B1 - Bid Abstract Corrected AUG23.pdf
PDF 414 KB Posted
- Attached to
- Philpott Dam Landslide Remediation Bassett, Virginia Federal contract opportunity
- Solicitation number
- W912PM23B0024
About this file
This is an abstract of bids for the Philpott Dam Landslide Remediation project in Bassett, Virginia. The solicitation was issued by the Department of the Army Corps of Engineers Engineering District Wilmington on July 10, 2023 with bids due on August 23, 2023. Seven bids were received ranging from $19.7 million to $37.7 million. Michels Construction Inc. provided the lowest bid at $19.7 million while Aspen Construction Company bid $34.3 million and Thalle Construction Company bid $36.2 million. The project involves remediating landslides along the Upper Road Corridor and stabilizing slopes in Zones 1 and 2 through activities such as installing secant piles, rock anchors, overburden removal and excavation. Additional work includes constructing a storm drainage system and switchgear building. All bidders acknowledged the relevant amendments and addenda. Award is pending review of the bids.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| B1 - Bid Opening Sign In Sheet.pdf | ||
| B1 - Bid Abstract.pdf | ||
| A11 - W912PM23B0024 Amendment 0004.pdf | ||
| RTA Plan Set UnLocked amendment 0003.pdf | ||
| RTA SPECS Volume 2 AMENDMENT 0003.pdf | ||
| RTA SPECS Volume 1 AMENDMENT 0003.pdf | ||
| W912PM23B0024 Amendment 0003.pdf | ||
| A11 - W912PM23B0024 Amendment 0002.pdf | ||
| Municipal Separate Storm Sewer System (MS4) Philpott.pdf | ||
| A11 - W912PM23B0024 REVISED SECTION B through Amendment 0001.pdf | ||
| A11 - W912PM23B0024 Amendment 0001.pdf | ||
| W912PM23B0024 SECTION 01 22 00.00 10 RVZD2AUG.pdf | ||
| Site Visit Sign-in Sheet.pdf | ||
| RTA Plan Set UnLocked.pdf | ||
| RTA Plan Set LOCKED.pdf | ||
| RTA SPECS Volume 2.pdf | ||
| W912PM23B0024.pdf | ||
| RTA SPECS Volume 1.pdf |
Show all 18
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ABSTRACT OF BIDS 1. SOLICITATION NUMBER 2. DATE ISSUED 3. DATE OPENED
4. ISSUING OFFICE NAME AND TITLE OF CERTIFYING OFFICIAL (TYPE)
I CERTIFY that I have opened, read, and recorded on this abstract all offers received SIGNATURE
69 Darlington Ave. In response to this solicitation.
Wilmington, North Carolina 28403
PROJECT TITLE 8. GOVERNMENT ESTIMATE 9. BIDDERS
(Check A, B or C and complete D, E and F.)
A. OFFEROR A. OFFEROR
Michels Construction Inc. Aspen Construction Company 817 Main St 3798 State Highway 371 NW
A. HIRED LABOR Brownsville, WI 53006 Hackensack, MN 56452 B. REASONABLE CONTRACT B. BID SECURITY (Type and Amount) B. BID SECURITY (Type and Amount)
(WITHOUT PROFIT)
NUMBER OF ADDENDA ISSUED C. REASONABLE CONTRACT C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED
(INCLUDING PROFIT)
0001 Upper Road Corridor 1 NSP $11,212,969.86 $11,212,969.86 $7,322,755.00 $7,322,755.00 $16,144,250.00 $16,144,250.00
0001AA Primary Secant Pile 1,788 LF $2,832.07 $5,063,741.16 $1,335.00 $2,386,980.00 $4,074.00 $7,284,312.00 0001AB Secondary Secant Pile 1,807 LF $2,889.95 $5,222,139.65 $1,850.00 $3,342,950.00 $4,074.00 $7,361,718.00 0001AC Strand Rock Anchors 15 EA $59,089.87 $886,348.05 $44,162.00 $662,430.00 $86,828.00 $1,302,420.00 0001AD Upper Road Corridor - Base Work 1 Job $40,741.00 $40,741.00 $930,395.00 $930,395.00 $195,800.00 $195,800.00
0002 West Slope (Zone 1) 1 NSP $22,131,506.20 $22,131,506.20 $8,778,268.00 $8,778,268.00 $7,404,330.00 $7,404,330.00 0002AA Overburden Removal 29,400 CY $714.80 $21,015,120.00 $222.22 $6,533,268.00 $111.16 $3,268,104.00 0002AB Spot Treatment Rock 40 EA $1,645.73 $65,829.20 $2,753.00 $110,120.00 $3,796.00 $151,840.00 0002AC Spot Treatment 100k 5 EA $14,145.60 $70,728.00 $11,567.00 $57,835.00 $15,956.00 $79,780.00 0002AD Spot Treatment Mesh/Grout 300 SF $41.88 $12,564.00 $435.00 $130,500.00 $600.06 $180,018.00 0002AE West Slope (Zone 1) - Base Work 1 Job $967,265.00 $967,265.00 $1,946,545.00 $1,946,545.00 $3,724,588.00 $3,724,588.00
0003 East Slope (Zone 2) 1 NSP $651,087.00 $651,087.00 $11,732,680.00 $11,732,680.00 $5,159,786.00 $5,159,786.00 0003AA Base Work ASSOCIATED W/EAST SLOPE 1 Job $57,487.00 $57,487.00 $297,480.00 $297,480.00 $1,140,386.00 $1,140,386.00 0003AB Excavation 70,000 CY $8.48 $593,600.00 $163.36 $11,435,200.00 $57.42 $4,019,400.00
0004 Lower Area Storm Drainage 1 Job $2,171,549.00 $2,171,549.00 $1,628,320.00 $1,628,320.00 $1,779,127.00 $1,779,127.00 0005 Switchgear Building 1 Job $371,685.00 $371,685.00 $351,448.00 $351,448.00 $579,795.00 $579,795.00 0006 Mobilization/Demobilization 1 Job $387,563.00 $387,563.00 $4,338,394.00 $4,338,394.00 $4,482,302.00 $4,482,302.00
0007 Performance & Payment Bonds 1 Job $753,691.00 $753,691.00 $188,860.00 $188,860.00 $200,260.00 $200,260.00
$37,680,051.06 $34,340,725.00 $35,749,850.00Total Amount of Line Items 0001-00007
U. S. Department of the Army, Corps of Engineers Wilmington Contracting Office
Edward Boddie
Philpott Dam Landslide Remediation, Basset, Virginia
W912PM23B0024
W912PM23B0024 10-Jul-23 23-Aug-23
Electronic Equivalent OF1419
CORRECTED August 24,2023
PROJECT TITLE 13. BIDDERS
A. OFFEROR A. OFFEROR A. OFFEROR
B. BID SECURITY (Type and Amount) B. BID SECURITY (Type and Amount) B. BID SECURITY (Type and Amount)
NUMBER OF ADDENDA ISSUED C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED
0001 Upper Road Corridor 1 NSP $10,031,308.00 $10,031,308.00 $11,325,500.00 $11,325,500.00 $11,716,750.00 $11,716,750.00 0001AA Primary Secant Pile 1,788 LF $1,507.00 $2,694,516.00 $2,500.00 $4,470,000.00 $2,000.00 $3,576,000.00 0001AB Secondary Secant Pile 1,807 LF $2,148.00 $3,881,436.00 $2,000.00 $3,614,000.00 $2,250.00 $4,065,750.00 0001AC Strand Rock Anchors 15 EA $48,935.00 $734,025.00 $36,100.00 $541,500.00 $125,000.00 $1,875,000.00 0001AD Upper Road Corridor - Base Work 1 Job $2,721,331.00 $2,721,331.00 $2,700,000.00 $2,700,000.00 $2,200,000.00 $2,200,000.00
0002 West Slope (Zone 1) 1 NSP $2,966,754.00 $2,966,754.00 $5,580,800.00 $5,580,800.00 $6,195,500.00 $6,195,500.00 0002AA Overburden Removal 29,400 CY $35.21 $1,035,174.00 $100.00 $2,940,000.00 $90.00 $2,646,000.00 0002AB Spot Treatment Rock 40 EA $3,019.00 $120,760.00 $3,760.00 $150,400.00 $2,300.00 $92,000.00 0002AC Spot Treatment 100k 5 EA $12,124.00 $60,620.00 $14,000.00 $70,000.00 $9,600.00 $48,000.00 0002AD Spot Treatment Mesh/Grout 300 SF $416.00 $124,800.00 $468.00 $140,400.00 $365.00 $109,500.00 0002AE West Slope (Zone 1) - Base Work 1 Job $1,625,400.00 $1,625,400.00 $2,280,000.00 $2,280,000.00 $3,300,000.00 $3,300,000.00
0003 East Slope (Zone 2) 1 NSP $3,633,200.00 $3,633,200.00 $8,147,000.00 $8,147,000.00 $8,500,000.00 $8,500,000.00 0003AA Base Work ASSOCIATED W/EAST SLOPE 1 Job $874,500.00 $874,500.00 $3,247,000.00 $3,247,000.00 $1,500,000.00 $1,500,000.00 0003AB Excavation 70,000 CY $39.41 $2,758,700.00 $70.00 $4,900,000.00 $100.00 $7,000,000.00
0004 Lower Area Storm Drainage 1 Job $1,815,800.00 $1,815,800.00 $4,195,000.00 $4,195,000.00 $3,147,000.00 $3,147,000.00 0005 Switchgear Building 1 Job $403,900.00 $403,900.00 $530,000.00 $530,000.00 $350,000.00 $350,000.00 0006 Mobilization/Demobilization 1 Job $741,000.00 $741,000.00 $2,000,000.00 $2,000,000.00 $1,000,000.00 $1,000,000.00
0007 Performance & Payment Bonds 1 Job $142,617.00 $142,617.00 $648,500.00 $648,500.00 $166,000.00 $166,000.00
$19,734,579.00 $32,426,800.00 $31,075,250.00Total Amount of Line Items 0001-00007
Titusville, FL 32781-1870
Kiewit Infastructure South Co.
4192 Innslake Drive Glen Allen, VA 23060
Brayman Construction Corporation 1000 John Roebling Way Saxonburg, PA 16056
Philpott Dam Landslide Remediation, Basset, Virginia
W912PM23B0024
David Boland, Inc.
P.O. Box 1870
Electronic Equivalent OF1419
PROJECT TITLE 13. BIDDERS
A. OFFEROR A. OFFEROR A. OFFEROR
B. BID SECURITY (Type and Amount) B. BID SECURITY (Type and Amount) B. BID SECURITY (Type and Amount)
NUMBER OF ADDENDA ISSUED C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED
0001 Upper Road Corridor 1 NSP $15,390,475.00 $15,390,475.00 $0.00 $0.00 0001AA Primary Secant Pile 1,788 LF $3,150.00 $5,632,200.00 $0.00 $0.00 0001AB Secondary Secant Pile 1,807 LF $3,325.00 $6,008,275.00 $0.00 $0.00 0001AC Strand Rock Anchors 15 EA $50,000.00 $750,000.00 $0.00 $0.00 0001AD Upper Road Corridor - Base Work 1 Job $3,000,000.00 $3,000,000.00 $0.00 $0.00
0002 West Slope (Zone 1) 1 NSP $6,900,000.00 $6,900,000.00 $0.00 $0.00 0002AA Overburden Removal 29,400 CY $80.00 $2,352,000.00 $0.00 $0.00 0002AB Spot Treatment Rock 40 EA $3,000.00 $120,000.00 $0.00 $0.00 0002AC Spot Treatment 100k 5 EA $12,000.00 $60,000.00 $0.00 $0.00 0002AD Spot Treatment Mesh/Grout 300 SF $400.00 $120,000.00 $0.00 $0.00 0002AE West Slope (Zone 1) - Base Work 1 Job $4,248,000.00 $4,248,000.00 $0.00 $0.00
0003 East Slope (Zone 2) 1 NSP $9,600,000.00 $9,600,000.00 $0.00 $0.00 0003AA Base Work ASSOCIATED W/EAST SLOPE 1 Job $5,400,000.00 $5,400,000.00 $0.00 $0.00 0003AB Excavation 70,000 CY $60.00 $4,200,000.00 $0.00 $0.00
0004 Lower Area Storm Drainage 1 Job $2,155,000.00 $2,155,000.00 $0.00 $0.00 0005 Switchgear Building 1 Job $281,080.00 $281,080.00 $0.00 $0.00 0006 Mobilization/Demobilization 1 Job $1,875,000.00 $1,875,000.00 $0.00 $0.00
0007 Performance & Payment Bonds 1 Job $19,100.00 $19,100.00 $0.00 $0.00
$36,220,655.00 $0.00 $0.00Total Amount of Line Items 0001-00007
Philpott Dam Landslide Remediation, Basset, Virginia
W912PM23B0024
Thalle Construction Company
| 2023-08-24T15:26:28-0400 | |
| BODDIE.EDWARD.ALLEN.1188962900 |
File details come from the government source that posted it. Updated .