CONSTRUCT PUMPHOUSE AND FUEL STORAGE, CANNON AIR FORCE BASE Federal contract opportunity
Solicitation number
W912PP-16-R-0005
Issued by
Department of the Army Corps of Engineers Engineering District Albuquerque

About this file

W912PP-16-R-0005 Amendment 0006

View the file

Other files for this federal contract opportunity

Other files attached to CONSTRUCT PUMPHOUSE AND FUEL STORAGE, CANNON AIR FORCE BASE, newest first.
File Type Posted
W912PP-16-R-0005_Amendment_0005.pdf PDF
W912PP-16-R-0005_Amendment_0004.pdf PDF
W912PP-16-R-0005-Amendment_0003.pdf PDF
Site_Visit_Attendance_Sheet.pdf PDF
W912PP-16-R-0005_Amendment_0002.pdf PDF
W912PP-16-R-0005_AMENDMENT_0001.pdf PDF
W912PP-16-R-0005-Drawings-Shts-92-264_10-Feb-16.pdf PDF
W912PP-16-R-0005-Drawings-Shts-1-91_10-Feb-16.pdf PDF
W912PP-16-R-0005-Specs-Vol-1of2.pdf PDF
W912PP-16-R-0005-Specs-Vol-2of2.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

Previous edition unusable

W912PP

PROJECT: CONSTRUCT PUMPHOUSE AND FUEL STORAGE, CANNON AIR FORCE BASE, CURRY COUNTY, NEW

MEXICO

1. This is Amendment No. 0006 to Solicitation No. W912PP-16-R-0005. The following revisions shall be incorporated into the specifications.

All other revisions shall remain unchanged.

US ARMY ENGINEER DISTRICT, ALBUQUERQUE

4101 JEFFERSON PLAZA NE

ALBUQUERQUE NM 87109-3435

See Item 6

J

W912PP-16-R-0005

1 2

03/08/2017

02/09/2017

W912PP-16-R-0005

Amendment No. 0006

2. SPECIFICATIONS: DELETE THE FOLLOWING LISTED SECTION OR PAGES AND

SUBSTITUTE THE SECTION OR PAGES ATTACHED HERETO. ON THE REVISED PAGES OR

SECTIONS, FOR CONVENIENCE, CHANGES ARE EMPHASIZED BY STRIKETHROUGH FOR

DELETIONS AND UNDERLINE FOR ADDITIONS FROM THE PREVIOUS ISSUE. ALL PORTIONS

OF THE REVISED (OR NEW) SECTION OR PAGES SHALL APPLY WHETHER OR NOT CHANGES

HAVE BEEN INDICATED.

Delete Section or Page Insert Section or Page

00650, Pages 65 to 70e 00650, Pages 65 to 70e 31 00 00 31 00 00

////////LAST ITEM////////

Amendment 0006

The following have been modified:

SECTION 00650 WAGE RATES

General Decision Number: NM170023 02/24/2017 NM23

Superseded General Decision Number: NM20160023

State: New Mexico

Construction Type: Building

County: Curry County in New Mexico.

BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).

Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.20 for calendar year 2017 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January

1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.20 (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2017.

The EO minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Modification Number Publication Date

0 01/06/2017

1 01/27/2017

2 02/24/2017

CARP1319-008 06/01/2016

Rates Fringes

CARPENTER

Metal Stud Installation

Only........................$ 23.75 9.92

* ELEC0611-020 01/01/2017

Rates Fringes

ELECTRICIAN

Excluding Low Voltage

Wiring for Alarms

Zone 1.....................$ 30.00 10.60

ZONE 1: Mileage calculated from the main post office in the following towns: Albuquerque-40 miles, Belen-12 miles, Carrizozo-12 miles, Clovis-12 miles, Espanola-14 miles, Farmington-6 miles, Gallup-10 miles, Las Vegas-8 miles, Los

Lunas-12 miles, Portales-12 miles, Ratan-6 miles, Roswell-12 miles, Ruidoso-12 miles, Santa Fe-10 miles, Tucumcari-6 miles.

ZONE 2: Extending up to 20 miles beyond Zone 1, EXCEPT

ALBURQUERQUE, shall receive 9% above Zone 1 rate.

ZONE 3: Extending up to 30 miles beyond Zone 1, EXCEPT

ALBURQUERQUE, shall receive 15% above Zone 1 rate.

ZONE 4: Extending more than 30 miles beyond Zone 1, EXCEPT

ALBURQUERQUE, shall receive 26% above Zone 1 rate.

ENGI0953-007 06/01/2016

Rates Fringes

Power Equipment Operator

(2) Roller(Dirt and Grade

Compaction).................$ 21.97 6.10

(4) Bobcat/Skid Loader, Loader (Front End)..........$ 22.81 6.10

(8) Crane...................$ 26.10 6.10

IRON0495-009 06/01/2016

IRONWORKER, ORNAMENTAL...........$ 26.50 14.04

IRONWORKER, STRUCTURAL (Metal

Building Erection Only)..........$ 26.50 14.04

PLUM0412-007 04/01/2016

PIPEFITTER (Including HVAC

Pipe Installation)...............$ 31.76 12.68

PLUMBER (Excluding HVAC Pipe

Installation)....................$ 31.76 12.68

SHEE0049-012 04/01/2015

Sheet Metal Worker (HVAC Duct and System Installation Only)....$ 30.17 15.86

SUNM2010-004 11/09/2010

BOILERMAKER......................$ 21.77 3.98

BRICKLAYER.......................$ 20.36 5.74

CARPENTER (Acoustical Ceiling

Installation Only)...............$ 20.79 0.00

CARPENTER (Form Work Only).......$ 19.79 6.14

CARPENTER, Excludes

Acoustical Ceiling

Installation, Batt

Insulation, Drywall Hanging, Form Work, and Metal Stud

Installation.....................$ 20.86 0.35

CEMENT MASON/CONCRETE FINISHER...$ 17.72 3.72

DRYWALL FINISHER/TAPER...........$ 19.64 2.75

DRYWALL HANGER...................$ 21.38 5.35

ELECTRICIAN (Low Voltage

Wiring for Alarms)...............$ 28.25 6.62

FLOOR LAYER: Carpet.............$ 22.31 0.30

GLAZIER..........................$ 20.15 3.95

INSULATOR - BATT.................$ 24.44 8.43

IRONWORKER, REINFORCING..........$ 20.84 7.68

IRONWORKER, STRUCTURAL,

Excludes Metal Building

Erection.........................$ 22.20 8.06

LABORER: Common or General......$ 15.15 4.38

LABORER: Landscape &

Irrigation.......................$ 10.60 0.24

LABORER: Mason Tender - Brick...$ 13.77 4.35

LABORER: Mason Tender -

Cement/Concrete..................$ 11.51 0.85

LABORER: Pipelayer..............$ 13.78 2.20

OPERATOR: Backhoe...............$ 22.13 4.30

OPERATOR: Forklift..............$ 21.13 4.83

OPERATOR: Grader/Blade..........$ 22.04 4.70

PAINTER: Brush, Roller and

Spray, Excludes Drywall

Finishing/Taping.................$ 16.58 1.75

PLASTERER........................$ 17.65 7.15

ROOFER...........................$ 13.24 0.50

SHEET METAL WORKER, Excludes

HVAC Duct and Unit

Installation.....................$ 22.01 9.65

TILE FINISHER....................$ 14.02 0.00

TILE SETTER......................$ 19.00 0.00

TRUCK DRIVER: Dump Truck........$ 16.14 5.48

TRUCK DRIVER: Pickup Truck......$ 15.91 3.13

TRUCK DRIVER: Water Truck.......$ 16.25 5.00

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the

Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.

Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses

(29CFR 5.5 (a) (1) (ii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate

(weighted union average rate).

Union Rate Identifiers

A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than "SU" or

"UAVG" denotes that the union classification and rate were prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.

Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.

Survey Rate Identifiers

Classifications listed under the "SU" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.

Survey wage rates are not updated and remain in effect until a new survey is conducted.

Union Average Rate Identifiers

Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010

08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.

A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour

Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the

Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the

Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations

Wage and Hour Division

U.S. Department of Labor

200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator

(See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator

U.S. Department of Labor

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative

Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board

U.S. Department of Labor

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION

Page 70a of 97

General Decision Number: NM170007 02/24/2017 NM7

Superseded General Decision Number: NM20160007

State: New Mexico

Construction Type: Heavy

County: Curry County in New Mexico.

HEAVY CONSTRUCTION PROJECTS

Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.20 for calendar year 2017 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January

1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.20 (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2017.

The EO minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Modification Number Publication Date

0 01/06/2017

1 02/24/2017

* ELEC0611-010 01/01/2017

Rates Fringes

ELECTRICIAN

Zone 1......................$ 30.00 10.60

ZONE 1: Mileage calculated from the main post office in the following towns: Albuquerque-40 miles, Belen-12 miles, Carrizozo-12 miles, Clovis-12 miles, Espanola-14 miles, Farmington-6 miles, Gallup-10 miles, Las Vegas-8 miles, Los

Lunas-12 miles, Portales-12 miles, Ratan-6 miles, Roswell-12 miles, Ruidoso-12 miles, Santa Fe-10 miles, Tucumcari-6 miles.

ZONE 2: Extending up to 20 miles beyond Zone 1, EXCEPT

ALBURQUERQUE, shall receive 9% above Zone 1 rate.

ZONE 3: Extending up to 30 miles beyond Zone 1, EXCEPT

ALBURQUERQUE, shall receive 15% above Zone 1 rate.

ZONE 4: Extending more than 30 miles beyond Zone 1, EXCEPT

ALBURQUERQUE, shall receive 26% above Zone 1 rate.

IRON0495-004 06/01/2016

Page 70b of 97

IRONWORKER

Structural..................$ 26.50 14.04

SUNM2009-001 09/14/2010

Rates Fringes

CARPENTER........................$ 22.26 6.20

IRONWORKER, REINFORCING..........$ 22.75 9.60

LABORER: Common or General......$ 12.37 0.00

LABORER: Flagger................$ 10.90 0.00

OPERATOR: Backhoe...............$ 14.03 0.00

OPERATOR: Grader/Blade..........$ 22.36 5.27

OPERATOR: Loader (Front End)....$ 22.69 3.74

OPERATOR: Scraper...............$ 14.03 0.00

PIPEFITTER.......................$ 25.64 11.31

PLUMBER..........................$ 26.27 7.69

TRUCK DRIVER: Dump Truck........$ 11.90 0.00

TRUCK DRIVER: Water Truck.......$ 13.72 5.25

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the

Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.

Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses

(29CFR 5.5 (a) (1) (ii)).

Page 70c of 97

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate

(weighted union average rate).

Union Rate Identifiers

A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than "SU" or

"UAVG" denotes that the union classification and rate were prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.

Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.

Survey Rate Identifiers

Classifications listed under the "SU" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.

Survey wage rates are not updated and remain in effect until a new survey is conducted.

Union Average Rate Identifiers

Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the

Page 70d of 97 classifications was union data. EXAMPLE: UAVG-OH-0010

08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.

A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour

Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the

Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the

Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations

Wage and Hour Division

U.S. Department of Labor

200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator

(See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator

U.S. Department of Labor

200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

Page 70e of 97

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative

Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board

U.S. Department of Labor

200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION

This page was intentionally left blank for duplex printing.

Replace Fuel Storage and Loading Fac, DESC1702, Cannon AFB, NM CN04

AMENDMENT NO. 0006

SECTION TABLE OF CONTENTS

DIVISION 31 - EARTHWORK

SECTION 31 00 00

EARTHWORK

08/08

PART 1 GENERAL

1.1 CRITERIA FOR BIDDING

1.2 REFERENCES

1.3 DEFINITIONS

1.3.1 Satisfactory Materials

1.3.1.1 Earthwork, Roadwork, and Utilities Systems (except beneath buildings)

1.3.1.2 Beneath Buildings

1.3.2 Unsatisfactory Materials

1.3.2.1 Earthwork, Roadwork, and Utilities Systems (except beneath buildings)

1.3.2.2 Beneath Buildings

1.3.3 Cohesionless and Cohesive Materials

1.3.4 Degree of Compaction

1.3.5 Topsoil

1.3.6 Hard/Unyielding Materials

1.3.7 Rock

1.3.8 Unstable Material

1.3.9 Granular Material

1.3.9.1 Select Granular Material

1.3.9.2 Graded Aggregate Base

1.3.10 Initial Backfill Material

1.3.11 Maximum Dry Density

1.4 SUBSURFACE DATA

1.4.1 Classification of Excavation

1.4.2 Blasting

1.4.3 Dewatering Work Plan

1.5 SUBMITTALS

PART 2 PRODUCTS

2.1 REQUIREMENTS FOR OFFSITE BORROW SOILS

2.2 BURIED WARNING AND IDENTIFICATION TAPE

2.2.1 Warning Tape for Metallic Piping

2.2.2 Detectable Warning Tape for Non-Metallic Piping

2.3 DETECTION WIRE FOR NON-METALLIC PIPING

2.4 CAPILLARY WATER BARRIER

PART 3 EXECUTION

3.1 STRIPPING OF TOPSOIL

3.2 GENERAL EXCAVATION

3.2.1 Ditches, Gutters, and Channel Changes

3.2.2 Drainage Structures

3.2.3 Drainage

SECTION 31 00 00 Page 1

3.2.4 Dewatering

3.2.5 Trench Excavation Requirements

3.2.5.1 Trench Bottom Preparation

3.2.5.2 Removal of Unyielding Material

3.2.5.3 Removal of Unstable Material

3.2.5.4 Excavation for Appurtenances

3.2.6 Underground Utilities

3.2.7 Structural Excavation

3.3 SELECTION OF BORROW MATERIAL

3.4 SHORING

3.4.1 General Requirements

3.5 GRADING AREAS

3.6 FINAL GRADE OF SURFACES TO SUPPORT CONCRETE

3.7 GROUND SURFACE PREPARATION

3.7.1 General Requirements

3.7.1.1 Subgrade Preparation for Building and Storage Tank Sites

3.7.2 Frozen Material

3.8 UTILIZATION OF EXCAVATED MATERIALS

3.9 BURIED TAPE AND DETECTION WIRE

3.9.1 Buried Warning and Identification Tape

3.9.2 Buried Detection Wire

3.10 MOISTURE CONTENT

3.11 GENERAL EARTHWORK

3.11.1 Earth Embankments

3.11.2 Subgrade Preparation

3.11.2.1 Proof Rolling

3.11.2.2 Construction

3.11.2.3 Compaction

3.12 FILLING AND BACKFILLING FOR BUILDINGS

3.12.1 General

3.12.2 Placement

3.13 BACKFILLING AND COMPACTION FOR UTILITIES SYSTEMS

3.13.1 Trench Backfill

3.13.1.1 Replacement of Unyielding Material

3.13.1.2 Replacement of Unstable Material

3.13.1.3 Initial Backfill

3.13.1.4 Final Backfill

3.13.2 Backfill for Appurtenances

3.14 SPECIAL REQUIREMENTS

3.14.1 Water Lines

3.14.2 Electrical Distribution System

3.15 FINISHING

3.15.1 Subgrade and Embankments

3.15.2 Capillary Water Barrier

3.15.3 Grading Around Structures

3.16 PLACING TOPSOIL

3.17 TESTING

3.17.1 Fill and Backfill Material Gradation, Classification, and

Moisture Content

3.17.2 Compaction

3.17.3 Test Required on Material Prior to Placement

3.17.3.1 General

3.17.3.2 Classification Tests

3.17.3.3 Compaction Tests

3.17.4 Tests Required During Placement

3.17.4.1 In-Place Density and Moisture Tests for General Earthwork

3.17.4.2 Optimum Moisture and Laboratory Maximum Density

3.17.4.3 Time and Location of Tests

3.17.5 Tolerance Tests for Subgrades

SECTION 31 00 00 Page 2

3.17.6 Displacement of Sewers

3.18 DISPOSITION OF SURPLUS MATERIAL

3.19 PROTECTION

-- End of Section Table of Contents --

SECTION 31 00 00 Page 3

SECTION 31 00 00

EARTHWORK

08/08

PART 1 GENERAL

1.1 CRITERIA FOR BIDDING

Base bids on the following criteria:

a. Surface elevations are as indicated.

b. Pipes or other artificial obstructions, except those indicated, will not be encountered.

c. Ground water elevations indicated by the boring logs were those existing at the time subsurface investigations were made and do not necessarily represent ground water elevation at the time of construction.

d. Material character is indicated by the boring logs.

e. Hard materials and rock are not expected to be encountered.

1.2 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

[*Am-6]

AMERICAN ASSOCIATION OF STATE HIGHWAY AND TRANSPORTATION OFFICIALS

(AASHTO)

AASHTO T 180 (2010) Standard Method of Test for Moisture-Density Relations of Soils Using a 4.54-kg (10-lb) Rammer and a 457-mm (18-in.) Drop

AASHTO T 224 (2010) Standard Method of Test for Correction for Coarse Particles in the Soil Compaction Test

ASTM INTERNATIONAL (ASTM)

ASTM C136 (2006) Standard Test Method for Sieve Analysis of Fine and Coarse Aggregates

ASTM C33/C33M (2013) Standard Specification for Concrete Aggregates

ASTM C33/C33M (2013) Standard Specification for Concrete Aggregates

ASTM D1140 (2000; R 2006) Amount of Material in Soils

SECTION 31 00 00 Page 4

Finer than the No. 200 (75-micrometer) Sieve

ASTM D1556 (2007) Density and Unit Weight of Soil in Place by the Sand-Cone Method

ASTM D1557 (2012) Standard Test Methods for Laboratory Compaction Characteristics of Soil Using Modified Effort (56,000 ft-lbf/ft3) (2700 kN-m/m3)

ASTM D2216 (2010) Laboratory Determination of Water (Moisture) Content of Soil and Rock by Mass

ASTM D2487 (2011) Soils for Engineering Purposes (Unified Soil Classification System)

ASTM D2937 (2010) Density of Soil in Place by the Drive-Cylinder Method

ASTM D422 (1963; R 2007; E 2014) Particle-Size Analysis of Soils

ASTM D4318 (2010; E 2014) Liquid Limit, Plastic Limit, and Plasticity Index of Soils

ASTM D2940/D2940M (2009) Standard Specification for Graded Aggregate Material for Bases or Subbases for Highways or Airports

ASTM D6938 (2015) Standard Test Method for In-Place Density and Water Content of Soil and Soil-Aggregate by Nuclear Methods (Shallow Depth)

U.S. ENVIRONMENTAL PROTECTION AGENCY (EPA)

EPA 600/4-79/020 (1983) Methods for Chemical Analysis of Water and Wastes

EPA SW-846.3-3 (1999, Third Edition, Update III-A) Test Methods for Evaluating Solid Waste:

Physical/Chemical Methods

1.3 DEFINITIONS

1.3.1 Satisfactory Materials

1.3.1.1 Earthwork, Roadwork, and Utilities Systems (except beneath buildings)

Satisfactory materials comprise any materials classified by ASTM D2487 as

GW, GP, GM, GP-GM, GW-GM, GC, GP-GC, GM-GC, SW, SP, SM, SW-SM, SC, SW-SC,

SP-SM, SP-SC, CL, ML, and CL-ML. Satisfactory materials for grading shall be free from roots and other organic matter, trash, debris, frozen material, and stones larger than 3 inches in any dimension.

SECTION 31 00 00 Page 5

1.3.1.2 Beneath Buildings

a. Natural In Situ Soil: Satisfactory materials for natural in situ soil supporting building foundations and/or slabs shall be limited to materials classified in ASTM D2487 as GW, GP, GM, GP-GM, GW-GM, GC, GP-GC, GM-GC, SW, SP, SM, SW-SM, SC, SW-SC, SP-SM, SP-SC, CL, ML, CL-ML, CH, MH, and shall be free of trash, debris, roots or other organic matter, frozen material, and stones larger than 3 inches in any dimension.

b. Foundation Fill or Backfill: Satisfactory materials for fill or backfill supporting building foundations and/or slabs shall be limited to materials classified in ASTM D2487 as GW, GP, GM, GP-GM, GW-GM, GC, GP-GC, GM-GC, SW, SP, SM, SW-SM, SC, SW-SC, SP-SM, SP-SC, CL, ML, CL-ML, and shall be free of trash, debris, roots or other organic matter, frozen material, and stones larger than 3 inches in any dimension.

c. Fill or Backfill Adjacent to Walls: Satisfactory materials for fill or backfill adjacent to walls shall be limited to cohesionless, free draining materials classified in ASTM D2487 as GW, GP, GM, SW, SP, SM, SP-SM, and shall be free of trash, debris, roots or other organic matter, frozen material, and stones larger than 3 inches in any dimension.

1.3.2 Unsatisfactory Materials

1.3.2.1 Earthwork, Roadwork, and Utilities Systems (except beneath buildings)

Materials which do not comply with the requirements for satisfactory materials are unsatisfactory. Unsatisfactory materials also include manmade fills; trash; refuse; backfills from previous construction;

demolition debris; and material classified as satisfactory which contains root and other organic matter or frozen material. The Contracting Officer shall be notified of any contaminated materials.

1.3.2.2 Beneath Buildings

a. Natural In Situ Soil: Unsatisfactory materials for supporting building foundations and/or slabs shall be materials classified in ASTM D2487 as PT, OH, and OL and any other materials not defined as satisfactory. The Contracting Officer shall be notified of any contaminated materials.

b. Foundation Fill or Backfill: Unsatisfactory materials for fill or backfill supporting building foundations and/or slabs shall be materials classified in ASTM D2487 as PT, OH, OL, CH, and MH.

c. Fill or Backfill Adjacent to Walls: Unsatisfactory materials for fill or backfill adjacent to walls shall be materials classified in accordance with ASTM D2487 as PT, OH, OL, GC, SC, CL, CH, ML, MH, GP-GM, GW-GM, GC, GP-GC, GM-GC, SW-SM, SC, SW-SC, SP-SC, CL, ML, and

CL-ML.

d. Wet or Soft Materials: Materials determined by the Contracting Officer as too wet or too soft to provide a stable subgrade, foundation, or fill will be classified as unsatisfactory regardless of classification. However, if such materials do meet the appropriate

SECTION 31 00 00 Page 6

ASTM D2487 classification, the Contractor shall at no additional cost to the Government, recondition the materials.

1.3.3 Cohesionless and Cohesive Materials

Cohesionless materials include materials classified in ASTM D2487 as GW, GP, SW, and SP. Cohesive materials include materials classified as GC, SC, ML, CL, MH, and CH. Materials classified as GM and SM will be identified as cohesionless only when the fines are nonplastic. Perform testing, required for classifying materials, in accordance with ASTM D4318, ASTM C136, ASTM D422, and ASTM D1140.

1.3.4 Degree of Compaction

Degree of compaction required, except as noted in the second sentence, is expressed as a percentage of the maximum density obtained by the test procedure presented in ASTM D1557 abbreviated as a percent of laboratory maximum density. Since ASTM D1557 applies only to soils that have 30 percent or less by weight of their particles retained on the 3/4 inch sieve, express the degree of compaction for material having more than 30 percent by weight of their particles retained on the 3/4 inch sieve as a percentage of the maximum density in accordance with AASHTO T 180 and corrected with AASHTO T 224. To maintain the same percentage of coarse material, use the "remove and replace" procedure as described in NOTE 8 of Paragraph 7.2 in AASHTO T 180.

1.3.5 Topsoil

Material suitable for topsoils obtained from offsite areas, excavations, or areas indicated on the drawings is defined as: Natural, friable soil representative of productive, well-drained soils in the area, free of subsoil, stumps, rocks larger than one inch diameter, brush, weeds, toxic substances, and other material detrimental to plant growth. Amend topsoil pH range to obtain a pH of 5.5 to 7.

1.3.6 Hard/Unyielding Materials

Hard/Unyielding materials comprise weathered rock, dense consolidated deposits, or conglomerate materials which are not included in the definition of "rock" with stones greater than 3 inch in any dimension or as defined by the pipe manufacturer, whichever is smaller. These materials usually require the use of heavy excavation equipment, ripper teeth, or jack hammers for removal.

1.3.7 Rock

Solid homogeneous interlocking crystalline material with firmly cemented, laminated, or foliated masses or conglomerate deposits, neither of which can be removed without systematic drilling and blasting, drilling and the use of expansion jacks or feather wedges, or the use of backhoe-mounted pneumatic hole punchers or rock breakers; also large boulders, buried masonry, or concrete other than pavement exceeding 1/2 cubic yard in volume. Removal of hard material will not be considered rock excavation because of intermittent drilling and blasting that is performed merely to increase production.

1.3.8 Unstable Material

Unstable materials are too wet to properly support the utility pipe, SECTION 31 00 00 Page 7 conduit, or appurtenant structure.

1.3.9 Granular Material

1.3.9.1 Select Granular Material

Select granular material shall be crushed stone or crushed gravel conforming to ASTM C33/C33M coarse aggregate, size No. 57 or 67. Use under equipment pads, slabs on grade, under structures, for pipe bedding, and other locations indicated on the drawings.

ASTM C33 Size No. 57 Size No. 67 Percent Passing Percent Passing 1 1/2 inches 100 --- 1 inch 95-100 100 3/4 inch --- 90-100 1/2 inch 25-60 --- 3/8 inch --- 20-55 No. 4 0-10 0-10 No. 8 0-5 0-5

1.3.9.2 Graded Aggregate Base

Graded aggregate base shall consist of crushed gravel or crushed stone conforming to ASTM D2940/D2940M. Use in the stabilization of soils beneath structures per paragraph 3.8.1.1 Subgrade Preparation for Building and Storage Tank Sites.

Sieve Size Percent Passing by Weight

2 inches 100 1-1/2 inches 90 - 100 No. 4 30 - 60 No. 200 0 - 12

1.3.10 Initial Backfill Material

Initial backfill consists of select granular material or satisfactory materials free from rocks 3 inches or larger in any dimension or free from rocks of such size as recommended by the pipe manufacturer, whichever is smaller. When the pipe is coated or wrapped for corrosion protection, free the initial backfill material of stones larger than 1 inch in any dimension or as recommended by the pipe manufacturer, whichever is smaller.

1.3.11 Maximum Dry Density

The maximum dry density is expressed as the maximum density obtained when the soil is compacted in accordance with ASTM D1557, abbreviated as laboratory maximum density.

1.4 SUBSURFACE DATA

Subsurface soil boring logs are included in the project Geotech Report as an attachment immediately following this Section 31 00 00. These data represent the best subsurface information available; however, variations

SECTION 31 00 00 Page 8 may exist in the subsurface between boring locations.

1.4.1 Classification of Excavation

No consideration will be given to the nature of the materials, and all excavation will be designated as unclassified excavation.

1.4.2 Blasting

Blasting will not be permitted.

1.4.3 Dewatering Work Plan

Dewatering is not generally anticipated for this project. If dewatering becomes necessary, submit procedures for accomplishing dewatering work.

1.5 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

SD-01 Preconstruction Submittals

Shoring; G-RO

Dewatering Work Plan; G-RO

Submit 15 days prior to starting work.

SD-03 Product Data

Utilization of Excavated Materials; G-RO

Procedure and location for disposal of unused satisfactory material.

SD-06 Test Reports

Testing Borrow Site Testing; G-RO

Within 24 hours of conclusion of physical tests, 3 copies of test results, including calibration curves and results of calibration tests. Results of testing at the borrow site.

SD-07 Certificates

Testing; G-RO

Qualifications of the Corps validated commercial testing laboratory or the Contractor's validated testing facilities.

SECTION 31 00 00 Page 9

PART 2 PRODUCTS

2.1 REQUIREMENTS FOR OFFSITE BORROW SOILS

Test offsite soils brought in for use as backfill for Total Petroleum Hydrocarbons (TPH), Benzene, Toluene, Ethyl Benzene, and Xylene (BTEX) and full Toxicity Characteristic Leaching Procedure (TCLP) including ignitability, corrosivity and reactivity. Backfill shall contain a maximum of 100 parts per million (ppm) of total petroleum hydrocarbons (TPH) and a maximum of 10 ppm of the sum of Benzene, Toluene, Ethyl Benzene, and Xylene (BTEX) and shall pass the TCLP test. Determine TPH concentrations by using EPA 600/4-79/020 Method 418.1. Determine BTEX concentrations by using EPA SW-846.3-3 Method 5030/8020. Perform TCLP in accordance with EPA SW-846.3-3 Method 1311. Provide Borrow Site Testing for TPH, BTEX and TCLP from a composite sample of material from the borrow site, with at least one test from each borrow site. Do not bring material onsite until tests have been approved by the Contracting Officer.

2.2 BURIED WARNING AND IDENTIFICATION TAPE

Depending on the pipe material, provide polyethylene plastic and metallic core or metallic-faced, acid- and alkali-resistant, polyethylene plastic warning tape manufactured specifically for warning and identification of buried utility lines. Provide tape on rolls, 3 inches minimum width, color coded as specified below for the intended utility with warning and identification imprinted in bold black letters continuously over the entire tape length. Warning and identification to read, "CAUTION, BURIED (intended service) LINE BELOW" or similar wording. Provide permanent color and printing, unaffected by moisture or soil.

Warning Tape Color Codes

Red: Electric Yellow: Gas, Oil; Dangerous Materials Orange: Telephone and Other Communications Blue: Water Systems Green: Sewer Systems White: Steam Systems Gray: Compressed Air

2.2.1 Warning Tape for Metallic Piping

Provide acid and alkali-resistant polyethylene plastic tape conforming to the width, color, and printing requirements specified above, with a minimum thickness of 0.003 inch and a minimum strength of 1500 psi lengthwise, and 1250 psi crosswise, with a maximum 350 percent elongation.

2.2.2 Detectable Warning Tape for Non-Metallic Piping

Provide polyethylene plastic tape conforming to the width, color, and printing requirements specified above, with a minimum thickness of 0.004 inch, and a minimum strength of 1500 psi lengthwise and 1250 psi crosswise. Manufacture tape with integral wires, foil backing, or other means of enabling detection by a metal detector when tape is buried up to 3 feet deep. Encase metallic element of the tape in a protective jacket or provide with other means of corrosion protection.

SECTION 31 00 00 Page 10

2.3 DETECTION WIRE FOR NON-METALLIC PIPING

Insulate a single strand, solid copper detection wire with a minimum of 12

AWG.

2.4 CAPILLARY WATER BARRIER

Provide capillary water barrier of clean crushed rock, crushed gravel, or uncrushed gravel placed beneath a building slab with or without a vapor barrier to cut off the capillary flow of pore water to the area immediately below. Conform to ASTM C33/C33M for coarse aggregate Size 57 or 67.

PART 3 EXECUTION

3.1 STRIPPING OF TOPSOIL

Where indicated or directed, strip topsoil to a depth of 4 inches. Spread topsoil on areas already graded and prepared for topsoil, or transport and deposit in stockpiles convenient to areas that are to receive application of the topsoil later, or store at locations indicated or specified. Keep topsoil separate from other excavated materials, brush, litter, objectionable weeds, roots, stones larger than 2 inches in diameter, and other materials that would interfere with planting and maintenance operations. Remove from the site any surplus of topsoil from excavations and grading.

3.2 GENERAL EXCAVATION

Perform excavation of every type of material encountered within the limits of the project to the lines, grades, and elevations indicated and as specified. Perform the grading in accordance with the typical sections shown and the tolerances specified in paragraph FINISHING. It is generally believed that borrow material will be required from off site sources to complete the grading indicated for this project and that no net surplus of usable material will need to be removed from the site or disposed of.

Should excess usable material exist, transport satisfactory excavated materials and legally dispose of at off site locations arranged and paid for by the Contractor. Excavate unsatisfactory materials encountered within the limits of the work below grade and replace with satisfactory materials as directed. Include such excavated material and the satisfactory material ordered as replacement in excavation. Legally dispose of unsatisfactory excavated material at off site locations arranged and paid for by the Contractor. During construction, perform excavation and fill in a manner and sequence that will provide proper drainage at all times. Excavate material required for fill or embankment in excess of that produced by excavation within the grading limits from off-site borrow areas selected and paid for by the Contractor, and approved by the Contracting Officer.

3.2.1 Ditches, Gutters, and Channel Changes

Finish excavation of ditches, gutters, and channel changes by cutting accurately to the cross sections, grades, and elevations shown on the contract drawings. Do not excavate ditches and gutters below grades shown. Backfill the excessive open ditch or gutter excavation with satisfactory, thoroughly compacted material or with suitable stone or cobble to grades shown. Dispose excavated material as shown or as directed. Maintain excavations free from detrimental quantities of leaves, brush, sticks, trash, and other debris until final acceptance of the work.

SECTION 31 00 00 Page 11

3.2.2 Drainage Structures

Make excavations to the lines, grades, and elevations shown, or as directed. Provide trenches and foundation pits of sufficient size to permit the placement and removal of forms for the full length and width of structure footings and foundations as shown. Clean rock or other hard foundation material of loose debris and cut to a firm, level, stepped, or serrated surface. Remove loose disintegrated rock and thin strata. Do not disturb the bottom of the excavation when concrete or masonry is to be placed in an excavated area. Do not excavate to the final grade level until just before the concrete or masonry is to be placed. Where pile foundations are to be used, stop the excavation of each pit at an elevation 1 foot above the base of the footing, as specified, before piles are driven. After the pile driving has been completed, remove loose and displaced material and complete excavation, leaving a smooth, solid, undisturbed surface to receive the concrete or masonry.

3.2.3 Drainage

Provide for the collection and disposal of surface and subsurface water encountered during construction. Completely drain construction site during periods of construction to keep soil materials sufficiently dry. Construct storm drainage features (ponds/basins) at the earliest stages of site development, and throughout construction grade the construction area to provide positive surface water runoff away from the construction activity or provide temporary ditches, swales, and other drainage features and equipment as required to maintain dry soils. When unsuitable working platforms for equipment operation and unsuitable soil support for subsequent construction features develop, remove unsuitable material and provide new soil material as specified herein. It is the responsibility of the Contractor to assess the soil and ground water conditions presented by the plans and specifications and to employ necessary measures to permit construction to proceed.

3.2.4 Dewatering

Control groundwater flowing toward or into excavations to prevent sloughing of excavation slopes and walls, boils, uplift and heave in the excavation and to eliminate interference with orderly progress of construction. Do not permit French drains, sumps, ditches or trenches within 3 feet of the foundation of any structure, except with specific written approval, and after specific contractual provisions for restoration of the foundation area have been made. Enable control measures before the excavation reaches the water level in order to maintain the integrity of the in situ material. While the excavation is open, maintain the water level continuously, at least 3 feet below the working level. Operate dewatering system continuously until construction work below existing water levels is complete. Submit performance records weekly. Measure and record performance of dewatering system at same time each day by use of observation wells or piezometers installed in conjunction with the dewatering system. Relieve hydrostatic head in previous zones below subgrade elevation in layered soils to prevent uplift.

3.2.5 Trench Excavation Requirements

Where possible and appropriate, excavate the trench as recommended by the manufacturer of the pipe to be installed. Slope trench walls below the top of the pipe, or make vertical, and of such width as recommended in the

SECTION 31 00 00 Page 12 manufacturer's printed installation manual. In all instances, trench walls shall be vertical, sloped, stepped, braced, sheeted or otherwise supported and excavated as necessary to protect workers, new work and existing facilities in accordance with 29 CFR Part 1926 - Safety and Health Regulations for Construction. Give special attention to slopes which may be adversely affected by weather or moisture content. Do not exceed the trench width below the pipe top of 24 inches plus pipe outside diameter (O.D.) for pipes of less than 24 inches inside diameter, and do not exceed 36 inches plus pipe outside diameter for sizes larger than 24 inches inside diameter. Where recommended trench widths are exceeded, provide redesign, stronger pipe, or special installation procedures by the Contractor. The Contractor is responsible for the cost of redesign, stronger pipe, or special installation procedures without any additional cost to the Government.

3.2.5.1 Trench Bottom Preparation

Grade the bottoms of trenches accurately to provide uniform bearing and support for the bottom quadrant of each section of the pipe. Excavate bell holes to the necessary size at each joint or coupling to eliminate point bearing. Remove stones of 1 inch or greater in any dimension, or as recommended by the pipe manufacturer, whichever is smaller, to avoid point bearing.

3.2.5.2 Removal of Unyielding Material

Where overdepth is not indicated and unyielding material is encountered in the bottom of the trench, remove such material to 6 inches below the required grade and replace with suitable materials as provided in paragraph

BACKFILLING AND COMPACTION.

3.2.5.3 Removal of Unstable Material

Where unstable material is encountered in the bottom of the trench, remove such material to the depth directed and replace it to the proper grade with select granular material as provided in paragraph BACKFILLING AND COMPACTION.