W912PM-16-R-0005-_0001__PN76513_SOF_Special_Tactics_Facility_Phase_2_ATF.pdf

PDF 64 KB Posted

Attached to
SOF Special Tactical Facility, Phase 2, at Fort Bragg, Aberdeen Training Facility, Hoke County, North Carolina
Solicitation number
W912PM-16-R-0005
Issued by

About this file

Amendment 0001

View the file

Other files

File Type Posted
W912PM16-R-0005_Amendment_0007.pdf PDF
W912PM16-R-0005_Amendment_0007_Conform_Copy.pdf PDF
W912PM-16-R-0005-0006_PN76513_SOF_Special_Tactics_Facility-Phase_2.pdf PDF
PN76513Amd0006Vol4Plans.pdf PDF
PN76513Amd0006Vol3Plans.pdf PDF
W912PM-16-R-0005-0006_PN76513_Conformed_Copy.pdf PDF
PN76513Amd0006Vol2Plans.pdf PDF
PN76513Amd0006Vol1Plans.pdf PDF
W912PM-16-R-0005-0005_PN76513_SOF_Special_Tactics_Facility__Phase_2.pdf PDF
PN76513Amd0004Vol1Plans.zip ZIP file
PN76513Amd0004Vol3Plans.zip ZIP file
W912PM-16-R-0005-0004.pdf PDF
PN76513Amd0004Vol2Plans.zip ZIP file
PN76513Amd0004Vol4Plans.zip ZIP file
W912PM-16-R-0005_Amend_0003.pdf PDF
Conform_Copy_W912PM-16-R-0005_Amend_0003.pdf PDF
AMD_0003_PLANS_Vol1.zip ZIP file
AMD_0003_PLANS_Vol4_3A-471.pdf PDF
AMD_0003_PLANS_Vol3_2A-610.pdf PDF
PPQ_NAVFAC-USACE.pdf PDF
PN76513Amd0002Vol1Plans.pdf PDF
Amendment_0002.pdf PDF
Amendment_0002_Drawing_dgn.zip ZIP file
9June-Site_Visit_Attendance_Sheet.pdf PDF
3June_Site-Visist.pdf PDF
2016-05-04_STG_Complex_Ft_Bragg_V1.pdf PDF
PN_76513 _SOF_SPECIAL_TACTICS_FACILITY _PHASE_2_-_DRAWINGS_VOLUME_2.pdf PDF
2016-05-04_STG_Complex_Ft_Bragg_V3.pdf PDF
PN_76513 _SOF_SPECIAL_TACTICS_FACILITY _PHASE_2_-_DRAWINGS_VOLUME_1.pdf PDF
PN_76513 _SOF_SPECIAL_TACTICS_FACILITY _PHASE_2_-_DRAWINGS_VOLUME_4.pdf PDF
2016-05-04_STG_Complex_Ft_Bragg_V2.pdf PDF
PN_76513 _SOF_SPECIAL_TACTICS_FACILITY _PHASE_2_-_DRAWINGS_VOLUME_3.pdf PDF
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

76513

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

W912PM-16-R-0005 is hereby amended to inoporate the follow ing changes:

1) correct the Due date of proposals in block 13 of the solicitation and in the Notice to Offerors.

All other terms and conditions remain in full force and effect.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 5

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 25-May-2016

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912PM-16-R-0005

X 9B. DATED (SEE ITEM 11)

25-May-2016

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

25-May-2016

CODE

U S ARMY CORPS OF ENGINEERS

WILMINGTON DISTRICT

ATTN: CONTRACTING DIVISION

69 DARLINGTON AVE

WILMINGTON NC 28403-1343

W912PM 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912PM-16-R-0005

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SECTION 00 00 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

SUMMARY OF CHANGES

SECTION 00 10 00 - SOLICITATION, CONTRACT LINE ITEM NUMBER (CLIN) SCHEDULE

The required response date/time 08-Jul-2016 02:00 PM has been added.

The Issued By organization has changed from

U S ARMY CORPS OF ENGINEERS

WILMINGTON DISTRICT

ATTN: JOHN MAYO

69 DARLINGTON AVE

WILMINGTON NC 28403-1343

to

U S ARMY CORPS OF ENGINEERS

WILMINGTON DISTRICT

ATTN: CONTRACTING DIVISION

69 DARLINGTON AVE

WILMINGTON NC 28403-1343

The following have been modified:

NOTICE TO OFFERORS

NOTICE TO BIDDERS/OFFERORS

NOTE 1:

FOR BASE BID ITEM: Electrical and Telecommunications Infrastructure in GF/GI systems Furniture (CLIN 0006), THE PERIOD OF PERFORMANCE OF THIS CLIN SHALL RUN

CONCURRENTLY WITH THE ENTIRE CONTRACT DURATION SO THAT THE PERIOD

OF PERFORMANCE SHALL NOT EXCEED 820 CALENDAR DAYS.

Activity Performance Period (Days)

Construction, CLINs 1 5 (and any options awarded)

Government Systems Furniture Installation 60 CLIN 6 Installation/Testing 30 Total Contract Duration 820

NOTE 2:

FOR OPTIONAL BID ITEMS 1, 2, 3 AND 4 (CLIN’s 0007-0010), IF EXERCISED, THE

PERIOD OF PERFORMANCE SHALL NOT BE EXTENDED BEYOND THE ORIGINAL

CONTRACT DURATION OF 730 CALENDAR DAYS. PERFORMANCE OF ANY

AWARDED OPTIONAL BID ITEMS SHALL RUN CONCURRENTLY WITH THE BASE

BID ITEMS CONTRACT DURATION SO THAT THE TOTAL PERIOD OF

PERFORMANCE SHALL NOT EXCEED 820 CALENDAR DAYS.

NOTE 3:

THE GOVERNMENT RESERVES THE RIGHT TO EXERCISE OPTIONAL BID ITEMS 1,

2, 3 AND 4 (CLIN’s 0007-0010) WITHIN 90 DAYS AFTER AWARD OF THE BASE

CONTRACT.

NOTE 4:

THE EXERCISE OF OPTIONAL BID ITEMS 1, 2, 3 AND 4 (CLIN’s 0007-0010) SHALL BE

SUBJECT TO THE AVAILABILITY OF FUNDS.

SUBMISSION OF PROPOSALS

ELECTRONIC PROPOSAL SUBMISSION, TO INCLUDE E-MAIL AND FACSIMILE

TRANSMISSIONS, IS NOT AUTHORIZED.

HAND CARRIED PROPOSAL SUBMISSION IS AUTHORIZED OF ELECTRONIC MEDIA

(CD-ROM) DISCS.

Proposals shall be organized and tabbed in accordance with Appendix A, General Proposal Submission and Tabbing Requirements and Appendix B, Proposal Factors and Submission Requirements. Proposals shall be electronically signed by a duly authorized official of the Offeror’s company and are required no later than July 8th 2016, at 2:00 PM EST. Refer to Appendix A for submittal instructions. Proposals shall be submitted by the date and time specified to the following address:

U.S. Army Engineer District, Wilmington ATTN: CESAW-CT (Mr. Michael M. Mullen, Contract Specialist) 69 Darlington Avenue Wilmington, NC 28403 Email: michael.m.mullen@usace.army.mil or

U.S. Army Engineer District, Wilmington ATTN: CESAW-CT (Mr. John T. Hill, Contracting Officer) 69 Darlington Avenue Wilmington, NC 28403 Email: john.t.hill@usace.army.mil

All proposals must be clearly identified with the contractor’s name and address. To ensure timely and proper handling, the lower left corner of the outermost wrapper should indicate the following:

Request For Proposal No: W912PM-16-R-0005 Due Date of Proposal: July 8th 2016 Time by which Proposals are due: 2:00 P.M. (E.T.)

Title of Project: SOF Special Tactics Facility Phase 2, PN76513

Offerors are responsible for allowing sufficient time for the proposal to be processed for receipt and are cautioned that sufficient time may be as much as 24 hours prior to the date and time designated for receipt of proposals.

The Government will not be responsible for proposals delivered to any location or to anyone other than those designated to receive proposals on its behalf. Offerors are responsible for ensuring that proposals are submitted so as to reach the office designated for receipt of proposals.

Offerors are responsible for allowing sufficient time for the proposal to be physically received and processed by Mailroom personnel in accordance with the information provided.

QUALITY CONTROL SYSTEM (QCS): Any contract award resulting from this solicitation will require the mandatory use of the automated Quality Control System. Please see Section 01 45 00.10 10 for additional information.

SECURITY REQUIREMENTS: Increased security at military installations may require vehicle and personnel registration, as well as 100% ID checks and random vehicle searches.

Additionally, construction of this facility is located within a high security area. A high security control area is defined as an area requiring armed security guard escort at all times, perimeter intrusion detection or access control measures, contractor personnel require identification badges and are subject to random searches of vehicles, equipment and personnel.

Due to the location of the construction site there are specific requirements with regard to security that must be adhered to including identification requirements, background checks, delivery coordination, Master Access Control Roster, work stoppages, etc. Please see Section 01 00 60 for additional information.

(End of Summary of Changes)

File details come from the government source that posted it. Updated .