W912QR21R0058-0003.pdf

PDF 5 MB Posted

Attached to
Hypersonics Lab Renovation at Wright-Patterson Air Force Base, OH
Solicitation number
W912QR21R0058
Issued by

About this file

This solicitation is for a hypersonics lab renovation at Wright-Patterson Air Force Base in Ohio. The project involves renovating Building 655 and is estimated to cost between $1,000,000 and $5,000,000. The NAICS code is 236220 for Commercial and Institutional Building Construction with a size standard of $39.5 million. This is a full and open procurement that requires a 10% price evaluation preference for HUBZone small businesses in accordance with FAR 19.1307. Offerors must register in the System for Award Management, which combines the former Central Contractor Registration and Online Representations and Certifications Application. A mandatory site visit is scheduled for July 8, 2021 at 1:30 PM Eastern Time, with RSVPs required by July 2. The solicitation number is W912QR21R0058.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CIVIL/OPS/ENVIRONMENTAL BR

ATTN: RENEE BOOTH

600 DR M L KING JR PL RM 821

LOUISVILLE KY 40202-2236

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Solicitation W912QR21R0058 for Hypersonics Lab Renovation, Building 655, at Wright-Patterson Air Force Base, OH is hereby modified as follows:

SEE CONTINUATION PAGE

1. CONTRACT ID CODE PAGE OF PAGES

1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912QR21R0058

X 9B. DATED (SEE ITEM 11)

29-Jun-2021

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO.

5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

10-Aug-2021

CODE

U. S. ARMY ENGINEER DISTRICT, LOUISVILLE

600 DR. MARTIN LUTHER KING, JR. PLACE

ROOM 821

LOUISVILLE KY 40202-2239

W912QR 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE W912QR

FACILITY CODECODE

EMAIL:TEL:

W912QR21R0058-0003

W912QR21R0058

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)

The following have been added by full text:

CONTINUATION PAGE AMENDMENT 0003

Solicitation W912QR21R0058 for Hypersonics Lab Renovation, Building 655, at Wright-Patterson Air Force Base, OH is hereby modified as follows:

a. The following Plan Sheets are replaced, in their entirety:

1. G-005

2. Q-411

3. Q-701

4. Q-702

5. Q-703

6. Q-704

7. Q-705

8. Q-706

b. The submission date is not extended. Offerors must acknowledge all amendments within their proposal submission deadline of 1100 ET on 12 August 2021.

(End of Summary of Changes)

W912QR21R0058-0003

ME

K J H

LARGE GRAPHITE FURNACE COMPONENTS

CONSTRUCTION

BARRIER

CONSTRUCTION BARRIER

TEMPORARY STORAGE AREA

NOTE:

ITEMS SHOWN ARE JUST TO

DEMONSTRATE CAPACITY

DUAL GLOVE BOX AUTOCLAVE

K J H

CONSTRUCTION

BARRIER

CONSTRUCTION BARRIER

TEMPORARY STORAGE AREA

188 193

ME

11' - 8"

19' - 4"

/8

/8

RELOCATE SPS UNIT

TRANSFORMER FROM

ROOM 191 (EQUIP. ITEMS

#130, 131 AND 132 SHOWN

ON Q-401)

SMALL GRAPHITE FURNACE ON ROLLING TABLE AND

CONTOL UNIT TO BE RELOCATED TO PH1 ROOM 191

(EQUIPMENT #115 AND #115A)

(4) RELOCATED LOCKERS FROM RM 188 AND 191

EXISTING WORKSTATIONS IN

THIS AREA REMAIN HOWEVER

SHIFTING THEM TO CREATE

STORAGE SPACE IS

ACCEPTABLE

STORAGE RACKS

RELOCATED FROM RM 193

ITEM #062 AND #144

(2) RELOCATED LOCKERS FROM RM 193

PHASE 1

PHASE 2

BUILDING 655

ROOMS

155A & B

ROOM

ROOM

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

*** SAFETY PAYS ***

*** SUPPORT VALUE ENGINEERING - IT PAYS ***

F

IL

E N

A M

E

F

IL

E N

U M

B E

R

KEY PLAN

G-005

P H

A S

E

P H

A S

IN

G

P L

A N

S

W R

IG

H

T -P

A T

T E

R S

O N

A F

B

O H

IO

L

O U

IS

V

IL

L

E D

IS

T

R

IC

T L

O U

IS

V

IL

L

E K

E N

T U

C K

Y

R C

U R

R A

N

R C

U R

R A

N

S K

IM

B

A L L

J S

W E

E N

E Y

J U

N E

W Q

R R

CERTIFIED FINAL

R E

N O

V A

T E

R E

S E

A R

C H

F A

C

IL

IT

Y

F O

R H

Y P

E R

S O

N

IC

S L

A B

F

/2

P R

O J E

C T

Z

H T

V

P

SCALE: 1/8" = 1'-0"

A1

PH1 DEMO PLAN - PHASING

SCALE: 1/8" = 1'-0"

A5

PH1 NEW WORK PLAN - PHASING

SCALE: 1/8" = 1'-0"

F3

PH1 RM 049 - NEW WORK

PLAN NORTH

GENERAL NOTES

THE HYPERSONICS LABORATORY, BUILDING 655, ROOMS 183,185,188,191,193, 195, 197 AND 199 WILL BE

RENOVATED AS A TWO-PHASE CONSTRUCTION PROJECT.

EXISTING LABORATORY EQUIPMENT - CONTRACTOR IS REQUIRED TO DISCONNECT UTILITIES & EQUIPMENT MOUNTING (IF ANY) BASED ON LAB EQUIPMENT SCHEDULE Q-600 SERIES (REMOVAL OF UTILITIES IS STILL

CONTRACTORS RESPONSIBILITY BASED ON MEP DRAWINGS), AND MOVE TO TEMPORARY STORAGE BEFORE

COMMENCEMENT OF EACH PHASE OF WORK. UPON COMPLETION OF CONSTRUCTION THE CONTRACTOR IS REQUIRED TO MOVE EXISTING EQUIPMENT FROM TEMPORARY STORAGE LOCATION TO THE INDIVIDUAL

DESIGNATED LOCATIONS WITHIN THE RENOVATED LAB AND MAKE ALL FINAL UTILITY CONNECTIONS.

CONTRACTOR SHALL VERIFY WITH THE GOVERNMENT THAT EACH PIECE OF EQUIPMENT INSTALLED IN ITS

FINAL LOCATION IS OPERATING PROPERLY. SEE Q-SERIES DRAWINGS FOR EQUIPMENT SCHEDULES AND EXISTING EQUIPMENT LOCATIONS. GOVERNMENT FURNISHED AND GOVERNEMENT INSTALLED EQUIPMENT

WILL BE PLACED AND HOOKED UP TO NEW (CONTRACTOR INSTALLED) UTILITIES.

EQUIPMENT SCHEDULES (Q-SERIES DRAWINGS) PROVIDE INFORMATION REGARDING EXISTING LOCATION OF

EQUIPMENT, LOCATION FOR TEMPORARY STORAGE DURING PHASED CONSTRUCTION, AND FINAL LOCATION

UPON COMPLETION OF CONSTRUCTION.

ALLOW TWO WEEKS (14 CALENDAR DAYS) BETWEEN CLOSE-OUT OF PHASE I AND COMMENCEMENT OF PHASE

II FOR GOVERNMENT LABORATORY OPERATIONS TRANSITION.

THE WORK WILL BE PERFORMED WITHIN AN OCCUPIED LABORATORY FACILITY AND WILL REQUIRE SPECIAL

MEASURES TO MAINTAIN AND CONDUCT CONSTRUCTION ACTIVITIES WITHOUT INTERRUPTING ONGOING

BUILDING OPERATIONS. DAILY COORDINATION WITH THE BUILDING USER WILL BE REQUIRED.

CONTRACTOR IS REQUIRED TO PROVIDE A PHASING RENOVATION WORK PLAN. WORK PLAN REQUIREMENTS

ARE AS FOLLOWS:

• PROVIDE A DETAILED CONSTRUCTION SCHEDULE DEMONSTRATING THE SEQUENCE OF WORK IN EACH

PHASE WITH APPROPRIATE TIME ALLOCATED FOR PHASE AND PROJECT CLOSE-OUT PROCEDURES.

• WORK PLAN TO BE SUBMITTED FOR GOVERNMENT REVIEW AND APPROVAL WITHIN 14 DAYS AFTER

NOTICE-TO-PROCEED WITH CONSTRUCTION.

• AN APPROVED WORK PLAN IS REQUIRED BEFORE CONSTRUCTION CAN COMMENCE.

A SCHEDULED WALK THROUGH WITH DESIGNATED GOVERNMENT PERSONNEL IS REQUIRED TO CONFIRM AND

DOCUMENT EXISTING CONDITIONS WITHIN & AROUND THE WORK AREA, CONTRACTOR TRAVEL PATH, AND

AREAS WHERE UTILITY CONNECTIONS ARE REQUIRED.

TEMPORARY STORAGE AREA (SHOWN CROSS HATCHED): CONSTRUCTION BARRIER (AS NOTED IN SOUTH

HALL, DIMENSIONED PHASE 2 NEW WORK) REQUIREMENTS ARE FOR TEMPORARY STORAGE OF GOVERNMENT EQUIPMENT. BARRIER WALLS SHALL BE 6 FEET HIGH AND NO HIGHER IN ORDER TO MAINTAIN SPRINKLER

COVERAGE. BARRIER WALLS DO NOT NEED TO BE A SECURED WALL BUT SHOULD BE OF A SOLID MATERIAL

SUCH AS DRYWALL OR PLYWOOD.

AUTOCLAVE ITEM #081 LOCATED IN RM #197 – WILL BE TEMPORARILY STORED IN SOUTH HALLWAY FOR THE

ENTIRE DURATION OF CONSTRUCTION FOR BOTH PHASES. IT WILL BE PLACED BACK TO ITS ORIGINAL

LOCATION UPON COMPLETION OF CONSTRUCTION OF BOTH PHASES.

PHASE I REQUIREMENTS

PHASE I INCLUDES ROOMS 188, 191, 193 AND ROOM 195.

ALL PHASE I DEMOLITION, CONSTRUCTION EQUIPMENT INSTALLATION, UTILITIES CONNECTIONS, EQUIPMENT INSTALLATION, EQUIPMENT UTILITIES CONNECTIONS, GOVERNMENT VERIFICATION OF SATISFACTORY

EQUIPMENT OPERATION, AND PHASE I CLOSE-OUT PROCEDURES MUST BE COMPLETE PRIOR TO

COMMENCEMENT OF THE PHASE II WORK.

SPS ITEM #130 – MODEL #HP D25, SERIAL #8433 (INCLUDE ITEMS 131 AND 132 FORM SCHEDULE IN Q-SERIES

DRAWINGS). CONTRACTOR TO COORDINATE WITH FCT SYSTEME GMBH, RAUENSTEIN, GEWERBEPARK 16, 96528

FRANKENBLICK, GERMANY; TELEPHONE 49-36766-824 FOR SPS REQUIREMENTS NECESSARY FOR TAKING THE UNIT OUT OF SERVICE, MOVING AND CALIBRATING / CERTIFYING THE UNIT IS OPERATIONAL WHEN PLACED

BACK IN SERVICE IN ROOM 049.

LARGE GRAPHITE FURNACE ITEMS #136 AND #137 IN ROOM 188 REQUIRES DISASSEMBLY TO MOVE AND STORE.

CONTRACTOR RESPONSIBLE FOR DISASSEMBLY & REASSEMBLY IN NEW LOCATION. GRAPHITE FURNACES –

MODEL #F14X14X14 GG-2500-VM-G, SERIAL #4337. CONTRACTOR TO COORDINATE WITH MANUFACTURER FOR

REQUIREMENTS NECESSARY FOR TAKING THE UNIT OUT OF SERVICE, MOVING AND CALIBRATING / CERTIFYING

THE UNIT IS OPERATIONAL WHEN PLACED BACK IN SERVICE.

SMALL TOP LOAD FURNACE ITEM #115, 115A AND 115B – MODEL T4X8-G-G-2500-VM-G, SERIAL #5453.

CONTRACTOR TO COORDINATE WITH MANUFACTURER FOR REQUIREMENTS NECESSARY FOR TAKING THE UNIT OUT OF SERVICE IN ROOM 049, MOVING AND CALIBRATING / CERTIFYING THE UNIT IS OPERATIONAL WHEN

PLACED BACK IN SERVICE IN ROOM 191.

BOTH FURNACES (LARGE AND SMALL) ARE FROM THE SAME COMPANY:

MRF (MATERIALS RESEARCH FURNACES INC.)

SUNBROOK BUSINESS PARK - RT 28 AND LAVOIE DR, SUNCOOK, NEW HAMPSHIRE 03275

603-485-2394

TUBE FURNACES ITEMS #147, #148, #149, #154, #155 AND #156 SHALL BE BROKEN DOWN AND MOVED FOR

TEMPORARY STORAGE. TUBE FURNACES #146 AND #150 AS WELL AS BOX FURNACE ITEM #119 SHALL BE BROKEN DOWN AND REASSEMBLED IN A TEMPORARY LOCATION THAT WAS PREVIOUSLY OCCUPIED BY THE

AUTOCLAVE IN ROOM 197. CONTRACTOR SHALL PROVIDE TEMPORARY ELECTRIC AND UTILITY DROPS FOR THE

TWO TUBE FURNACES AND THE ONE BOX FURNACE. GOVERNMENT SHALL PROVIDE A MOBILE CART FOR

THESE THREE ITEMS AT THIS POSITION. (SEE CONTRACTING OFFICER FOR ADDITIONAL INFORMATION.) ONCE NEW WORK HAS BEEN COMPLETED THE ENTIRE ORIGINAL ASSEMBLY SHALL BE RELOCATED BACK TO ITS

ORIGINAL POSITION WITH THE EXCEPTION OF ITEMS #155 AND #156 WHICH SHALL BE LOCATED IN ROOM 195

WHEN NEW WORK IS COMPLETED.

REFER TO Q-SERIES DRAWINGS FOR EXISTING LOCATION OF LAB EQUIPMENT, SCHEDULES OF LAB EQUIPMENT

AND NEW LOCATION OF LAB EQUIPMENT AFTER COMPLETED RENOVATION WORK. SCHEDULES ALSO PROVIDE

INFORMATION AS TO WHERE TEMPORARY STORAGE MAY APPLY DURING RENOVATION AND WHO IS PROVIDING

AND INSTALLING EQUIPMENT.

SCALE: 1/8" = 1'-0"

F1

PH1 RM 049 - DEMO WORK

SCALE: 1/8" = 1'-0"

F5

PH1 RM 136 - NEW WORK

A

M E

N D

M E

N T

/2

/2

A

M E

N D

M E

N T

/0

/2

0' 4' 8' 16' 0' 4' 8' 16' 0' 4' 8' 16'

0' 4' 8' 16' 0' 4' 8' 16'

W

2Q R

R

-0

ME

K J H

A-421A6

C7

A3

A-421F7 F5

A-422

A2

A-421 C5

A1

D7

A-421 C1

D5

A-422

A1

A5 C4

A-422

D1 F3

F1 D4

C1

D1

C3

ME

119 120 121

159 157 117 118

069 070

115A

150 146

045046

170169

TV

068 071

GAS

APPLY NEW 5/16" THICK ALUMINUM

PLATE (6061) TOP OVER ENTIRE

FURNACE STAND. USE OLD TOP AS A

TEMPLATE.

GAS

ITEM 133 AND 134

EXHAUST HOODS ABOVE

36"W X 78"H X 24"D

11' - 8"

19' - 4"

/8

/8

RELOCATE SPS UNIT,

CHILLER AND

TRANSFORMER FROM

ROOM 191 (EQUIP. ITEMS

#130, 131 AND 132 SHOWN

ON Q-401)

(4) RELOCATED LOCKERS FROM RM 188 AND 191

EXISTING WORKSTATIONS IN

THIS AREA REMAIN HOWEVER

SHIFTING THEM TO CREATE

STORAGE SPACE IS

ACCEPTABLE

STORAGE RACKS

RELOCATED FROM RM 193

ITEM #062 AND #144

(2) RELOCATED LOCKERS FROM RM 193

PHASE 1

PHASE 2

BUILDING 655

ROOMS

155A & B

ROOM

ROOM

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

*** SAFETY PAYS ***

*** SUPPORT VALUE ENGINEERING - IT PAYS ***

F

IL

E N

A M

E

F

IL

E N

U M

B E

R

PLAN NORTH

KEY PLAN

Q-411

E N

L A

R G

E D

P H

A S

E

E Q

U

IP

M E

N T

P L

A N

N

E W

W O

R K

W R

IG

H

T -P

A T

T E

R S

O N

A F

B

O H

IO

L

O U

IS

V

IL

L

E D

IS

T

R

IC

T L

O U

IS

V

IL

L

E K

E N

T U

C K

Y

R C

U R

R A

N

B C

H E

R R

Y

S K

IM

B

A L L

J S

W E

E N

E Y

J U

N E

W Q

R R

CERTIFIED FINAL

R E

N O

V A

T E

R E

S E

A R

C H

F A

C

IL

IT

Y

F O

R H

Y P

E R

S O

N

IC

S L

A B

F

/2

P R

O J E

C T

Z

H T

V

SCALE: 1/4" = 1'-0"

A1

PH1 PARTIAL FIRST FLOOR PLAN - NEW WORK

0' 4' 8' 16'

SCALE: 1/8" = 1'-0"

C8

PH1 RM 049 - NEW WORK

SCALE: 1/8" = 1'-0"

E8

PH1 RM 136 - NEW WORK

A

M E

N D

M E

N T

/2

/2

A

M E

N D

M E

N T

/0

/2

W

2Q R

R

-0

A. SEE LAB EQUIPMENT SCHEDULE FOR WHAT ITEMS ARE TO BE TEMPORARILY STORED

FOR RELOCATION, ITEMS THAT WILL BE REMOVED AND RELOCATED BY THE

GOVERNMENT AND ITEMS THAT A CONTRACTOR FURNISHED AND INSTALLED.

B. SEE LAB EQUIPMENT SCHEDULE FOR WHERE ITEMS WILL BE TEMPORARILY RELOCATED

BY THE CONTRACTOR. SAME ITEMS WILL BE REINSTALLED IN A NEW LOCATION BY THE

CONTRACTOR.

C. REFER TO FLOOR PLANS FOR WHICH ITEMS OCCUR IN WHICH OF THE 2 PHASES

D. CONTRACTOR SHALL WITNESS GOVERNMENT OPERATION OF EQUIPMENT PRIOR TO

REMOVING, DOCUMENT WITH PHOTOS, DISCONNECT ALL UTILITIES (SEE MEP AND TECH

DWGS), WRAP FOR PROTECTION WHILE IN STORAGE. CONTRACTOR IS ALSO

RESPONSIBLE TO WITNESS GOVERNMENT OPERATION OF EQUIPMENT AFTER

RECONNECTION OF UTILITIES TO CONFIRM UNIT IS OPERATIONAL.

GENERAL NOTES:

024 - GIANT CENTRIFUGE #3

NUMBER CORRESPONDS TO NUMBER IN FIRST COLUMN OF

LAB EQUIPMENT SCHEDULE (Q-600 SERIES)

BRIEF DESCRIPTION OF EQUIPMENT

THIS NUMBER MEANS THERE IS MORE THAN ONE, EACH ARE

LISTED ON SCHEDULE

PHOTO LEGEND

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

*** SAFETY PAYS ***

*** SUPPORT VALUE ENGINEERING - IT PAYS ***

F

IL

E N

A M

E

F

IL

E N

U M

B E

R

Q-701

E Q

U

IP

M E

N T

P H

O T

O S

W R

IG

H

T -P

A T

T E

R S

O N

A F

B

O H

IO

L

O U

IS

V

IL

L

E D

IS

T

R

IC

T L

O U

IS

V

IL

L

E K

E N

T U

C K

Y

R C

U R

R A

N

R C

U R

R A

N

S K

IM

B

A L L

J S

W E

E N

E Y

J U

N E

W Q

R R

CERTIFIED FINAL

R E

N O

V A

T E

R E

S E

A R

C H

F A

C

IL

IT

Y

F O

R H

Y P

E R

S O

N

IC

S L

A B

F

/2

P R

O J E

C T

Z

H T

V

010 - DEIONIZED WATER SYSTEM REMOVE FUME HOOD

REMOVE FUME HOOD 015 - GLOVE BOX 1 016 - PAN BALANCE (O'HAUS)

017 - PAN BALANCE (SARTORIOUS)

018 - ROTO - BUCHI

REMOVE FUME HOOD REMOVE FUME HOOD

005 - BALANCE (METTLER) AND MARBLE TABLE 006 -BATH CIRCULATOR - NESLAB 011 + 112 - FLAMMABLE CABINETS #1 AND #2

022 + 023 - REFRIDGERATOR #1 AND #2

024 - REFRIDGERATOR #3 027 - GRAVITY CONVECTION OVEN #1 - YAMATO 028 - GRAVITY CONVECTION OVEN #2 - YAMATO

SCALE: NTS

PHOTO

F1

SCALE: NTS

PHOTO

F3

SCALE: NTS

PHOTO

F5

SCALE: NTS

PHOTO

F7

SCALE: NTS

PHOTO

F9

SCALE: NTS

PHOTO

D1

SCALE: NTS

PHOTO

D3

SCALE: NTS

PHOTO

D5

SCALE: NTS

PHOTO

D7

SCALE: NTS

PHOTO

D9

SCALE: NTS

PHOTO

B1

SCALE: NTS

PHOTO

B3

SCALE: NTS

PHOTO

B5

SCALE: NTS

PHOTO

B7

SCALE: NTS

PHOTO

B9

A

M E

N D

M E

N T

/0

/2

W

2Q R

R

-0

GOVERNMENT AND ITEMS THAT A CONTRACTOR FURNISHED AND INSTALLED.

B. SEE LAB EQUIPMENT SCHEDULE FOR WHERE ITEMS WILL BE TEMPORARILY RELOCATED

BY THE CONTRACTOR. SAME ITEMS WILL BE REINSTALLED IN A NEW LOCATION BY THE

CONTRACTOR.

C. REFER TO FLOOR PLANS FOR WHICH ITEMS OCCUR IN WHICH OF THE 2 PHASES

D. CONTRACTOR SHALL WITNESS GOVERNMENT OPERATION OF EQUIPMENT PRIOR TO

REMOVING, DOCUMENT WITH PHOTOS, DISCONNECT ALL UTILITIES (SEE MEP AND TECH

DWGS), WRAP FOR PROTECTION WHILE IN STORAGE. CONTRACTOR IS ALSO

RESPONSIBLE TO WITNESS GOVERNMENT OPERATION OF EQUIPMENT AFTER

RECONNECTION OF UTILITIES TO CONFIRM UNIT IS OPERATIONAL.

GENERAL NOTES:

024 - GIANT CENTRIFUGE #3

NUMBER CORRESPONDS TO NUMBER IN FIRST COLUMN OF

LAB EQUIPMENT SCHEDULE (Q-600 SERIES)

BRIEF DESCRIPTION OF EQUIPMENT

THIS NUMBER MEANS THERE IS MORE THAN ONE, EACH ARE

LISTED ON SCHEDULE

PHOTO LEGEND

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

*** SAFETY PAYS ***

*** SUPPORT VALUE ENGINEERING - IT PAYS ***

F

IL

E N

A M

E

F

IL

E N

U M

B E

R

Q-702

E Q

U

IP

M E

N T

P H

O T

O S

W R

IG

H

T -P

A T

T E

R S

O N

A F

B

O H

IO

L

O U

IS

V

IL

L

E D

IS

T

R

IC

T L

O U

IS

V

IL

L

E K

E N

T U

C K

Y

R C

U R

R A

N

R C

U R

R A

N

S K

IM

B

A L L

J S

W E

E N

E Y

J U

N E

W Q

R R

CERTIFIED FINAL

R E

N O

V A

T E

R E

S E

A R

C H

F A

C

IL

IT

Y

F O

R H

Y P

E R

S O

N

IC

S L

A B

F

/2

P R

O J E

C T

Z

H T

V

030 - MIXER

034 - ULTRA SONIC CLEANER

035 - BALL MILL 1

036 - BALL MILL 2

REMOVE FUME HOODREMOVE FUME HOOD

029 - GRAVITY CONVECTION OVEN #3 - YAMATO 033 - STORAGE LOCKER #3 037 - CARVER PRESS #1 (IN FUMEHOOD 051)

038 - CARVER PRESS #2 039 - CARVER PRESS #3 045 - FIBER COATER RIG 046 - FIBER COATER RIG FILAMENT WINDER 047 - FLAMMABLE CABINET #3

048 - FLAMMABLE CABINET #4

066 - TABLE

050 - WALK-IN FUME HOOD 052 - GLOVE BOX #2 - BRAUN

SCALE: NTS

PHOTO

F1

SCALE: NTS

PHOTO

F3

SCALE: NTS

PHOTO

F5

SCALE: NTS

PHOTO

F7

SCALE: NTS

PHOTO

F9

SCALE: NTS

PHOTO

D1

SCALE: NTS

PHOTO

D3

SCALE: NTS

PHOTO

D5

SCALE: NTS

PHOTO

D7

SCALE: NTS

PHOTO

D9

SCALE: NTS

PHOTO

B1

SCALE: NTS

PHOTO

B3

SCALE: NTS

PHOTO

B5

SCALE: NTS

PHOTO

B7

SCALE: NTS

PHOTO

B9

A

M E

N D

M E

N T

/0

/2

W

2Q R

R

-0

GOVERNMENT AND ITEMS THAT A CONTRACTOR FURNISHED AND INSTALLED.

B. SEE LAB EQUIPMENT SCHEDULE FOR WHERE ITEMS WILL BE TEMPORARILY RELOCATED

BY THE CONTRACTOR. SAME ITEMS WILL BE REINSTALLED IN A NEW LOCATION BY THE

CONTRACTOR.

C. REFER TO FLOOR PLANS FOR WHICH ITEMS OCCUR IN WHICH OF THE 2 PHASES

D. CONTRACTOR SHALL WITNESS GOVERNMENT OPERATION OF EQUIPMENT PRIOR TO

REMOVING, DOCUMENT WITH PHOTOS, DISCONNECT ALL UTILITIES (SEE MEP AND TECH

DWGS), WRAP FOR PROTECTION WHILE IN STORAGE. CONTRACTOR IS ALSO

RESPONSIBLE TO WITNESS GOVERNMENT OPERATION OF EQUIPMENT AFTER

RECONNECTION OF UTILITIES TO CONFIRM UNIT IS OPERATIONAL.

GENERAL NOTES:

024 - GIANT CENTRIFUGE #3

NUMBER CORRESPONDS TO NUMBER IN FIRST COLUMN OF

LAB EQUIPMENT SCHEDULE (Q-600 SERIES)

BRIEF DESCRIPTION OF EQUIPMENT

THIS NUMBER MEANS THERE IS MORE THAN ONE, EACH ARE

LISTED ON SCHEDULE

PHOTO LEGEND

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

*** SAFETY PAYS ***

*** SUPPORT VALUE ENGINEERING - IT PAYS ***

F

IL

E N

A M

E

F

IL

E N

U M

B E

R

Q-703

E Q

U

IP

M E

N T

P H

O T

O S

W R

IG

H

T -P

A T

T E

R S

O N

A F

B

O H

IO

L

O U

IS

V

IL

L

E D

IS

T

R

IC

T L

O U

IS

V

IL

L

E K

E N

T U

C K

Y

R C

U R

R A

N

R C

U R

R A

N

S K

IM

B

A L L

J S

W E

E N

E Y

J U

N E

W Q

R R

CERTIFIED FINAL

R E

N O

V A

T E

R E

S E

A R

C H

F A

C

IL

IT

Y

F O

R H

Y P

E R

S O

N

IC

S L

A B

F

/2

P R

O J E

C T

Z

H T

V

054 - HUMIDITY OVEN 055 - LAMINATOR 056 - LATHE - MICROLUX NOT LISTED - WINDING TABLE RELOCATE TO RM 195 058 - SAW

060 AND 061 - STORAGE LOCKER #4 AND #5 063 AND 064 - SYRINGE PUMP #1 AND #2 (INSIDE WALK-IN FUME HOOD) 065 - SYRINGE PUMP #3 (INSIDE WALK-IN FUME HOOD) 068 - VACUUM OVEN #1

071 - VACUUM OVEN #2

069 - VACUUM OVEN #14

070 - VACCUM OVEN #18 076 - FIBER POLISHER 077 - FIBER PUSHOUT TESTER 078 - MTS SYNERGIE 400 079 - USCOPE

SCALE: NTS

PHOTO

F1

SCALE: NTS

PHOTO

F3

SCALE: NTS

PHOTO

F5

SCALE: NTS

PHOTO

F7

SCALE: NTS

PHOTO

F9

SCALE: NTS

PHOTO

D1

SCALE: NTS

PHOTO

D3

SCALE: NTS

PHOTO

D5

SCALE: NTS

PHOTO

D7

SCALE: NTS

PHOTO

D9

SCALE: NTS

PHOTO

B1

SCALE: NTS

PHOTO

B3

SCALE: NTS

PHOTO

B5

SCALE: NTS

PHOTO

B7

SCALE: NTS

PHOTO

B9

A

M E

N D

M E

N T

/0

/2

W

2Q R

R

-0

GOVERNMENT AND ITEMS THAT A CONTRACTOR FURNISHED AND INSTALLED.

B. SEE LAB EQUIPMENT SCHEDULE FOR WHERE ITEMS WILL BE TEMPORARILY RELOCATED

BY THE CONTRACTOR. SAME ITEMS WILL BE REINSTALLED IN A NEW LOCATION BY THE

CONTRACTOR.

C. REFER TO FLOOR PLANS FOR WHICH ITEMS OCCUR IN WHICH OF THE 2 PHASES

D. CONTRACTOR SHALL WITNESS GOVERNMENT OPERATION OF EQUIPMENT PRIOR TO

REMOVING, DOCUMENT WITH PHOTOS, DISCONNECT ALL UTILITIES (SEE MEP AND TECH

DWGS), WRAP FOR PROTECTION WHILE IN STORAGE. CONTRACTOR IS ALSO

RESPONSIBLE TO WITNESS GOVERNMENT OPERATION OF EQUIPMENT AFTER

RECONNECTION OF UTILITIES TO CONFIRM UNIT IS OPERATIONAL.

GENERAL NOTES:

024 - GIANT CENTRIFUGE #3

NUMBER CORRESPONDS TO NUMBER IN FIRST COLUMN OF

LAB EQUIPMENT SCHEDULE (Q-600 SERIES)

BRIEF DESCRIPTION OF EQUIPMENT

THIS NUMBER MEANS THERE IS MORE THAN ONE, EACH ARE

LISTED ON SCHEDULE

PHOTO LEGEND

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

*** SAFETY PAYS ***

*** SUPPORT VALUE ENGINEERING - IT PAYS ***

F

IL

E N

A M

E

F

IL

E N

U M

B E

R

Q-704

E Q

U

IP

M E

N T

P H

O T

O S

W R

IG

H

T -P

A T

T E

R S

O N

A F

B

O H

IO

L

O U

IS

V

IL

L

E D

IS

T

R

IC

T L

O U

IS

V

IL

L

E K

E N

T U

C K

Y

R C

U R

R A

N

R C

U R

R A

N

S K

IM

B

A L L

J S

W E

E N

E Y

J U

N E

W Q

R R

CERTIFIED FINAL

R E

N O

V A

T E

R E

S E

A R

C H

F A

C

IL

IT

Y

F O

R H

Y P

E R

S O

N

IC

S L

A B

F

/2

P R

O J E

C T

Z

H T

V

080 - USCOPE 081 - AUTOCLAVE 085 - CUTTING TABLE (MIRROR IS NOT IN SCOPE) REMOVE FUME HOOD 088 - IMPULSE AUTOSEALER

089 - ROLL RACK 090 - STORAGE LOCKER #1 091 - STORAGE LOCKER #2 092 - THINKY MIXER #1

093 - THINKY MIXER #2

094 - ASIGA

100 - CENTRIFUGE

102 - DESICCATOR RACK 104 - FISHER OVEN 105 - FREEZER 106 - HJ LASER 3D PRINTER 107 - HYREL SYSTEM 30M

SCALE: NTS

PHOTO

F1

SCALE: NTS

PHOTO

F3

SCALE: NTS

PHOTO

F5

SCALE: NTS

PHOTO

F7

SCALE: NTS

PHOTO

F9

SCALE: NTS

PHOTO

D1

SCALE: NTS

PHOTO

D3

SCALE: NTS

PHOTO

D5

SCALE: NTS

PHOTO

D7

SCALE: NTS

PHOTO

D9

SCALE: NTS

PHOTO

B1

SCALE: NTS

PHOTO

B3

SCALE: NTS

PHOTO

B5

SCALE: NTS

PHOTO

B7

SCALE: NTS

PHOTO

B9

A

M E

N D

M E

N T

/0

/2

W

2Q R

R

-0

GOVERNMENT AND ITEMS THAT A CONTRACTOR FURNISHED AND INSTALLED.

B. SEE LAB EQUIPMENT SCHEDULE FOR WHERE ITEMS WILL BE TEMPORARILY RELOCATED

BY THE CONTRACTOR. SAME ITEMS WILL BE REINSTALLED IN A NEW LOCATION BY THE

CONTRACTOR.

C. REFER TO FLOOR PLANS FOR WHICH ITEMS OCCUR IN WHICH OF THE 2 PHASES

D. CONTRACTOR SHALL WITNESS GOVERNMENT OPERATION OF EQUIPMENT PRIOR TO

REMOVING, DOCUMENT WITH PHOTOS, DISCONNECT ALL UTILITIES (SEE MEP AND TECH

DWGS), WRAP FOR PROTECTION WHILE IN STORAGE. CONTRACTOR IS ALSO

RESPONSIBLE TO WITNESS GOVERNMENT OPERATION OF EQUIPMENT AFTER

RECONNECTION OF UTILITIES TO CONFIRM UNIT IS OPERATIONAL.

GENERAL NOTES:

024 - GIANT CENTRIFUGE #3

NUMBER CORRESPONDS TO NUMBER IN FIRST COLUMN OF

LAB EQUIPMENT SCHEDULE (Q-600 SERIES)

BRIEF DESCRIPTION OF EQUIPMENT

THIS NUMBER MEANS THERE IS MORE THAN ONE, EACH ARE

LISTED ON SCHEDULE

PHOTO LEGEND

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

*** SAFETY PAYS ***

*** SUPPORT VALUE ENGINEERING - IT PAYS ***

F

IL

E N

A M

E

F

IL

E N

U M

B E

R

Q-705

E Q

U

IP

M E

N T

P H

O T

O S

W R

IG

H

T -P

A T

T E

R S

O N

A F

B

O H

IO

L

O U

IS

V

IL

L

E D

IS

T

R

IC

T L

O U

IS

V

IL

L

E K

E N

T U

C K

Y

R C

U R

R A

N

R C

U R

R A

N

S K

IM

B

A L L

J S

W E

E N

E Y

J U

N E

W Q

R R

CERTIFIED FINAL

R E

N O

V A

T E

R E

S E

A R

C H

F A

C

IL

IT

Y

F O

R H

Y P

E R

S O

N

IC

S L

A B

F

/2

P R

O J E

C T

Z

H T

V

108 - PARTICLE SIZE ANALYZER

109 - PYCNOMETER

110 - RHEO AND CHILLER 113 - ULTRA SONIC HORN 115 - GRAPHITE FURNACE AND CONTROLLER 117 AND 118 - ASHING FURNACES #10 AND #11

119 - BOX FURNACE #6 120 - BOX FURNACE #7 121 - BOX FURNACE #8 122 - BOX FURNACE #8 CONTROLLER

130 - FIELD ASSISTED SINTERING UNIT (SPS)

133 - CHILLER AND TRANSFORMER

136 - GRAPHITE FURNACE #15 137 - GRAPHITE FURNACE CHILLER 138 - HAY WET FURNACE 140 AND 141 - STORAGE LOCKER #6 AND #7

SCALE: NTS

PHOTO

F1

SCALE: NTS

PHOTO

F3

SCALE: NTS

PHOTO

F5

SCALE: NTS

PHOTO

F7

SCALE: NTS

PHOTO

F9

SCALE: NTS

PHOTO

D1

SCALE: NTS

PHOTO

D3

SCALE: NTS

PHOTO

D5

SCALE: NTS

PHOTO

D7

SCALE: NTS

PHOTO

B1

SCALE: NTS

PHOTO

B3

SCALE: NTS

PHOTO

B5

SCALE: NTS

PHOTO

B7

SCALE: NTS

PHOTO

B9

A

M E

N D

M E

N T

/0

/2

W

2Q R

R

-0

GOVERNMENT AND ITEMS THAT A CONTRACTOR FURNISHED AND INSTALLED.

B. SEE LAB EQUIPMENT SCHEDULE FOR WHERE ITEMS WILL BE TEMPORARILY RELOCATED

BY THE CONTRACTOR. SAME ITEMS WILL BE REINSTALLED IN A NEW LOCATION BY THE

CONTRACTOR.

C. REFER TO FLOOR PLANS FOR WHICH ITEMS OCCUR IN WHICH OF THE 2 PHASES

D. CONTRACTOR SHALL WITNESS GOVERNMENT OPERATION OF EQUIPMENT PRIOR TO

REMOVING, DOCUMENT WITH PHOTOS, DISCONNECT ALL UTILITIES (SEE MEP AND TECH

DWGS), WRAP FOR PROTECTION WHILE IN STORAGE. CONTRACTOR IS ALSO

RESPONSIBLE TO WITNESS GOVERNMENT OPERATION OF EQUIPMENT AFTER

RECONNECTION OF UTILITIES TO CONFIRM UNIT IS OPERATIONAL.

GENERAL NOTES:

024 - GIANT CENTRIFUGE #3

NUMBER CORRESPONDS TO NUMBER IN FIRST COLUMN OF

LAB EQUIPMENT SCHEDULE (Q-600 SERIES)

BRIEF DESCRIPTION OF EQUIPMENT

THIS NUMBER MEANS THERE IS MORE THAN ONE, EACH ARE

LISTED ON SCHEDULE

PHOTO LEGEND

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

*** SAFETY PAYS ***

*** SUPPORT VALUE ENGINEERING - IT PAYS ***

F

IL

E N

A M

E

F

IL

E N

U M

B E

R

Q-706

E Q

U

IP

M E

N T

P H

O T

O S

W R

IG

H

T -P

A T

T E

R S

O N

A F

B

O H

IO

L

O U

IS

V

IL

L

E D

IS

T

R

IC

T L

O U

IS

V

IL

L

E K

E N

T U

C K

Y

R C

U R

R A

N

R C

U R

R A

N

S K

IM

B

A L L

J S

W E

E N

E Y

J U

N E

W Q

R R

CERTIFIED FINAL

R E

N O

V A

T E

R E

S E

A R

C H

F A

C

IL

IT

Y

F O

R H

Y P

E R

S O

N

IC

S L

A B

F

/2

P R

O J E

C T

Z

H T

V

142 AND 143 - STORAGE LOCKER #8 AND #9 145 - TORCH TEST STATION 146 THRU 155 - TUBE FURNACES (FRONT AND BACK

151 - TUBE FURNACE #4

152 - TUBE FURNACE #4 PRE-HEATER

153 - TUBE FURNACE #4 WATER PUMP

156 - TUBE FURNACE #9 CONTROLLER

157 - VACUUM OVEN #16

158 - VACUUM OVEN #16 CHILLER

144 - STORAGE RACK #2

159 - ZR02 FURNACE

SCALE: NTS

PHOTO

F1

SCALE: NTS

PHOTO

F3

SCALE: NTS

PHOTO

F5

SCALE: NTS

PHOTO

F7

SCALE: NTS

PHOTO

F9

SCALE: NTS

PHOTO

D1

SCALE: NTS

PHOTO

D3

A

M E

N D

M E

N T

/0

/2

W

2Q R

R

-0

STANDARD FORM 30
SUMMARY OF CHANGES
Sheets
G-005 - PHASE 1 PHASING PLANS
Q-411 - ENLARGED PHASE 1 EQUIPMENT PLAN - NEW WORK
Q-411 - ENLARGED PHASE 1 EQUIPMENT PLAN - NEW WORK.pdf
Sheets
G-005 - PHASE 1 PHASING PLANS
Q-411 - ENLARGED PHASE 1 EQUIPMENT PLAN - NEW WORK
Q-701 - EQUIPMENT PHOTOS.pdf
Sheets
Q-701 - EQUIPMENT PHOTOS
Q-702 - EQUIPMENT PHOTOS.pdf
Sheets
Q-702 - EQUIPMENT PHOTOS
Q-703 - EQUIPMENT PHOTOS
Q-704 - EQUIPMENT PHOTOS
Q-705 - EQUIPMENT PHOTOS
Q-706 - EQUIPMENT PHOTOS
Q-703 - EQUIPMENT PHOTOS.pdf
Sheets
Q-702 - EQUIPMENT PHOTOS
Q-703 - EQUIPMENT PHOTOS
Q-704 - EQUIPMENT PHOTOS
Q-705 - EQUIPMENT PHOTOS
Q-706 - EQUIPMENT PHOTOS
Q-704 - EQUIPMENT PHOTOS.pdf
Sheets
Q-702 - EQUIPMENT PHOTOS
Q-703 - EQUIPMENT PHOTOS
Q-704 - EQUIPMENT PHOTOS
Q-705 - EQUIPMENT PHOTOS
Q-706 - EQUIPMENT PHOTOS
Q-705 - EQUIPMENT PHOTOS.pdf
Sheets
Q-702 - EQUIPMENT PHOTOS
Q-703 - EQUIPMENT PHOTOS
Q-704 - EQUIPMENT PHOTOS
Q-705 - EQUIPMENT PHOTOS
Q-706 - EQUIPMENT PHOTOS
Q-706 - EQUIPMENT PHOTOS.pdf
Sheets
Q-702 - EQUIPMENT PHOTOS
Q-703 - EQUIPMENT PHOTOS
Q-704 - EQUIPMENT PHOTOS
Q-705 - EQUIPMENT PHOTOS
Q-706 - EQUIPMENT PHOTOS

File details come from the government source that posted it. Updated .