AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
W912PM-16-R-0005 is hereby amended to inoporate the follow ing changes:
1) correct the Due date of proposals in block 13 of the solicitation and in the Notice to Offerors.
All other terms and conditions remain in full force and effect.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 5
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 25-May-2016
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912PM-16-R-0005
X 9B. DATED (SEE ITEM 11)
25-May-2016
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
25-May-2016
CODE
U S ARMY CORPS OF ENGINEERS
WILMINGTON DISTRICT
ATTN: CONTRACTING DIVISION
69 DARLINGTON AVE
WILMINGTON NC 28403-1343
W912PM 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912PM-16-R-0005
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SECTION 00 00 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
SUMMARY OF CHANGES
SECTION 00 10 00 - SOLICITATION, CONTRACT LINE ITEM NUMBER (CLIN) SCHEDULE
The required response date/time 08-Jul-2016 02:00 PM has been added.
The Issued By organization has changed from
U S ARMY CORPS OF ENGINEERS
WILMINGTON DISTRICT
ATTN: JOHN MAYO
69 DARLINGTON AVE
WILMINGTON NC 28403-1343
to
U S ARMY CORPS OF ENGINEERS
WILMINGTON DISTRICT
ATTN: CONTRACTING DIVISION
69 DARLINGTON AVE
WILMINGTON NC 28403-1343
The following have been modified:
NOTICE TO OFFERORS
NOTICE TO BIDDERS/OFFERORS
NOTE 1:
FOR BASE BID ITEM: Electrical and Telecommunications Infrastructure in GF/GI systems Furniture (CLIN 0006), THE PERIOD OF PERFORMANCE OF THIS CLIN SHALL RUN
CONCURRENTLY WITH THE ENTIRE CONTRACT DURATION SO THAT THE PERIOD
OF PERFORMANCE SHALL NOT EXCEED 820 CALENDAR DAYS.
Activity Performance Period (Days)
Construction, CLINs 1 5 (and any options awarded)
Government Systems Furniture Installation 60 CLIN 6 Installation/Testing 30 Total Contract Duration 820
NOTE 2:
FOR OPTIONAL BID ITEMS 1, 2, 3 AND 4 (CLIN’s 0007-0010), IF EXERCISED, THE
PERIOD OF PERFORMANCE SHALL NOT BE EXTENDED BEYOND THE ORIGINAL
CONTRACT DURATION OF 730 CALENDAR DAYS. PERFORMANCE OF ANY
AWARDED OPTIONAL BID ITEMS SHALL RUN CONCURRENTLY WITH THE BASE
BID ITEMS CONTRACT DURATION SO THAT THE TOTAL PERIOD OF
PERFORMANCE SHALL NOT EXCEED 820 CALENDAR DAYS.
NOTE 3:
THE GOVERNMENT RESERVES THE RIGHT TO EXERCISE OPTIONAL BID ITEMS 1,
2, 3 AND 4 (CLIN’s 0007-0010) WITHIN 90 DAYS AFTER AWARD OF THE BASE
CONTRACT.
NOTE 4:
THE EXERCISE OF OPTIONAL BID ITEMS 1, 2, 3 AND 4 (CLIN’s 0007-0010) SHALL BE
SUBJECT TO THE AVAILABILITY OF FUNDS.
SUBMISSION OF PROPOSALS
ELECTRONIC PROPOSAL SUBMISSION, TO INCLUDE E-MAIL AND FACSIMILE
TRANSMISSIONS, IS NOT AUTHORIZED.
HAND CARRIED PROPOSAL SUBMISSION IS AUTHORIZED OF ELECTRONIC MEDIA
(CD-ROM) DISCS.
Proposals shall be organized and tabbed in accordance with Appendix A, General Proposal Submission and Tabbing Requirements and Appendix B, Proposal Factors and Submission Requirements. Proposals shall be electronically signed by a duly authorized official of the Offeror’s company and are required no later than July 8th 2016, at 2:00 PM EST. Refer to Appendix A for submittal instructions. Proposals shall be submitted by the date and time specified to the following address:
U.S. Army Engineer District, Wilmington ATTN: CESAW-CT (Mr. Michael M. Mullen, Contract Specialist) 69 Darlington Avenue Wilmington, NC 28403 Email: michael.m.mullen@usace.army.mil or
U.S. Army Engineer District, Wilmington ATTN: CESAW-CT (Mr. John T. Hill, Contracting Officer) 69 Darlington Avenue Wilmington, NC 28403 Email: john.t.hill@usace.army.mil
All proposals must be clearly identified with the contractor’s name and address. To ensure timely and proper handling, the lower left corner of the outermost wrapper should indicate the following:
Request For Proposal No: W912PM-16-R-0005 Due Date of Proposal: July 8th 2016 Time by which Proposals are due: 2:00 P.M. (E.T.)
Title of Project: SOF Special Tactics Facility Phase 2, PN76513
Offerors are responsible for allowing sufficient time for the proposal to be processed for receipt and are cautioned that sufficient time may be as much as 24 hours prior to the date and time designated for receipt of proposals.
The Government will not be responsible for proposals delivered to any location or to anyone other than those designated to receive proposals on its behalf. Offerors are responsible for ensuring that proposals are submitted so as to reach the office designated for receipt of proposals.
Offerors are responsible for allowing sufficient time for the proposal to be physically received and processed by Mailroom personnel in accordance with the information provided.
QUALITY CONTROL SYSTEM (QCS): Any contract award resulting from this solicitation will require the mandatory use of the automated Quality Control System. Please see Section 01 45 00.10 10 for additional information.
SECURITY REQUIREMENTS: Increased security at military installations may require vehicle and personnel registration, as well as 100% ID checks and random vehicle searches.
Additionally, construction of this facility is located within a high security area. A high security control area is defined as an area requiring armed security guard escort at all times, perimeter intrusion detection or access control measures, contractor personnel require identification badges and are subject to random searches of vehicles, equipment and personnel.
Due to the location of the construction site there are specific requirements with regard to security that must be adhered to including identification requirements, background checks, delivery coordination, Master Access Control Roster, work stoppages, etc. Please see Section 01 00 60 for additional information.
(End of Summary of Changes)