About this file

This file contains drawings for a new Central Utility Plant (CUP) related to a Sources Sought notice for the construction of a Critical Care Center at the VA Greater Los Angeles Healthcare System. The drawings are part of a larger project documentation package for a planned 52,000 GSF Central Utility Plant that will support current and future buildings on the VA campus, replacing the existing CUP facility.

This file should be reviewed alongside the main Sources Sought notice, which outlines a construction project exceeding $1 billion with an anticipated award date of February 2027. The CUP drawings are one component of a larger project that includes a 450,000 GSF Critical Care Center and a 15,000 GSF Logistics Transportation Hub. The project will require LEED Silver certification and includes specialized medical facility construction experience requirements, with an Industry Day planned for February 12, 2025.

Other files

File Type Posted
Industry Day Sign-In Roster 12 Feb 25.pdf PDF
Question and Answer Session.docx DOCX document
Industry Day Presentation 20250212.pdf PDF
Parking Shuttle Service.pdf PDF
691-408.000.PHASING - INDUSTRY DAY R1_WATERMARK.pdf PDF
691-408.000.SITE.DRAWINGS.zip ZIP file
691-408-2HOSP.METHANE DWGS.zip ZIP file
691-408.8AGVLD-B500.DRAWINGS.zip ZIP file
691-408-2HOSP.DRAWINGS.VOL 3.zip ZIP file
691-408-2HOSP.DRAWINGS.VOL 5.zip ZIP file
691-408-2HOSP.DRAWINGS.VOL 4.zip ZIP file
691-408-2HOSP.DRAWINGS.VOL 2.zip ZIP file
Industry Day - Site Map.pptx PPTX presentation
691-408-2HOSP.DRAWINGS.VOL 1.zip ZIP file
691-408.000.PHASING.pdf PDF
Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .