W912PP-16-R-0005_Amendment_0004.pdf
PDF 253 KB Posted
- Attached to
- CONSTRUCT PUMPHOUSE AND FUEL STORAGE, CANNON AIR FORCE BASE Federal contract opportunity
- Solicitation number
- W912PP-16-R-0005
About this file
W912PP-16-R-0005 Amendment 0004
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W912PP-16-R-0005_Amendment_0006.pdf | ||
| W912PP-16-R-0005_Amendment_0005.pdf | ||
| W912PP-16-R-0005-Amendment_0003.pdf | ||
| Site_Visit_Attendance_Sheet.pdf | ||
| W912PP-16-R-0005_Amendment_0002.pdf | ||
| W912PP-16-R-0005_AMENDMENT_0001.pdf | ||
| W912PP-16-R-0005-Drawings-Shts-92-264_10-Feb-16.pdf | ||
| W912PP-16-R-0005-Drawings-Shts-1-91_10-Feb-16.pdf | ||
| W912PP-16-R-0005-Specs-Vol-1of2.pdf | ||
| W912PP-16-R-0005-Specs-Vol-2of2.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
PROJECT: CONSTRUCT PUMPHOUSE AND FUEL STORAGE, CANNON AIR FORCE BASE, CURRY COUNTY, NEW MEXICO
1. This is Amendment No. 0004 to Solicitation No. W912PP-16-R-0005. The follow ing revisions shall be incorporated into the specif ications.
All other provisions shall remain unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912PP-16-R-0005
X 9B. DATED (SEE ITEM 11)
09-Feb-2017
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
03-Mar-2017
CODE
US ARMY ENGINEER DISTRICT, ALBUQUERQUE
4101 JEFFERSON PLAZA NE
ALBUQUERQUE NM 87109-3435
W912PP 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912PP-16-R-0005
Amendment 0004
2. SPECIFICATIONS: DELETE THE FOLLOWING LISTED SECTION OR PAGES AND
SUBSTITUTE THE SECTION OR PAGES ATTACHED HERETO. ON THE REVISED PAGES OR
SECTIONS, FOR CONVENIENCE, CHANGES ARE EMPHASIZED BY STRIKETHROUGH FOR
DELETIONS AND UNDERLINE FOR ADDITIONS FROM THE PREVIOUS ISSUE. ALL PORTIONS
OF THE REVISED (OR NEW) SECTION OR PAGES SHALL APPLY WHETHER OR NOT CHANGES
HAVE BEEN INDICATED.
Delete Section or Page Insert Section or Page
Section 00110, page 18 of 97 Section 00110, page 18 of 97
W912PP-16-R-0005
Amendment 0004
FACTOR 4 Vol 2 Tab 3 SECTION 00010, PRICING
SCHEDULE
4th Most Important Factor (less important than Factors 1, 2, and 3 combined)
N/A Vol 2 Tab 4 Bid Guarantee (Bid Bond) Not Rated
N/A Vol 2 Tab 5 Representations & Certifications Not Rated
N/A Vol 2 Tab 6 Financials and Financial
Standing Questionnaire
Not Rated
N/A Vol 2 Tab 7 Small Business Subcontracting
Plan
Acceptable/ Unacceptable
N/A Vol 2 Tab 8 JV Agreement (if applicable) and/or Corporate, Partnership, Joint Venture Certificate, Teaming Agreement
Not Rated
ALL NON-PRICE FACTORS/SUB-FACTORS COMBINED ARE SIGNIFICANTLY MORE IMPORTANT
THAN COST/PRICE.
3.0.1 Where the word “project(s)” appears, it is understood to mean a project(s), contract(s), task order(s), or any other contract document provided for in the Federal Acquisition Regulation (FAR 2.101). Examples of projects submitted by the Prime Construction Contractor may be projects performed for a State or Federal Government
Agency; or for a commercial or private sector customer.
3.0.2 Where the word “recent” appears it is understood to mean a construction type project for which construction is at least 70% complete (measured by performance period days) as of the RFP closing date or a construction type project that has been completed within 5 years of the RFP closing date. Projects completed more than 5 years before the RFP closing date will not be considered for evaluation purposes.
3.0.3 Where the word “relevant” appears it is understood to mean that project experience submitted is similar to the context of this solicitation in terms of scope, type, complexity, and magnitude of effort and as described and required in this RFP. For this RFP, “relevant” projects are defined as projects that are similar in terms of:
Scope (Large jet/air craft fueling station and storage complex with two (2) JP-8 above ground storage tanks, two (2) commercial truck unloading and four (4) truck fill stands, distribution pump house, 13 person dispatch building, 6 space R-11 refueler parking area, to include construction phasing).
Type (Jet/air craft fuel station in compliance with, UFC 3-460-01 Petroleum Fuels Facilities and Type
III Fuel Systems Standards including current safety and/or emergency features, back-up generator, product recovery system and receipt filter separator. Include project with concrete masonry unit
(CMU) building and structural standing seam metal roof (SSMR) construction, metal parking canopies, Portland cement concrete pavement and asphalt paving).
Complexity (Ground-up construction, utility installation and paving projects being constructed while next to an active taxiway, hazardous clarifications, working with DoD Fuels Distribution Center of
Expertise.
Project Magnitude (2 projects with a construction value greater than or equal to $10 Million and 1 project with a construction value greater than or equal to $16 Million.).
4.0 FACTOR 1: TECHNICAL -- SUBFACTOR A: RELEVANT CONTRACTOR EXPERIENCE
4.1 SUBMISSION REQUIREMENTS
4.1.1 The Offeror shall submit examples of construction projects which best illustrate the experience of the construction contractor on relevant projects of similar in scope, type, complexity, and magnitude as defined in section 3.03 above.
A minimum three (3) projects, but not more than 5, are to be submitted. Each project example shall include a
File details come from the government source that posted it. Updated .