W912PM-16-R-0005-0006_PN76513_SOF_Special_Tactics_Facility-Phase_2.pdf

PDF 272 KB Posted

Attached to
SOF Special Tactical Facility, Phase 2, at Fort Bragg, Aberdeen Training Facility, Hoke County, North Carolina
Solicitation number
W912PM-16-R-0005
Issued by

About this file

Amendment 0006

View the file

Other files

File Type Posted
W912PM16-R-0005_Amendment_0007.pdf PDF
W912PM16-R-0005_Amendment_0007_Conform_Copy.pdf PDF
PN76513Amd0006Vol4Plans.pdf PDF
PN76513Amd0006Vol3Plans.pdf PDF
W912PM-16-R-0005-0006_PN76513_Conformed_Copy.pdf PDF
PN76513Amd0006Vol2Plans.pdf PDF
PN76513Amd0006Vol1Plans.pdf PDF
W912PM-16-R-0005-0005_PN76513_SOF_Special_Tactics_Facility__Phase_2.pdf PDF
PN76513Amd0004Vol1Plans.zip ZIP file
PN76513Amd0004Vol3Plans.zip ZIP file
W912PM-16-R-0005-0004.pdf PDF
PN76513Amd0004Vol2Plans.zip ZIP file
PN76513Amd0004Vol4Plans.zip ZIP file
W912PM-16-R-0005_Amend_0003.pdf PDF
Conform_Copy_W912PM-16-R-0005_Amend_0003.pdf PDF
AMD_0003_PLANS_Vol1.zip ZIP file
AMD_0003_PLANS_Vol4_3A-471.pdf PDF
AMD_0003_PLANS_Vol3_2A-610.pdf PDF
PPQ_NAVFAC-USACE.pdf PDF
PN76513Amd0002Vol1Plans.pdf PDF
Amendment_0002.pdf PDF
Amendment_0002_Drawing_dgn.zip ZIP file
9June-Site_Visit_Attendance_Sheet.pdf PDF
3June_Site-Visist.pdf PDF
W912PM-16-R-0005-_0001__PN76513_SOF_Special_Tactics_Facility_Phase_2_ATF.pdf PDF
2016-05-04_STG_Complex_Ft_Bragg_V1.pdf PDF
PN_76513 _SOF_SPECIAL_TACTICS_FACILITY _PHASE_2_-_DRAWINGS_VOLUME_2.pdf PDF
2016-05-04_STG_Complex_Ft_Bragg_V3.pdf PDF
PN_76513 _SOF_SPECIAL_TACTICS_FACILITY _PHASE_2_-_DRAWINGS_VOLUME_1.pdf PDF
PN_76513 _SOF_SPECIAL_TACTICS_FACILITY _PHASE_2_-_DRAWINGS_VOLUME_4.pdf PDF
2016-05-04_STG_Complex_Ft_Bragg_V2.pdf PDF
PN_76513 _SOF_SPECIAL_TACTICS_FACILITY _PHASE_2_-_DRAWINGS_VOLUME_3.pdf PDF
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

76513

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Solicitation W912PM-16-R-0005 is hereby amended to incorporate the follow ing changes:

1) Revise the Bid Schedule, Subtoals Page and Notice to Offerors to relfect changes to Bid Schedule

2) See Technical Sumamry of Changes

3) The due date of proposals is changed to 7 December 2016 at 2:00PM local time

4) Projnet Inquiry System w ill be made available and close 10 Calendar Days prior to the receipt of proposals

5) The Acceptance Period of Proposals is change to 90 days from 180 days

All other terms and conditions remain in full force and effect

1. CONTRACT ID CODE PAGE OF PAGES

J 1 6

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 07-Nov-2016

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912PM-16-R-0005

X 9B. DATED (SEE ITEM 11)

25-May-2016

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

07-Nov-2016

CODE

U S ARMY CORPS OF ENGINEERS

WILMINGTON DISTRICT

ATTN: CONTRACTING DIVISION

69 DARLINGTON AVE

WILMINGTON NC 28403-1343

W912PM 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912PM-16-R-0005

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SECTION 00 00 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

SUMMARY OF CHANGES

SECTION 00 10 00 - SOLICITATION, CONTRACT LINE ITEM NUMBER (CLIN) SCHEDULE

The required response date/time has changed from 19-Aug-2016 02:00 PM to 07-Dec-2016 02:00 PM.

The offeror acceptance period has decreased by 90 from 180 to 90.

CLIN 0011 is added as follows:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0011 1 Job OPTION OPTIONAL BID ITEM 5: Building 2 Room 101 Sports Flooring

Provision of all work associated with the provision and installation of Rubber Sports Flooring for Room 101 of Building 2 as indicated on the Room Finish Schedules Sheets 2A-610 and 2A-611 and specified in Specification Section 09 65

66 RESILIENT ATHLETIC FLOORING.

FOB: Destination

NET AMT

CLIN 0012 is added as follows:

0012 1 Job OPTION OPTIONAL BID ITEM 6: Bituminous Paving of South Parking Lot

Provision of all work associated with the Bituminous Pavement of the parking lots south of Buildings 1 and 2 as indicated on drawing sheet CS114 of Volume 1 of the drawings, and others drawings referenced from this sheet, and the specifications, but not including any work indicated or specified to be provided under any other Bid Items.

CLIN 0013 is added as follows:

0013 1 Job OPTION OPTIONAL BID ITEM 7: Parking Lot North Side of Roadway "B"

Provision of all work related to the construction of the Parking Lot on the north side of Roadway “B” north of Buildings 1 and 2 to include earthwork, storm drainage, sediment and erosion control, paving, landscaping, utilities and other sitework complete in accordance with Sheet CS112 of Volume 1 of the drawings, and others referenced from this sheet, and the specifications, but not including any work indicated or specified to be provided under any other Bid Items.

The following have been modified:

NOTICE TO OFFERORS

NOTICE TO BIDDERS/OFFERORS

NOTE 1:

FOR BASE BID ITEM: Electrical and Telecommunications Infrastructure in GF/GI systems Furniture (CLIN 0006), THE PERIOD OF PERFORMANCE OF THIS CLIN SHALL RUN

CONCURRENTLY WITH THE ENTIRE CONTRACT DURATION SO THAT THE PERIOD

OF PERFORMANCE SHALL NOT EXCEED 820 CALENDAR DAYS.

Activity Performance Period

(Days)

Construction, CLINs 1‐5 (and any options awarded)

Government Systems Furniture Installation 60

CLIN 6 Installation/Testing 30

Total Contract Duration 820

NOTE 2:

FOR OPTIONAL BID ITEMS 1, 2, 3, 4, 5, 6 AND 7 (CLIN’s 0007-0013), IF EXERCISED, THE PERIOD OF PERFORMANCE SHALL NOT BE EXTENDED BEYOND THE

ORIGINAL CONTRACT DURATION OF 730 CALENDAR DAYS. PERFORMANCE OF

ANY AWARDED OPTIONAL BID ITEMS SHALL RUN CONCURRENTLY WITH THE

BASE BID ITEMS CONTRACT DURATION SO THAT THE TOTAL PERIOD OF

PERFORMANCE SHALL NOT EXCEED 820 CALENDAR DAYS.

NOTE 3:

THE GOVERNMENT RESERVES THE RIGHT TO EXERCISE OPTIONAL BID ITEMS 1,

2, 3, 4, 5, 6 AND 7 (CLIN’s 0007-0013), WITHIN 90 DAYS AFTER AWARD OF THE BASE

CONTRACT.

NOTE 4:

THE EXERCISE OF OPTIONAL BID ITEMS 1, 2, 3, 4, 5, 6 AND 7 (CLIN’s 0007-0013), SHALL BE SUBJECT TO THE AVAILABILITY OF FUNDS.

SUBMISSION OF PROPOSALS

ELECTRONIC PROPOSAL SUBMISSION, TO INCLUDE E-MAIL AND FACSIMILE

TRANSMISSIONS, IS NOT AUTHORIZED.

HAND CARRIED PROPOSAL SUBMISSION IS AUTHORIZED OF ELECTRONIC MEDIA

(CD-ROM) DISCS.

Proposals shall be organized and tabbed in accordance with Paragraphs 3.8.1 and 3.8.2 of the General Proposal Submission and Tabbing Requirements. Proposals shall be electronically signed by a duly authorized official of the Offeror’s company and are required no later than December 7th 2016, at 2:00 PM EST. Refer to General Proposal Submission And Tabbing Requirements for detailed submittal instructions. Proposals shall be submitted by the date and time specified to the following address:

U.S. Army Engineer District, Wilmington ATTN: CESAW-CT (Mr. Michael M. Mullen, Contract Specialist) 69 Darlington Avenue Wilmington, NC 28403 Email: michael.m.mullen@usace.army.mil and

U.S. Army Engineer District, Wilmington ATTN: CESAW-CT (Mr. John T. Hill, Contracting Officer) 69 Darlington Avenue Wilmington, NC 28403 Email: john.t.hill@usace.army.mil

All proposals must be clearly identified with the contractor’s name and address. To ensure timely and proper handling, the lower left corner of the outermost wrapper should indicate the following:

Request For Proposal No: W912PM-16-R-0005 Due Date of Proposal: December 7th 2016

Time by which Proposals are due: 2:00 P.M. (E.T.)

Title of Project: SOF Special Tactics Facility Phase 2, PN76513

Offerors are responsible for allowing sufficient time for the proposal to be processed for receipt and are cautioned that sufficient time may be as much as 24 hours prior to the date and time designated for receipt of proposals.

The Government will not be responsible for proposals delivered to any location or to anyone other than those designated to receive proposals on its behalf. Offerors are responsible for ensuring that proposals are submitted so as to reach the office designated for receipt of proposals.

Offerors are responsible for allowing sufficient time for the proposal to be physically received and processed by Mailroom personnel in accordance with the information provided.

QUALITY CONTROL SYSTEM (QCS): Any contract award resulting from this solicitation will require the mandatory use of the automated Quality Control System. Please see Section 01 45 00.10 10 for additional information.

SECURITY REQUIREMENTS: Increased security at military installations may require vehicle and personnel registration, as well as 100% ID checks and random vehicle searches.

Additionally, construction of this facility is located within a high security area. A high security control area is defined as an area requiring armed security guard escort at all times, perimeter intrusion detection or access control measures, contractor personnel require identification badges and are subject to random searches of vehicles, equipment and personnel.

Due to the location of the construction site there are specific requirements with regard to security that must be adhered to including identification requirements, background checks, delivery coordination, Master Access Control Roster, work stoppages, etc. Please see Section 01 00 60 for additional information.

SUBTOTALS

SUBTOTAL BASE BID ITEMS; CLINS 0001 – 0006 $________________________

SUBTOTAL OPTIONAL BID ITEM 0001, CLIN 0007 $________________________

SUBTOTAL OPTIONAL BID ITEM 0002, CLIN 0008 $________________________

SUBTOTAL OPTIONAL BID ITEM 0003, CLIN 0009 $________________________

SUBTOTAL OPTIONAL BID ITEM 0004, CLIN 0010 $________________________

SUBTOTAL OPTIONAL BID ITEM 0005, CLIN 0011 $________________________

SUBTOTAL OPTIONAL BID ITEM 0006, CLIN 0012 $________________________

SUBTOTAL OPTIONAL BID ITEM 0007, CLIN 0013 $________________________

TOTAL AMOUNT OF ALL LINE ITEMS 0001-0013 $________________________

SECTION 00 73 00 - SUPPLEMENTARY CONDITIONS

The following Acceptance/Inspection Schedule was added for CLIN 0011:

INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY

N/A N/A N/A Government

The following Acceptance/Inspection Schedule was added for CLIN 0012:

The following Acceptance/Inspection Schedule was added for CLIN 0013:

(End of Summary of Changes)

Amendment 0006

Technical Summary of Changes

MAIN TABLE OF CONTENTS (Volumes 1 thru 3)

Delete existing Pages throughout Volumes 1 thru 3 in their entirety and replace with revised enclosed Pages.

SPECIFICATIONS – Volume 1 Of 3

01 33 00 – SUBMITTAL PROCEDURES

Delete existing Pages 51 and 82 of 98 in their entirety and replace with revised enclosed like-numbered Pages.

SPECIFICATIONS – Volume 2 Of 3

08 71 00 – DOOR HARDWARE

Delete existing Pages 1 thru 16 in their entirety and replace with revised enclosed Page 1 thru Page 18.

08 81 00 – GLZAING

Delete existing Pages 1 thru 11 in their entirety and replace with revised enclosed Pages 1 thru 13.

DIVISION 13 – SPECIAL CONSTRUCTION

Delete existing SECTIONS listed below in their entirety:

13 17 20 – TREADMILL THERAPEUTIC TREATMENT POOL.

13 17 30 – POLAR PLUNGE THERAPEUTIC TREATMENT POOLS.

13 17 40 – THERMAL THERAPEUTIC TREATMENT POOLS

Amendment 0006

SPECIFICATIONS – Volume 3 Of 3

DIVISION 27 – COMMUNICATIONS

Delete existing SECTION 27 51 16 – POOL AREA PUBLIC ADDRESS SYSTEMS in its entirety.

NOTE:

Text that is added or revised by this amendment is identified with ***Amendment 0006(beginning of revision/addition) in bold print.

The text changes may have necessitated reformatting of subsequent text or pages. If this is the case, those pages have also been issued as amended pages but are not underlined or bold text.

DRAWINGS

Delete existing Volumes 1 through 4 in their entirety and replace with enclosed revised Volumes. Revisions noted on Technical Summary of Changes Page 3 through Page 7.

--- End of Summary of Changes---

Encls As Stated

Drawing Revision Description

SITE/CIVIL

CD152 Deleted temporary construction gate and curb removal.

CD153 Added temporary construction gate.

CS101 Deleted northern parking lots in western area. Deleted east parking lot in eastern area.

CS110 Deleted east parking lot, revised southern parking area.

CS112 Added Option 7 notes for northern parking area.

CS113 Deleted east parking lot in eastern area. Revised notes.

CS114 Added Option 6 notes for southern parking area.

CS114A Deleted joints.

CS115 Added Option 6 notes for southern parking area.

CS150 Deleted northern parking lots.

CS152 Deleted northern parking lots.

CS153 Deleted northern parking lots.

CS502 Revised detail 9 to 9" of aggregate.

CS601 Revised sign schedule.

CG101 Deleted northern parking lots in western area. Deleted east parking lot in eastern area.

CG110 Deleted east parking lot in eastern area.

CG113 Deleted east parking lot. Revised grading. Changed Curb Inlets CI-5 and CI-6 to catch basins CB-20 and CB-21 CG150 Deleted northern parking lots.

CG152 Deleted northern parking lots and storm drainage. Revised grading.

CG153 Deleted northern parking lots and storm drainage. Revised grading.

CG201 Revised Storm profiles "A" and "D".

CG203 Revised Storm profiles "L" and "M".

CG204 Revised Storm profile "O".

CG205 Deleted Storm profile "X".

CG601 Revised stormwater drainage schedule.

CG602 Revised stormwater drainage schedule.

CG701 Deleted northern parking lots in western area. Deleted east parking lot in eastern area.

CG720 Deleted east parking lot.

CG723 Deleted east parking lot.

CG730 Deleted east parking lot.

CG733 Deleted east parking lot.

CG760 Deleted northern parking lots and revised sediment and erosion control.

CG762 Deleted northern parking lots and revised sediment and erosion control.

CG763 Deleted northern parking lots and revised sediment and erosion control.

CG770 Deleted northern parking lots and revised sediment and erosion control.

CG772 Deleted northern parking lots and revised sediment and erosion control.

CG773 Deleted northern parking lots and revised sediment and erosion control.

CU101 Deleted northern parking lots in western area. Deleted east parking lot in eastern area.

TECHNICAL SUMMARY OF CHANGES - Page 3

K7EPEOAF

Highlight

CU110 Deleted east parking lot.

CU113 Deleted east parking lot.

CU150 Deleted northern parking lots.

CU152 Deleted northern parking lots.

CU153 Deleted northern parking lots.

CP101 Deleted northern parking lots in western area. Deleted east parking lot in eastern area.

CP110 Deleted east parking lot.

CP122 Deleted east parking lot.

CP150 Delete drawing.

CP180 Delete drawing.

CP185 Delete drawing.

LP101 Deleted landscaping associated with removed parking areas.

LP110 Deleted landscaping associated with removed parking areas.

LP113 Deleted landscaping associated with removed parking areas.

LP150 Deleted landscaping associated with removed parking areas.

LP152 Deleted landscaping associated with removed parking areas.

LP153 Deleted landscaping associated with removed parking areas.

LP601 Revised Landscape plant schedule.

ES101 Revised circuits to ONUS enclosure receptacles (Deleted Panel PP3).

BUILDING 1

1A-123 Deleted note 8 referring to knox box 1A-581 Deleted knox box detail 1FA111 Deleted FA/FN Strobes for private offices 1FA121 Deleted FA/FN Strobes for private offices 1FA122 Deleted FA/FN Strobes for private offices 1FA601 Removed reference to knox box tampers switch from FA Matrix 1M-710 Deleted polar plunge pool chiller condensing water pump, piping, controls and control points.

1M-711 Deleted Paragraph H, Plunge pool chiller unit sequence of operation.

1M-712 Deleted polar plunge pool chiller condensing water control points.

BUILDING 2

2S-100 Deleted all therapy pools, observation room, and stair 3. Updated stepped footings. Revised general notes, sheet notes, and legend.

2S-111 Deleted all therapy pools, observation room, and stair 3. Re-sloped slab, relocated drains, and updated stepped footings. Revised sheet notes and drain elevatio 2S-112 Added new 3'x3'x3' deep pit for mechanical.

2S-201 Deleted all therapy pools, observation room, and stair 3. Updated stepped footings.

2S-211 Revised stepped footings, and added top of footing elevations.

2S-212 Revised stepped footings, and added top of footing elevations.

2S-213 Revised stepped footings, and added top of footing elevations.

2S-214 Revised stepped footings, and added top of footing elevations.

2S-302 Revised dimension for sections A&B to "1'-4"*" "*UNLESS NOTED OTHERWISE" 2S-303 Deleted section D 2S-304 Revised section A to show slab on grade near pilaster. Deleted concrete slab for therapy pools on section A. Deleted sections B, C, and D.

TECHNICAL SUMMARY OF CHANGES - Page 4

2S-305 Revised section B dimension to "varies" (for stepped footings). Revised slab to be slab on grade, and deleted concrete slab for therapy pools. Deleted section C.

2S-308 Revised section A footing thickness to 1'-4". Revised slab to be slab on grade, and deleted concrete slab for therapy pools. Deleted section B.

2S-310 Deleted entire sheet.

2S-311 Deleted observation slab, door and window.

2S-603 Revised top of footing elevation for column B-5.

2S-604 Revised top of footing elevation for column F-5.

2S-605 Revised top of footing elevation for columns O-5 and P-5.

2A-100 Deleted all therapy pools, vault, observation room, and stair 3 2A-110 Deleted all therapy pools, vault, observation room, and stair 3 2A-111 Deleted all therapy pools, vault, observation room, and stair 3 2A-113 Deleted all therapy pools, vault, observation room, and stair 3 2A-120 Deleted all therapy pools, vault, observation room, and stair 3 2A-121 Deleted all therapy pools, vault, observation room, and stair 3 2A-123 Deleted all therapy pools, vault, observation room, and stair 3 2A-124 Deleted note 8 referring to knox box 2A-161 Deleted all therapy pools, vault, observation room, and stair 3 2A-163 Deleted all therapy pools, vault, observation room, and stair 3 2A-171 Deleted all therapy pools, vault, observation room, and stair 3 2A-173 Deleted all therapy pools, vault, observation room, and stair 3 2A-180 Deleted all therapy pools, vault, observation room, and stair 3 2A-181 Deleted all therapy pools, vault, observation room, and stair 3 2A-191 Deleted all therapy pools, vault, observation room, and stair 3 2A-300 Deleted all therapy pools, vault, observation room, and stair 3 2A-327 Deleted stair 3 2A-450 Deleted stair 3 2A-452 Deleted details for stair 3 2A-461 Deleted all therapy pools, vault, observation room, and stair 3 2A-463 Deleted all therapy pools, vault, observation room, and stair 3 2A-471 Deleted all therapy pools, vault, observation room, and stair 3 2A-472 Rubber floor at gym is optional bid item, concrete floor is base bid 2A-473 Deleted all therapy pools, vault, observation room, and stair 3 2A-500 Deleted door F at vault 2A-520 Deleted observation window at main pool 2A-522 Deleted observation window at main pool details 2A-581 Deleted knox box detail 2A-600 Deleted door 3A at vault 2A-610 Deleted all therapy pools, vault, observation room, and stair 3 2A-611 Rubber floor at gym is optional bid item, concrete floor is base bid 2A-612 Rubber floor at gym is optional bid item, concrete floor is base bid 2A-620 Deleted all therapy pools, vault, observation room, and stair 3 2I-110 Deleted all therapy pools, vault, observation room, and stair 3

TECHNICAL SUMMARY OF CHANGES - Page 5

2I-111 Deleted all therapy pools, vault, observation room, and stair 3 2I-120 Deleted all therapy pools, vault, observation room, and stair 3 2I-121 Deleted all therapy pools, vault, observation room, and stair 3 2F-110 Deleted all therapy pools, vault, observation room, and stair 3 2F-120 Deleted all therapy pools, vault, observation room, and stair 3 2FA122 Deleted FA/FN Strobes for private offices 2FA601 Removed reference to knox box tampers switch from FA Matrix 2PP101 Removal of sanitary sewers and domestic water for therapy pools. Added floor drain for ductwork pit.

2PP111 Relocated floor drains in pool area 2PP112 Deleted vent piping from lower level sanitary serving therapy pools 2PP114 Deleted water line serving therapy pools 2PP711 Deleted sheet notes for therapy pools 2P-411 Reworked sanitary from floor drains serving pool, do to deletion of therapy pools 2P-551 Revised isometric from deletion of therapy pools 2P-552 Revised isometric from deletion of therapy pools 2P-553 Revised isometric from deletion of therapy pools 2P-601 Deleted sump pump for deletion of therapy pools 2P-753 Delete sheet, therapy pool details 2P-754 Delete sheet, therapy pool details 2P-755 Delete sheet, therapy pool details 2MH100 Revised pool exhaust system ductwork. Delete all thereapy pools.

2MH111 Revised drawing to add exhaust grille, manual damper and ductwork.

2M-411 Revised drawing to add exhaust grille, manual damper and ductwork.

2M-412 Deleted polar plunge pool chiller condensing water suply and return piping and valves.

2M-508 Deleted polar plunge pool chiller condensing water pump, piping, controls and control points.

2M-603 Revised the AIR DEVICE SCHEDULE 2EL101 Deleted sheet - Deleted equipment & circuits associated with therapy pools, vault, observation room, and stair 3 2EL111 Deleted lighting switch, circuit and Sheet Note 6 associated with stair 3.

2EL121 Revised pool area lighting design 2EL602 Revised Lighting Fixture schedule to new pool area lighting design 2EP111 Deleted References & Note associated with therapy pools, vault, observation room, and stair 3 2EP151 Deleted References & Note associated with therapy pools, vault, observation room, and stair 3 2EP410 Deleted sheet - Deleted equipment & circuits associated with therapy pools, vault, observation room, and stair 3 2EP602 Revised one-line diagram to reflect removal of Panel PP3 due to removal of therapy pool loads.

2EP611 Revised panel schedules to reflect new power loading 2EP612 Revised panel schedules to reflect lighting circuit changes 2EP613 Revised panel schedules to delete circuits associated with the exercise pools 2EP614 Revised panel schedules to delete circuits associated with the exercise pools 2EP616 Revised panel schedules to delete circuits associated with the exercise pools 2EY111 Deleted pool area PA system components 2EY702 Deleted Sheet - Deleted underwater PA Speakers

TECHNICAL SUMMARY OF CHANGES - Page 6

2EY710 Deleted Sheet - Deleted pool area PA system amplifier detail 2EY711 Deleted Sheet - Deleted Plunge Pool Details 2EY712 Deleted Sheet - Deleted Underwater Treadmill Details

BUILDING 3

3A-123 Deleted note 8 referring to knox box 3A-581 Deleted knox box detail 3FA111 Deleted FA/FN Strobes for private offices 3FA112 Deleted FA/FN Strobes for private offices 3FA121 Deleted FA/FN Strobes for private offices 3FA122 Deleted FA/FN Strobes for private offices 3FA601 Removed reference to knox box tampers switch from FA Matrix

TECHNICAL SUMMARY OF CHANGES - Page 7

SOF SPECIAL TACTICS FACILITY, PHASE 2 PN 76513

FT. BRAGG W912PM-16-R-0005

PROJECT TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

01 00 60 JSOC SECURITY

01 10 00.10 38 SUPPLEMENTARY SPECIAL CONTRACT REQUIREMENTS

01 11 00 SUMMARY OF WORK

01 14 00 WORK RESTRICTIONS

01 30 00 ADMINISTRATIVE REQUIREMENTS

01 32 01.00 10 PROJECT SCHEDULE

01 33 00 SUBMITTAL PROCEDURES

01 33 29.00 37 SUSTAINABILITY

01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS

01 42 00 SOURCES FOR REFERENCE PUBLICATIONS

01 45 00.00 10 QUALITY CONTROL

01 45 00.10 10 QUALITY CONTROL SYSTEM (QCS)

01 45 35 SPECIAL INSPECTIONS

01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS

01 57 16 TEMPORARY PEST CONTROL

01 57 19.37 INDOOR AIR QUALITY (IAQ) MANAGEMENT

01 57 20.00 06 ENVIRONMENTAL PROTECTION AND PERMITS

01 57 23 TEMPORARY STORM WATER POLLUTION CONTROL

01 62 35 RECYCLED/RECOVERED/BIOBASED MATERIALS

01 74 19.37 CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT

01 78 00 CLOSEOUT SUBMITTALS

01 78 23 OPERATION AND MAINTENANCE DATA

01 91 00.00 37 COMMISSIONING

DIVISION 03 - CONCRETE

03 11 13.00 10 CONCRETE FORMING

03 15 00.00 10 CONCRETE ACCESSORIES

03 20 00.00 10 CONCRETE REINFORCING

03 30 00.00 10 CAST-IN-PLACE CONCRETE

03 35 00.00 10 CONCRETE FINISHING

03 39 00.00 10 CONCRETE CURING

03 40 00.00 10 PLANT-PRECAST CONCRETE PRODUCTS FOR BELOW GRADE

CONSTRUCTION

DIVISION 04 - MASONRY

04 20 00 MASONRY

DIVISION 05 - METALS

05 12 00 STRUCTURAL STEEL

05 21 16 LONGSPAN STEEL JOIST FRAMING

05 21 19 OPEN WEB STEEL JOIST FRAMING

05 21 23 STEEL JOIST GIRDER FRAMING

05 30 00 STEEL DECKS

05 40 00 COLD-FORMED METAL FRAMING

05 50 13 MISCELLANEOUS METAL FABRICATIONS

05 51 00 METAL STAIRS

05 51 33 METAL LADDERS

05 52 00 METAL RAILINGS

DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES

06 10 00 ROUGH CARPENTRY

PROJECT TABLE OF CONTENTS Page 1 (Revised by Amendment 0006)

06 20 00 FINISH CARPENTRY

06 41 16.00 10 LAMINATE CLAD ARCHITECTURAL CASEWORK

06 61 16 SOLID POLYMER (SOLID SURFACING) FABRICATIONS

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 05 23 PRESSURE TESTING AN AIR BARRIER SYSTEM FOR AIR TIGHTNESS

07 13 53 ELASTOMERIC SHEET WATERPROOFING

07 21 13 BOARD AND BLOCK INSULATION

07 21 16 MINERAL FIBER BLANKET INSULATION

07 21 29 SPRAYED INSULATION

07 22 00 ROOF AND DECK INSULATION

07 26 10 SELF-ADHERING AIR AND VAPOR BARRIER

07 27 10.00 10 BUILDING AIR BARRIER SYSTEM

07 42 63 FABRICATED WALL PANEL ASSEMBLIES

07 52 00 MODIFIED BITUMINOUS MEMBRANE ROOFING

07 60 00 FLASHING AND SHEET METAL

07 61 14.00 20 STEEL STANDING SEAM ROOFING

07 84 00 FIRESTOPPING

07 92 00 JOINT SEALANTS

DIVISION 08 - OPENINGS

08 11 13 STEEL DOORS AND FRAMES

08 14 00 WOOD DOORS

08 33 23 OVERHEAD COILING DOORS

08 34 59 ARMORY DOORS

08 34 73 SOUND CONTROL DOOR ASSEMBLIES

08 35 13.26 HORIZONTAL SLIDING, ACCORDION-TYPE FIRE OR SMOKE DOORS

08 41 13 ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS

08 45 00 INSULATED TRANSLUCENT WALL AND ROOF PANEL SYSTEMS

08 71 00 DOOR HARDWARE

08 81 00 GLAZING

08 91 00 METAL WALL LOUVERS

DIVISION 09 - FINISHES

09 06 90 COLOR SCHEDULE

09 22 00 SUPPORTS FOR PLASTER AND GYPSUM BOARD

09 29 00 GYPSUM BOARD

09 30 13 CERAMIC TILING

09 51 00 ACOUSTICAL CEILINGS

09 62 38 STATIC-CONTROL FLOORING

09 65 00 RESILIENT FLOORING

09 65 66 RESILIENT ATHLETIC FLOORING

09 67 23.13 01 STANDARD RESINOUS FLOORING

09 67 66 FLUID APPLIED ATHLETIC FLOORING

09 68 00 CARPETING

09 69 13 RIGID GRID ACCESS FLOORING

09 77 20 FIBERGLASS REINFORCED WALL PANELS

09 83 13 ACOUSTICAL WALL TREATMENT

09 90 00 PAINTS AND COATINGS

09 96 00 HIGH-PERFORMANCE COATINGS

DIVISION 10 - SPECIALTIES

10 10 00 VISUAL COMMUNICATIONS SPECIALTIES

10 14 00.20 INTERIOR SIGNAGE

10 14 01 EXTERIOR SIGNAGE

PROJECT TABLE OF CONTENTS Page 2

10 21 13 TOILET COMPARTMENTS

10 22 13.00 48 WIRE MESH PARTITIONS

10 22 39 FOLDING PANEL PARTITIONS

10 26 13 WALL AND CORNER GUARDS

10 28 13 TOILET ACCESSORIES

10 44 16 FIRE EXTINGUISHERS

10 51 13 METAL LOCKERS

10 51 26 PLASTIC LOCKERS AND BENCHES

DIVISION 11 - EQUIPMENT

11 13 10 DOCK LEVELERS

***Amendment 0006***

DIVISION 13 - SPECIAL CONSTRUCTION

13 15 00 SWIMMING POOL SYSTEMS

***Amendment 0006***

DIVISION 14 - CONVEYING EQUIPMENT

14 24 00 HYDRAULIC ELEVATORS

DIVISION 21 - FIRE SUPPRESSION

21 13 13.00 10 WET PIPE SPRINKLER SYSTEM, FIRE PROTECTION

21 22 00.00 10 CLEAN AGENT FIRE EXTINGUISHING SYSTEMS

DIVISION 22 - PLUMBING

22 00 00 PLUMBING, GENERAL PURPOSE

22 15 14.00 40 GENERAL SERVICE COMPRESSED-AIR SYSTEMS, LOW PRESSURE

DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)

23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS

23 05 15 COMMON PIPING FOR HVAC

23 05 48.00 40 VIBRATION AND SEISMIC CONTROLS FOR HVAC PIPING AND

EQUIPMENT

23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC

23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS

23 09 23 LONWORKS DIRECT DIGITAL CONTROL FOR HVAC AND OTHER

BUILDING CONTROL SYSTEMS

23 64 26 CHILLED, CHILLED-HOT, AND CONDENSER WATER PIPING SYSTEMS

23 73 13.00 40 MODULAR INDOOR CENTRAL-STATION AIR-HANDLING UNITS

23 81 47 WATER-LOOP AND GROUND-LOOP HEAT PUMP SYSTEMS

23 82 00.00 20 TERMINAL HEATING AND COOLING UNITS

23 82 02.00 48 UNITARY HEATING AND COOLING EQUIPMENT

DIVISION 25 - INTEGRATED AUTOMATION

25 10 10 UTILITY MONITORING AND CONTROL SYSTEM (UMCS) FRONT END

AND INTEGRATION

DIVISION 26 - ELECTRICAL

26 20 00 INTERIOR DISTRIBUTION SYSTEM

26 23 00 SWITCHBOARDS AND SWITCHGEAR

26 29 23 VARIABLE FREQUENCY DRIVE SYSTEMS UNDER 600 VOLTS

PROJECT TABLE OF CONTENTS Page 3

26 32 14.00 10 DIESEL-GENERATOR SET, STATIONARY 15-300 KW, STANDBY

APPLICATIONS

26 32 15.00 10 DIESEL-GENERATOR SET STATIONARY 100-2500 KW, WITH

AUXILIARIES

26 36 00.00 10 AUTOMATIC TRANSFER SWITCH AND BY-PASS/ISOLATION SWITCH

26 41 00 LIGHTNING PROTECTION SYSTEM

26 51 00 INTERIOR LIGHTING WITH LED

***Amendment 0006***

DIVISION 27 - COMMUNICATIONS

27 05 14.00 10 CABLE TELEVISION PREMISES DISTRIBUTION SYSTEM

27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM

***Amendment 0006***

DIVISION 28 - ELECTRONIC SAFETY AND SECURITY

28 23 23.00 10 CLOSED CIRCUIT TELEVISION SYSTEMS

28 31 76 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM

DIVISION 31 - EARTHWORK

31 00 00 EARTHWORK

31 05 22.00 06 GEOTEXTILES USED AS FILTERS

31 11 00 CLEARING AND GRUBBING

31 31 16 SOIL TREATMENT FOR SUBTERRANEAN TERMITE CONTROL

DIVISION 32 - EXTERIOR IMPROVEMENTS

32 01 19 FIELD MOLDED SEALANTS FOR SEALING JOINTS IN RIGID

PAVEMENTS

32 05 33 LANDSCAPE ESTABLISHMENT

32 11 23 AGGREGATE AND/OR GRADED-CRUSHED AGGREGATE BASE COURSE

32 12 10 BITUMINOUS TACK AND PRIME COATS

32 12 11 BITUMINOUS SURFACE TREATMENT

32 12 16 HOT-MIX ASPHALT (HMA) FOR ROADS

32 13 13.06 PORTLAND CEMENT CONCRETE PAVEMENT FOR ROADS AND SITE

FACILITIES

32 16 13 CONCRETE SIDEWALKS AND CURBS AND GUTTERS

32 17 24.00 10 PAVEMENT MARKINGS

32 92 19 SEEDING

32 92 23 SODDING

32 93 00 EXTERIOR PLANTS

DIVISION 33 - UTILITIES

33 11 00 WATER DISTRIBUTION

33 30 00 SANITARY SEWERS

33 40 00 STORM DRAINAGE UTILITIES

33 46 13 FOUNDATION DRAINAGE SYSTEM

33 46 16 SUBDRAINAGE SYSTEM

33 61 00 PREFABRICATED UNDERGROUND HEATING/COOLING DISTRIBUTION

SYSTEM

33 70 02.00 10 ELECTRICAL DISTRIBUTION SYSTEM, UNDERGROUND

33 82 00 TELECOMMUNICATIONS OUTSIDE PLANT (OSP)

DIVISION 41 - MATERIAL PROCESSING AND HANDLING EQUIPMENT

PROJECT TABLE OF CONTENTS Page 4

41 22 23.19 PARALOFT HOISTS

41 22 23.20 DIVING TOWER HOISTS

-- End of Project Table of Contents --

PROJECT TABLE OF CONTENTS Page 5

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 51 OF 98 PAGES

SOF SPECIAL TACTICS FACILITY, PHASE 2

11 13 10 2.7.1 GRestraining Device

SD-11 Closeout Submittals

1.4.3 GRecord Drawings

13 15 00 SD-03 Product Data

3.3 G ROInstallation

13 17 20 SD-03 Product Data

3.2 G ROInstallation

13 17 30 SD-03 Product Data

3.2 G ROInstallation

13 17 40 SD-03 Product Data

3.2 G ROInstallation

14 24 00 SD-02 Shop Drawings

1.4.4 GDetail Drawings

SD-03 Product Data

2.1 GPassenger Elevators

3.2 GField Quality Control

2.4.2 GLogic Control

SD-05 Design Data

1.2.1 GReaction Loads

1.2.1 GHeat Loads

SD-06 Test Reports

3.2.2Field Tests Reports

SD-07 Certificates

1.4.3 GWelders' Qualifications

SD-10 Operation and Maintenance

Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

(Revised by Amendment 0006)

Cross-Out

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 82 OF 98 PAGES

SOF SPECIAL TACTICS FACILITY, PHASE 2

27 10 00 SD-11 Closeout Submittals

1.10.2 GRecord Documentation

27 51 16 SD-02 Shop Drawings

2.1.4 GDetail Drawings

SD-03 Product Data

1.5Spare Parts

SD-06 Test Reports

3.5 GApproved Test Procedures

3.5Acceptance Tests

SD-07 Certificates

2.2Components

SD-10 Operation and Maintenance

Data

2.1 GPool Area Public Address System

2.7.1 GUnderwater Speaker

28 23 23.00 10 SD-01 Preconstruction Submittals

1.5.3Predelivery Test Procedures

SD-02 Shop Drawings

1.5.4.4 GGraphics

1.4.3 GAs-built Drawings

SD-03 Product Data

1.5.4.2 GTraining Documentation

3.6.9 GSoftware Updates

3.4.1 GCopies of the Audio-Visual

Materials

SD-06 Test Reports

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

(Revised by Amendment 0006)

Cross-Out

SECTION TABLE OF CONTENTS

DIVISION 08 - OPENINGS

SECTION 08 71 00

DOOR HARDWARE

PART 1 GENERAL

1.1 REFERENCES

1.2 SUBMITTALS

1.3 HARDWARE SCHEDULE

1.4 KEY BITTING CHART REQUIREMENTS

1.5 QUALITY ASSURANCE

1.5.1 Hardware Manufacturers and Modifications

1.5.2 Hardware Coordination and Keying Meeting

1.6 DELIVERY, STORAGE, AND HANDLING

PART 2 PRODUCTS

2.1 TEMPLATE HARDWARE

2.2 HARDWARE FOR FIRE DOORS AND EXIT DOORS

2.3 HARDWARE FOR SOUND RATED DOORS

2.4 HARDWARE ITEMS FOR STANDARD DOORS

2.4.1 Hinges

2.4.1.1 Butt Hinges

2.4.1.2 Continuous Hinges

2.4.2 Locks and Latches

2.4.2.1 Bored Locks and Latches

2.4.2.2 Combination Locks

2.4.2.3 High Security Combination Locks and Latches

2.4.3 Exit Devices

2.4.4 Cylinders and Cores

2.4.5 Keying System

2.4.6 Lock Trim

2.4.6.1 Lever Handles

2.4.6.2 Texture

2.4.7 Keys

2.4.8 Door Bolts

2.4.9 Closers

2.4.9.1 Identification Marking

2.4.10 Closer Holder-Release Devices

2.4.11 Door Trim

2.4.11.1 Kick Plates

2.4.11.2 Push Plates

2.4.11.3 Pull Plates

2.4.12 Door Stops and Silencers

2.4.13 Thresholds

2.4.14 Weather Stripping Gasketing

2.4.15 Lightproofing Gasketing

2.4.16 Fire Rated Gasketing

2.4.17 Rain Drips

2.4.17.1 Door Rain Drips

SECTION 08 71 00 Page 1

2.4.17.2 Overhead Rain Drips

2.4.18 Special Tools

2.5 FASTENERS

2.6 FINISHES

2.7 KEY CABINET AND CONTROL SYSTEM

PART 3 EXECUTION

3.1 INSTALLATION

3.1.1 Weather Stripping Installation

3.1.2 Lightproofing and Fire Rated Gasketing Installation

3.1.3 Threshold Installation

3.2 FIRE DOORS AND EXIT DOORS

3.3 HARDWARE LOCATIONS

3.4 KEY CABINET AND CONTROL SYSTEM

3.5 FIELD QUALITY CONTROL

3.6 HARDWARE SETS

-- End of Section Table of Contents --

SECTION 08 71 00 Page 2

SECTION 08 71 00

DOOR HARDWARE

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by the basic designation only.

ASTM INTERNATIONAL (ASTM)

ASTM E283 (2004; R 2012) Determining the Rate of Air Leakage Through Exterior Windows, Curtain Walls, and Doors Under Specified Pressure Differences Across the Specimen

BUILDERS HARDWARE MANUFACTURERS ASSOCIATION (BHMA)

ANSI/BHMA A156.1 (2013) Butts and Hinges

ANSI/BHMA A156.13 (2012) Mortise Locks & Latches Series 1000

ANSI/BHMA A156.16 (2013) Auxiliary Hardware

ANSI/BHMA A156.18 (2012) Materials and Finishes

ANSI/BHMA A156.2 (2011) Bored and Preassembled Locks and Latches

ANSI/BHMA A156.21 (2009) Thresholds

ANSI/BHMA A156.26 (2012) Continuous Hinges. This Standard establishes requirements for architectural continuous hinges used in building construction. Cycle, finish, abuse, overload, vertical wear, and strength tests are included.

ANSI/BHMA A156.4 (2013) Door Controls - Closers

ANSI/BHMA A156.5 (2014) Auxiliary Locks and Associated Products

ANSI/BHMA A156.6 (2010) Architectural Door Trim

ANSI/BHMA A156.7 (2003; R 2009) Template Hinge Dimensions

BHMA A156.15 (2011) Release Devices Closer Holder, Electromagnetic and Electromechanical

BHMA A156.22 (2012) Door Gasketing and Edge Seal Systems

SECTION 08 71 00 Page 3

NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)

NFPA 101 (2012; Amendment 1 2012) Life Safety Code

NFPA 80 (2013) Standard for Fire Doors and Other Opening Protectives

STEEL DOOR INSTITUTE (SDI/DOOR)

SDI/DOOR A250.8 (2003; R2008) Recommended Specifications for Standard Steel Doors and Frames

UNDERWRITERS LABORATORIES (UL)

UL Bld Mat Dir (2012) Building Materials Directory

1.2 SUBMITTALS

Submittals with an "S" are for inclusion in the Sustainability Notebook, in conformance with Section 01 33 29.00 37 SUSTAINABILITY. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES.

SD-02 Shop Drawings

Hardware schedule; G

Keying system; G

SD-03 Product Data

Hardware items; G

SD-08 Manufacturer's Instructions

Installation

SD-10 Operation and Maintenance Data

Hardware Schedule items, Data Package 1; G

Submit data package in accordance with Section 01 78 23 OPERATION

AND MAINTENANCE DATA.

SD-11 Closeout Submittals

Key Bitting

1.3 HARDWARE SCHEDULE

Prepare and submit hardware schedule in the following form:

SECTION 08 71 00 Page 4

Hardware Item

QuantitySize Reference Publi-cation Type No.

Finish Mfr Name and Catalog No.

Key Control Symbols

UL

Mark (If fire rated and listed)

BHMA

Finish Desig-nation

1.4 KEY BITTING CHART REQUIREMENTS

Submit key bitting charts to the Contracting Officer prior to completion of the work. Include:

a. Complete listing of all keys (AA1, AA2, etc.).

b. Complete listing of all key cuts (AA1-123456, AA2-123458).

c. Tabulation showing which key fits which door.

d. Copy of floor plan showing doors and door numbers.

e. Listing of 20 percent more key cuts than are presently required in each master system.

1.5 QUALITY ASSURANCE

1.5.1 Hardware Manufacturers and Modifications

Provide, as far as feasible, locks, hinges, and closers of one lock, hinge, or closer manufacturer's make. Modify hardware as necessary to provide features indicated or specified.

1.5.2 Hardware Coordination and Keying Meeting

Prior to the submission of the hardware shop drawing, the Contracting Officer, Contractor, Door Hardware subcontractor, using Activity and Base Locksmith shall meet to discuss coordination of Government furnished hardware and key requirements for the facility.

1.6 DELIVERY, STORAGE, AND HANDLING

Deliver hardware in original individual containers, complete with necessary appurtenances including fasteners and instructions. Mark each individual container with item number as shown in hardware schedule. Deliver permanent keys and removable cores to the Contracting Officer, either directly or by certified mail. Deliver construction master keys with the locks.

PART 2 PRODUCTS

2.1 TEMPLATE HARDWARE

Provide hardware to be applied to metal or to prefinished doors manufactured to template. Promptly furnish template information or templates to door and frame manufacturers. Conform to ANSI/BHMA A156.7 for template hinges. Coordinate hardware items to prevent interference with other hardware.

SECTION 08 71 00 Page 5

2.2 HARDWARE FOR FIRE DOORS AND EXIT DOORS

Provide all hardware necessary to meet the requirements of NFPA 80 for fire doors and NFPA 101 for exit doors, as well as to other requirements indicated, even if such hardware is not specifically mentioned under paragraph entitled "Hardware Sets." Provide the label of Underwriters Laboratories, Inc. for such hardware listed in UL Bld Mat Dir or labeled and listed by another testing laboratory acceptable to the Contracting Officer.

2.3 HARDWARE FOR SOUND RATED DOORS

Seals, hinges, and thresholdS for sound rated door assemblies shall be provided by the door assembly manufacturer to ensure a complete performance guaranteed acoustical assembly. Balance of door hardware shall be per paragraph entitled "Hardware Sets" and as specified here-in. Coordinate locks, exit devices, and other hardware items to maintain door manufacturer's sound rating.

2.4 HARDWARE ITEMS FOR STANDARD DOORS

Clearly and permanently mark with the manufacturer's name or trademark, hinges, pivots, locks, latches, exit devices, bolts and closers where the identifying mark will be visible after the item is installed. For closers with covers, the name or trademark may be beneath the cover.

2.4.1 Hinges

2.4.1.1 Butt Hinges

ANSI/BHMA A156.1, 4-1/2 by 4-1/2 inch unless otherwise indicated.

Construct loose pin hinges for exterior doors and reverse-bevel interior doors so that pins will be nonremovable when door is closed. Other antifriction bearing hinges may be provided in lieu of ball-bearing hinges.

2.4.1.2 Continuous Hinges

ANSI/BHMA A156.26, concealed gear type with nonremoveable pin. Finish of hinge shall match finish on door.

2.4.2 Locks and Latches

2.4.2.1 Bored Locks and Latches

ANSI/BHMA A156.2, Series 4000, Grade 1.

2.4.2.2 Combination Locks

ANSI/BHMA A156.5, Heavy-duty, mechanical combination lockset with five pushbuttons, standard-sized lever, 3/4 inch deadlocking latch, 2-3/4 inch backset. Operate the locks by pressing two or more of the buttons in unison or individually in the proper sequence. Inside lever will operate the latch. Provide a keyed cylinder on the interior to permit setting the combination.

2.4.2.3 High Security Combination Locks and Latches

Doors requiring high-security combination locks will be equipped with a

SECTION 08 71 00 Page 6 built-in GSA-approved combination lock meeting Federal Specifications FF-L-2740B such as the Kaba Mas CDX-10.

2.4.3 Exit Devices

Detex brand exit devices model V40xEBxCD will be Government furnished Contractor installed.

2.4.4 Cylinders and Cores

Provide cylinders for new locks, including locks provided under other sections of this specification. Provide cylinders which are fully compatible with products of the Best Lock Corporation with interchangeable cores which are removable by a special control key. Factory set the cores with seven pin tumblers using the A4 system and D keyway. Submit a core code sheet with the cores. Provide master keyed cores in one system for this project. Provide construction interchangeable cores.

2.4.5 Keying System

***Amendment 0004*** Provide an extension of the existing keying system. Provide key cabinet as specified.

***Amendment 0004***

2.4.6 Lock Trim

Cast, forged, or heavy wrought construction and commercial plain design.

2.4.6.1 Lever Handles

Provide lever handles in lieu of knobs. Provide lever handle locks with a breakaway feature (such as a weakened spindle or a shear key) to prevent irreparable damage to the lock when force in excess of that specified in ANSI/BHMA A156.13 is applied to the lever handle. Provide solid, curved lever handles that return to within 1/2 inch of the door face.

2.4.6.2 Texture

Provide knurled or abrasive coated knobs or lever handles for doors which are accessible to blind persons and which lead to dangerous areas.

2.4.7 Keys

Furnish one file key, one duplicate key, and one working key for each key change and for each master keying system. Furnish one additional working key for each lock of each keyed-alike group. Furnish 10 construction master keys, and 2 control keys for removable cores. Furnish a quantity of key blanks equal to 20 percent of the total number of file keys. Stamp each key with appropriate key control symbol and "U.S. property - Do not duplicate." Do not place room number on keys.

2.4.8 Door Bolts

ANSI/BHMA A156.16. Flush bolts type L04081, provide dustproof strikes for bottom bolts. Dutch door bolts type L04161.

SECTION 08 71 00 Page 7

2.4.9 Closers

ANSI/BHMA A156.4, Series C02000, Grade 1, with PT 4C. Provide with brackets, arms, mounting devices, fasteners, full size covers, except at storefront mounting, and other features necessary for the particular application. Size closers in accordance with manufacturer's recommendations, or provide multi-size closers, Sizes 1 through 6, and list sizes in the Hardware Schedule. Provide manufacturer's 10 year warranty.

2.4.9.1 Identification Marking

Engrave each closer with manufacturer's name or trademark, date of manufacture, and manufacturer's size designation located to be visible after installation.

2.4.10 Closer Holder-Release Devices

BHMA A156.15. Use type C00011 where indicated.

2.4.11 Door Trim

ANSI/BHMA A156.6.

2.4.11.1 Kick Plates

2 inch less than door width for single doors; one inch less than door width for pairs of doors. Provide 10 inch kick plates for flush doors, made from .050 inch thick stainless steel and beveled on all four sides.

2.4.11.2 Push Plates

4 inch by 16 inch made from .050 inch thick stainless steel and beveled on all four sides.

2.4.11.3 Pull Plates

4 inch by 16 inch made from .050 inch thick stainless steel and beveled on all four sides with 8 inch tubular, straight pull bar.

2.4.12 Door Stops and Silencers

ANSI/BHMA A156.16. Silencers Type L03011. Provide three silencers for each single door, two for each pair. Door stops Type L02251. Mounting shall be per manufacturer's recommendations for specific wall substrate.

2.4.13 Thresholds

ANSI/BHMA A156.21. Use J35100, with vinyl or silicone rubber insert in face of stop, for exterior doors opening out, unless specified otherwise.

2.4.14 Weather Stripping Gasketing

BHMA A156.22. Provide a set to include head and jamb seals, type R0Y155 of silicone or thermo-plastic elastomer; sweep strips, type R3A356; and, for pairs of doors, astragals, type R3A835. Air leakage of weather stripped doors not to exceed 1.25 cubic feet per minute of air per square foot of door area when tested in accordance with ASTM E283.

SECTION 08 71 00 Page 8

2.4.15 Lightproofing Gasketing

BHMA A156.22. Include adjustable doorstops at head and jambs and an automatic door bottom per set, both of extruded aluminum, clear (natural) anodized, surface applied, with vinyl fin seals between plunger and housing. Provide doorstops with solid neoprene tube, silicone rubber, or closed-cell sponge gasket. Furnish door bottoms with adjustable operating rod and silicone rubber or closed-cell sponge neoprene gasket. Doorstops mitered at corners. For pairs of door provide meeting stiles type, split overlapping astragal, applied to door face at lock stiles. Provide the type and function designation where specified in paragraph entitled "Hardware Sets".

2.4.16 Fire Rated Gasketing

BHMA A156.22. Provide a set to include head and jamb seals, type R0Y155 of silicone or thermo-plastic elastomer; and, for pairs of doors, astragals, type R3A835.

2.4.17 Rain Drips

Extruded aluminum, not less than 0.08 inch thick, clear anodized. Set drips in sealant and fasten with stainless steel screws.

2.4.17.1 Door Rain Drips

Approximately 1-1/2 inch high by 5/8 inch projection. Align bottom with bottom edge of door.

2.4.17.2 Overhead Rain Drips

Approximately 1-1/2 inch high by 2-1/2 inch projection, with length equal to overall width of door frame. Align bottom with door frame rabbet.

2.4.18 Special Tools

Provide special tools, such as spanner and socket wrenches and dogging keys, required to service and adjust hardware items.

2.5 FASTENERS

Provide fasteners of proper type, quality, size, quantity, and finish with hardware. Provide stainless steel or nonferrous metal fasteners that are exposed to weather. Provide fasteners of type necessary to accomplish a permanent installation.

2.6 FINISHES

ANSI/BHMA A156.18. Provide hardware in BHMA 630 finish (satin stainless steel), unless specified otherwise. Provide items not manufactured in stainless steel in BHMA 626 finish (satin chromium plated) over brass or bronze, except aluminum paint finish for surface door closers, and except BHMA 652 finish (satin chromium plated) for steel hinges. Provide hinges for exterior doors in stainless steel with BHMA 630 finish or chromium plated brass or bronze with BHMA 626 finish. Furnish exit devices in BHMA 626 finish in lieu of BHMA 630 finish. Match exposed parts of concealed closers to lock and door trim. Match hardware finish for aluminum doors to the doors.

SECTION 08 71 00 Page 9

2.7 KEY CABINET AND CONTROL SYSTEM

ANSI/BHMA A156.5. Type required to yield a capacity (number of hooks) 50 percent greater than the number of key changes used for door locks.

PART 3 EXECUTION

3.1 INSTALLATION

Install hardware in accordance with manufacturers' printed installation instructions. Fasten hardware to wood surfaces with full-threaded wood screws or sheet metal screws. Provide machine screws set in expansion shields for fastening hardware to solid concrete and masonry surfaces.

Provide toggle bolts where required for fastening to hollow core construction. Provide through bolts where necessary for satisfactory installation.

3.1.1 Weather Stripping Installation

Handle and install weather stripping to prevent damage. Provide full contact, weather-tight seals. Weather stripping shall be installed such that doors operate without binding.

3.1.2 Lightproofing and Fire Rated Gasketing Installation

Handle and install gasketing to prevent damage. Provide full contact seals. Gasketing shall be installed such that doors operate without binding.

3.1.3 Threshold Installation

Extend thresholds the full width of the opening and notch end for jamb stops. Set thresholds in a full bed of sealant and anchor to floor with cadmium-plated, countersunk, steel screws in expansion sleeves.

3.2 FIRE DOORS AND EXIT DOORS

Install hardware in accordance with NFPA 80 for fire doors, NFPA 101 for exit doors.

3.3 HARDWARE LOCATIONS

SDI/DOOR A250.8, unless indicated or specified otherwise.

a. Kick Plates: Push side of single-acting doors. Bottom flush with bottom of door.

3.4 KEY CABINET AND CONTROL SYSTEM

Locate where directed by Contracting Officer. Tag one set of file keys and one set of duplicate keys. Place other keys in appropriately marked envelopes, or tag each key. Furnish complete instructions for setup and use of key control system. On tags and envelopes, indicate door and room numbers or master or grand master key.

3.5 FIELD QUALITY CONTROL

After installation, protect hardware from paint, stains, blemishes, and other damage until acceptance of work. Submit notice of testing 15 days