDING. EVALUATIONS OF LIFE SAFETY,
FIRE ALARM AND OR FIRE SUPPRESSION SYSTEMS ARE NOT
BEING PROVIDED UNDER THIS SCOPE OF WORK.
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E A
P P
R
A m en dm e n t 0
.1 2.
W
2Q R
R
-0
COCO
S
S
RTS
RTS
MECH RM
FIRE ALARM LEGEND
PROJECT AREA
(NO HATCHING)
OUTSIDE OF
PROJECT AREA
NEW CARBON MONOXIDE (CO)
DETECTOR
CO
FIRE ALARM CONTROL PANEL
E = EXISTING
FACP
S
RTS
NEW DUCT SMOKE
DETECTOR
NEW DUCT SMOKE
DETECTOR REMOTE TEST
AND INDICATOR
A R
C H
IT
E
C T
U R
E E
N G
IN
E
E R
IN
G
G E
O S
P A
T
IA
L
SHEET KEYNOTES:
1 2 3 4 5
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
B
Y
S
IZ
E
F
IL
E N
A M
E
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
LI
C
IT
A
T
IO
N N
O
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
C K
E C
K E
D B
Y
US Army Corps of
Engineers ®
A N
S I '
D
D
C
B
A
F
IL
E N
U M
B E
R
SHEET ID
B
IM
6 0
W
P A
F B
H
T H
W L in e
D /0
8 0
B
LD
G
_3 0 1
_M
E P
F _R
2 0 .r vt
8/
/2
:4 0:
A
M W R
IG
H
T -P
A T
T E
R S
O N
A
IR
F O
R C
E B
A S
E
W P
A F
B
O H
IO
R
E P
A
IR
S T
E A
M
H T
H W
L
IN
E D
P
H A
S E
I I)
(B U
IL
D
IN
G
P N
Z H
T V
F
Y P
JU
N
E
W
2Q R
-X X
-X -X
X X
X
W
2Q R
-X X
-X -X
X X
X
LOUISVILLE DISTRICT
J.
M
U S
G R
O V
E
P . B
U T
T
J.
M
U S
G R
O V
E
FA101N
LO
U
IS
V
IL
LE
D
IS
T R
IC
T
LO
U
IS
V
IL
LE
, K E
N T
U C
K Y
J.
Z
IM
M
E R
M A
N
F A
C
IL
IT
Y
F
IR
E
A L A
R M
P L A
N
CERTIFIED FINAL - JUNE 2021
30138
KEY PLAN - AREA A
30138
SCALE : 1/8" = 1'-0"A1 FACILITY 30138 - FIRE ALARM PLAN
PLAN NORTH
4'0 8' 16'
708 EXISTING FIRE ALARM INITIATING DEVICES TO REMAIN IN
PROJECT AREA.
717 REPLACE EXISTING FIRE ALARM CONTROL PANEL WITH A NEW
ADDRESSABLE FIRE ALARM CONTROL PANEL. INTERFACE ALL
NEW AND EXISTING INITIATING AND/OR INDICATING DEVICES INTO
NEW FIRE ALARM CONTROL PANEL. PROVIDE MONITOR OR
CONTROL MODULES AS NECCESSARY.
APPLICABLE CODES AND STANDARDS
• UFC 3-600-01, FIRE PROTECTION ENGINEERING FOR FACILITIES
(CHANGE 5, 20 AUGUST 2020)
• NFPA 70, NATIONAL ELECTRIC CODE (2020)
• NFPA 72, NATIONAL FIRE ALARM AND SIGNALING CODE (2019)
FIRE ALARM SHEET NOTES
1. THE LAYOUT OF DEVICES, APPLIANCES, AND OTHER SYSTEM
COMPONENTS ON THESE DRAWINGS SHOWS THE MINIMUM
NUMBER OF COMPONENTS. THE CONTRACTOR IS RESPONSIBLE
FOR PROVIDING ADDITIONAL SYSTEM COMPONENTS AS
REQUIRED TO COMPLY WITH THE APPLICABLE CODES,
STANDARDS, PROJECT SPECIFICATIONS, AND DESIGN CRITERIA.
2. CONTRACTOR SHALL RETAIN THE SERVICES OF A QUALIFIED
FIRE PROTECTION ENGINEER (QFPE), AS REQUIRED IN
SPECIFICATION SECTION 28 31 76. THE QUALIFIED FIRE
PROTECTION ENGINEER (QFPE) SHALL REVIEW AND APPROVE
ALL SHOP DRAWINGS AND SUBMITTAL INFORMATION PRIOR TO
SUBMITTAL TO THE GOVERNMENT. THE QUALIFIED FIRE
PROTECTION ENGINEER (QFPE) SHALL WITNESS ALL
PRELIMINARY AND FINAL TESTING AND SHALL SIGN THE
TESTING REPORTS. SEE SECTION 28 31 76 FOR ADDITIONAL
SUBMITTAL AND TESTING REQUIREMENTS.
3. CONTRACTOR SHALL SUBMIT AS-BUILT DRAWINGS SHOWING
FINAL SYSTEM CONFIGURATION DURING PROJECT CLOSEOUT.
THE SCOPE OF THE AS-BUILT DRAWINGS SHALL BE LIMITED TO
THE PROJECT AREA AND SHALL INCLUDE ANY MODIFICATIONS
MADE TO THE EXISTING SYSTEM UNDER THIS CONTRACT.
SUMMARY OF EXISTING FIRE ALARM SYSTEM
CONTROL PANEL TYPE: AUTOCALL
CONNECTION TO THE EXISTING REPORTING SYSTEM
1. EXISTING FIRE ALARM SYSTEM REPORTING SHALL REMAIN
2. CARBON MONOXIDE (CO) ALARM AND TROUBLE SIGNALS
SHALL BE TRANSMITTED TO THE BASE FIRE DEPARTMENT
CENTRAL REPORTING STATION AS SEPARATE ZONES.
PROVIDE TWO NEW SETS OF CONTACTS IN THE FIRE
ALARM CONTROL PANEL; OPEN FOR THE CO ALARM AND
CLOSED FOR THE CO TROUBLE/SUPERVISORY. PROVIDE
DEDICATED CONDUCTORS FROM THE FIRE ALARM
CONTROL PANEL TO THE SAME COMMUNICATIONS ROOM
WHERE EXISTING FIRE ALARM SIGNALS ARE TRANSMITTED.
CONTRACTOR SHALL ACQUIRE DEDICATED PHONE LINE
CONNECTIONS TO THE BASE FIRE DEPARTMENT CENTRAL
REPORTING STATION. CONTRACTOR SHALL COORDINATE
PHONE LINE CONNECTIONS WITH BASE COMMUNICATIONS
DEPARTMENT. CONTRACTOR SHALL ALSO COORDINATE
PROGRAMMING OF THE CENTRAL REPORTING
STATIONWITH THE FIRE DEPARTMENT CENTRAL
REPORTING STATION.
FACP
E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E A
P P
R
A m en dm e n t
.0 6.
A m en dm e n t 0
.1 2.
A m en dm e n t 0
W
2Q R
R
-0
F A
C P
E
CO
SECURE STORAGE
Space
MECH RM
Space
FIRE ALARM LEGEND
PROJECT AREA
(NO HATCHING)
OUTSIDE OF
PROJECT AREA
NEW CARBON MONOXIDE
(CO) DETECTORCO
FIRE ALARM CONTROL PANEL
E = EXISTING
FACP
A R
C H
IT
E
C T
U R
E E
N G
IN
E
E R
IN
G
G E
O S
P A
T
IA
L
SHEET KEYNOTES:
1 2 3 4 5
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
B
Y
S
IZ
E
F
IL
E N
A M
E
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
LI
C
IT
A
T
IO
N N
O
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
C K
E C
K E
D B
Y
US Army Corps of
Engineers ®
A N
S I '
D
D
C
B
A
F
IL
E N
U M
B E
R
SHEET ID
B
IM
6 0
W
P A
F B
H
T H
W L in e
D /0
8 0
B
LD
G
_3 0 1
_M
E P
F _R
2 0 .r vt
8/
/2
:4 0:
A
M W R
IG
H
T -P
A T
T E
R S
O N
A
IR
F O
R C
E B
A S
E
W P
A F
B
O H
IO
R
E P
A
IR
S T
E A
M
H T
H W
L
IN
E D
P
H A
S E
I
(B U
IL
D
IN
G
P N
Z H
T V
F
Y P
JU
N
E
W
2Q R
-X X
-X -X
X X
X
W
2Q R
-X X
-X -X
X X
X
LOUISVILLE DISTRICT
J.
M
U S
G R
O V
E
P . B
U T
T
J.
M
U S
G R
O V
E
FA101O
LO
U
IS
V
IL
LE
D
IS
T R
IC
T
LO
U
IS
V
IL
LE
, K E
N T
U C
K Y
J.
Z
IM
M
E R
M A
N
F A
C
IL
IT
Y
F
IR
E
A L A
R M
P L A
N
CERTIFIED FINAL - JUNE 2021
30140
KEY PLAN - AREA A
30140
PLAN NORTH
4'0 8' 16'SCALE : 1/8" = 1'-0"A2 FACILITY 30140 - FIRE ALARM PLAN
APPLICABLE CODES AND STANDARDS
• UFC 3-600-01, FIRE PROTECTION ENGINEERING FOR FACILITIES
(CHANGE 5, 24 SEPTEMBER 2020)
• NFPA 70, NATIONAL ELECTRIC CODE (2020)
• NFPA 72, NATIONAL FIRE ALARM AND SIGNALING CODE (2019)
FIRE ALARM SHEET NOTES
1. THE LAYOUT OF DEVICES, APPLIANCES, AND OTHER SYSTEM
COMPONENTS ON THESE DRAWINGS SHOWS THE MINIMUM
NUMBER OF COMPONENTS. THE CONTRACTOR IS RESPONSIBLE
FOR PROVIDING ADDITIONAL SYSTEM COMPONENTS AS
REQUIRED TO COMPLY WITH THE APPLICABLE CODES,
STANDARDS, PROJECT SPECIFICATIONS, AND DESIGN CRITERIA.
2. CONTRACTOR SHALL RETAIN THE SERVICES OF A QUALIFIED
FIRE PROTECTION ENGINEER (QFPE), AS REQUIRED IN
SPECIFICATION SECTION 28 31 76. THE QUALIFIED FIRE
PROTECTION ENGINEER (QFPE) SHALL REVIEW AND APPROVE
ALL SHOP DRAWINGS AND SUBMITTAL INFORMATION PRIOR TO
SUBMITTAL TO THE GOVERNMENT. THE QUALIFIED FIRE
PROTECTION ENGINEER (QFPE) SHALL WITNESS ALL
PRELIMINARY AND FINAL TESTING AND SHALL SIGN THE
TESTING REPORTS. SEE SECTION 28 31 76 FOR ADDITIONAL
SUBMITTAL AND TESTING REQUIREMENTS.
3. CONTRACTOR SHALL SUBMIT AS-BUILT DRAWINGS SHOWING
FINAL SYSTEM CONFIGURATION DURING PROJECT CLOSEOUT.
THE SCOPE OF THE AS-BUILT DRAWINGS SHALL BE LIMITED TO
THE PROJECT AREA AND SHALL INCLUDE ANY MODIFICATIONS
MADE TO THE EXISTING SYSTEM UNDER THIS CONTRACT.
SUMMARY OF EXISTING FIRE ALARM SYSTEM
CONTROL PANEL TYPE: SIMPLEX 4002
CONNECTION TO THE EXISTING REPORTING SYSTEM
1. EXISTING FIRE ALARM SYSTEM REPORTING SHALL REMAIN
2. CARBON MONOXIDE (CO) ALARM AND TROUBLE SIGNALS
SHALL BE TRANSMITTED TO THE BASE FIRE DEPARTMENT
CENTRAL REPORTING STATION AS SEPARATE ZONES.
PROVIDE TWO NEW SETS OF CONTACTS IN THE FIRE
ALARM CONTROL PANEL; OPEN FOR THE CO ALARM AND
CLOSED FOR THE CO TROUBLE/SUPERVISORY. PROVIDE
DEDICATED CONDUCTORS FROM THE FIRE ALARM
CONTROL PANEL TO THE SAME COMMUNICATIONS ROOM
WHERE EXISTING FIRE ALARM SIGNALS ARE TRANSMITTED.
CONTRACTOR SHALL ACQUIRE DEDICATED PHONE LINE
CONNECTIONS TO THE BASE FIRE DEPARTMENT CENTRAL
REPORTING STATION. CONTRACTOR SHALL COORDINATE
PHONE LINE CONNECTIONS WITH BASE COMMUNICATIONS
DEPARTMENT. CONTRACTOR SHALL ALSO COORDINATE
PROGRAMMING OF THE CENTRAL REPORTING
STATIONWITH THE FIRE DEPARTMENT CENTRAL
REPORTING STATION.
704 EXISTING FIRE ALARM INITIATING DEVICES AND NOTIFICATION
APPLIANCES TO REMAIN IN PROJECT AREA.
717 REPLACE EXISTING FIRE ALARM CONTROL PANEL WITH A NEW
ADDRESSABLE FIRE ALARM CONTROL PANEL. INTERFACE ALL
NEW AND EXISTING INITIATING AND/OR INDICATING DEVICES
INTO NEW FIRE ALARM CONTROL PANEL. PROVIDE MONITOR
OR CONTROL MODULES AS NECCESSARY.
912 THIS AREA IS CONSIDERED PART OF THE PROJECT AREA
ONLY AS SUPPORT FOR THE WORK OCCURING WHERE
MECHANICAL EQUIPMENT IS BEING PROVIDED AT OTHER
LOCATIONS IN THE BUILDING. EVALUATIONS OF LIFE SAFETY,
FIRE ALARM AND OR FIRE SUPPRESSION SYSTEMS ARE NOT
BEING PROVIDED UNDER THIS SCOPE OF WORK.
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E A
P P
R
A m en dm e n t 0
.1 2.
W
2Q R
R
-0
| Sheets |
| A-101R - FACILITY 30151 FLOOR PLANS |
| FA101H - FACILITY 30029 - OVERALL FIRE ALARM PLAN |
| FA101N - FACILITY 30138 - FIRE ALARM PLAN |
| FA101O - FACILITY 30140 - FIRE ALARM PLAN |
| FA101H - FACILITY 30029 - OVERALL FIRE ALARM PLAN |
| FA101N - FACILITY 30138 - FIRE ALARM PLAN |
| FA101O - FACILITY 30140 - FIRE ALARM PLAN |