This document is a solicitation for a firm fixed price construction contract to perform slope stabilization and landslide remediation work at the Philpott Dam site near Bassett, Virginia. The work includes primary and secondary secant pile walls, rock anchors, overburden removal, rock bolting, mesh installation, and storm drainage improvements. Pricing is requested for line items such as secant piles, anchors, excavation, mobilization, bonds, and base work associated with specific slopes. Responses are due to the U.S. Army Corps of Engineers Wilmington District by the specified date. The total evaluated price will determine award of the firm fixed price contract. Completion is required per the provided schedules and specifications.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| B1 - Bid Abstract Corrected AUG23.pdf | ||
| B1 - Bid Abstract.pdf | ||
| B1 - Bid Opening Sign In Sheet.pdf | ||
| A11 - W912PM23B0024 Amendment 0004.pdf | ||
| RTA Plan Set UnLocked amendment 0003.pdf | ||
| RTA SPECS Volume 2 AMENDMENT 0003.pdf | ||
| RTA SPECS Volume 1 AMENDMENT 0003.pdf | ||
| W912PM23B0024 Amendment 0003.pdf | ||
| A11 - W912PM23B0024 Amendment 0002.pdf | ||
| Municipal Separate Storm Sewer System (MS4) Philpott.pdf | ||
| W912PM23B0024 SECTION 01 22 00.00 10 RVZD2AUG.pdf | ||
| A11 - W912PM23B0024 Amendment 0001.pdf | ||
| Site Visit Sign-in Sheet.pdf | ||
| RTA Plan Set UnLocked.pdf | ||
| RTA Plan Set LOCKED.pdf | ||
| RTA SPECS Volume 2.pdf | ||
| W912PM23B0024.pdf | ||
| RTA SPECS Volume 1.pdf |
Show all 18
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W912PM23B0024
Section B - Supplies or Services and Prices
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Upper Road CorridorFFP
This Contract Line Item Number (CLIN) Slope mitigation measures include stabilization of upper dam access roadway. The overarching work to stabilize the upper access road and secant pile wall is reflected in the SUBCLINs.
The contractor shall furnish all labor, equipment, transportation, and materials necessary to perform all work in strict accordance with the specifications, schedules, Drawings, and other contract documents to stabilize the upper access road and secant pile wall.
For Bidding purposes the amount of CLIN 0001 should be recorded as the total of subclins 0001AA -0001AD..
NET AMT
ITEM NO SUPPLIES/SERVICES ESTIMATED
QUANTITY
UNIT UNIT PRICE AMOUNT
0001AA Primary Secant Pile 1,788 Linear Foot
Description: Drilling in soil and rock, casing, cleaning and inspections of shaft, concrete forming, placement & curing, weep drains, walers, top finishing, parapet and miscellaneous details.
Bidders are required to submit a FFP unit price based upon the quantities shown.
Note: FAR Clause 52.211-18 Variation in Estimated Quantity is incorporated by reference to establish adjustments for variations between the estimated quantities and actual quantities.
UNIT UNIT PRICE AMOUNT
0001AB Secondary Secant Pile 1,807 Linear Foot
Drilling in soil and rock, casing, cleaning and inspections of shaft, reinforcing steel, concrete forming , placement & curing, pile testing, walers, top finishing, parapet and miscellaneous details.
Bidders are required to submit a FFP unit price based upon the quantities shown.
Note: FAR Clause 52.211-18 Variation in Estimated Quantity is incorporated by
UNIT UNIT PRICE AMOUNT
0001AC Strand Rock Anchors 15 Each $________________ $_________________ Drilling, anchor, grout, anchor head structure, inspection and testing.
Bidders are required to submit a FFP unit price based upon the quantities shown.
Note: FAR Clause 52.211-18 Variation in Estimated Quantity is incorporated by
0001AD 1 Job Upper Road Corridor - Base WorkFFP
Includes temporary T-Walls and other work not included in CLIN 001 Unit Cost Items.
The overarching scope of CLIN 0001 is Slope mitigation measures include stabilization of upper dam access roadway. The overarching work to stabilize the upper access road and secant pile wall is reflected in the Unit priced Work required to stabilize the upper access road and secant pile wall is reflected in the SUBCLINs. This SUBCLIN shall be used to capture non-unit priced items, such as temporary T-Walls required to complete the work required under CLIN0001.
FOB: Destination
PSC CD: Y1KA
West Slope (Zone 1)FFP
The work includes slope stability remediation to reduce the risk of personnel injury and damage to infrastructure due to landslide activity at the Philpott Dam site near Basset, Virginia and incidental related work. This Contract Line Item Number (CLIN) removal of west slope overburden and west slope stabilization & rockfall protection to include grading, bolts, mesh, & rockfall fence in accordance with the plans and specs. The overarching work to stabilize the west slope is reflected in the SUBCLINs.
The contractor shall furnish all labor, equipment, transportation, and materials necessary to perform all work in strict accordance with the specifications, schedules, Drawings, and other contract documents to remove the west slope overburden and stabilize the west slope.
For Bidding purposes, the amount of CLIN 0002 should be recorded as the total of SUBCLINs 0002AA -0002AE in accordance with the plans and specs.
UNIT UNIT PRICE AMOUNT
0002AA Overburden Removal 29,400 Cubic Yard
All activities relating to removal and disposal of overburden.
Bidders are required to submit a FFP unit price based upon the quantities shown.
Note: FAR Clause 52.211-18 Variation in Estimated Quantity is incorporated by
UNIT UNIT PRICE AMOUNT
0002AB Spot Treatment Rock Bolts
40 Each $________________ $_________________
Drilling, anchor, grout, inspection and testing.
Bidders are required to submit a FFP unit price based upon the quantities shown.
Note: FAR Clause 52.211-18 Variation in Estimated Quantity is incorporated by
UNIT UNIT PRICE AMOUNT
0002AC Spot Treatment 100k Anchors
5 Each $________________ $_________________
Drilling, anchor, grout, inspection and testing
UNIT UNIT PRICE AMOUNT
0002AD Spot Treatment Mesh/Grout
300 Square Foot
Cleaning, steel mesh, grout and finishing
Bidders are required to submit a FFP unit price based upon the quantities shown.
Note: FAR Clause 52.211-18 Variation in Estimated Quantity is incorporated by
0002AE 1 Job West Slope (Zone 1) -Base WorkFFP
All costs, including the Slope Drape system and other work (unit priced and non-unit priced) required to complete the CLIN, shall be captured in the in the subclins and rolled up to represent a total cost for the CLIN 0002. The overarching scope of CLIN 0002 is removal of west slope overburden and west slope stabilization & rockfall protection to include grading, bolts, mesh, & rockfall fence in accordance with the plans and specs is reflected is reflected in the Unit priced work SUBCLINs. This SUBCLIN shall be used to capture non unit-priced items, such as the Slope Drape system required to complete the work required under CLIN.
The amount of CLIN 002 should be recorded as the total of Item: 002AA -002AE
East Slope (Zone 2)FFP
The work includes slope stability remediation to reduce the risk of personnel injury and damage to infrastructure due to landslide activity at the Philpott Dam site near Basset, Virginia and incidental related work. This Contract Line Item Number (CLIN) removal of east slope overburden and east slope stabilization in accordance with the plans and specs. The overarching work to stabilize the East Slope is reflected in the SUBCLINs.
The contractor shall furnish all labor, equipment, transportation, and materials necessary to perform all work in strict accordance with the specifications, schedules, Drawings, and other contract documents to remove the east slope overburden and stabilize the east slope.
For Bidding purposes, the amount of CLIN 0003 should be recorded as the total of SUBCLINs 0003AA -0003AB in accordance with the plans and specs.
0003AA 1 Job Base Work ASSOCIATED W/EAST SLOPEFFP
All costs, unit priced and non-unit priced)required to complete the CLIN, shall be captured in the in the subclins and rolled up to represent a total cost for the CLIN 0003. The overarching scope of CLIN 0003 is removal of east slope overburden and east slope stabilization in accordance with the plans and specs is reflected is reflected in the Unit priced work SUBCLINs. This SUBCLIN shall be used to capture non unit priced items, directly related to the East Slope work. The amount of CLIN 003 should be recorded as the total of Item: 003AA -003AB.
UNIT UNIT PRICE AMOUNT
0003AB Excavation 70,000 Cubic Yard
All activities relating to removal and disposal of soil and rock materials.
Bidders are required to submit a FFP unit price based upon the quantities shown.
Note: FAR Clause 52.211-18 Variation in Estimated Quantity is incorporated by
0004 1 Job Lower Area Storm DrainageFFP
Firmed Fixed Pricing for all Activities related to the stormwater management improvements in accordance with the plans and specs.
0005 1 Job Switchgear BuildingFFP
This Contract Line Item Number (CLIN) is a firm fixed price for the work at the switchgear building as described in the plans and specs
0006 1 Job Mobilization/DemobilizationFFP
Payment will be made for costs associated with mobilization and demobilization, as defined in Special Contract Clause PAYMENT FOR
MOBILIZATION AND DEMOBILIZATION.
0007 1 Job Payment & Performance BondsFFP
Bonding:
Insert % ___________
Contractor shall submit Performance and Payment bonds. You are required to submit Performance and Payment bonds within 10 calendar days of contract award.
Original copies of the performance and Payment bonds shall be sent to the District Office address below for review:
U.S. Army Corps of Engineers Wilmington District CESAW-CTW912PM23B0024 ATTN: Troy Small 69 Darlington Avenue Wilmington, NC 28403 FOB: Destination PN/CN: Payment & Performance Bon
TOTAL AMOUNTS
TOTAL AMOUNT OF LINE ITEM 0001 – 0007 $___________________
NOTE:
PLEASE BE SURE TO INCLUDE UNIT PRICES ROUNDED TO TWO DECIMAL PLACES.
File details come from the government source that posted it. Updated .