This solicitation is for a hypersonics lab renovation at Wright-Patterson Air Force Base in Ohio. The project involves renovating Building 655 and is estimated to cost between $1,000,000 and $5,000,000. The NAICS code is 236220 for Commercial and Institutional Building Construction with a size standard of $39.5 million. This is a full and open procurement that requires a 10% price evaluation preference for HUBZone small businesses in accordance with FAR 19.1307. Offerors must register in the System for Award Management, which combines the former Central Contractor Registration and Online Representations and Certifications Application. A mandatory site visit is scheduled for July 8, 2021 at 1:30 PM Eastern Time, with RSVPs required by July 2. The solicitation number is W912QR21R0058.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CIVIL/OPS/ENVIRONMENTAL BR
ATTN: RENEE BOOTH
600 DR M L KING JR PL RM 821
LOUISVILLE KY 40202-2236
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Solicitation W912QR21R0058 for Hypersonics Lab Renovation, Building 655, at Wright-Patterson Air Force Base, OH is hereby modified as follows:
SEE CONTINUATION PAGE
1. CONTRACT ID CODE PAGE OF PAGES
1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912QR21R0058
X 9B. DATED (SEE ITEM 11)
29-Jun-2021
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO.
5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
10-Aug-2021
CODE
U. S. ARMY ENGINEER DISTRICT, LOUISVILLE
600 DR. MARTIN LUTHER KING, JR. PLACE
ROOM 821
LOUISVILLE KY 40202-2239
W912QR 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE W912QR
FACILITY CODECODE
EMAIL:TEL:
W912QR21R0058-0003
W912QR21R0058
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
CONTINUATION PAGE AMENDMENT 0003
Solicitation W912QR21R0058 for Hypersonics Lab Renovation, Building 655, at Wright-Patterson Air Force Base, OH is hereby modified as follows:
a. The following Plan Sheets are replaced, in their entirety:
1. G-005
2. Q-411
3. Q-701
4. Q-702
5. Q-703
6. Q-704
7. Q-705
8. Q-706
b. The submission date is not extended. Offerors must acknowledge all amendments within their proposal submission deadline of 1100 ET on 12 August 2021.
(End of Summary of Changes)
W912QR21R0058-0003
ME
K J H
LARGE GRAPHITE FURNACE COMPONENTS
CONSTRUCTION
BARRIER
CONSTRUCTION BARRIER
TEMPORARY STORAGE AREA
NOTE:
ITEMS SHOWN ARE JUST TO
DEMONSTRATE CAPACITY
DUAL GLOVE BOX AUTOCLAVE
K J H
CONSTRUCTION
BARRIER
CONSTRUCTION BARRIER
TEMPORARY STORAGE AREA
188 193
ME
11' - 8"
19' - 4"
/8
/8
RELOCATE SPS UNIT
TRANSFORMER FROM
ROOM 191 (EQUIP. ITEMS
#130, 131 AND 132 SHOWN
ON Q-401)
SMALL GRAPHITE FURNACE ON ROLLING TABLE AND
CONTOL UNIT TO BE RELOCATED TO PH1 ROOM 191
(EQUIPMENT #115 AND #115A)
(4) RELOCATED LOCKERS FROM RM 188 AND 191
EXISTING WORKSTATIONS IN
THIS AREA REMAIN HOWEVER
SHIFTING THEM TO CREATE
STORAGE SPACE IS
ACCEPTABLE
STORAGE RACKS
RELOCATED FROM RM 193
ITEM #062 AND #144
(2) RELOCATED LOCKERS FROM RM 193
PHASE 1
PHASE 2
BUILDING 655
ROOMS
155A & B
ROOM
ROOM
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
*** SAFETY PAYS ***
*** SUPPORT VALUE ENGINEERING - IT PAYS ***
F
IL
E N
A M
E
F
IL
E N
U M
B E
R
KEY PLAN
G-005
P H
A S
E
P H
A S
IN
G
P L
A N
S
W R
IG
H
T -P
A T
T E
R S
O N
A F
B
O H
IO
L
O U
IS
V
IL
L
E D
IS
T
R
IC
T L
O U
IS
V
IL
L
E K
E N
T U
C K
Y
R C
U R
R A
N
R C
U R
R A
N
S K
IM
B
A L L
J S
W E
E N
E Y
J U
N E
W Q
R R
CERTIFIED FINAL
R E
N O
V A
T E
R E
S E
A R
C H
F A
C
IL
IT
Y
F O
R H
Y P
E R
S O
N
IC
S L
A B
F
/2
P R
O J E
C T
Z
H T
V
P
SCALE: 1/8" = 1'-0"
A1
PH1 DEMO PLAN - PHASING
SCALE: 1/8" = 1'-0"
A5
PH1 NEW WORK PLAN - PHASING
SCALE: 1/8" = 1'-0"
F3
PH1 RM 049 - NEW WORK
PLAN NORTH
GENERAL NOTES
THE HYPERSONICS LABORATORY, BUILDING 655, ROOMS 183,185,188,191,193, 195, 197 AND 199 WILL BE
RENOVATED AS A TWO-PHASE CONSTRUCTION PROJECT.
EXISTING LABORATORY EQUIPMENT - CONTRACTOR IS REQUIRED TO DISCONNECT UTILITIES & EQUIPMENT MOUNTING (IF ANY) BASED ON LAB EQUIPMENT SCHEDULE Q-600 SERIES (REMOVAL OF UTILITIES IS STILL
CONTRACTORS RESPONSIBILITY BASED ON MEP DRAWINGS), AND MOVE TO TEMPORARY STORAGE BEFORE
COMMENCEMENT OF EACH PHASE OF WORK. UPON COMPLETION OF CONSTRUCTION THE CONTRACTOR IS REQUIRED TO MOVE EXISTING EQUIPMENT FROM TEMPORARY STORAGE LOCATION TO THE INDIVIDUAL
DESIGNATED LOCATIONS WITHIN THE RENOVATED LAB AND MAKE ALL FINAL UTILITY CONNECTIONS.
CONTRACTOR SHALL VERIFY WITH THE GOVERNMENT THAT EACH PIECE OF EQUIPMENT INSTALLED IN ITS
FINAL LOCATION IS OPERATING PROPERLY. SEE Q-SERIES DRAWINGS FOR EQUIPMENT SCHEDULES AND EXISTING EQUIPMENT LOCATIONS. GOVERNMENT FURNISHED AND GOVERNEMENT INSTALLED EQUIPMENT
WILL BE PLACED AND HOOKED UP TO NEW (CONTRACTOR INSTALLED) UTILITIES.
EQUIPMENT SCHEDULES (Q-SERIES DRAWINGS) PROVIDE INFORMATION REGARDING EXISTING LOCATION OF
EQUIPMENT, LOCATION FOR TEMPORARY STORAGE DURING PHASED CONSTRUCTION, AND FINAL LOCATION
UPON COMPLETION OF CONSTRUCTION.
ALLOW TWO WEEKS (14 CALENDAR DAYS) BETWEEN CLOSE-OUT OF PHASE I AND COMMENCEMENT OF PHASE
II FOR GOVERNMENT LABORATORY OPERATIONS TRANSITION.
THE WORK WILL BE PERFORMED WITHIN AN OCCUPIED LABORATORY FACILITY AND WILL REQUIRE SPECIAL
MEASURES TO MAINTAIN AND CONDUCT CONSTRUCTION ACTIVITIES WITHOUT INTERRUPTING ONGOING
BUILDING OPERATIONS. DAILY COORDINATION WITH THE BUILDING USER WILL BE REQUIRED.
CONTRACTOR IS REQUIRED TO PROVIDE A PHASING RENOVATION WORK PLAN. WORK PLAN REQUIREMENTS
ARE AS FOLLOWS:
• PROVIDE A DETAILED CONSTRUCTION SCHEDULE DEMONSTRATING THE SEQUENCE OF WORK IN EACH
PHASE WITH APPROPRIATE TIME ALLOCATED FOR PHASE AND PROJECT CLOSE-OUT PROCEDURES.
• WORK PLAN TO BE SUBMITTED FOR GOVERNMENT REVIEW AND APPROVAL WITHIN 14 DAYS AFTER
NOTICE-TO-PROCEED WITH CONSTRUCTION.
• AN APPROVED WORK PLAN IS REQUIRED BEFORE CONSTRUCTION CAN COMMENCE.
A SCHEDULED WALK THROUGH WITH DESIGNATED GOVERNMENT PERSONNEL IS REQUIRED TO CONFIRM AND
DOCUMENT EXISTING CONDITIONS WITHIN & AROUND THE WORK AREA, CONTRACTOR TRAVEL PATH, AND
AREAS WHERE UTILITY CONNECTIONS ARE REQUIRED.
TEMPORARY STORAGE AREA (SHOWN CROSS HATCHED): CONSTRUCTION BARRIER (AS NOTED IN SOUTH
HALL, DIMENSIONED PHASE 2 NEW WORK) REQUIREMENTS ARE FOR TEMPORARY STORAGE OF GOVERNMENT EQUIPMENT. BARRIER WALLS SHALL BE 6 FEET HIGH AND NO HIGHER IN ORDER TO MAINTAIN SPRINKLER
COVERAGE. BARRIER WALLS DO NOT NEED TO BE A SECURED WALL BUT SHOULD BE OF A SOLID MATERIAL
SUCH AS DRYWALL OR PLYWOOD.
AUTOCLAVE ITEM #081 LOCATED IN RM #197 – WILL BE TEMPORARILY STORED IN SOUTH HALLWAY FOR THE
ENTIRE DURATION OF CONSTRUCTION FOR BOTH PHASES. IT WILL BE PLACED BACK TO ITS ORIGINAL
LOCATION UPON COMPLETION OF CONSTRUCTION OF BOTH PHASES.
PHASE I REQUIREMENTS
PHASE I INCLUDES ROOMS 188, 191, 193 AND ROOM 195.
ALL PHASE I DEMOLITION, CONSTRUCTION EQUIPMENT INSTALLATION, UTILITIES CONNECTIONS, EQUIPMENT INSTALLATION, EQUIPMENT UTILITIES CONNECTIONS, GOVERNMENT VERIFICATION OF SATISFACTORY
EQUIPMENT OPERATION, AND PHASE I CLOSE-OUT PROCEDURES MUST BE COMPLETE PRIOR TO
COMMENCEMENT OF THE PHASE II WORK.
SPS ITEM #130 – MODEL #HP D25, SERIAL #8433 (INCLUDE ITEMS 131 AND 132 FORM SCHEDULE IN Q-SERIES
DRAWINGS). CONTRACTOR TO COORDINATE WITH FCT SYSTEME GMBH, RAUENSTEIN, GEWERBEPARK 16, 96528
FRANKENBLICK, GERMANY; TELEPHONE 49-36766-824 FOR SPS REQUIREMENTS NECESSARY FOR TAKING THE UNIT OUT OF SERVICE, MOVING AND CALIBRATING / CERTIFYING THE UNIT IS OPERATIONAL WHEN PLACED
BACK IN SERVICE IN ROOM 049.
LARGE GRAPHITE FURNACE ITEMS #136 AND #137 IN ROOM 188 REQUIRES DISASSEMBLY TO MOVE AND STORE.
CONTRACTOR RESPONSIBLE FOR DISASSEMBLY & REASSEMBLY IN NEW LOCATION. GRAPHITE FURNACES –
MODEL #F14X14X14 GG-2500-VM-G, SERIAL #4337. CONTRACTOR TO COORDINATE WITH MANUFACTURER FOR
REQUIREMENTS NECESSARY FOR TAKING THE UNIT OUT OF SERVICE, MOVING AND CALIBRATING / CERTIFYING
THE UNIT IS OPERATIONAL WHEN PLACED BACK IN SERVICE.
SMALL TOP LOAD FURNACE ITEM #115, 115A AND 115B – MODEL T4X8-G-G-2500-VM-G, SERIAL #5453.
CONTRACTOR TO COORDINATE WITH MANUFACTURER FOR REQUIREMENTS NECESSARY FOR TAKING THE UNIT OUT OF SERVICE IN ROOM 049, MOVING AND CALIBRATING / CERTIFYING THE UNIT IS OPERATIONAL WHEN
PLACED BACK IN SERVICE IN ROOM 191.
BOTH FURNACES (LARGE AND SMALL) ARE FROM THE SAME COMPANY:
MRF (MATERIALS RESEARCH FURNACES INC.)
SUNBROOK BUSINESS PARK - RT 28 AND LAVOIE DR, SUNCOOK, NEW HAMPSHIRE 03275
603-485-2394
TUBE FURNACES ITEMS #147, #148, #149, #154, #155 AND #156 SHALL BE BROKEN DOWN AND MOVED FOR
TEMPORARY STORAGE. TUBE FURNACES #146 AND #150 AS WELL AS BOX FURNACE ITEM #119 SHALL BE BROKEN DOWN AND REASSEMBLED IN A TEMPORARY LOCATION THAT WAS PREVIOUSLY OCCUPIED BY THE
AUTOCLAVE IN ROOM 197. CONTRACTOR SHALL PROVIDE TEMPORARY ELECTRIC AND UTILITY DROPS FOR THE
TWO TUBE FURNACES AND THE ONE BOX FURNACE. GOVERNMENT SHALL PROVIDE A MOBILE CART FOR
THESE THREE ITEMS AT THIS POSITION. (SEE CONTRACTING OFFICER FOR ADDITIONAL INFORMATION.) ONCE NEW WORK HAS BEEN COMPLETED THE ENTIRE ORIGINAL ASSEMBLY SHALL BE RELOCATED BACK TO ITS
ORIGINAL POSITION WITH THE EXCEPTION OF ITEMS #155 AND #156 WHICH SHALL BE LOCATED IN ROOM 195
WHEN NEW WORK IS COMPLETED.
REFER TO Q-SERIES DRAWINGS FOR EXISTING LOCATION OF LAB EQUIPMENT, SCHEDULES OF LAB EQUIPMENT
AND NEW LOCATION OF LAB EQUIPMENT AFTER COMPLETED RENOVATION WORK. SCHEDULES ALSO PROVIDE
INFORMATION AS TO WHERE TEMPORARY STORAGE MAY APPLY DURING RENOVATION AND WHO IS PROVIDING
AND INSTALLING EQUIPMENT.
SCALE: 1/8" = 1'-0"
F1
PH1 RM 049 - DEMO WORK
SCALE: 1/8" = 1'-0"
F5
PH1 RM 136 - NEW WORK
A
M E
N D
M E
N T
/2
/2
A
M E
N D
M E
N T
/0
/2
0' 4' 8' 16' 0' 4' 8' 16' 0' 4' 8' 16'
0' 4' 8' 16' 0' 4' 8' 16'
W
2Q R
R
-0
ME
K J H
A-421A6
C7
A3
A-421F7 F5
A-422
A2
A-421 C5
A1
D7
A-421 C1
D5
A-422
A1
A5 C4
A-422
D1 F3
F1 D4
C1
D1
C3
ME
119 120 121
159 157 117 118
069 070
115A
150 146
045046
170169
TV
068 071
GAS
APPLY NEW 5/16" THICK ALUMINUM
PLATE (6061) TOP OVER ENTIRE
FURNACE STAND. USE OLD TOP AS A
TEMPLATE.
GAS
ITEM 133 AND 134
EXHAUST HOODS ABOVE
36"W X 78"H X 24"D
11' - 8"
19' - 4"
/8
/8
RELOCATE SPS UNIT,
CHILLER AND
TRANSFORMER FROM
ROOM 191 (EQUIP. ITEMS
#130, 131 AND 132 SHOWN
ON Q-401)
(4) RELOCATED LOCKERS FROM RM 188 AND 191
EXISTING WORKSTATIONS IN
THIS AREA REMAIN HOWEVER
SHIFTING THEM TO CREATE
STORAGE SPACE IS
ACCEPTABLE
STORAGE RACKS
RELOCATED FROM RM 193
ITEM #062 AND #144
(2) RELOCATED LOCKERS FROM RM 193
PHASE 1
PHASE 2
BUILDING 655
ROOMS
155A & B
ROOM
ROOM
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
*** SAFETY PAYS ***
*** SUPPORT VALUE ENGINEERING - IT PAYS ***
F
IL
E N
A M
E
F
IL
E N
U M
B E
R
PLAN NORTH
KEY PLAN
Q-411
E N
L A
R G
E D
P H
A S
E
E Q
U
IP
M E
N T
P L
A N
N
E W
W O
R K
W R
IG
H
T -P
A T
T E
R S
O N
A F
B
O H
IO
L
O U
IS
V
IL
L
E D
IS
T
R
IC
T L
O U
IS
V
IL
L
E K
E N
T U
C K
Y
R C
U R
R A
N
B C
H E
R R
Y
S K
IM
B
A L L
J S
W E
E N
E Y
J U
N E
W Q
R R
CERTIFIED FINAL
R E
N O
V A
T E
R E
S E
A R
C H
F A
C
IL
IT
Y
F O
R H
Y P
E R
S O
N
IC
S L
A B
F
/2
P R
O J E
C T
Z
H T
V
SCALE: 1/4" = 1'-0"
A1
PH1 PARTIAL FIRST FLOOR PLAN - NEW WORK
0' 4' 8' 16'
SCALE: 1/8" = 1'-0"
C8
PH1 RM 049 - NEW WORK
SCALE: 1/8" = 1'-0"
E8
PH1 RM 136 - NEW WORK
A
M E
N D
M E
N T
/2
/2
A
M E
N D
M E
N T
/0
/2
W
2Q R
R
-0
A. SEE LAB EQUIPMENT SCHEDULE FOR WHAT ITEMS ARE TO BE TEMPORARILY STORED
FOR RELOCATION, ITEMS THAT WILL BE REMOVED AND RELOCATED BY THE
GOVERNMENT AND ITEMS THAT A CONTRACTOR FURNISHED AND INSTALLED.
B. SEE LAB EQUIPMENT SCHEDULE FOR WHERE ITEMS WILL BE TEMPORARILY RELOCATED
BY THE CONTRACTOR. SAME ITEMS WILL BE REINSTALLED IN A NEW LOCATION BY THE
CONTRACTOR.
C. REFER TO FLOOR PLANS FOR WHICH ITEMS OCCUR IN WHICH OF THE 2 PHASES
D. CONTRACTOR SHALL WITNESS GOVERNMENT OPERATION OF EQUIPMENT PRIOR TO
REMOVING, DOCUMENT WITH PHOTOS, DISCONNECT ALL UTILITIES (SEE MEP AND TECH
DWGS), WRAP FOR PROTECTION WHILE IN STORAGE. CONTRACTOR IS ALSO
RESPONSIBLE TO WITNESS GOVERNMENT OPERATION OF EQUIPMENT AFTER
RECONNECTION OF UTILITIES TO CONFIRM UNIT IS OPERATIONAL.
GENERAL NOTES:
024 - GIANT CENTRIFUGE #3
NUMBER CORRESPONDS TO NUMBER IN FIRST COLUMN OF
LAB EQUIPMENT SCHEDULE (Q-600 SERIES)
BRIEF DESCRIPTION OF EQUIPMENT
THIS NUMBER MEANS THERE IS MORE THAN ONE, EACH ARE
LISTED ON SCHEDULE
PHOTO LEGEND
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
*** SAFETY PAYS ***
*** SUPPORT VALUE ENGINEERING - IT PAYS ***
F
IL
E N
A M
E
F
IL
E N
U M
B E
R
Q-701
E Q
U
IP
M E
N T
P H
O T
O S
W R
IG
H
T -P
A T
T E
R S
O N
A F
B
O H
IO
L
O U
IS
V
IL
L
E D
IS
T
R
IC
T L
O U
IS
V
IL
L
E K
E N
T U
C K
Y
R C
U R
R A
N
R C
U R
R A
N
S K
IM
B
A L L
J S
W E
E N
E Y
J U
N E
W Q
R R
CERTIFIED FINAL
R E
N O
V A
T E
R E
S E
A R
C H
F A
C
IL
IT
Y
F O
R H
Y P
E R
S O
N
IC
S L
A B
F
/2
P R
O J E
C T
Z
H T
V
010 - DEIONIZED WATER SYSTEM REMOVE FUME HOOD
REMOVE FUME HOOD 015 - GLOVE BOX 1 016 - PAN BALANCE (O'HAUS)
017 - PAN BALANCE (SARTORIOUS)
018 - ROTO - BUCHI
REMOVE FUME HOOD REMOVE FUME HOOD
005 - BALANCE (METTLER) AND MARBLE TABLE 006 -BATH CIRCULATOR - NESLAB 011 + 112 - FLAMMABLE CABINETS #1 AND #2
022 + 023 - REFRIDGERATOR #1 AND #2
024 - REFRIDGERATOR #3 027 - GRAVITY CONVECTION OVEN #1 - YAMATO 028 - GRAVITY CONVECTION OVEN #2 - YAMATO
SCALE: NTS
PHOTO
F1
SCALE: NTS
PHOTO
F3
SCALE: NTS
PHOTO
F5
SCALE: NTS
PHOTO
F7
SCALE: NTS
PHOTO
F9
SCALE: NTS
PHOTO
D1
SCALE: NTS
PHOTO
D3
SCALE: NTS
PHOTO
D5
SCALE: NTS
PHOTO
D7
SCALE: NTS
PHOTO
D9
SCALE: NTS
PHOTO
B1
SCALE: NTS
PHOTO
B3
SCALE: NTS
PHOTO
B5
SCALE: NTS
PHOTO
B7
SCALE: NTS
PHOTO
B9
A
M E
N D
M E
N T
/0
/2
W
2Q R
R
-0
GOVERNMENT AND ITEMS THAT A CONTRACTOR FURNISHED AND INSTALLED.
B. SEE LAB EQUIPMENT SCHEDULE FOR WHERE ITEMS WILL BE TEMPORARILY RELOCATED
BY THE CONTRACTOR. SAME ITEMS WILL BE REINSTALLED IN A NEW LOCATION BY THE
CONTRACTOR.
C. REFER TO FLOOR PLANS FOR WHICH ITEMS OCCUR IN WHICH OF THE 2 PHASES
D. CONTRACTOR SHALL WITNESS GOVERNMENT OPERATION OF EQUIPMENT PRIOR TO
REMOVING, DOCUMENT WITH PHOTOS, DISCONNECT ALL UTILITIES (SEE MEP AND TECH
DWGS), WRAP FOR PROTECTION WHILE IN STORAGE. CONTRACTOR IS ALSO
RESPONSIBLE TO WITNESS GOVERNMENT OPERATION OF EQUIPMENT AFTER
RECONNECTION OF UTILITIES TO CONFIRM UNIT IS OPERATIONAL.
GENERAL NOTES:
024 - GIANT CENTRIFUGE #3
NUMBER CORRESPONDS TO NUMBER IN FIRST COLUMN OF
LAB EQUIPMENT SCHEDULE (Q-600 SERIES)
BRIEF DESCRIPTION OF EQUIPMENT
THIS NUMBER MEANS THERE IS MORE THAN ONE, EACH ARE
LISTED ON SCHEDULE
PHOTO LEGEND
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
*** SAFETY PAYS ***
*** SUPPORT VALUE ENGINEERING - IT PAYS ***
F
IL
E N
A M
E
F
IL
E N
U M
B E
R
Q-702
E Q
U
IP
M E
N T
P H
O T
O S
W R
IG
H
T -P
A T
T E
R S
O N
A F
B
O H
IO
L
O U
IS
V
IL
L
E D
IS
T
R
IC
T L
O U
IS
V
IL
L
E K
E N
T U
C K
Y
R C
U R
R A
N
R C
U R
R A
N
S K
IM
B
A L L
J S
W E
E N
E Y
J U
N E
W Q
R R
CERTIFIED FINAL
R E
N O
V A
T E
R E
S E
A R
C H
F A
C
IL
IT
Y
F O
R H
Y P
E R
S O
N
IC
S L
A B
F
/2
P R
O J E
C T
Z
H T
V
030 - MIXER
034 - ULTRA SONIC CLEANER
035 - BALL MILL 1
036 - BALL MILL 2
REMOVE FUME HOODREMOVE FUME HOOD
029 - GRAVITY CONVECTION OVEN #3 - YAMATO 033 - STORAGE LOCKER #3 037 - CARVER PRESS #1 (IN FUMEHOOD 051)
038 - CARVER PRESS #2 039 - CARVER PRESS #3 045 - FIBER COATER RIG 046 - FIBER COATER RIG FILAMENT WINDER 047 - FLAMMABLE CABINET #3
048 - FLAMMABLE CABINET #4
066 - TABLE
050 - WALK-IN FUME HOOD 052 - GLOVE BOX #2 - BRAUN
SCALE: NTS
PHOTO
F1
SCALE: NTS
PHOTO
F3
SCALE: NTS
PHOTO
F5
SCALE: NTS
PHOTO
F7
SCALE: NTS
PHOTO
F9
SCALE: NTS
PHOTO
D1
SCALE: NTS
PHOTO
D3
SCALE: NTS
PHOTO
D5
SCALE: NTS
PHOTO
D7
SCALE: NTS
PHOTO
D9
SCALE: NTS
PHOTO
B1
SCALE: NTS
PHOTO
B3
SCALE: NTS
PHOTO
B5
SCALE: NTS
PHOTO
B7
SCALE: NTS
PHOTO
B9
A
M E
N D
M E
N T
/0
/2
W
2Q R
R
-0
GOVERNMENT AND ITEMS THAT A CONTRACTOR FURNISHED AND INSTALLED.
B. SEE LAB EQUIPMENT SCHEDULE FOR WHERE ITEMS WILL BE TEMPORARILY RELOCATED
BY THE CONTRACTOR. SAME ITEMS WILL BE REINSTALLED IN A NEW LOCATION BY THE
CONTRACTOR.
C. REFER TO FLOOR PLANS FOR WHICH ITEMS OCCUR IN WHICH OF THE 2 PHASES
D. CONTRACTOR SHALL WITNESS GOVERNMENT OPERATION OF EQUIPMENT PRIOR TO
REMOVING, DOCUMENT WITH PHOTOS, DISCONNECT ALL UTILITIES (SEE MEP AND TECH
DWGS), WRAP FOR PROTECTION WHILE IN STORAGE. CONTRACTOR IS ALSO
RESPONSIBLE TO WITNESS GOVERNMENT OPERATION OF EQUIPMENT AFTER
RECONNECTION OF UTILITIES TO CONFIRM UNIT IS OPERATIONAL.
GENERAL NOTES:
024 - GIANT CENTRIFUGE #3
NUMBER CORRESPONDS TO NUMBER IN FIRST COLUMN OF
LAB EQUIPMENT SCHEDULE (Q-600 SERIES)
BRIEF DESCRIPTION OF EQUIPMENT
THIS NUMBER MEANS THERE IS MORE THAN ONE, EACH ARE
LISTED ON SCHEDULE
PHOTO LEGEND
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
*** SAFETY PAYS ***
*** SUPPORT VALUE ENGINEERING - IT PAYS ***
F
IL
E N
A M
E
F
IL
E N
U M
B E
R
Q-703
E Q
U
IP
M E
N T
P H
O T
O S
W R
IG
H
T -P
A T
T E
R S
O N
A F
B
O H
IO
L
O U
IS
V
IL
L
E D
IS
T
R
IC
T L
O U
IS
V
IL
L
E K
E N
T U
C K
Y
R C
U R
R A
N
R C
U R
R A
N
S K
IM
B
A L L
J S
W E
E N
E Y
J U
N E
W Q
R R
CERTIFIED FINAL
R E
N O
V A
T E
R E
S E
A R
C H
F A
C
IL
IT
Y
F O
R H
Y P
E R
S O
N
IC
S L
A B
F
/2
P R
O J E
C T
Z
H T
V
054 - HUMIDITY OVEN 055 - LAMINATOR 056 - LATHE - MICROLUX NOT LISTED - WINDING TABLE RELOCATE TO RM 195 058 - SAW
060 AND 061 - STORAGE LOCKER #4 AND #5 063 AND 064 - SYRINGE PUMP #1 AND #2 (INSIDE WALK-IN FUME HOOD) 065 - SYRINGE PUMP #3 (INSIDE WALK-IN FUME HOOD) 068 - VACUUM OVEN #1
071 - VACUUM OVEN #2
069 - VACUUM OVEN #14
070 - VACCUM OVEN #18 076 - FIBER POLISHER 077 - FIBER PUSHOUT TESTER 078 - MTS SYNERGIE 400 079 - USCOPE
SCALE: NTS
PHOTO
F1
SCALE: NTS
PHOTO
F3
SCALE: NTS
PHOTO
F5
SCALE: NTS
PHOTO
F7
SCALE: NTS
PHOTO
F9
SCALE: NTS
PHOTO
D1
SCALE: NTS
PHOTO
D3
SCALE: NTS
PHOTO
D5
SCALE: NTS
PHOTO
D7
SCALE: NTS
PHOTO
D9
SCALE: NTS
PHOTO
B1
SCALE: NTS
PHOTO
B3
SCALE: NTS
PHOTO
B5
SCALE: NTS
PHOTO
B7
SCALE: NTS
PHOTO
B9
A
M E
N D
M E
N T
/0
/2
W
2Q R
R
-0
GOVERNMENT AND ITEMS THAT A CONTRACTOR FURNISHED AND INSTALLED.
B. SEE LAB EQUIPMENT SCHEDULE FOR WHERE ITEMS WILL BE TEMPORARILY RELOCATED
BY THE CONTRACTOR. SAME ITEMS WILL BE REINSTALLED IN A NEW LOCATION BY THE
CONTRACTOR.
C. REFER TO FLOOR PLANS FOR WHICH ITEMS OCCUR IN WHICH OF THE 2 PHASES
D. CONTRACTOR SHALL WITNESS GOVERNMENT OPERATION OF EQUIPMENT PRIOR TO
REMOVING, DOCUMENT WITH PHOTOS, DISCONNECT ALL UTILITIES (SEE MEP AND TECH
DWGS), WRAP FOR PROTECTION WHILE IN STORAGE. CONTRACTOR IS ALSO
RESPONSIBLE TO WITNESS GOVERNMENT OPERATION OF EQUIPMENT AFTER
RECONNECTION OF UTILITIES TO CONFIRM UNIT IS OPERATIONAL.
GENERAL NOTES:
024 - GIANT CENTRIFUGE #3
NUMBER CORRESPONDS TO NUMBER IN FIRST COLUMN OF
LAB EQUIPMENT SCHEDULE (Q-600 SERIES)
BRIEF DESCRIPTION OF EQUIPMENT
THIS NUMBER MEANS THERE IS MORE THAN ONE, EACH ARE
LISTED ON SCHEDULE
PHOTO LEGEND
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
*** SAFETY PAYS ***
*** SUPPORT VALUE ENGINEERING - IT PAYS ***
F
IL
E N
A M
E
F
IL
E N
U M
B E
R
Q-704
E Q
U
IP
M E
N T
P H
O T
O S
W R
IG
H
T -P
A T
T E
R S
O N
A F
B
O H
IO
L
O U
IS
V
IL
L
E D
IS
T
R
IC
T L
O U
IS
V
IL
L
E K
E N
T U
C K
Y
R C
U R
R A
N
R C
U R
R A
N
S K
IM
B
A L L
J S
W E
E N
E Y
J U
N E
W Q
R R
CERTIFIED FINAL
R E
N O
V A
T E
R E
S E
A R
C H
F A
C
IL
IT
Y
F O
R H
Y P
E R
S O
N
IC
S L
A B
F
/2
P R
O J E
C T
Z
H T
V
080 - USCOPE 081 - AUTOCLAVE 085 - CUTTING TABLE (MIRROR IS NOT IN SCOPE) REMOVE FUME HOOD 088 - IMPULSE AUTOSEALER
089 - ROLL RACK 090 - STORAGE LOCKER #1 091 - STORAGE LOCKER #2 092 - THINKY MIXER #1
093 - THINKY MIXER #2
094 - ASIGA
100 - CENTRIFUGE
102 - DESICCATOR RACK 104 - FISHER OVEN 105 - FREEZER 106 - HJ LASER 3D PRINTER 107 - HYREL SYSTEM 30M
SCALE: NTS
PHOTO
F1
SCALE: NTS
PHOTO
F3
SCALE: NTS
PHOTO
F5
SCALE: NTS
PHOTO
F7
SCALE: NTS
PHOTO
F9
SCALE: NTS
PHOTO
D1
SCALE: NTS
PHOTO
D3
SCALE: NTS
PHOTO
D5
SCALE: NTS
PHOTO
D7
SCALE: NTS
PHOTO
D9
SCALE: NTS
PHOTO
B1
SCALE: NTS
PHOTO
B3
SCALE: NTS
PHOTO
B5
SCALE: NTS
PHOTO
B7
SCALE: NTS
PHOTO
B9
A
M E
N D
M E
N T
/0
/2
W
2Q R
R
-0
GOVERNMENT AND ITEMS THAT A CONTRACTOR FURNISHED AND INSTALLED.
B. SEE LAB EQUIPMENT SCHEDULE FOR WHERE ITEMS WILL BE TEMPORARILY RELOCATED
BY THE CONTRACTOR. SAME ITEMS WILL BE REINSTALLED IN A NEW LOCATION BY THE
CONTRACTOR.
C. REFER TO FLOOR PLANS FOR WHICH ITEMS OCCUR IN WHICH OF THE 2 PHASES
D. CONTRACTOR SHALL WITNESS GOVERNMENT OPERATION OF EQUIPMENT PRIOR TO
REMOVING, DOCUMENT WITH PHOTOS, DISCONNECT ALL UTILITIES (SEE MEP AND TECH
DWGS), WRAP FOR PROTECTION WHILE IN STORAGE. CONTRACTOR IS ALSO
RESPONSIBLE TO WITNESS GOVERNMENT OPERATION OF EQUIPMENT AFTER
RECONNECTION OF UTILITIES TO CONFIRM UNIT IS OPERATIONAL.
GENERAL NOTES:
024 - GIANT CENTRIFUGE #3
NUMBER CORRESPONDS TO NUMBER IN FIRST COLUMN OF
LAB EQUIPMENT SCHEDULE (Q-600 SERIES)
BRIEF DESCRIPTION OF EQUIPMENT
THIS NUMBER MEANS THERE IS MORE THAN ONE, EACH ARE
LISTED ON SCHEDULE
PHOTO LEGEND
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
*** SAFETY PAYS ***
*** SUPPORT VALUE ENGINEERING - IT PAYS ***
F
IL
E N
A M
E
F
IL
E N
U M
B E
R
Q-705
E Q
U
IP
M E
N T
P H
O T
O S
W R
IG
H
T -P
A T
T E
R S
O N
A F
B
O H
IO
L
O U
IS
V
IL
L
E D
IS
T
R
IC
T L
O U
IS
V
IL
L
E K
E N
T U
C K
Y
R C
U R
R A
N
R C
U R
R A
N
S K
IM
B
A L L
J S
W E
E N
E Y
J U
N E
W Q
R R
CERTIFIED FINAL
R E
N O
V A
T E
R E
S E
A R
C H
F A
C
IL
IT
Y
F O
R H
Y P
E R
S O
N
IC
S L
A B
F
/2
P R
O J E
C T
Z
H T
V
108 - PARTICLE SIZE ANALYZER
109 - PYCNOMETER
110 - RHEO AND CHILLER 113 - ULTRA SONIC HORN 115 - GRAPHITE FURNACE AND CONTROLLER 117 AND 118 - ASHING FURNACES #10 AND #11
119 - BOX FURNACE #6 120 - BOX FURNACE #7 121 - BOX FURNACE #8 122 - BOX FURNACE #8 CONTROLLER
130 - FIELD ASSISTED SINTERING UNIT (SPS)
133 - CHILLER AND TRANSFORMER
136 - GRAPHITE FURNACE #15 137 - GRAPHITE FURNACE CHILLER 138 - HAY WET FURNACE 140 AND 141 - STORAGE LOCKER #6 AND #7
SCALE: NTS
PHOTO
F1
SCALE: NTS
PHOTO
F3
SCALE: NTS
PHOTO
F5
SCALE: NTS
PHOTO
F7
SCALE: NTS
PHOTO
F9
SCALE: NTS
PHOTO
D1
SCALE: NTS
PHOTO
D3
SCALE: NTS
PHOTO
D5
SCALE: NTS
PHOTO
D7
SCALE: NTS
PHOTO
B1
SCALE: NTS
PHOTO
B3
SCALE: NTS
PHOTO
B5
SCALE: NTS
PHOTO
B7
SCALE: NTS
PHOTO
B9
A
M E
N D
M E
N T
/0
/2
W
2Q R
R
-0
GOVERNMENT AND ITEMS THAT A CONTRACTOR FURNISHED AND INSTALLED.
B. SEE LAB EQUIPMENT SCHEDULE FOR WHERE ITEMS WILL BE TEMPORARILY RELOCATED
BY THE CONTRACTOR. SAME ITEMS WILL BE REINSTALLED IN A NEW LOCATION BY THE
CONTRACTOR.
C. REFER TO FLOOR PLANS FOR WHICH ITEMS OCCUR IN WHICH OF THE 2 PHASES
D. CONTRACTOR SHALL WITNESS GOVERNMENT OPERATION OF EQUIPMENT PRIOR TO
REMOVING, DOCUMENT WITH PHOTOS, DISCONNECT ALL UTILITIES (SEE MEP AND TECH
DWGS), WRAP FOR PROTECTION WHILE IN STORAGE. CONTRACTOR IS ALSO
RESPONSIBLE TO WITNESS GOVERNMENT OPERATION OF EQUIPMENT AFTER
RECONNECTION OF UTILITIES TO CONFIRM UNIT IS OPERATIONAL.
GENERAL NOTES:
024 - GIANT CENTRIFUGE #3
NUMBER CORRESPONDS TO NUMBER IN FIRST COLUMN OF
LAB EQUIPMENT SCHEDULE (Q-600 SERIES)
BRIEF DESCRIPTION OF EQUIPMENT
THIS NUMBER MEANS THERE IS MORE THAN ONE, EACH ARE
LISTED ON SCHEDULE
PHOTO LEGEND
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
*** SAFETY PAYS ***
*** SUPPORT VALUE ENGINEERING - IT PAYS ***
F
IL
E N
A M
E
F
IL
E N
U M
B E
R
Q-706
E Q
U
IP
M E
N T
P H
O T
O S
W R
IG
H
T -P
A T
T E
R S
O N
A F
B
O H
IO
L
O U
IS
V
IL
L
E D
IS
T
R
IC
T L
O U
IS
V
IL
L
E K
E N
T U
C K
Y
R C
U R
R A
N
R C
U R
R A
N
S K
IM
B
A L L
J S
W E
E N
E Y
J U
N E
W Q
R R
CERTIFIED FINAL
R E
N O
V A
T E
R E
S E
A R
C H
F A
C
IL
IT
Y
F O
R H
Y P
E R
S O
N
IC
S L
A B
F
/2
P R
O J E
C T
Z
H T
V
142 AND 143 - STORAGE LOCKER #8 AND #9 145 - TORCH TEST STATION 146 THRU 155 - TUBE FURNACES (FRONT AND BACK
151 - TUBE FURNACE #4
152 - TUBE FURNACE #4 PRE-HEATER
153 - TUBE FURNACE #4 WATER PUMP
156 - TUBE FURNACE #9 CONTROLLER
157 - VACUUM OVEN #16
158 - VACUUM OVEN #16 CHILLER
144 - STORAGE RACK #2
159 - ZR02 FURNACE
SCALE: NTS
PHOTO
F1
SCALE: NTS
PHOTO
F3
SCALE: NTS
PHOTO
F5
SCALE: NTS
PHOTO
F7
SCALE: NTS
PHOTO
F9
SCALE: NTS
PHOTO
D1
SCALE: NTS
PHOTO
D3
A
M E
N D
M E
N T
/0
/2
W
2Q R
R
-0
| STANDARD FORM 30 |
| SUMMARY OF CHANGES |
| Sheets |
| G-005 - PHASE 1 PHASING PLANS |
| Q-411 - ENLARGED PHASE 1 EQUIPMENT PLAN - NEW WORK |
| Q-411 - ENLARGED PHASE 1 EQUIPMENT PLAN - NEW WORK.pdf |
| Sheets |
| G-005 - PHASE 1 PHASING PLANS |
| Q-411 - ENLARGED PHASE 1 EQUIPMENT PLAN - NEW WORK |
| Q-701 - EQUIPMENT PHOTOS.pdf |
| Sheets |
| Q-701 - EQUIPMENT PHOTOS |
| Q-702 - EQUIPMENT PHOTOS.pdf |
| Sheets |
| Q-702 - EQUIPMENT PHOTOS |
| Q-703 - EQUIPMENT PHOTOS |
| Q-704 - EQUIPMENT PHOTOS |
| Q-705 - EQUIPMENT PHOTOS |
| Q-706 - EQUIPMENT PHOTOS |
| Q-703 - EQUIPMENT PHOTOS.pdf |
| Sheets |
| Q-702 - EQUIPMENT PHOTOS |
| Q-703 - EQUIPMENT PHOTOS |
| Q-704 - EQUIPMENT PHOTOS |
| Q-705 - EQUIPMENT PHOTOS |
| Q-706 - EQUIPMENT PHOTOS |
| Q-704 - EQUIPMENT PHOTOS.pdf |
| Sheets |
| Q-702 - EQUIPMENT PHOTOS |
| Q-703 - EQUIPMENT PHOTOS |
| Q-704 - EQUIPMENT PHOTOS |
| Q-705 - EQUIPMENT PHOTOS |
| Q-706 - EQUIPMENT PHOTOS |
| Q-705 - EQUIPMENT PHOTOS.pdf |
| Sheets |
| Q-702 - EQUIPMENT PHOTOS |
| Q-703 - EQUIPMENT PHOTOS |
| Q-704 - EQUIPMENT PHOTOS |
| Q-705 - EQUIPMENT PHOTOS |
| Q-706 - EQUIPMENT PHOTOS |
| Q-706 - EQUIPMENT PHOTOS.pdf |
| Sheets |
| Q-702 - EQUIPMENT PHOTOS |
| Q-703 - EQUIPMENT PHOTOS |
| Q-704 - EQUIPMENT PHOTOS |
| Q-705 - EQUIPMENT PHOTOS |
| Q-706 - EQUIPMENT PHOTOS |
File details come from the government source that posted it. Updated .