View the file

Other files for this federal contract opportunity

Other files attached to Construction Indefinite Delivery-Indefinite Quantity (IDIQ) Multiple Award Task Order Contracts (MATOC), newest first.
File Type Posted
FBO_CONTRACT_LISTING.pdf PDF
2013_01_11_09_21_40.pdf PDF
MATOC_PRE_PROP_CONF_FY_13.pptx PPTX presentation
MATOC__EXHIBIT_E__Oct__2012.pdf PDF
A-11_MATOC_Exhibits_A-D_F-G_Oct_2012.pdf PDF
Prototypical_Drawings_-B55_100__Half_Size_Dwgs.pdf PDF
Prototypical_Specifications-B55_100_.pdf PDF
W912PQ-13-R-0002.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

15 January 2013

Question: Are we required to submit a CD version of our proposal?

Answer: If your firm does not submit a CD version your proposal will still be considered.

Question: What are the asbestos and lead paint quantities for the prototypical project?

Answer: For the prototypical project the asbestos removal 3,100 SF and for the lead paint it is

1,200 SF.

Question: The specs for this project are California regulations. Should we use California or New York regulations?

Answer: For this prototypical project you can use New York.

Question: Section 00800, para. 1.13.b and para. 1.23.b make reference to Washington D.C., Maryland and Virginia. We assume these are to read State of New York, please confirm.

Answer: New York is Correct.

Question: Exhibit E specifies Performance Period for Prototypical Project as 180 days after NTP. However, MATOC Prototypical Project Section 01320 para. 1.05. A. shows 260 days.

Please confirm 180 day period is correct.

Answer: Exhibit E is correct which indicates 180 days after the NTP.

Question: Section 07552 para. 2.05 and 3.06.J (pages 7 and 11) call for walk pads, but not shown on Dwg. A-7. Please confirm walk pads are not required (although this project will not be constructed).

Answer: In case of difference between drawings and specifications, the specifications shall govern-Walk pads are required.

Note: Some firms are having trouble sending emails under the “.net” domain as it might get flagged by the firewall in which you may need to set up a “.com” domain in order to send documents to the Guard.

File details come from the government source that posted it. Updated .