W912QR20R0045Specs-0004.pdf

PDF 2 MB Posted

Attached to
Consolidated Mission Complex (CMC), Phase 3 at Warner Robins Air Force Base (AFB), Georgia
Solicitation number
W912QR20R0045
Issued by

About this file

This solicitation is for construction of a Consolidated Mission Complex (CMC), Phase 3 located at Warner Robins Air Force Base (AFB), Georgia. The project cost is estimated between $25,000,000 to $100,000,000. It is a full and open procurement requiring a 10% price evaluation for HUBZone small businesses. The NAICS code is 236220 with a size determination of $39.5 million. Funds are not presently available and no contract award will be made until appropriated funds are available. Offerors must comply with CCR/ORCA, FAR, and DFARS requirements through the System for Award Management. Technical inquiries should be submitted via the Bidder Inquiry system on ProjNet.

View the file

Other files

File Type Posted
W912QR20R0045Plans-0004.pdf PDF
W912QR20R0045Specs-0003.pdf PDF
W912QR20R0045Plans-0003.pdf PDF
W912QR20R0045-0002.pdf PDF
W912QR20R0045Specs-0001.pdf PDF
W912QR20R0045Plans-0001.pdf PDF
Site Visit Sign-In Sheet.pdf PDF
LRD JA Warner Robins CMC phase 3 - Mech VAV FCU_Redacted.pdf PDF
LRD JA Warner Robins CMC phase 3 - Electrical_Redacted.pdf PDF
LRD JA Warner Robins CMC phase 3 - Structure_Redacted.pdf PDF
W912QR20R0045Plans_Vol5-0000.pdf PDF
LRD JA Warner Robins CMC phase 3 - Mech chillers and boilers_Redacted.pdf PDF
LRD JA Warner Robins CMC phase 3 - FP_Redacted.pdf PDF
LRD JA Warner Robins CMC phase 3 - Mech AHU_Redacted.pdf PDF
LRD JA Warner Robins CMC phase 3 -Plumbing_Redacted.pdf PDF
W912QR20R0045_FF-E_Vol1-0000.pdf PDF
W912QR20R0045_FF-E_Vol2-0000.pdf PDF
LRD JA Warner Robins CMC phase 3 - Mech cond unit dc fan_Redacted.pdf PDF
W912QR20R0045Plans_Vol4-0000.pdf PDF
LRD JA Warner Robins CMC phase 3 - Security_Redacted.pdf PDF
LRD JA Warner Robins CMC phase 3 - Arch_Redacted.pdf PDF
W912QR20R0045Plans_Vol2-0000.pdf PDF
W912QR20R0045Plans_Vol1-0000.pdf PDF
W912QR20R0045Specs_Vol1-0000.pdf PDF
W912QR20R0045Specs_Vol2-0000.pdf PDF
W912QR20R0045Plans_Vol6-0000.pdf PDF
LRD JA Warner Robins CMC phase 3 - Mech ERU_Redacted.pdf PDF
W912QR20R0045Plans_Vol3-0000.pdf PDF
LRD JA Warner Robins CMC phase 3 - communication_Redacted.pdf PDF
W912QR20R0045_SID-0000.pdf PDF
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CIVIL/OPS/ENVIRONMENTAL BR

ATTN: GLENN W MOON

600 DR M L KING JR PL RM 821

LOUISVILLE KY 40202-2236

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

See Continuation page.

1. CONTRACT ID CODE PAGE OF PAGES

1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912QR20R0045

X 9B. DATED (SEE ITEM 11)

09-Sep-2020

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO.

5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

06-Nov-2020

CODE

U. S. ARMY ENGINEER DISTRICT, LOUISVILLE

600 DR. MARTIN LUTHER KING, JR. PLACE

ROOM 821

LOUISVILLE KY 40202-2239

W912QR 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE 964860

FACILITY CODECODE

EMAIL:TEL:

W912QR20R0045-0004

W912QR20R0045

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)

The following have been added by full text:

SUMMARY OF CHANGES AMEND 0004

Solicitation W912QR20R0045 for Construction of a Consolidated Mission Complex (CMC), Phase 3 located at Warner Robins Air Force Base (AFB), Georgia is hereby modified as follows:

1. Offerors must acknowledge all amendments.

2. The due date and time for submission has been extended to 13 November 2020 at 10:00 AM Eastern Time.

3. The following PLAN SHEETS have been replaced:

SF101 – PARTIAL FRAMING PLAN -LEVEL 1 -OPTION 2

SF113 – PARTIAL FRAMING PLAN -LEVEL 2 -AREA B

SF114 – PARTIAL FRAMING PLAN -LEVEL 2 -AREA C

S-306 – CONCRETE SECTIONS

S-404 – ENLARGED PLANS

S-538 – STEEL SECTIONS

AE111 – PARTIAL FLOOR PLAN – LEVEL 2 – AREA C

AE123 – REFLECTED CEILING PLAN – LEVEL 1 – AREA C

A-310 – WALL SECTIONS

A-313 – WALL SECTIONS

A-410 – ENLARGED PLANS – OPTION 2 – AUDITORIUM

A-423 – VERTICAL CIRCULATION – STAIR 2

A-542 – STAIR DETAILS

A-601 – PARTITION TYPES

4. The following SPECIFICATION SECTIONS have been replaced:

PROJECT TABLE OF CONTENTS

00 80 00.00 06 – SUBMITTAL REGISTER

5. The following SPECIFICATION SECTIONS have been added:

05 73 00 – STAINLESS STEEL HANDRAILS AND RAILINGS

09 54 60 – LINEAR METAL CEILING SYSTEM

6. Davis Bacon Wage Determination GA20200140 is hereby deleted and replaced with the current version dated 30 October 2020.

7. All other information remains the same.

W912QR20R0045

SECTION 00 10 00 - SOLICITATION

The required response date/time has changed from 10-Nov-2020 10:00 AM to 13-Nov-2020 10:00 AM.

(End of Summary of Changes)

General Decision Number: GA20200140 10/30/2020

Superseded General Decision Number: GA20190140

State: Georgia

Construction Type: Building

County: Houston County in Georgia.

Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.80 for calendar year 2020 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January

1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.80 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year

2020. If this contract is covered by the EO and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must pay workers in that classification at least the wage rate determined through the conformance process set forth in 29 CFR 5.5(a)(1)(ii) (or the EO minimum wage rate,if it is higher than the conformed wage rate). The EO minimum wage rate will be adjusted annually. Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the

Davis-Bacon Related Acts, including those set forth at 29 CFR

5.1(a)(2)-(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Modification Number Publication Date

0 01/03/2020

1 10/30/2020

* ASBE0048-001 04/01/2020

Rates Fringes

ASBESTOS WORKER/HEAT & FROST

INSULATOR........................$ 28.77 16.51

BOIL0026-001 03/01/2018

BOILERMAKER......................$ 28.97 22.39

ELEC1316-020 09/01/2019

ELECTRICIAN (Including Low

Voltage Wiring)..................$ 26.54 17%+8.80

ENGI0474-001 07/01/2017

POWER EQUIPMENT OPERATOR:

Bobcat/Skid Steer/Skid

Loader, Bulldozer, and

Forklift (under 15 tons)....$ 25.02 13.83

Crane (over 10 tons) and

Forklift (15 tons and over).$ 26.85 13.83

Crane (over 120 tons).......$ 27.85 13.83

Crane (over 250 tons).......$ 28.85 13.83

Oiler.......................$ 22.68 13.83

PLUM0072-007 08/01/2018

PIPEFITTER (Including HVAC

Pipe Installation)...............$ 28.48 15.91

PLUMBER..........................$ 28.48 15.91

SHEE0085-009 07/01/2017

SHEET METAL WORKER (HVAC Duct

Installation Only)...............$ 31.04 14.10

SUGA2012-059 08/11/2012

BRICKLAYER.......................$ 15.09 1.04

CARPENTER, Includes Form Work....$ 15.00 0.00

CEMENT MASON/CONCRETE FINISHER...$ 15.18 3.89

FLOOR LAYER (Carpet, Vinyl and Resilient Flooring)..........$ 20.00 0.00

IRONWORKER, REINFORCING..........$ 20.47 3.89

IRONWORKER, STRUCTURAL...........$ 24.04 9.26

LABORER: Common or General......$ 10.99 0.00

LABORER: Mason Tender - Brick...$ 9.00 0.00

LABORER: Pipelayer..............$ 11.48 1.90

OPERATOR: Backhoe/Excavator.....$ 14.63 0.00

OPERATOR: Grader/Blade..........$ 17.52 0.00

OPERATOR: Loader................$ 8.00 0.00

PAINTER: Brush, Roller and

Spray............................$ 16.00 1.62

ROOFER...........................$ 14.48 0.00

SHEET METAL WORKER, Excludes

HVAC Duct Installation...........$ 18.03 0.00

TILE FINISHER....................$ 10.31 0.00

TILE SETTER......................$ 20.00 0.00

TRUCK DRIVER: Dump Truck........$ 10.00 1.33

TRUCK DRIVER: Lowboy Truck......$ 17.41 0.00

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the

Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.

Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses

(29CFR 5.5 (a) (1) (ii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate

(weighted union average rate).

Union Rate Identifiers

A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or

""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.

Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.

Survey Rate Identifiers

Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.

Survey wage rates are not updated and remain in effect until a new survey is conducted.

Union Average Rate Identifiers

Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010

08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.

A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour

Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the

Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the

Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations

Wage and Hour Division

U.S. Department of Labor

200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator

(See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator

U.S. Department of Labor

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative

Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board

U.S. Department of Labor

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION

479708 AFRC Consolidated Mission Complex, Phase 3 Robins Air Force Base, Georgia

PROJECT TABLE OF CONTENTS

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

00 80 00.00 06 SPECIAL PROVISIONS

DIVISION 01 - GENERAL REQUIREMENTS

01 32 01.00 10 PROJECT SCHEDULE

01 33 00.00 06 SUBMITTAL PROCEDURES

01 33 29.00 06 SUSTAINABILITY REPORTING

01 35 26.00 06 GOVERNMENT SAFETY REQUIREMENTS

01 42 00 SOURCES FOR REFERENCE PUBLICATIONS

01 45 00.15 10 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE (RMS CM)

01 45 04.10 06 CONTRACTOR QUALITY CONTROL

01 45 35 SPECIAL INSPECTIONS

01 46 00.00 06 TOTAL BUILDING COMMISSIONING (CONTRACTOR CxA)

01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS

01 57 19.00 06 TEMPORARY ENVIRONMENTAL CONTROLS AND PERMITS

01 74 19 CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL

01 78 23 OPERATION AND MAINTENANCE DATA

DIVISION 02 - EXISTING CONDITIONS

02 41 00 DEMOLITION

02 82 00 ASBESTOS REMEDIATION

02 83 13.00 06 LEAD IN CONSTRUCTION

DIVISION 03 - CONCRETE

03 30 00 CAST-IN-PLACE CONCRETE

DIVISION 04 - MASONRY

04 20 00 UNIT MASONRY

04 21 13.13 NONBEARING MASONRY VENEER/STEEL STUD WALLS

04 72 00 ARCHITECTURAL CAST STONE

DIVISION 05 - METALS

05 12 00 STRUCTURAL STEEL

05 21 19 OPEN WEB STEEL JOIST FRAMING

05 30 00 STEEL DECKS

05 40 00 COLD-FORMED METAL FRAMING

05 50 13 MISCELLANEOUS METAL FABRICATIONS

05 51 00 METAL STAIRS

05 51 33 METAL LADDERS

05 52 00 METAL RAILINGS AND GUARDRAILS

05 58 13 FORMED METAL COLUMN COVERS

PROJECT TABLE OF CONTENTS Page 1 Amendment 0004

DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES

06 10 00 ROUGH CARPENTRY

06 20 00 FINISH CARPENTRY

06 41 16.00 10 PLASTIC-LAMINATE-CLAD ARCHITECTURAL CABINETS

06 61 16 SOLID POLYMER (SOLID SURFACING) FABRICATIONS

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

Amendment 0004***************************************************************

***************************************************************Amendment 0004 05 73 00 STAINLESS STEEL HANDRAILS AND RAILINGS32 31 13 CHAIN LINK FENCES AND GATES

07 05 23 PRESSURE TESTING AN AIR BARRIER SYSTEM FOR AIR TIGHTNESS

07 11 13 BITUMINOUS DAMPPROOFING

07 13 53 ELASTOMERIC SHEET WATERPROOFING

07 19 00 WATER REPELLENTS

07 21 13 BOARD AND BLOCK INSULATION

07 21 16 MINERAL FIBER BLANKET INSULATION

07 22 00 ROOF AND DECK INSULATION

07 27 10.00 10 BUILDING AIR BARRIER SYSTEM

07 27 13 SELF-ADHERED NON PERMEABLE AIR BARRIER MEMBRANE

07 27 26 FLUID-APPLIED MEMBRANE AIR BARRIERS

07 42 63 FABRICATED WALL PANEL ASSEMBLIES

07 54 19 POLYVINYL-CHLORIDE ROOFING

07 60 00 FLASHING AND SHEET METAL

07 72 00 ROOF ACCESSORIES

07 84 00 FIRESTOPPING

07 92 00 JOINT SEALANTS

07 95 16 BUILDING EXPANSION JOINTS

DIVISION 08 - OPENINGS

08 11 13 STEEL DOORS AND FRAMES

08 14 00 WOOD DOORS

08 34 73 SOUND CONTROL DOOR ASSEMBLIES

08 41 13 ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS

08 41 23 FIRE RESISTIVE GLASS AND FRAMING SYSTEMS

08 51 13 ALUMINUM WINDOWS

08 71 00 DOOR HARDWARE

08 81 00 GLAZING

08 91 00 METAL WALL LOUVERS

DIVISION 09 - FINISHES

09 22 00 SUPPORTS FOR PLASTER AND GYPSUM BOARD

09 22 16 EXTRUDED ALUMINUM PARTITION CLOSURE

09 29 00 GYPSUM BOARD

09 29 13 DRYWALL PENETRATION BARRIER

09 30 10 CERAMIC AND QUARRY TILING

09 51 00 ACOUSTICAL CEILINGS

PROJECT TABLE OF CONTENTS Page 2 Amendment 0004

09 62 38 STATIC-CONTROL FLOORING

09 65 00 RESILIENT FLOORING

09 67 23.13 STANDARD RESINOUS FLOORING

09 68 00 CARPETING

09 69 13 RIGID GRID ACCESS FLOORING

09 84 20 ACOUSTICAL WALL PANELS

09 90 00 PAINTS AND COATINGS

DIVISION 10 - SPECIALTIES

10 14 00.10 EXTERIOR SIGNAGE

10 14 00.20 INTERIOR SIGNAGE

10 14 53 TRAFFIC SIGNAGE

10 21 13 TOILET COMPARTMENTS

10 21 23.16 CUBICLE TRACK AND HARDWARE

10 22 39 FOLDING PANEL PARTITIONS

10 26 00 WALL AND DOOR PROTECTION

10 28 13 TOILET ACCESSORIES

10 44 16 FIRE EXTINGUISHERS

09 54 60 LINEAR METAL CEILING SYSTEM

Amendment 0004***************************************************************

***************************************************************Amendment 0004

10 51 13 METAL LOCKERS

DIVISION 11 - EQUIPMENT

11 31 13 ELECTRIC KITCHEN EQUIPMENT

DIVISION 12 - FURNISHINGS

12 22 00 CURTAINS AND DRAPES

12 24 13 ROLLER WINDOW SHADES

12 61 13 UPHOLSTERED AUDIENCE SEATING

DIVISION 14 - CONVEYING EQUIPMENT

14 24 19 HYDRAULIC SERVICE ELEVATORS

DIVISION 21 - FIRE SUPPRESSION

21 13 13.00 10 WET PIPE SPRINKLER SYSTEM, FIRE PROTECTION

DIVISION 22 - PLUMBING

22 00 00 PLUMBING, GENERAL PURPOSE

DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)

23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS

23 05 15 COMMON PIPING FOR HVAC

23 05 48.19 BRACING FOR HVAC

23 05 93.00 06 TESTING, ADJUSTING, AND BALANCING (TAB) OF HVAC

23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS

23 09 00 INSTRUMENTATION AND CONTROL FOR HVAC

23 09 13 INSTRUMENTATION AND CONTROL DEVICES FOR HVAC

23 09 23.02 BACNET DIRECT DIGITAL CONTROL FOR HVAC AND OTHER BUILDING

CONTROL SYSTEMS

23 11 25 FACILITY GAS PIPING

23 23 00 REFRIGERANT PIPING

23 25 00 CHEMICAL TREATMENT OF WATER FOR MECHANICAL SYSTEMS

23 52 46.00 20 LOW PRESSURE WATER HEATING BOILERS (OVER 800,000 BTU/HR

OUTPUT)

23 64 10 WATER CHILLERS, VAPOR COMPRESSION TYPE

23 64 26 CHILLED, CHILLED-HOT, AND CONDENSER WATER PIPING SYSTEMS

23 81 00 DECENTRALIZED UNITARY HVAC EQUIPMENT

23 81 00.00 20 UNITARY AIR CONDITIONING EQUIPMENT

DIVISION 25 - INTEGRATED AUTOMATION

25 05 11.21 CYBERSECURITY FOR FACILITY-RELATED CONTROL SYSTEMS FIRE

AND LIFE SAFETY INCLUDING MASS NOTIFICATION SYSTEM

25 05 11.23 01 CYBERSECURITY FOR FACILITY-RELATED CONTROL SYSTEMS

UTILITY MONITORING CONTROL SYSTEM (UMCS) TO INCLUDE HVAC

AND BUILDING LIGHTING CONTROL SYSTEM

25 05 11.26 CYBERSECURITY FOR FACILITY-RELATED CONTROL SYSTEMS

ADVANCED METERS FOR ADVANCED METER READING SYSTEM (AMRS)

25 10 10 UTILITY MONITORING AND CONTROL SYSTEM (UMCS) FRONT END

AND INTEGRATION

DIVISION 26 - ELECTRICAL

PROJECT TABLE OF CONTENTS Page 3 Amendment 0004

26 08 00 APPARATUS INSPECTION AND TESTING

26 09 23 PRESENTATION LIGHTING SYSTEMS

26 12 19.10 THREE-PHASE, LIQUID-FILLED PAD-MOUNTED TRANSFORMERS

26 13 01 PAD-MOUNTED DEAD-FRONT AIR INSULATED SWITCHGEAR

26 20 00 INTERIOR DISTRIBUTION SYSTEM

26 24 13 SWITCHBOARDS

26 28 01.00 10 COORDINATED POWER SYSTEM PROTECTION

26 29 23 VARIABLE FREQUENCY DRIVE SYSTEMS UNDER 600 VOLTS

26 41 00 LIGHTNING PROTECTION SYSTEM

26 51 00 INTERIOR LIGHTING

26 56 00 EXTERIOR LIGHTING

DIVISION 27 - COMMUNICATIONS

27 05 14.00 10 CABLE TELEVISION PREMISES DISTRIBUTION SYSTEM

27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM

DIVISION 28 - ELECTRONIC SAFETY AND SECURITY

28 08 10 ELECTRONIC SECURITY SYSTEM ACCEPTANCE TESTING

28 10 05 ELECTRONIC SECURITY SYSTEMS (ESS)

28 31 76 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM

DIVISION 31 - EARTHWORK

31 00 00.00 06 EARTHWORK

31 05 22.00 06 GEOTEXTILES USED AS FILTERS

31 11 00 CLEARING AND GRUBBING

31 31 16.13 CHEMICAL TERMITE CONTROL

DIVISION 32 - EXTERIOR IMPROVEMENTS

32 01 19 FIELD MOLDED SEALANTS FOR SEALING JOINTS IN RIGID

PAVEMENTS

32 05 33 LANDSCAPE ESTABLISHMENT

32 11 20 BASE COURSE FOR RIGID AND SUBBASES FOR FLEXIBLE PAVING

32 12 13 BITUMINOUS TACK AND PRIME COATS

32 12 16 HOT-MIX ASPHALT (HMA) FOR ROADS

32 13 13.06 06 PORTLAND CEMENT CONCRETE PAVEMENT FOR ROADS AND SITE

FACILITIES

32 16 15 CONCRETE BLOCK PAVEMENTS

32 16 19 CONCRETE CURBS, GUTTERS AND SIDEWALKS

32 17 23 PAVEMENT MARKINGS

32 31 13 CHAIN LINK FENCES AND GATES

32 92 19 SEEDING

32 92 23 SODDING

32 93 00 EXTERIOR PLANTS

DIVISION 33 - UTILITIES

33 11 00 WATER UTILITY DISTRIBUTION PIPING

33 11 23 NATURAL GAS AND LIQUID PETROLEUM PIPING

33 30 00 SANITARY SEWERAGE

33 40 00 STORM DRAINAGE UTILITIES

33 46 16 SUBDRAINAGE PIPING

33 48 13.00 06 BIORETENTION AREAS

33 71 02 UNDERGROUND ELECTRICAL DISTRIBUTION

-- End of Project Table of Contents --

PROJECT TABLE OF CONTENTS Page 4

PROJECT TABLE OF CONTENTS Page 5

THIS PAGE INTENTIONALLY LEFT BLANK

PROJECT TABLE OF CONTENTS Page 6

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 110 PAGES

AFRC Consolidated Mission Complex, Phase 3

00 80 00.00 06 SD-01 Preconstruction Submittals

1.28 GLabor, Equipment, and Material

Report

1.28Daily Equipment Report

1.14Fingerprints of all persons employed or to be employed

SD-02 Shop Drawings

1.41 GMechanical/Electrical Room

Layout

SD-04 Samples

1.16 GEquipment Warranty Identification

Tags

SD-05 Design Data

1.9.1Equipment-in-Place List

1.9.1Maintenance and Parts Data

1.12 GStandard Form 1413 Statement

and Acknowledgement

1.14Local Agency Check

1.45Progress Photographs

SD-07 Certificates

1.16Warranty of Construction

1.15 GNO ASBESTOS - CONTAINING

MATERIAL (ACM)

CERTIFICATION

1.32Insurance

1.30 GSales and Use Tax

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 110 PAGES

00 80 00.00 06 SD-11 Closeout Submittals

1.7.4 GPreliminary (Working) As-Built

Drawings

1.7.1 GFinal As-Built Drawings

1.7.1.2 GCAD Working As-Built Drawings

1.16 GWarranty Management Plan

1.7.3 GContour Map

01 32 01.00 10 SD-01 Preconstruction Submittals

1.3Project Scheduler Qualifications

3.4.1 GPreliminary Project Schedule

3.6.2 GPeriodic Schedule Update

01 33 00.00 06 SD-01 Preconstruction Submittals

3.1 G ROSubmittal Register

01 33 29.00 06 SD-01 Preconstruction Submittals

1.5.1.1 GSustainability Action Plan

1.4 GGBCI Guiding Principles

Assessment Professional

1.5.1.4 GSustainability Progress Report

SD-11 Closeout Submittals

1.5.1.2 GFinal Sustainability eNotebook

1.5.1.2 GAmended Final Sustainability

eNotebook

1.5.1.2 GFinal High Performance and

Sustainable Building Checklist

01 35 26.00 06 SD-01 Preconstruction Submittals

1.7 GAccident Prevention Plan (APP)

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 110 PAGES

01 35 26.00 06 1.7Fatigue Management Plan

1.7Bloodborne Pathogen Plan

1.7Exposure Control Plan

1.7Automatic External Defibrillator

(AED) Program

1.7Site Layout Plan

1.7Access/Haul Road Plan

1.7Hearing Conservation Program

1.7Respiratory Protection Plan

1.7Health Hazard Control Program

1.7Hazard Communication Program

1.7Process Safety Management

Plan

1.7Lead Compliance Plan &

Specifications

1.7Asbestos Abatement Plan &

Specifications

1.7Radiation Safety Program

1.7Abrasive Blasting Plan

1.7Heat Stress Monitoring Plan

1.7Cold Stress Monitoring Plan

1.7Indoor Air Quality Management

Plan

1.7Mold Remediation Plan

1.7Chromium (VI) Exposure

Evaluation

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 110 PAGES

01 35 26.00 06 1.7Crystalline Silica Assessment

1.7Lighting Plan for Night Operations

1.7Traffic Control Plan

1.7Fire Prevention Plan

1.7Wild Land Fire Management Plan

1.7Arc Flash Hazard Analysis

1.7Assured Equipment Grounding

Control Program (AEGCP)

1.7Hazardous Energy Control Plan

1.7Standard Pre-Lift Plan (LHE)

1.7Critical Lift Plan - LHE

1.7Fall Protection and Prevention

Plan

1.7Demolition/Renovation Plan (to include engineering survey)

1.7Rope Access Work Plan

1.7Excavation/Trenching Plan

1.7Fire Prevention and Protection

Plan for Underground

Construction

1.7Compressed Air Plan for

Underground Construction

1.7Erection and Removal Plan for

Formwork and Shoring

1.7PreCast Concrete Plan

1.7Lift-Slab Plans

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 110 PAGES

01 35 26.00 06 1.7Masonry Bracing Plan

1.7Steel Erection Plan

1.7Explosives Safety Site Plan

(ESSP)

1.7Tree Felling/Maintenance

Program

1.7Site Safety and Health Plan

(HTRW)

1.7Confined Space Entry

Procedures

1.7Confined Space Program

1.8Activity Hazard Analysis (AHA)

1.5.1.1Site Safety and Health Officer

Qualifications(SSHO)

1.12.7Proof of qualification for Crane

Operators

1.12.7 G ROCritical Lift Plan

SD-06 Test Reports

1.12Reports

1.12.1Accident Reports

1.12.3Monthly Exposure Reports

1.12.5Crane Reports

1.12.4Regulatory Citations and

Violations

SD-07 Certificates

1.12.8Confined Space Entry Permit

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 110 PAGES

01 35 26.00 06 1.13Hot work permit

1.12.6Crane Certificate of Compliance

01 45 04.10 06 SD-01 Preconstruction Submittals

3.2 G ROConstruction Quality Control Plan

01 45 35 SD-01 Preconstruction Submittals

3.1.2Written Practices

3.1.2NDT Procedures and Equipment

Calibration Records

SD-06 Test Reports

3.1.2Daily Reports

3.1.1Biweekly Reports

SD-07 Certificates

2.1Fabrication Plant

2.1Steel Joist Institute Membership

2.1Certificate of Compliance

1.5 GSpecial Inspector

3.1.2Qualification Records

SD-11 Closeout Submittals

3.1.2Interim Final Report

2.1 GComprehensive Final Report

3.1.2 GComprehensive Final Report

01 46 00.00 06 SD-01 Preconstruction Submittals

1.3 GCommissioning Specialists

1.6.2 GProject Schedule

SD-06 Test Reports

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 110 PAGES

01 46 00.00 06 3.1.2 GConstruction Phase

Commissioning Plan

3.1.4.5PVT Procedures

3.1.4.5 GPVT Report

1.4 GIssues Log

3.1.4.6 GTrend Log Report

3.3 GTrend Log Report

3.2 GCommissioning Report

SD-07 Certificates

1.5 GCertificate of Readiness

SD-10 Operation and Maintenance

Data

3.1.5 GSystems Training

3.1.6 GTraining Plan

3.1.7Systems Manual

3.1.8Maintenance and Service Life

Plans

01 50 00 SD-01 Preconstruction Submittals

1.3 GConstruction Site Plan

3.4.1 GTraffic Control Plan

1.6.1.4Contractor Computer

Cybersecurity Compliance

Statements

1.6.6 GContractor Temporary Network

Cybersecurity Compliance

Statements

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 110 PAGES

01 50 00 SD-03 Product Data

1.4Backflow Preventers

SD-06 Test Reports

2.5Backflow Preventer Tests

SD-07 Certificates

1.4Backflow Preventers

01 57 19.00 06 SD-01 Preconstruction Submittals

1.6.1Preconstruction Survey

1.11 GSolid Waste Management Permit

1.6.2 GRegulatory Notifications

1.7 GEnvironmental Protection Plan

1.7.9.1 GDirt and Dust Control Plan

1.6.5 GEmployee Training Records

1.6.4 GEnvironmental Manager

Qualifications

3.2.1 GErosion, Sedimentation, and

Pollution Control (ESPC) Plan

3.2.1 GNotice of Intent (NOI)

SD-06 Test Reports

3.7.1.1.2Laboratory Analysis

3.2.3.2Inspection Reports

3.7.2.1 GSolid Waste Management Report

SD-07 Certificates

1.6.5 GEmployee Training Records

1.6.5.1Certificate of Competency

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 110 PAGES

01 57 19.00 06 1.6.5Erosion and Sediment Control

Inspector

SD-11 Closeout Submittals

3.2.3.3 GStormwater Notice of Termination

3.7.1 GWaste Determination

Documentation

3.7.4.6 GDisposal Documentation for

Hazardous and Regulated Waste

1.6.5 GAssembled Employee Training

Records

1.11 GSolid Waste Management Permit

3.7.2.1 GSolid Waste Management Report

3.7.4.1 GHazardous Waste/Debris

Management

1.6.2 GRegulatory Notifications

3.7.2.1 GSales Documentation

3.7.2.1Contractor Certification

01 74 19 SD-01 Preconstruction Submittals

1.7 GConstruction Waste Management

Plan

SD-06 Test Reports

1.9.2Quarterly Reports

1.9.3Annual Report

SD-11 Closeout Submittals

1.10 SFinal Construction Waste

Diversion Report

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 110 PAGES

01 78 23 SD-10 Operation and Maintenance

Data

1.4 GO&M Database

3.1.1 GTraining Plan

3.1.3 GTraining Outline

3.1.2 GTraining Content

SD-11 Closeout Submittals

3.1.4 GTraining Video Recording

3.1.6 GValidation of Training Completion

02 41 00 SD-01 Preconstruction Submittals

1.9 GExisting Conditions

SD-07 Certificates

1.2.1 GDemolition Plan

1.6 GNotification

02 82 00 SD-03 Product Data

1.2.2 GAmended Water

1.3.8 GSafety Data Sheets (SDS) for All

Materials

3.1.2.1 GRespirators

3.1.6 GLocal Exhaust Equipment

3.1.6 GPressure Differential Automatic

Recording Instrument

3.1.8 GGlovebags

SD-06 Test Reports

1.5.5 GAir Sampling Results

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 110 PAGES

02 82 00 1.5.6 GPressure Differential Recordings for Local Exhaust System

3.3.3.2 GAsbestos Disposal Quantity

Report

SD-07 Certificates

1.3.3 GEmployee Training

1.3.4 GNotifications

1.3.6 GRespiratory Protection Program

1.3.9 GAsbestos Hazard Abatement Plan

1.3.10 GTesting Laboratory

1.3.11 GLandfill Approval

1.3.11 GDelivery Tickets

1.3.11 GWaste Shipment Records

1.3.12 GTransporter Certification

1.3.13 GMedical Certification

1.5.1 GPrivate Qualified Person

Documentation

1.5.2 GCompetent Person

1.5.3 GWorker's License

1.5.4 GContractor's License

1.5.9 GFederal, State or Local Citations

on Previous Projects

3.1 GEquipment Used to Contain

Airborne Asbestos Fibers

3.1.3.3 GWater Filtration Equipment

SD-11 Closeout Submittals

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 110 PAGES

02 82 00 1.3.4 GPermits and Licenses

1.3.4 GNotifications

1.3.6.1 GRespirator Program Records

1.5.7 GProtective Clothing

Decontamination Quality Control

Records

1.5.8 GProtective Clothing

Decontamination Facility

Notification

1.6.1 GRental Equipment

02 83 13.00 06 SD-01 Preconstruction Submittals

1.5.2.3Occupational and Environmental

Assessment Data Report

1.5.2.2Lead Compliance Plan

1.5.1.1Competent Person

1.5.1.2Training Certification

1.5.2.8Lead waste management plan

3.5.2.1Written evidence

1.5.2.4Medical Examinations

SD-06 Test Reports

1.5.2.3Sampling results

1.5.2.3Occupational and Environmental

Assessment Data Report

SD-07 Certificates

1.5.1.3Testing laboratory

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 110 PAGES

02 83 13.00 06 1.5.1.4Third party consultant qualifications

3.5.1.1Clearance Certification

SD-11 Closeout Submittals

3.5.2.1hazardous waste manifest

03 30 00 SD-01 Preconstruction Submittals

1.6.4 GQuality Control Plan

1.6.5 GQuality Control Personnel

Certifications

1.6.5Quality Control Organizational

Chart

1.6.7 GLaboratory Accreditation

SD-02 Shop Drawings

1.6.2.1 GReinforcing Steel

SD-03 Product Data

2.4.5Joint Sealants

2.4.4Joint Filler

2.1Formwork Materials

2.3.1Cementitious Materials

2.4.6Vapor Barrier

2.4.1Concrete Curing Materials

2.6Reinforcement

2.4.3.1Liquid Chemical Floor Hardeners and Sealers

2.3.4Admixtures

2.2.2Waterstops

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 110 PAGES

03 30 00 1.7.1Local/Regional Materials

2.2.3Biodegradable Form Release

Agent

2.4.2Nonshrink Grout

SD-05 Design Data

1.6.1.1 G AEConcrete Mix Design

SD-06 Test Reports

1.6.1.1 GConcrete Mix Design

1.6.3.1Fly Ash

1.6.3.2Slag Cement

1.6.3.3Aggregates

3.10.2.1Tolerance Report

3.14.2.3Compressive Strength Tests

3.14.2.5Chloride Ion Concentration

3.14.2.4Air Content

3.14.2.1Slump Tests

2.3.2Water

SD-07 Certificates

2.6.1Reinforcing Bars

1.7.2Forest Stewardship Council

(FSC) Certification

1.6.5.2Field Testing Technician and

Testing Agency

SD-08 Manufacturer’s Instructions

2.4.3.1Liquid Chemical Floor Hardeners and Sealers

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 110 PAGES

03 30 00 2.4.5Joint Sealants

2.4.1Curing Compound

04 20 00 SD-02 Shop Drawings

3.3.5.1 G AECut CMU

3.4.1.1 G AEDetail Drawings

SD-03 Product Data

1.5.1Hot Weather Procedures

1.5.2Cold Weather Procedures

2.2.2Clay Brick

2.2.3.2.1Cement

2.4.1.1Cementitious Materials

SD-04 Samples

1.3.1.1 GMock-Up Panel

2.2.2 GClay Brick

2.2.3.2 GConcrete Masonry Units (CMU)

2.6.1 GAnchors, Ties, and Bar

Positioners

2.6.2 GJoint Reinforcement

SD-05 Design Data

2.1.2 G AEMasonry Compressive Strength

3.2.4 G AEBracing Calculations

SD-06 Test Reports

2.2.2.1.4Efflorescence Test

3.6.1.1Field Testing of Mortar

3.6.1.2Field Testing of Grout

3.6.1.4Prism Tests

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 110 PAGES

04 20 00 3.6.1.5Single-Wythe Masonry Wall

Water Penetration Test

SD-07 Certificates

2.2.2Clay Brick

2.2.3.2Concrete Masonry Units (CMU)

2.2.4Precast Concrete Units

2.4.1.1Cementitious Materials

2.4.2.2Admixtures for Grout

2.6.1Anchors, Ties, and Bar

Positioners

2.6.2Joint Reinforcement

SD-08 Manufacturer’s Instructions

2.4.2.2Admixtures for Grout

SD-10 Operation and Maintenance

Data

3.8Take-Back Program

SD-11 Closeout Submittals

2.2.2.1.3 SClay Units

2.2.3.2.2 SRecycled Content

04 21 13.13 SD-02 Shop Drawings

2.3Framing

SD-03 Product Data

2.3Steel Studs, Top and Bottom

Tracks, Runners, Horizontal

Bridging, and Other Cold-Formed

Members and Other Accessories

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 110 PAGES

04 21 13.13 SD-04 Samples

2.1.1Clay Brick

1.3.1Sample Panel

1.3.3Metal Framing Calculations

SD-06 Test Reports

1.3.2 GEfflorescence Tests

2.2 GMortar

2.2.1 GMasonry Cement

SD-07 Certificates

2.1.1Clay Brick

2.4Insulation

2.6Exterior Sheathing

2.7.1Fluid-Applied Air Barrier

2.8Veneer Anchors

2.9.2Welding

04 72 00 SD-02 Shop Drawings

2.4Fabricaton

SD-04 Samples

2.5.1 GColor

SD-08 Manufacturer’s Instructions

3.1Installation

3.2Cleaning

05 12 00 SD-01 Preconstruction Submittals

1.4.1.1 G AEErection and Erection Bracing

Drawings

SD-02 Shop Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 110 PAGES

05 12 00 1.4.2 G AEFabrication Drawings

SD-03 Product Data

2.6.2Shop Primer

2.4.1Welding Electrodes and Rods

2.3.1.3Direct Tension Indicator Washers

2.4.2Non-Shrink Grout

2.2.1 SRecycled Content for Structural

Steel

2.2.2 SRecycled Content for Structural

Steel Tubing

2.2.3 SRecycled Content for Steel Pipe

SD-06 Test Reports

2.6.2Class B Coating

2.3Bolts, Nuts, and Washers

3.7.1.2Weld Inspection Reports

3.7.2.1Direct Tension Indicator Washer

Inspection Reports

3.7.3.1Bolt Testing Reports

3.7.4Embrittlement Test Reports

SD-07 Certificates

2.2Steel

2.3Bolts, Nuts, and Washers

2.5Galvanizing

1.3AISC Structural Steel Fabricator

Quality Certification

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 110 PAGES

05 12 00 1.3AISC Structural Steel Erector

Quality Certification

1.4.3.1Welding Procedures and

Qualifications

2.4.1Welding Electrodes and Rods

3.7.1.1Certified Welding Inspector

3.7.1.2NDT Technician

3.4Welding Procedure Specifications

(WPS)

05 21 19 SD-01 Preconstruction Submittals

1.5.3Welder qualification

1.5.3Material Safety Data Sheet

SD-02 Shop Drawings

1.5.1 G AESteel joist framing

1.5.2 G AEJoist calculations

SD-06 Test Reports

3.3.1Erection inspection

3.3.1Welding inspections

SD-07 Certificates

2.1Accessories

1.5.3Certification of Compliance

05 30 00 SD-02 Shop Drawings

1.3.5 G AEFabrication Drawings

SD-03 Product Data

2.2Accessories

2.1Deck Units

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 110 PAGES

05 30 00 2.1.4Galvanizing Repair Paint

2.2.17Mechanical Fasteners

2.1.4Touch-up Paint

1.3.3Welding Equipment

1.3.3Welding Rods and Accessories

SD-04 Samples

2.1.1Metal Roof Deck Units

2.2.4Flexible Closure Strips

SD-07 Certificates

1.3.2Powder-Actuated Tool Operator

1.3.3Welder Qualifications

1.3.3Welding Procedures

1.3.4.1Fire Safety

1.3.4.2Wind Storm Resistance

1.3.1Manufacturer's Certificate

2.2.12Stud Manufacture's Certification

2.2.12Stud Manufacture's Test Reports

SD-11 Closeout Submittals

2.1Recycled Content of Steel

Products

05 40 00 SD-02 Shop Drawings

1.6.1 GFraming Components

SD-03 Product Data

2.1Studs, Joists

SD-05 Design Data

1.6.2 G AEMetal Framing Calculations

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 110 PAGES

05 40 00 SD-07 Certificates

1.4Load-Bearing Cold-Formed Metal

Framing

3.1.1Welds

SD-11 Closeout Submittals

2.1Recycled Content of Steel

Products

05 50 13 SD-02 Shop Drawings

2.4 GExpansion Joint Covers

2.6 GBollards/Pipe Guards

2.8 GAngles and Plates

2.10 GRoof Hatches

SD-03 Product Data

2.4 G AEExpansion Joint Covers

2.10 GRoof Hatches

2.7 GDownspout Terminations

SD-04 Samples

2.4Expansion Joint Covers

2.1 GCertificates of Compliance

2.2 GCertified Mill

2.1 SRecycled Content

05 51 00 SD-02 Shop Drawings

2.1 GIron and Steel Hardware

2.1 GSteel Shapes, Plates, Bars, and

Strips

2.2.1 G AEMetal Stair System

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 22 OF 110 PAGES

05 51 00 SD-03 Product Data

2.4.1Structural-Steel Plates, Shapes, and Bars

2.4.2Cold-Rolled Carbon Steel Sheets

2.3.2 GConcrete Inserts

2.3.3Masonry Anchorage Devices

2.2.3Protective Coating

2.2.2Steel Pan Stairs

2.3.1Steel Stairs

SD-08 Manufacturer’s Instructions

2.4.1Structural-Steel Plates, Shapes, and Bars

2.4.2Cold-Rolled Carbon Steel Sheets

2.2.3Protective Coating

2.3.3Masonry Anchorage Devices

05 51 33 SD-02 Shop Drawings

2.3Ladders

2.3.2Ship's Ladder

SD-03 Product Data

2.3Ladders

2.3.2Ship's Ladder

2.3.1Ladder Safety Devices

SD-07 Certificates

1.3Fabricator Certification for Ladder

Assembly

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 23 OF 110 PAGES

05 51 33 1.3Fabricator Certification for Ships

Ladder Assembly

05 52 00 SD-02 Shop Drawings

1.2.1 G AEFabrication Drawings

3.2 GIron and Steel Hardware

3.2 GSteel Shapes, Plates, Bars and

Strips

SD-03 Product Data

2.2.1Structural-Steel Plates, Shapes, and Bars

2.2.2Structural-Steel Tubing

2.2.3Cold-Drawn Steel Tubing

2.1.2Protective Coating

2.2.6Steel Railings and Handrails

1.2.1Anchorage and Fastening

Systems

SD-08 Manufacturer’s Instructions

3.2Installation Instructions

05 58 13 SD-01 Preconstruction Submittals

1.3.2Manufacturer Qualifications

1.3.3Installater Qualifications

1.5 GWarranty

SD-03 Product Data

2.2Formed Metal Column Covers

SD-04 Samples

2.2Formed Metal Column Covers

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 24 OF 110 PAGES

05…

This is the start of the file's text. The full file is on GovTribe.