This document contains questions and answers regarding a federal contract solicitation for facility improvements at a National Guard building. The solicitation seeks improvements including replacement of exterior doors and frames with 16 gauge frames and insulated doors, addition of a window to one door, replacement of thresholds and weatherstripping. Electrical and ductwork upgrades are required to support new motorized vehicle exhaust systems at each work bay venting through a roof manifold plate. Concrete pads outside doors need replacement including the supply room pad. Conduit needs run from the mechanical room to the perimeter fence for a security system. The contractor must confirm duct and electrical capacities and accommodate ongoing building operations during the project.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FMS Building 5 Q&A
W912PQ-23-Q-0036
1. Asking for 16 ga. Frames & 14 ga. Doors ( 5.10 & 5.11 ) Seems reversed from normal.
a. Door 16 ga, Frame 14 ga. Provide insulated exterior doors.
2. Are All Doors & Frames Galvanized ?
a. Yes, Hot-Dip Zinc-Coated and Factory-Primed Finish Doors and Frames
3. Do not see any Door Schedule showing any sizes , Jamb Depths , Eleva�ons for any Doors. – Need Something.
a. Match exis�ng.
b. Supply room door, add window in door with security wire in glazing.
4. Do you want New Thresholds & Weatherstrip.?
a. Yes, Provide new thresholds and weatherstripping.
5. Mag. Lock in 5.6 is by Owner –Correct ? What type of mag lock will need to be know for correct door and frame prep.
a. Actual electronic lock will be provided by and installed by Owner. For type, see Ques�ons and Answers Atachment 1 and Ques�ons and Answers Atachment 2.
6. Will electric panel have enough breakers available for separate feed to all 5 controllers/motors?
a. Verify if exis�ng electrical panel is designed to support the required loads. Provide required addi�onal equipment.
b. Currently feeding the vehicle exhaust system; 2ea – 3PH – 20A breakers. Some free space exists, contractor to verify.
7. 5.14; Excava�on depth? Concrete or sand trench backfill needed? Rough Distance of conduit runs? No wiring needed for this, just conduits?
a. Excava�on Depth: Bury conduit at a minimum depth of 18 in below grade. Conduits must be 24 in minimum depth under roads and pavement.
b. Compacted sub-base, sand backfill, asphalt over that.
c. Rough Distance: From building = Verify distances in field / From mechanical room: Verify distances in field
d. Provide pull strings in conduit. No addi�onal wiring is required.
8. Please confirm the desire to switch hose reels from spring operated to a motorized reel.
a. Provide motorized reels.
9. Will a 6” be large enough for applica�on?
a. Contractor to confirm duct size with manufacturer’s requirements to achieve designated
CFM.
10. Is there a hose temperature requirement?
a. Hose Temperature Range: -80 Deg F to 600 Deg F (Must meet Military Specifica�on MIL PFR 62028 Paragraph 4.7.8 for 72 hours at 1000 Deg F).
11. Is there a need to have system running while a vehicle is in high rpm’s or is intended use only for idling vehicles?
a. Main use is for idling vehicles, some high rpm but at limited dura�on.
12. Will a quick disconnect hose nozzle atachment be required for either stack (with a telescopic handle) or botom exhaust in work bays? Allows for easy change of hose nozzles without tools.
a. Yes, provide the quick disconnect hose nozzle atachment, stack atachment, and botom exhaust atachment.
13. Are all separate ductwork runs needed for each work bay?
a. Yes, each work bay will have a separate ductwork run to exterior.
14. Will the exhaust system be ven�ng out the window or through the roof?
a. Ductwork will follow current path to exterior through side window. Provide a manifold plate to accept duct from each work bay with a weather cover hood on exterior of building. Provide bird screen across manifold and/or exterior exhaust openings.
15. Will the shop be opera�on during the project?
a. Yes the shop will s�ll be opera�onal during the project. Project manager and shop chief will make accommoda�ons according to forward progress of project.
16. Should the steel doors have hold opens? Will this comply with fire code?
a. No hold open is required. Provide door stops to prevent door hardware from impac�ng adjacent surfaces when opened.
17. Do all concrete pads outside the steel doors need replaced?
a. As per scope, just the concrete apron outside the supply room requires replacement.
18. Are the transoms included in the single doors that need replaced?
a. Match exis�ng.
19. How does the conduit need to be run? Straight from mechanical room to gate? Or out the front corner of the building?
a. This is means and methods, contractor may choose either method as long as conduit starts in mechanical room and ends at the man gate at the fence line.
20. Is the 800 CFM requirement at the end of the hose with the en�re exhaust system running?
a. CFM at hose nozzle will read 800 CFM or greater when all exhaust systems are running.
21. Do all exterior doors require security hinges?
a. Yes, match exis�ng door hardware.
22. What is the grade needed on the replace concrete pads?
a. Concrete pads to be at interior slab grade, sloped away from building for posi�ve drainage (2% slope recommended).