P h il p o tt P o w e r h o u s e
R o a n o k e R iv e r B a s in
V ir g in ia
R F P N o
W P
M -1
-R -0
RFP No. W912PM-15-R-0001
Automatic Voltage Regulator Upgrade
Governor Upgrade and
Switchgear Relocation
Smith River, Virginia
Philpott Reservoir Project
FILE NUMBER CADD FILE NAME TITLE
INDEX TO DRAWINGS
GENERAL
NO.
SHEET
GOVERNMENT REFERENCE DRAWINGS
TITLE
CIVIL
STRUCTURAL
ARCHITECTURAL
PA411B
PA809B-0
PE501B
PE503B
POWERHOUSE UPSTREAM SECTIONAL ELEVATION
TRANSVERSE SECTION THROUGH MAIN UNIT
TRANSVERSE SECTION THROUGH SECONDARY UNIT
LONGITUDINAL SECTION THRU GENERATOR ROOM
15 kV CABLE AND RACEWAYS
WIRING - MAIN SINGLE LINE DIAGRAM
WIRING - STATION SERVICE 460 VAC, SINGLE LINE DIAGRAM
WIRING - DC SCHEMATIC & DC SINGLE LINE DIAGRAM
WIRING-MAIN UNIT CONTROL SCHEMATIC DIAGRAM
IDENTIFICATION
SHEET
POWERHOUSE PLAN - EL. 836.0 AND 837.25
PLAN - EL. 823.0
POWERHOUSE PLAN - EL. 814.0
INTER-CONNECTION DIAGRAM
VOLTAGE REGULATOR (OUTLINE)
ELEMANTARY DIAGRAM
VOLTAGE REGULATOR
WORK AREAS
PROJECT LOCATION
EQUIPMENT INSTALL EL. 823.0 PLAN VIEW
INTERCONNECTION WIRING, ANNUNCIATORS & RELAY CABINETS
ANNUNCIATOR RELAY CONTROL PANEL WIRING
GOVERNOR & PUMP ARRANGEMENT, MAIN UNITS
GOVERNOR & PUMP ARRANGEMENT, SECONDARY UNIT
WIRING DIAGRAM, MAIN UNITS NO. 1 & NO. 2
WIRING DIAGRAM, MAIN UNITS NO. 1 & NO. 2
WIRING DIAGRAM, MAIN UNITS NO. 1 & NO. 2
ASSEMBLY, HYDRAULIC TURBINE-DRIVEN GENERATOR
GATE RING & CONN. ROD ASSEMBLY
GATE RING & CONN. ROD
ASSEMBLY SECTION 56�
UNIT 1N & 1R, GEN. 1 NEUTRAL ACB
UNIT 2N & 2R, GEN. 2 NEUTRAL ACB
UNITS 2N & 2R, GEN. 2 NEUTRAL ACB INDOOR METAL CLAD SWGR
UNIT 8, GENERATOR 1
UNIT 7, GENERATOR 1
UNIT 7, GENERATOR 1, AUX. INDOOR METAL CLAD SWGR
PANEL 6, GENERATOR 2
UNIT 5, GENERATOR 2, AUX.
PANEL 4, MAIN TRANSFORMER
UNITS 2N & 2R, GEN. 2 NEUTRAL ACB INDOOR METAL CLAD SWGR
UNIT 3, FUTURE LINES
PANEL 2, SECONDARY GENERATOR
UNIT 1 STATION TRANSFORMER
DUPLEX STATION SWITCHBOARD PANEL NO. 5R - WIRING DIAGRAM
DUPLEX STATION SWITCHBOARD PANEL NO. 4R - WIRING DIAGRAM
DUPLEX STATION SWITCHBOARD PANEL NO. 3R - WIRING DIAGRAM
DUPLEX STATION SWITCHBOARD PANEL NO. 2R - WIRING DIAGRAM
DUPLEX STATION SWITCHBOARD PANEL NO. 1R - WIRING DIAGRAM
DUPLEX STATION SWITCHBOARD PANEL NO. 4F - WIRING DIAGRAM
DUPLEX STATION SWITCHBOARD, PANEL NO. 3F, CONNECTION DIAGRAM
DUPLEX STATION SWITCHBOARD PANEL NO. 2F - WIRING DIAGRAM
DUPLEX STATION SWITCHBOARD PANEL NO. 1F - WIRING DIAGRAM
SCHEMATIC DIAGRAM & ONE LINE DIAGRAM OF STATION BOARD
TYPICAL WIRING AI POINTS PHILPOTT - GEN RTU
TYPICAL RELAY WIRING PHILPOTT - GEN RTU
DIGITAL METER CONNECTIONS (TYPICAL)
DO TERMINATION BLOCK WIRING PHILPOTT - GEN
AI TERMINATION BLOCK WIRING PHILPOTT - GEN
RTU I/O POWER DISTRIBUTION
RTU 19 POWER DISTRIBUTION PHILPOTT - GEN
GROUND BUS ASSEMBLY PHILPOTT - GEN
RTU 19 RELAY PANEL LAYOUT PHILPOTT - GEN
RTU 19 PANEL LAYOUT PHILPOTT - GEN
RTU 19 CABINET ASSEMBLY PHILPOTT - GEN
TERMINATION BLOCK WIRING PHILPOTT
PHILPOTT RTU 17 POWER DISTRIBUTION
GROUND BUS ASSEMBLY PHILPOTT
I/O TERMINATION PANELS - PHILPOTT RTU 17
RTU 17 PANEL PHILPOTT
RTU 17 CABINET ASSEMBLY PHILPOTT
KERR PHILPOTT UPGRADE SYSTEM BLOCK DIAGRAM
PRESURE TANK FOR MAIN UNIT NO. 1
PUMP BASE FOR MAIN UNIT NO. 2
AUTOMATIC CONTROL PANEL, WIRING DIAGRAM - FRONT PANEL
AUTOMATIC CONTROL PANEL, WIRING DIAGRAM - REAR PANEL
PRESSURE TANK OIL LEVEL GAUGE ASSEMBLY
ASSEMBLY DRAWING OF FLOAT VALVE
PHILPOTT SHT.5 SIMS FOCUS 200 TRUNK
PHILPOTT SHT.4 SIMS FOCUS 200 TRUNK
PHILPOTT SHT.3 SIMS FOCUS 200 TRUNK
PHILPOTT SHT.2 SIMS FOCUS 200 TRUNK
PHILPOTT SHT.1 SIMS FOCUS 200 TRUNK
PA403B-1
PA402B-1
PA401B
P-9159365
M-8654697
KK-6576634
K-8688602
GG226B
GG204B
E-06-1.02-102-PHP-C
D-408
D-400AE
982296D SH. 5
982296 SH. 4
970673F SH. 1
970673D SH. 3
970673D SH. 2
528E706
46308
46300 PART 2
46300
41-A-6017B
41-A-6017A
41-A-6017
41-A-6016B
41-A-6016A
41-A-6016
41-A-6015
41-A-6014B
41-A-6014
41-A-6014
41-A-6013B
41-A-6013A
41-A-6012
41-A-5095 PART 2
41-A-5095
41-A-5094
41-A-5093
41-A-5092
41-A-5090
41-A-5089
41-A-5088
41-A-5087
41-A-5086
30270-243
30270-242
30270-238
30270-237
30270-236
30270-235
30270-234
30270-233
30270-232
30270-231
30270-230
30270-225
30270-224
30270-223
30270-222
30270-221
30270-220
30270-100
195192B
194416
176312
176311
161116C
161103-D-S
14656
14656
14656
14656
14656
PA407B-0
PA409B-0
PA410B-0
PE502B-1
PE505B-0
EXISTING SITE CONDITIONS SURVEY
WORK AREA - POWERHOUSE
INDEX OF DRAWINGS SHEET 2 0F 2 & PROJECT LOCATION AND VICINITY MAPS
INDEX OF DRAWINGS SHEET 1 0F 2
V-001
G-101
G-002
G-001
PHP-1.02-0-0/4
PHP-1.02-0-0/3
PHP-1.02-0-0/2
G-00-1.02-101-PHP-C.dgn
G-00-1.02-003-PHP-C.dgn
G-00-1.02-002-PHP-C.dgn
P H
P -X .X
X X -0 -0 /2
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
P O
R T
L A
N D
O R
E G
O N
H Y
D R
O E
L E
C T
R
IC
D
E S
IG
N C
E N
T E
R
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
W
IL
M
IN
G T
O N
N C
W
IL
M
IN
G T
O N D
IS
T R
IC
T
S
E V
E N R
M
IL
E S P .E
A N
S I
D
/0
/2
G -0
-1 .0
-0
-P
H P -C .d g n
G
H D
C E
S
B
B O
U W
M A
N
G
H D
C M
IN
D
E X O
F D
R A
W
IN
G
G-001
G
V
E R
N O
R A
N D A .V .R
U P
G R
A D
E
S W
IT
C H
G E
A R R
E L
O C
A T
IO
N
S M
IT
H R
IV
E R V
IR
G
IA
IL
P O
T T R
E S
E R
V O
IR
P
R O J E
C T
S H
E E
T O
F
WILMINGTON DISTRICT
E-001
ED101
ED102
ED401
ED402
ED601
ED602
ED603
ED604
ED605
ED606
ED607
ED608
ED609
ED701
ED702
E-101
E-102
E-103
E-401
E-402
E-403
E-404
E-601
E-602
E-603
E-604
E-605
E-606
E-607
E-608
E-609
E-610
E-611
E-612
E-613
E-614
E-615
E-616
E-617
E-701
PHP-1.02-6-0A0/1
PHP-1.02-6-0A0/2
PHP-1.02-6-0A0/3
PHP-1.02-6-0A4/1
PHP-1.02-6-0A4/2
PHP-1.02-6-1A21/1
PHP-1.02-6-1A21/2
PHP-1.02-6-4A21/1
PHP-1.02-6-9D24/1
PHP-1.02-6-9D24/2
PHP-1.02-6-9E24/1
PHP-1.02-6-9E24/2
PHP-1.02-6-9E24/3
PHP-1.02-6-9A24/1
PHP-1.02-6-9A70/1
PHP-1.02-6-9A70/2
PHP-1.02-6-0A0/5
PHP-1.02-6-0A0/6
PHP-1.02-6-0A0/7
PHP-1.02-6-0A1/1
PHP-1.02-6-0A1/2
PHP-1.02-6-0A1/3
PHP-1.02-6-0A1/4
PHP-1.02-6-1A21/3
PHP-1.02-6-1A21/4
PHP-1.02-6-4A21/2
PHP-1.02-6-9D24/3
PHP-1.02-6-9D24/4
PHP-1.02-6-9E24/4
PHP-1.02-6-9E24/4
PHP-1.02-6-9E24/5
PHP-1.02-6-9A24/2
PHP-1.02-6-1D21/1
PHP-1.02-6-1D21/2
PHP-1.02-6-1A4/1
PHP-1.02-6-9D24/1
PHP-1.02-6-9A26/1
PHP-1.02-6-1D4/1
PHP-1.02-6-9D24/5
PHP-1.02-6-9D24/6
PHP-1.02-6-9A70/3
E-06-1.02-001-PHP-C.dgn
ED-06-1.02-101-PHP-C.dgn
ED-06-1.02-102-PHP-C.dgn
ED-06-1.02-401-PHP-C.dgn
ED-06-1.02-402-PHP-C.dgn
ED-06-1.02-601-PHP-C.dgn
ED-06-1.02-602-PHP-C.dgn
ED-06-1.02-603-PHP-C.dgn
ED-06-1.02-604-PHP-C.dgn
ED-06-1.02-605-PHP-C.dgn
ED-06-1.02-606-PHP-C.dgn
ED-06-1.02-607-PHP-C.dgn
ED-06-1.02-608-PHP-C.dgn
ED-06-1.02-609-PHP-C.dgn
ED-06-1.02-701-PHP-C.dgn
ED-06-1.02-702-PHP-C.dgn
E-06-1.02-101-PHP-C.dgn
E-06-1.02-102-PHP-C.dgn
E-06-1.02-103-PHP-C.dgn
E-06-1.02-401-PHP-C.dgn
E-06-1.02-402-PHP-C.dgn
E-06-1.02-403-PHP-C.dgn
E-06-1.02-404-PHP-C.dgn
E-06-1.02-601-PHP-C.dgn
E-06-1.02-602-PHP-C.dgn
E-06-1.02-603-PHP-C.dgn
E-06-1.02-604-PHP-C.dgn
E-06-1.02-605-PHP-C.dgn
E-06-1.02-606-PHP-C.dgn
E-06-1.02-607-PHP-C.dgn
E-06-1.02-608-PHP-C.dgn
E-06-1.02-609-PHP-C.dgn
E-06-1.02-610-PHP-C.dgn
E-06-1.02-611-PHP-C.dgn
E-06-1.02-612-PHP-C.dgn
E-06-1.02-613-PHP-C.dgn
E-06-1.02-614-PHP-C.dgn
E-06-1.02-615-PHP-C.dgn
E-06-1.02-616-PHP-C.dgn
E-06-1.02-617-PHP-C.dgn
E-06-1.02-701-PHP-C.dgn
ELECTRICAL LEGEND SHEET
EQUIPMENT REMOVAL EL. 823.0 PLAN VIEW
EQUIPMENT REMOVAL ELEVATION VIEW
CONTROL BOARD 13.8KV. SWITCHGEAR REMOVAL
480V SWITCHGEAR REMOVAL
ONE LINE DIAGRAM REMOVAL
480V SWITCHGEAR ONE LINE DIAGRAM REMOVAL
125 VDC SYSTEM REMOVAL DETAILS
SECONDARY GENERATOR SCHEMATICS REMOVAL SHEET 1 OF 2
SECONDARY GENERATOR SCHEMATICS REMOVAL SHEET 2 0F 2
MAIN GENERATOR SCHEMATICS REMOVAL SHEET 1 OF 3
MAIN GENERATOR SCHEMATICS REMOVAL SHEET 2 OF 3
MAIN GENERATOR SCHEMATICS REMOVAL SHEET 3 OF 3
BREAKERS AND LOAD CONTROLLERS SCHEMATICS REMOVAL
CONDUIT AND CABLE SCHEDULE REMOVAL SHEET 1 OF 2
CONDUIT AND CABLE SCHEDULE REMOVAL SHEET 2 OF 2
EQUIPMENT INSTALL EL. 823.0 PLAN VIEW
EQUIPMENT INSTALL EL. 823.0 PLAN VIEW
POWERHOUSE EQUIPMENT INSTALL ELEVATION VIEW
TRAY ROUTING TRAY ROUTING PLAN VIEW
TRAY ROUTING TRAY ROUTING ELEVATION VIEW
AVR REPLACEMENT CONDUIT LAYOUT
SWITCHGEAR BUILDING CONDUITS AND TRENCH DETAILS
ONE LINE DIAGRAM INSTALL
480V SWITCHGEAR ONE LINE DIAGRAM INSTALL
125 VDC SYSTEM MODIFICATIONS DETAILS INSTALL
SECONDARY GENERATOR OPERATING SCHEMATICS INSTALL SHEET 1 OF 2
SECONDARY GENERATOR SCHEMATICS INSTALL SHEET 2 OF 2
MAIN GENERATOR SCHEMATICS INSTALL SHEET 1 OF 3
MAIN GENERATOR SCHEMATICS INSTALL SHEET 2 OF 3
MAIN GENERATOR SCHEMATICS INSTALL SHEET 3 OF 3
BREAKERS AND LOAD CONTROLLERS SCHEMATICS INSTALL
480V CQ1, CQ2, CQ3 PANEL SCHEDULES INSTALL
480V CQ4, CQ5 PANEL SCHEDULES INSTALL
15KV SWITCHGEAR ONE LINE LAYOUT, NAMEPLATE AND LOCAL/REMOTE PANEL INSTALL
BREAKER 52-M, 52-E AND SQ1 TRANSFER CONTROLS INSTALL
BUS DIFFERENTIAL PROTECTION INSTALL
480V SUBSTATION LAYOUT & NAME PLATE INSTALLATION
CONTROL BOARD AND 52S(F) BREAKER CONTROL INSTALL
AVR REPLACEMENT EXCITATION SYSTEM EXTERNAL CONNECTIONS
CONDUIT AND CABLE SCHEDULE INSTALL SHEET 1 OF 3
DEMOLITION PLAN
FENCE GATE DETAILS
FENCE DETAILS
SEDIMENT AND EROSION CONTROL DETAILS
CIVIL DETAILS
BUILDING FOUNDATION DETAILS
RETAINING WALL PLAN AND PROFILE
RETAINING WALL CROSS SECTION AND DETAILS
BUILDING PLAN AND ELEVATIONS
LIGHTING & POWER PLAN
SCHEDULES, RISERS & DETAILS
MECHANICAL PLAN
Approval Recommended: *
Approved: *
DATE
DATE
AND APPROVAL OF ALL DRAWINGS IN THIS SET AS INDEXED ON THIS SHEET.
SIGNATURES AFFIXED BELOW INDICATE OFFICIAL RECOMMENDATION
CHIEF, DESIGN AND GENERAL ENGINEERING SECTION
CHIEF, ENGINEERING BRANCH
SCOPE OF THEIR EMPLOYMENT. SIGNATURES ARE REQUIRED BY ER 1110-1-8152.
DESIGNATIONS APPEAR ON THESE DOCUMENTS ARE OPERATING WITHIN THE
WILMINGTON DISTRICT. INDIVIDUALS WHOSE SIGNATURES AND REGISTRATION
* THIS PROJECT WAS DESIGNED BY THE U.S. ARMY CORPS OF ENGINEERS,
ELECTRICAL
A-101
A-102
A-103
A-104
S-301
S-201
S-501
BUILDING SITE PLAN
C-101
EROSION & SEDIMENT CONTROL PLANC-102
C-103
C-501
C-502
C-503
C-504
07-OCT-2014
07-OCT-2014
M-03-1.02-901-PHP-C.dgn
M-03-1.02-201-PHP-C.dgn
M-03-1.02-103-PHP-C.dgn
M-03-1.02-102-PHP-C.dgn
M-03-1.02-101-PHP-C.dgn
GATE SHAFT GOVERNOR MECHANICAL UPGRADE PHOTOS
GOVERNOR & PUMP SECTIONS AND DETAILS
SELF LUBRICATED BUSHING MODIFICATIONS
GATE RING AND CONNECTING ROD SELF LUBRICATED BUSHING MODIFICATIONS
GOVERNOR & PUMP ARRANGEMENT
M-901
M-201
M-103
M-102
M-101
PHP-1.02-3-10/5
PHP-1.02-3-10/4
PHP-1.02-3-10/3
PHP-1.02-3-10/2
PHP-1.02-3-10/1
E-702
E-703
PHP-1.02-6-9A70/4
PHP-1.02-6-9A70/5
E-06-1.02-702-PHP-C.dgn
E-06-1.02-703-PHP-C.dgn
CONDUIT AND CABLE SCHEDULE INSTALL SHEET 2 OF 3
CONDUIT AND CABLE SCHEDULE INSTALL SHEET 3 OF 3
MECHANICAL
ELECTRICAL DUCT BANK AND CONDUIT DETAILS
SITE UTILITY PLANC-104
C-505
S O
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N M
A R
K
D A
T E
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
C O
N T
R A
C T N
O
D A
T E
A P
P R
D R
A W
IN
G N
U M
B E
R of Engineers
US Army Corps fi
P L
O T D
A T
E
54321
D
C
B
A
IDENTIFICATION
SHEET
$SHEETN$SHEET NAME:$USER$BY USERNAME:$TIME$$$DATE$$$$DATE AND TIME PLOTTED:
D A
T E
DRAWING PLOT SIZE: $BORDER$
PE505C
PE505D
PE506C
PE506D
PE506E
PE507B
PE510B
PE511B
PE520B
PE520B-7
PE525B
PE600B
PE805B
PE807B
PH-LS-D19794 SH. 1
PH-LS-D19794 SH. 2
PH-LS-D19794 SH. 3
PH-LS-D19794 SH. 4
PH-LS-D19794 SH. 5
PH-LS-D19794 SH. 6
PH-LS-D19796 SH. 1
PH-LS-D19796 SH. 2
PH-LS-D19796 SH. 3
PH-LS-D19796 SH. 4
PH-LS-D19796 SH. 5
PH-LS-D19796 SH. 6
PH-LS-D19796 SH. 7
PH-LS-D19796 SH. 8
PH-LS-D19797 SH. 1
PH-LS-D19797 SH. 2
PH-LS-D19797 SH. 3
PH-LS-D19798 SH. 1
PH-LS-D19798 SH. 2
PH-LS-D19800
PPCAD101 (PE505C)
PPCAD102
PPCAD103 (PE505D)
PPCAD105
T-6354654
T-9795124
T-9910517
MAIN GENERATOR OPERATING SCHEMATICS
SECONDARY GENERATOR LOAD CONTROLLER
SECONDARY GENERATOR OPERATING SCHEMATICS
STATION A.C.B.’S AND AUXILIARY SCHEMATICS
MAIN GENERATOR LOAD CONTROLLER
WIRING - STATION SERVICE AUXILIARIES SCHEMATIC DIAGRAMS - SHEET 1
WIRING - STATION SERVICE AUXILIARIES SCHEMATIC DIAGRAMS - SHEET 2
WIRING - ANNUNCIATOR SYSTEM TROUBLE POINT DIAGRAM
WIRING - DEVICE SCHEDULE
WIRING - THREE LINE DIAGRAM MAIN UNITS
WIRING - THREE LINE DIAGRAM, MAIN UNITS
WIRING - THREE LINE DIAGRAM SECONDARY UNIT
AUTOMATIC OPERATION SCHEMATICS
SWITCHBOARDS 13.8 kV SWITCHGEAR
SWITCHBOARDS NAME PLATE ENGRAVING
SWITCHBOARDS STATION BOARD
SWITCHBOARDS 460 VAC SWITCHGEAR
CONDUIT AND GROUNDING, PLAN - EL. 823.0
CONDUIT AND GROUNDING, SECTIONS AND DETAILS
CONDUIT AND GROUNDING, MAIN TRANSFORMER AREA AND MISCELLANEOUS DETAILS
CONDUIT AND GROUNDING MAIN GROUNDING PLAN
CONDUIT AND GROUNDING, GROUNDING DETAILS
15KV CABLE AND RACEWAYS
SEC. GEN. GOVERNOR CONTROLLER ELEMENTARY DIAGRAM
SEC. GEN. GOVERNOR CONTROLLER ELEMENTARY DIAGRAM
SEC. GEN. GOVERNOR CONTROLLER ELEMENTARY DIAGRAM
SEC. GEN. GOVERNOR CONTROLLER ELEMENTARY DIAGRAM
SEC. GEN. GOVERNOR CONTROLLER ELEMENTARY DIAGRAM
SEC. GEN. GOVERNOR CONTROLLER ELEMENTARY DIAGRAM
SEC. GEN. GOVERNOR CONTROLLER INTERNAL WIRING DIAGRAM
SEC. GEN. GOVERNOR CONTROLLER INTERNAL WIRING DIAGRAM
SEC. GEN. GOVERNOR CONTROLLER INTERNAL WIRING DIAGRAM
SEC. GEN. GOVERNOR CONTROLLER INTERNAL WIRING DIAGRAM
SEC. GEN. GOVERNOR CONTROLLER INTERNAL WIRING DIAGRAM
SEC. GEN. GOVERNOR CONTROLLER INTERNAL WIRING DIAGRAM
SEC. GEN. GOVERNOR CONTROLLER INTERNAL WIRING DIAGRAM
SEC. GEN. GOVERNOR CONTROLLER INTERNAL WIRING DIAGRAM
SEC. GEN. GOVERNOR CONTROLLER EXTERNAL CONNECTION DIAGRAM
SEC. GEN. GOVERNOR CONTROLLER EXTERNAL CONNECTION DIAGRAM
SEC. GEN. GOVERNOR CONTROLLER EXTERNAL CONNECTION DIAGRAM
SEC. GEN. GOVERNOR CONTROLLER GCC ASSEMBLY
SEC. GEN. GOVERNOR CONTROLLER GCC ASSEMBLY
SEC. GEN. GOVERNOR CONTROLLER HYDRAULIC SCHEMATIC DIAGRAM
COMPRESSED AIR SYSTEM - SHEET 1
MAIN GENERATOR OPERATING SCHEMATICS
SECONDARY GENERATOR OPERATING SCHEMATICS
STATION A.C.B.’S AND AUXILIARY SCHEMATICS
SECONDARY GENERATOR LOAD CONTROLLER
13.8 kV SWITCHBOARD AND 460 V SWITCHGEAR - CHANNEL BASE DETAILS
EXCITATION CUBICLE, CONNECTION DIAGRAM
MAIN & NEUTRAL LEAD ARRANGEMENT
EXCITATION CUBICLES
GOVERNMENT REFERENCE DRAWINGS
TITLE
2FDX030U SH. A AEP FOUNDATION DETAILS
PE508B-1
PE521B-6
PE601B-0
PE602B-0
PE701B-3
PE801B-5
PE804B-3
PE808B-0
PE809B-0
PP401B-0
PS811B-0
IDENTIFICATION
SHEET
P H
P -X .X
X X -0 -0 /2
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
P O
R T
L A
N D
O R
E G
D R
O E
L E
C T
R
IC
D
E S
IG
N C
E N
T E
R
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
W
IL
M
IN
G T
O N
N C
W
IL
M
IN
G T
O N D
IS
T R
IC
WILMINGTON DISTRICT
E V
E N R
M
IL
E S P .E
A N
S I
D
/0
/2
G -0
-1 .0
-0
-P
H P -C .d g n
G
H D
C E
S
B
B O
U W
M A
N
G
H D
C M
E X O
F D
R A
W
IN
G
G-002
V
E R
N O
R A
N D A .V .R
U P
G R
A D
E
S W
IT
C H
G E
A R R
E L
O C
A T
IO
N
S M
IT
H R
IV
E R V
IR
G
IL
P O
T T R
E S
E R
V O
IR
P
R O J E
C T
S H
E E
T O
F
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N M
A R
K
D A
T E
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
C O
N T
R A
C T N
O
D A
T E
A P
P R
D R
A W
IN
G N
U M
B E
R of Engineers
US Army Corps fi
P L
O T D
A T
E
54321
D
C
$SHEETN$SHEET NAME:$USER$BY USERNAME:$TIME$$$DATE$$$$DATE AND TIME PLOTTED:
D A
T E
DRAWING PLOT SIZE: $BORDER$
P -X .X
X X -0 -0 /3
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
P O
R T
L A
N D
O R
E G
D R
O E
L E
C T
R
IC
D
E S
IG
N C
E N
T E
R
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
W
IL
M
IN
G T
O N
N C
W
IL
M
IN
G T
O N D
IS
T R
IC
T
WILMINGTON DISTRICT
S T
E V
E N R
M
IL
E S P .E
A N
S I
D G -0
-1 .0
-1
-P
H P -C .d g n
G
H D
C B
P E
D
C O
S T
W
E R
H O
U S
E
W O
R K A
R E
G-101
V E
R N
O R A
N D A .V .R
U P
G R
A D
E
S W
IT
C H
G E
A R R
E L
O C
A T
IO
N
S M
IT
H R
IV
E R V
IR
G
IL
P O
T T R
E S
E R
V O
IR
P
R O J E
C T
/0
/2
G
H D
C M
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N M
A R
K
D A
T E
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
C O
N T
R A
C T N
O
D A
T E
A P
P R
D R
A W
IN
G N
U M
B E
R of Engineers
US Army Corps
P L
O T D
A T
E
54321
D
C
G-001SHEET NAME:G2hdcrlk Robert KainBY USERNAME:1:06:13 PM4/4/2014DATE AND TIME PLOTTED:
/4 /2
DRAWING PLOT SIZE: ANSI D
20 0 20 40 60
SCALE: 1" = 20’
C O
N D
IT
IO
N S
S
U R
V E
Y E
X
IS
T
IT
E
V-001
E F
D
C
K
A
B C D
E F G H
F
IL
E
M E
D A T E
R E
V
IE
W
D R
A W
C
D E
S Y
M B
O L
D E S
C R
IP
T
IO
N
D E S
IG
N
A P P
R O
V E
D D
A T E
C H
IE
F
D E S
IG
N E
N G
R S E
C T
IO
N
I
W
IL
M
IN
G T
O N
N O
R
R O
L
IN
A
C O
R
E
N G
IN
E E
R S
U .S
A R
M Y
E
N G
IN
E
R
IS
T R
IC
T
C L D
J U
L
G O
V E
R N
.V .R
U P
G R
A D
E S
W
IT
C H
G E
L O
C A T
IO
N
S M
IV
E R
V
IR
G
IN
IA
P H
IL
P O
T T
R
E S E
R V
O
IR
P
R O J E
C T
IDENTIFICATION
SHEET
N
V A S
O U
T H Z
O N
E N
A D
AREA
RIP-RAP
S
S
E L
E V
R A I
L
E L
E V
R A I
LB
A
Y
T R
A N
S F
O R
M E
R
870871
875876877878
882883
8’ CHAIN LINK FENCE8
904905
FLOW
SMITH RIVER
NOTES:
1. SURVEY PERFORMED BY:
JOYNER KEENY, PLLC
ROCKY MOUNT, NORTH CAROLINA 27804
2. HORIZONTAL CONTROL
INFORMATION PROVIDED BY CORPS OF ENGINEERS - WILMINGTON
DISTRICT FROM PLANS PREPARED BY SEPI ENGINEERING GROUP OF
RALEIGH, NC DATED 5/01/2008 REVISED 7/19/2011 ENTITLED
"PREPARED FOR TETRA TEC" FOR PROPOSED SEWER IMPROVEMENTS.
COORDINATES ARE NAD83(2007) VIRGINIA STATE GRID COORDINATES
SOUTH ZONE IN U.S. SURVEY FEET.
3. VERTICAL CONTROL
INFORMATION PROVIDED BY CORPS OF ENGINEERS - WILMINGTON
DISTRICT FROM PLANS PREPARED BY SEPI ENGINEERING GROUP OF
RALEIGH, NC DATED 5/01/2008 REVISED 7/19/2011 ENTITLED
"PREPARED FOR TETRA TEC" FOR PROPOSED SEWER IMPROVEMENTS.
ELEVATIONS ARE NAVD1988 DATUM PER OPUS OBSERVATIONS IN
U.S. SURVEY FEET.
4. THE LOCATION OF UNDERGROUND UTILITIES IS BASED UPON THE FIELD
SURVEYS OF ABOVE GROUND FEATURES ONLY. THE SURVEYOR DOES
NOT GUARANTEE THAT ALL UNDERGROUND STRUCTURES SUCH AS UTILITIES,
TANKS, PIPES, ETC. ARE LOCATED HEREON, EITHER IN SERVICE OR
ABANDONED. THE SURVEYOR FURTHER DOES NOT WARRANT THAT THE
UNDERGROUND UTILITIES SHOWN ARE IN THE EXACT LOCATION INDICATED
IF MARKED BY OTHERS. NO EXCAVATIONS WERE MADE DURING THIS
SURVEY TO LOCATE ANY BURIED UTILITIES OR STRUCTURES.
NOTES:
5. NO DETERMINATION HAS BEEN MADE BY THE SURVEYOR AS TO THE FOLLOWING:
A. 100-YEAR FLOOD LIMITS; B. WETLANDS; C. UNDERGROUND STORAGE FACILITIES;
D. GRAVES, CEMETERIES, OR BURIAL GROUNDS
6. DATE OF FIELD SURVEY: 23AUG2011 THRU 25AUG2011
7. INFORMATION TO GRAPHICALLY SHOW THE UNDERGROUND "WATER TREATMENT ROOM"
WAS OBTAINED FROM PLANS PROVIDED BY THE PHILPOTT DAM POWERHOUSE OPERATOR.
PLANS ARE ENTITLED "PHILPOTT RESERVOIR PROJECT - POWERHOUSE - PLAN -
EL 823.0 DATED JULY 1951 SHEET 9; FILE PA402B-0" AND " PHILPOTT RESERVOIR
PROJECT - POWERHOUSE - PLAN - EL 836.0 AND EL 837.25 DATED JULY 1951
SHEET 10; FILE PA403B-0"
I, STEPHEN R. WOLFE, CERTIFY THAT THIS PROJECT WAS COMPLETED UNDER MY DIRECT
AND RESPONSIBLE CHARGE FROM AN ACTUAL FIELD SURVEY MADE UNDER MY SUPERVISION;
THAT THE FIELD SURVEY WAS COMPLETED ON 25AUG2011.
STEPHEN R. WOLFE, VA PLS #1785 DATE
WALL
8’ CHAIN LINK FENCE
G A
T E
A I
L
N C
E
24" RCP
P
R C P
P
WALL
WALL
WALL
W A
L L
W A
L L
STEPS
24" RCP OUT=826.07
15" RCP IN=826.12
8" PVC IN=826.66
24" RCP IN=282.17
8" PVC IN=828.92
TOP=834.67
STORM MH
INV.=825.30
8’ CHAIN LINK FENCE
INV.=830.21
TOP=834.51
CATCH BASIN
INV.=827.27
TOP=832.09
DROP INLET
INV.=832.04
DIRECTION ONLY
END NOT FOUND
8" PLA. PIPE
INV.=831.12
TOP=834.50
CATCH BASIN
8’ CHAIN LINK FENCE
INV.=830.21
TOP=835.02
SAN. MH
8" RCP
METER
ELEC
BOX
JUNCTION
ELEC
G A
T E
POST
POST
POST
POST
POST
BOLLARD
SIGN
S I
G N
MAILBOX
BOLLARD
CONC
8’ CHAIN LINK FENCEWALL
WALL
WALL
CONC SIDEWALK
CONC SIDEWALK
CONC SIDEWALK
24" RCP OUT=829.19
18" RCP IN=830.60
18" RCP IN=830.87
TOP=834.77
STORM MH
T
M
STEPS
SWITCH
ELEC
3’ RAIL FENCE
3’ RAIL FENCE
LID
METAL
LID
METAL
8" PVC OUT=829.95
8" PVC IN=830.15
4" PVC INV=833.16
TOP=835.35
SAN. MH
8" P
VC
FES INV.=826.73
P
INV=828.59
TOP=834.30
CATCH BASIN
LIFT STATION
SANITARY SEWER
CONC SIDEWALK
BOX
ELEC
POLE
POLE
SIGN
METER
ELEC
INV=829.56
TOP=834.39
CATCH BASIN
INV=829.17
P
AREA
RIP-RAP
AREA
RIP-RAP
AREA
RIP-RAP
8" PVC OUT=830.25
8" PVC IN=830.36
TOP=834.97
SAN. MH
INV=833.79
TOP=837.84
DROP INLET
R C P
18" RCP
OVERHANG
BUILDING
GUARDRAIL FENCE
ON FACE OF WALL
8" PVC PIPES
O N
F
A
W
L L
P
V C
P I P
E S
FORCE MAIN
WV
WVLP GAS TANK
TOP=865.7’
FOUNDATION
CONC
TOP=864.7’
FOUNDATION
CONC
NO ELEV.
FOUNDATION
CONC
TOP=863.4’
FOUNDATION
CONC
TOP=863.6’
FOUNDATION
CONC
TOP=850.7’
FOUNDATION
CONC
TOP=848.5’
FOUNDATION
CONC
WALL
FOR SANITARY SEWER
PAVEMENT CUT
FOR SANITARY SEWER
PAVEMENT CUT
FOR WATERLINE
PAVEMENT CUT
FOR SANITARY SEWER
PAVEMENT CUT
G E
N E
R A
T O
R
E M
E R
G E
N C
Y
FFE=835.26
CONC/BRICK BUILDING
POWER HOUSE
E L
N E
O V
E R
H E
A D
E L
N E
O V
E R
H E
A D
POLE
POLE
ROP=861.5’
FOUNDATION
CONC TOP=861.3’
FOUNDATION
CONC
WOOD
STEPS
I-BEAM
I-BEAM
I-BEAM
ELEV=849.18
PLATFORM
GENERATOR
EMERGENCY
ELEVATED
FOR LIGHTS
FOUNDATION
CONC
TOP=876.4’
FOR STEEL TOWER
FOUNDATION
CONC
TOP=876.4’
FOR STEEL TOWER
FOUNDATION
CONC
DAM SPILLWAY ROAD
PAVEMENT
ASPHALT
PAVEMENT
ASPHALT
PAVEMENT
ASPHALT
PAVEMENT
ASPHALT
ASPHALT PAVEMENT
INV=828.59
TOP=834.35
CATCH BASIN
BOX
TELEPHONE
SEE NOTE 12
WATER TREATMENT ROOM
SUB-SURFACE
EDGE OF WOODS
E D
O D S
EDGE OF WOODS
ELEV=834.63
E=11,035,796.78
N=3,447,334.14
CONTROL POINT #TP51
ELEV=834.92
E=11,035,699.48
N=3,447,395.00
PK NAIL SET
CONTROL POINT #6
ELEV=834.96
E=11,035,665.66
N=3,447,394.03
PK NAIL SET
CONTROL POINT #5
E D
O D
S
CP #5
ELEV=835.17
E=11,035,950.66
N=3,447,307.00
NAIL SET
CONTROL POINT #4
PAVEMENT
ASPHALT
01_Existing_Site_Conditions_Survey.dgn 10/1/2014 3:51:31 PM
SCALE: 1" = 10’
010 10 20 30
D E
M O
L
IT
IO
A
N
E F
D
C
A
B C D
E F G H
F
M E
D A T E
R E
V
IE
W
D R
A W
D E
S Y
M B
O L
D E S
C R
IP
T
IO
N
D E S
IG
N
A P P
R O
V E
D D
A T E
C H
IE
F
D E S
N E
N G
R S E
C T
IO
N
I
W
IL
M
IN
G T
O N
N O
R
R O
L
IN
A
C O
R
E
N G
IN
E E
R S
U .S
A R
M Y
E
N G
IN
E
T R
IC
T
C L D
J U
L
G O
V E
R N
.R
U P
G R
A D
E S
W
IT
C H
G E
L O
C A T
IO
N
S M
E R
V
IR
G
IN
IA
P H
IL
P O
T T
R
E S E
R V
O
IR
P
R O J E
C T
IDENTIFICATION
SHEET
SG-11-HA-2
SG-2
SG-1
SG-3
SG-11-HA-1
INV.=827.27
TOP=832.09
DROP INLET
LINE & SPRINKLER
ABANDONED WATER
REMOVE EXISTING
UGT
U G
E
UGW
UGW
UGW
UGE
UGW
UGT
EXISTING FENCE
EXISTING SANITARY SEWER
EXISTING UNDERGROUND ELECTRICAL
EXISTING UNDERGROUND WATER
EXISTING UNDERGROUND TELEPHONE
UGW
U G
E
UGW
UGT
UGW UGW
UGW
UGW
UGT
C-101
N 3,447,283.0
N 3,447,268.4
N 3,447,300.8
E 11,035,723.4
E 11,035,766.8
E 11,035,842.3
LAT 36.7806
LAT 36.7805
LAT 36.7806
OF THE SPECIFICATIONS.
8. SUBSURFACE INVESTIGATIONS WERE PERFORMED IN NOVEMBER 2010. BORING LOGS ARE LOCATED IN APPENDIX A
PROJECT - POWERHOUSE - PLAN - EL 836.0 AND EL 837.25 DATED JULY 1951 SHEET 10; FILE PA403B-0".
PROJECT - POWERHOUSE - PLAN - EL 823.0 DATED JULY 1951 SHEET 9; FILE PA402B-0" AND " PHILPOTT RESERVOIR PLANS PROVIDED BY THE PHILPOTT DAM POWERHOUSE OPERATOR. PLANS ARE ENTITLED "PHILPOTT RESERVOIR
7. INFORMATION TO GRAPHICALLY SHOW THE UNDERGROUND "WATER TREATMENT ROOM" WAS OBTAINED FROM
6. CONTRACTOR SHALL CLEAR TREES FROM HILLSIDE ABOVE NEW BUILDING SITE AS SHOWN.
AND EROSION CONTROL DETAILS C-501 AND RETAINING WALL PLAN AND PROFILE.
5. CONTRACTOR TO INSTALL EROSION CONTROL TEMPORARY INLET PROTECTION FOR GRATE INLET. SEE SEDIMENT
WALL SHALL BE SAW CUT SQUARE TO EXISTING WALL.
4. REMOVE ANGLED REINFORCED CONCRETE WALL SECTION FROM EDGE TO EDGE. EDGE TO BE JOINED TO NEW
3. CONTRACTOR SHALL REMOVE CHAIN LINK FENCES AS SHOWN.
LOCAL REQUIREMENTS.
2. 15" RCP SHALL BE BROKEN UP AND DISPOSED OF OFF-SITE IN ACCORDANCE WITH ALL FEDERAL, STATE, AND
1. CONTRACTOR SHALL FIELD LOCATE ALL UTILITIES PRIOR TO EXCAVATING.
NOTES:
N
V A S
O U
T H Z
O N
E N
A D
LONG -80.0269
LONG -80.0270
LONG -80.0266
S
S
WV
WV
U G
E
U G
W
GATE
EXISTING
REMOVE
15" RCP
REMOVE
SWITCH
ELEC
METER
ELEC
METER
ELEC
R
C P
INV.=831.12
TOP=834.50
CATCH BASIN
24" RCP
24" RCP OUT=826.07
15" RCP IN=826.12
8" PVC IN=826.66
24" RCP IN=828.17
8" PVC IN=828.92
TOP=834.67
STORM MH
INV.=830.21
TOP=834.51
CATCH BASIN
R C
P
8" RCP
15" R C P
R
C P
INV.=825.30
INV.=832.04
INV=829.56
TOP=834.39
CATCH BASIN
R C
P
INV=829.17
FLOW
SMITH RIVER
LP GAS TANK
FOR W
ATERLINE
PAVEMENT CUT
TREATMENT ROOM"
UNDERGROUND "WATER
DEMO AREA
BORING LOCATION
WOOD STEPS
REMOVE EXISTING
SECTION OF WALL
REMOVE EXISTING
LEGEND
CHAIN LINK FENCE
REMOVE EXISTING
DEMOLISH EXISTING PAVEMENT
SAW CUT EDGE
(APPROX. 0.1 AC)
FROM HILLSIDE
CLEAR TREES
AND CHAIN LINK FENCE
REMOVE EXISTING GATE
PROTECT IN PLACE
FOUNDATION (TYP. 6)
EXISTING CONCRETE
02_Demolition_Plan.dgn 10/7/2014 9:05:27 AM
SOIL EROSION AND SEDIMENT CONTROL MEASURES
10 0 10 20 30
E R
O S
E
D
IM
E N
T
C
O N
T R
O L
P L A
N
E F
D
C
A
B C D
E F G H
F
M E
D A T E
R E
V
IE
W
D R
A W
D E
S Y
M B
O L
D E S
C R
IP
T
IO
N
D E S
IG
N
A P P
R O
V E
D D
A T E
C H
IE
F
D E S
N E
N G
R S E
C T
IO
N
I
W
IL
M
IN
G T
O N
N O
R
R O
L
IN
A
C O
R
E
N G
IN
E E
R S
U .S
A R
M Y
E
N G
IN
E
T R
IC
T
C L D
J U
L
G O
V E
R N
.R
U P
G R
A D
E S
W
IT
C H
G E
L O
C A T
IO
N
S M
E R
V
IR
G
IN
IA
P H
IL
P O
T T
R
E S E
R V
O
IR
P
R O J E
C T
IDENTIFICATION
SHEET
9. PLACE HAY BALES TO DIVERT RUNOFF TO THE EAST TOWARDS THE STORM WATER INLET.
ARE IMPLEMENTED.
ALL TEMPORARY SOIL EROSION CONTROL MEASURES SHALL BE MAINTAINED UNTIL PERMANENT SOIL EROSION CONTROL MEASURES
SIGNIFICANT EARTH CHANGE ACTIVITY CEASES, TEMPORARY SOIL EROSION CONTROL MEASURES SHALL BE IMPLEMENTED IMMEDIATELY.
WHEN IT IS NOT POSSIBLE TO PERMANENTLY STABILIZE A DISTURBED AREA IMMEDIATELY AFTER AN EARTH CHANGE OR WHERE
8. PERMANENT SOIL EROSION CONTROL MEASURES FOR ANY DISTURBED LAND AREA SHALL BE STABILIZED AS SOON AS POSSIBLE.
AND ANY NECESSARY REPAIRS SHALL BE MADE WITHOUT DELAY.
7. DAILY INSPECTION SHALL BE MADE BY THE CONTRACTOR TO DETERMINE THE EFFECTIVENESS OF EROSION CONTROL MEASURES, EARTH CHANGES HAVE BEEN ACCOMPLISHED.
PLANS. HE SHALL REMOVE TEMPORARY MEASURES AS SOON AS PERMANENT STABILIZATION OF SLOPES, DITCHES, AND OTHER
6. CONTRACTOR SHALL APPLY TEMPORARY EROSION AND SEDIMENTATION CONTROL MEASURES SHOWN AND AS DIRECTED ON THESE
5. EROSION AND SEDIMENTATION CONTROL MEASURES SHALL BE PLACED PRIOR TO OR AS THE FIRST STEP IN CONSTRUCTION.
OFFSITE AREA OR IN WATERWAYS TO INCLUDE BOTH MAN MADE OPEN DITCHES, STREAMS OR STORM DRAINS.
4. SEDIMENTATION FROM WORK ON THIS SITE SHALL BE CONTAINED ON THE SITE AND SHALL NOT BE ALLOWED TO COLLECT ON ANY
AND SHALL BE MAINTAINED THROUGHOUT THE PERIOD OF CONSTRUCTION.
3. ALL SOIL EROSION AND SEDIMENTATION CONTROL MEASURES NOTED SHALL BE INSTALLED PRIOR TO THE START OF CONSTRUCTION
2. ACCESS TO THE SITE WILL BE BY EXISTING PAVED ROADWAYS AND HIGHWAYS.
DROP INLETS, DIVERSION OF STORM WATER FROM HILLSIDE AWAY FROM EXCAVATION, AND CONTAINMENT OF STOCKPILED SOILS.
1. DESCRIPTION OF WORK: SOIL EROSION AND SEDIMENT CONTROL MEASURES SHALL INCLUDE: PROTECTION OF STORM DRAIN
INV.=831.12
TOP=834.50
CATCH BASIN
METER
ELEC
24" RCP OUT=826.07
15" RCP IN=826.12
8" PVC IN=826.66
24" RCP IN=828.17
8" PVC IN=828.92
TOP=834.67
STORM MH
INV.=827.27
TOP=832.09
DROP INLET
ELEVATION 835.5’
FINISHED FLOOR
BUILDING
NEW SWITCHGEAR
SG-11-HA-1
SG-11-HA-2
xxxxxxxx xx xx xxxxxxxxxx xx xx xx xx xx xx xx
(TYP. OF 2)
NEW HVAC UNIT
FENCE 6’ HIGH
NEW CHAIN LINK
FLOW
SMITH RIVER
C-102
(TYP OF 5)
NEW BOLLARD
NEW CONCRETE PADS
AEP EQUIPMENT
NEW MANHOLE
EXIST. CONC. SIDEWALK
N
V A S
O U
T H Z
O N
E N
A D
NEW ROCKFALL BARRIER
S
S
S
FENCE 6’ HIGH
NEW CHAIN LINK
FENCE 6’ HIGH
NEW CHAIN LINK
SEE NOTE 9
HAY BALES
SEE NOTE 9
HAY BALES
(TYP OF 2)
SEE SHEET C-501
INLET PROTECTION
SWITCH
ELEC
METER
ELEC
POWERHOUSE
INV.=825.30
INV.=830.21
TOP=834.51
CATCH BASIN
INV.=832.04
INV=829.56
TOP=834.39
CATCH BASIN
G E
N E
R A
T O
R
E M
E R
G E
N C
Y T
O E O
F D
A M
EXIST. 8’ CHAIN LINK FENCE
E X
IS
T C
H A
IN
L
IN
K F
E N
C E
ELEVATION 847.5’
TOP OF WALL
RETAINING WALL
NEW CONCRETE
FENCE GATE
NEW CHAIN LINK
03_Erosion_Sediment_Control_Plan.dgn 10/1/2014 3:51:34 PM
10 0 10 20 30
B U
IL
D
E
P L A
N
E F
D
C
A
B C D
E F G H
F
M E
D A T E
R E
V
IE
W
D R
A W
D E
S Y
M B
O L
D E S
C R
IP
T
IO
N
D E S
IG
N
A P P
R O
V E
D D
A T E
C H
IE
F
D E S
N E
N G
R S E
C T
IO
N
I
W
IL
M
IN
G T
O N
N O
R
R O
L
IN
A
C O
R
E
N G
IN
E E
R S
U .S
A R
M Y
E
N G
IN
E
T R
IC
T
C L D
J U
L
G O
V E
R N
.R
U P
G R
A D
E S
W
IT
C H
G E
L O
C A T
IO
N
S M
E R
V
IR
G
IN
IA
P H
IL
P O
T T
R
E S E
R V
O
IR
P
R O J E
C T
IDENTIFICATION
SHEET
GENERAL CONSTRUCTION NOTES
INV.=831.12
TOP=834.50
CATCH BASIN
METER
ELEC
24" RCP OUT=826.07
15" RCP IN=826.12
8" PVC IN=826.66
24" RCP IN=828.17
8" PVC IN=828.92
TOP=834.67
STORM MH
INV.=827.27
TOP=832.09
DROP INLET
ELEVATION 835.5’
FINISHED FLOOR
BUILDING
NEW SWITCHGEAR
SG-2
SG-3
SG-11-HA-1
SG-11-HA-2
xxxxxxxx xx xx xxxxxxxxxx xx xx xx xx xx xx xx
(TYP. OF 2)
NEW HVAC UNIT
INVERT OUT= 826.90
INVERT IN= 827.15
NEW MANHOLE
FENCE 6’ HIGH
NEW CHAIN LINK
SEE NOTE 4
NEW CONCRETE PADS
AEP EQUIPMENT
FLOW
SMITH RIVER
C-103
EXIST. CONC. SIDEWALK
SHEET S-501
SEE DETAIL
(TYP OF 8)
NEW BOLLARD
ARRESTING, AND RETAINING A DESIGN IMPACT LOAD OF 500 KJ.
8. FOR PURPOSES OF PREPARING BIDS, THE ROCKFALL BARRIER SHALL BE SIX FEET TALL AND BE CAPABLE OF ABSORBING,
7. THE ROCKFALL BARRIER SHALL BE INSTALLED IN ACCORDANCE WITH THE REQUIREMENTS OF THE MANUFACTURER.
WITH MANUFACTURING SUCH SYSTEMS USED IN A SIMILAR APPLICATION AND CAPACITY.
ENGAGED IN DESIGNING AND MANUFACTURING ROCK FALL PROTECTION SYSTEMS AND HAVE DOCUMENTED EXPERIENCE
LENGTH OF FENCE SHOWN ON THIS SITE PLAN. THE MANUFACTURER OF THE ROCKFALL BARRIER SHALL BE REGULARLY
6. THE ROCKFALL BARRIER SYSTEM SHALL INCLUDE: POSTS, CABLES, BRAKING ELEMENTS, AND REQUIRED ANCHORS FOR THE
DESIGN OF ROCKFALL BARRIERS.
BY A PROFESSIONAL GEOTECHNICAL ENGINEER REGISTERED IN THE COMMONWEALTH OF VIRGINIA AND EXPERIENCED IN THE
5. CONTRACTOR TO DESIGN, PROVIDE AND INSTALL ROCKFALL BARRIER SYSTEM. THE ROCKFALL SYSTEM SHALL BE DESIGNED
REFERENCE DRAWING 2FDX030U.
4. NEW AEP EQUIPMENT CONCRETE PADS DIMENSIONS SHALL BE 10’ X 7’ AND 6’ X 4’. FFE = 835.5’. SEE EQUIPMENT PAD DETAILS ON
PURCHASING ANY MATERIALS.
3. THE CONTRACTOR SHALL NOTIFY THE CONTRACTING OFFICER OF ANY VARIANCES PRIOR TO COMMENCEMENT OF WORK OR
CONTRACTOR SHALL COOPERATE WITH UTILITY COMPANIES DURING ANY RELOCATION OPERATION AS REQUIRED.
WHEN CROSSING ANY UNDERGROUND UTILITY, WHETHER SHOWN ON THE PLAN OR LOCATED BY THE UTILITY COMPANY. THE
WHERE AND HOW YOU CAN BE REACHED AND THE BEST TIME TO CONTACT YOU. THE CONTRACTOR SHALL EXERCISE CAUTION
COMPANY NAME, TELEPHONE NUMBER, OWNER’S NAME, DATE AND TIME YOU EXPECT TO COMMENCE CONSTRUCTION, AND
FOLLOWING INFORMATION READY: COUNTY, TOWN, LOCATION, NEAREST ROAD INTERSECTIONS, TYPE OF WORK, YOUR
DAYS NOTICE TO ALLOW TIME FOR EXISTING UTILITIES TO BE STAKED. BEFORE CALLING, THE CONTRACTOR SHALL HAVE THE
2. PRIOR TO INSTALLATION OF ANY WORK ONSITE, THE CONTRACTOR SHALL GIVE THE UTILITY COMPANIES THREE (3) WORKING
1. IT IS RECOMMENDED THAT CONTRACTORS BIDDING ON THIS WORK VISIT THE SITE PRIOR TO BIDDING.
N
V A S
O U
T H Z
O N
E N
A D
(SEE NOTES 5 THRU 8)
NEW ROCKFALL BARRIER
SG-1
S
S
S
FENCE 6’ HIGH
NEW CHAIN LINK
FENCE 6’ HIGH
NEW CHAIN LINK
SWITCH
ELEC
METER
ELEC
POWERHOUSE
INV.=825.30
INV.=830.21
TOP=834.51
CATCH BASIN
INV.=832.04
INV=829.56
TOP=834.39
CATCH BASIN
G E
N E
R A
T O
R
E M
E R
G E
N C
Y T
O E O
F D
A M
EXIST. 8’ CHAIN LINK FENCE
E X
IS
T C
H A
IN
L
IN
K F
E N
C E
ELEVATION 847.5’
TOP OF WALL
RETAINING WALL
NEW CONCRETE
SHEET C-100-101
SEE DETAILS
FENCE GATE
NEW CHAIN LINK
04_Building_Site_Plan.dgn 10/1/2014 3:51:36 PM
HA-2
HA-1
10 0 10 20 30
SCALE: 1" = 10’
SG-3
SG-2
S
U
IL
IT
Y
P L A
N
C-104
E F
D
C
A
B C D
E F G H
F
M E
D A T E
R E
V
IE
W
D R
A W
D E
S Y
M B
O L
D E S
C R
IP
T
IO
N
D E S
IG
N
A P P
R O
V E
D D
A T E
C H
IE
F
D E S
N E
N G
R S E
C T
IO
N
I
W
IL
M
IN
G T
O N
N O
R
R O
L
IN
A
C O
R
E
N G
IN
E E
R S
U .S
A R
M Y
E
N G
IN
E
T R
IC
T
C L D
J U
L
G O
V E
R N
.R
U P
G R
A D
E S
W
IT
C H
G E
L O
C A T
IO
N
S M
E R
V
IR
G
IN
IA
P H
IL
P O
T T
R
E S E
R V
O
IR
P
R O J E
C T
IDENTIFICATION
SHEET
UGW
UGW
UGW
NEW 15" RCP
10’
10’
NEW 15" RCP
(SEE NOTE 6)
ELECTRICAL DUCTBANK
NEW CONCRETE
(SEE NOTES 4 & 5)
EQUIPMENT PADS
NEW CONC. AEP
(SEE NOTES 2 & 3)
CONDUIT ROUTING
NEW TRANSFORMER
(SEE NOTE 4)
FOUR DUCTS
NOTES:
B.
A.
(SEE NOTE 9)
NEW 2-INCH WATER LINE
FOOTING
RETAINING WALL
METER
ELEC
U G
E
UGT
UGW
METER
ELEC
U G
E
4’-9" 11.25’
24" RCP
P
V C
UGT
SG-1
UGW
UGW
INV=829.17
UGT
FLOW
SMITH RIVER
V A S
O U
T H Z
O N
E N
A D
PLATE C-502
CROSSING DETAIL
SEE UTILITY
PLATE C-502
CROSSING DETAIL
SEE UTILITY
UGE
UGW
UGT
EXISTING FENCE
EXISTING SANITARY SEWER
EXISTING UNDERGROUND ELECTRICAL
EXISTING UNDERGROUND WATER
EXISTING UNDERGROUND TELEPHONE
8.
7.
6.
5.
4.
3.
2.
1.
SHEET. EXISTING 2-INCH WATER LINE TO BE BYPASSED SHALL BE REMOVED PER SHEET C-101.
NEW 2-INCH WATER LINE AND VALVE TO BE CONSTRUCTED PER SPEC SECTION 33 11 00 AND DETAILS ON THIS
REFER TO C-101 FOR DEMOLITION PLAN.
SEE SHEET C-505 FOR PROFILE AND DETAILS OF NEW CONCRETE DUCTBANK.
ABOVE FFE OF EQUIPMENT PAD.
TO THE AEP EQUIPMENT PADS. DUCTS SHALL ORIGINATE IN BUILDING CABLE TRENCH AND STUB-UP
CONTRACTOR SHALL PROVIDE FOUR SIZE 2 TYPE EB-35 DUCT FROM THE NEW SWITCHGEAR BUILDING
SEE EQUIPMENT PAD DETAILS ON REFERENCE DRAWING 2FDX030U.
NEW CONCRETE AEP EQUIPMENT PADS DIMENSIONS SHALL BE: 10’ X 7’, AND 6’ X 4’. FFE = 835.5’.
DIMENSIONS SHOWN FOR BIDDING PURPOSE ONLY.
CONTRACTOR TO SIZE, DESIGN, PROVIDE, AND INSTALL CONDUIT SYSTEM. CONDUIT ROUTING AND
ENCLOSURE LOCATED IN THE VAULT BACK WALL.
- SIMILAR ROUTING FROM THE NEW SWITCHGEAR TRENCH TO GSU TRANSFORMER CONTROLS
CONTROLS AND INSTRUMENTATION 4" CONDUIT.
- USE BOTTOM ENTRY IN THE BUSHING ENCLOSURE
- DOWN TO VAULT AGGREGATE ELEVATION
- INSIDE THE INCLINED VAULT WALL
- ON TOP OF THE WALL AND INSIDE THE FENCE
GSU LEADS 2 STACKED, PARALLEL 6" CONDUITS.
NEW TRANSFORMER CONDUIT ROUTING
ELECTRICAL LINES IN THE VICINITY OF THE EXCAVATION.
PRIOR TO EXCAVATION THE CONTRACTOR SHALL ASSURE DE-GENERATION OF ANY EXISTING
N
0+40
0+50
0+60
0+70
S
S
S
WV
WV
U G
W
CONDUIT
4-INCH
0+80
P
SWITCH
ELEC
R
C P
LP GAS TANK
POWERHOUSE
8" PVC
R C
P
ELEVATION 847.5’
TOP OF WALL
RETAINING WALL
NEW CONCRETE
ELEVATION 835.5’
FINISHED FLOOR
BUILDING
NEW SWITCHGEAR
BORING LOCATION
LEGEND
05_ Site_Utility_Plan.dgn 10/1/2014 3:51:37 PM
SILT FENCE
WASHED STONE
NO. 5 OR NO. 57
TYP.
12"
STEEL POST (TYP.)
FILTER FABRIC
FILTER FABRIC
24"
A A
DROP INLET
TYP.
TYP.
T Y
P
2. VEGETATIVE STABILIZATION.
SEED PERMANENT GROUND COVER FOR ALL DISTURBED AREAS WITHIN 15 WORKING DAYS
OR 30 CALENDAR DAYS (WHICHEVER IS SHORTER) FOLLOWING COMPLETION OF
CONSTRUCTION OR DEVELOPMENT.
IMMEDIATELY AFTER SEEDING, FIRM ENTIRE AREA EXCEPT FOR SLOPES IN EXCESS OF
3 TO 1 WITH ROLLER NOT EXCEEDING 90 POUNDS FOR EACH FOOT OF ROLLER WIDTH.
IF SEEDING IS PERFORMED WITH CULTIPACKER-TYPE SEEDER OR HYDROSEEDING,
ROLLING MAY BE ELIMINATED.
PLANTING SEASON PLANTING DATES
SEASON 1
1 SEPTEMBER TO 15 OCTOBER
SEASON 2
TEMPORARY SEEDING 1 SUMMER
TEMPORARY SEEDING 2 SPRING, FALL AND WINTER
PLANTING SEASON VARIETY PERCENT (BY WEIGHT)
SEASON 1 TALL FESCUE 100 (160)
SEASON 2 TALL FESCUE 55 (130)
BERMUDA 13 ( 30)
BAHIA 19 ( 45)
LESPEDEZA, COMMON 13 ( 30)
TEMPORARY SEEDING 1 SUDAN GRASS 100
TEMPORARY SEEDING 2 RYE GRAIN 100
FERTILIZER
APPLY FERTILIZER AT RATES AS DETERMINED BY LABORATORY SOIL ANALYSIS OF THE
SOILS AT THE JOB SITE. GRANULAR CONTROLLED RELEASE FERTILIZER CONTAINING
THE FOLLOWING MINIMUM PERCENTAGES, BY WEIGHT OF PLANT FOOD NUTRIENTS:
8 PERCENT AVAILABLE NITROGEN
8 PERCENT AVAILABLE PHOSPHORUS
8 PERCENT AVAILABLE POTASSIUM
HYDROSEEDING FERTILIZER SHALL HAVE THE SAME COMPOSITION OF AVAILABLE FOOD
NUTRIENTS, COMPOSED OF PILLS COATED WITH PLASTIC RESIN TO PROVIDE A CONTINUOUS
RELEASE OF NUTRIENTS FOR AT LEAST 6 MONTHS.
MULCH
MULCH SHALL BE FREE OF NOXIOUS WEEDS, MOLD, AND OTHER DELETERIOUS MATERIALS.
HAY OR STRAW MULCH SHALL BE SPREAD UNIFORMLY AT THE RATE OF 2 TONS PER ACRE.
MULCH SHALL BE SPREAD BY HAND, BLOWER-TYPE MULCH SPREADER, OR OTHER APPROVED
METHOD. MULCHING SHALL BE STARTED ON THE WINDWARD SIDE OF RELATIVELY FLAT
AREAS OR ON THE UPPER PART OF STEEP SLOPES, AND CONTINUED UNIFORMLY UNTIL THE
AREA IS COVERED. THE MULCH SHALL NOT BE BUNCHED OR CLUMPED. SUNLIGHT SHALL
NOT BE COMPLETELY EXCLUDED FROM PENETRATING TO THE GROUND SURFACE. ALL AREAS
INSTALLED WITH SEED SHALL BE MULCHED ON THE SAME DAY AS THE SEEDING. MULCH
SHALL BE ANCHORED IMMEDIATELY FOLLOWING SPREADING. MECHANICAL ANCHOR SHALL
BE A V-TYPE-WHEEL LAND PACKER; A SCALLOPED-DISK LAND PACKER DESIGNED TO FORCE
MULCH INTO THE SOIL SURFACE; OR OTHER SUITABLE EQUIPMENT.
STORM DRAIN AND INLET PROTECTION NOTES:
1.SILT FENCE INSTALLATION SHALL BE IN ACCORDANCE WITH VIRGINIA EROSION AND SEDIMENT CONTROL
HANDBOOK, CHAPTER 3.05.
2. STORM DRAIN INLET PROTECTION INSTALLATION SHALL BE IN ACCORDANCE WITH VIRGINIA EROSION
AND SEDIMENT CONTROL HANDBOOK, CHAPTER 3.07.
3. THE SILT FENCE SHALL BE INSPECTED AFTER EACH RAIN EVENT AND REPAIRS MADE AS NECESSARY.
4.CONSTRUCTION OPERATIONS SHALL BE CARRIED OUT IN SUCH A MANNER THAT EROSION AND WATER
POLLUTION ARE MINIMIZED.
SOIL EROSION MAINTENANCE NOTES:
1. DAILY INSPECTIONS OF EROSION CONTROL MEASURES AS WELL AS PERIODIC INSPECTIONS WITHIN 24 HOURS OF ANY
RAINFALL WILL BE REQUIRED. THESE INSPECTIONS MAY RESULT IN RECOMMENDATIONS FOR ROUTINE MAINTENANCE OF
THE SOIL EROSION CONTROL DEVICES, AS WELL AS FURTHER MAINTENANCE AS OUTLINED BELOW.
2. THROUGHOUT THE CONSTRUCTION PERIOD, ALL MUD/SILT TRACKED ONTO EXISTING COUNTY ROADS FROM THE SITE DUE
TO CONSTRUCTION SHALL BE IMMEDIATELY REMOVED BY THE CONTRACTOR.
3. TEMPORARY SILT FENCE SHALL BE INSPECTED DAILY BY CONTRACTOR. IF REPAIRS OR REPLACEMENT ARE NECESSARY, THEY SHALL BE PERFORMED IMMEDIATELY. THE TEMPORARY SILT FENCE SHALL BE TRENCHED IN, BACKFILLED, AND
STAPLED OR STAKED ACCORDING TO THE MANUFACTURER’S RECOMMENDATIONS. IF SEDIMENT ACCUMULATES1
2 THE
HEIGHT OF THE TEMPORARY SILT FENCE, CONTRACTOR MAY HAVE TO REMOVE, REPLACE, RE-TRENCH, OR RE-BACKFILL THE
TEMPORARY SILT FENCE IF IT FAILS. TEMPORARY SILT FENCE SHALL ALSO BE REPLACED IF ANY PORTION OF THE FENCING
IS DAMAGED BY CONSTRUCTION MACHINERY.
4. SEEDING OR RESEEDING MAY BE REQUIRED IMMEDIATELY IN AREAS WHICH HAVE BEEN DAMAGED BY RUNOFF OR
CONSTRUCTION ACTIVITES.
PLAN VIEW
1’-6"
SECTION A-A
1 MARCH TO 15 MAY
16 MAY TO 31 AUGUST
C-501
FERTILIZER MAY BE APPLIED DURING THIS PROCEDURE.
CONSTRUCTION OPERATIONS SHALL BE COMPLETELY PULVERIZED BY TILLAGE. THE
PATTERNS SHALL BE MAINTAINED AS INDICATED ON DRAWINGS. AREAS COMPACTED BY
1-HORIZONTAL-TO-1-VERTICAL AND STEEPER, NO TILLAGE IS REQUIRED. DRAINAGE
USED WHERE SOIL CONDITIONS AND LENGTH OF SLOPE PERMIT. ON SLOPES
PLOWS, OR SIMILAR IMPLEMENTS, OR OTHER SIMILAR METHOD. ROTOTILLERS SHALL BE
2 INCH DEPTH BY SCARIFYING WITH HEAVY RAKES, SPIKED TOOTH HARROW, CHISEL
1-HORIZONTAL-TO-1-VERTICAL, THE SOIL SHALL BE TILLED TO A MINIMUM
A MINIMUM 4 INCH DEPTH. ON SLOPES BETWEEN 3-HORIZONTAL-TO-1-VERTICAL AND
SOIL IN SLOPES UP TO A MAXIMUM 3-HORIZONTAL-TO-1-VERTICAL SHALL BE TILLED TO
SOIL PREPARATION
APPLICATION OF GRASS SEED AND FERTILIZER.
9 TO 15 PERCENT MOISTURE, pH RANGE FROM 5.5 TO 8.2. USE HYDRAULIC
METERING OF MATERIALS APPLICATION. COMPOSITION ON AIR-DRY WEIGHT BASIS:
INHIBITING FACTORS AND DYED AN APPROPRIATE COLOR TO FACILITATE VISUAL
(100 PERCENT) HYDRAULIC MULCH. PROCESSED TO CONTAIN NO GROWTH OR GERMINATION-
USE RECOVERED MATERIALS OF EITHER PAPER-BASED (100 PERCENT) OR WOOD-BASED
WOOD CELLULOSE FIBER MULCH
MULCH BLOWING EQUIPMENT. HAY SHALL BE STERILE, CONTAINING NO FERTILE SEED.
AIR-DRY CONDITION AND OF PROPER CONSISTENCY FOR PLACING WITH COMMERCIAL
HAY
EQUIPMENT. STRAW SHALL CONTAIN NO FERTILE SEED.
AND OF PROPER CONSISTENCY FOR PLACING WITH COMMERCIAL MULCH BLOWING
STRAW FROM OATS, WHEAT, RYE, BARLEY, OR RICE. FURNISH IN AIR-DRY CONDITION
STRAW
GENERAL NOTES (CONTINUED)
GENERAL NOTES
1. CONSTRUCTION SEQUENCE.
BEFORE THE START OF THE NEXT STAGE, THE CONTRACTOR SHALL STABILIZE
THE DISTURBED EARTH.
CONTRACTOR SHALL INSTALL SILT FENCE BARRIER TO CONTROL STOCKPILE RUNOFF.
SHALL NOTIFY THE NORTH CAROLINA ONE CALL SYSTEM AT 1-800-632-4949 OR
DIAL 811.
ON THE PLANS. FENCE OFF ANY TREES TO BE SAVED.
AND AFTER RAINFALL EVENTS. NEEDED REPAIRS SHALL BE MADE IMMEDIATELY.
DAM SWITCHGEAR, RESTORE DISTURBED AREA. REMOVE ACCUMULATED SEDIMENT
BEHIND SILT FENCE AND REMOVE ALL SILT FENCE.
A. AT THE COMPLETION OF EACH STAGE OF EARTH DISTURBING ACTIVITY AND
B. BEFORE EXCAVATION OR STOCKPILING OF ANY EXCAVATED MATERIALS THE
C. BEFORE STARTING ANY EARTH DISTURBING ACTIVITIES, THE CONTRACTOR
D. CLEARLY FIELD MARK THE LOCATIONS OF THE LIMITS OF DISTURBANCE AS SHOWN
E. INSTALL SILT FENCE.
F. PERFORM RETAINING WALL AND ASSOCIATED WORK ON PHILPOTT DAM SWITCHGEAR.
G. ALL EROSION AND SEDIMENT CONTROL PRACTICES WILL BE INSPECTED WEEKLY
H. UPON COMPLETION OF THE RETAINING WALL AND ASSOCIATED WORK ON PHILPOTT
C O
N T R
O L
D
E T
A
IL
S S E
D
IM
E
O S
IO
N
E F
D
C
A
B C D
E F G H
F
M E
D A T E
R E
V
IE
W
D R
A W
D E
S Y
M B
O L
D E S
C R
IP
T
IO
N
D E S
IG
N
A P P
R O
V E
D D
A T E
C H
IE
F
D E S
N E
N G
R S E
C T
IO
N
I
W
IL
M
IN
G T
O N
N O
R
R O
L
IN
A
C O
R
E
N G
IN
E E
R S
U .S
A R
M Y
E
N G
IN
E
T R
IC
T
C L D
J U
L
G O
V E
R N
.R
U P
G R
A D
E S
W
IT
C H
G E
L O
C A T
IO
N
S M
E R
V
IR
G
IN
IA
P H
IL
P O
T T
R
E S E
R V
O
IR
P
R O J E
C T
IDENTIFICATION
06_SedimentandErosion_Control_Details.dgn 10/1/2014 3:51:39 PM
SUBSURFACE COURSE
2" S9.5B OR S9.5C
b
H
6" FOR H GREATER THAN 10’
4" FOR H LESS THAN 10’
12"
4" MIN.
9.5"
12"
12" 12"
9.5"
#57 BEDDING
AGGREGATE
UNDISTURBED EARTH
SECTION X-X
NOT TO SCALE
(S Q
B25.C BASE COURSE
11" B25.0B OR
SEE NOTE 1
6"
SEE NOTE 1
6"
19"
TYPE
FOUNDATION
(b)
BEDDING THICKNESS
NORMAL EARTH
ROCK
SOFT & YIELDING
1" PER FOOT OF H, MAX. 8"
12"
SEE NOTE 3
COMPACTED BACKFILL
SEE NOTE 3
INITIAL BACKFILL
DRAINAGE STRUCTURE BEDDING DETAIL
AND PAVEMENT REPAIR DETAIL
STORM DRAINPIPE TRENCH
CONTRACTING OFFICER
OR AS DIRECTED BY THE
AS SPECIFIED ON THE PLANS
#57 BEDDING
AGGREGATE
EXISTING EXISTING
PLUGS
PLAN
18" MIN.
EXIST. SANITARY SEWER PIPE
NEW WATER PIPE
UTILITY CROSSING DETAIL
COURSE, TYPE 1-2
2" BIT. CONC. SURF.
(6" LIFTS)
TAMPED BACKFILL
3’-0" MIN. COVER
PIPE
TRENCH WIDTH
SEE TRENCH DETAIL
PAVEMENT PATCH DETAIL
6" 12"
(TYP.)
MACHINE CUT (TYP.)
8" CONCRETE
(TYP.)
EXISTING PAVEMENT
THRUST BLOCKS
NOTES:
1. WIDTH OF BEDDING MATERIAL SHALL EXTEND A MINIMUM OF 6" BEYOND THE BASE OF
THE STRUCTURE ON ALL SIDES.
2. HEIGHT OF STRUCTURE (H) IS MEASURED FROM THE INVERT OF THE STRUCTURE TO
THE TOP OF THE FRAME AND COVER OR CONCRETE DEPENDING ON STRUCTURE
TYPE. SEE APPLICABLE DRAINAGE STRUCTURE STANDARD FOR DETAIL.
3. INITIAL AND COMPACTED BACKFILL SHALL MEET THE REQUIREMENTS OF SECTION
520.03 OF THE VDOT SPECIFICATIONS. CRUSHED GLASS CONFORMING TO THE SIZE
REQUIREMENTS FOR CRUSHER RUN AGGREGATE SIZE 25 OR 26 AND MEETING THE
REQUIREMENTS OF SECTION 520.03 OF THE VDOT SPECIFICATION MAY BE USED AS
BACKFILL MATERIAL.
C
IV
IL
D
E T
A
IL
S
C-502
E F
D
C
A
B C D
E F G H
F
M E
D A T E
R E
V
IE
W
D R
A W
D E
S Y
M B
O L
D E S
C R
IP
T
IO
N
D E S
IG
N
A P P
R O
V E
D D
A T E
C H
IE
F
D E S
N E
N G
R S E
C T
IO
N
I
W
IL
M
IN
G T
O N
N O
R
R O
L
IN
A
C O
R
E
N G
IN
E E
R S
U .S
A R
M Y
E
N G
IN
E
T R
IC
T
C L D
J U
L
G O
V E
R N
.R
U P
G R
A D
E S
W
IT
C H
G E
L O
C A T
IO
N
S M
E R
V
IR
G
IN
IA
P H
IL
P O
T T
R
E S E
R V
O
IR
P
R O J E
C T
IDENTIFICATION
SHEET
6"
A A
X
X
UNDISTURBED EARTH
A A
B B
UNDISTURBED EARTH
X
AA
B
PLAN
X
6" MIN.
UNDISTURBED EARTH
B
ELEVATION
24" MIN., 12" & LARGER PIPE
18" MIN., 10" & SMALLER PIPE
UNDISTURBED
EARTH
SUBGRADE
COMPACTED
B B
SIZE
UP
TO
6"
8"
10"
12" 29"
26"
22"
16"
A B A B A B A B C D
1/4 BENDS 1/8 BENDS 1/16 BENDS TEES PLUGS
10"
13’
17"
21" 16"
14"
12"
9" 10"
13"
17"
21" 11"
10"
8"
6" 8"
10"
13"
16" 18"
16"
13"
10" 12"
16"
20"
24" 16"
14"
12"
10" 21"
29"
36"
41"
18"
MIN.
D S
Q
C
UNDISTURBED EARTH
PLAN
ELEVATION
TEES
BENDS
N.T.S.
N.T.S.
DRAINAGE STRUCTURE BEDDING
N.T.S.
N.T.S.
C-502C-502
C-502
C-502
07_Civil_Details.dgn 10/1/2014 3:51:41 PM
ON EXTENSION ARMS
BARBED-WIRE APRON
TOP RAIL OR TENSION WIRE
BRACE RAIL
OR PULL POST
CORNER, END,
16" MIN. DIA.
M
IN
XXXXX
X
X
X
X
X
X
X
X
X
X
XXXXX
X
X
X
X
X
X
X
X
X
X
XXXXX
X X X X X
XXXXX
XXX
X
X
X X X
XXXX
XXXX
X X X X
XXXX
XXXX
X X X X
XXXX
XXXXX
X X X X X
XXXXX
XXXX
X
X
X X X
XXX
X
X
X
X
X
X
XX
X
X
X
X
XXXXX
X
X
X
X
X X
XX
XXXXX
X X X X
XXXX
X
X
XXXX
X X X X
XXXX
X
X
XX
X
X
F A
B R
IC
W
ID
T
H
10’-0" MAXIMUM
CONCRETE BASE
LINE POST
LINE POST
TENSION WIRE
GRADE
HOG RINGS (TYP.)
10" MIN. DIA.
1’ -6
6" T Y P
1’ -1 0"
7.
5" (T
YP.
LOCK PIN (TYP.) BARBED WIRE (TYP.)
FABRIC
TENSION BAR
CARRIAGE BOLT
FABRIC
TOP RAIL OR TENSION WIRE
PULL POSTLINE POST LINE POST
TRUSS ROD
10’-0" MAX. 10’-0" MAX.
FENCE POST
USE AND SECTION
MINIMUM OUTSIDE DIMENSIONS (NOMINAL)
FABRIC LESS THAN 72" FABRIC 72" TO 96" FABRIC OVER 96"
CORNER, END & PULL POSTS
TUBULAR - ROUND
LINE POSTS
TUBULAR - ROUND
2.375" O.D.
2.375" O.D.
2.875" O.D.
2.875" O.D.
4.00" O.D.
1.90" O.D.
1’-0"
NOTE:
CONCRETE BASE 2
(T
Y P
RIVETED FLUSH (TYP.)
" PLAIN PIN8
RIVETED FLUSH (TYP.)
" PLAIN PIN8
(2’-0" O.C. MAX.)
9-GAGE STEEL TIE WIRES
FITTING OF COPPER
OR APPROVED CLAMP-TYPE
MOLDED EXOTHERMIC WELD
COPPER WIRE
#8 AWG SOLID
STEEL GROUND ROD
" DIA. COPPER-CLAD4
STRAIGHT RUNS EXCEED 500 FEET.
PROVIDE BRACE PANEL WHENEVER
(3/8" MIN. DIA.)
TRUSS ROD
TENSION WIRE
BARBED-WIRE OR
TOP AND BOTTOM OF FABRIC)
(15" O.C. MAX. AND WITHIN 4" FROM
TENSION BAND
CLIPS (TYP.)
TIE WIRES OR
(3/8" MIN. DIA.)
TRUSS ROD
NOTES:
LINE POST
EXTENSION ARM DETAILS
CORNER POST
FASTENING DETAILS
ROUND POST
LINE POST ATTACHMENTS
END OR GATE POST DETAIL
TENSION BAND DETAIL
TOP OR BRACE RAIL ATTACHMENT
CHAIN-LINK SECURITY FENCE DETAIL
TRUSS ROD AND BAND
NO SCALE
NO SCALE
NO SCALE
LINE POSTS TO BE EQUALLY SPACED
10’-0" MAXIMUM
BRACE PANEL DETAIL
GROUNDING DETAILNO SCALE
NO SCALE
OF FABRIC
BOTTOM
(TYP.)
RINGS
OR HOG
TIE WIRES
DEGREES
DEGREES
FABRIC LINK
ENGAGE EACH
TENSION BAR TO
OF FABRIC)
TOP AND BOTTOM
AND WITHIN 4" FROM
WIRE (15" O.C. MAX.
9-GAGE STEEL TIE
RAILS
BRACE
RAILS
BRACE
(9 GAGE, 2" MESH)
CHAIN-LINK FABRIC
TRUSS ROD
E F
D
F E
N C
E D
E T
A
IL
S
AND METHODS OF INSTALLATION.
NOT INTENDED TO LIMIT OTHER TYPES OF FENCE SECTIONS
1. DETAILS SHOWN ARE TO CLARIFY REQUIREMENTS AND ARE
SECURE AREA.
FABRIC SHALL BE PLACED ON THE OPPOSITE SIDE OF THE
ON THE SECURE SIDE OF THE FENCE ALIGNMENT. CHAIN-LINK
2. WIRE TIES, RAILS, POSTS, AND BRACES SHALL BE CONSTRUCTED
STEEL POST SCHEDULE
C-503
C
A
B C D
E F G H
F
M E
D A T E
R E
V
IE
W
D R
A W
D E
S Y
M B
O L
D E S
C R
IP
T
IO
N
D E S
IG
N
A P P
R O
V E
D D
A T E
C H
IE
F
D E S
N E
N G
R S E
C T
IO
N
I
W
IL
M
IN
G T
O N
N O
R
R O
L
IN
A
C O
R
E
N G
IN
E E
R S
U .S
A R
M Y
E
N G
IN
E
T R
IC
T
C L D
J U
L
G O
V E
R N
.R
U P
G R
A D
E S
W
IT
C H
G E
L O
C A T
IO
N
S M
E R
V
IR
G
IN
IA
P H
IL
P O
T T
R
E S E
R V
O
IR
P
R O J E
C T
IDENTIFICATION
08_Fence_Gate_Details.dgn 10/1/2014 3:51:43 PM x x x x x x x x x x x x xxxxxx x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x xxxxxxx x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x xxx xxx xxxx x x x x x x x x x x x x x x x x x x x x xx x x x x x x x x x x x x x x
D
F E
N
T
A
IL
S
FABRIC
CHAIN LINK
OF BARBED WIRE
3 HORIZONTAL STRANDS
WIRE (TYP.)
3 STRANDS OF BARBED
FENCE FABRIC (TYP.)
DIRECTION GATE SWING (TYP.)
GATE OPENING 18’
GATE FRAME
F E
N C
E F
A B
R
IC
LINE POST
4" O. D. & LESS
2’-10" MIN. FOR POSTS
" O. D.8
53’-4" FOR POSTS 6
" 0. D.8
53’-10" FOR POSTS 8
POSTS OVER 4" O.D.
24" DIA. FOR GATE
POSTS 4" O. D. & LESS
16" DIA. MIN. FOR GATE
RODS (TYP)
" DIA. TRUSS8
DROP ROD
LEAF 9’
GATE FRAME
WIRE (TYP.)
3 STRANDS OF BARBED
ASSEMBLY
LATCH
FABRIC
CHAIN-LINK
M A
X
M
IN
PLAN
RAIL AS SPECIFIED (TYP)
TOP TENSION WIRE OR
WIRE (TYP.)
3 STRANDS OF BARBED
BRACE RAIL (TYP)
HINGES (TYP)
WIRE (TYP)
BOTTOM TENSION
GRADE LINE
BRACE RAIL (TYP)
TRUSS ROD (TYP)
LINE POST
DOUBLE SWING GATE (TYPE FE-6 FENCE)
ELEVATION
DEPTH
CURB FULL
SAWCUT
GUTTER
EXIST. CURB &
JOINT
" EXP.2
GATE
3" MIN.
GUTTER
SAWCUT
POST
GATE
GATE LEAF WIDTH
(NOMINAL) (NOMINAL)
OUTSIDE DIMENSION
6’ OR LESS
6’ TO 13’
13’ TO 18’
MORE THAN 18’ 8.625" OD
6.625" OD
4.0" OD
2.5" SQ
2.875" OD
ASSEMBLY AND GATE KEEPERS EXCEPT AS NOTED.
2. SWING GATES SHALL BE CONSTRUCTED WITH DROP RODS, PADLOCKS, LATCH
NOTES:
LIMIT OTHER TYPE OF FENCE SECTIONS AND METHODS OF INSTALLATION.
1. DETAILS SHOWN ARE TO CLARIFY REQUIREMENTS AND ARE NOT INTENDED TO
OF ALL GATES SUPPLIED.
CONTRACTOR SHALL BE RESPONSIBLE FOR THE PROPER RIGID CONSTRUCTION
LIEU OF TRUSS RODS TO BRACE ALL WELDED GATE FRAMES. THE
CONTRACTOR’S OPTION A WELDED HORIZONTAL BRACE MAY BE USED IN
CONSTRUCTION OR SHALL BE ASSEMBLED USING HEAVY FITTINGS. AT
2.00" NOMINAL (SQUARE). GATE FRAMES SHALL BE OF WELDED
3. ALL GATE FRAMES SHALL BE A MINIMUM 1.90" NOMINAL (ROUND) OR
OFFSET HINGE STANDARD HINGE
SWING GATE DETAILS
(TO HOLD GATE OPEN)
GATE KEEPER
NO SCALE
ASSEMBLY
LATCH
DROP ROD FOUNDATION
AT CURB AND GUTTER
GATE POST DETAIL
SECTION
NO SCALE
A
PLAN
HINGE
STANDARD
EXIST. CURB
POST FTG.
NEW GATE
5" MAX.
2" MIN.
WASHER
NEW GATE
FINISHED GRADE
1" ID STEEL PIPE
P.C. CONC.
6" DIA.
SAND/GRAVEL
FINISHED GRADE
(INDUSTRY STANDARD)
" DIA. DROP ROD2
" D
IA
10"
ASSEMBLY
DROP ROD
GATE POST SCHEDULE
C-504
C
A
B C D
E F G H
F
M E
D A T E
R E
V
IE
W
D R
A W
D E
S Y
M B
O L
D E S
C R
IP
T
IO
N
D E S
IG
N
A P P
R O
V E
D D
A T E
C H
IE
F
D E S
N E
N G
R S E
C T
IO
N
I
W
IL
M
IN
G T
O N
N O
R
R O
L
IN
A
C O
R
E
N G
IN
E E
R S
U .S
A R
M Y
E
N G
IN
E
T R
IC
T
C L D
J U
L
G O
V E
R N
.R
U P
G R
A D
E S
W
IT
C H
G E
L O
C A T
IO
N
S M
E R
V
IR
G
IN
IA
P H
IL
P O
T T
R
E S E
R V
O
IR
P
R O J E
C T
IDENTIFICATION
09_Fence_Details.dgn 10/1/2014 3:51:44 PM
CONTRACTING OFFICER PRIOR TO EXCAVATION OF BEDROCK. SEE SPECIFICATION 31 00 00.
14. THE CONTRACTOR SHALL SUBMIT A BEDROCK REMOVAL PLAN FOR APPROVAL TO THE
APPENDIX OF THE SPECIFICATIONS.
TRENCH. BEDROCK MATERIAL CHARACTER IS INDICATED IN THE GEOTECHNICAL
13. HARD MATERIALS AND BEDROCK WILL BE ENCOUNTERED FOR EXCAVATION OF DUCTBANK
SHALL BE APPROVED BY THE CONTRACTING OFFICER’S REPRESENTATIVE.
12. CONTRACTOR SHALL PROVIDE TEMPORARY SHORING PLAN. TEMPORARY SHORING PLAN
HAVE A YIELD STRENGTH OF 60 KSI OR GREATER AND COMPLY WITH ASTM A615, GRADE 60.
11. CONCRETE STRENGTH SHALL BE 3,000 PSI OR GREATER. REINFORCING STEEL SHALL
10. SEE PLATE E-404 FOR SWITCHGEAR BUILDING CONDUIT DETAILS.
SHALL BE DESIGNED BY A LICENSED STRUCTURAL ENGINEER.
IN WALL. BOX OPENING SHALL BE REINFORCED WITH STEEL FRAME. STEEL FRAME
WALL MAY INCLUDE CORE DRILLING EACH CONDUIT OR CUTTING BOX SHAPED OPENING
FOR APPROVAL BY THE CONTRACTING OFFICER. METHODS FOR PENETRATING CONCRETE
9. CONTRACTOR SHALL SUBMIT METHOD FOR PENETRATING EXISTING CONCRETE WALL
INTERVALS ALONG DUCTBANK.
VERTICAL INTERLOCKING THEN PROVIDE TOP TIE-DOWN BAR AT 48" MAX
SNAP-LOCK OR UNDERGROUND DEVICES WUNPEECE). IF SPACERS DO NOT HAVE
PLACED AT 48" MAX INTERVALS ALONG DUCTBANK (SIMILAR TO CARLON
8. FOR ALL CONDUITS USE MODULAR PLASTIC DUCT SPACER WITH REBAR HOLDERS
THE DESIGNATIONS SHOWN (TYP. OF 12 DUCTS).
WITH 36" OF SLACK AND AN EMBOSSED PLASTIC TAG AT BOTH ENDS WITH
" BRAIDED NYLON PULROPE4
1 ARE SIZE 5 TYPE EB-35. CONTAINING A
7. CONDUIT SHALL BE SIZE 4 TYPE EB-35 DUCT, EXCEPT B, C, D, E THAT
INSIDE DIAMETER
6. CONDUITS BENDS SHALL HAVE A MINIMUM BEND RADIUS OF 10 TIMES THE
5. TRENCH IN THE SWITCHGEAR BUILDING FLOOR FOR AUXILIARY CABLES
4. MAIN TRANSFORMER BREAKER WILL USE SWITCHGEAR TOP ENTRY
3. CONDUIT SPACING DIMENSIONS SHOWN IN THE CROSS-SECTION ARE IN INCHES.
2. INSTALL NONMETALLIC END BELLS ON ALL CONDUIT.
EXISTING ELECTRICAL LINES IN THE VICINITY OF THE EXCAVATION
1. PRIOR TO EXCAVATION THE CONTRACTOR SHALL ASSURE DE-GENERATION OF ANY
NOTES:
VERTICAL BEND
22.5 DEGREE
(SEE NOTE 10)
CABLE TRENCH
SIZE 2 TYPE EB-35
DUCT TO AEP EQUIPMENT
PADS (4 TYP.)
SIZE 4 TYPE EB-35 DUCT
5 CONTROL CONDUITS
TO POWER HOUSE
3"
A
GE
K M N
UTSR
3" (TYP.)
3"
/ 2
NOTES
1.
2.
3.
4.
DETAIL A
C-505
C-505
C-505
A
N D
T
A
IL
S E L E
C T R
IC
A L
D
U C
T
B
A
D
C
A
B C D
E F G H
F
M E
D A T E
R E
V
IE
W
D R
A W
D E
S Y
M B
O L
D E S
C R
IP
T
IO
N
D E S
IG
N
A P P
R O
V E
D D
A T E
C H
IE
F
D E S
N E
N G
R S E
C T
IO
N
I
W
IL
M
IN
G T
O N
N O
R
R O
L
IN
A
C O
R
E
N G
IN
E E
R S
U .S
A R
M Y
E
N G
IN
E
T R
IC
T
C L D
J U
L
G O
V E
R N
.R
U P
G R
A D
E S
W
IT
C H
G E
L O
C A T
IO
N
S M
E R
V
IR
G
IN
IA
P H
IL
P O
T T
R
E S E
R V
O
IR
P
R O J E
C T
IDENTIFICATION
SHEET
A, B, C, & D CONDUITS SIZE 6
TYPE EB-35 DUCT
E, F, G, & H CONDUITS SIZE 5
TYPE EB-35 DUCT
J - V CONDUITS SIZE 4
TYPE EB-35 DUCT
ALL CONDUITS CONTAIN A
4" BRAIDED NYLON
PULROPE WITH 36" OF
SLACK AND AN EMBOSSED
PLASTIC TAG AT BOTH ENDS
WITH THE DESIGNATIONS
SHOWN (TYP. OF 18 DUCTS).
CONCRETE ENCASEMENT 2500 PSI
FORMED TOP AND SIDES
#4 REBAR LOOPS 12"
ON CENTERS (TYP.)
#4 REBAR SPACED 6" ON
CENTERS (TYP.)
D
H
B C
F
J L
P
MAX INTERVALS ALONG DUCTBANK
PROVIDE TOP TIE-DOWN BAR AT 48"
OR UNDERGROUND DEVICES WUNPEECE).
(SIMILAR TO CARLON SNAP-LOCK
INTERVALS ALONG DUCTBANK
HOLDERS PLACED AT 48" MAX
PLASTIC DUCT SPACER WITH REBAR
FOR ALL CONDUITS USE MODULAR
- UNIT 1
DUCTS C AND D (6") - UNIT 2
DUCTS E AND F (5") - 480V STATION SERVICE GENERATOR LEADS
DUCT H (5") - 480 V SQ1-SQ0 STATION SERVICE SWITCHGEAR FEEDER
DUCT H (5") - 480V SPARE TO SQ1 SWITCHGEAR
DUCT J (4") - NEW SWITCHGEAR BUILDING POWER
DUCTS K - N, S(4") - CONTROL/INSTRUMENTATION AND SPARE TO CABLE TRENCH
DUCT P, R, T, U (4") - SPARE TERMINATED WITH COUPLING AND PLUG
TWO INCHES ABOVE BUILDING FLOOR
PLACED APPROXIMATELY 12 INCHES BELOW FINISHED GRADE
AND PLUG, TWO INCHES ABOVE VAULT AGGREGATE,
AGAINST THE WALL CLOSEST TO THE SWITCHGEAR BUILDING
DUCTS A AND B (6")
INSTALL 3-INCH WIDE 5-MIL BRIGHTLY COLORED PLASTIC TAPE
TERMINATE SPARE CONDUIT INSIDE GSU VAULT WITH COUPLING
MINIMUM LONGITUDINAL DUCTBANK - SLOPE 4 INCHES PER 100 FEET
SIZE 4 RMC DUCT
CONTROL CONDUIT
TO THE TRANSFORMER
VAULT - SEE NOTE 4
L
S
N
MK
"4 31’-7
PROFILE - NEW ELECTRICAL DUCTBANK
SCALE 1V : 1H
CROSS-SECTION - NEW ELECTRICAL DUCTBANK
N.T.S.
FFE 836.0
-0+10 0+00 0+20
P O
W E
R H
O U
S E
FFE 823.0
APPROX. EL 835.0
EXISTING GRADE
EL 832.0 W S
EL828.3 24" RCP
EL829.2 8" PVC
EL829.5
8" PVC
AEP CONCRETE
EQUIPMENT PAD
SWITCHGEAR
BUILDING
FFE 835.5
0+40 0+60 0+80 1+00 1+10
NEW ELECTRICAL CONCRETE DUCTBANK
(SEE NOTE 9)
WALL PENETRATION
POWERHOUSE CONCRETE
VERTICAL BEND
22.5 DEGREE
DRAIN 2%
SLOPE TO
DRAIN 2%
SLOPE TO
GRAVEL PIT
DUCTBANK DRAIN
10_…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .