W912QR20R0008_ATTACH_1thru3-0000.pdf

PDF 71 MB Posted

Attached to
Detroit Arsenal Substation
Solicitation number
W912QR20R0008
Issued by

About this file

This document is a solicitation for a design-build project to construct a high-voltage substation. The U.S. Army Corps of Engineers Louisville District is seeking proposals to construct a substation including high-voltage circuit switchers and transformers, secondary switchgears, distribution transformers, duct banks and cabling to interconnect with existing electrical infrastructure at the Detroit Arsenal. Supporting facilities such as site development, paving, fencing, drainage and communications systems are also required. The project magnitude is estimated between $10-25 million. The contract duration is approximately 730 calendar days. A two-phase selection process will evaluate offerors on past performance, management plan, design and technical approach, small business participation plan, and price. The government intends to award without discussions but reserves the right to conduct discussions if deemed in the best interest. The point of contact is the Contract Specialist Blake Gevedon at the listed email address.

View the file

Other files

File Type Posted
W912QR20R0008-0006.pdf PDF
W912QR20R0008-0005.pdf PDF
W912QR20R0008-0004.pdf PDF
W912QR20R0008_SiteVisit-0003.pdf PDF
W912QR20R0008-0003.pdf PDF
W912QR20R0008-0002.pdf PDF
W912QR20R0008Opt4-0002.pdf PDF
W912QR20R0008-0001.pdf PDF
W912QR20R0008_ATTACH_4thru8-0000.pdf PDF
W912QR20R0008_SPECS-0000.pdf PDF
JA - Simplex Fire Alarm System DTA Substation.pdf PDF
W912QR20R0008_ATTACH_9-0000.pdf PDF
W912QR20R0008_ATTACH_10thru11-0000.pdf PDF
Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .