505N Move PWS.pdf
PDF 195 KB Posted
- Attached to
- NYARNG Equipment Move at CSTS
- Solicitation number
- W912PQ25QA040
About this file
This Performance Work Statement (PWS) details medical equipment moving services for the Medical Readiness Detachment (MRD) at Camp Smith Training Site. The contract requires moving specific medical equipment from Building 505N to Building 502, with a one-day performance period targeted for September 22-24, 2025. The move involves transporting 15 total items, including a panoramic X-ray machine, dental chair, hearing booths, medical refrigerators, supply chests/lockers, and medical exam tables, with estimated weights ranging from 500-1000 pounds per item.
Key requirements include moving all equipment in a single day, with items located on both first and second floors of Building 505N, and being placed in specific rooms in Building 502. The distance between buildings is less than 200 meters, and the contractor must provide all personnel, equipment, and materials necessary for the move. The unit's full-time staff will prepare equipment by cleaning, powering down, and removing contents beforehand. No hazardous materials are involved, and the contractor is not responsible for disposing of any biological or hazardous materials. The work will be directly overseen by the MRD full-time staff, with the primary objective of relocating medical equipment to support the facility's transition.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Ver. October 2022
PERFORMANCE WORK STATEMENT (PWS)
FOR
Medical Equipment Moving Services
1.0 General:
1.1 Scope: The contractor shall provide all personnel, equipment, tools, materials, supervision, and quality control necessary, except as specified in Paragraph 3.0 as Government Furnished, to move, set up, and dispose of select furniture, as defined in this PWS.
1.1.1 Objectives. The objective of this contract is to move select pieces of medical equipment and office furniture from Camp Smith Bldg 505N to Bldg 502.
1.2 Background: The Medical Readiness Detachment (MRD) currently operates out of Building 505N located on Camp Smith Training Site. Building 505N was built to house approximately 300 Soldier and was transitioned to a medical readiness facility while building 502 was renovated to house the MRD. In early September 2025, Building 502 will reach substantial completion and the MRD will move all medical equipment from Bldg 505N to Bldg 502. This contract meets labor requirements which cannot be met with organic personnel.
1.3 Period of Performance (PoP): The Period of Performance shall be approximately 1 full day in length. All equipment should be moved from Bldg 505N to building 502 on a single day.
1.4 General Information:
1.4.1 Place and Performance of Services: The contractor shall provide services between the hours of 0900-1700 Mondays through Fridays except on recognized US holidays or when the Government facility/installation is closed due to local or national emergencies, administrative closings, or similar Government-directed facility/installation closings. Performance shall be at Camp Smith Training site located at 11 Bear Mountain Road, Bldg 505N and Bldg 502. The contractor shall at all times maintain an adequate work force for the uninterrupted performance of all tasks defined within this PWS when the Government facility/installation is not closed for the above reasons.
When hiring personnel, the contractor shall keep in mind that the stability and continuity of the work force are essential. Teleworking is/is not authorized.
1.4.1.1 Telework: The Government does not permit the contractor to telework in support of this requirement. In furtherance of Continuity of Operations Planning (COOP), an alternate performance date shall be identified as needed. This contract can only be performed in-person at the location identified din section 1.4.1.
1.4.1.2 Unscheduled gate closures by the Security Police may occur at any time causing all personnel entering or exiting a closed installation to experience a delay. This cannot be predicted or prevented. Contractors are not compensated for unexpected closures or delays. Vehicles operated by contractor personnel are subject to search pursuant to applicable regulations. Any moving violation of any applicable motor vehicle regulation may result in the termination of the contractor employee’s installation driving privileges.
1.4.1.3 The contractor’s employees shall become familiar with and obey the regulations of the installation; including fire, traffic, safety and security regulations while on the installation. Contractor employees should only enter restricted areas when required to do so and only upon prior approval. All contractor employees shall carry proper identification with them at all times and shall be subject to such checks as may be deemed necessary. The contractor shall ensure compliance with all regulations and orders of the installation, which may affect performance. The Government reserves the right to direct the removal of an employee from Government property or revoke access to Government systems for misconduct, security reasons, or any overt evidence of communicable disease. Removal of contractor employees for reasons stated above does not relieve the Contractor from responsibility for total performance of this contract.
1.4.2 Recognized Holidays: The following are recognized United States (US) holidays.
While it is unlikely any dates will apply to this contract due to the period of performance falling outside any federal holidays, the contractor shall not perform services on these days in the event an alternate date of performance is required:
1.4.2.1 New Year’s Day: January 1st
1.4.2.2 Martin Luther King, Jr.’s Birthday
1.4.2.3 President’s Day
1.4.2.4 Memorial Day
1.4.2.5 Juneteenth National Independence Day: June 19th
1.4.2.6 Independence Day: July 4th
1.4.2.7 Labor Day
1.4.2.8 Columbus Day
1.4.2.9 Veteran’s Day: November 11th
1.4.2.10 Thanksgiving Day
1.4.2.11 Christmas Day: December 25th
1.4.3 Quality Control (QC): The contractor shall develop and maintain an effective QC Plan (QCP) to ensure services are performed in accordance with this PWS and the contractor does not cause any damage to governmental facilities or equipment within the performance period of this contract. The contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The contractor’s QCP is the means by which it assures itself that its work complies with the requirements of the contract.
1.4.4 Quality Assurance (QA): The Government will evaluate the contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan (QASP). This plan is primarily focused on what the Government will do to ensure that the contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and acceptable quality level(s) or defect rate(s).
1.4.5 Installation Access and Security Requirements. The contractor shall comply with all applicable installation/facility access and local security policies and procedures, which may be obtained from the COR. The contractor and all associated subcontractor employees shall provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services, or Security Office. The contractor shall ensure compliance with all personal identity verification requirements as directed by Department of Defense (DoD), Headquarters Department of Army (HQDA) and/or local policy (see PWS 6.0). Should the Force Protection Condition (FPCON) change, the Government may require changes in contractor security matters or processes.
Installation access requests or a roster of personnel to perform this work will be submitted to the KO NLT 7 days prior to executing the work described in Paragraph 5.
1.4.6 For contractors that do not require a CAC, but require access to a DoD facility or installation: Contractor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification (NCIC-III) and Terrorist Screening Database (TSDB) (Army Directive 2014-05), and applicable installation, facility and area commander installation/facility access, and local security policies and procedures (provided by a Government representative). All personnel accessing Camp Smith Training site will have the requisite background checks and will confirm completion of these checks NLT 7 day prior to the date the contractor executes the requirements described in Paragraph 5.
1.4.7 Communications Security/Information Technology (COMSEC/IT) Security. All communications with DoD organizations are subject to COMSEC review. All telephone communications networks are continually subject to intercept by unfriendly intelligence organizations. DoD has authorized the military departments to conduct COMSEC monitoring and recording of telephone calls originating from, or terminating at, DoD organizations. Therefore, the contractor is advised that any time contractor personnel place or receive a call they are subject to COMSEC procedures. The contractor shall ensure wide and frequent dissemination of the above information to all employees dealing with DoD information. The contractor shall abide by all Government regulations concerning the authorized use of the Government's computer network, including the restriction against using the network to recruit Government personnel or advertise job openings.
1.4.8 Complete initial and/or annual Information Assurance (IA) training as defined in the IA Best Business Practices (BBP) training (https://atc.us.army.mil/iastar/docs/Training_BBP.pdf).
1.4.9 Mark and safeguard files, output products, and storage media per classification level and disseminate them only to individuals authorized to receive them with a valid need to know.
1.4.10 Protect IS and IS peripherals located in their respective areas in accordance with physical security and data protection requirements.
1.4.11 Practice safe network and Internet operating principles and take no actions that threaten the integrity of the system or network.
1.4.12 Physical Security. The contractor shall safeguard all Government property provided for contractor use. At the close of each work period, Government facilities, equipment and materials shall be secured.
1.4.13 The contractor shall immediately report any occurrences of lost or duplicated keys/key cards to the COR.
1.4.14 In the event keys, other than master keys, are lost or duplicated, the contractor shall, upon direction by the KO, re-key or replace the affected lock or locks; however, the Government, at its option, may replace the affected lock or locks or perform re-keying. When the Government replaces or re-keys the locks, the Government will deduct the total cost of lock replacement or re-keying from the monthly payment due the contractor. In the event a master key is lost or duplicated, the Government will replace all locks and keys for that system, and will deduct the total cost from the monthly payment due the contractor.
1.4.15 The contactor shall prohibit the use of the Government issued keys/key cards by any persons other than the contractor’s employees. The contractor shall prohibit the opening of locked areas by contractor employees to permit entrance of persons other than contactor employees engaged in the performance of services in those areas, or personnel authorized entrance by the KO.
1.4.16 Special Qualifications: The contractor shall ensure all employees possess all required licenses for conducting the services requested in the State of New York and shall be properly licensed and insured prior to performance of this contract. This does not include education or other qualifications for the position in which the contractor employee is performing, dress codes, or other information.
1.4.17 Post Award Conference/Periodic Progress Meetings: The contractor agrees to attend any post award conference convened by the KO in accordance with FAR 42.5.
The KO, COR and other Government personnel, as appropriate, may meet periodically with the contractor to review the contactor’s performance. At these meetings, the KO https://atc.us.army.mil/iastar/docs/Training_BBP.pdf will apprise the contractor of how the Government views the contractor’s performance and the contractor shall apprise the Government of problems, if any, being experienced.
The contractor shall resolve outstanding issues raised by the Government. Contractor attendance at these meetings shall be at no additional cost to the Government.
1.4.18 Contract Manager (CM): The contactor shall designate a CM who shall ensure performance under this contract. The name of this person, and an alternate who shall act for the contractor when the CM is absent, shall be designated in writing to the KO.
The CM or alternate shall have full authority to act for the contractor on all contract matters relating to daily operation of this contract. The CM shall work through the KO, to resolve issues, receive technical instructions, and ensure adequate performance of services. The CM shall ensure that contractor employees do not perform any services outside the scope of the contract without an official modification issued by the KO. The CM shall ensure contractor employees understand that services performed outside the scope of the contract are performed wholly at the expense of the contractor.
1.4.19 Identification of Contractor Employees: The contractor’s status as a “contractor” shall be predominantly displayed in all correspondence types (to include signature blocks on e-mail) and dealings with Government or non-Government entities. Contractor personnel shall wear identification badges distinguishing themselves as such. The badges shall have the company name, employee name and the word “contractor” displayed.
1.4.20 The contractor shall retrieve all identification media (including vehicle passes) from its employees who depart employment for any reason. The contractor shall return all identification media (i.e., badges and vehicles passes) to the KO within 14 days of an employee’s departure.
1.4.21 Combating Trafficking in Persons: The United States Government has adopted a zero tolerance policy regarding trafficking in persons. Contractors and contractor employees shall not engage in severe forms of trafficking in persons during the period of performance of the contract; procure commercial sex acts during the period of performance of the contract; or use forced labor in the performance of the contract. The Contractor shall notify its employees of the United States Government’s zero tolerance policy, the actions that will be taken against employees for violations of this policy. The contractor shall take appropriate action, up to and including termination, against employees or subcontractors that violate the US Government policy as described at
FAR 22.17.
1.4.22 Organizational Conflicts of Interest (OCI): The contractor and subcontractor personnel performing services under this contract may receive, have access to or participate in the development of proprietary or source selection information (e.g., cost or pricing information, budget information or analyses, specifications or work statements, etc.) or perform evaluation services which may create a current or subsequent OCIs, as defined in FAR Subpart 9.5. The contractor shall notify the KO immediately whenever it becomes aware that such access or participation may result in any actual or potential OCI and shall promptly submit a plan to the KO to avoid or mitigate any such OCI. The contractor’s mitigation plan will be determined to be acceptable solely at the discretion of the KO. In the event the KO unilaterally determines that any such OCI cannot be satisfactorily avoided or mitigated, the KO may impose other remedies as he or she deems necessary, including prohibiting the contractor from participation in subsequent contracted requirements which may be affected by the OCI.
2.0 Definitions and Acronyms:
2.1 Definitions:
2.1.1 Contractor: A supplier or vendor awarded a contract to provide specific supplies or service to the Government. The term used in this contract refers to the prime.
2.1.2 Defective Service: A service output that does not meet the standard of performance associated with the PWS.
2.1.3 Deliverable: Anything that can be physically delivered and includes non-manufactured things such as meeting minutes or reports.
2.1.4 Key Personnel: Contractor personnel that are evaluated in a source selection process and that may be required to be used in the performance of a contract by the PWS. When key personnel are used as an evaluation factor in best value procurement, an offer can be rejected if it does not have a firm commitment from the persons that are listed in the proposal.
2.1.5 Physical Security: Actions that prevent the loss or damage of Government property.
2.1.6 Quality Assurance: The Government procedures to verify that services being performed by the Contractor are performed according to acceptable standards.
2.1.7 Quality Assurance Surveillance Plan (QASP): An organized written document specifying the surveillance methodology to be used for surveillance of contractor performance.
2.1.8 Quality Control: All necessary measures taken by the Contractor to ensure that the quality of an end product or service shall meet contract requirements.
2.1.9 Subcontractor: One that enters into a contract with a prime contractor. The Government does not have privity of contract with the subcontractor.
2.1.10 Medical Equipment: Refers exclusively to those items or pieces of medical equipment identified in section 5.1 of the PWS.
2.2 Acronyms:
AEI Army Enterprise Infostructure AR Army Regulation AT/OPSEC Antiterrorism/Operational Security BI Background Investigation CM Contract Manager COR Contracting Officer Representative DA Department of the Army DD254 Department of Defense Contract Security Classification Specification DFARS Defense Federal Acquisition Regulation Supplement DoD Department of Defense DSCA Defense Counterintelligence and Security Agency FAR Federal Acquisition Regulation GFP/M/E/S Government Furnished Property/Material/Equipment/Services HQDA Headquarters, Department of the Army HSPD Homeland Security Presidential Directive IA Information Assurance IS Information System(s) KO Contracting Officer NGB National Guard Bureau OCI Organizational Conflict of Interest PII Personally Identifiable Information PIPO Phase In/Phase Out POC Point of Contact PRS Performance Requirements Summary PWS Performance Work Statement QA Quality Assurance QASP Quality Assurance Surveillance Plan QC Quality Control QCP Quality Control Program SCR Service Contract Reporting SSN Social Security Number TE Technical Exhibit USD(I) Under Secretary of Defense for Intelligence
3.0 Government Furnished Property, Material, Equipment and Services (GFP/M/E/S):
The Government will not provide the contractor any property, material, equipment, and/or services for the purposes of executing this contract. The contractor shall
4.0 Contractor Furnished Property, Materials, and Equipment (CFP/M/E):
4.1 General: Except for those items specifically stated to be Government-Furnished in Paragraph 3.0, the contractor shall furnish everything required to perform these services as indicated in Paragraph 1.1.
4.3 Contractor Security Clearance: Security clearances are not required unde this PWS.
5.0 Requirements: The contractor shall:
5.1 Provide professional moving services to relocated durable medical equipment and office furniture at Camp Smith Training Site from building 505N to building 502.
Placement of equipment shall be in the room where the Med Det will use the equipment or other location in the building as directed by the Med Det staff. The following items shall be moved from building 505N to building 502:
5.1.1 One (1) Panoramic Dental Xray machine (Est. Weight: 1,000 lbs) – located on second floor (approximately 20 stairs / no elevator available)
5.1.2 One (1) Dental Chair (Est Weight: 500 lbs) – located on second floor (approximately 20 stairs / no elevator available)
5.1.3 Two (2) single-person hearing booths (Est. Weight: 500 lbs ea) – located on first floor
5.1.4 Three (3) medical refrigerators (Est Weight: 500 lbs ea) – Located on first floor and has wheels (doors can be removed to reduce weight and all contents will be removed)
5.1.5 One (1) Medical Supply chest (Est Weight: 500 lbs) – located on second floor (approximately 20 stairs / no elevator available)
5.1.6 Six (6) Medical Supply Lockers (Est Weight: 500 lbs ea) – located on first floor
5.1.7 Two (2) Medical Examination Tables (Est Weight: 500 lbs ea) – located on second floor (approximately 20 stairs / no elevator available)
5.2 All equipment will be moved from Building 505N to Building 502. Distance between entrances to each building is less than 200 meters. Equipment will be moved into Building 502 by a back entrance that is at ground level. The selected contractor will need to move equipment out of a second-story room in Building 505N. All equipment will be moved to a single ground floor in building 502.
5.3 All equipment must be moved from building 505N into building 502 on an estimated single day. This requirement cannot be split between multiple working days. Preferred dates for this move are as soon as feasible but no later than 22-24 September.
5.4 All equipment must be moved with any associated components and chords (etc.).
The contractor is not required to move expendable items that are used with/around the identified equipment.
5.5 There is no HAZMAT associated with these items.
5.6 There is no risk of exposure to radiology emissions when moving the dental Xray machine provided the machine is not running and is unplugged.
5.7 All items that must be moved will be cleaned and powered down/unplugged by the unit full-time staff prior to the contractor’s arrival.
5.8 The unit full-time staff will ensure any biological products (primarily vaccines) are moved and the refrigerators are cleaned / free of any biological hazards prior to the contractor’s arrival.
5.9 There is no requirement for the contractor to dispose of any HAZMAT or biohazardous materials as part of this contract. The cost associated with this requirement should be exclusively for moving medical equipment and any required Material handling equipment, personal protective gear, and personnel labor associated with this requirement.
6.0 Applicable Publications: Publications applicable to this PWS are listed below:
Publication (Chapter/Page)
Date of Publication
Mandatory or Advisory
Website
Federal Acquisition Regulation https://www.acquisition.gov/?q=browsefar Defense Federal Acquisition
Regulation Supplement http://www.acq.osd.mil/dpap/dars/dfarspgi/current/in dex.html or https://www.acquisition.gov/dfars Joint Travel Regulation (JTR) https://www.defensetravel.dod.mil/site/travelreg.cfm
DoDM 1000.13-M-V1 DoD Identification (ID) Cards (Enclosure 2, paragraph 3.b)
01/23/2014 (Change 1:
07/28/2020) http://www.esd.whs.mil/Directives/issuances/dodm
Federal Information Processing Standards (FIPS) Publication 201-2 Personal Identity Verification (PIV) of Federal Employees and Contractors
(paragraph 9)
August 2013 http://nvlpubs.nist.gov/nistpubs/FIPS/NIST.FIPS.201 -2.pdf
DoDM 5200.2 Procedures for the DoD Personnel Security Program
(PSP)
04/03/2017 https://www.esd.whs.mil/Directives/issuances/dodm/
DoDI 5200.46 DoD Investigative and Adjudicative Guidance for Issuing the Common
Access Card (CAC)
09/09/14 (Change 1:
05/04/2018) https://www.esd.whs.mil/Directives/issuances/dodi/
Homeland Security Presidential Directive (HSPD)-12
Policy for a Common Identification Standard for Federal Employees and
Contractors
08/27/2004 https://www.dhs.gov/homeland-security-presidential-directive-12
DoDI 5400.11 Department of Defense Privacy and
Civil Liberties Programs
01/29/2019
DoD 5400.11-R Department of Defense Privacy
Program
05/14/2007 https://www.esd.whs.mil/Directives/issuances/dodm/ https://www.acquisition.gov/?q=browsefar http://www.acq.osd.mil/dpap/dars/dfarspgi/current/index.html http://www.acq.osd.mil/dpap/dars/dfarspgi/current/index.html https://www.acquisition.gov/dfars http://www.esd.whs.mil/Directives/issuances/dodm http://nvlpubs.nist.gov/nistpubs/FIPS/NIST.FIPS.201-2.pdf http://nvlpubs.nist.gov/nistpubs/FIPS/NIST.FIPS.201-2.pdf https://www.esd.whs.mil/Directives/issuances/dodm/ https://www.esd.whs.mil/Directives/issuances/dodi/ https://www.dhs.gov/homeland-security-presidential-directive-12 https://www.dhs.gov/homeland-security-presidential-directive-12
DoDD 8140.01 Cyberspace Workforce Management
10/05/2020 https://www.esd.whs.mil/Directives/issuances/dodd/
DoD 8570.01-M Information Assurance Workforce
Improvement Program
12/19/2005 (Change 4:
11/10/2015) https://www.esd.whs.mil/Directives/issuances/dodm/
DoD 5220.22-M National Industrial Security Program
Operating Manual (NISPOM)
02/28/2006 (Change 2:
05/18/2016)
Army Directive 2014-05 Policy and Implementation
Procedures for Common Access Card Credentialing and Installation Access for Uncleared Contractors
03/07/2014 https://armypubs.army.mil/ProductMaps/PubForm/A rmyDir.aspx
AR 25-2
Information Assurance
04/04/2019 http://armypubs.army.mil/ProductMaps/PubForm/AR .aspx
AR 530-1
Operations Security
09/26/2014 http://armypubs.army.mil/ProductMaps/PubForm/AR .aspx
AR 525-13
Antiterrorism
12/09/2019 http://armypubs.army.mil/ProductMaps/PubForm/AR .aspx
AR 381-12
Threat Awareness and Reporting
Program (TARP) (Section II, ¶ 2-4.b)
06/01/2016 http://armypubs.army.mil/ProductMaps/PubForm/AR .aspx
6.1 Applicable Forms: Forms applicable to the PWS are listed below:
Form Date Website
DD 1172-2
Application for Identification Card/DEERS Enrollment
Mar 2017 http://www.dtic.mil/whs/directives/forms/index.htm
I-9 Employment Eligibility Verification
10/21/2019 https://www.uscis.gov/sites/default/files/files/form/i-9.pdf
DD 441
Department of Defense Security
Agreement
Feb 2020 http://www.dtic.mil/whs/directives/forms/dd/ddforms0001- 0499.htm
DD 250
Material Inspection and Receiving
Report
Aug 2000 https://www.esd.whs.mil/Directives/forms/dd0001_0499/ https://www.esd.whs.mil/Directives/issuances/dodd/ https://www.esd.whs.mil/Directives/issuances/dodm/ http://armypubs.army.mil/ProductMaps/PubForm/AR.aspx http://armypubs.army.mil/ProductMaps/PubForm/AR.aspx http://armypubs.army.mil/ProductMaps/PubForm/AR.aspx http://armypubs.army.mil/ProductMaps/PubForm/AR.aspx http://armypubs.army.mil/ProductMaps/PubForm/AR.aspx http://armypubs.army.mil/ProductMaps/PubForm/AR.aspx http://armypubs.army.mil/ProductMaps/PubForm/AR.aspx http://armypubs.army.mil/ProductMaps/PubForm/AR.aspx http://www.dtic.mil/whs/directives/forms/forminfo/forminfopage2479.html http://www.dtic.mil/whs/directives/forms/forminfo/forminfopage2479.html http://www.dtic.mil/whs/directives/forms/index.htm https://www.uscis.gov/sites/default/files/files/form/i-9.pdf http://www.dtic.mil/whs/directives/forms/dd/ddforms0001-0499.htm http://www.dtic.mil/whs/directives/forms/dd/ddforms0001-0499.htm https://www.esd.whs.mil/Directives/forms/dd0001_0499/
TECHNICAL EXHIBIT 1
Performance Requirements Summary (PRS)
This PRS includes performance objectives the Government will use to determine contractor performance and will compare contractor performance to the Acceptable Quality Level (AQL).
Performance
Objective Performance Standard Acceptable Quality
Levels (AQL) Surveillance Method / By
Whom 5.1-5.4 Move all identified equipment from Camp Smith Training Site (CSTS) Building 505N to
Building 502 in designated locations.
Same-Day Completion (1 Working Day)
Work will be directly overseen by the Med Det full-time staff.
TECHNICAL EXHIBIT 2
Deliverables Schedule
PWS Reference / Deliverable Title
Frequency Number of Copies
Medium/Format Submit To
1.4.5 Installation
Access and
Security Requirements
NLT 7 days prior to date of performance
1 Electronic Submission
KO
1.4.6 NLT 7 days prior to date of
performance, completion of all background investigations and security requirements as described in paragraph 1.4.6 with appropriate confirmation sent to KO
1 Electronic submission
KO
1.4.8 Complete initial and/or
annal information
Assurance requirements as defined in paragraph 1.4.8
1 Electronic Submission
KO
5.1-5.4 Move all identified equipment from Camp
Smith Training Site (CSTS) Building 505N to Building
502 in designated locations.
1 Observation Unit Full-Time Staff
TECHNICAL EXHIBIT 3
List of Items to be moved by Location
ITEM DESCRIPTION QTY ESTIMATED
WEIGHT
LOCATION IN
505N
LOCATION
IN 502
SPECIAL
HANDLING
INSTRUCTIONS
1 PANORAMIC
XRAY MACHINE
1 1000 505N
UPSTAIRS
OFFICE
ROOM
1003 EXAM
ROOM 4
N/A
2 DENTAL CHAIR 1 500 505N
UPSTAIRS
OFFICE
ROOM
1002 EXAM
ROOM 4
N/A
3 SINGLE-PERSON
HEARING BOOTH
2 500 DOWNSTAIRS
CLINIC /
DOWNSTAIRS
BAY
ROOM
LOBBY
N/A
4 MEDICAL
REFRIGERATORS
3 500 DOWNSTAIRS
BAY
ROOM
DOORS CAN
BE REMOVED
5 MEDICAL
SUPPLY CHEST
1 500 UPSTAIRS BAY ROOM
N/A
6 MEDICAL
SUPPLY
LOCKERS
6 500 DOWNSTAIRS
BAY
ROOM
N/A
7 MEDICAL EXAM
TABLES
2 500 UPSTAIRS BAY DRILL
FLOOR
N/A
File details come from the government source that posted it. Updated .