About this file

This file contains phasing plan drawings for a major construction project at the West Los Angeles VA Medical Center. The drawings detail an 8-phase construction sequence for building a new Critical Care Center (B600), Central Utility Plant (B602), and Logistics Transportation Hub (B601), along with associated site infrastructure and utilities work.

The phasing plans show detailed site layouts and construction sequencing, including contractor mobilization and site preparation in Phase 1; construction of B600, B601, and B602 in Phases 2-3; commissioning and utility work in Phases 4-5; completion of B600 construction and commissioning in Phase 6; renovation of Building 500 in Phase 7; and final interior renovations in Phase 8. Key elements include temporary construction barriers, contractor parking areas, maintaining access to existing facilities, utility tunnel connections, automated guided vehicle (AGV) tunnel connections, temporary loading docks, oxygen yard relocation, and security measures like guard houses and perimeter fencing. The drawings also include detailed floor plans for Building 605 elevator work and provide extensive general notes about maintaining operations, safety requirements, and construction protocols throughout the phasing sequence.

View the file

Other files

File Type Posted
Industry Day Sign-In Roster 12 Feb 25.pdf PDF
Question and Answer Session.docx DOCX document
Industry Day Presentation 20250212.pdf PDF
Parking Shuttle Service.pdf PDF
691-408.000.PHASING - INDUSTRY DAY R1_WATERMARK.pdf PDF
691-408.000.SITE.DRAWINGS.zip ZIP file
691-408-2HOSP.METHANE DWGS.zip ZIP file
691-408.8AGVLD-B500.DRAWINGS.zip ZIP file
691-408.602.CUP.DRAWINGS.zip ZIP file
691-408-2HOSP.DRAWINGS.VOL 3.zip ZIP file
691-408-2HOSP.DRAWINGS.VOL 5.zip ZIP file
691-408-2HOSP.DRAWINGS.VOL 4.zip ZIP file
691-408-2HOSP.DRAWINGS.VOL 2.zip ZIP file
Industry Day - Site Map.pptx PPTX presentation
691-408-2HOSP.DRAWINGS.VOL 1.zip ZIP file
Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STOP

STOP

STOP

BUMP

BUMP

V .A

B

U S O

N L Y

P A

T

IE

N T

-V A

N

PED PED

XING XING

BUMP

BU M

P

ENTER

M O

T O

R C

Y C

L E

S O

N L

Y

H C

H C

H C

H C

H C

H C

H C

STOP

STOP

STOP

STOP

STOP

STOP

STOP

STOP

BUMP

BUMP

KEEP

CLEAR

STOP

HC

NO

PA

RKING

HC

NO

PA

RKING

NO

P

A

RK

IN

G

NO

PA

RKING

NO

PA

RKINGNO

P A

RK

IN

G

NO

P A

RK

IN

G

PARKING

NO

PARKINGPARKINGPARKING

PARKING PARKING PARKINGNO NO NO

NONONO

PARKING

NO

FI R E LA N E

PARKINGPARKINGPARKINGPARKINGPARKINGPARKINGPARKING

PARKING

NO

NONONONONONONO

NO PARKINGNO PARKING

FIRE LANE

BUMP

BUMP

STOP

S T

OP

S T

OP

S T

OP

STOPSTOP

STOP

STO

P

HCHC

S

TO

P S

T O

P

HC

STOP

HC

N O

PA

R

KI

NG

N O

PA

R

KI

NG

N O

PA

R

KI

NG

HCHCHCHCHCHCHC

HC HC HCHCHCHCHCHCHCHCHCHC

S TOP

ST O

P

STOP

N O

P A

R K

IN

G

NO PARKING

NO PARKING

N O

P A

R K

IN

G

N O

P A

R K

IN

G

N O

P A

R K

IN

G

N O

P A

R K

IN

G

N O

P A

R K

IN

G

N O

P A

R K

IN

G

N O

P A

R K

IN

G

N O

P A

R K

IN

G

N O

P A

R K

IN

G

NO PARKING

NO PARKINGNO PARKING

NO PARKING NO PARKING

BU M

P

LAUNDRY

NO PARKING

BUMP

NO PARKING

N O

P A

R K

IN

G

NO PARKING

NO PARKING

N O

P A

R K

IN

G

HC HC

HC

HC

HCHC

STO

P

NO PARKING

NO PARKING

STOP

STO

P

S TOP

BU M

P

LAUNDRY

NO PARKING

BUMP

IN

O

U T

DO

NOT

ENTER

E

XIT

STOP

STOP

EXIT

EXIT

S T

OP

HCHC HC HC HC HC HC

HCHCHCHCHCHCHCHCHC

NO PARKING NO PARKINGNO PARKING

TSTS

TS

TS

TS

TS

TS

TS

TS

TS

TS

TS

TS

PED

XING

STOP

STO

P

STOP

U T

U T

U T

U T

H H

H H

U T

U T

H H

U T

D

E

D

D

E

D

D

M W M W M W

D

E

D

D

E

E

E

D

E

D

D

D

M W

M W M W

D E

D

D

M WM W

D

M W

M W

P B

D

M W

D

D

D

M W

D D

M W

D

D

M W

M W

D

D

M W

T

T T

T

T

T

T

P B

P B

D

E

D

PHASE 1 - CONTRACTOR MOBILIZATION / MAKE READY

1.a REMOVE PV PANELS AND CLEAR SITE. MAKE READY FOR GRADING.

FENCE AREA OF CONSTRUCTION.

1.b REMOVE PV PANELS. SALVAGE PV SUPPORT STRUCTURE FOR

REINSTALLATION AT LOT 5. CLEAR SITE. MAKE READY FOR

GRADING. FENCE AREA OF CONSTRUCTION.

1.c REMOVE PV PANELS. GRADE AND PAVE AREA. PREPARE AREA FOR

CONTRACTOR USE AS CONSTRUCTION STAGING AREA, TRAILER,

AND/OR PARKING. ERECT FENCE TO SECURE AREA. VERIFY ALL

REQURIED CLEARANCES WITH ACTIVE HELIPAD SITE. NOTE:

CONTRACTOR TO SECURE THEIR OWN POWER SOURCE AND ALL

REQUIRED CONNECTIONS.

1.d RELOCATE OXYGEN YARD TO TEMPORARY LOCATION.

1.e CONSTRUCT TEMPORARY LOADING DOCK. RELOCATE

UNDERGROUND UTILITIES AS REQUIRED FOR TEMPORARY

LOADING DOCK WORK. ROUGH-IN NEW UTILITIES AS REQUIRED TO

MAINTAIN ACCESS TO THE TEMPORARY DOCK DURING

CONSTRUCTION. MAINTAIN ACCESS TO EXISTING LOADING DOCK

UNTIL TEMPORARY LOADING DOCK IS COMPLETE.

1.f GRADE AND PAVE AREA FOR CONTRACTOR USE AS

CONTRACTOR PARKING. PROIVDE DIRECT ENTRANCE FROM OHIO

AVENUE. ERECT FENCE TO SECURE AREA.

1.g ABOVE-GROUND FUEL TANKS. MAINTAIN TRUCK ACCESS TO

TANKS.

1.h EDISON SUBSTATION EXPECTED TO BE UNDER CONSTRUCTION.

1.i PROTECT BUILDING AIR INTAKES FROM DUST AND OTHER

CONSTRUCTION DEBRIS, TYPICAL.

1.j PROVIDE ACCESS TO EXISTING ENTRANCES AT B500 DURING

CONSTRUCTION.

1.k PROVIDE FIRE DEPARTMENT ACCESS DURING CONSTRUCTION.

1.l MAINTAIN CLEARANCE AT AMBULANCE ENTRY.

1.m INSTALL ELECTRICAL DUCTBANK TO BACKFEED B501.

1.n INSTALL STORM DRAIN PIPING.

CONTRACTOR

CONTROLLED PARKING &

CONSTRUCTION TRAILERS

(PARKING AND TRAILER

LAYOUT SHOWN FOR

REFERENCE ONLY)

KITCHEN

LOADING DOCK

1.b

1.f

1.c

1.d

1.l

1.a

TEMP.

KITCHEN

GENERATOR

1.g1.e

LOT A

LOT B

LOT 6

LOT 6

B608

PARKING

GARAGE

LOT F

B501

CUP

B500

HOSPITAL

B304

B402 B401

B345

B527 A.R.C.

B507

B522

B318

B312 B311

B23 B307

B308

B309

B91

B90

B104

B310

U.S. ARMY

CALIFORNIA

NATIONAL GUARD

U.S. AIR FORCE

PROPERTY

B105

EDISON

SUBSTATION

LOT 5

B607

PATRIOT

HOUSE

B606

FISHER HOUSE

B605

KITCHEN

B603

BOILER

METRO STATION

SUBSTATION

LOT 42

LOT C

LOT 2

S

A W

T E

L L

E

B O

U L

E V

A R

D

D O W L E N D R I V E

D O

W L E N

D R

I V E

W I L S H I R E V O U L E V A R D

O H I O A V E N U E

1.h

1.i

1.j

1.k

1.i

1.m

1.m

AMBULANCE

ENTRY

1.c

B527

PARKING

LOT

1.n

HELIPAD

1. PROVIDE EGRESS ACCESS FROM EXISTING BUILDING

EXITS AND AREAS OF NEW WORK DURING

CONSTRUCTION.

2. PHASING IS SCHEMATIC AND NOT INTENDED TO BE

SEQUENTIAL

3. ENSURE DUST CONTROL PLAN IS IN PLACE. SEE

SUSTAINABLE CONSTRUCTION REQUIREMENTS

SPECIFICATION.

4. PROTECT EXISTING BUILDING AIR INTAKES FROM

DUST AND OTHER CONSTRUCTION DEBRIS.

5. PROVIDE FIRE DEPARTMENT ACCESS TO BUILDINGS

DURING CONSTRUCTION.

6. SEE LOGISTICS TRANSPORTATION HUB DRAWINGS

FOR PHASING INFORMATION AT B500.

7. FOR FULL EXTENTS OF AREAS OF WORK, SEE CIVIL

DEMOLITION PLANS.

8. CONTRACTOR SHALL NOT ENTER AREAS WHICH ARE

NOT IN CONTRACT. IF ACCESS TO THESE AREAS ARE

NEEDED, GC TO COORDINATE ACCESS WITH

CONTRACTING OFFICER REPRESENTATIVE.

9. PROVIDE TEMPORARY CONSTRUCTION BARRIERS TO

SEPARATE AREAS OF WORK FROM OTHER AREAS.

10. REFER TO THE SPECIFICATIONS AND FIRE

PROTECTION DESIGN MANUAL SECTION 1.4 FOR FIRE

PROTECTION REQUIREMENTS DURING

CONSTRUCTION.

11. USE ONLY THE CONTRACTOR'S PERSONNEL PARKING

AS INDICATED ON PHASING PLANS.

12. MAINTAIN CIRCULATION AREAS FREE OF BARRIERS

TO EMERGENCY VEHICLES.

13. MAINTAIN UTILITY SERVICES AT AND TO FACILITIES AT

ALL TIMES. IF INTERRUPTIONS ARE NECESSARY,

RECEIVE ADVANCE APPROVAL FROM COR.

14. MAINTAIN EXISTING FIRE EXITS OPEN AND FREE

FROM DEBRIS AND OBSTACLES.

15. MAINTAIN FIRE ALARM DETECTION AND SUPPRESSION

SYSTEMS. PROVIDE TEMPORARY INTERIM SYSTEMS

WHEN PERMANENT SYSTEMS CANNOT BE USED.

16. PROVIDE AND MAINTAIN PORTABLE FIRE

SUPPRESSION EQUIPMENT WHERE REQUIRED.

EXISTING BUILDING

PROPERTY LINE

UNDERGROUND STORAGE TANKS

LIMITS OF WORK (ACTIVE WORK AREA)

AREA EXPECTED TO BE UNDER

CONSTRUCTION BY OTHER PROGRAM

CONTRACTOR PARKING/ STAGING/

TRAILER AREAS

NEW BUILDING

UTILITY TUNNEL CONNECTIONS

AGV (AUTOMATED GUIDED VEHICLE)

TUNNEL CONNECTIONS

PEDESTRIAN PATH ACCESS

PATH OF EGRESS

PROPOSED LOCATION OF FUTURE

EXPANSION

N TRUE

NORTH

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

A u to d e s k D o c s /0

-1

-0

V A

W

L A

-C C

C C

U P

S it e

U ti ls

R e n o o f_ B

/6

-4

.0

.A

R C

H .r v t

/1

/2

:2

:3

P

M

GI201

PHASING PLAN - PHASE 1 - MAKE

READYLEO A DALY COMPANY

LOS ANGELES, CA 90071

(213) 629-0100

NICOS KATSELLIS

WEST LA MEDICAL CENTER

SITE INFRASTRUCTURE AND

UTILITIES

WEST LOS ANGELES, CA

691-408

N/A

2.16.24 KT

CONSTRUCTION

DOCUMENTS

550 SOUTH HOPE STREET, 27TH FLOOR

SCALE:1 : 1440

F1

SITE PLAN OVERALL - PHASE 1

SYMBOL LEGEND

GENERAL NOTES

SCALE : 1" = 120'-0"

0 120' 240'

Revisions: Date:

FOR REFERENCE ONLY

NOT FOR CONSTRUCTION

FOR REFERENCE ONLY - NOT FOR CONSTRUCTION : QUANTITIES AND DESIGNS CAN, AND LIKELY WILL, CHANGE. BY USING THESE DRAWINGS, YOU AGREE LEO A DALY IS RELEASED AND HELD HARMLESS FOR ANY AND ALL DAMAGES OR CLAIMS RELATED TO OR ARISING FROM SUCH USE

STOP

STOP

BUMP

BUMP

V .A

B

U S O

N L Y

P A

T

IE

N T

-V A

N

PED PED

XING XING

BUMP

BU M

P

ENTER

M O

T O

R C

Y C

L E

S O

N L

Y

H C

H C

H C

H C

H C

H C

H C

STOP

STOP

STOP

STOP

STOP

STOP

STOP

STOP

BUMP

BUMP

KEEP

CLEAR

STOP

HC

NO

PA

RKING

HC

NO

PA

RKING

NO

P

A

RK

IN

G

NO

PA

RKING

NO

PA

RKING

NO

P

A

RK

IN

G

NO

P

A

RK

IN

G

PARKING

NO

PARKINGPARKINGPARKING

PARKING PARKING PARKINGNO NO NO

NONONO

PARKING

NO

FI R E LA N E

PARKINGPARKINGPARKINGPARKINGPARKINGPARKINGPARKING

PARKING

NO

NONONONONONONO

NO PARKINGNO PARKING

FIRE LANE

BUMP

BUMP

STOP

S T

OP

S T

OP

S T

OP

STOPSTOP

STOP

STO

P

HCHC

S

TO

P S

T O

P

HC

STOP

HC

N O

PA

R

KI

NG

N O

PA

R

KI

NG

N O

PA

R

KI

NG

HCHCHCHCHCHCHC

HC HC HCHCHCHCHCHCHCHCHCHC

S TOP

ST O

P

STOP

N O

P A

R K

IN

G

NO PARKING

NO PARKING

N O

P A

R K

IN

G

N O

P A

R K

IN

G

N O

P A

R K

IN

G

N O

P A

R K

IN

G

N O

P A

R K

IN

G

N O

P A

R K

IN

G

N O

P A

R K

IN

G

N O

P A

R K

IN

G

N O

P A

R K

IN

G

NO PARKING

NO PARKINGNO PARKING

NO PARKING NO PARKING

BU M

P

LAUNDRY

NO PARKING

BUMP

NO PARKING

N O

P A

R K

IN

G

NO PARKING

NO PARKING

N O

P A

R K

IN

G

HC HC

HC

HC

HCHC

STO

P

NO PARKING

NO PARKING

STOP

STO

P

S TOP

BU M

P

LAUNDRY

NO PARKING

BUMP

IN

O

U T

DO

NOT

ENTER

E

XIT

STOP

STOP

EXIT

EXIT

S T

OP

HCHC HC HC HC HC HCHCHCHCHCHCHCHCHCHC

NO PARKING NO PARKINGNO PARKING

TSTS

TS

TS

TS

TS

TS

TS

TS

TS

TS

TS

TS

PED

XING

STOP

STO

P

STOP

U T

U T

U T

U T

H H

H H

U T

U T

H H

U T

D

E

D

D

E

D

D

M W M W M W

D

E

D

D

E

E

E

D

E

D

D

D

M W

M W M W

D E

D

D

M WM W

D

M W

M W

P B

D

M W

D

D

D

M W

D D

M W

D

D

M W

M W

D

D

M W

T

T T

T

T

T

T

P B

P B

D

E

D

KITCHEN

LOADING DOCK

PHASE 2 - CONSTRUCTION

2.a GRADE SITE. BEGIN CONSTRUCTION OF B601 OVER EXISTING

UTILITY TUNNEL BETWEEN B500 AND B501.

2.b BEGIN EXCAVATION AND CONSTRUCTION OF B601

ELEVATORS STRUCTURE.

2.c GRADE SITE. BEGIN EXCAVATION AND CONSTRUCTION OF B600 AND B602.

2.d MAINTAIN ACCESS TO B605 AND B603.

2.e TEMPORARY LOADING DOCK IS OPERATIONAL.

2.f TEMPORARY LOADING DOCK ACCESS ROAD ALONG SAWTELLE

BLVD. MAINTAIN ALL REQUIRED CONSTRUCTION CLEARANCES

FROM FUTURE B600.

2.g EDISON SUBSTATION EXPECTED TO BE UNDER CONSTRUCTION.

2.h ABOVE-GROUND FUEL TANKS. MAINTAIN ALL TRUCK ACCESS TO

TANKS.

2.i CONSTRUCTION OF BOILER B603 IS COMPLETE.

TEMPORARILY RELOCATED

OXYGEN YARD

2.b

EXISTING UTILITY TUNNEL

2.c 2.c

2.d

2.a

2.f

2.g

2.h

TEMP.

KITCHEN

GENERATOR

TEMP

LOADING

DOCK

2.e

B527

PARKING

LOT

S A

W T

E L

U

L E

V A

R D

D O W L E N D R I V E

D O

W L E N

D R

I V E

W I L S H I R E V O U L E V A R D

O H I O A V E N U E

LOT A

LOT B

LOT 6

LOT 6

B608

PARKING

GARAGE

LOT F

B501

CUP

B500

HOSPITAL

B304

B402 B401

B345

A.R.C.

B507

B522

B318

B312 B311

B23 B307

B308

B309

B91

B90

B104

B310

U.S. ARMY

CALIFORNIA

NATIONAL GUARD

U.S. AIR FORCE

PROPERTY

B105

EDISON

SUBSTATION

LOT 5

B607

PATRIOT

HOUSE

B606

FISHER HOUSE

B605

KITCHEN

B603

BOILER

METRO STATION

SUBSTATION

LOT 42

LOT C

B601

(B601 - LOADING DOCK/LOGISTICS TRANSPORTATION HUB - LTH)

(B602 - CENTRAL UTILITY PLANT - CUP)

(B600 - CRITICAL CARE CENTER - CCC)

2.i

B600

CCC

B602

CUP

HELIPAD

1. PROVIDE EGRESS ACCESS FROM EXISTING BUILDING

EXITS AND AREAS OF NEW WORK DURING

CONSTRUCTION.

2. PHASING IS SCHEMATIC AND NOT INTENDED TO BE

SEQUENTIAL

3. ENSURE DUST CONTROL PLAN IS IN PLACE. SEE

SUSTAINABLE CONSTRUCTION REQUIREMENTS

SPECIFICATION.

4. PROTECT EXISTING BUILDING AIR INTAKES FROM

DUST AND OTHER CONSTRUCTION DEBRIS.

5. PROVIDE FIRE DEPARTMENT ACCESS TO BUILDINGS

DURING CONSTRUCTION.

6. SEE LOGISTICS TRANSPORTATION HUB DRAWINGS

FOR PHASING INFORMATION AT B500.

7. FOR FULL EXTENTS OF AREAS OF WORK, SEE CIVIL

DEMOLITION PLANS.

8. CONTRACTOR SHALL NOT ENTER AREAS WHICH ARE

NOT IN CONTRACT. IF ACCESS TO THESE AREAS ARE

NEEDED, GC TO COORDINATE ACCESS WITH

CONTRACTING OFFICER REPRESENTATIVE.

9. PROVIDE TEMPORARY CONSTRUCTION BARRIERS TO

SEPARATE AREAS OF WORK FROM OTHER AREAS.

10. REFER TO THE SPECIFICATIONS AND FIRE

PROTECTION DESIGN MANUAL SECTION 1.4 FOR FIRE

PROTECTION REQUIREMENTS DURING

CONSTRUCTION.

11. USE ONLY THE CONTRACTOR'S PERSONNEL PARKING

AS INDICATED ON PHASING PLANS.

12. MAINTAIN CIRCULATION AREAS FREE OF BARRIERS

TO EMERGENCY VEHICLES.

13. MAINTAIN UTILITY SERVICES AT AND TO FACILITIES AT

ALL TIMES. IF INTERRUPTIONS ARE NECESSARY,

RECEIVE ADVANCE APPROVAL FROM COR.

14. MAINTAIN EXISTING FIRE EXITS OPEN AND FREE

FROM DEBRIS AND OBSTACLES.

15. MAINTAIN FIRE ALARM DETECTION AND SUPPRESSION

SYSTEMS. PROVIDE TEMPORARY INTERIM SYSTEMS

WHEN PERMANENT SYSTEMS CANNOT BE USED.

16. PROVIDE AND MAINTAIN PORTABLE FIRE

SUPPRESSION EQUIPMENT WHERE REQUIRED.

EXISTING BUILDING

PROPERTY LINE

UNDERGROUND STORAGE TANKS

LIMITS OF WORK (ACTIVE WORK AREA)

AREA EXPECTED TO BE UNDER

CONSTRUCTION BY OTHER PROGRAM

CONTRACTOR PARKING/ STAGING/

TRAILER AREAS

NEW BUILDING

UTILITY TUNNEL CONNECTIONS

AGV (AUTOMATED GUIDED VEHICLE)

TUNNEL CONNECTIONS

PEDESTRIAN PATH ACCESS

PATH OF EGRESS

PROPOSED LOCATION OF FUTURE

EXPANSION

N TRUE

NORTH

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

A u to d e s k D o c s /0

-1

-0

V A

W

L A

-C C

C C

U P

S it e

U ti ls

R e n o o f_ B

/6

-4

.0

.A

R C

H .r v t

/1

/2

:2

:3

P

M

GI202

PHASING PLAN - PHASE 2 -

CONSTRUCTIONLEO A DALY COMPANY

LOS ANGELES, CA 90071

(213) 629-0100

NICOS KATSELLIS

WEST LA MEDICAL CENTER

SITE INFRASTRUCTURE AND

UTILITIES

WEST LOS ANGELES, CA

691-408

N/A

2.16.24

CONSTRUCTION

DOCUMENTS

550 SOUTH HOPE STREET, 27TH FLOOR

SCALE:1 : 1440

F1

SITE PLAN OVERALL - PHASE 2

SYMBOL LEGEND

GENERAL NOTES

SCALE : 1" = 120'-0"

0 120' 240'

Revisions: Date:

FOR REFERENCE ONLY

FOR REFERENCE ONLY - NOT FOR CONSTRUCTION : QUANTITIES AND DESIGNS CAN, AND LIKELY WILL, CHANGE. BY USING THESE DRAWINGS, YOU AGREE LEO A DALY IS RELEASED AND HELD HARMLESS FOR ANY AND ALL DAMAGES OR CLAIMS RELATED TO OR ARISING FROM SUCH USE

STOP

STOP

BUMP

BUMP

V .A

B

U S O

N L Y

P A

T

IE

N T

-V A

N

PED PED

XING XING

BUMP

BU M

P

ENTER

M O

T O

R C

Y C

L E

S O

N L

Y

H C

H C

H C

H C

H C

H C

H C

STOP

STOP

STOP

STOP

STOP

STOP

STOP

STOP

BUMP

BUMP

KEEP

CLEAR

STOP

HC

NO

PA

RKING

HC

NO

PA

RKING

NO

P

A

RK

IN

G

NO

PA

RKING

NO

PA

RKINGNO

P A

RK

IN

G

NO

P A

RK

IN

G

PARKING

NO

PARKINGPARKINGPARKING

PARKING PARKING PARKINGNO NO NO

NONONO

PARKING

NO

FI R E LA N E

PARKINGPARKINGPARKINGPARKINGPARKINGPARKINGPARKING

PARKING

NO

NONONONONONONO

NO PARKINGNO PARKING

FIRE LANE

BUMP

BUMP

STOP

S T

OP

S T

OP

S T

OP

STOPSTOP

STOP

STO

P

HCHC

S

TO

P S

T O

P

HC

STOP

HC

N O

PA

R

KI

NG

N O

PA

R

KI

NG

N O

PA

R

KI

NG

HCHCHCHCHCHCHC

HC HC HCHCHCHCHCHCHCHCHCHC

S TOP

ST O

P

STOP

N O

P A

R K

IN

G

NO PARKING

NO PARKING

N O

P A

R K

IN

G

N O

P A

R K

IN

G

N O

P A

R K

IN

G

N O

P A

R K

IN

G

N O

P A

R K

IN

G

N O

P A

R K

IN

G

N O

P A

R K

IN

G

N O

P A

R K

IN

G

N O

P A

R K

IN

G

NO PARKING

NO PARKINGNO PARKING

NO PARKING NO PARKING

BU M

P

LAUNDRY

NO PARKING

BUMP

NO PARKING

N O

P A

R K

IN

G

NO PARKING

NO PARKING

N O

P A

R K

IN

G

HC HC

HC

HC

HCHC

STO

P

NO PARKING

NO PARKING

STOP

STO

P

S TOP

BU M

P

LAUNDRY

NO PARKING

BUMP

IN

O

U T

DO

NOT

ENTER

E

XIT

STOP

STOP

EXIT

EXIT

S T

OP

HCHC HC HC HC HC HC

HCHCHCHCHCHCHCHCHC

NO PARKING NO PARKINGNO PARKING

TSTS

TS

TS

TS

TS

TS

TS

TS

TS

TS

TS

TS

PED

XING

STOP

STO

P

STOP

U T

U T

U T

U T

H H

H H

U T

U T

H H

U T

D

E

D

D

E

D

D

M W M W M W

D

E

D

D

E

E

E

D

E

D

D

D

M W

M W M W

D E

D

D

M WM W

D

M W

M W

P B

D

M W

D

D

D

M W

D D

M W

D

D

M W

M W

D

D

M W

T

T T

T

T

T

T

P B

P B

D

E

D

PHASE 3 - CONSTRUCTION

3.a CONSTRUCTION CONTINUES AT B600, B601 AND B602.

3.b ABOVE-GROUND FUEL TANKS. MAINTAIN ALL TRUCK ACCESS TO TANKS.

3.c

3.d INSTALL UNDERGROUND UTILITIES BETWEEN B600 AND B602.

3.e CONSTRUCTION BEGINS ON AGV TUNNEL FROM B601 B605.

3.f EDISON SUBSTATION EXPECTED IS COMPLETED. REWORK

AREA OF FORMER PARKING LOT F.

3.g BEGIN INSTALLATION OF UNDERGROUND UTILITIES BETWEEN

B600, B602 AND B603.

3.h CONSTRUCT UNDERGROUND STORAGE TANKS.

KITCHEN

LOADING DOCK

3.a

3.a 3.a

3.d

3.e

3.b

TEMP.

KITCHEN

GENERATOR

TEMP

LOADING

DOCK

3.f

S A

W T

E L

U

L E

V A

R D

D O W L E N D R I V E

D O

W L E N

D R

I V E

W I L S H I R E V O U L E V A R D

O H I O A V E N U E

B600

CCC

B602

CUP

B601

LTH

3.g

LOT A

LOT B

LOT 6

LOT 6

B608

PARKING

GARAGE

LOT F

B500

HOPSPITAL

B304

B402 B401

B345

A.R.C.

B507

B522

B318

B312 B311

B23 B307

B308

B309

B91

B90

B104

B310

U.S. ARMY

CALIFORNIA

NATIONAL GUARD

U.S. AIR FORCE

PROPERTY

B105

LOT D

EDISON

SUBSTATION

LOT 5

B607

PATRIOT

HOUSE

B606

FISHER HOUSE

B605

KITCHEN

B603

BOILER

METRO STATION

SUBSTATION

LOT 42

B501

CUP

HELIPADHELIPAD

3.h

1. PROVIDE EGRESS ACCESS FROM EXISTING BUILDING

EXITS AND AREAS OF NEW WORK DURING

CONSTRUCTION.

2. PHASING IS SCHEMATIC AND NOT INTENDED TO BE

SEQUENTIAL

3. ENSURE DUST CONTROL PLAN IS IN PLACE. SEE

SUSTAINABLE CONSTRUCTION REQUIREMENTS

SPECIFICATION.

4. PROTECT EXISTING BUILDING AIR INTAKES FROM

DUST AND OTHER CONSTRUCTION DEBRIS.

5. PROVIDE FIRE DEPARTMENT ACCESS TO BUILDINGS

DURING CONSTRUCTION.

6. SEE LOGISTICS TRANSPORTATION HUB DRAWINGS

FOR PHASING INFORMATION AT B500.

7. FOR FULL EXTENTS OF AREAS OF WORK, SEE CIVIL

DEMOLITION PLANS.

8. CONTRACTOR SHALL NOT ENTER AREAS WHICH ARE

NOT IN CONTRACT. IF ACCESS TO THESE AREAS ARE

NEEDED, GC TO COORDINATE ACCESS WITH

CONTRACTING OFFICER REPRESENTATIVE.

9. PROVIDE TEMPORARY CONSTRUCTION BARRIERS TO

SEPARATE AREAS OF WORK FROM OTHER AREAS.

10. REFER TO THE SPECIFICATIONS AND FIRE

PROTECTION DESIGN MANUAL SECTION 1.4 FOR FIRE

PROTECTION REQUIREMENTS DURING

CONSTRUCTION.

11. USE ONLY THE CONTRACTOR'S PERSONNEL PARKING

AS INDICATED ON PHASING PLANS.

12. MAINTAIN CIRCULATION AREAS FREE OF BARRIERS

TO EMERGENCY VEHICLES.

13. MAINTAIN UTILITY SERVICES AT AND TO FACILITIES AT

ALL TIMES. IF INTERRUPTIONS ARE NECESSARY,

RECEIVE ADVANCE APPROVAL FROM COR.

14. MAINTAIN EXISTING FIRE EXITS OPEN AND FREE

FROM DEBRIS AND OBSTACLES.

15. MAINTAIN FIRE ALARM DETECTION AND SUPPRESSION

SYSTEMS. PROVIDE TEMPORARY INTERIM SYSTEMS

WHEN PERMANENT SYSTEMS CANNOT BE USED.

16. PROVIDE AND MAINTAIN PORTABLE FIRE

SUPPRESSION EQUIPMENT WHERE REQUIRED.

EXISTING BUILDING

PROPERTY LINE

UNDERGROUND STORAGE TANKS

LIMITS OF WORK (ACTIVE WORK AREA)

AREA EXPECTED TO BE UNDER

CONSTRUCTION BY OTHER PROGRAM

CONTRACTOR PARKING/ STAGING/

TRAILER AREAS

NEW BUILDING

UTILITY TUNNEL CONNECTIONS

AGV (AUTOMATED GUIDED VEHICLE)

TUNNEL CONNECTIONS

PEDESTRIAN PATH ACCESS

PATH OF EGRESS

PROPOSED LOCATION OF FUTURE

EXPANSION

N TRUE

NORTH

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

A u to d e s k D o c s /0

-1

-0

V A

W

L A

-C C

C C

U P

S it e

U ti ls

R e n o o f_ B

/6

-4

.0

.A

R C

H .r v t

/1

/2

:2

:4

P

M

GI203

PHASING PLAN - PHASE 3 -

CONSTRUCTIONLEO A DALY COMPANY

LOS ANGELES, CA 90071

(213) 629-0100

NICOS KATSELLIS

WEST LA MEDICAL CENTER

SITE INFRASTRUCTURE AND

UTILITIES

WEST LOS ANGELES, CA

691-408

N/A

2.16.24 KHOI

CONSTRUCTION

DOCUMENTS

550 SOUTH HOPE STREET, 27TH FLOOR

SCALE:1 : 1440

F1

SITE PLAN OVERALL - PHASE 3

SYMBOL LEGEND

GENERAL NOTES

SCALE : 1" = 120'-0"

0 120' 240'

Revisions: Date:

FOR REFERENCE ONLY

FOR REFERENCE ONLY - NOT FOR CONSTRUCTION : QUANTITIES AND DESIGNS CAN, AND LIKELY WILL, CHANGE. BY USING THESE DRAWINGS, YOU AGREE LEO A DALY IS RELEASED AND HELD HARMLESS FOR ANY AND ALL DAMAGES OR CLAIMS RELATED TO OR ARISING FROM SUCH USE

STOP

STOP

BUMP

BUMP

V .A

B

U S O

N L Y

P A

T

IE

N T

-V A

N

PED PED

XING XING

BUMP

BU M

P

ENTER

M O

T O

R C

Y C

L E

S O

N L

Y

H C

H C

H C

H C

H C

H C

H C

STOP

STOP

STOP

STOP

STOP

STOP

STOP

STOP

BUMP

BUMP

KEEP

CLEAR

STOP

HC

NO

PA

RKING

HC

NO

PA

RKING

NO

P

A

RK

IN

G

NO

PA

RKING

NO

PA

RKINGNO

P A

RK

IN

G

NO

P A

RK

IN

G

PARKING

NO

PARKINGPARKINGPARKING

PARKING PARKING PARKINGNO NO NO

NONONO

PARKING

NO

FI R E LA N E

PARKINGPARKINGPARKINGPARKINGPARKINGPARKINGPARKING

PARKING

NO

NONONONONONONO

NO PARKINGNO PARKING

FIRE LANE

BUMP

BUMP

STOP

S T

OP

S T

OP

S T

OP

STOPSTOP

STOP

STO

P

HCHC

S

TO

P S

T O

P

HC

STOP

HC

N O

PA

R

KI

NG

N O

PA

R

KI

NG

N O

PA

R

KI

NG

HCHCHCHCHCHCHC

HC HC HCHCHCHCHCHCHCHCHCHC

S TOP

ST O

P

STOP

N O

P A

R K

IN

G

NO PARKING

NO PARKING

N O

P A

R K

IN

G

N O

P A

R K

IN

G

N O

P A

R K

IN

G

N O

P A

R K

IN

G

N O

P A

R K

IN

G

N O

P A

R K

IN

G

N O

P A

R K

IN

G

N O

P A

R K

IN

G

N O

P A

R K

IN

G

NO PARKING

NO PARKINGNO PARKING

NO PARKING NO PARKING

BU M

P

LAUNDRY

NO PARKING

BUMP

NO PARKING

N O

P A

R K

IN

G

NO PARKING

NO PARKING

N O

P A

R K

IN

G

HC HC

HC

HC

HCHC

STO

P

NO PARKING

NO PARKING

STOP

BU M

P

LAUNDRY

NO PARKING

BUMP

IN

O

U T

DO

NOT

ENTER

STOP

STOP

EXIT

EXIT

S T

OP

HCHC HC HC HC HC HCHCHCHCHCHCHCHCHCHC

NO PARKING NO PARKINGNO PARKING

TSTS

TS

TS

TS

TS

TS

TS

TS

TS

TS

TS

TS

PED

XING

STOP

STO

P

STOP

U T

U T

U T

U T

H H

H H

U T

U T

H H

U T

D

E

D

D

E

D

D

M WM W

M W

D

E

D

D

E

E

E

D

E

D

D

D

M W

M W M W

D E

D

D

M WM W

D

M W

M W

P B

D

M W

D

D

D

M W

D D

M W

D

D

M W

M W

D

D

T

T T

T

T

T

T

P B

P B

D

E

D

PHASE 4 - CONSTRUCTION

4.a CONSTRUCT TELECOM DUCTBANK. MAINTAIN ACCESS TO B608

PARKING GARAGE.

4.b CONSTRUCTION CONTINUES ON B600.

4.c B602 BUILDING CONSTRUCTION IS COMPLETE. BEGIN

COMMISSIONING OF BUILDING B602.

4.d CONSTRUCT FISHER HOUSE DRIVEWAY & SITE IMPROVEMENTS.

MAINTAIN PEDESTRIAN ACCESS FROM PARKING GARAGE B608

TO KITCHEN B604.

4.e CONTINUE INSTALLATION OF UNDERGROUND UTILITIES

BETWEEN B600, B602 AND B603.

4.f RELOCATE OXYGEN YARD TO PERMANENT LOCATION.

4.g CONTINUE REWORK AREA OF FORMER PARKING LOT F.

4.h ABOVE-GROUND FUEL TANKS. MAINTAIN TRUCK ACCESS TO

TANKS.

4.i B601 CONSTRUCTION COMPLETE. COMMISSION B601.

4.j

4.k CONSTRUCTION OF AGV TUNNEL CONTINUES.

4.l CONSTRUCT NEW PARKING AREAS.

4.d

4.j

4.b

KITCHEN

LOADING DOCK

4.g

OXYGEN YARD RELOCATED TO

PERMANENT LOCATION

4.a

TEMP.

KITCHEN

GENERATOR

4.h

TEMP

LOADING

DOCK 4.i

B601

LTH

LOT A

LOT B

LOT 6

LOT 6

B608

PARKING

GARAGE

LOT F

B500

HOPSPITAL

B304

B402 B401

B345

A.R.C.

B507

B522

B318

B312 B311

B23 B307

B308

B309

B91

B90

B104

B310

U.S. ARMY

CALIFORNIA

NATIONAL GUARD

U.S. AIR FORCE

PROPERTY

B105

EDISON

SUBSTATION

LOT 5

B607

PATRIOT

HOUSE

B606

FISHER HOUSE

B605

KITCHEN

B603

BOILER

METRO STATION

SUBSTATION

LOT 42

S A

W T

E L

U

L E

V A

R D

D O W L E N D R I V E

D O

W L E N

D R

I V E

W I L S H I R E V O U L E V A R D

O H I O A V E N U E

4.k

B501

CUP

LOT C

4.l

4.c

B600

CCC

B602

CUP

HELIPADHELIPAD

4.e

4.f

1. PROVIDE EGRESS ACCESS FROM EXISTING BUILDING

EXITS AND AREAS OF NEW WORK DURING

CONSTRUCTION.

2. PHASING IS SCHEMATIC AND NOT INTENDED TO BE

SEQUENTIAL

3. ENSURE DUST CONTROL PLAN IS IN PLACE. SEE

SUSTAINABLE CONSTRUCTION REQUIREMENTS

SPECIFICATION.

4. PROTECT EXISTING BUILDING AIR INTAKES FROM

DUST AND OTHER CONSTRUCTION DEBRIS.

5. PROVIDE FIRE DEPARTMENT ACCESS TO BUILDINGS

DURING CONSTRUCTION.

6. SEE LOGISTICS TRANSPORTATION HUB DRAWINGS

FOR PHASING INFORMATION AT B500.

7. FOR FULL EXTENTS OF AREAS OF WORK, SEE CIVIL

DEMOLITION PLANS.

8. CONTRACTOR SHALL NOT ENTER AREAS WHICH ARE

NOT IN CONTRACT. IF ACCESS TO THESE AREAS ARE

NEEDED, GC TO COORDINATE ACCESS WITH

CONTRACTING OFFICER REPRESENTATIVE.

9. PROVIDE TEMPORARY CONSTRUCTION BARRIERS TO

SEPARATE AREAS OF WORK FROM OTHER AREAS.

10. REFER TO THE SPECIFICATIONS AND FIRE

PROTECTION DESIGN MANUAL SECTION 1.4 FOR FIRE

PROTECTION REQUIREMENTS DURING

CONSTRUCTION.

11. USE ONLY THE CONTRACTOR'S PERSONNEL PARKING

AS INDICATED ON PHASING PLANS.

12. MAINTAIN CIRCULATION AREAS FREE OF BARRIERS

TO EMERGENCY VEHICLES.

13. MAINTAIN UTILITY SERVICES AT AND TO FACILITIES AT

ALL TIMES. IF INTERRUPTIONS ARE NECESSARY,

RECEIVE ADVANCE APPROVAL FROM COR.

14. MAINTAIN EXISTING FIRE EXITS OPEN AND FREE

FROM DEBRIS AND OBSTACLES.

15. MAINTAIN FIRE ALARM DETECTION AND SUPPRESSION

SYSTEMS. PROVIDE TEMPORARY INTERIM SYSTEMS

WHEN PERMANENT SYSTEMS CANNOT BE USED.

16. PROVIDE AND MAINTAIN PORTABLE FIRE

SUPPRESSION EQUIPMENT WHERE REQUIRED.

EXISTING BUILDING

PROPERTY LINE

UNDERGROUND STORAGE TANKS

LIMITS OF WORK (ACTIVE WORK AREA)

AREA EXPECTED TO BE UNDER

CONSTRUCTION BY OTHER PROGRAM

CONTRACTOR PARKING/ STAGING/

TRAILER AREAS

NEW BUILDING

UTILITY TUNNEL CONNECTIONS

AGV (AUTOMATED GUIDED VEHICLE)

TUNNEL CONNECTIONS

PEDESTRIAN PATH ACCESS

PATH OF EGRESS

PROPOSED LOCATION OF FUTURE

EXPANSION

N TRUE

NORTH

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

A u to d e s k D o c s /0

-1

-0

V A

W

L A

-C C

C C

U P

S it e

U ti ls

R e n o o f_ B

/6

-4

.0

.A

R C

H .r v t

/1

/2

:2

:4

P

M

GI204

PHASING PLAN - PHASE 4 -

CONSTRUCTIONLEO A DALY COMPANY

LOS ANGELES, CA 90071

(213) 629-0100

NICOS KATSELLIS

WEST LA MEDICAL CENTER

SITE INFRASTRUCTURE AND

UTILITIES

WEST LOS ANGELES, CA

691-408

N/A

2.16.24

CONSTRUCTION

DOCUMENTS

550 SOUTH HOPE STREET, 27TH FLOOR

SCALE : 1" = 120'-0"

0 120' 240'

SCALE:1 : 1440

F1

SITE PLAN OVERALL - PHASE 4

SCALE : 1" = 120'-0"

0 120' 240'

SYMBOL LEGEND

GENERAL NOTES

Revisions: Date:

FOR REFERENCE ONLY

FOR REFERENCE ONLY - NOT FOR CONSTRUCTION : QUANTITIES AND DESIGNS CAN, AND LIKELY WILL, CHANGE. BY USING THESE DRAWINGS, YOU AGREE LEO A DALY IS RELEASED AND HELD HARMLESS FOR ANY AND ALL DAMAGES OR CLAIMS RELATED TO OR ARISING FROM SUCH USE

S T

OP

STOP

STOP

BUMP

BUMP

V .A

B

U S O

N L Y

P A

T

IE

N T

-V A

N

PED PED

XING XING

BUMP

BU M

P

ENTER

M O

T O

R C

Y C

L E

S O

N L

Y

H C

H C

H C

H C

H C

H C

H C

STOP

STOP

STOP

STOP

STOP

STOP

STOP

STOP

BUMP

BUMP

KEEP

CLEAR

STOP

HC

NO

PA

RKING

HC

NO

PA

RKING

NO

P

A

RK

IN

G

NO

PA

RKING

NO

PA

RKING

NO

P

A

RK

IN

G

NO

P

A

RK

IN

G

PARKING

NO

PARKINGPARKINGPARKING

PARKING PARKING PARKINGNO NO NO

NONONO

PARKING

NO

FI R E LA N E

PARKINGPARKINGPARKINGPARKINGPARKINGPARKINGPARKING

PARKING

NO

NONONONONONONO

NO PARKINGNO PARKING

FIRE LANE

BUMP

BUMP

STOP

S T

OP

S T

OP

S T

OP

STOPSTOP

STOP

STO

P

HCHC

S

TO

P S

T O

P

HC

STOP

HC

YI ELD

N O

PA

R

KI

NG

N O

PA

R

KI

NG

N O

PA

R

KI

NG

VAN

VAN VAN

VANVAN

VANVANVAN

VANVANVAN

VAN

278.69

BFP/3"IP

S T

OP

HCHC HC HC HC HC HCHCHCHCHCHCHCHCHCHC

NO PARKING NO PARKINGNO PARKING

PED

XING

STOP

STO

P

STOP

D

E

D

D

E

D

D

D

E

D

D

E

E

E

D

D

D

E D

D

D

D

D

D

D

D D

D

D

D

D

PHASE 5 - CONSTRUCTION

5.a EXPAND CONSTRUCTION FENCE TO ENCLOSE AREAS OF

CONSTRUCTION.

5.b GRADE AREA WEST OF B600 AND CONSTRUCT THE PEDESTRIAN

SPINE.

5.c REMOVE HARDSCAPE AND LANDSCAPE IN AREA BETWEEN B500 &

B304. CONSTRUCT NORTH DRIVE AND PARKING LOTS.

CONTRACTOR TO DEVELOP MICRO-PHASING PLANS, INCLUDING

POTENTIAL TEMPORARY MEASURES, TO ASSURE CONTINUED

CROSS CAMPUS ACCESS.

5.d AREA TO THE EAST OF B600 WORK: AFTER TEMPORARY ACCESS

FROM SOUTHEAST SIDE OF B500 TO B501 IS ESTABLISHED,

REWORK UTILITIES AND CONSTRUCT AMBULANCE DRIVEWAY &

DROP-OFF AT EAST SIDE OF B600. COMPLETE INSTALLATION OF

BURIED UTILITIES BEYWEEN B600 AND B602. COMPLETE AGV

TUNNEL CONNECTION TO KITCHEN.

5.e CONSTRUCT LANDSCAPE, DRIVEWAYS, WALKWAYS, AND

HOLDING AREAS AROUND B602 AND B603.

5.f COMMISSIONING OF B601 IS COMPLETE. LOADING DOCK. IS

OPERATIONAL.

5.g BEGIN SITE WORK AT FITNESS TRAIL. TEMPORARY KITCHEN

GENERATOR REMAINS OPERABLE.

5.h CONTINUE COMMISSIONING OF B602

5.i INSTALL SALVAGED SOLAR PANEL SUPPORT STRUCTURE. INSTAL

SOLAR PANELS.

5.j PROVIDE PEDESTRIAN ACCESS TO AND EGRESS FROM OCCUPIED

BULDINGS DURING CONSTRUCTION.

5.k COMPLETE CONSTRUCTION OF B600.

5.l TEMPORARY DOCK IS REMOVED AND TEMPORARY ACCESS TO

B501 AND ABOVE GROUND FUEL TANKS IS ESTABLISHED.

5.m SWITCH UTILITY SERVING B603 AND B605 FROM B501 TO B602.

- PHASE THE 2 POWER FEEDS SERVING B603 AND THE 2 POWER

FEEDS SERVING B605 AS REQUIRED TO MAKE THE TRANSITION

TO CUP B602.

5.n CONSTRUCT ELEVATOR AT B605.

5.b

5.d

5.a

5.c

5.e

5.g

5.h

KITCHEN

LOADING DOCK

TEMP.

KITCHEN

GENERATOR

5.i

5.f

5.k

S A

W T

E L

U

L E

V A

R D

D O W L E N D R I V E

D O

W L E N

D R

I V E

W I L S H I R E V O U L E V A R D

O H I O A V E N U E

5.l

5.j

5.j

5.j

5.j

5.j

5.j

5.m

TEMP

ELECTRICAL

SWITCHGEAR

FEEDING

BOILER B603

LOT A

LOT B

LOT 6

LOT 6

B608

PARKING

GARAGE

B500

HOPSPITAL

B304

B402 B401

B345

A.R.C.

B507

B522

B318

B312 B311

B23 B307

B308

B309

B91

B90

B104

B310

U.S. ARMY

CALIFORNIA

NATIONAL GUARD

U.S. AIR FORCE

PROPERTY

B105

LOT D

EDISON

SUBSTATION

LOT 5

B607

PATRIOT

HOUSE

B606

FISHER HOUSE

B605

KITCHEN

B603

BOILER

METRO STATION

SUBSTATION

LOT 42

5.d

5.d

5.n

B501

CUP

LOT C

B602

CUP

HELIPADHELIPAD

B601

LTH

B600

CCC

LOADING

DOCK

1. PROVIDE EGRESS ACCESS FROM EXISTING BUILDING

EXITS AND AREAS OF NEW WORK DURING

CONSTRUCTION.

2. PHASING IS SCHEMATIC AND NOT INTENDED TO BE

SEQUENTIAL

3. ENSURE DUST CONTROL PLAN IS IN PLACE. SEE

SUSTAINABLE CONSTRUCTION REQUIREMENTS

SPECIFICATION.

4. PROTECT EXISTING BUILDING AIR INTAKES FROM

DUST AND OTHER CONSTRUCTION DEBRIS.

5. PROVIDE FIRE DEPARTMENT ACCESS TO BUILDINGS

DURING CONSTRUCTION.

6. SEE LOGISTICS TRANSPORTATION HUB DRAWINGS

FOR PHASING INFORMATION AT B500.

7. FOR FULL EXTENTS OF AREAS OF WORK, SEE CIVIL

DEMOLITION PLANS.

8. CONTRACTOR SHALL NOT ENTER AREAS WHICH ARE

NOT IN CONTRACT. IF ACCESS TO THESE AREAS ARE

NEEDED, GC TO COORDINATE ACCESS WITH

CONTRACTING OFFICER REPRESENTATIVE.

9. PROVIDE TEMPORARY CONSTRUCTION BARRIERS TO

SEPARATE AREAS OF WORK FROM OTHER AREAS.

10. REFER TO THE SPECIFICATIONS AND FIRE

PROTECTION DESIGN MANUAL SECTION 1.4 FOR FIRE

PROTECTION REQUIREMENTS DURING

CONSTRUCTION.

11. USE ONLY THE CONTRACTOR'S PERSONNEL PARKING

AS INDICATED ON PHASING PLANS.

12. MAINTAIN CIRCULATION AREAS FREE OF BARRIERS

TO EMERGENCY VEHICLES.

13. MAINTAIN UTILITY SERVICES AT AND TO FACILITIES AT

ALL TIMES. IF INTERRUPTIONS ARE NECESSARY,

RECEIVE ADVANCE APPROVAL FROM COR.

14. MAINTAIN EXISTING FIRE EXITS OPEN AND FREE

FROM DEBRIS AND OBSTACLES.

15. MAINTAIN FIRE ALARM DETECTION AND SUPPRESSION

SYSTEMS. PROVIDE TEMPORARY INTERIM SYSTEMS

WHEN PERMANENT SYSTEMS CANNOT BE USED.

16. PROVIDE AND MAINTAIN PORTABLE FIRE

SUPPRESSION EQUIPMENT WHERE REQUIRED.

EXISTING BUILDING

PROPERTY LINE

UNDERGROUND STORAGE TANKS

LIMITS OF WORK (ACTIVE WORK AREA)

AREA EXPECTED TO BE UNDER

CONSTRUCTION BY OTHER PROGRAM

CONTRACTOR PARKING/ STAGING/

TRAILER AREAS

NEW BUILDING

UTILITY TUNNEL CONNECTIONS

AGV (AUTOMATED GUIDED VEHICLE)

TUNNEL CONNECTIONS

PEDESTRIAN PATH ACCESS

PATH OF EGRESS

PROPOSED LOCATION OF FUTURE

EXPANSION

N TRUE

NORTH

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

A u to d e s k D o c s /0

-1

-0

V A

W

L A

-C C

C C

U P

S it e

U ti ls

R e n o o f_ B

/6

-4

.0

.A

R C

H .r v t

/1

/2

:2

:5

P

M

GI205

PHASING PLAN - PHASE 5 -

CONSTRUCTIONLEO A DALY COMPANY

LOS ANGELES, CA 90071

(213) 629-0100

NICOS KATSELLIS

WEST LA MEDICAL CENTER

SITE INFRASTRUCTURE AND

UTILITIES

WEST LOS ANGELES, CA

691-408

N/A

2.16.24

CONSTRUCTION

DOCUMENTS

550 SOUTH HOPE STREET, 27TH FLOOR

SCALE:1 : 1440

F1

SITE PLAN OVERALL - PHASE 5

SYMBOL LEGEND

GENERAL NOTES

SCALE : 1" = 120'-0"

0 120' 240'

Revisions: Date:

FOR REFERENCE ONLY

FOR REFERENCE ONLY - NOT FOR CONSTRUCTION : QUANTITIES AND DESIGNS CAN, AND LIKELY WILL, CHANGE. BY USING THESE DRAWINGS, YOU AGREE LEO A DALY IS RELEASED AND HELD HARMLESS FOR ANY AND ALL DAMAGES OR CLAIMS RELATED TO OR ARISING FROM SUCH USE

S T

OP

STOP

BUMP

BUMP

BU M

P

ENTER

M O

T O

R C

Y C

L E

S O

N L

Y

H C

H C

H C

H C

H C

H C

H C

STOP

STOP

STOP

STOP

STOP

STOP

STOP

STOP

BUMP

BUMP

KEEP

CLEAR

HC

NO

PA

RKING

HC

NO

PA

RKING

NO

P

A

RK

IN

G

NO

PA

RKING

NO

PA

RKING

NO

P

A

RK

IN

G

NO

P

A

RK

IN

G

PARKING

NO

PARKINGPARKINGPARKING

PARKING PARKING PARKINGNO NO NO

NONONO

PARKING

NO

FI R E LA N E

PARKINGPARKINGPARKINGPARKINGPARKINGPARKINGPARKING

PARKING

NO

NONONONONONONO

NO PARKINGNO PARKING

FIRE LANE

BUMP

BUMP

STOP

S T

OP

S T

OP

S T

OP

STOPSTOP

STOP

STO

P

HCHC

S

TO

P S

T O

P

HC

STOP

HC

YI ELD

N O

PA

R

KI

NG

N O

PA

R

KI

NG

N O

PA

R

KI

NG

V A N

V A N

VAN

VAN VAN

VANVAN

VANVANVAN

VANVANVAN

VAN

278.69

BFP/3"IP

S T

OP

HCHC HC HC HC HC HCHCHCHCHCHCHCHCHCHC

NO PARKING NO PARKINGNO PARKING

PED

XING

STOP

STO

P

STOP

D

E

D

D

E

D

D

D

E

D

E

E

E

D

D

D

E D

D

D

D

D

D

D D

D

D

D

D

STOP

BUMP

V .A

B

U S O

N L Y

P A

T

IE

N T

-V A

N

PED PED

XING XING

D

D

STOP

STOP

BU M

P

BUMP

BU M

P

BUMP

STOP

PHASE 6 - CONSTRUCTION

6.a B600 CONSTRUCTION IS COMPLETE. COMMISSION B600.

6.b CONTINUE CONSTRUCTION OF PERSTRIAN SPINE.

6.c CONTINUE HARDSCAPE AND LANDSCAPRE WORK.

6.d COMPLETE THE COMMISSIONING OF B602

6.e

6.f DEMOLISH TEMPORARY KITCHEN GENERATOR AND COMPLETE

LANDSCAPE OF FITNESS TRAIL.

6.g

6.h

6.i DEMOLISH TEMPORARY ELECTRICAL SWITCHGEAR AND

ENCLOSURE.

6.j

6.k UTILITY AND DRIVE WORK IS COMPLETE.

6.l COMPLETE INTERIOR WORK AT KITCHEN B605.

KITCHEN

LOADING DOCK

TEMP.

KITCHEN

GENERATOR

D O W L E N D R I V E

D O

W L E N

D R

I V E

W I L S H I R E V O U L E V A R D

6.a

6.l

LOADING

DOCKB601

LTH

B600

CCC

B602

CUP

LOT A

LOT B

LOT 6

LOT 6

B608

PARKING

GARAGE

LOT F

B500

HOPSPITAL

B304

B402 B401

B345

A.R.C.

B507

B522

B318

B312 B311

B23 B307

B308

B309

B91

B90

B104

B310

U.S. ARMY

CALIFORNIA

NATIONAL GUARD

U.S. AIR FORCE

PROPERTY

B105

LOT D

EDISON

SUBSTATION

LOT 5

B607

PATRIOT

HOUSE

B606

FISHER HOUSE

B605

KITCHEN

B603

BOILER

METRO STATION

SUBSTATION

LOT 42

B501

CUP

HELIPADHELIPAD

LOT C

6.c

6.b

6.d6.c

6.f

6.i

1. PROVIDE EGRESS ACCESS FROM EXISTING BUILDING

EXITS AND AREAS OF NEW WORK DURING

CONSTRUCTION.

2. PHASING IS SCHEMATIC AND NOT INTENDED TO BE

SEQUENTIAL

3. ENSURE DUST CONTROL PLAN IS IN PLACE. SEE

SUSTAINABLE CONSTRUCTION REQUIREMENTS

SPECIFICATION.

4. PROTECT EXISTING BUILDING AIR INTAKES FROM

DUST AND OTHER CONSTRUCTION DEBRIS.

5. PROVIDE FIRE DEPARTMENT ACCESS TO BUILDINGS

DURING CONSTRUCTION.

6. SEE LOGISTICS TRANSPORTATION HUB DRAWINGS

FOR PHASING INFORMATION AT B500.

7. FOR FULL EXTENTS OF AREAS OF WORK, SEE CIVIL

DEMOLITION PLANS.

8. CONTRACTOR SHALL NOT ENTER AREAS WHICH ARE

NOT IN CONTRACT. IF ACCESS TO THESE AREAS ARE

NEEDED, GC TO COORDINATE ACCESS WITH

CONTRACTING OFFICER REPRESENTATIVE.

9. PROVIDE TEMPORARY CONSTRUCTION BARRIERS TO

SEPARATE AREAS OF WORK FROM OTHER AREAS.

10. REFER TO THE SPECIFICATIONS AND FIRE

PROTECTION DESIGN MANUAL SECTION 1.4 FOR FIRE

PROTECTION REQUIREMENTS DURING

CONSTRUCTION.

11. USE ONLY THE CONTRACTOR'S PERSONNEL PARKING

AS INDICATED ON PHASING PLANS.

12. MAINTAIN CIRCULATION AREAS FREE OF BARRIERS

TO EMERGENCY VEHICLES.

13. MAINTAIN UTILITY SERVICES AT AND TO FACILITIES AT

ALL TIMES. IF INTERRUPTIONS ARE NECESSARY,

RECEIVE ADVANCE APPROVAL FROM COR.

14. MAINTAIN EXISTING FIRE EXITS OPEN AND FREE

FROM DEBRIS AND OBSTACLES.

15. MAINTAIN FIRE ALARM DETECTION AND SUPPRESSION

SYSTEMS. PROVIDE TEMPORARY INTERIM SYSTEMS

WHEN PERMANENT SYSTEMS CANNOT BE USED.

16. PROVIDE AND MAINTAIN PORTABLE FIRE

SUPPRESSION EQUIPMENT WHERE REQUIRED.

EXISTING BUILDING

PROPERTY LINE

UNDERGROUND STORAGE TANKS

LIMITS OF WORK (ACTIVE WORK AREA)

AREA EXPECTED TO BE UNDER

CONSTRUCTION BY OTHER PROGRAM

CONTRACTOR PARKING/ STAGING/

TRAILER AREAS

NEW BUILDING

UTILITY TUNNEL CONNECTIONS

AGV (AUTOMATED GUIDED VEHICLE)

TUNNEL CONNECTIONS

PEDESTRIAN PATH ACCESS

PATH OF EGRESS

PROPOSED LOCATION OF FUTURE

EXPANSION

N TRUE

NORTH

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

A u to d e s k D o c s /0

-1

-0

V A

W

L A

-C C

C C

U P

S it e

U ti ls

R e n o o f_ B

/6

-4

.0

.A

R C

H .r v t

/1

/2

:2

:5

P

M

GI206

PHASING PLAN - PHASE 6 -

CONSTRUCTIONLEO A DALY COMPANY

LOS ANGELES, CA 90071

(213) 629-0100

NICOS KATSELLIS

WEST LA MEDICAL CENTER

SITE INFRASTRUCTURE AND

UTILITIES

WEST LOS ANGELES, CA

691-408

N/A

2.16.24

CONSTRUCTION

DOCUMENTS

550 SOUTH HOPE STREET, 27TH FLOOR

SCALE:1 : 1440

F1

SITE PLAN OVERALL - PHASE 6

SYMBOL LEGEND

GENERAL NOTES

SCALE : 1" = 120'-0"

0 120' 240'

Revisions: Date:

FOR REFERENCE ONLY

FOR REFERENCE ONLY - NOT FOR CONSTRUCTION : QUANTITIES AND DESIGNS CAN, AND LIKELY WILL, CHANGE. BY USING THESE DRAWINGS, YOU AGREE LEO A DALY IS RELEASED AND HELD HARMLESS FOR ANY AND ALL DAMAGES OR CLAIMS RELATED TO OR ARISING FROM SUCH USE

S T

OP

STOP

STOP

BUMP

BUMP

V .A

B

U S O

N L Y

P A

T

IE

N T

-V A

N

PED PED

XING XING

BUMP

BU M

P

ENTER

M O

T O

R C

Y C

L E

S O

N L

Y

H C

H C

H C

H C

H C

H C

H C

STOP

STOP

STOP

STOP

STOP

STOP

STOP

STOP

BUMP

BUMP

KEEP

CLEAR

STOP

HC

NO

PA

RKING

HC

NO

PA

RKING

NO

P

A

RK

IN

G

NO

PA

RKING

NO

PA

RKING

NO

P

A

RK

IN

G

NO

P

A

RK

IN

G

PARKING

NO

PARKINGPARKINGPARKING

PARKING PARKING PARKINGNO NO NO

NONONO

PARKING

NO

FI R E LA N E

PARKINGPARKINGPARKINGPARKINGPARKINGPARKINGPARKING

PARKING

NO

NONONONONONONO

NO PARKINGNO PARKING

FIRE LANE

BUMP

BUMP

STOP

S T

OP

S T

OP

S T

OP

STOPSTOP

STOP

STO

P

HCHC

S

TO

P S

T O

P

HC

STOP

HC

YI ELD

N O

PA

R

KI

NG

N O

PA

R

KI

NG

N O

PA

R

KI

NG

V A N

V A N

VAN

VAN VAN

VANVAN

VANVANVAN

VANVANVAN

VAN

278.69

BFP/3"IP

S T

OP

HCHC HC HC HC HC HCHCHCHCHCHCHCHCHCHC

NO PARKING NO PARKINGNO PARKING

PED

XING

STOP

STO

P

STOP

D

E

D

D

E

D

D

D

E

D

D

E

E

E

D

D

D

E D

D

D

D

D

D

D

D D

D

D

D

D x xx x xx xxx x x x x x x x x x x x x x x x x x x x x x x x x xx xx xx x x x x x x xx x x i i i ii x x x x x x x x x x x x xx x x x x x x x x x x x x x

1. PROVIDE EGRESS ACCESS FROM EXISTING BUILDING

EXITS AND AREAS OF NEW WORK DURING

CONSTRUCTION.

2. PHASING IS SCHEMATIC AND NOT INTENDED TO BE

SEQUENTIAL

3. ENSURE DUST CONTROL PLAN IS IN PLACE. SEE

SUSTAINABLE CONSTRUCTION REQUIREMENTS

SPECIFICATION.

4. PROTECT EXISTING BUILDING AIR INTAKES FROM

DUST AND OTHER CONSTRUCTION DEBRIS.

5. PROVIDE FIRE DEPARTMENT ACCESS TO BUILDINGS

DURING CONSTRUCTION.

6. SEE LOGISTICS TRANSPORTATION HUB DRAWINGS

FOR PHASING INFORMATION AT B500.

7. FOR FULL EXTENTS OF AREAS OF WORK, SEE CIVIL

DEMOLITION PLANS.

8. CONTRACTOR SHALL NOT ENTER AREAS WHICH ARE

NOT IN CONTRACT. IF ACCESS TO THESE AREAS ARE

NEEDED, GC TO COORDINATE ACCESS WITH

CONTRACTING OFFICER REPRESENTATIVE.

9. PROVIDE TEMPORARY CONSTRUCTION BARRIERS TO

SEPARATE AREAS OF WORK FROM OTHER AREAS.

10. REFER TO THE SPECIFICATIONS AND FIRE

PROTECTION DESIGN MANUAL SECTION 1.4 FOR FIRE

PROTECTION REQUIREMENTS DURING

CONSTRUCTION.

11. USE ONLY THE CONTRACTOR'S PERSONNEL PARKING

AS INDICATED ON PHASING PLANS.

12. MAINTAIN CIRCULATION AREAS FREE OF BARRIERS

TO EMERGENCY VEHICLES.

13. MAINTAIN UTILITY SERVICES AT AND TO FACILITIES AT

ALL TIMES. IF INTERRUPTIONS ARE NECESSARY,

RECEIVE ADVANCE APPROVAL FROM COR.

14. MAINTAIN EXISTING FIRE EXITS OPEN AND FREE

FROM DEBRIS AND OBSTACLES.

15. MAINTAIN FIRE ALARM DETECTION AND SUPPRESSION

SYSTEMS. PROVIDE TEMPORARY INTERIM SYSTEMS

WHEN PERMANENT SYSTEMS CANNOT BE USED.

16. PROVIDE AND MAINTAIN PORTABLE FIRE

SUPPRESSION EQUIPMENT WHERE REQUIRED.

EXISTING BUILDING

PROPERTY LINE

UNDERGROUND STORAGE TANKS

LIMITS OF WORK (ACTIVE WORK AREA)

AREA EXPECTED TO BE UNDER

CONSTRUCTION BY OTHER PROGRAM

CONTRACTOR PARKING/ STAGING/

TRAILER AREAS

NEW BUILDING

UTILITY TUNNEL CONNECTIONS

AGV (AUTOMATED GUIDED VEHICLE)

TUNNEL CONNECTIONS

PEDESTRIAN PATH ACCESS

PATH OF EGRESS

PROPOSED LOCATION OF FUTURE

EXPANSION

PHASE 7 - CONSTRUCTION

7.a MOVE INPATIENT PROGRAMS TO B600 FROM B500. RENOVATE

INTERIORS AT B500

7.b CONSTRUCT NORTH VEHICULAR GUARD HOUSE AND CHECK POINT.

7.c CONSTRUCT SOUTH VEHICULAR GUARD HOUSE AND ANC CHECK

POINT.

7.d DEMOLISH TEMPORARY PARKING LOT AND CONSTRUCT

DETENTION BASIN.

7.f

7.g COMPLETE PERIMETER SECURITY FENCE.

7.h

7.i

7.a

KITCHEN

LOADING DOCK

TEMP.

KITCHEN

GENERATOR

D O W L E N D R I V E

D O

W L E N

D R

I V E

W I L S H I R E V O U L E V A R D

7.d

8.l

LOADING

DOCKB601

LTH

B600

CCC

B602

CUP

LOT A

LOT B

LOT 6

LOT 6

B608

PARKING

GARAGE

LOT F

B500

HOPSPITAL

B304

B402 B401

B345

A.R.C.

B507

B522

B318

B312 B311

B23 B307

B308

B309

B91

B90

B104

B310

U.S. ARMY

CALIFORNIA

NATIONAL GUARD

U.S. AIR FORCE

PROPERTY

B105

LOT D

EDISON

SUBSTATION

LOT 5

B607

PATRIOT

HOUSE

B606

FISHER HOUSE

B605

KITCHEN

B603

BOILER

METRO STATION

SUBSTATION

LOT 42

B501

CUP

HELIPADHELIPAD

7.b

7.c

7.f

7.g

7.i

9e

N TRUE

NORTH

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

A u to d e s k D o c s /0

-1

-0

V A

W

L A

-C C

C C

U P

S it e

U ti ls

R e n o o f_ B

/6

-4

.0

.A

R C

H .r v t

/1

/2

:2

:0

P

M

GI207

PHASING PLAN - PHASE 7 -

CONSTRUCTIONLEO A DALY COMPANY

LOS ANGELES, CA 90071

(213) 629-0100

NICOS KATSELLIS

WEST LA MEDICAL CENTER

SITE INFRASTRUCTURE AND

UTILITIES

WEST LOS ANGELES, CA

691-408

N/A

2.16.24

CONSTRUCTION

DOCUMENTS

550 SOUTH HOPE STREET, 27TH FLOOR

SYMBOL LEGEND

GENERAL NOTES

SCALE : 1" = 120'-0"

0 120' 240'

Revisions: Date:

SCALE:1 : 1440

F1

SITE PLAN OVERALL - PHASE 7

FOR REFERENCE ONLY

FOR REFERENCE ONLY - NOT FOR CONSTRUCTION : QUANTITIES AND DESIGNS CAN, AND LIKELY WILL, CHANGE. BY USING THESE DRAWINGS, YOU AGREE LEO A DALY IS RELEASED AND HELD HARMLESS FOR ANY AND ALL DAMAGES OR CLAIMS RELATED TO OR ARISING FROM SUCH USE

DNDN

CRAWL SPACE

ACCESS

ELEVATOR

MACHINE ROOM

124 ELEV. #1

EL101LOBBY

CRAWL SPACE

CS101

CORRIDOR

C101

LOUNGE

CONFERENCE

COST CLERK

ELECTRICAL

ROOM

STAIR #1

ST101

275' - 0"

271' - 0"

275' - 0"

271' - 0"

MEN'S STAFF

FACILITIES

SECRETARY

IT/FMS

ON-LINE

TRAINING

DIETITIAN

NSF ASSISTANT

NSF ASSISTANT

NSF CHIEF

CLINICAL ADMIN

SERVICE SYS

MGR

INTERN

DIRECTOR

CORRIDOR

C102

MECHANICAL

ELEV. #2

EL202

STAIR #2

ST102

MEN'S TOILET

122A

WOMEN'S TOILET

121A

WOMEN'S STAFF

FACILITIES

HOUSEKEEPING

MEN'S

WOMEN'S

DIETETIC

INTERNS

MAINTAIN ACCESS TO EXITS

DURING CONSTRUCTION

AREA OF NEW WORK

ELEV. #1

EL101

RECYCLE/

GARBAGE

CLEANING

SUPPLY

WOMEN'S TOILET

MEN'S TOILET

ELECTRICAL

HAZARDOUS

SUPPLY

CORRIDOR

C203

LOADING

DOCK-SOILED

LOBBY

289' - 6"

ELEV. #2

EL202

IT/FMS

FOOD SERVICE

FOREMEN

COMM. CENTER

ELECTRICAL

FOOD PREP

FOOD PREP

DRY STORAGE

NON-FOOD DRY

STORAGE

ELECTRICAL

RECEIVING

NOURISH PREP

STORAGE

216A

NOURISH PREP

TRAY ASSEMBLY

TRAY RETHERM

CART HOLDING

SUPERVISOR

TRAY LINE

CLEAN CART

TRAYLINE

COOLER

SUPERVISOR

WAREWASH

DISH WASH/ POT

WASH

SOILED/ WASH

CART

EXTERIOR

STORAGE

STAIR #1

ST201

LOADING

DOCK-CLEAN

CORRIDOR

C201

CORRIDOR

C202

STAIR #2

ST202

SHAFT

SH101

AREA OF NEW WORK

EXISTING TO REMAIN

LIMITS OF WORK (ACTIVE WORK AREA)

PATH OF EGRESS

275' - 0"

271' - 0"

275' - 0"

LOCATION OF

NEW ELEVATOR PIT

CRAWL SPACE

ACCESS

ELEVATOR

MACHINE ROOM

124 ELEV. #1

EL101LOBBY

CRAWL SPACE

CS101

CORRIDOR

C101

LOUNGE

CONFERENCE

COST CLERK

ELECTRICAL

ROOM

STAIR #1

ST101

MEN'S STAFF

FACILITIES

SECRETARY

IT/FMS

ON-LINE

TRAINING

DIETITIAN

NSF ASSISTANT

NSF ASSISTANT

NSF CHIEF

CLINICAL ADMIN

SERVICE SYS

MGR

INTERN

DIRECTOR

CORRIDOR

C102

MECHANICAL

STAIR #2

ST102

MEN'S TOILET

122A

WOMEN'S TOILET

121A

WOMEN'S STAFF

FACILITIES

HOUSEKEEPING

MEN'S

WOMEN'S

DIETETIC

INTERNS

COORDINATE NEW

AGV TUNNEL WORK

WITH WORK AT B605

EXISTING WALL

MAINTAIN ACCESS TO EXITS

DURING CONSTRUCTION

TEMPORARY CONSTRUCTION

BARRIER

289' - 6"

289' - 6"

ELEV. #1

EL101

RECYCLE/

GARBAGE

CLEANING

SUPPLY

WOMEN'S TOILET

MEN'S TOILET

ELECTRICAL

HAZARDOUS

SUPPLY

CORRIDOR

C203

LOADING

DOCK-SOILED

LOBBY

ELEV. #2

EL202

IT/FMS

FOOD SERVICE

FOREMEN

COMM. CENTER

ELECTRICAL

FOOD PREP

FOOD PREP

DRY STORAGE

NON-FOOD DRY

STORAGE

ELECTRICAL

RECEIVING

NOURISH PREP

STORAGE

216A

NOURISH PREP

TRAY ASSEMBLY

TRAY RETHERM

CART HOLDING

SUPERVISOR

TRAY LINE

CLEAN CART

TRAYLINE

COOLER

SUPERVISOR

WAREWASH

DISH WASH/ POT

WASH

SOILED/ WASH

CART

EXTERIOR

STORAGE

STAIR #1

ST201

LOADING

DOCK-CLEAN

CORRIDOR

C201

RECEIVING

STAIR #2

ST202

SHAFT

SH101

MAINTAIN ACCESS TO ROOMS

DURING CONSTRUCTION

TEMPORARY CONSTRUCTION

BARRIER

MAINTAIN ACCESS TO EXITS

DURING CONSTRUCTION

AREA OF NEW WORK

N TRUE

NORTH

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

A u to d e s k D o c s /0

-1

-0

V A

W

L A

-C C

C C

U P

S it e

U ti ls

R e n o o f_ B

/6

-4

.0

.A

R C

H .r v t

/1

/2

:2

:1

P

M

GI207A

SUBPHASING PLAN - PHASE 7A -

KITCHEN B605 ELEVATORLEO A DALY COMPANY

LOS ANGELES, CA 90071

(213) 629-0100

NICOS KATSELLIS

WEST LA MEDICAL CENTER

SITE INFRASTRUCTURE AND

UTILITIES

WEST LOS ANGELES, CA

691-408

N/A

2.16.24

CONSTRUCTION

DOCUMENTS

550 SOUTH HOPE STREET, 27TH FLOOR

Revisions: Date:

SYMBOL LEGEND

GENERAL NOTES

SCALE: 1/16" = 1'-0"

F5

PHASING PLAN - B605 LEVEL 1

SCALE: 1/16" = 1'-0"

D5

PHASING PLAN - B605 LEVEL 2

1. PROVIDE EGRESS PATHWAYS FROM EXISTING

BUILDING EXITS AND AREAS OF NEW WORK DURING

CONSTRUCTION. PROVIDE ACCESS TO EXISTING

BUILDINGS DURING CONSTRUCTION.

2. ENSURE DUST CONTROL PLAN IS IN PLACE. SEE

SUSTAINABLE CONSTRUCTION REQUIREMENTS

SPECIFICATION.

3. PHASING IS SCHEMATIC AND NOT INTENDED TO BE

SEQUENTIAL.

4. PROTECT EXISTING BUILDING AIR INTAKES FROM

DUST AND OTHER CONSTRUCTION DEBRIS.

5. FOR FULL EXTENTS OF AREAS OF WORK, SEE

ARCHITECTURAL DEMOLITION PLANS.

6. CONTRACTOR SHALL NOT ENTER AREAS WHICH ARE

NOT IN CONTRACT. IF ACCESS TO THESE AREAS

ARE NEEDED, GC TO COORDINATE ACCESS WITH

CONTRACTING OFFICER REPRESENTATIVE.

7. PROVIDE TEMPORARY CONSTRUCTION BARRIERS

TO SEPARATE AREAS OF WORK FROM OTHER

AREAS PER SPECIFICATIONS.

8. REFER TO THE SPECIFICATIONS AND FIRE

PROTECTION DESIGN MANUAL SECTION 1.4 FOR

FIRE PROTECTION REQUIREMENTS DURING

CONSTRUCTION.

9. USE ONLY THE CONTRACTOR'S PERSONNEL

PARKING AS INDICATED ON PHASING PLANS.

10. MAINTAIN UTILITY SERVICES AT ALL TIMES. IF

INTERRUPTIONS ARE NECESSARY, RECEIVE

ADVANCE APPROVAL FROM COR.

11. MAINTAIN EXISTING FIRE EXITS OPEN AND FREE

FROM DEBRIS AND OBSTACLES.

12. MAINTAIN FIRE ALARM DETECTION AND

SUPPRESSION SYSTEMS. PROVIDE TEMPORARY

INTERIM SYSTEMS WHEN PERMANENT SYSTEMS

CANNOT BE USED.

13. PROVIDE TEMPORARY PARTITIONS THAT ARE

SMOKE-TIGHT AND FIRE RATED AS APPROPRIATE.

14. PROVIDE AND MAINTAIN PORTABLE FIRE

SUPPRESSION EQUIPMENT.

SCALE: 1/16" = 1'-0"

F1

PHASING PLAN - B605 EXISTING LEVEL 1

SCALE: 1/16" = 1'-0"

D1

PHASING PLAN - B605 EXISTING LEVEL 2

FOR REFERENCE ONLY

FOR REFERENCE ONLY - NOT FOR CONSTRUCTION : QUANTITIES AND DESIGNS CAN, AND LIKELY WILL, CHANGE. BY USING THESE DRAWINGS, YOU AGREE LEO A DALY IS RELEASED AND HELD HARMLESS FOR ANY AND ALL DAMAGES OR CLAIMS RELATED TO OR ARISING FROM SUCH USE

S T

OP

STOP

STOP

BUMP

BUMP

V .A

B

U S O

N L Y

P A

T

IE

N T

-V A

N

PED PED

XING XING

BUMP

BU M

P

ENTER

M O

T O

R C

Y C

L E

S O

N L

Y

H C

H C

H C

H C

H C

H C

H C

STOP

STOP

STOP

STOP

STOP

STOP

STOP

STOP

BUMP

BUMP

KEEP

CLEAR

STOP

HC

NO

PA

RKING

HC

NO

PA

RKING

NO

P

A

RK

IN

G

NO

PA

RKING

NO

PA

RKING

NO

P

A

RK

IN

G

NO

P

A

RK

IN

G

PARKING

NO

PARKINGPARKINGPARKING

PARKING PARKING PARKINGNO NO NO

NONONO

PARKING

NO

FI R E LA N E

PARKINGPARKINGPARKINGPARKINGPARKINGPARKINGPARKING

PARKING

NO

NONONONONONONO

NO PARKINGNO PARKING

FIRE LANE

BUMP

BUMP

STOP

S T

OP

S T

OP

S T

OP

STOPSTOP

STOP

STO

P

HCHC

S

TO

P S

T O

P

HC

STOP

HC

YI ELD

N O

PA

R

KI

NG

N O

PA

R

KI

NG

N O

PA

R

KI

NG

VAN

VAN VAN

VANVAN

VANVANVAN

VANVANVAN

VAN

278.69

BFP/3"IP

S T

OP

HCHC HC HC HC HC HCHCHCHCHCHCHCHCHCHC

NO PARKING NO PARKINGNO PARKING

PED

XING

STOP

STO

P

STOP

D

E

D

D

E

D

D

D

E

D

D

E

E

E

D

D

D

E D

D

D

D

D

D

D

D D

D

D

D

D x xx x xx xxx x x x x x x x x x x x x x x x x x x x x x x x x xx xx xx x x x x x x xx x x i i i ii x x x x x x x x x x x x xx x x x x x x x x x x x x x

PHASE 8 - CONSTRUCTION

8.a COMPLETE AND COMMISSION B500 INTERIOR RENOVATION WORK.

NEW NORTH GUARDHOUSE/

VEHICULAR CHECK POINT

NEW SOUTH GUARDHOUSE/

VEHICULAR CHECK POINT

KITCHEN

LOADING DOCK

S A

W T

E L

U

L E

V A

R D

D O W L E N D R I V E

D O

W L E N

D R

I V E

W I L S H I R E V O U L E V A R D

O H I O A V E N U E

8.a

LOADING

DOCKB601

LTH

B600

CCC

B602

CUP

LOT A

LOT B

LOT 6

LOT 6

B608

PARKING

GARAGE

B500

HOSPITAL

B304

B402 B401

B345

A.R.C.

B507

B522

B318

B312 B311

B23 B307

B308

B309

B91

B104

B310

U.S. ARMY

CALIFORNIA

NATIONAL GUARD

U.S. AIR FORCE

PROPERTY

B105

LOT D

EDISON

SUBSTATION

LOT 5

B607

PATRIOT

HOUSE

B606

FISHER HOUSE

B605

KITCHEN

B603

BOILER

METRO STATION

SUBSTATION

LOT 42

DETENTION BASIN

B501

CUP

HELIPAD

1. PROVIDE EGRESS ACCESS FROM EXISTING BUILDING

EXITS AND AREAS OF NEW WORK DURING

CONSTRUCTION.

2. PHASING IS SCHEMATIC AND NOT INTENDED TO BE

SEQUENTIAL

3. ENSURE DUST CONTROL PLAN IS IN PLACE. SEE

SUSTAINABLE CONSTRUCTION REQUIREMENTS

SPECIFICATION.

4. PROTECT EXISTING BUILDING AIR INTAKES FROM

DUST AND OTHER CONSTRUCTION DEBRIS.

5. PROVIDE FIRE DEPARTMENT ACCESS TO BUILDINGS

DURING CONSTRUCTION.

6. SEE LOGISTICS TRANSPORTATION HUB DRAWINGS

FOR PHASING INFORMATION AT B500.

7. FOR FULL EXTENTS OF AREAS OF WORK, SEE CIVIL

DEMOLITION PLANS.

8. CONTRACTOR SHALL NOT ENTER AREAS WHICH ARE

NOT IN CONTRACT. IF ACCESS TO THESE AREAS ARE

NEEDED, GC TO COORDINATE ACCESS WITH

CONTRACTING OFFICER REPRESENTATIVE.

9. PROVIDE TEMPORARY CONSTRUCTION BARRIERS TO

SEPARATE AREAS OF WORK FROM OTHER AREAS.

10. REFER TO THE SPECIFICATIONS AND FIRE

PROTECTION DESIGN MANUAL SECTION 1.4 FOR FIRE

PROTECTION REQUIREMENTS DURING

CONSTRUCTION.

11. USE ONLY THE CONTRACTOR'S PERSONNEL PARKING

AS INDICATED ON PHASING PLANS.

12. MAINTAIN CIRCULATION AREAS FREE OF BARRIERS

TO EMERGENCY VEHICLES.

13. MAINTAIN UTILITY SERVICES AT AND TO FACILITIES AT

ALL TIMES. IF INTERRUPTIONS ARE NECESSARY,

RECEIVE ADVANCE APPROVAL FROM COR.

14. MAINTAIN EXISTING FIRE EXITS OPEN AND FREE

FROM DEBRIS AND OBSTACLES.

15. MAINTAIN FIRE ALARM DETECTION AND SUPPRESSION

SYSTEMS. PROVIDE TEMPORARY INTERIM SYSTEMS

WHEN PERMANENT SYSTEMS CANNOT BE USED.

16. PROVIDE AND MAINTAIN PORTABLE FIRE

SUPPRESSION EQUIPMENT WHERE REQUIRED.

EXISTING BUILDING

PROPERTY LINE

UNDERGROUND STORAGE TANKS

LIMITS OF WORK (ACTIVE WORK AREA)

AREA EXPECTED TO BE UNDER

CONSTRUCTION BY OTHER PROGRAM

CONTRACTOR PARKING/ STAGING/

TRAILER AREAS

NEW BUILDING

UTILITY TUNNEL CONNECTIONS

AGV (AUTOMATED GUIDED VEHICLE)

TUNNEL CONNECTIONS

PEDESTRIAN PATH ACCESS

PATH OF EGRESS

PROPOSED LOCATION OF FUTURE

EXPANSION

N TRUE

NORTH

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

A u to d e s k D o c s /0

-1

-0

V A

W

L A

-C C

C C

U P

S it e

U ti ls

R e n o o f_ B

/6

-4

.0

.A

R C

H .r v t

/1

/2

:2

:1

P

M

GI208

PHASING PLAN - PHASE 8 -

CONSTRUCTIONLEO A DALY COMPANY

LOS ANGELES, CA 90071

(213) 629-0100

NICOS KATSELLIS

WEST LA MEDICAL CENTER

SITE INFRASTRUCTURE AND

UTILITIES

WEST LOS ANGELES, CA

691-408

N/A

2.16.24

CONSTRUCTION

DOCUMENTS

550 SOUTH HOPE STREET, 27TH FLOOR

SCALE:1 : 1440

F1

SITE PLAN OVERALL - PHASE 8

SYMBOL LEGEND

GENERAL NOTES

SCALE : 1" = 120'-0"

0 120' 240'

Revisions: Date:

FOR REFERENCE ONLY

FOR REFERENCE ONLY - NOT FOR CONSTRUCTION : QUANTITIES AND DESIGNS CAN, AND LIKELY WILL, CHANGE. BY USING THESE DRAWINGS, YOU AGREE LEO A DALY IS RELEASED AND HELD HARMLESS FOR ANY AND ALL DAMAGES OR CLAIMS RELATED TO OR ARISING FROM SUCH USE

Sheets
GI201 - PHASING PLAN -PHASE 1 -MAKE READY
GI202 - PHASING PLAN -PHASE 2 -CONSTRUCTION
GI203 - PHASING PLAN -PHASE 3 -CONSTRUCTION
GI204 - PHASING PLAN -PHASE 4 -CONSTRUCTION
GI205 - PHASING PLAN -PHASE 5 -CONSTRUCTION
GI206 - PHASING PLAN -PHASE 6 -CONSTRUCTION
GI207 - PHASING PLAN -PHASE 7 -CONSTRUCTION
GI207A - SUBPHASING PLAN -PHASE 7A -KITCHEN B605 ELEVATOR
GI208 - PHASING PLAN -PHASE 8 -CONSTRUCTION

File details come from the government source that posted it. Updated .