SPECIFICATIONS - VOLUME 1

View the file

Other files

File Type Posted
W912PM16-R-0005_Amendment_0007.pdf PDF
W912PM16-R-0005_Amendment_0007_Conform_Copy.pdf PDF
W912PM-16-R-0005-0006_PN76513_SOF_Special_Tactics_Facility-Phase_2.pdf PDF
PN76513Amd0006Vol4Plans.pdf PDF
PN76513Amd0006Vol3Plans.pdf PDF
W912PM-16-R-0005-0006_PN76513_Conformed_Copy.pdf PDF
PN76513Amd0006Vol2Plans.pdf PDF
PN76513Amd0006Vol1Plans.pdf PDF
W912PM-16-R-0005-0005_PN76513_SOF_Special_Tactics_Facility__Phase_2.pdf PDF
PN76513Amd0004Vol1Plans.zip ZIP file
PN76513Amd0004Vol3Plans.zip ZIP file
W912PM-16-R-0005-0004.pdf PDF
PN76513Amd0004Vol2Plans.zip ZIP file
PN76513Amd0004Vol4Plans.zip ZIP file
W912PM-16-R-0005_Amend_0003.pdf PDF
Conform_Copy_W912PM-16-R-0005_Amend_0003.pdf PDF
AMD_0003_PLANS_Vol1.zip ZIP file
AMD_0003_PLANS_Vol4_3A-471.pdf PDF
AMD_0003_PLANS_Vol3_2A-610.pdf PDF
PPQ_NAVFAC-USACE.pdf PDF
PN76513Amd0002Vol1Plans.pdf PDF
Amendment_0002.pdf PDF
Amendment_0002_Drawing_dgn.zip ZIP file
9June-Site_Visit_Attendance_Sheet.pdf PDF
3June_Site-Visist.pdf PDF
W912PM-16-R-0005-_0001__PN76513_SOF_Special_Tactics_Facility_Phase_2_ATF.pdf PDF
PN_76513 _SOF_SPECIAL_TACTICS_FACILITY _PHASE_2_-_DRAWINGS_VOLUME_2.pdf PDF
2016-05-04_STG_Complex_Ft_Bragg_V3.pdf PDF
PN_76513 _SOF_SPECIAL_TACTICS_FACILITY _PHASE_2_-_DRAWINGS_VOLUME_1.pdf PDF
PN_76513 _SOF_SPECIAL_TACTICS_FACILITY _PHASE_2_-_DRAWINGS_VOLUME_4.pdf PDF
2016-05-04_STG_Complex_Ft_Bragg_V2.pdf PDF
PN_76513 _SOF_SPECIAL_TACTICS_FACILITY _PHASE_2_-_DRAWINGS_VOLUME_3.pdf PDF
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFP No. W912PM-16-R-0005

SOF Special Tactics Facility, Phase 2

PN: 76513

Fort Bragg, North Carolina

Specifications – Volume 1 of 3

May 2016

*IMPORTANT: THIS CONTRACT MUST COMPLY

WITH THE 2014 EDITION OF THE EM 385-1-1

*** ***FOR OFFICIAL USE ONLY

Specifications - Volume 1

READY TO ADVERTISE

May 9, 2016

Wilmington District prepared for

Solicitation #: W912PM-16-R-0005

PN #: 76513

M&H Project #: 0142.01

Fort Bragg, NC

SOF Special Tactics Facility, Phase 2

SOF SPECIAL TACTICS FACILITY, PHASE 2 PN 76513

FT. BRAGG W912PM-16-R-0005

PROJECT TABLE OF CONTENTS

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

STANDARD FORM 1442

00 10 00 SOLICITATION, CONTRACT LINE ITEM NUMBER (CLIN) SCHEDULE

00 21 16 INSTRUCTIONS TO PROPOSERS

00 45 00 REPRESENTATIONS AND CERTIFICATIONS

00 70 00 CONDITIONS OF THE CONTRACT

00 73 00 SUPPLEMENTARY CONDITIONS

DIVISION 01 - GENERAL REQUIREMENTS

01 00 60 JSOC SECURITY

01 10 00.10 38 SUPPLEMENTARY SPECIAL CONTRACT REQUIREMENTS

01 11 00 SUMMARY OF WORK

01 14 00 WORK RESTRICTIONS

01 30 00 ADMINISTRATIVE REQUIREMENTS

01 32 01.00 10 PROJECT SCHEDULE

01 33 00 SUBMITTAL PROCEDURES

01 33 29.00 37 SUSTAINABILITY

01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS

01 42 00 SOURCES FOR REFERENCE PUBLICATIONS

01 45 00.00 10 QUALITY CONTROL

01 45 00.10 10 QUALITY CONTROL SYSTEM (QCS)

01 45 35 SPECIAL INSPECTIONS

01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS

01 57 16 TEMPORARY PEST CONTROL

01 57 19.37 INDOOR AIR QUALITY (IAQ) MANAGEMENT

01 57 20.00 06 ENVIRONMENTAL PROTECTION AND PERMITS

01 57 23 TEMPORARY STORM WATER POLLUTION CONTROL

01 62 35 RECYCLED/RECOVERED/BIOBASED MATERIALS

01 74 19.37 CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT

01 78 00 CLOSEOUT SUBMITTALS

01 78 23 OPERATION AND MAINTENANCE DATA

01 91 00.00 37 COMMISSIONING

DIVISION 03 - CONCRETE

03 11 13.00 10 CONCRETE FORMING

03 15 00.00 10 CONCRETE ACCESSORIES

03 20 00.00 10 CONCRETE REINFORCING

03 30 00.00 10 CAST-IN-PLACE CONCRETE

03 35 00.00 10 CONCRETE FINISHING

03 39 00.00 10 CONCRETE CURING

03 40 00.00 10 PLANT-PRECAST CONCRETE PRODUCTS FOR BELOW GRADE

CONSTRUCTION

DIVISION 04 - MASONRY

04 20 00 MASONRY

DIVISION 05 - METALS

05 12 00 STRUCTURAL STEEL

05 21 16 LONGSPAN STEEL JOIST FRAMING

05 21 19 OPEN WEB STEEL JOIST FRAMING

05 21 23 STEEL JOIST GIRDER FRAMING

PROJECT TABLE OF CONTENTS Page 1

05 30 00 STEEL DECKS

05 40 00 COLD-FORMED METAL FRAMING

05 50 13 MISCELLANEOUS METAL FABRICATIONS

05 51 00 METAL STAIRS

05 51 33 METAL LADDERS

05 52 00 METAL RAILINGS

DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES

06 10 00 ROUGH CARPENTRY

06 20 00 FINISH CARPENTRY

06 41 16.00 10 LAMINATE CLAD ARCHITECTURAL CASEWORK

06 61 16 SOLID POLYMER (SOLID SURFACING) FABRICATIONS

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 05 23 PRESSURE TESTING AN AIR BARRIER SYSTEM FOR AIR TIGHTNESS

07 13 53 ELASTOMERIC SHEET WATERPROOFING

07 21 13 BOARD AND BLOCK INSULATION

07 21 16 MINERAL FIBER BLANKET INSULATION

07 21 29 SPRAYED INSULATION

07 22 00 ROOF AND DECK INSULATION

07 26 10 SELF-ADHERING AIR AND VAPOR BARRIER

07 27 10.00 10 BUILDING AIR BARRIER SYSTEM

07 42 63 FABRICATED WALL PANEL ASSEMBLIES

07 52 00 MODIFIED BITUMINOUS MEMBRANE ROOFING

07 60 00 FLASHING AND SHEET METAL

07 61 14.00 20 STEEL STANDING SEAM ROOFING

07 84 00 FIRESTOPPING

07 92 00 JOINT SEALANTS

DIVISION 08 - OPENINGS

08 11 13 STEEL DOORS AND FRAMES

08 14 00 WOOD DOORS

08 33 23 OVERHEAD COILING DOORS

08 34 59 ARMORY DOORS

08 34 73 SOUND CONTROL DOOR ASSEMBLIES

08 35 13.26 HORIZONTAL SLIDING, ACCORDION-TYPE FIRE OR SMOKE DOORS

08 41 13 ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS

08 45 00 INSULATED TRANSLUCENT WALL AND ROOF PANEL SYSTEMS

08 71 00 DOOR HARDWARE

08 81 00 GLAZING

08 91 00 METAL WALL LOUVERS

DIVISION 09 - FINISHES

09 06 90 COLOR SCHEDULE

09 22 00 SUPPORTS FOR PLASTER AND GYPSUM BOARD

09 29 00 GYPSUM BOARD

09 30 13 CERAMIC TILING

09 51 00 ACOUSTICAL CEILINGS

09 62 38 STATIC-CONTROL FLOORING

09 65 00 RESILIENT FLOORING

09 65 66 RESILIENT ATHLETIC FLOORING

09 67 23.13 01 STANDARD RESINOUS FLOORING

09 67 66 FLUID APPLIED ATHLETIC FLOORING

09 68 00 CARPETING

09 69 13 RIGID GRID ACCESS FLOORING

PROJECT TABLE OF CONTENTS Page 2

09 77 20 FIBERGLASS REINFORCED WALL PANELS

09 83 13 ACOUSTICAL WALL TREATMENT

09 90 00 PAINTS AND COATINGS

09 96 00 HIGH-PERFORMANCE COATINGS

DIVISION 10 - SPECIALTIES

10 10 00 VISUAL COMMUNICATIONS SPECIALTIES

10 14 00.20 INTERIOR SIGNAGE

10 14 01 EXTERIOR SIGNAGE

10 21 13 TOILET COMPARTMENTS

10 22 13.00 48 WIRE MESH PARTITIONS

10 22 39 FOLDING PANEL PARTITIONS

10 26 13 WALL AND CORNER GUARDS

10 28 13 TOILET ACCESSORIES

10 44 16 FIRE EXTINGUISHERS

10 51 13 METAL LOCKERS

10 51 26 PLASTIC LOCKERS AND BENCHES

DIVISION 11 - EQUIPMENT

11 13 10 DOCK LEVELERS

DIVISION 13 - SPECIAL CONSTRUCTION

13 15 00 SWIMMING POOL SYSTEMS

13 17 20 TREADMILL THERAPEUTIC TREATMENT POOL

13 17 30 POLAR PLUNGE THERAPEUTIC TREATMENT POOLS

13 17 40 THERMAL THERAPEUTIC TREATMENT POOLS

DIVISION 14 - CONVEYING EQUIPMENT

14 24 00 HYDRAULIC ELEVATORS

DIVISION 21 - FIRE SUPPRESSION

21 13 13.00 10 WET PIPE SPRINKLER SYSTEM, FIRE PROTECTION

21 22 00.00 10 CLEAN AGENT FIRE EXTINGUISHING SYSTEMS

DIVISION 22 - PLUMBING

22 00 00 PLUMBING, GENERAL PURPOSE

22 15 13.16 40 HIGH-PRESSURE COMPRESSED-AIR PIPING, PIPING COMPONENTS,

AND VALVES, STAINLESS

22 15 14.00 40 GENERAL SERVICE COMPRESSED-AIR SYSTEMS, LOW PRESSURE

DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)

23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS

23 05 15 COMMON PIPING FOR HVAC

23 05 48.00 40 VIBRATION AND SEISMIC CONTROLS FOR HVAC PIPING AND

EQUIPMENT

23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC

23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS

23 09 23 LONWORKS DIRECT DIGITAL CONTROL FOR HVAC AND OTHER

BUILDING CONTROL SYSTEMS

23 64 26 CHILLED, CHILLED-HOT, AND CONDENSER WATER PIPING SYSTEMS

23 73 13.00 40 MODULAR INDOOR CENTRAL-STATION AIR-HANDLING UNITS

23 81 47 WATER-LOOP AND GROUND-LOOP HEAT PUMP SYSTEMS

PROJECT TABLE OF CONTENTS Page 3

23 82 00.00 20 TERMINAL HEATING AND COOLING UNITS

23 82 02.00 48 UNITARY HEATING AND COOLING EQUIPMENT

DIVISION 25 - INTEGRATED AUTOMATION

25 10 10 UTILITY MONITORING AND CONTROL SYSTEM (UMCS) FRONT END

AND INTEGRATION

DIVISION 26 - ELECTRICAL

26 20 00 INTERIOR DISTRIBUTION SYSTEM

26 23 00 SWITCHBOARDS AND SWITCHGEAR

26 29 23 VARIABLE FREQUENCY DRIVE SYSTEMS UNDER 600 VOLTS

26 32 14.00 10 DIESEL-GENERATOR SET, STATIONARY 15-300 KW, STANDBY

APPLICATIONS

26 32 15.00 10 DIESEL-GENERATOR SET STATIONARY 100-2500 KW, WITH

AUXILIARIES

26 36 00.00 10 AUTOMATIC TRANSFER SWITCH AND BY-PASS/ISOLATION SWITCH

26 41 00 LIGHTNING PROTECTION SYSTEM

26 51 00 INTERIOR LIGHTING WITH LED

DIVISION 27 - COMMUNICATIONS

27 05 14.00 10 CABLE TELEVISION PREMISES DISTRIBUTION SYSTEM

27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM

27 51 16 POOL AREA PUBLIC ADDRESS SYSTEMS

DIVISION 28 - ELECTRONIC SAFETY AND SECURITY

28 23 23.00 10 CLOSED CIRCUIT TELEVISION SYSTEMS

28 31 76 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM

DIVISION 31 - EARTHWORK

31 00 00 EARTHWORK

31 05 22.00 06 GEOTEXTILES USED AS FILTERS

31 11 00 CLEARING AND GRUBBING

31 31 16 SOIL TREATMENT FOR SUBTERRANEAN TERMITE CONTROL

DIVISION 32 - EXTERIOR IMPROVEMENTS

32 01 19 FIELD MOLDED SEALANTS FOR SEALING JOINTS IN RIGID

PAVEMENTS

32 05 33 LANDSCAPE ESTABLISHMENT

32 11 23 AGGREGATE AND/OR GRADED-CRUSHED AGGREGATE BASE COURSE

32 12 10 BITUMINOUS TACK AND PRIME COATS

32 12 11 BITUMINOUS SURFACE TREATMENT

32 12 16 HOT-MIX ASPHALT (HMA) FOR ROADS

32 13 13.06 PORTLAND CEMENT CONCRETE PAVEMENT FOR ROADS AND SITE

FACILITIES

32 16 13 CONCRETE SIDEWALKS AND CURBS AND GUTTERS

32 17 24.00 10 PAVEMENT MARKINGS

32 92 19 SEEDING

32 92 23 SODDING

32 93 00 EXTERIOR PLANTS

DIVISION 33 - UTILITIES

33 11 00 WATER DISTRIBUTION

PROJECT TABLE OF CONTENTS Page 4

33 30 00 SANITARY SEWERS

33 40 00 STORM DRAINAGE UTILITIES

33 46 13 FOUNDATION DRAINAGE SYSTEM

33 46 16 SUBDRAINAGE SYSTEM

33 61 00 PREFABRICATED UNDERGROUND HEATING/COOLING DISTRIBUTION

SYSTEM

33 70 02.00 10 ELECTRICAL DISTRIBUTION SYSTEM, UNDERGROUND

33 82 00 TELECOMMUNICATIONS OUTSIDE PLANT (OSP)

DIVISION 41 - MATERIAL PROCESSING AND HANDLING EQUIPMENT

41 22 23.19 PARALOFT HOISTS

41 22 23.20 DIVING TOWER HOISTS

-- End of Project Table of Contents --

PROJECT TABLE OF CONTENTS Page 5

W912PM-16-R-0005 Construct SOF Special Tactics Facility Phase 2, Fort Bragg, NC.

This procurement is being solicited and procured using the Best Value Performance Price Trade-Off Request for Proposal in accordance w ith FAR Part 15.101-1. The is an unrestricted solicitation.

The Magnitude of Construction is betw een $25,000,000.00 and $100,000,000.00.

Point of Contact:

Michael Mullen michael.m.mullen@usace.army.mil 910-251-4710

JOHN T HILL 910-251-4451

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS

NEGOTIATED

25-May-2016

(RFP)

(IFB)

X

CALL:

SOF Special Tactics Facility Phase 2

B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

See Item 7

2. TYPE OF SOLICITATION

SEALED BID

3. DATE ISSUED

9. FOR INFORMATION A. NAME

SOLICITATION

NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)

Prescribed by GSA

FAR (48 CFR) 53.236-1(e)

11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________820 calendar days after receiving aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________Sec. 00 73 00

12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

X YES NO

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and __________0 copies to perform the w ork required are due at the place specified in Item 8 by ___________ local time ______________ (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.

shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

B. An offer guarantee X is, is not required.

C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than _______180 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

7. ISSUED BY CODE

U S ARMY CORPS OF ENGINEERS

WILMINGTON DISTRICT

ATTN: JOHN HILL

69 DARLINGTON AVE

WILMINGTON NC 28403-1343

W912PM

PAGE OF PAGES

1 OF

CODE

(Title, identifying no., date):

12B. CALENDAR DAYS

(hour)

Sealed envelopes containing offers

5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.

76513

8. ADDRESS OFFER TO (If Other Than Item 7)

910-251-4454FAX:TEL: 910-251-4451 TEL: FAX:

W912PM-16-R-0005 88

20B. SIGNATURE

(REV. 4-85)STANDARD FORM 1442 BACK

TO SIGN

NSN 7540-01-155-3212

SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)

CODE FACILITY CODE

17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.

the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)

AMOUNTS SEE SCHEDULE OF PRICES

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN

OFFER (Type or print)

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

(4 copies unless otherwise specified)

CODE

(Insert any number equal to or greater than

20C. OFFER DATE

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY

(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)

See Item 14

(Include only if different than Item 14)16. REMITTANCE ADDRESS

30B. SIGNATURE

29. AWARD (Contractor is not required to sign this document.)

document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .

gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)

30C. DATE

(Type or print)

TEL: EMAIL:

31B. UNITED STATES OF AMERICA 31C. AWARD DATE

BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this28. NEGOTIATED AGREEMENT

(M ust be fully completed by offeror)OFFER

W912PM-16-R-0005

Section 00 00 00 - Procurement and Contracting Requirements

DB WAGE DETERMINATIONS

IAW 52.222-6 – Construction Wage Rate Requirements, the following Davis-Bacon Wage Determinations apply to this solicitations and any resulting contract award:

NC160034 - 01/08/2016

NC160081 - 01/08/2016

NC160103 - 01/08/2016

Offerors are reminded that wage determinations are subject to change prior to award. All proposed pricing shall include the most current wage rates. All Offerors are encouraged to review wage rates established by the Department of Labor prior to submitting proposals. Wage Determinations are available for viewing by using the following link:

http://www.wdol.gov/ If a Contractor plans on employing positions not covered by the Wage Determinations, it is the responsibliity of the contractor to request a Wage Determination through the Department of Labor via the above hyperlink.

Further information on Davis Bacon Wage Determinations are outlined in Specification section 01 10 00.10 38

SCOPE OF WORK

Description of Work:

See Description at 1.1 Requirements & Instructions

SITE VISIT INFORMATION

FAR Clause 52.236-27, Site Visit (Construction), two organized site visit will be held on June 3rd 2016, at 10:00 am EST and June 9th 2016 at 10:00 am EST.

No individual escorts will be allowed. The site visit kick off briefing will be held at the ATF visitors center. (Map provided below, also see plans). Upon completion of the kick off briefing, all participants will board Government transport vehicle and depart to the site of construction.

All participants must board the Government transport vehicle in order to visit the construction site, as Privately Owned Vehicles will not be allowed into the high security compound. Offeror’s are limited to three (3) participants total from their entire team (including subcontractors) to attend the site visit. In order to enter the high security compound, each participant shall bring a government issued photo identification document (i.e. driver’s license, military I.D. etc.) and social security card Upon arrival to the high security compound, each participant will be searched and have identification verified. Without these forms of identification, participants will not be allowed to enter the high security compound. While inside the compound, site visit participants must be escorted at all times. Upon completion of the site visit, participants will be processed out of the compound accordingly. No guns, knives, weapons, or electronic devices will be allowed in the high security compound, to include cameras, cell phones, laptops, and blackberries. There will be a sign-in roster at both locations.

TECHNICAL MATTERS

Technical inquiries and questions relating to proposal procedures or bonds shall be submitted via Bidder Inquiry in ProjNet at www.projnet.org\projnet.

Offerors shall not submit their proposals via ProjNet. Any questions regarding acceptable means of submitting offers shall be made directly to the Contract Specialist identified in the solicitation.

To submit and review bid inquiry items, bidders will need to be a current registered user or self-register into system. To self-register go to web page, click BID tab select Bidder Inquiry, select agency USACE, enter Key for this solicitation listed below, and your e-mail address, click login.

Fill in all required information and click create user. Verify that information on next screen is correct and click continue. From this page you may view all bidder inquiries or add inquiry.

Bidders will receive an acknowledgement of their question via email, followed by an answer to their question after it has been reviewed and response approved by the Contracting Officer.

i. The Solicitation Number is: W912PM-16-R-0005

ii. The Bidder Inquiry Key is: TW9C6Q-QU3H93

Bidders/Offerors are requested to review the specification in its entirety and to review the Bidder Inquiry System for answers to questions prior to submission of a new inquiry. The name of the submitter or firm is not published for the public on the report of all Bidder Inquiries. Bidders/ Offerors are on notice of, and assumed to be aware of, all inquiries, responses, and information posted in the Bidder Inquiry System up to the date of bid submission, whether the inquiry was generated by the Bidder themselves or another potential Bidder/Offeror.

Government responses to technical inquiries and questions relating to proposal procedures or bonds that are submitted to ProjNet in accordance with the procedures above are not binding on the Government unless an amendment to the solicitation is issued on Standard Form 30. In the case of any conflicts, the solicitation governs. Any changes or revisions to the solicitation will be made by formal amendment.

The ability to enter technical inquiries and questions relating to proposal procedures or bonds will be disabled ten (10) calendar days prior to the closing date stated in the solicitation. The Government reserves the right to not respond to questions/inquiries received after this date. No inquiries will be accepted by the Bidder Inquiry system within ten (10) calendar days prior to the date of bid opening. However, the Bidder Inquiry system may still be accessed to view answers/replies to previous inquiries until the proposal due date.

ATOPSEC

A REVIEW OF CONTRACT REQUIREMENTS FOR ANTITERRORISM/OPERATIONS SECURITY FOR THIS SOLICITATION

INCLUDE:

1. AT Level I Training. This provision/contract text is for contractor employees with an area of performance within an Army controlled installation, facility or area. All contractor employees, to include subcontractor employees, requiring access to Army installations, facilities and controlled access areas shall complete AT Level I awareness training within 30 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. The contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee, to the COR or to the contracting officer, if a COR is not assigned, within 5 calendar days after completion of training by all employees and subcontractor personnel. AT Level I awareness training is available at the following website: https://atlevel1.dtic.mil/at.

2. Access and General Protection/Security Policy and Procedures. This standard language text is for contractor employees with an area of performance within an Army controlled installation, facility or area.

Contractor and all associated sub‐contractors employees shall comply with applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative). The contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes.

3. iWATCH Training. This standard language is for contractor employees with an area of performance within an Army controlled installation, facility or area.The contractor and all associated sub‐contractors shall brief all employees on the local iWATCH program (training standards provided by the requiring activity ATO). This local developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR. This training shall be completed within 30 calendar days of contract award and within 30 calendar days of new employees commencing performance with the results reported to the COR NLT 5 calendar days after contract award.

4. For Contracts that Require OPSEC Training. Per AR 530‐1, Operations Security, new contractor employees must complete Level I OPSEC training within 30 calendar days of their reporting for duty. All contractor employees must complete annual OPSEC awareness training.

5. Eligibility Verification for Employment. E‐Verify is an Internet‐based system that compares information from an employee's Form I‐9, EmploymentEligibility Verification, to data from U.S. Department of Homeland Security and Social Security Administration records to confirm employment eligibility. The U.S.

Department of Homeland Security is working to stop unauthorized employment. By using E‐Verify to determine the employment eligibility of their employees, companies become part of the solution in addressing this problem. All U.S. employers must complete and retain a Form I‐9 for each individual they hire for employment in the United States. This includes citizens and noncitizens. On the form, the employer must examine the employment eligibility and identity document(s) an employee presents to determine whether the document(s) reasonably appear to be genuine and relate to the individual and record the document information on the Form I‐9. The list of acceptable documents can be found on the last page of the form. E‐Verify is mandatory for employers with federal contracts or subcontracts that contain the Federal Acquisition Regulation E‐Verify clause.

REQUIREMENTS & INSTRUCTIONS

GENERAL PROPOSAL SUBMISSION AND TABBING REQUIREMENTS

PN76513

SOF Special Tactics Facility, Phase 2 Fort Bragg, NC

1. OVERVIEW.

1.1 This Request for Proposal (RFP) solicits construction of a new two-story headquarters building of approximately 3,686 SM (39,700 SF), two-story medical training facility of approximately 2,908 SM (31,300 SF) and a two story combat support training facility of approximately 4,202 SM (45,200 SF) to serve as the group headquarters facility, medical training facility and combat training facility respectively at Aberdeen Training Facility (ATF).

The headquarters building functional areas include command suite, Operations suites, auditorium, conference rooms, cages, communications, latrines and electrical/mechanical spaces.

The medical training facility functional areas include administrative offices, flight and logistics training, trauma training, conference room, gym, latrines, communications and electrical spaces, mechanical rooms, automatic fire suppression systems, uninterrupted power service (UPS), security system and storage areas. The medical training building includes an aquatic training center of approximately 849 SM (9,140 SF) square feet. The combat support training building functional areas include leadership offices, supply, armory, parachute packing and drying tower, classrooms, aircrew support spaces, radio and computers, conference rooms, latrines, communications and electrical spaces, mechanical rooms, automatic fire suppression systems, uninterrupted power service (UPS), security system and storage areas. Support facilities include water, sanitary sewer, storm drainage, parking lots with access driveways, walks, curbs, electrical and communications systems, exterior lighting and landscaping. The Site Access Road includes approximately 1,780 linear feet of asphalt pavement, access control point (ACP) search lanes, traffic pattern routing at existing ACP, roundabout, associated sidewalks and storm drainage. Electric services include conditioned (isolated, filtered and regulated) power to service computers and computer based communications equipment. Protected wire distribution system will be provided from a manhole to the building. Anti-terrorism/Force protection measures and sustainment mandates will be incorporated. The resultant contract will be Firm-Fixed Price

(FFP).

1.2 The purpose of the Source Selection plan is to establish a uniform evaluation procedure for the technical evaluation of proposals by the Source Selection Evaluation Board (SSEB) and the development of the Best Value Decision by the Source Selection Authority (SSA) using the Trade-Off Process (See Federal Acquisition Regulation 15.101-1). The proposal shall describe the capability of the offeror to perform the contract. The proposal should be specific and complete in every detail as well as be prepared simply and economically, providing a straightforward and concise description of capabilities to satisfactorily perform the contract.

1.3 For the purposes of this solicitation, the Government will utilize a Price Performance Trade-off (PPT) Process. In the PPT process, interested offerors submit certain specified performance and capability proposals in conjunction with price proposals for review and consideration by the Government. The Government will evaluate these performance capability proposals in accordance with the criteria described herein.

2. GENERAL INSTRUCTIONS.

In accordance with FAR Clause 52.215-1, Instructions to Offerors – Competitive Acquisitions, the Government reserves the right to make award without discussions. Therefore, offerors should submit their best technical and price terms in their initial offer and not automatically assume that they will have an opportunity to participate in discussions or to submit a revised offer. The Government may make award of a conforming proposal without discussions, if deemed to be within the best interests of the Government.

In accordance with 15.306(c)(1) and FAR Clause 52.215-1(f)(4), Instructions to Offerors – Competitive Acquisitions,the Government reserves the right to conduct discussions if the Contracting Officer later determines them to be necessary. If the Contracting Officer determines that the number of proposals that would otherwise be in the competitive range exceeds the number at which an efficient competition can be conducted, the Contracting Officer may limit the number of proposals in the competitive range to the greatest number that will permit an efficient competition among the most highly rated proposals.

2.1 Contractor Team Arrangements. The Government will recognize the integrity and validity of contractor teaming arrangements, provided the arrangements are identified and company relationships are fully disclosed in the offer. As further described in paragraph 2.4, below, the Government will only evaluate the information submitted by the legal entity with whom the Government would enter into a contract. This is the legal entity represented in Tab E, as registered in System for Award Management (SAM) and identified by its specifically assigned CAGE Code.

2.3 If applicable, the offeror shall submit evidence from the offeror’s SBA Servicing Agency that the offeror has notified and discussed the proposed joint venture for this project with the appropriate SBA personnel. For 8(a) set- aside procurements, all prospective Joint Ventures must comply with Title 13 Code of Federal Regulations (CFR) Part 124.513. For HUBZone set- aside procurements and awards to HUBZone SBCs through full and open competition after a price evaluation preference in favor of qualified HUBZone SBCs, a Joint Venture must comply with

13 CFR 126.616.

2.4 Notwithstanding the specific requirements of any other area of the RFP, information submitted about any company other than the offeror, whether a predecessor company, affiliated company, subsidiary (including wholly owned subsidiaries), or subcontractor, WILL NOT be evaluated for any factor.

2.5 Offerors shall submit their proposal to the address shown in Block 7 of Standard Form 1442.

2.6 Proposals are due no later than the time and date specified in Block 13 of Standard Form 1442.

3. GENERAL PROPOSAL FORMAT.

3.1 Cover Page. Include the title of the solicitation, solicitation number, offeror name, and date of the submittal.

3.2 Table of Contents. Each Disc of the proposal shall contain a detailed table of contents. If more than one CD-ROM is used for a volume, the complete table of contents shall be included in each. Any materials submitted but not required by this solicitation (such as company brochures) shall be relegated to appendices.

3.3 All information intended to be evaluated as part of the Technical Proposal must be submitted as part of the Technical Proposal. Do not cross-reference similar material in the Price Proposal, or vice versa. No dollar amounts from the Price Proposal are to be included in the Technical proposal.

3.4 Each offeror must submit both a Price Proposal and a Technical Proposal. No hard paper copies will be accepted or evaluated. Both the Price Proposal and the Technical Proposal must be received by the closing date and time set for receipt of proposals. The Price Proposal and Technical Proposal must be submitted as separate (CD-ROM) Discs. No font size may be less than 12-point.

3.5 The contractor is responsible for including sufficient details in its proposal to permit a complete and accurate evaluation. Accordingly, the Contractor shall be clear and concise in its proposal. The Government will not make assumptions concerning the Contractor’s intent.

3.6 The technical data criteria specified for each factor identified herein and as described in these instructions shall be submitted as part of the proposal. Failure to submit all the data required by the RFP, and these instructions may be cause for determining a proposal incomplete and, therefore, not considered for award.

3.7 Do not include exceptions to the terms and conditions of the solicitation in either the technical or price proposal. Should the offer include any standard company terms and conditions that conflict with the terms and conditions of the solicitation, the offer may be determined “unacceptable” and thus ineligible for award. Should the offeror have any questions related to specific terms and conditions, these should be resolved prior to the submission of the offer.

3.8 Tabs. Proposal shall be organized and tabbed as follows:

3.8.1 Disc 1 - VOLUME I: Offerors Certifications and Price (Factor 5)

One (1) electronic copy (CD-ROM) shall be submitted and one (1) original copy of the bid guarantee in hardcopy only.

Electronic Requirements: Written portions of the proposal should be in MS Word, or Adobe Acrobat PDF. The submission shall be a single file tabbed as listed in the table below. The CD-

ROM must be clearly labeled by solicitation number, project name, installation, and offeror’s name.

TAB Table of Contents of the Offerors Certification and Price Proposal

A The Proposal Cover Sheet B Standard Form 1442 C Acknowledgement of Amendments (If Applicable) D Proposal Price Schedule E Section 00 45 00 – Representations and Certifications F Teaming Arrangement (If Applicable) G Bid Guarantee (Bid Bond) H Financial Information and Bonding Capability I Subcontracting Plan (FOR LARGE BUSINESSES ONLY)

TAB A – The proposal cover sheet is required by FAR 52.215-1 (c) (2) and must be submitted by all offerors. The format for the proposal cover sheet is as follows:

PROPOSAL COVER SHEET

1. The solicitation number;

2. The name, address, and telephone and facsimile numbers of the offeror (and electronic address if available);

3. A statement specifying the extent of agreement with all terms, conditions, and provisions included in the solicitation and agreement to furnish any or all items upon which prices are offered at the price set opposite each item;

4. Names, titles, and telephone and facsimile numbers (and electronic addresses if available) of persons authorized to negotiate on the offeror’s behalf with the Government in connection with this solicitation; and

5. Name, title, and signature of person authorized to sign the proposal. Proposals signed by an agent shall be accompanied by evidence of that agent’s authority, unless that evidence has been previously furnished to the issuing office.

See Attachment 1 provided at the end of this section. Offerors should ensure telephone number; fax number, e-mail address, DUNS number and CAGE Code are all included.

DUNS number will be used to access Contractor Performance Assessment Reporting System (CPARS) data. Offerors should also provide any other assigned number that identifies them in the CPARS database. If a separate DUNS has been created for a joint venture (J-V) it must be submitted. A DUNS number shall also be provided for each company identified in any other proposed association of firms or Contractor Team Arrangement. The offeror should also submit their Tax ID number on the proposal data sheet

TAB B - Standard Form 1442, completed and signed by authorized individual(s) of the offeror. Offers submitted in the name of a Joint Venture must be signed in accordance with the terms and conditions specified in the joint venture agreement as evidenced in the proposal.

TAB C - If applicable - All amendments must be acknowledged by all offerors and duly executed with an original signature by an official authorized to bind the company in accordance with FAR 4.102.

TAB D - Task order price schedule is to be completed in its entirety by all offerors. See Attachment 1.

TAB E - Section 00 45 00 – Representations and Certifications. Offerors shall include any narratives as it pertains to the requirement at 2.2 to document any teaming arrangement the offeror has or will enter into.

TAB F - Teaming Agreement, if applicable. See paragraph 2.2 and 2.3 Note to 8(a)—SBA must approve a joint venture agreement prior to the award of an 8(a) contract on behalf of the joint venture.

TAB G - Offerors shall provide a fully executed Bid Bond as required by FAR Clause 52.228-1, Bid Guarantee in both Hard copy and electronically in Tab G.

For purposes of this Request for Proposal, if the offeror represents the combining of two or more companies in a Contract Team Arrangement as defined in paragraph 2.2 above please note that in accordance with (IAW) FAR 25.001 Definitions:

“Bond means a written instrument executed by a bidder or contractor (the “principal”), and a second party (the “surety” or “sureties”) (except as provided in 28.204), to assure fulfillment of the principal’s obligations to a third party (the “obligee” or “Government”), identified in the bond. If the principal’s obligations are not met, the bond assures payment, to the extent stipulated, of any loss sustained by the obligee.”

Bonds shall therefore be executed in the name of the legal entity, whether a joint venture, partnership or the Prime Contractor of an informal teaming arrangement, with whom the government would enter into a contract for a successful offeror. The entity named on the bond must be able to acquire bonding capacity on its own merits, and not as the result of indemnification from a subcontractor or third party.

TAB H - Financial Information & Bonding Capability (e.g. past three years financial statements, annual reports, Dun & Bradstreet Ratings and/or number, etc.) Provide a list of all current contracts held, total dollar value, award date, anticipated completion, performance and payment bond amount.

TAB I - Subcontracting Plan – FOR LARGE BUSINESS OFFERORS ONLY.

Subcontracting Plan shall be prepared in accordance with FAR 52.219-9, and SBA’s Electronic Subcontracting Reporting System (eSRS) located at http://esrs.gov. Instructions for completion of requisite forms, as well as guidance on coordinating and preparing for all compliance reviews by Federal agencies can be found at this website. Offerors are to ensure subcontractors agree to submit to ESRS.

3.8.2 Disc 2 - VOLUME II: Technical Proposal (Factors 1-4)

One (1) electronic copy (CD-ROM).

Electronic Requirements: Written portions of the proposal should be in MS Word, or Adobe Acrobat PDF. The electronic version shall be a single file tabbed in the same order as the hard copy. Drawings should be in Adobe Acrobat PDF. Any portion of the proposal not available in electronic format, i.e. cut sheets, should be scanned in Adobe Acrobat PDF format. The CD- ROM must be clearly labeled by solicitation number, project name, installation, and offeror’s name.

TAB Table of Contents of Technical Proposal (Factors 1-4)

A Factor 1: Corporate Relevant Specialized Experience B Factor 2: Past Performance C Factor 3: Key Personnel D Factor 4: Small Business Participation Plan

3.8.3 Further Description of TABs A through D and further information of Factors 1, 2, 3, & 4 can be found in the subsequent sections (sections 4-8) of this the GENERAL PROPOSAL

SUBMISSION AND TABBING REQUIREMENTS.

4. TAB A—FACTOR 1 – CORPORATE RELEVANT SPECIALIZED EXPERIENCE.

4.1 SUBMISSION REQUIREMENTS:

4.1.1 The offeror shall demonstrate recent, relevant experience as the prime contractor on projects using Attachment 2 at the end of this section. Offerors may identify state and local government and private contracts that are similar to the Government’s requirements. If the offeror is a joint venture, or any other formal or informal teaming arrangement, only projects completed by the proposed prime entity may be submitted for evaluation. If any firm has multiple functions or divisions, limit the project examples to those performed by the division, unit or team member submitting the offer.

4.1.2 Projects must be deemed relevant to be considered for this procurement. Relevant projects are those projects which meet all of the minimum criteria specified in paragraph 4.1.2.1. The Government will not consider multiple projects such as individual task orders combined to meet the criteria referenced in 4.1.2.1 below. Projects which do not meet all of the minimum criteria specified shall be deemed not relevant and shall not be considered further. Relevant projects which meet some or all of the additional criteria specified in paragraph 4.1.2.2 may be given more weight by the Government in determining the appropriate rating.

4.1.2.1 Minimum Criteria:

4.1.2.1.1 Projects submitted by the offeror shall be projects where the offeror was the prime contractor.

4.1.2.1.2 Projects submitted by the offeror shall have a new construction and/or renovation value of no less than $20M.

Note: If the project is a combination of new construction and renovation, the value of the new construction and the value of the renovation work must total no less than $20M.

4.1.2.1.3 Projects shall have been successfully completed, or substantially completed (at least 50% construction progress completed) within six (6) years preceding the date of this Solicitation.

4.1.2.1.4 A minimum of two projects submitted shall include construction of a Sensitive Compartment Information Facility (SCIF) area within the building.

4.1.2.1.5 Projects shall involve vertical construction or renovation or combination of both types of work of at least 30,000 square feet of gross space.

4.1.2.2 Additional Criteria:

4.1.2.2.1 Projects may include new construction, renovation and addition or improvement to a multi-story facility.

4.1.2.2.2 Projects may include construction of a facility within high security-controlled area. A high security control area is defined as an area requiring armed security guard escort at all times, perimeter intrusion detection or access control measures, and contractor personnel require identification badges and are subject to random searches of vehicles, equipment and personnel.

4.1.2.2.3 Projects may include construction of a facility within an area that requires advanced site access coordination for all contractor personnel.

4.1.2.2.4 Projects may include new construction of 60,000 square feet of gross space or greater.

4.1.2.2.5 Projects may include construction of multiple buildings within a single project site.

4.1.2.2.6 Projects may include construction of a Sensitive Compartment Information Facility (SCIF) where the entire facility is a SCIF.

4.1.2.2.7 Proposals may include more than two submitted projects where Sensitive Compartment Information Facility (SCIF) construction is involved.

4.1.2.2.8 Projects may include construction of rooms with complex audio-visual infrastructure, equipment, and capabilities.

4.1.2.2.9 Projects may include construction of consolidated administrative offices, operational and planning areas.

4.1.2.2.10 Projects may include those of scope and complexity similar to the scope and complexity of the work set forth in the plans and specification of this solicitation.

4.1.3 Offerors shall submit no fewer than three (3) and no more than five (5) Project Information Sheets. For a project awarded as a task order or delivery order under an IDIQ type contract, offerors are cautioned to only submit information considered that is relevant to the specific requirements of this RFP. All projects shall be successfully completed, or substantially completed (fully designed and at least 50% construction progress completed) within six (6) years preceding the date of this Solicitation. At a minimum, Project Information Sheets shall provide all specific information that demonstrates compliance with the minimum criteria outlined in paragraph 4.1.2.1, as well as: the Project Point of Contact with telephone number, role and function performed on project, significance of role to overall project, project description (title), scope, location, cost (of specific contract action), and date of completion or anticipated completion date and percent constructed as of the date of the solicitation. Individual Project Information Sheets shall not exceed five (5) pages.

4.1.4 The experience of individuals will not be evaluated under this factor.

4.2 EVALUATION CRITERIA:

4.2.1 The Government will evaluate the extent of recent, relevant experience of the prime contractor as identified in paragraph 4.1.2. Projects that were awarded on an individual task/delivery order basis will not be aggregated for purposes of meeting minimum or additional criteria. Federal Government project experience will not be rated inherently more important than non-Federal Government project experience.

4.2.2 To be considered eligible for award, the Government will verify that each offeror has submitted a minimum of three (3) projects which meet the minimum criteria of paragraph

4.1.2.1. The offeror’s Corporate Relevant Specialized Experience will be evaluated based on the Government’s assessment of each submitted project’s similarity (in terms of size, scope and complexity) to the work described in this RFP.

4.2.3 The Government intends to give greater consideration to proposals that demonstrate experience with the additional criteria listed in paragraph 4.1.2.2 when assigning evaluation standards in accordance with paragraphs 9.1 through 9.4.

4.2.4 The Government reserves the right to verify the experience record of cited projects or other recent projects by reviewing the Contractor Performance Assessment Reporting System (CPARS), Past Performance Information Retrieval System (PPIRS), other DOD or Government appraisal systems or by contacting owners or references. The Government may check any or all cited references, or available uncited references, to verify supplied information.

4.2.5 The relevant experience of key personnel proposed for this project will not be evaluated or considered under this factor.

4.2.6 If the offeror is determined to have insufficient recent, relevant experience in accordance with the submission requirements of this RFP, the offeror will be considered ineligible for award.

5. TAB B—FACTOR 2 - PAST PERFORMANCE.

5.1 SUBMISSION REQUIREMENTS:

5.1.1 Past performance refers to the quality of recent, relevant project experience from the owner’s perspective. The offeror shall complete and provide a Past Performance Assessment Sheet (Attachment 3) on no fewer than three (3) and no more than five (5) projects. Projects submitted under this factor must first be deemed relevant in accordance with the minimum criteria specified in paragraph 4.1.2.1 and additional criteria in paragraph 4.1.2.2 before being evaluated for quality in accordance with the criteria specified in paragraph 5.3 and the evaluation standards set forth in paragraphs 9.2 and 9.3.

The offeror shall provide clear and adequate information in response to the past performance elements identified on Attachment 3. Though not required, ideally project past performance information submitted under this factor would be on the same projects submitted for consideration under Factor 1. Individual project Past Performance Assessment Sheets shall not exceed five (5) pages. If any firm has multiple functions or divisions, limit the project examples to those performed by the division, unit or team member submitting the offer. The Government will call and confirm information provided by the offeror on the Past Performance Assessment Sheet with the points of contact, to the extent necessary to conduct a meaningful evaluation. The Government reserves the right to interview other individuals if the point of contact is not available.

5.1.2 Other Sources. The Government may contact sources other than those provided by the offeror for information with respect to past performance. These other sources may include but are not limited to: Contract Performance Assessment Report (CPAR), Past Performance Information Retrieval System (PPIRS), other Government sources, and interviews with organizations or individuals familiar with the offeror’s performance.

5.1.3 The past performance of individuals will not be considered under this factor.

5.2 EVALUATION CRITERIA:

5.2.1 The Government will evaluate the offeror's past performance using the sources available to it including but not limited to: the example projects identified by the offeror and submitted on the Past Performance Assessment Sheets and any additional information received from references, PPIRS or other sources. Offerors may be provided an opportunity to address any negative past performance information about which the offeror has not previously had an opportunity to respond if such information is determined to present an impact on the rating to be assessed.

5.2.2 The Government will consider past performance of the prime construction contractor. If a firm has multiple functions or divisions, the Government will only evaluate the past performance of the unit or division submitting the offer. Where the Government views an offeror’s role, or that of its team members, if any, as not significant or as not clearly defined, the Government reserves the right to view this lack of involvement, or clarity, as a risk which may impact an offeror’s rating for this factor despite the quality of recent, relevant past performance information.

5.2.3 The Government will consider recent, relevant projects that are successfully completed, or substantially completed (fully designed and at least 50% construction progress completed) within six (6) years preceding the date of the solicitation. To be deemed relevant, projects must comply with minimum criteria in paragraph 4.1.2.1. The Government will consider the recency and relevance of the information, source of the information, context of the data, and general trends in contractor performance. The Government places higher value on projects for which successful performance can be validated by means other than the offeror’s self-assessment such as through independent telephone interviews with points of contact identified in the proposal, CCASS or other agency performance databases, offeror furnished references or personal knowledge. The Government places a higher value on projects which provided particularly difficult or unique challenges and the innovative methods the offeror used to resolve problems successfully.

5.2.4 Offerors are cautioned that the submission of each Past Performance Assessment Sheet shall not exceed five (5) pages and that Government evaluators will review and evaluate only the information contained on the first five pages.

5.3 The Government will evaluate recent, relevant past performance (as set forth in paragraph 9.2) based on the elements listed below to assign a confidence rating in accordance with paragraph 9.3:

5.3.1 Quality of Construction. The Government will evaluate all information available with respect to the quality of the actual construction undertaken and the standards of workmanship exhibited by the offeror.

5.3.2 Timeliness of Performance. The Government will evaluate all information available with respect to the completion of projects within the scheduled completion times.

5.3.3 Customer Satisfaction. The Government will evaluate all information available with respect to customer satisfaction, cooperation with customers, and interaction on past projects.

5.3.4 Subcontractor Management. The Government will evaluate all information available with respect to effective…