W912QR20R0045_FF-E_Vol2-0000.pdf

PDF 45 MB Posted

Attached to
Consolidated Mission Complex (CMC), Phase 3 at Warner Robins Air Force Base (AFB), Georgia
Solicitation number
W912QR20R0045
Issued by

About this file

This document provides details on a federal construction solicitation. The solicitation is for the construction of a Consolidated Mission Complex (CMC), Phase 3 located at Warner Robins Air Force Base in Georgia, with an estimated cost between $25-100 million. The NAICS code is 236220 and size determination is $39.5 million. This is a Full-and-Open procurement that requires the HUBZone 10% price evaluation in accordance with FAR 19.1307. Technical inquiries should be submitted through the Bidder Inquiry in ProjNet by the specified date. The Department of the Army Corps of Engineers Engineering District Louisville is the contracting agency. Offerors must comply with CCR/ORCA requirements through SAM, which is free of charge for both registrants and users. No contract award will be made until appropriated funds are available.

View the file

Other files

File Type Posted
W912QR20R0045Plans-0004.pdf PDF
W912QR20R0045Specs-0004.pdf PDF
W912QR20R0045Specs-0003.pdf PDF
W912QR20R0045Plans-0003.pdf PDF
W912QR20R0045-0002.pdf PDF
W912QR20R0045Specs-0001.pdf PDF
W912QR20R0045Plans-0001.pdf PDF
Site Visit Sign-In Sheet.pdf PDF
LRD JA Warner Robins CMC phase 3 - Mech VAV FCU_Redacted.pdf PDF
LRD JA Warner Robins CMC phase 3 - Electrical_Redacted.pdf PDF
LRD JA Warner Robins CMC phase 3 - Structure_Redacted.pdf PDF
W912QR20R0045Plans_Vol5-0000.pdf PDF
LRD JA Warner Robins CMC phase 3 - Mech chillers and boilers_Redacted.pdf PDF
LRD JA Warner Robins CMC phase 3 - FP_Redacted.pdf PDF
LRD JA Warner Robins CMC phase 3 - Mech AHU_Redacted.pdf PDF
LRD JA Warner Robins CMC phase 3 -Plumbing_Redacted.pdf PDF
W912QR20R0045_FF-E_Vol1-0000.pdf PDF
LRD JA Warner Robins CMC phase 3 - Mech cond unit dc fan_Redacted.pdf PDF
W912QR20R0045Plans_Vol4-0000.pdf PDF
LRD JA Warner Robins CMC phase 3 - Security_Redacted.pdf PDF
LRD JA Warner Robins CMC phase 3 - Arch_Redacted.pdf PDF
W912QR20R0045Plans_Vol2-0000.pdf PDF
W912QR20R0045Plans_Vol1-0000.pdf PDF
W912QR20R0045Specs_Vol1-0000.pdf PDF
W912QR20R0045Specs_Vol2-0000.pdf PDF
W912QR20R0045Plans_Vol6-0000.pdf PDF
LRD JA Warner Robins CMC phase 3 - Mech ERU_Redacted.pdf PDF
W912QR20R0045Plans_Vol3-0000.pdf PDF
LRD JA Warner Robins CMC phase 3 - communication_Redacted.pdf PDF
W912QR20R0045_SID-0000.pdf PDF
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation For AFRC Consolidated Mission Complex Phase 3 Robins Air Force Base, GA

P2: 479708

Design Bid Build

Furniture, Fixtures, & Equipment

(FF&E)

Volume 2 of 2 Certified Final

09 September 2020

W912QR20R0045

ARIMS: 200A

Disposition: Maintain for 15yrs after construction

W912QR20R0045-0000

Furniture, Fixtures & Equipment – Audio Visual

Robins Air Force Base Georgia

Certified Final Design Submittal

31 August 2020

Binder 2 of 2 Jacobs Engineering Group Inc.

Texas Registered Engineering Firm F-2966

777 Main Street, Fort Worth, Texas 76102

T +1.817.735.6000

F +1.817.735.6148

D3191901

AFRC Consolidated Mission Complex

Phase 3 Project Number: UHHZ07-3005

Louisville District

TABLE OF CONTENTS

AUDIO VISUAL EQUIPMENT

AV System Cutsheets Tab 1

Presentation Lighting Cutsheets Tab 2

AV Plans & Details Tab 3

FF&E Package Refer to Binder 1

DESIGNER OF RECORD:

JACOBS

777 MAIN STREET, FORT WORTH, TX 76102

CONTACT: CHRIS EVANS

PROJECT:

AFRC CONSOLIDATED MISSION COMPLEX – PHASE 3

ROBINS AFB, GEORGIA

PROJECT NO: UHHZ07-3005

COVER
AV_00 AV COVER
AV_00 AV TABLE OF CONTENTS
AV_01 AV CUTSHEETS
AV_02 LIGHTING CUTSHEETS
AV_03A AV PLANS
AV_03B LIGHTING PLANS

File details come from the government source that posted it. Updated .