This document provides details for a federal contract opportunity for the replacement of a high-temperature hot water line at Wright-Patterson Air Force Base. The U.S. Army Corps of Engineers seeks to issue a request for proposal for repairs to the existing Area A Line D heating system using natural gas boilers and supporting infrastructure for 22 buildings. The project scope includes new gas-fired boilers, associated piping and valves, controls, equipment installation, tie-ins, demolition and capping of existing steam and hot water systems. The contract duration is 730 calendar days with an estimated value between $5-10 million. This will be a firm-fixed-price contract under NAICS code 238220. The selection method is a single-phase best value tradeoff evaluation of past performance, technical, small business, and price factors. The point of contact is provided for any questions.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Replacement of HTHW Line D (Area A) w ith Natural Gas Boilers at Wright-Patterson Air Force Base, Ohio.
Estimated Construction Cost betw een $5,000,000 and $10,000,000.
NAICS Code 238220. Size Standard $16,500,000. Please note that business size in the System for Aw ard Management (SAM) is determined by the NAICS code. If the vendor size is not listed correctly for a particular NAICS code in SAM the business w ill be considered other than a small business.
This is a Full and open procurement. In accordance w ith Federal Acquisition Regulation 19.1307, this project requires the HUBZone 10% price evaluation.
Central Contractor Registration and ORCA are now available through SAM, available at w w w .sam.gov. Offerors must comply w ith the requirements of 52.204-7, 52.204-8, 52.232-33, and any other CCR/ORCA requirements in this solicitation through SAM.
PLEASE NOTE: SAM is completely free of charge for both registrants and users.
Funds are not presently available for this acquisition. No contract aw ard w ill be made until appropriated funds are made available.
JESSICA K MOSS 502.315.6179
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS
NEGOTIATED
12-Jul-2021
(RFP)
(IFB)
X
CALL:
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
See Item 7
2. TYPE OF SOLICITATION
SEALED BID
3. DATE ISSUED
9. FOR INFORMATION A. NAME
SOLICITATION
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA
FAR (48 CFR) 53.236-1(e)
11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________730 calendar days after receiving aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________FAR 52.211-10
12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
X YES NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and __________6 copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time ______________11 Aug 2021 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.
shall be marked to show the offeror's name and address, the solicitation number, and the date and time of fers are due.
B. An offer guarantee is, X is not required.
C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than _______90 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
7. ISSUED BY CODE
U. S. ARMY ENGINEER DISTRICT, LOUISVILLE
600 DR. MARTIN LUTHER KING, JR. PLACE
ROOM 821
LOUISVILLE KY 40202-2239
W912QR
PAGE OF PAGES
1 OF
CODE
(Title, identifying no., date):
12B. CALENDAR DAYS
01:00 PM (hour)
Sealed envelopes containing offers
5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
8. ADDRESS OFFER TO (If Other Than Item 7)
502.315.6195 OR 6193FAX:TEL: 502.315.6172 TEL: FAX:
W912QR21R0065 86
20B. SIGNATURE
(REV. 4-85)STANDARD FORM 1442 BACK
TO SIGN
NSN 7540-01-155-3212
SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)
CODE FACILITY CODE
17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.
the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS SEE SCHEDULE OF PRICES
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN
OFFER (Type or print)
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
(4 copies unless otherwise specified)
CODE
(Insert any number equal to or greater than
20C. OFFER DATE
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY
(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)
See Item 14
(Include only if different than Item 14)16. REMITTANCE ADDRESS
30B. SIGNATURE
29. AWARD (Contractor is not required to sign this document.)
document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .
gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)
30C. DATE
(Type or print)
TEL: EMAIL:
31B. UNITED STATES OF AMERICA 31C. AWARD DATE
BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this28. NEGOTIATED AGREEMENT
(M ust be fully completed by offeror)OFFER
Section 00 10 00 - Solicitation
PRICE BREAKOUT SCHEDULE
SECTION 00 10 00
PRICE BREAKOUT SCHEDULE
10/18
OFFEROR'S NAME: ____________________________________
CONTRACT LINE ITEM SCHEDULE
CLIN Description Unit Unit Amount
BASE PROPOSAL
0001 All work, labor, materials, and equipment required to complete the repairs for facilities 30109, 30110, 30140, and 30152, executed as part of Phase I, at Wright- Patterson Air Force Base, Ohio. Includes converting steam/HTHW services to natural gas;
abandon in place existing steam/HTHW and cap ends at buildings and associated staging/laydown. JOB
0002 All work, labor, materials, and equipment required to complete the repairs for facilities 30109, 30110, 30140,and 30152 executed as part of Phase I, at Wright- Patterson Air Force Base, Ohio. Includes hazardous materials abatement and associated staging/laydown. JOB
0003 All work, labor, materials, and equipment required to complete the repairs for facilities 30017, 30019, 30021, 30022, 30023, 30027, 30028, 30029, 30029E, 30138, and 30143, executed as part of Phase II, at Wright- Patterson Air Force Base, Ohio. Includes converting steam/HTHW services to natural gas;
abandon in place existing steam/HTHW and cap ends at buildings and associated staging/laydown. JOB
0004 All work, labor, materials, and equipment required to complete the repairs for facilities 30017, 30019, 30021, 30022, 30023, 30027, 30028, 30029, 30029E, 30138, and 30143, executed as part of Phase II, at Wright- Patterson Air Force Base, Ohio. Includes hazardous materials abatement and associated staging/laydown. JOB
SUBTOTAL BASE ITEMS
BID OPTIONS
BID OPTION 1
All work, labor, materials, and equipment required to complete the repairs for facilities 30055 and 30069, executed as part of Phase I, at Wright-Patterson Air Force Base, Ohio. Includes converting steam/HTHW services to natural gas; abandon in place existing steam/HTHW and cap ends at buildings and associated staging/laydown. JOB
0006 BID OPTION 2
required to complete the repairs for facilities 30055 and 30069, executed as part of Phase I, at Wright-Patterson Air Force Base, Ohio. Includes hazardous materials abatement and associated staging/laydown. JOB
BID OPTION 3
required to complete the repairs for facility 30219, executed as part of Phase I, at Wright- Patterson Air Force Base, Ohio. Includes converting steam/HTHW services to natural gas;
abandon in place existing steam/HTHW and cap ends at building and associated
0008 BID OPTION 4
required to complete the repairs for facility 30219, executed as part of Phase I, at Wright- Patterson Air Force Base, Ohio. Includes hazardous materials abatement and associated
BID OPTION 5
required to complete the repairs for facility 30142, executed as part of Phase I, at Wright- Patterson Air Force Base, Ohio. Includes converting steam/HTHW services to natural gas;
abandon in place existing steam/HTHW and cap ends at buildings and associated
0010 BID OPTION 6
required to complete the repairs for facility 30142, executed as part of Phase I, at Wright- Patterson Air Force Base, Ohio. Includes
BID OPTION 7
required to complete the repairs for facility 30151, executed as part of Phase I, at Wright- Patterson Air Force Base, Ohio. Includes converting steam/HTHW services to natural gas;
abandon in place existing steam/HTHW and cap ends at buildings. Includes hazardous materials abatement. Includes staging and laydown JOB
0012 BID OPTION 8
required to complete the repairs for facility 30151, executed as part of Phase I, at Wright- Patterson Air Force Base, Ohio. Includes
SUBTOTAL BID OPTIONS
TOTAL (BASE & OPTIONS)
NOTES FOR CONTRACT LINE ITEM (CLIN) SCHEDULE
NOTE NO. 1. To better facilitate the receipt and proposal process, all modifications to proposals are to be submitted on copies of the latest Contract Line Item (CLIN) schedules as published in the solicitation or the latest amendment thereto. In lieu of indicating additions/deductions to line items, all Offerors should state their revised prices for each item.
NOTE NO. 2. Offerors must insert a price on all numbered items including unit prices and options of the CLIN Schedule other than those CLINs titled ”Supporting Facilities / Privatized Utilities”. Failure to do so may result in the offer being unacceptable.
NOTE NO. 3. The Offeror s Base Bid and all Options will be evaluated. In accordance with 52.217-5, Evaluation of Options, the Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. Evaluation of options will not obligate the Government to exercise the option(s).
NOTE NO. 4. Bid Options can be exercised up to 60 days after NTP.
-- End of Document --
Section 00 21 00 - Instructions
PROJNET INSTRUCTIONS
OFFEROR'S QUESTIONS AND COMMENTS
Technical inquiries and questions relating to proposal procedures or bonds are to be submitted via Bidder Inquiry in ProjNet at http://www.ProjNet.org/ProjNet. As noted below, offerors shall not submit their proposals via ProjNet. Offerors shall submit their proposals in accordance with the provisions stated in the solicitation.
To submit and review bid inquiry items, bidders will need to be a current registered user or selfregister into system.
The Solicitation Number is: W912QR21R0065 The Bidder Inquiry Key is: T8DXS3-PJMJYF Specific Instructions for ProjNet Bid Inquiry Access:
1. From the ProjNet home page linked above, click on Quick Add on the upper right side of the screen.
2. Identify the Agency. This should be marked as USACE.
3. Key. Enter the Bidder Inquiry Key listed above.
4. Email. Enter the email address you would like to use for communication.
5. Select Continue. A page will then open stating a user account was not found and will ask you to create one using the provided form.
6. Enter your First Name, Last Name, Company, City, State, Phone, Email, Secret
Question, Secret Answer, and Time Zone. Make sure to remember your Secret Question and Answer as they will be used from this point on to access the ProjNet system.
7. Select Add User. Once this is completed you are now registered within ProjNet and are currently logged into the system.
Specific Instructions for Future ProjNet Bid Inquiry Access:
1. For future access to ProjNet, you will not be emailed any type of password. You will utilize your Secret Question and Secret Answer to log in.
2. From the ProjNet home page linked above, click on Quick Add on the upper right side of the screen.
3. Identify the Agency. This should be marked as USACE.
4. Key. Enter the Bidder Inquiry Key listed above.
5. Email. Enter the email address you used to register previously in ProjNet.
6. Select Continue. A page will then open asking you to enter the answer to your
SecretQuestion.
7. Enter your Secret Answer and click Login. Once this is completed you are now logged into the system.
From this page you may view all bidder inquiries or add an inquiry.
Bidders will receive an acknowledgement of their question via email, followed by an answer to their question after it has been processed by our technical team.
Offerors are requested to review the specification in its entirety and to review the Bidder Inquiry System for answers to questions prior to submission of a new inquiry.
The call center operates weekdays from 8AM to 5PM U.S. Central Time Zone (Chicago). The telephone number for the Call Center is 800-428-HELP.
Offers will NOT be publicly opened. Information concerning the status of the evaluation and/or award will NOT be available after receipt of proposals.
NOTES:
1. Offerors shall not submit their proposals via ProjNet, but in accordance with the provisions stated in the solicitation. Any questions regarding acceptable means of submitting offers shall be made directly to the Contract Specialist identified in the solicitation.
2. Government responses to technical inquiries and questions relating to proposal procedures or bonds that are submitted to ProjNet in accordance with the procedures above are not binding on the Government unless an amendment is issued on Standard Form 30. In the case of any conflicts, the solicitation governs. Any changes or revisions to the solicitation will be made by formal amendment. Government responses will be limited to: (a) Notice that an amendment will be issued; (b) Reference to an existing requirement contained in the solicitation; or (c) Notice that a response is not necessary.
3. The ability to enter technical inquiries and questions relating to proposal procedures or bonds will be disabled ten (10) calendar days prior to the closing date stated in the solicitation. No Government responses will be entered into the ProjNet system within five (5) calendar days prior to the closing date stated in the solicitation.
CLAUSES INCORPORATED BY REFERENCE
52.204-7 System for Award Management OCT 2018 52.204-16 Commercial and Government Entity Code Reporting AUG 2020 52.204-22 Alternative Line Item Proposal JAN 2017 52.215-1 Instructions to Offerors--Competitive Acquisition JAN 2017 52.217-5 Evaluation Of Options JUL 1990 252.204-7008 Compliance With Safeguarding Covered Defense Information
Controls
OCT 2016
252.204-7019 Notice of NIST SP 800-171 DoD Assessment Requirements NOV 2020
CLAUSES INCORPORATED BY FULL TEXT
52.216-1 TYPE OF CONTRACT (APR 1984)
The Government contemplates award of a Firm Fixed Price contract resulting from this solicitation.
(End of provision)
52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS--SECONDARY SITE OF THE WORK (MAY
2014)
(a)(1) The offeror shall notify the Government if the offeror intends to perform work at any secondary site of the work, as defined in paragraph (a)(1)(ii) of the FAR clause at 52.222-6, Construction Wage Rate Requirements,of this solicitation.
(2) If the offeror is unsure if a planned work site satisfies the criteria for a secondary site of the work, the offeror shall request a determination from the Contracting Officer.
(b)(1) If the wage determination provided by the Government for work at the primary site of the work is not applicable to the secondary site of the work, the offeror shall request a wage determination from the Contracting Officer.
(2) The due date for receipt of offers will not be extended as a result of an offeror's request for a wage determination for a secondary site of the work.
52.225-12 NOTICE OF BUY AMERICAN ACT REQUIREMENT-- CONSTRUCTION MATERIALS UNDER
TRADE AGREEMENTS (MAY 2014) ALTERNATE II (JUN 2009)
(a) Definitions. “Commercially available off-the-shelf (COTS) item,” “construction material,” “designated country construction material,” “domestic construction material,” and “foreign construction material,” as used in this provision, are defined in the clause of this solicitation entitled “Buy American Act-- Construction Materials Under Trade Agreements” (Federal Acquisition Regulation (FAR) clause 52.225-11).
(b) Requests for determination of inapplicability. An offeror requesting a determination regarding the inapplicability of the Buy American Act should submit the request to the Contracting Officer in time to allow a determination before submission of offers. The offeror shall include the information and applicable supporting data required by paragraphs (c) and (d) of FAR clause 52.225-11 in the request. If an offeror has not requested a determination regarding the inapplicability of the Buy American Act before submitting its offer, or has not received a response to a previous request, the offeror shall include the information and supporting data in the offer.
(c) Evaluation of offers. (1) The Government will evaluate an offer requesting exception to the requirements of the Buy American Act, based on claimed unreasonable cost of domestic construction materials, by adding to the offered price the appropriate percentage of the cost of such foreign construction material, as specified in paragraph (b)(4)(i) of FAR clause 52.225-11.
(2) If evaluation results in a tie between an offeror that requested the substitution of foreign construction material based on unreasonable cost and an offeror that did not request an exception, the Contracting Officer will award to the offeror that did not request an exception based on unreasonable cost.
(d) Alternate offers.
(1) When an offer includes foreign construction material, except foreign construction material from a designated country other than Bahrain, Mexico, or Oman that is not listed by the Government in this solicitation in paragraph (b)(3) of FAR clause 52.225-11, the offeror also may submit an alternate offer based on use of equivalent domestic or designated country construction material other than Bahrainian, Mexican, or Omani construction material.
(2) If an alternate offer is submitted, the offeror shall submit a separate Standard Form 1442 for the alternate offer, and a separate price comparison table prepared in accordance with paragraphs (c) and (d) of FAR clause 52.225-11 for the offer that is based on the use of any foreign construction material for which the Government has not yet determined an exception applies.
(3) If the Government determines that a particular exception requested in accordance with paragraph (c) of FAR clause 52.225-11 does not apply, the Government will evaluate only those offers based on use of the equivalent domestic or designated country construction material other than Bahrainian, Mexican, or Omani construction material. An offer based on use of the foreign construction material for which an exception was requested--
(i) Will be rejected as nonresponsive if this acquisition is conducted by sealed bidding; or
(ii) May be accepted if revised during negotiations.
52.233-2 SERVICE OF PROTEST (SEP 2006)
(a) Protests, as defined in section 33.101 of the Federal Acquisition Regulation, that are filed directly with an agency, and copies of any protests that are filed with the Government Accountability Office (GAO), shall be served on the Contracting Officer (addressed as follows) by obtaining written and dated acknowledgment of receipt from
U.S. Army Corps of Engineers – LRL ATTN: Patrick J. Duggins, Room 821 600 Dr. Martin Luther King Jr. Pl.
Louisville, KY 40202
(b) The copy of any protest shall be received in the office designated above within one day of filing a protest with the GAO.
52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) – ALTERNATE I (FEB 1995)
(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.
(b) An organized site visit has been scheduled for--
8:30 a.m. Eastern Time on 29 July 2021
(c) Participants will meet at--
Pass and ID in Area A of WPAFB
NOTE: Due to COVID-19 Social Distancing Guidelines will be implemented and Face Coverings will be required if you have not been vaccinated.
All attendees are required to meet at Pass and ID in Area A of WPAFB for In-Processing at 0830 hours.
Schedule:
0830-0900: Registration for site visit (USACE will sponsor visitors for a (1) day base pass) 0915-1600: Site Visit at site location (All Participants must ride the bus)
Participants should consider packing lunch or snacks; we will not be breaking in order to maintain schedule and visit all (22) buildings for this project.
No inquiries will be allowed during the site visit. All inquiries must be submitted via the Projnet Bidder Inquiry site.
A Bidder Key is provided with the solicitation information. Please RSVP the following information:
1. Name of Attendee
2. Company
3. Phone Number
4. Email Address
Please remember to bring a State Issued ID in order to attend the site visit.
Send RSVP to John.P.Hearn@usace.army.mil, USACE must receive the email by 1500 hours EST. on 26 July 2021.
No additional attendees will be registered after this date or time. A Confirmation email will be sent out no later than 27 July 2021, to confirm each registration. It will include driving instructions to WPAFB visitors center. We will also provide a base map and any other pertinent information.
52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)
This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es):
The full text of FAR clauses and provisions (numbered as 52.XXX-XX) can be found at this site:
https://www.acquisition.gov/browse/index/far
The full text of DFARS clauses and provisions (numbered as 252.XXX-XX) can be found at this site:
https://www.acq.osd.mil/dpap/dars/dfarspgi/current/
52.252-5 AUTHORIZED DEVIATIONS IN PROVISIONS (NOV 2020)
(a) The use in this solicitation of any Federal Acquisition Regulation (48 CFR Chapter 1) provision with an authorized deviation is indicated by the addition of "(DEVIATION)" after the date of the provision.
(b) The use in this solicitation of any Defense Federal Acquisition Regulation Supplement (48 CFR Chapter 2) provision with an authorized deviation is indicated by the addition of "(DEVIATION)" after the name of the regulation.
Section 00 22 00 - Supplementary Instructions
SECTION 00112
SECTION 00112 – PROCEDURES FOR SUBMITTAL OF OFFERS AND PROPOSAL EVALUATION
CRITERIA
1. Overview.
1.1 The intent of this solicitation is to select one contractor for the abandonment of High Temperature Hot Water Line D and the installation of new boilers and supporting infrastructure for the Hospital, Visitor’s Quarters, AFMC Headquarters, and Tenant Unit Facilities. The Government will evaluate the proposals in accordance with the criteria described herein, and award a firm fixed price contract to the responsible offeror, whose proposal conforms with all the terms and conditions of the solicitation and whose proposal is determined to represent the overall best value to the Government, all factors considered.
1.2 The basis of award is the Tradeoff Process. The Contracting Officer will award a firm fixed price contract to the responsible offeror whom the Source Selection Authority determines conforms to the solicitation, is fair and reasonable and offers the best overall value to the Government, all factors considered. The Government reserves the right to accept other than the lowest priced offer or to reject all offers.
2. Submittal of offers.
2.1 Offerors submitting proposals for this project should limit submissions to data essential for evaluation of proposals so that a minimum of time and monies will have been expended in preparing information required herein. However, in order to be effectively and equitably evaluated, the proposals must include information sufficiently detailed to clearly describe the offeror's past performance and management capabilities necessary for successful completion of the project. Requirements stated in this RFP are minimums.
2.2 Offerors shall submit their proposals to the US Army Corps of Engineers, 600 Dr. Martin Luther King, Jr. Place, Room 821, Louisville, KY 40202-2267 no later than the time and date specified in Block 13 of Standard Form 1442.
2.3 Offerors are required to submit a proposal made up of the Past Performance, Technical Plan (Management Plan) factors, and the Small Business Participation Plan along with Price and Pro Forma information. All proposal materials shall be submitted in binders with a table of contents and tabbed section dividers. The sections should parallel the submission requirements identified below. Volume I shall be submitted in original and six (6) paper copies and one electronic copy on CD*. Volume II shall be submitted in original and 1 CD* only and shall be placed in a separate envelope. Failure to place the required submission information under the appropriate tab may result in a lower rating if the evaluators cannot readily find the appropriate information.
2.4 The target ceiling for contract award is $8,000,000 based on funds made available for this project.
The Government cannot guarantee that additional funds can be made available for award. Offerors are under no obligation to approach this ceiling.
*NOTE: Provide the complete Volume I proposal submittal including text, renderings, drawings, photographs, etc. on CD (one copy). Provide the complete Volume II proposal submittal on CD (one copy) with the final price breakout schedule, if available, electronically. The paper copy of the proposal shall be used for evaluation and will control any conflicts or discrepancies between the two media.
Offeror is responsible for ensuring the paper copy is consistent with the electronic copy of the proposal.
3. Proposal Evaluation Process.
3.1. A Source Selection Evaluation Board (SSEB) comprised of representatives of the Corps of Engineers, User/Customer, and other required personnel will evaluate the proposals. Offerors are advised that the technical evaluation and rating of proposals will be conducted in strict confidence. Technical/quality proposals will be reviewed and rated without knowledge of the price offered. The number and identities of offerors are not revealed to anyone who is not involved in the evaluation and award process or to other offerors. Proposals will be evaluated based on the factors described herein, and the basis of award is the Best Value Tradeoff Process.
3.2 The evaluation process essentially consists of four parts: proposal compliance review and responsibility determination, technical/quality evaluation, price evaluation, and cost/technical trade-off analysis.
3.2.1 Proposal Compliance Review: This is an initial review to ensure that all required forms and certifications are complete and that both a technical and price proposal were received.
3.2.2 Technical Evaluation: The SSEB will evaluate and rate the proposals against the RFP requirements.
Some factors will be rated using an adjectival-based system. Past Performance will be rated based on recency/relevancy and confidence.
3.2.3 Price Evaluation: The SSEB and Contracting Officer/SSA will evaluate price proposals independent of the technical/quality evaluation. The SSEB will not have access to price information until completion of the technical/quality evaluation.
3.2.4 Price/Technical Trade-off Analysis: After all above evaluations are complete, the Contracting Officer/SSA will compare the relative advantages and disadvantages of technical proposals and compare prices. The Source Selection Authority (SSA) will then consider all factors to select the proposal offering the best value to the Government.
4. Proposal Information and Related Evaluation Factors.
4.1 Proposals will be evaluated in accordance with the factors and subfactors below, listed in relative order of importance. All evaluation factors, other than cost or price, when combined are considered approximately equal to cost or price. Offerors are reminded to include their best technical and price terms in their initial offer and not to automatically assume that they will have an opportunity to participate in discussions or be asked to submit a revised offer. The Government may make award of a conforming proposal without discussions, if deemed to be within the best interest of the Government.
4.2 Volume I – Factor I – Past Performance (Three-Ring Binder) 1st
4.3 Volume I – Factor II – Management Plan (Three-Ring Binder) 2nd
4.4 Volume I- Factor III – Small Business Participation Plan 3rd
4.5 Volume II - Price and Pro Forma Information (Sealed Envelope)
Tab A Standard Form 1442 and Price Breakout Schedule Not Rated
Tab B Joint Venture Agreements Not Rated
Tab C Evidence of Ability to Obtain Bonding and Not Rated
Proof of Financial Ability
Tab D Subcontracting Plan Not Rated
Tab E Pre-Award Information Not Rated
4.6 Ratings
Evaluators will apply the adjectival rating for the definition that most closely matches the evaluation.
Past Performance Relevancy Ratings Rating Definition Very Relevant Present/past performance effort involved essentially the same scope and magnitude of effort and complexities this solicitation requires.
Relevant Present/past performance effort involved similar scope and magnitude of effort and complexities this solicitation requires.
Somewhat Relevant Present/past performance effort involved some of the scope and magnitude of effort and complexities this solicitation requires.
Not Relevant
Present/past performance effort involved little or none of the scope and magnitude of effort and complexities this solicitation requires.
Performance Confidence Assessments
Substantial Confidence
Based on the offeror’s recent/relevant performance record, the Government has a high expectation that the offeror will successfully perform the required effort.
Satisfactory Confidence
Government has a reasonable expectation that the offeror will successfully perform the required effort.
Limited Confidence
Government has a low expectation that the offeror will successfully
No Confidence
Government has no expectation that the offeror will successfully
Management Plan & Risk Management Plan Assessment Ratings
Outstanding
Proposal indicates an exceptional approach and understanding of the requirements and contains multiple strengths, and risk of unsuccessful performance is low.
Good
Proposal indicates a thorough approach and understanding of the requirements and contains at least one strength, and risk of unsuccessful performance is low to moderate.
Acceptable Proposal meets requirements and indicates an adequate approach and understanding of the requirements, and risk of unsuccessful performance is no worse than moderate.
Marginal
Proposal has not demonstrated an adequate approach and understanding of the requirements and/or risk of unsuccessful performance is high.
Unacceptable
Proposal does not meet requirements of the solicitation, and thus, contains one or more deficiencies, and/or risk of unsuccessful performance is unacceptable. Proposal is unawardable.
Small Business Participation Plan
Acceptable Proposal clearly meets the minimum requirements of the solicitation.
Unacceptable Proposal does not clearly meet the minimum requirements of the solicitation.
4.7 Definitions
1. Deficiency. A material failure of a proposal to meet a Government requirement or a combination of significant weaknesses in a proposal that increases the risk of unsuccessfulcontract performance to an unacceptable level. See FAR 15.001.
2. Strength. An aspect of an offeror’s proposal that has merit or exceeds specified performance or capability requirements in a way that will be advantageous to the Government during contract performance.
3. Significant Strength. An aspect of an offeror’s proposal that has appreciable merit or appreciably exceeds specified performance or capability requirements in a way that will be appreciably advantageous to the Government during contract performance.
4. Weakness. A flaw in the proposal that increases the risk of unsuccessful contract performance.
See FAR 15.001.
5. Significant Weakness. A flaw in the proposal that appreciably increases the riskof unsuccessful contract performance. See FAR 15.001.
6. Uncertainty. Any aspect of a non-cost/price factor proposal for which the intent of the offeror is unclear (e.g., more than one way to interpret the offer or inconsistencies in the proposal indicating that there may have been an error, omission or mistake).
7. Clarification. Limited exchanges between the Government and offerors that may occur when award without discussions is contemplated. See FAR 15.306(a)(1).
8. Adverse Past Performance. Past performance information that supports a less than satisfactory rating from sources where the information is from other than formal rating systems such as “PPIRS” or “FAPPIS.”
5.0 Volume I – Factor I – Past Performance
5.1 Submission Requirements:
Provide descriptions of up to three (3) projects substantially complete or completed by theprime contractor within the last 7 years from the solicitation issue date which are similar to this project in size and scope.
Projects considered to be substantially complete are projects that are at least 95% complete.
Projects considered similar to this project include projects with both new construction and renovation in areas utilizing gas-fired boilers with direct digital control, piping, metering, and correction to existing facilities heating systems. The construction and/or renovation must include the installation and removal of boilers requiring phasing within multiple facilities simultaneously.
Projects considered similar in size to the solicited project are projects with a single boiler size of at least 30,000 MBTU (Note: Multiple Boilers may NOT be combined to meet the similar in size requirement).
The prime contractor must have self-performed at least 15% of the cost of the contract, not including the cost of materials, with its own employees to be considered similar.
An IDIQ contract may be submitted only if a single task order could be considered similar to this project. Task orders may not be combined in order for the project to be considered similar.
Please note in the proposal if projects submitted have the following additional features. Additional consideration may be given if projects submitted have the following features: Previous experience with:
USACE
Wright-Patterson Air Force Base Phased projects A single project with multiple sites over multiple heating seasons (typically Oct-Apr)
Provide two references for all of the projects identified in paragraph 5.1. Reference information must include project name, location, owner's name, point of contact, telephone number, and email address. Also include any ratings, letters, awards, etc. which support past performance on these projects. A sample Past Performance Questionnaire is attached for your convenience. If used, the Past Performance Questionnaire must be submitted by the offeror with the proposal submission and not sent directly to the agency from the reference.
Formats for Project Details are included for your use. Use as many forms as necessary to meet the criteria. If you elect not to use the formats, all information identified on the formats is still required for evaluation of this item.
NOTE: For purposes of evaluating past performance, the Prime Contractor is defined as the contractor identified in Block 14 of the Standard Form 1442. If more than one contractor is listed in Block 14, then a signed joint venture must be submitted with the proposal and the joint venture shall be registered as such in the System for Award Management (SAM). However, each party of the Joint Venture must submit their own DUNS number with the Joint Ventures’ proposal. Projects performed by other contractors than the offeror, such as teaming partners or subcontractors, will not be evaluated for past performance, unless those other contractors are part of a joint venture offeror as demonstrated by a signed joint venture agreement. If the Offeror represents the combining of two or more companies as a joint venture for the purpose of this RFP, each company in the joint venture may submit project examples, but the total submitted by the joint venture will not exceed three (3).
5.2. Evaluation Criteria:
The SSEB will evaluate the relevancy of recent past performance identified in the proposal. Documentation of successful completion of projects similar in size and scope to this project will be considered relevant to the similar characteristics of the RFP. Conversely, proposals that do not show documentation of successful completion of projects similar in size and scope will be considered less relevant to the similar characteristics of the RFP. Additional consideration may be given for the following: (1) projects completed for the USACE or (2) Wright-Patterson Air Force Base, (3) a single project with multiple sites over multiple heating seasons.
The SSEB will assign a confidence rating to each offeror based on the degree of successful performance of all recent and relevant projects identified in the proposal in response to paragraph 5.1. The Government reserves the right to check any or all cited references to verify supplied information and to assess owner satisfaction. The Government also reserves the right to not contact the provided references. The Government may also use other tools such as CPARS, FAPIIS, Unique Entity Identifier (Dun & Bradstreet), or any other relevant information to assist in its evaluation of an offeror’s past performance.
6.0 Volume I – Factor II – Management Plan
6.1 Submission Requirements:
Provide a management plan for the project that describes the following:
1. Briefly describe how your labor, resources, subcontractors and material suppliers will be coordinated and used to ensure successful completion of the project at all sites within the period of performance.
2. Identify and discuss significant areas of project-specific technical risks and provide your plan for mitigating risk during contract performance.
3. Describe your process for coordinating with existing building functions and personnel prior to connection to existing facility. Narrative should reference how construction activities (utility service interruptions, construction parking/beddown areas, coordination of connection to existing facility (i.e., alarm systems, secure perimeter access control, etc.) will be integrated into the project to ensure minimal impact to ongoing building operations.
4. Provide a detailed schedule showing approach considering multiple sites to include each location of work (simultaneous/phased efforts) and show any shutdowns. The schedule shall include a narrative and the work periods for each item listed within the submitted schedule.
5. Discuss additional resources that are available to mitigate the risk of schedule slippage.
There is a page limit of ten (10) single-sided pages (front and back will count as two pages) for the Management Plan factor. The narrative should use a minimum font size of eleven (11). Page size shall be 8.5”x11” with a minimum margin of one- half inch on all sides. Any information that exceeds this page limit will not be evaluated.
6.2 Evaluation Criteria:
Comprehensive plans that demonstrate a clear understanding of the work and an ability to coordinate resources to ensure successful pursuit of the work will be regarded as having met the RFP requirements. Plans that do not demonstrate a clear understanding of the work or that do not demonstrate a capability to coordinate resources will be regarded as having not met the RFP requirements. Plans will be evaluated based on the level of involvement the contractor will have in the management, oversight, control, and coordination of the work performed by subcontractors. The SSEB will evaluate the clarity, adequacy, capabilities and strengths of the offeror’s narrative describing their ability to manage a successful project.
7.0 Volume I- Factor III – Small Business Participation Plan
7.1 Submission Requirements:
ALL OFFERORS ARE REQUIRED TO SUBMIT A SMALL BUSINESS PARTICIPATION
PLAN. The Small Business Participation Plan shall be based on the Offeror’s best effort and be required to address each of the following areas individually:
The extent in which the small business programs listed in FAR 19 (small business, small disadvantaged business, woman-owned small business, HubZone, service disabled veteran owned small business, etc.) are specifically identified in the Small Business Participation Plan;
The extent of participation of such firms in terms of the value of the total acquisition in %’s for the base year and for each individual option year; the extent of commitment to use such firms (for example, enforceable commitments, i.e. teaming agreements signed, are to be considered more heavily than non-enforceable ones);
The complexity and variety of the work small firms are to perform on this acquisition;
The realism of the Small Business Participation Plan, i.e., aggressive goals.
The Small Business Participation Plan shall be organized as follows:
(1) Prime Contractor type of business (check all that apply):
( ) Large ( ) Small (also check type of small business) ( ) Small Non-Disadvantaged Business ( ) Small Disadvantaged Business ( ) Woman-Owned Small Business ( ) HUBZone Small Business ( ) Veteran Owned Small Business ( ) Service Disabled, Veteran Owned Small Business
(2) Percentage of your participation as a prime contractor: %
(3) Percentage of total contract value of subcontracts planned for:
% of Total Contract Value Large %
Total Small % Small Non-Disadvantaged % Small Disadvantaged % Small Woman Owned % Small HUB Zone % Small Veteran Owned % Small Service Disabled Veteran Owned %
Each percentage above shall be accompanied by detailed supporting documentation regarding individual commitments.
NOTE: The sum of the percentages of Small Non-Disadvantaged and Small Disadvantaged should equal the entries for the Total Small; however, the sum of all of the percentages need not equal 100% since the prime is not included and individual subcontractors may be counted towards more than one category.
(4) List principal supplies/services (be specific) to be subcontracted to:
Name of Company
Type of Service/Supply
Large Small Non-Disadvantaged Small Disadvantaged Small Woman Owned Small HUB Zone
Small Veteran Owned Small Service Disabled Veteran Owned
(5) Prior Performance Information: Provide any information substantiating the Offeror’s track record of utilizing small business on past contracts.
(6) For Large and Small Businesses provide descriptive information for all small business categories. Any information concerning long-term relationships with Small Business subcontractors, such as mentor-protégé relationships, should be provided.
(7) Extent of Commitment: Provide documentation regarding enforceable commitments to utilize any small business category as defined in FAR Part 19 as subcontractors.
(8) Small Business Subcontracting Plan: Each Large Business Offeror shall provide a
Small Business Subcontracting Plan that contains all of the elements required by FAR Clause 52.219-9 Alt II. This Plan shall be submitted separately from the Small Business Participation information required above which applies to both Large and Small Businesses. The Subcontracting Plan is not a requirement for evaluation in source selection but, rather a requirement for award to a Large Business. The approved Small Business Subcontracting Plan will be incorporated into any resultant contract(s).
7.2 Evaluation Criteria:
ALL OFFERORS ARE REQUIRED TO SUBMIT A SMALL BUSINESS PARTICIPATION
PLAN. The Small Business Participation Plan will be evaluated on the Offeror’s best efforts and the level of small business commitment that is being demonstrated for the proposed acquisition and the prior level of commitment to utilizing small businesses in performance of prior contracts. The Small Business Participation Plan must meet the minimum Total Small Business Participation goal of 15% of the total contract value (through collective small business participation from any type of small business or sub- category small business).
Pursuant to DFARS PGI 215.304(c)(i)(A) the following elements will be considered in evaluating an Offeror’s Participation Plan:
The extent to which such firms, as defined in FAR Part 19, are specifically identified in plans;
The extent of commitment to use such firms (enforceable commitments will be weighted more heavily than non-enforceable ones);
The complexity and variety of the work such firms are to perform;
The realism of the plans;
Past performance of Offerors in complying with the requirements of the Subcontracting Plan
Goals for such firms and monetary targets for participation;
The extent of participation of such firms in terms of the proposed subcontracted value; and The extent to which the Offeror provides detailed explanations/documentation supporting the proposed participations percentages, or lack thereof. The Department of Defense (DOD) has established small business goals as an assistance to assure small business receives a fair proportion of DOD awards.
8.0 Volume 2 - Price and Proforma Information (Submit in a separate envelope).
8.1 Tab A - Standard Form 1442 and Proposal Price Breakout Schedule.
8.1.1 Submission Requirements:
The offeror shall complete and submit Standard Form 1442 and Section 00 10 00, Proposal Price Breakout Schedule.
8.1.2 Evaluation Criteria:
The price will be evaluated on base proposal plus all options. The price will be evaluated by the SSEB and Contracting Officer/SSA for fairness and reasonableness through the use of a price analysis. Price will also be checked for unbalancing of line items. Offerors are cautioned to distribute costs appropriately.
8.2 Tab B – Joint Venture and Mentor-Protégé Agreements
8.2.1 Submission Requirements:
Small business offerors (e.g., 8(a), HUBZone, SDVOSBC, etc.) submitting a proposal as a Joint Venture or Mentor- Protégé Joint Venture shall submit evidence from the Offeror's SBA Servicing Agency that the Offeror has notified and discussed the proposed joint venture for this specific project with the appropriate SBA Representative or Business Opportunity Specialist. Joint Venture agreements and approved 8(a) Mentor-Protégé agreements must be submitted with the proposal.
8.2.2 Evaluation Criteria:
Joint Venture Agreements and Mentor-Protégé agreements must comply with the relevant regulations in Title 13 of the Code of Federal Regulations.
8.3 Tab C – Evidence of Ability to Obtain Bonding and Proof of Financial Ability
8.3.1 Submission Requirements:
8.3.1.1 Financial Capability. Submit Proof of Financial Ability (Most recent financial statement covering assets and liabilities). Include the name, address and telephone number of firm's banking institution.
8.3.1.2 Bonding Capability. Submit information showing offeror's ability to be bonded for this project. Include the name, address and telephone number of the firm's bonding company.
8.3.2 Evaluation Criteria:
This information will be used for the purpose of completing the Pre-Award Survey and will not be rated.
8.4 Tab D – Subcontracting Plan
8.4.1 Submission Requirements:
Large business offerors shall submit a Subcontracting Plan in accordance with FAR Clauses 52.219-8 and 52.219-9 Alt II. To be acceptable, plans must adequately address the required statutory elements and provide sufficient information to enable the Contracting Officer to answer affirmatively questions 1 through 13 of Appendix DD, Part 3, AFARS 5119.705-4. You may use the attached sample sub-contracting plan as a starting point. Percentage goals apply to the total amount being subcontracted.
8.4.2 Evaluation Criteria:
Submitted information will be evaluated for acceptability in accordance with AFARS 19.705. To be acceptable, subcontracting plans must:
8.4.2.1 Adequately address the required statutory elements of Part 3 of Appendix DD
8.4.2.2 Provide sufficient information to enable the Contracting Officer to answer affirmatively questions 1 through 13 of Appendix DD (AFARS 5119.705-4), a copy of which is attached.
8.4.2.3 To be acceptable, the contractor must satisfy all objectives in Part 3 of Appendix
DD. Failure to receive a subcontracting plan rating of acceptable could jeopardize the offeror’s selection for contract award. If discussions with offerors are necessary, those areas where the plan is deficient will be reviewed with each offeror with the goal of correcting deficiencies.
8.5 Tab E – Pre-Award Information
8.5.1 Submission Requirements:
A. The offeror shall submit one completed copy of Section 00 45 00, Representations and Certification.
B. The offeror shall submit the following information:
a) Number of years the firm has been in business
b) Name, address and telephone…