SOW_Tech_Exhibit_2_Pricing_Format.pdf
PDF 123 KB Posted
- Attached to
- Exterior Concrete Minor Construction
- Solicitation number
- W912QM-19-R-0006
About this file
DRAFT: SOW Tech Exhibit 2 proposed CLIN structure
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SOW_Tech_Exhibit_2_Pricing_Format.pdf | ||
| W912QM-19-R-0006.pdf | ||
| SOW_Tech_Exhibit_1_Drawings.pdf | ||
| SOW_Tech_Exhibit_3_Deliverables_Schedule.pdf | ||
| SOW_Tech_Exhibit_1_Drawings.pdf | ||
| SOW.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CLIN SUPPLIES/SERVICES QTY UNIT ISSUE UNIT PRICE TOTALS COMMENTS
0001 The Contractor shall layout the proposed slab and walkways using spray paint or other markers for approval by the COR prior to commencing construction 1 JOB
0002 The contractor shall prep the area for concrete (level ground, remove grass and other unwanted ground cover, build forms, and supports) 1 JOB
The contractor shall poor 4” mesh rebar, reinforced slab concrete and walkways with anti-slip and crack mitigation for the areas roughly shown in figure 1-2. The large circular areas will have a stamped paver appearance.
1 JOB
0004 Mesh rebar Unk EACH Bulk Materials bid using dimensions provided in diagrams 0005 Concrete (4" depth) Unk EACH Bulk Materials bid using dimensions provided in diagrams
0006 The Contractor shall install two access boxes for the existing water shutoffs near the fountain. 1 JOB
0007 In Ground Access Box 2 EACH
The Contractor shall remove 2 sections of fence to allow the walk way to tie into the road. 1 JOB
The Contractor tie the new walkway into the existing street, temporarily move the barriers and replace them after the concrete is cured, place an appropriately sized draining pipe under the walkway next to the road to allow water to flow in the draining ditch.
1 JOB
0010 Drainage Pipe 1 EACH
0011 The contractor shall construct two seating benches made finished with smooth cement.
Construction can be cinder block or solid concrete. 1 JOB
0012 Cinder Blocks Seating 2 EACH Bulk Materials bid using dimensions provided in diagrams
0013 The Contractor shall create a cement flag stand like the one outside BLDG M-05 capable of holding 4 flags 1 JOB
0014 The Contractor shall build a Stone Fire pit with gas burner 1 JOB
0015 Gas Burner 1 EACH 0016 Stone Façade 1 EACH Bulk Materials bid using dimensions provided in diagrams 0017 Trench and bury ~3M of Propane gas line 1 JOB 0018 ~3M of Propane gas line 1 EACH Bulk Materials bid using dimensions provided in diagrams
The Contractor shall procure, deliver, and install a remote propane tank storage box with a removable and refillable Liquid Propane tank similar to the following (https://www.ashleyfurniture.com/p/hatchlands-tank-storage-box/P015-907.html):
1 EACH
0020 The Contractor shall procure, deliver, and install 6 wooden chairs 6 EACH
0021 The contractor shall remove and replant the tree at the specified location to the location requested in the diagram 1 JOB
SOW Appendix B JTF‐B Command Area Improvement Minor Military Construction Pricing Format
Fire Pit
New Cement Work
Permanent Cement Seating
Permanent Flag Stand
Move Tree
CLIN SUPPLIES/SERVICES QTY UNIT ISSUE UNIT PRICE TOTALS COMMENTS
0022 The contractor shall move existing logs to create four new parking spots. 1 JOB 0023 Add three new divider logs and 3 EACH 0024 Paint all new and existing logs yellow 1 JOB
0025 The contractor shall add weed and grass prevention measures and then add 3” of gravel for new spots 1 JOB
0026 Weed and grass prevention material 1 EACH Bulk Materials bid using dimensions provided in diagrams 0027 Gravel 1 EACH Bulk Materials bid using dimensions provided in diagrams
0028 The Contractor shall install 8 new parking signs and poles as depicted in figure 6-2: 1 JOB
0029 Parking Signs 8 EACH 0030 Parking Sign Posts 8 EACH
0031 Contractor shall procure, deliver and install 6 sets of café style tables with 4 chairs per set 6 EACH
0032 The Contractor shall place 3” of gravel the length of the walkway between the R-31 fence and the existing jersey barriers as specified in the diagram 1 JOB
0033 The contractor shall install border guards to prevent gravel spill over into the fenced grass area surrounding Bldg. R-31 1 EACH Bulk Materials bid using dimensions provided in diagrams
0034 The contractor shall add weed and grass prevention measures 1 JOB 0035 Weed and grass prevention material 1 EACH Bulk Materials bid using dimensions provided in diagrams 0036 Gravel 1 EACH Bulk Materials bid using dimensions provided in diagrams
The Contractor shall do a final cleaning to include disposal of debris resulting from construction as well as dispose of containers for the materials used during construction.
All debris and garbage, demolition materials, debris from the construction, as well as the garbage created by the containers for the materials, such as boxes and bags shall be removed. All the grass that grows in the construction lot during construction shall be cut and clippings moved to the municipal dumps by Contractor.
1 JOB
0038 The Contractor shall repair all trenched areas (repair any damaged concrete) and backfill and resod as appropriate. 1 JOB
0039 Concrete Unknown EACH Bulk Materials bid using dimensions provided in diagrams 0040 Sod Unknown EACH Bulk Materials bid using dimensions provided in diagrams
Contractor shall warrant its work against faulty workmanship for a period of not less than one year from the date of Government acceptance of the work provided under this contract. Under this warranty, Contractor shall be prepared to return to the work site within one working day after notification without charge to make any necessary repairs as a result of faulty workmanship. Refer to FAR Clause 52.236-5, Warranty of Construction.
1 EACH
Clean up and Finishing
Warranty
Enlarge Gravel Parking Area
Café Style Seating
Gravel Walkway