W912QR21R0015Specs_Vol4-0000.pdf
PDF 23 MB Posted
- Attached to
- Ft. Campbell Vehicle Maintenance Shop
- Solicitation number
- W912QR21R0015
About this file
This document provides details on a federal contract solicitation for construction services. The U.S. Army Corps of Engineers Engineering District Louisville is seeking offers to construct a new Vehicle Maintenance Shop at Fort Campbell, Kentucky with an estimated cost between $25-100 million. The NAICS code for this project is 236220 with a size standard of $39.5 million. Offerors must register in the System for Award Management which integrates the former Central Contractor Registration and Online Representations and Certifications Application systems. The response deadline will be provided in the formal solicitation expected to be released on April 16th, along with additional pre-proposal site visit details. This is a full and open procurement that requires a 10% price evaluation preference for qualified HUBZone small businesses.
View the file
Other files
Show all 28
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation For Vehicle Maintenance Shop Ft. Campbell, KY
P2: 322298
Design Bid Build
Specifications Vol. 4 of 4 (DIV 32-41) Appendices A-E
Ready To Advertise (RTA)
16 March 2021
W912QR21R0015
ARIMS: 200A
Disposition: Maintain for 15yrs after construction
W912QR21R0015-0000
Vehicle Maintenance Shop W912QR21R0015 Ft. Campbell, KY
PROJECT TABLE OF CONTENTS
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
00 80 00 SPECIAL PROVISIONS
DIVISION 01 - GENERAL REQUIREMENTS
01 32 01 PROJECT SCHEDULE
01 33 00 SUBMITTAL PROCEDURES
01 33 29 SUSTAINABILITY REPORTING
01 35 26 GOVERNMENT SAFETY REQUIREMENTS
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00.15 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE (RMS CM)
01 45 04.10 CONTRACTOR QUALITY CONTROL
01 45 35 SPECIAL INSPECTIONS
01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS
01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS AND PERMITS
01 74 19 CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT
01 78 23 OPERATION AND MAINTENANCE DATA
01 91 00 TOTAL BUILDING COMMISSIONING
DIVISION 03 - CONCRETE
03 11 13 STRUCTURAL CAST-IN-PLACE CONCRETE FORMING
03 15 00 CONCRETE ACCESSORIES
03 20 00 CONCRETE REINFORCING
03 30 00 CAST-IN-PLACE CONCRETE
03 30 53 MISCELLANEOUS CAST-IN-PLACE CONCRETE
03 39 00 CONCRETE CURING
03 42 13 PLANT-PRECAST CONCRETE PRODUCTS FOR BELOW GRADE
CONSTRUCTION
DIVISION 04 - MASONRY
04 20 00 MASONRY
DIVISION 05 - METALS
05 05 23.16 STRUCTURAL WELDING
05 12 00 STRUCTURAL STEEL
05 30 00 STEEL DECKS
05 40 00 COLD-FORMED METAL FRAMING
05 50 13 MISCELLANEOUS METAL FABRICATIONS
05 51 00 METAL STAIRS
05 51 33 METAL LADDERS
05 52 00 METAL RAILINGS
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
06 10 00 ROUGH CARPENTRY
06 41 16 PLASTIC-LAMINATE-CLAD ARCHITECTURAL CABINETS
06 61 16 SOLID SURFACING FABRICATIONS
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 05 23 PRESSURE TESTING AN AIR BARRIER SYSTEM FOR AIR TIGHTNESS
07 11 13 BITUMINOUS DAMPPROOFING
07 13 53 ELASTOMERIC SHEET WATERPROOFING
PROJECT TABLE OF CONTENTS Page 1
07 21 13 BOARD AND BLOCK INSULATION
07 21 16 MINERAL FIBER BLANKET INSULATION
07 27 10 BUILDING AIR BARRIER SYSTEM
07 27 19.01 SELF-ADHERING AIR BARRIERS
07 27 26 FLUID-APPLIED MEMBRANE AIR BARRIERS
07 60 00 FLASHING AND SHEET METAL
07 61 14 STEEL STANDING SEAM ROOFING
07 84 00 FIRESTOPPING
07 92 00 JOINT SEALANTS
DIVISION 08 - OPENINGS
08 11 13 STEEL DOORS AND FRAMES
08 11 16 ALUMINUM DOORS AND FRAMES
08 33 13 COILING COUNTER DOORS
08 33 23 OVERHEAD COILING DOORS
08 34 59 VAULT DOORS AND DAY GATES
08 44 00 CURTAIN WALL AND GLAZED ASSEMBLIES
08 51 13 ALUMINUM WINDOWS
08 60 45 SKYLIGHTS AND TRANSLUCENT PANELS
08 71 00 DOOR HARDWARE
08 81 00 GLAZING
08 91 00 METAL WALL AND DOOR LOUVERS
DIVISION 09 - FINISHES
09 06 00 SCHEDULES FOR FINISHES
09 22 00 SUPPORTS FOR PLASTER AND GYPSUM BOARD
09 29 00 GYPSUM BOARD
09 30 10 CERAMIC, QUARRY, AND GLASS TILING
09 51 00 ACOUSTICAL CEILINGS
09 65 00 RESILIENT FLOORING
09 90 00 PAINTS AND COATINGS
DIVISION 10 - SPECIALTIES
10 10 00 VISUAL COMMUNICATIONS SPECIALTIES
10 14 01 EXTERIOR SIGNAGE
10 14 02 INTERIOR SIGNAGE
10 14 53 TRAFFIC SIGNAGE
10 21 13 TOILET COMPARTMENTS
10 22 13 WIRE MESH PARTITIONS
10 22 39 FOLDING PANEL PARTITIONS
10 26 13 WALL AND CORNER GUARDS
10 28 13 TOILET ACCESSORIES
10 44 16 FIRE EXTINGUISHERS
10 51 13 METAL LOCKERS
DIVISION 12 - FURNISHINGS
12 24 13 ROLLER WINDOW SHADES
12 48 00.13 WALK-OFF MAT
12 93 00 SITE FURNISHINGS
DIVISION 13 - SPECIAL CONSTRUCTION
13 12 80 RELOCATABLE HAZARDOUS MATERIAL AND HAZARDOUS WASTE
STORAGE BUILDINGS
13 34 19 METAL BUILDING SYSTEMS (OSB)
PROJECT TABLE OF CONTENTS Page 2
13 34 20 METAL BUILDING SYSTEMS (TEMF)
13 48 00 SEISMIC PROTECTION FOR MISCELLANEOUS EQUIPMENT
DIVISION 14 - CONVEYING EQUIPMENT
14 24 23 HYDRAULIC PASSENGER ELEVATORS
DIVISION 21 - FIRE SUPPRESSION
21 13 13 WET PIPE SPRINKLER SYSTEM, FIRE PROTECTION
21 30 00 FIRE PUMPS
DIVISION 22 - PLUMBING
22 00 00 PLUMBING, GENERAL PURPOSE
22 05 48 MECHANICAL SOUND, VIBRATION, AND SEISMIC CONTROL
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS
23 05 15 COMMON PIPING FOR HVAC
23 05 48 VIBRATION AND SEISMIC CONTROLS FOR HVAC PIPING AND
EQUIPMENT
23 05 48.19 SEISMIC BRACING FOR HVAC
23 05 93 TESTING, ADJUSTING, AND BALANCING (TAB) OF HVAC
23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS
23 09 00 INSTRUMENTATION AND CONTROL FOR HVAC
23 09 13 INSTRUMENTATION AND CONTROL DEVICES FOR HVAC
23 09 23.01 LONWORKS DIRECT DIGITAL CONTROL FOR HVAC AND OTHER
BUILDING CONTROL SYSTEMS
23 09 93 SEQUENCES OF OPERATION FOR HVAC CONTROL
23 11 25 FACILITY GAS PIPING
23 23 00 REFRIGERANT PIPING
23 35 00 OVERHEAD VEHICLE TAILPIPE AND WELDING FUME EXHAUST
REMOVAL SYSTEM(S)
23 52 00 HEATING BOILERS
23 54 16 HEATING SYSTEM - GAS-FIRED HEATERS
23 81 00 DECENTRALIZED UNITARY HVAC EQUIPMENT
DIVISION 25 - INTEGRATED AUTOMATION
25 05 11 CYBERSECURITY FOR FACILITY-RELATED CONTROL SYSTEMS
25 05 13 CYBERSECURITY FOR FACILITY-RELATED CONTROL SYSTEMS
(FA/MNS)
DIVISION 26 - ELECTRICAL
26 00 00 BASIC ELECTRICAL MATERIALS AND METHODS
26 05 48 SEISMIC PROTECTION FOR ELECTRICAL EQUIPMENT
26 08 00 APPARATUS INSPECTION AND TESTING
26 20 00 INTERIOR DISTRIBUTION SYSTEM
26 23 00 SWITCHBOARDS
26 28 01 COORDINATED POWER SYSTEM PROTECTION
26 29 23 VARIABLE FREQUENCY DRIVE SYSTEMS UNDER 600 VOLTS
26 41 00 LIGHTNING PROTECTION SYSTEM
26 42 14 CATHODIC PROTECTION SYSTEM (SACRIFICIAL ANODE)
26 51 09.23 INTERIOR LIGHTING AND LIGHTING CONTROL DEVICES
26 56 00 EXTERIOR LIGHTING
PROJECT TABLE OF CONTENTS Page 3
DIVISION 27 - COMMUNICATIONS
27 05 14 CABLE TELEVISION PREMISES DISTRIBUTION SYSTEM
27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
28 31 76 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM
DIVISION 31 - EARTHWORK
31 00 00 EARTHWORK
31 05 19 GEOTEXTILE
31 05 22 GEOTEXTILES USED AS FILTERS
31 11 00 CLEARING AND GRUBBING
31 31 16.13 CHEMICAL TERMITE CONTROL
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 01 19 FIELD MOLDED SEALANTS FOR SEALING JOINTS IN RIGID
PAVEMENTS
32 05 33 LANDSCAPE ESTABLISHMENT
32 11 23 AGGREGATE BASE COURSES
32 11 23.23 BASE COURSE DRAINAGE LAYERS
32 12 13 BITUMINOUS TACK COATS
32 12 16 HOT-MIX ASPHALT (HMA) FOR ROADS
32 13 14.13 CONCRETE PAVING FOR AIRFIELDS AND OTHER HEAVY DUTY
PAVEMENTS
32 16 19 CONCRETE CURBS, GUTTERS AND SIDEWALKS
32 17 23 PAVEMENT MARKINGS
32 31 13.53 HIGH-SECURITY CHAIN LINK FENCES AND GATES
32 92 19 SEEDING
32 93 00 EXTERIOR PLANTS
DIVISION 33 - UTILITIES
33 11 00 WATER UTILITY DISTRIBUTION PIPING
33 30 00 SANITARY SEWERAGE
33 40 00 STORM DRAINAGE UTILITIES
33 46 13 FOUNDATION DRAINAGE SYSTEM
33 46 16 SUBDRAINAGE PIPING
33 48 00 BIORETENTION AREAS
33 71 02 UNDERGROUND ELECTRICAL DISTRIBUTION
33 82 00 TELECOMMUNICATIONS OUTSIDE PLANT (OSP)
DIVISION 41 - MATERIAL PROCESSING AND HANDLING EQUIPMENT
41 22 13 BRIDGE CRANES
APPENDICES
APPENDIX A ELECTRICAL SERVICE APPLICATION AND MANUAL
APPENDIX B WATER, WASTEWATER AND RECYCLED WATER DESIGN, STANDARDS,
AND DETAILS
APPENDIX C FORT CAMPBELL INSTALLATION ACCESS
APPENDIX D COMMISSIONING APPENDICES A - E
APPENDIX E EXTERIOR SIGNAGE AND MARKINGS
PROJECT TABLE OF CONTENTS Page 4
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 5
SECTION TABLE OF CONTENTS
DIVISION 32 - EXTERIOR IMPROVEMENTS
SECTION 32 01 19
FIELD MOLDED SEALANTS FOR SEALING JOINTS IN RIGID PAVEMENTS
08/08
PART 1 GENERAL
1.1 NOT USED
1.2 REFERENCES
1.3 SUBMITTALS
1.4 QUALITY ASSURANCE
1.4.1 Test Requirements
1.4.2 Trial Joint Sealant Installation
1.5 DELIVERY, STORAGE, AND HANDLING
1.6 ENVIRONMENTAL REQUIREMENTS
PART 2 PRODUCTS
2.1 SEALANTS
2.2 PRIMERS
2.3 BACKUP MATERIALS
2.4 BOND BREAKING TAPES
PART 3 EXECUTION
3.1 EXECUTING EQUIPMENT
3.1.1 Joint Cleaning Equipment
3.1.1.1 Tractor-Mounted Routing Tool
3.1.1.2 Concrete Saw
3.1.1.3 Sandblasting Equipment
3.1.1.4 Waterblasting Equipment
3.1.1.5 Hand Tools
3.1.2 Sealing Equipment
3.1.2.1 Hot-Poured Sealing Equipment
3.2 PREPARATION OF JOINTS
3.2.1 Sawing
3.2.1.1 Facing of Joints
3.2.1.2 Refacing of Random Cracks
3.2.2 Sandblasting
3.2.3 Back-Up Material
3.2.4 Bond Breaking Tape
3.2.5 Rate of Progress of Joint Preparation
3.3 PREPARATION OF SEALANT
3.3.1 Hot-Poured Sealants
3.4 INSTALLATION OF SEALANT
3.4.1 Time of Application
3.4.2 Sealing Joints
3.5 INSPECTION
3.5.1 Joint Cleaning
3.5.2 Joint Sealant Application Equipment
3.5.3 Joint Sealant
SECTION 32 01 19 Page 1
3.6 CLEAN-UP
-- End of Section Table of Contents --
SECTION 32 01 19 Page 2
SECTION 32 01 19
FIELD MOLDED SEALANTS FOR SEALING JOINTS IN RIGID PAVEMENTS
08/08
PART 1 GENERAL
1.1 NOT USED
1.2 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
ASTM INTERNATIONAL (ASTM)
ASTM C1016 (2014) Standard Test Method for Determination of Water Absorption of Sealant Backing (Joint Filler) Material
ASTM D6690 (2015) Standard Specification for Joint and Crack Sealants, Hot Applied, for Concrete and Asphalt Pavements
ASTM D789 (2015) Determination of Relative Viscosity and Moisture Content of Polyamide (PA)
U.S. ARMY CORPS OF ENGINEERS (USACE)
COE CRD-C 525 (1989) Corps of Engineers Test Method for Evaluation of Hot-Applied Joint Sealants for Bubbling Due to Heating
1.3 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submittals with an "S" are for inclusion in the Sustainability eNotebook, in conformance to Section 01 33 29 SUSTAINABILITY REPORTING. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-03 Product Data
Equipment .
SD-04 Samples
Materials ; G, RO .
SD-06 Test Reports
Certified Copies of the Test Reports ; G, RO .
SECTION 32 01 19 Page 3
1.4 QUALITY ASSURANCE
1.4.1 Test Requirements
Test the joint sealant and backup or separating material for conformance with the referenced applicable material specification. Perform testing of the materials in an approved independent laboratory and submit certified copies of the test reports for approval 30 days prior to the use of the materials at the job site. Samples will be retained by the Government for possible future testing should the materials appear defective during or after application. Conformance with the requirements of the laboratory tests specified will not constitute final acceptance of the materials.
Final acceptance will be based on the performance of the in-place materials .
Submit samples of the materials (sealant, primer if required, and backup material), in sufficient quantity for testing and approval 10 days prior to the beginning of work. No material will be allowed to be used until it has been approved.
1.4.2 Trial Joint Sealant Installation
Prior to the cleaning and sealing of the joints for the entire project, prepare a test section at least 200 feet long using the specified materials and approved equipment, so as to demonstrate the proposed joint preparation and sealing of all types of joints in the project. Following the completion of the test section and before any other joint is sealed, inspect the test section to determine that the materials and installation meet the requirements specified. If it is determined that the materials or installation do not meet the requirements, remove the materials, and reclean and reseal the joints at no cost to the Government. When the test section meets the requirements, it may be incorporated into the permanent work and paid for at the contract unit price per linear foot for sealing items scheduled. Prepare and seal all other joints in the manner approved for sealing the test section.
1.5 DELIVERY, STORAGE, AND HANDLING
Inspect materials delivered to the job site for defects, unload, and store them with a minimum of handling to avoid damage. Provide storage facilities at the job site for maintaining materials at the temperatures and conditions recommended by the manufacturer.
1.6 ENVIRONMENTAL REQUIREMENTS
The ambient air temperature and the pavement temperature within the joint wall shall be a minimum of 50 degrees F and rising at the time of application of the materials. Do not apply sealant if moisture is observed in the joint.
PART 2 PRODUCTS
2.1 SEALANTS
Materials for sealing cracks in the various paved areas indicated on the drawings shall be as follows:
ASTM D6690, Type III and COE CRD-C 525
SECTION 32 01 19 Page 4
2.2 PRIMERS
When primers are recommended by the manufacturer of the sealant, use them in accordance with the recommendation of the manufacturer.
2.3 BACKUP MATERIALS
Provide backup material that is a compressible, nonshrinking, nonstaining, nonabsorbing material, nonreactive with the joint sealant. The material shall have a melting point at least 5 degrees F greater than the pouring temperature of the sealant being used when tested in accordance with ASTM D789. The material shall have a water absorption of not more than 5 percent of the sample weight when tested in accordance with ASTM C1016.
Use backup material that is 25 plus or minus 5 percent larger in diameter than the nominal width of the crack.
2.4 BOND BREAKING TAPES
Provide a bond breaking tape or separating material that is a flexible, nonshrinkable, nonabsorbing, nonstaining, and nonreacting adhesive-backed tape. The material shall have a melting point at least 5 degrees F greater than the pouring temperature of the sealant being used when tested in accordance with ASTM D789. The bond breaker tape shall be approximately 1/8 inch wider than the nominal width of the joint and shall not bond to the joint sealant.
PART 3 EXECUTION
3.1 EXECUTING EQUIPMENT
Machines, tools, and equipment used in the performance of the work required by this section shall be approved before the work is started maintained in satisfactory condition at all times. Submit a list of proposed equipment to be used in performance of construction work including descriptive data, 10 days prior to use on the project.
3.1.1 Joint Cleaning Equipment
3.1.1.1 Tractor-Mounted Routing Tool
If required provide a routing tool, used for removing old sealant from the joints, of such shape and dimensions and so mounted on the tractor that it will not damage the sides of the joints. The tool shall be designed so that it can be adjusted to remove the old material to varying depths as required. The use of V-shaped tools or rotary impact routing devices will not be permitted. Hand-operated spindle routing devices may be used to clean and enlarge random cracks.
3.1.1.2 Concrete Saw
Provide a self-propelled power saw, with water-cooled diamond or abrasive saw blades, for cutting joints to the depths and widths specified or for refacing joints or cleaning sawed joints where sandblasting does not provide a clean joint.
3.1.1.3 Sandblasting Equipment
Include with the sandblasting equipment an air compressor, hose, and long-wearing venturi-type nozzle of proper size, shape and opening. The
SECTION 32 01 19 Page 5 maximum nozzle opening should not exceed 1/4 inch . The air compressor shall be portable and capable of furnishing not less than 150 cfm and maintaining a line pressure of not less than 90 psi at the nozzle while in use. Demonstrate compressor capability, under job conditions, before approval. The compressor shall be equipped with traps that will maintain the compressed air free of oil and water. The nozzle shall have an adjustable guide that will hold the nozzle aligned with the joint approximately 1 inch above the pavement surface. Adjust the height, angle of inclination and the size of the nozzle as necessary to secure satisfactory results.
3.1.1.4 Waterblasting Equipment
Include with the waterblasting equipment a trailer-mounted water tank, pumps, high-pressure hose, wand with safety release cutoff control, nozzle, and auxiliary water resupply equipment. Provide water tank and auxiliary resupply equipment of sufficient capacity to permit continuous operations. The nozzle shall have an adjustable guide that will hold the nozzle aligned with the joint approximately 1 inch above the pavement surface. Adjust the height, angle of inclination and the size of the nozzle as necessary to obtain satisfactory results. A pressure gauge mounted at the pump shall show at all times the pressure in psi at which the equipment is operating.
3.1.1.5 Hand Tools
Hand tools may be used, when approved, for removing defective sealant from a crack and repairing or cleaning the crack faces.
3.1.2 Sealing Equipment
3.1.2.1 Hot-Poured Sealing Equipment
The unit applicators used for heating and installing ASTM D6690 joint sealant materials shall be mobile and shall be equipped with a double-boiler, agitator-type kettle with an oil medium in the outer space for heat transfer; a direct-connected pressure-type extruding device with a nozzle shaped for inserting in the joint to be filled; positive temperature devices for controlling the temperature of the transfer oil and sealant; and a recording type thermometer for indicating the temperature of the sealant. The applicator unit shall be designed so that the sealant will circulate through the delivery hose and return to the inner kettle when not in use.
3.2 PREPARATION OF JOINTS
Immediately before the installation of the sealant, thoroughly clean the joints to remove all laitance, curing compound, filler, protrusions of hardened concrete, and old sealant from the sides and upper edges of the joint space to be sealed.
3.2.1 Sawing
3.2.1.1 Facing of Joints
Accomplish facing of joints using a concrete saw as specified in paragraph EQUIPMENT to saw through sawed and filler-type joints to loosen and remove material until the joint is clean and open to the full specified width and depth. Stiffen the blade with a sufficient number of suitable dummy
SECTION 32 01 19 Page 6
(used) blades or washers. Thoroughly clean, immediately following the sawing operation, the joint opening using a water jet to remove all saw cuttings and debris.
3.2.1.2 Refacing of Random Cracks
Accomplish sawing of the cracks using a power-driven concrete saw as specified in paragraph EQUIPMENT. The saw blade shall be 6 inches or less in diameter to enable the saw to follow the trace of the crack. Stiffen the blade, as necessary, with suitable dummy (or used) blades or washers.
Immediately following the sawing operation, thoroughly clean the crack opening using a water jet to remove all saw cuttings and debris.
3.2.2 Sandblasting
The newly exposed concrete joint faces and the pavement surfaces extending a minimum of 1/2 inch from the joint edges shall be sandblasted or waterblasted clean. use a multiple-pass technique until the surfaces are free of dust, dirt, curing compound, filler, old sealant residue, or any foreign debris that might prevent the bonding of the sealant to the concrete. After final cleaning and immediately prior to sealing, blow out the joints with compressed air and leave them completely free of debris and water.
3.2.3 Back-Up Material
When the joint opening is of a greater depth than indicated for the sealant depth, plug or seal off the lower portion of the joint opening using a back-up material to prevent the entrance of the sealant below the specified depth. Take care to ensure that the backup material is placed at the specified depth and is not stretched or twisted during installation.
3.2.4 Bond Breaking Tape
Where inserts or filler materials contain bitumen, or the depth of the joint opening does not allow for the use of a backup material, insert a bond breaker separating tape to prevent incompatibility with the filler materials and three-sided adhesion of the sealant. Securely bond the tape to the bottom of the joint opening so it will not float up into the new sealant.
3.2.5 Rate of Progress of Joint Preparation
Limit the stages of joint preparation, which include sandblasting, air pressure cleaning and placing of the back-up material to only that lineal footage that can be sealed during the same day.
3.3 PREPARATION OF SEALANT
3.3.1 Hot-Poured Sealants
Do not heat sealants conforming to ASTM D6690 in excess of the safe heating temperature recommended by the manufacturer as shown on the sealant containers. Withdraw and waste sealant that has been overheated or subjected to application temperatures for over 4 hours or that has remained in the applicator at the end of the day's operation.
SECTION 32 01 19 Page 7
3.4 INSTALLATION OF SEALANT
3.4.1 Time of Application
Seal joints immediately following final cleaning of the joint walls and following the placement of the separating or backup material. Open joints, that cannot be sealed under the conditions specified, or when rain interrupts sealing operations shall be recleaned and allowed to dry prior to installing the sealant.
3.4.2 Sealing Joints
Immediately preceding, but not more than 50 feet ahead of the joint sealing operations, perform a final cleaning with compressed air. Fill the joints from the bottom up to 1/4 inch plus or minus 1/16 inch below the pavement surface. Remove and discard excess or spilled sealant from the pavement by approved methods. Install the sealant in such a manner as to prevent the formation of voids and entrapped air. In no case shall gravity methods or pouring pots be used to install the sealant material.
Traffic shall not be permitted over newly sealed pavement until authorized by the Contracting Officer. When a primer is recommended by the manufacturer, apply it evenly to the joint faces in accordance with the manufacturer's instructions. Check the joints frequently to ensure that the newly installed sealant is cured to a tack-free condition within the time specified.
3.5 INSPECTION
3.5.1 Joint Cleaning
Inspect joints during the cleaning process to correct improper equipment and cleaning techniques that damage the concrete pavement in any manner.
Cleaned joints will be approved prior to installation of the separating or back-up material and joint sealant.
3.5.2 Joint Sealant Application Equipment
Inspect the application equipment to ensure conformance to temperature requirements, proper proportioning and mixing (if two-component sealant) and proper installation. Evidences of bubbling, improper installation, failure to cure or set will be cause to suspend operations until causes of the deficiencies are determined and corrected.
3.5.3 Joint Sealant
Inspect the joint sealant for proper rate of cure and set, bonding to the joint walls, cohesive separation within the sealant, reversion to liquid, entrapped air and voids. Sealants exhibiting any of these deficiencies at any time prior to the final acceptance of the project shall be removed from the joint, wasted, and replaced as specified herein at no additional cost to the Government.
3.6 CLEAN-UP
Upon completion of the project, remove all unused materials from the site and leave the pavement in a clean condition.
-- End of Section --
SECTION 32 01 19 Page 8
SECTION TABLE OF CONTENTS
DIVISION 32 - EXTERIOR IMPROVEMENTS
SECTION 32 05 33
LANDSCAPE ESTABLISHMENT
02/10
PART 1 GENERAL
1.1 REFERENCES
1.2 DEFINITIONS
1.2.1 Pesticide
1.2.2 Stand of Turf
1.2.3 Planter Beds
1.3 RELATED REQUIREMENTS
1.4 SUBMITTALS
1.5 DELIVERY, STORAGE AND HANDLING
1.5.1 Delivery
1.5.2 Storage
1.5.2.1 Fertilizer, Lime, Iron, Mulch Storage
1.5.2.2 Antidessicants Storage
1.5.3 Handling
1.6 LOCAL/REGIONAL MATERIALS
1.7 MAINTENANCE
PART 2 PRODUCTS
2.1 POST-PLANT FERTILIZER
2.2 WATER
2.3 MULCHES TOPDRESSING
2.3.1 Organic Mulch Materials
2.3.2 Recycled Organic Mulch
2.4 PESTICIDES
PART 3 EXECUTION
3.1 EXTENT OF WORK
3.1.1 Policing
3.1.2 Drainage System Maintenance
3.2 IRRIGATION ESTABLISHMENT PERIOD
3.2.1 Maintenance During the Irrigation Establishment Period
3.2.2 Water Restrictions
3.2.3 Fire Hydrants
3.2.4 Final Acceptance
3.2.5 Controller Charts
3.3 GROUNDCOVER ESTABLISHMENT PERIOD
3.3.1 Frequency of Maintenance
3.3.2 Promotion of Growth
3.3.3 Mowing
3.3.3.1 Turf
3.3.3.2 Native Grasses
3.3.3.3 Wildflowers
3.3.4 Turf Edging and Trimming
SECTION 32 05 33 Page 1
3.3.5 Post-Fertilizer Application
3.3.6 Turf Watering
3.3.7 Turf Clearance Area
3.3.8 Replanting
3.3.9 Final Inspection and Acceptance
3.3.10 Unsatisfactory Work
3.4 EXTERIOR PLANT ESTABLISHMENT PERIOD
3.4.1 Frequency of Maintenance
3.4.2 Promotion of Plant Growth and Vigor
3.4.3 Planter Bed Maintenance
3.4.3.1 Shrub Selective Maintenance
3.4.3.2 Tree Maintenance
3.4.4 Slope Erosion Control Maintenance
3.4.5 Removal of Dying or Dead Plants
3.4.6 Tracking of Unhealthy Plants
3.4.7 Final Inspection
3.4.7.1 Total Plants on Site
3.4.7.2 Mulching and Weeding
3.4.7.3 Tree Supports
3.4.7.4 Remedial Work
3.4.8 Unsatisfactory Work
3.5 FIELD QUALITY CONTROL
3.5.1 Maintenance Inspection Report
3.5.2 Plant Quantities
3.5.3 Tree Staking and Guying Removal
-- End of Section Table of Contents --
SECTION 32 05 33 Page 2
SECTION 32 05 33
LANDSCAPE ESTABLISHMENT
02/10
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
ASTM INTERNATIONAL (ASTM)
ASTM D5851 (1995; R 2011) Planning and Implementing a Water Monitoring Program
TREE CARE INDUSTRY ASSOCIATION (TCIA)
TCIA Z133.1 (2006) American National Standard for Arboricultural Operations - Pruning, Repairing, Maintaining, and Removing Trees, and Cutting Brush - Safety Requirements
U.S. GREEN BUILDING COUNCIL (USGBC)
LEED NC (2009) Leadership in Energy and Environmental Design(tm) New Construction Rating System
1.2 DEFINITIONS
1.2.1 Pesticide
Any substance or mixture of substances, including biological control agents, that may prevent, destroy, repel, or mitigate pests and are specifically labeled for use by the U.S. Environmental Protection Agency (EPA). Also, any substance used as a plant regulator, defoliant, disinfectant, or biocide. Examples of pesticides include fumigants, herbicides, insecticides, fungicides, nematicides, molluscicides and rodenticides.
1.2.2 Stand of Turf
95 percent ground cover of the established species.
1.2.3 Planter Beds
A planter bed is defined as an area containing one or a combination of the following plant types: shrubs, vines, wildflowers, annuals, perennials, ground cover, and a mulch topdressing excluding turf. Trees may also be found in planter beds.
1.3 RELATED REQUIREMENTS
Section 32 92 19 SEEDING applies to this section for installation of
SECTION 32 05 33 Page 3 seedrequirements, with additions and modifications herein.
Section 32 93 00 EXTERIOR PLANTS applies to this section for installation of trees, shrubs, ground cover, vines, and wildflower, with additions and modifications herein.
1.4 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. The following shall be submitted in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
Integrated Pest Management Plan
SD-03 Product Data
Local/Regional Materials ; ( LEED NC) Fertilizer ; G, RO Hoses ; ( LEED NC) Mulches Topdressing ; ( LEED NC) Organic Mulch Materials
SD-07 Certificates
Maintenance Inspection Report Plant Quantities
SD-10 Operation and Maintenance Data
Maintenance
SD-11 Closeout Submittals
Tree, Staking And Guying Removal
1.5 DELIVERY, STORAGE AND HANDLING
1.5.1 Delivery
Deliver fertilizer, gypsum, iron to the site in original containers bearing manufacturer's chemical analysis, name, trade name, or trademark, and indication of conformance to state and federal laws. Instead of containers, fertilizer, gypsum may be furnished in bulk with a certificate indicating the above information.
1.5.2 Storage
1.5.2.1 Fertilizer, Lime, Iron, Mulch Storage
Material shall be stored in designated areas. Lime and fertilizer shall be stored in cool, dry locations away from contaminants.
1.5.2.2 Antidessicants Storage
Do not store with fertilizers or other landscape maintenance materials.
SECTION 32 05 33 Page 4
1.5.3 Handling
Do not drop or dump materials from vehicles.
1.6 LOCAL/REGIONAL MATERIALS
Use materials or products extracted, harvested, or recovered, as well as manufactured, within a 500 mile radius from the project site, if available from a minimum of 3 sources. See Section 01 33 29 SUSTAINABILITY REPORTING for cumulative total local material requirements. Landscaping materials may be locally available. Submit documentation indicating distance between manufacturing facility and the project site. Indicate distance of raw material origin from the project site. Indicate relative dollar value of local/regional materials to total dollar value of products included in project.
1.7 MAINTENANCE
Submit Operation and Maintenance (O&M) Manuals for planting materials.
Include instructions indicating procedures during one typical year including variations of maintenance for climatic conditions throughout the year. Provide instructions and procedures for watering; promotion of growth, including fertilizing, pruning, and mowing; and integrated pest management. O&M Manuals shall include pictures of planting materials cross referenced to botanical and common names, with a description of the normal appearance in each season.
Develop a water monitoring program for surface and ground water on the project site in accordance with ASTM D5851 and consistent with the water management program utilized during construction operations.
PART 2 PRODUCTS
Submit product data indicating percentage of post-industrial and post-consumer recycled content per unit of product. Indicate relative dollar value of recycled content products to total dollar value of products included in project.
2.1 POST-PLANT FERTILIZER
Fertilizer for groundcover, wildflowers, and grasses is not permitted.
Fertilizer for trees, plants, and shrubs shall be as recommended by plant supplier, except synthetic chemical fertilizers are not permitted.
Fertilizers containing petrochemical additives or that have been treated with pesticides or herbicides are not permitted.
Organic, granular controlled release fertilizer containing the following minimum percentages, by weight, of plant food nutrients:
1.5 percent available nitrogen
0.5 percent available phosphorus
1.0 percent available potassium 0 percent sulfur
2.2 WATER
Source of water shall be approved by the Contracting Officer, and be of suitable quality for irrigation. Use collected storm water or graywater
SECTION 32 05 33 Page 5 when available.
Hoses used for watering shall be a minimum of 60 percent post-consumer rubber or plastic.
2.3 MULCHES TOPDRESSING
Free from noxious weeds, mold, pesticides, or other deleterious materials.
2.3.1 Organic Mulch Materials
Shredded hardwood, pine straw mulch, pine needles, recycled from site when available. Biobased content shall be a minimum of 100 percent. Wood cellulose fiber shall be processed to contain no growth or germination-inhibiting factors, dyed with non-toxic, biodegradable dye to an appropriate color to facilitate visual metering of materials application. Paper-based hydraulic mulch shall contain a minimum of 100 percent post-consumer recycled content. Wood-based hydraulic mulch shall contain a minimum of 100 percent recycled material. Submit documentation indicating type of biobased material in product and biobased content.
Indicate relative dollar value of biobased content products to total dollar value of products included in project.
2.3.2 Recycled Organic Mulch
Recycled mulch may include compost, tree trimmings, or pine needles with a gradation that passes through a 2-1/2 by 2-1/2 inch screen. It shall be cleaned of all sticks a minimum 1 inch in diameter and plastic materials a minimum 3 inch length. The material shall be treated to retard the growth of mold and fungi.
2.4 PESTICIDES
Pesticides and herbicides are not permitted. Submit an Integrated Pest Management Plan , including weed and pest management strategies. Use biological pest controls as approved in the Plan.
PART 3 EXECUTION
3.1 EXTENT OF WORK
Provide landscape construction maintenance to include mowing, edging, overseeding, aeration, fertilizing, watering, weeding, pruning, stake and guy adjusting, for all newly installed landscape areas, unless indicated otherwise, and at all areas inside or outside the limits of the construction that are disturbed by the Contractor's operations.
3.1.1 Policing
The Contractor shall police all landscaped areas. Policing includes removal of leaves, branches and limbs regardless of length or diameter, dead vegetation, paper, trash, cigarette butts, garbage, rocks or other debris. Policing shall extend to both sides of fencing or walls.
Collected debris shall be promptly removed and disposed of at an approved disposal site.
3.1.2 Drainage System Maintenance
The Contractor shall remove all obstructions from surface and subsurface
SECTION 32 05 33 Page 6 drain lines to allow water to flow unrestricted in swales, gutters, catch basins, storm drain curb inlets, and yard drains. Remove grates and clear debris in catch basins. Open drainage channels are to be maintained free of all debris and vegetation at all times. Edges of these channels shall be clear of any encroachment by vegetation.
3.2 IRRIGATION ESTABLISHMENT PERIOD
The irrigation establishment period will commence on the date that inspection by the Contracting Officer shows that the new irrigation equipment furnished under this contract have been satisfactorily installed and is functional and shall continue for a period of 365 days.
3.2.1 Maintenance During the Irrigation Establishment Period
Begin maintenance immediately after irrigation equipment has been installed and is functional. Inspect irrigation equipment at least once a week during the installation and establishment period and perform needed maintenance promptly. Automatic controllers not equipped with rain shut-off sensors shall be turned off during periods of rain that exceed twelve hours of continuous rainfall in one day or during rain storms of one day or more. Once the rain has subsided timers shall be reactivated.
Irrigation controllers shall be inspected and reprogrammed after power outages. Contractor shall be responsible for winterization and startup.
Sprinkler heads shall direct water away from buildings and hard surfaced areas.
3.2.2 Water Restrictions
The Contractor shall abide by state, local or other water conservation regulations in force during the establishment period. Automatic controller shall be adjusted to comply with the water conservation regulations schedule.
3.2.3 Fire Hydrants
To use a fire hydrant for irrigation, the Contractor shall obtain a backflow preventer (BFP) from PSUS. The fee associated with this the BFP installation is $300 annually with a $1200 deposit. Upon return of the BFP in good working order, PSUS will refund the $1200 deposit. Once contractor has completed BFP application, PSUS will attach hydrant as determined by Contractor and provide annual BFP test as required by law. Contractor is responsible for insulating and protecting BFP during inclement weather.
3.2.4 Final Acceptance
Upon completion of the irrigation establishment period and final acceptance of groundcover and exterior plants, irrigation equipment shall be removed.
3.2.5 Controller Charts
Provide one chart for each controller supplied. Indicate in chart area controlled by the automatic controller. The chart is a reduction of the actual plan(s) that will fit the maximum dimensions inside the controller housing. Use a black line print for the chart and a different pastel or transparent color to indicate each station zone of coverage. After chart is completed and approved for final acceptance, seal chart between two 20 mil pieces of clear plastic.
SECTION 32 05 33 Page 7
3.3 GROUNDCOVER ESTABLISHMENT PERIOD
Groundcover establishment period will commence on the date that inspection by the Contracting Officer shows that the new turf furnished under this contract has been satisfactorily installed to a 95 percent stand of coverage. The establishment period shall continue for a period of 365 days.
3.3.1 Frequency of Maintenance
Begin maintenance immediately after turf has been installed. Inspect areas once a week during the installation and establishment period and perform needed maintenance promptly.
3.3.2 Promotion of Growth
Groundcover shall be maintained in a manner that promotes proper health, growth, natural color.Turf shall have a neat uniform manicured appearance, free of bare areas, ruts, holes, weeds, pests, dead vegetation, debris, and unwanted vegetation that present an unsightly appearance. Mow, remove excess clippings, eradicate weeds, water, fertilize, overseed, topdress and perform other operations necessary to promote growth, as approved by Contracting Officer and consistent with approved Integrated Pest Management Plan. Remove noxious weeds common to the area from planting areas by mechanical means.
3.3.3 Mowing
3.3.3.1 Turf
Turf shall be mowed at a uniform finished height. Mow turfed areas to a minimum average height of 2 inches when average height of grass becomes 3 inches for spring/summer maintenance and to a minimum average height of 2 inches when the average height of grass reaches 3 inches for fall maintenance. The height of turf is measured from the soil. Mowing of turf shall be performed in a manner that prevents scalping, rutting, bruising, uneven and rough cutting. Prior to mowing, all rubbish, debris, trash, leaves, rocks, paper, and limbs or branches on a turf area shall be picked up and disposed. Adjacent paved areas shall be swept/vacuumed clean.
3.3.3.2 Native Grasses
Mow above height of native grass seedlings (approximately 3.5 to 4 inches ). Mow during spring or early summer. Do not mow after early summer during the second growing season.
3.3.3.3 Wildflowers
Mow three times per season above height of the wildflowers (approximately 12 to 15 inches ).
3.3.4 Turf Edging and Trimming
Perimeter of planter bed edges, sidewalks, driveways, curbs, and other paved surfaces shall be edged. Uniformly edge these areas to prevent encroachment of vegetation onto paved surfaces and to provide a clear cut division line between planter beds, turf, and ground cover. Edging is to
SECTION 32 05 33 Page 8 be accomplished in a manner that prevents scalping, rutting, bruising, uneven and rough cutting. Edging shall be performed on the same day that turf is mowed. Use of string line trimmers is permitted in "soft" areas such as an edge between turfgrass and a planter bed. Care shall be exercised to avoid damage to any plant materials, structures, and other landscape features.
Trimming around trees, fences, poles, walls, irrigation valve boxes and other similar objects is to be accomplished to match the height and appearance of surrounding mowed turf growth. Trimming shall be performed on the same day the turf's mowed. Care shall be exercised to avoid "Girdling" trees located in turf areas. The use of protective tree collars on trees in turf areas may be utilized as a temporary means to avoid injury to tree trunks. At the end of the plant establishment period Contractor will be responsible for removing all protective tree collars.
3.3.5 Post-Fertilizer Application
Do not fertilize wildflowers, groundcover, and grasses. Apply turf fertilizer in a manner that promotes health, growth, vigor, color and appearance of cultivated turf areas. The method of application, fertilizer type and frequencies shall be determined by the laboratory soil analysis results the requirements of the particular turf species. Organic fertilizer shall be used. In the event that organic fertilizer is not producing the desired effect, the Contractor shall contract the Contracting Officer for approval prior to the use of a synthetic type of fertilizer. Fertilizer shall be applied by approved methods in accordance with the manufacturer's recommendations.
3.3.6 Turf Watering
The Contractor shall perform irrigation in a manner that promotes the health, growth, color and appearance of cultivated vegetation and that complies with all Federal, State, and local water agencies and authorities directives. The Contractor shall be responsible to prevent over watering, water run-off, erosion, and ponding due to excessive quantities or rate of application. The Contractor shall abide by state, local or other water conservation regulations or restrictions in force during the establishment period. Irrigation controllers shall be adjusted to comply with the water conservation regulations schedule.
3.3.7 Turf Clearance Area
Trees located in turf areas shall be maintained with a growth free clearance of 30 inches from the tree trunk base. The use of mechanical weed whips to accomplish the turf growth free bed area is prohibited.
3.3.8 Replanting
Replant in accordance with Section 32 92 19 SEEDING and within specified planting dates areas which do not have a satisfactory stand of turf.
Replant areas which do not have a satisfactory stand of other groundcover and grasses.
3.3.9 Final Inspection and Acceptance
Final inspection will be make upon written request from the Contractor at least 10 days prior to the last day of the turf establishment period.
Final turf acceptance will be based upon a satisfactory stand of turf.
SECTION 32 05 33 Page 9
Final acceptance of wildflower and grass areas will be based upon a stand of 95 percent groundcover of established species.
3.3.10 Unsatisfactory Work
When work is found to not meet design intent and specifications, maintenance period will be extended at no additional cost to the Government until work has been completed, inspected and accepted by Contracting Officer.
3.4 EXTERIOR PLANT ESTABLISHMENT PERIOD
The exterior plant establishment period will commence on the date that inspection by the Contracting Officer shows that the new plants furnished under this contract have been satisfactorily installed and shall continue for a period of 365 days.
3.4.1 Frequency of Maintenance
Begin maintenance immediately after plants have been installed. Inspect exterior plants at least once a week during the installation and establishment period and perform needed maintenance promptly.
3.4.2 Promotion of Plant Growth and Vigor
Water, prune, fertilize, mulch, adjust stakes, guys and turnbuckles, eradicate weeds and perform other operations necessary to promote plant growth, and vigor.
3.4.3 Planter Bed Maintenance
Planter beds shall be weeded, fertilized, irrigated, kept pest free, turf free, pruned, and mulch levels maintained. Planter beds will not be allowed to encroach into turf areas. A definite break shall be maintained between turf areas and planter beds. Fertilize exterior planting materials to promote healthy plant growth without encouraging excessive top foliar growth. Remove noxious weeds common to the area from planting areas by mechanical means.
3.4.3.1 Shrub Selective Maintenance
In addition to the above requirements, shrubs shall be selectively pruned, and shaped for health and safety when the following conditions exist:
Remove growth in front of windows, over entrance ways or walks, and any growth which will obstruct vision at street intersections or of security personnel; Remove dead, damaged or diseased branches or limbs; where shrub growth obstructs pedestrian walkways; where shrub growth is found growing against or over structures; where shrub growth permits concealment of unauthorized persons. All pruning debris shall be disposed of in a proper manner.
3.4.3.2 Tree Maintenance
Tree maintenance shall include adjustment of stakes, ties, guy supports and turnbuckles, watering, fertilizing, pest control, mulching, pruning for health and safety and fall leaf cleanup. Fertilize exterior trees to promote healthy plant growth without encouraging excessive top foliar growth. Stakes, ties, guy supports and turnbuckles shall be inspected and adjusted to avoid girdling and promote natural development. All trees
SECTION 32 05 33 Page 10 within the project boundaries, regardless of caliper, shall be selectively pruned for safety and health reasons. These include but are not limited to removal of dead and broken branches and correction of structural defects. Prune trees according to their natural growth characteristics leaving trees well shaped and balanced. Pruning of all trees including palm trees shall be accomplished by or in the presence of a certified member of the International Society of Arboriculture and in accordance with TCIA Z133.1 . All pruning debris generated shall be disposed of in a proper manner.
3.4.4 Slope Erosion Control Maintenance
The Contractor shall provide slope erosion control maintenance to prevent undermining of all slopes in newly landscaped. Maintenance tasks include immediate repairs to weak spots in sloped areas, and maintaining clean, clear culverts, and graded berms, and terraces to intercept and direct water flow to prevent development of large gullies and slope erosion and during periods of extended rainfall, irrigation systems shall be secured.
Eroded areas shall be filled with amended topsoil and replanted with the same plant species. Erosion control netting and blankets damaged due to slope erosion shall be reinstalled.
3.4.5 Removal of Dying or Dead Plants
Remove dead and dying plants and provide new plants immediately upon commencement of the specified planting season, and replace stakes, guys, mulch and eroded earth mound water basins. No additional plant establishment period will be required for replacement plants beyond the original warranty period. A tree shall be considered dying or dead when the main leader has died back, or a minimum of 20 percent of the crown has died. A shrub or ground cover shall be considered dying or dead when a minimum of 20 percent of the plant has died. This condition shall be determined by scraping on a branch an area 1/16 inch square, maximum, to determine the cause for dying plant material and shall provide recommendations for replacement. The Contractor shall determine the cause for dying plant material and provide recommendations for replacement.
3.4.6 Tracking of Unhealthy Plants
Note plants not in healthy growing condition, as determined by the Contracting Officer, and as soon as seasonal conditions permit, remove and replace with plants of the same species and sizes as originally specified.
Install replacement plantings in accordance with Section 32 93 00 EXTERIOR
PLANTS.
3.4.7 Final Inspection
Final inspection will be made upon written request from the Contractor at least 10 days prior to the last day of the establishment period. Final inspection will be based upon satisfactory health and growth of plants and on the following:
3.4.7.1 Total Plants on Site
Plants have been accepted and required number of replacements have been installed.
SECTION 32 05 33 Page 11
3.4.7.2 Mulching and Weeding
Planter beds and earth mound water basins are properly mulched and free of weeds.
3.4.7.3 Tree Supports
Stakes, guys and turnbuckles are in good condition.
3.4.7.4 Remedial Work
Remedial measures directed by the Contracting Officer to ensure plant material survival and promote healthy growth have been completed.
3.4.8 Unsatisfactory Work
When work is found to not meet design intent and specifications, maintenance period will be extended at no additional cost to the Government until work has been completed, inspected and accepted by Contracting Officer.
3.5 FIELD QUALITY CONTROL
3.5.1 Maintenance Inspection Report
Provide maintenance inspection report to ensure that landscape maintenance is being performed in accordance with the specifications and in the best interest of plant growth and survivability. Site observations shall be documented at the start of the establishment period, then quarterly following the start, and at the end of establishment period. Results of site observation visits shall be submitted to the Contracting Officer within 7 calendar days of each site observation visit.
3.5.2 Plant Quantities
The Contractor shall provide Contracting Officer with the number of plant quantities. In addition, provide total exterior area of hardscape and landscaping such as turf and total number of shrubs.
3.5.3 Tree Staking and Guying Removal
Provide a certified letter that the stakes and guys are removed from the project trees at the end of the establishment period.
-- End of Section --
SECTION 32 05 33 Page 12
SECTION TABLE OF CONTENTS
DIVISION 32 - EXTERIOR IMPROVEMENTS
SECTION 32 11 23
AGGREGATE BASE COURSES
08/17
PART 1 GENERAL
1.1 REFERENCES
1.2 DEFINITIONS
1.2.1 Aggregate Base Course
1.2.2 Degree of Compaction
1.3 SUBMITTALS
1.4 EQUIPMENT, TOOLS, AND MACHINES
1.5 QUALITY ASSURANCE
1.5.1 Sampling
1.5.2 Tests
1.5.2.1 Sieve Analysis
1.5.2.2 Liquid Limit and Plasticity Index
1.5.2.3 Moisture-Density Determinations
1.5.2.4 Field Density Tests
1.5.2.5 Wear Test
1.5.2.6 Weight of Slag
1.6 ENVIRONMENTAL REQUIREMENTS
PART 2 PRODUCTS
2.1 AGGREGATES
2.1.1 Coarse Aggregate
2.1.1.1 Aggregate Base Course
2.1.2 Fine Aggregate
2.1.2.1 Aggregate Base Course
2.1.3 Gradation Requirements
2.2 LIQUID LIMIT AND PLASTICITY INDEX
2.3 TESTS, INSPECTIONS, AND VERIFICATIONS
2.3.1 Initial Tests
2.3.2 Approval of Material
PART 3 EXECUTION
3.1 GENERAL REQUIREMENTS
3.2 OPERATION OF AGGREGATE SOURCES
3.3 STOCKPILING MATERIAL
3.4 PREPARATION OF UNDERLYING COURSE OR SUBGRADE
3.5 GRADE CONTROL
3.6 MIXING AND PLACING MATERIALS
3.7 LAYER THICKNESS
3.8 COMPACTION
3.9 PROOF ROLLING
3.10 EDGES OF BASE COURSE
3.11 FINISHING
3.12 SMOOTHNESS TEST
SECTION 32 11 23 Page 1
3.13 FIELD QUALITY CONTROL
3.13.1 In-Place Tests
3.13.2 Approval of Material
3.14 TRAFFIC
3.15 MAINTENANCE
3.16 DISPOSAL OF UNSATISFACTORY MATERIALS
-- End of Section Table of Contents --
SECTION 32 11 23 Page 2
SECTION 32 11 23
AGGREGATE BASE COURSES
08/17
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by basic designation only.
AMERICAN ASSOCIATION OF STATE HIGHWAY AND TRANSPORTATION OFFICIALS
(AASHTO)
AASHTO T 180 (2017) Standard Method of Test for Moisture-Density Relations of Soils Using a 4.54-kg (10-lb) Rammer and a 457-mm (18-in.) Drop
AASHTO T 224 (2010) Standard Method of Test for Correction for Coarse Particles in the Soil Compaction Test
AASHTO T 88 (2013) Standard Method of Test for…