This is an Industry Day presentation for a VA Critical Care Center construction project in Los Angeles, scheduled for February 12, 2025. The project involves constructing a new 450,000 GSF Critical Care Center with 160 beds (44 mental health), a 52,000 GSF Central Utility Plant, and a 15,000 GSF Logistics Transportation Hub at the West Los Angeles VA Medical Center campus.
The project is expected to exceed $1 billion with target award in February 2027. Key requirements include experience building medical centers within the last 10 years, radiation shielding construction, lead/asbestos abatement, medical gas systems, LEED Silver certification, and seismic zone construction. The facility will house sterile processing, morgue, pharmacy, emergency department, imaging, surgical suites, ICU units, acute mental health, and med-surge patient rooms. The project also includes renovations to existing Building 500, utility upgrades, and construction of support facilities. The U.S. Army Corps of Engineers Los Angeles District is managing procurement, with bonding capability of $1+ billion required from contractors. The presentation outlines administrative requirements, procurement process, subcontracting requirements, and construction contract administration details.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Industry Day Sign-In Roster 12 Feb 25.pdf | ||
| Question and Answer Session.docx | DOCX document | |
| Parking Shuttle Service.pdf | ||
| 691-408.000.PHASING - INDUSTRY DAY R1_WATERMARK.pdf | ||
| 691-408.000.SITE.DRAWINGS.zip | ZIP file | |
| 691-408-2HOSP.METHANE DWGS.zip | ZIP file | |
| 691-408.8AGVLD-B500.DRAWINGS.zip | ZIP file | |
| 691-408.602.CUP.DRAWINGS.zip | ZIP file | |
| 691-408-2HOSP.DRAWINGS.VOL 3.zip | ZIP file | |
| 691-408-2HOSP.DRAWINGS.VOL 5.zip | ZIP file | |
| 691-408-2HOSP.DRAWINGS.VOL 4.zip | ZIP file | |
| 691-408-2HOSP.DRAWINGS.VOL 2.zip | ZIP file | |
| Industry Day - Site Map.pptx | PPTX presentation | |
| 691-408-2HOSP.DRAWINGS.VOL 1.zip | ZIP file | |
| 691-408.000.PHASING.pdf |
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CRITICAL CARE CENTER /
CENTRAL UTILITY PLANT /
SITE UTILITIES &
SELECTIVE RENOVATIONS OF B500
VETERANS AFFAIRS GREATER LOS ANGELES
HEALTHCARE SYSTEM
WEST LOS ANGELES CAMPUS
LOS ANGELES, CALIFORNIA
2ND INDUSTRY DAY
12 FEBRUARY 2025
• This Presentation is for Informational Purposes Only and is not / will not be contractually binding
• Please silence cell phones
• No recording allowed
• Emergency information
• Posting of briefing
• Purpose of Industry Day
• All inquiries shall go through points of contact listed in the announcement
• No photography of people on VA property is allowed
ADMINISTRATIVE ANNOUNCEMENTS
OPENING REMARKS
INTRODUCTIONS
Home of the Veterans since 1887
VA West Los Angeles
• Project Overview
• Procurement Process
• Construction Contract Administration
• Subcontracting Requirements
• Forecast, Outreach and SAM.GOV
• USACE Los Angeles District
• Q & A
AGENDA
PROJECT OVERVIEW
North Residential Campus South Medical Campus
(Project Location)
Campus Location
1. New Critical Care Center CCC
2. New Central Utility Plant CUP
3. New Logistics Transportation Hub LTH, Loading Dock, & Selective renovations in B500
4. New Site Work & Utilities Infrastructure
Other projects in development on Medical Campus (Requiring Coordination with this Project)
─ New Boiler Plant – Design completed
─ New Parking Garage by METRO – In construction
─ New SCE Substation – In development
Project Components – Mission Critical
SITE
CCC
Central Kitchen
Boiler Plant
Parking
Garage
PROJECT OVERVIEW
CUP
LTH
SCE Substation
B500
─ 450,000 sf, 160-Bed, In-Patient Hospital
─ 6-Story + 2 Interstitial + Mech Penthouse
─ OPTION: Bridge to B500
─ D&T Podium: Pharmacy, Sterile Processing, Morgue, ED, Imaging, OR Suite, ICU, Data
Center, Chapel, Café, Police
─ Nursing Tower & Acute Mental Health
─ Base Isolation with Dampers
─ Blast Protection & Progressive Collapse
─ Automated Guided Vehicle (AGV) System
─ Pneumatic Tube System
Critical Care Center (CCC)
CRITICAL CARE CENTER
─ 52,000 sf
─ 2-Story + Underground Utility Tunnel connections
─ Electrical 20MVA / 12,470V + Generators
─ Cooling Towers
─ Chillers
─ Administrative Areas
─ Supports New Buildings and Future Needs
─ Energized by new SCE Substation currently in development
Central Utility Plant (CUP)
CENTRAL UTILITY PLANT .
─ 20,000 sf
─ 2-Story + Basement
─ New Loading Dock – relocating existing operations
─ AGV connections to B500 Logistics Area and CCC
─ Connections to new CUP
─ B500 renovation of Logistics Area
Logistics Transportation Hub (LTH)
Loading Dock
Selected Renovations in B500
LOGISTICS TRANSPORTATION HUB
─ New Domestic & Fire Water, Sewage, Steam, Stormwater Utilities
─ New Electrical and Low Voltage Utilities (SCE / Frontier)
─ Underground concrete tunnels:
AGV System: Connects LTH, B500, CCC, & Kitchen
─ Redundant Feeds and Physical Separation
─ Underground Storage: Water/Sewage Tanks and Fuel Vaults
─ Stormwater Treatment & Bioretention
─ Phasing / Sequencing to avoid impacts on 24/7 Operations
─ Construction Traffic, Noise, Dust, Vibration, Infection Control
─ LEED Silver Minimum Goal: 2 Registrations: CCC & CUP/LTH
Site Work & Utilities Infrastructure
PROJECT OVERVIEW
CCC
Kitchen
CUP
LTH
B500
Boiler
Existing Buildings requiring uninterrupted operations
Scope of Work and Staging
Projects by other contractors
Temporary Loading Dock facilitating construction phasing
Sequence of Construction / Phasing
PROCUREMENT PROCESS
Sean Sackett
Chief of Contracting
USACE-SPL
***Note: Information in this presentation is for informational purposes only and is not/will not be contractually binding.
Review the solicitation and amendments for any revisions***
Project Schedule Target Milestones
February 2025• Sources Sought
• Advertisement Period Start
• Proposals Due
• Contract Award
• Project Completion
January 2026
April 2026
February 2027
May 2031
2026 2027 2028 2029 20302025 Feb May
Feb
AprJan
• Project is a Design-Bid-Build (D-B-B)
• Solicitation – Request for Proposal (RFP)
• Selection will be made on “Best Value” trade-off
• Evaluation criteria will be included in the RFP
• The Source Selection Evaluation Board (SSEB) evaluates contractors’ proposals based on specific factors which will be defined in the RFP
Factors include: Past Performance, Specialized Experience, Technical Approach
• Questions in Sources Sought Notice to help inform strategy
CONSTRUCTION CONTRACT ADMINISTRATION
***Note: Information in this presentation is for informational purposes only and is not/will not be contractually binding.
Review the solicitation and amendments for any revisions***
Norman Boeman
Deputy Chief, Construction Division
USACE-SPL
• USACE Contracting Officer appoints in writing USACE Administrative Contracting
Officer (ACO) and Contracting Officer’s Representative(s) (COR)
• USACE Contract Administrative and Technical Staff on-site with DVA
Construction and Facilities Management (CFM) personnel
• USACE led Preconstruction Conference, including Safety, and Coordination and
Mutual Understanding Meeting
• USACE intends to follow “Construction Project Partnering Playbook”
• USACE intends to use a Construction Management Platform (CMP) for all official contract actions
• USACE uses Primavera P6 to Construction Schedule, Contractor to use compatible version and attend a Scheduling Expectations Kickoff Meeting(SEKO)
• Submittals not designated for Government Approval or AE Approval will be approved the Contractor’s QC Staff
• Requests For Information (RFIs) are submitted for review through the CMP indicating whether potential cost or schedule impact
• Contract Administrative, Financial, Quality Control, Submittal, Schedule Information submitted through CMP
• Government seeks to develop a high performing/profitable long-lasting relationship
Other General Administration Requirements Include:
• Building Information Modeling (BIM) Requirements
• Special Inspections
• Exterior Enclosure Performance Requirements, Mockups and Testing – CCC
• Preconstruction Laboratory Mockup Testing for Building Enclosure – CUP
• Sustainable Construction Requirements
• DVA/USACE Projects General Commissioning Requirements
SUBCONTRACTING REQUIREMENTS
34SMALL BUSINESS
SUBCONTRACTING REQUIREMENTS
Kinya Roger Minami
Procurement Analyst
Small Business Office
USACE-SPL
***Note: Information in this presentation is for informational purposes only and is not/will not be contractually binding.
Review the solicitation and amendments for any revisions***
Reference: Federal Small Business Contracting Goals, Congressional Research Service, 5/14/24
SUBCONTRACTING PLAN, FAR 52.219-9
Elements in a Subcontracting Plan-FAR 19.704 (Large Business Primes Required to Submit, $1.5M for
Construction)
SB Subcontracting Goals to be included in eventual SAM posting
U.S. SBA and SPL, Contracting and Small Business Ofc concurrence of plan prior to award (Plan on file w/U.S. SBA)
Subcontracting is an evaluated factor in CPARS reporting
USACE HQ monitors submission of Individual Subcontracting Reports (ISRs)
SUBCONTRACTING PLAN, FAR 52.219-9
Factors to consider when submitting a plan… (For info about subcontracting checklist, see DFAR PGI
219.705-4)
Do not list goals smaller than those in posting!
SDVOSB: (SDVOSB goal increased to 5%) (SDVOSB certification via SBA required for subcontracting)
-P.L. 118-31, the National Defense Authorization Act for FY24
Note: There is a grace period through 12/22/24
(https://www.sba.gov/federal-contracting/contracting-assistance-programs/veteran-contracting-assistance-programs )
SDB goal: “Is the proposed SDB goal greater than five percent (5%)?
If no, the proposed goal of less than five percent (5%) must be approved one level above the contracting officer”
-DFARS 219.705-4(d)
Include NAICS codes with names of small business subcontractors-description of supplies/services to be subcontracted
List outreach in SPL footprint! Please be proactive in local veteran’s small business outreach
If you plan to use SB subs with no SAM registrations, make sure you are using credible reps/certs (contact local Apex for help?)
SPL asks for proof of SB qualifications (UEI or reps/certs)
Look around the room, network and identify potential small business subcontractors!
https://www.sba.gov/federal-contracting/contracting-assistance-programs/veteran-contracting-assistance-programs
Small Business Participation Plans
-LB and SB primes are required to submit a SB Participation proposal on UNR best value/trade off acquisitions
-The Small Business Participation Plan is based on Total Contract Value
-This is a rated factor (evaluated during SSEB)
-See DFARS PGI 215.304(c)(i)(A)-for examples of SB participation eval criteria, actual solicitation may differ
Joint Ventures
-SPL only recognizes formal joint venture agreements
-No teaming arrangements or partnering
-Joint Venture agreements must be approved prior to proposal submission
-Agreements are reviewed by Office of Counsel
SMALL BUSINESS PARTICIPATION PLAN AND JOINT VENTURES
FORECAST, OUTREACH AND SAM.GOV
1. Forecast of Contracting Opportunities Updated Quarterly, posted to SB webpage
2. Upcoming outreach events Posted to SB webpage, throughout year
3. SAM.gov Advertised Opportunities Opportunities = W075 ENDIST LOS ANGELES
Save search and hit notify for automatic email notifications
4. SB Points of Contact
Roger Minami
Procurement Analyst, Office of SB Programs
Kinya.R.Minami@usace.army.mil
213-452-3234 https://www.spl.usace.army.mil/Business-With-Us/Small-Business-Program
FORECAST, OUTREACH AND SAM.GOV
mailto:Kinya.R.Minami@usace.army.mil
Ms. Melanie Ellis Outreach Coordinator melanie.j.ellis@usace.army.mil www.spl.usace.army.mil
COL Andrew Baker Commander and District Engineer
(213) 452-3961 Andrew.J.Baker@usace.army.mil
Ms. Sally DeSimone, Administrative Assistant
(213) 452-3964 Sally.M.DeSimone@usace.army.mil
Mr. Justin Gay Deputy District Engineer for Programs and Project Management
(213) 369-0271 justin.gay@usace.army.mil
Kenneth Reed, Administrative Assistant
(213) 452-3974
Kenneth.Reed@usace.army.mil
Mr. Patrick Mckinley Mega Projects Program Manager
(415) 793-2697 patrick.a.mckinley@usace.army.mil
Andrea Rodriguez, VA Projects Program Manager
(240) 381-7484 andrea.e.rodriguez@usace.army.mil
Mr. Roger Minami Office of SB Programs
(805) 878-8177
Kinya.R.Minami@usace.army.mil
U.S. ARMY CORPS OF ENGINEERS LOS ANGELES DISTRICT
Ms. Sean Sackett Contracting Officer
(213) 452-3229 sean.p.sackett@usace.army.mil mailto:melanie.j.ellis@usace.army.mil http://www.spl.usace.army.mil/ mailto:Andrew.J.Baker@usace.army.mil mailto:%20Sally.M.DeSimone@usace.army.mil mailto:justin.gay@usace.army.mil mailto:Kaire.N.Morrissey@usace.army.mil mailto:patrick.a.mckinley@usace.army.mil mailto:andrea.e.rodriguez@usace.army.mil mailto:Kinya.R.Minami@usace.army.mil mailto:sean.p.sackett@usace.army.mil
Q & A
| Slide 1 |
| Slide 2: Administrative announcements |
| Slide 3 |
| Slide 4: AGENDA |
| Slide 5: PROJECT OVERVIEW |
| Slide 6: Project OVERVIEW |
| Slide 7: Project OVERVIEW |
| Slide 8: CRITICAL CARE CENTER |
| Slide 9: CRITICAL CARE CENTER |
| Slide 10: CRITICAL CARE CENTER |
| Slide 11: CRITICAL CARE CENTER |
| Slide 12: CRITICAL CARE CENTER |
| Slide 13: CRITICAL CARE CENTER |
| Slide 14: CRITICAL CARE CENTER |
| Slide 15: CRITICAL CARE CENTER |
| Slide 16: CRITICAL CARE CENTER |
| Slide 17: Project OVERVIEW |
| Slide 18: Central utility plant . |
| Slide 19: Project OVERVIEW |
| Slide 20: LOGISTICS TRANSPORTATION HUB |
| Slide 21: Project OVERVIEW |
| Slide 22: Project OVERVIEW |
| Slide 23: Refer to provided video .mp4 file |
| Slide 24: PROCUREMENT PROCESS |
| Slide 25: PROCUREMENT PROCESS |
| Slide 26: PROCUREMENT PROCESS |
| Slide 27: PROCUREMENT PROCESS |
| Slide 28: CONSTRUCTION CONTRACT ADMINISTRATION |
| Slide 29: CONSTRUCTION CONTRACT ADMINISTRATION |
| Slide 30: CONSTRUCTION CONTRACT ADMINISTRATION |
| Slide 31: CONSTRUCTION CONTRACT ADMINISTRATION |
| Slide 32: CONSTRUCTION CONTRACT ADMINISTRATION |
| Slide 33: SUBCONTRACTING REQUIREMENTS |
| Slide 34: SMALL BUSINESS SUBCONTRACTING REQUIREMENTS |
| Slide 35 |
| Slide 36 |
| Slide 37 |
| Slide 38: Forecast, outreach and sam.gov |
| Slide 39: Forecast, outreach and sam.gov |
| Slide 40: U.S. ARMY CORPS OF ENGINEERS LOS ANGELES DISTRICT |
| Slide 41 |
File details come from the government source that posted it. Updated .