VA Long Beach Healthcare System Medical Center

VA Project Number 600-405

COMMUNITY LIVING CENTER (BUILDING 170)

PROJECT MANUAL

VOLUME 4 OF 4

DIVISIONS 27 - APPENDICES

August 10, 2018 Bid Set

VA Long Beach Healthcare System Medical Center Bid Set

COMMUNITY LIVING CENTER (BUILDING 170)

VA Project Number 600-405

August 10, 2018

00 00 01 - 2

Client Department of Veterans Affairs Office of Construction & Facilities 1175 Nimitz Avenue, Suite 200 Vallejo, CA 94592 Tel: (707) 562-8430

VA Long Beach Healthcare System 5901 East 7th Street Long Beach, CA 90822 Tel: (562) 826-8000

Architect & Hellmuth, Obata + Kassabaum, Inc.

Team Management 9530 Jefferson Blvd.

Landscape Culver City, CA 90232 LEED Tel: (310) 838-9555

Mechanical, Electrical, M-E Engineers, Inc.

Plumbing 10113 Jefferson Boulevard

Culver City, CA 90232 Tel: (310) 842-8700

Structural Engineer: KPFF Consulting Engineers 6080 Center Drive Suite 300 Los Angeles, CA 90045 Tel: (310) 665-1536

Civil Engineer: Michael Baker International 3536 Concours St. Suite 100 Ontario, CA 91764 Tel: (949)330-4173

Low Voltage AVS Engineers, Inc.

& Fire Alarm 981 Corporate Center Drive, Suite 108

Pomona, CA 91768 Tel: (909) 860-1400

Security Jensen Hughes 2099 S. State College Blvd, Suite 540 Anaheim, CA 92806 Tel: (714) 739-3870

Vertical HKA Elevator Consulting, Inc.

Transportation 23211 South Pointe Drive

Laguna Hills, CA 92653 Tel: (949) 348-9711

Door Hardware DORMA USA, Inc.

32212 Via Barrida San Juan Capistrano, CA 92675 Tel: (949) 218-0335

Signage & Wayfinding: SKA Design 900 Palm Avenue

Bid Set

COMMUNITY LIVING CENTER (BUILDING 170)

VA Project Number 600-405

August 10, 2018

00 00 01 - 3

South Pasadena, CA 91030-3029 Tel: (626) 403-5870

Acoustics Newson Brown Acoustics, LLC 2001 Wilshire Blvd Suite 301 Santa Monica, CA 90403 Tel: (310) 829-6343

Asbestos, Lead & AEC (Advantage Environmental Consultants) Hazmat Survey 145 Vallecitos De Oro, Suite 201

San Marcos, CA Tel: (760) 744-3363

Waterproofing D 7 Consulting Inc.

1000 Dove Street, Suite 102 Newport Beach, CA 92660 Tel: (949) 955-2777

Bid Set

COMMUNITY LIVING CENTER (BUILDING 170)

VA Project Number 600-405

August 10, 2018

00 01 10-1

TABLE OF CONTENTS

Section 00 01 10

DIVISION 00 - SPECIAL SECTIONS DATE

00 00 01 Cover Page 08.10.18 00 01 10 Table of Contents 08.10.18

VOLUME 1

DIVISION 00 – PROCUREMENT AND CONTRACTING

REQUIREMENTS

Provided by Owner

DIVISION 01 - GENERAL REQUIREMENTS

Provided by Owner

VOLUME 2

DIVISION 02 – EXISTING CONDITIONS

02 41 00 Demolition 08.10.13

DIVISION 03 – CONCRETE

03 30 00 Cast-in-Place Concrete 08.10.13

DIVISION 04 – MASONRY

04 05 13 Masonry Mortaring 08.10.13 04 05 16 Masonry Grouting 08.10.13 04 20 00 Unit Masonry 08.10.13

DIVISION 05 – METALS

05 12 00 Structural Steel Framing 08.10.13 05 12 50 Buckling Restrained Braces 08.10.13 05 31 00 Steel Decking 08.10.13 05 36 00 Composite Metal Decking 08.10.13 05 50 00 Metal Fabrications 08.10.13 05 51 00 Metal Stairs 08.10.13

DIVISION 06 – WOOD,PLASTICS AND COMPOSITES

06 10 00 Rough Carpentry 08.10.13 06 16 63 Cementitious Sheathing 08.10.13 06 20 00 Finish Carpentry 08.10.13

Bid Set

COMMUNITY LIVING CENTER (BUILDING 170)

VA Project Number 600-405

August 10, 2018

00 01 10-2

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 13 00 Sheet Waterproofing 08.10.13 07 14 16 Cold Fluid Applied Waterproofing 08.10.13 07 16 16 Crystalline Waterproofing 08.10.13 07 21 13 Thermal Insulation 08.10.13 07 22 00 Roof and Deck Insulation 08.10.13 07 27 26 Fluid-Applied Membrane Air Barrier, Vapor Permeable 08.10.13 07 42 33 Solid Phenolic Exterior Wall Panels 08.10.13 07 46 46 Fiber-Cement Rainscreen Panels 08.10.13 07 54 19 Polyvinyl-Chloride (PVC) Roofing 08.10.13 07 60 00 Flashing and Sheet Metal 08.10.13 07 71 00 Roof Specialties 08.10.13 07 72 00 Roof Accessories 08.10.13 07 81 00 Applied Fireproofing 08.10.13 07 84 00 Firestopping 08.10.13 07 87 00 Smoke Containment System 08.10.13 07 92 00 Joint Sealants 08.10.13

DIVISION 08 - OPENINGS

08 11 13 Hollow Metal Doors and Frames 08.10.13 08 14 00 Interior Wood Doors 08.10.13 08 17 10 Integrated Door Assemblies 08.10.13 08 31 13 Access Doors and Frames 08.10.13 08 33 00 Coiling Doors and Grilles 08.10.13 08 41 13 Aluminum-Framed Entrances and Storefronts 08.10.13 08 56 53 Blast Resistant Façade Systems 08.10.13 08 63 00 Metal-Framed Skylights 08.10.13 08 71 00 Door Hardware 08.10.13 08 71 13 Automatic Door Operators 08.10.13 08 80 00 Glazing 08.10.13 08 90 00 Louvers and Vents 08.10.13

DIVISION 09 – FINISHES

09 05 16 Subsurface Preparation for Floor Finishes 08.10.13 09 06 00 Schedule for Finishes 08.10.13 09 22 16 Non-Structural Metal Framing 08.10.13 09 24 00 Portland Cement Plaster 08.10.13 09 29 00 Gypsum Board 08.10.13 09 30 13 Ceramic/Porcelain Tiling 08.10.13 09 51 00 Acoustical Ceilings 08.10.13 09 65 13 Resilient Base and Accessories 08.10.13 09 65 16 Resilient Sheet Flooring 08.10.13 09 65 19 Resilient Tile Flooring 08.10.13 09 68 00 Carpeting 08.10.13 09 91 00 Painting 08.10.13

Bid Set

COMMUNITY LIVING CENTER (BUILDING 170)

VA Project Number 600-405

August 10, 2018

00 01 10-3

DIVISION 10 – SPECIALTIES

10 11 13 Chalkboards and Markerboards 08.10.13 10 11 23 Tackboards 08.10.13 10 14 00 Exterior Signage 08.10.13 10 14 13 Interior Signage 08.10.13 10 21 13 Toilet Compartments 08.10.13 10 21 23 Cubicle Curtain Tracks 08.10.13 10 22 39 Folding Panel Partitions 08.10.13 10 25 13 Headwalls 08.10.13 10 26 00 Wall and Door Protection 08.10.13 10 28 00 Toilet, Bath, and Laundry Accessories 08.10.13 10 31 00 Manufactured Fireplaces 08.10.13 10 44 13 Fire Extinguisher Cabinets 08.10.13 10 51 13 Metal Lockers 08.10.13 10 70 00 Exterior Sun Control Devices 08.10.13

DIVISION 11 – EQUIPMENT

11 40 00 Food Service Equipment 08.10.13 11 73 00 Patient Lift System 08.10.13

DIVISION 12 – FURNISHINGS

12 36 00 Stainless Steel Countertops and Sinks 08.10.13 12 36 61 Simulated Stone Countertops 08.10.13 12 48 23 Entrance Floor Grilles 08.10.13 12 93 00 Site Furnishings 08.10.13

DIVISION 13 - SPECIAL CONSTRUCTION

13 05 41 Seismic Restraint Requirements For Non-Structural Components

08.10.13

DIVISION 14– CONVEYING EQUIPEMENT

14 24 00 Hydraulic Elevators 08.10.13

DIVISION 21- FIRE SUPPRESSION

21 08 00 Commissioning of Fire Suppression Systems 08.10.13 21 13 13 Wet-Pipe Sprinkler Systems and Fire Standpipes 08.10.13 21 30 13 Electric Driven Fire Pumps 08.10.13

VOLUME 3

DIVISION 22 – PLUMBING

22 05 11 Common Work Results for Plumbing 08.10.13 22 05 12 General Motor Requirements for Plumbing Equipment 08.10.13

Bid Set

COMMUNITY LIVING CENTER (BUILDING 170)

VA Project Number 600-405

August 10, 2018

00 01 10-4

22 05 19 Meters and Gages for Plumbing Piping 08.10.13 22 05 23 General-Duty Valves for Plumbing Piping 08.10.13 22 07 11 Plumbing Insulation 08.10.13 22 08 00 Commissioning of Plumbing Systems 08.10.13 22 11 00 Facility Water Distribution 08.10.13 22 11 23 Domestic Water Pumps 08.10.13 22 13 00 Facility Sanitary and Vent Piping 08.10.13 22 13 33 Packaged, Submersible Sewerage Pump Units 08.10.13 22 14 00 Facility Storm Drainage 08.10.13 22 14 29 Sump Pumps 08.10.13 22 35 00 Domestic Water Heat Exchangers 08.10.13 22 40 00 Plumbing Fixtures 08.10.13 22 42 26 Commercial Disposers 08.10.13 22 62 00 Medical Vacuum Systems for Healthcare Facilities 08.10.13 22 63 00 Medical Gas Systems for Healthcare Facilities 08.10.13

DIVISION 23 – HEATING, VENTILATING, AND AIR

CONDITIONING (HVAC)

23 05 11 Common Work Results for HVAC 08.10.13 23 05 12 General Motor Requirements for HVAC and Steam

Generation Equipment 08.10.13

23 05 41 Noise and Vibration Control For HVAC Piping and Equip 08.10.13 23 05 93 Testing, Adjusting and Balancing for HVAC 08.10.13 23 07 11 HVAC and Boiler Plant Insulation 08.10.13 23 08 00 Commissioning of HVAC Systems 08.10.13 23 09 23 Direct-Digital Control System for HVAC 08.10.13 23 21 13 Hydronic Piping 08.10.13 23 21 23 Hydronic Pumps 08.10.13 23 22 13 Steam and Condensate Heating Piping 08.10.13 23 22 23 Steam Condensate Pumps 08.10.13 23 31 00 HVAC Ducts and Casings 08.10.13 23 34 00 HVAC Fans 08.10.13 23 36 00 Air Terminal Units 08.10.13 23 37 00 Air Outlets and Inlets 08.10.13 23 40 00 HVAC Air Cleaning Devices 08.10.13 23 73 00 Indoor Central-Station Air-Handling Units 08.10.13 23 82 16 Air Coils 08.10.13

DIVISION 25 – INTEGRATED AUTOMATION

25 10 10 Advanced Utility Metering System 08.10.13

DIVISION 26 – ELECTRICAL

26 05 11 Requirements for Electrical Installations 08.10.13 26 05 13 Medium-Voltage Cables 08.10.13 26 05 19 Low-Voltage Electrical Power Conductors and Cables 08.10.13 26 05 26 Grounding and Bonding for Electrical Systems 08.10.13 26 05 33 Raceway and Boxes for Electrical Systems 08.10.13 26 05 41 Underground Electrical Construction 08.10.13

Bid Set

COMMUNITY LIVING CENTER (BUILDING 170)

VA Project Number 600-405

August 10, 2018

00 01 10-5

26 05 49 Electrical Equipment Noise Control, Vibration Isolation and Seismic Restraint

08.10.13

26 05 73 Overcurrent Protective Device Coordination Study 08.10.13 26 08 00 Commissioning of Electrical Systems 08.10.13 26 09 23 Lighting Controls 08.10.13 26 11 16 Secondary Unit Substations 08.10.13 26 13 13 Medium-Voltage Circuit Breaker Switchgear 08.10.13 26 22 00 Low-Voltage Transformers 08.10.13 26 24 13 Distribution Switchboards 08.10.13 26 24 16 Panelboards 08.10.13 26 27 26 Wiring Devices 08.10.13 26 29 11 Motor Controllers 08.10.13 26 29 21 Enclosed Switches and Circuit Breakers 08.10.13 26 36 23 Automatic Transfer Switches 08.10.13 26 41 00 Facility Lightning Protection 08.10.13 26 43 13 Surge Protective Device 08.10.13 26 51 00 Interior Lighting 08.10.13 26 56 00 Exterior Lighting 08.10.13

VOLUME 4

DIVISION 27 – COMMUNICATIONS

27 05 00 Requirements for Communications Installations 08.10.13 27 05 26 Grounding and Bonding for Communications Systems 08.10.13 27 05 28 Pathways for Communications Systems 08.10.13 27 08 00 Commissioning of Communications Systems 08.10.13 27 10 00 Control, Communications and Signal Wires 08.10.13 27 41 31 Master Antenna Television Equipment and Systems 08.10.13 27 51 16 Public Address and Mass Notification Systems 08.10.13 27 52 23 Nurse Call and Code Blue Systems 08.10.13

DIVISION 28 – ELECTRONIC SAFETY AND SECURITY

28 08 00 Commissioning of Electronic Safety and Security

Systems 08.10.13

28 13 11 Physical Access Control System 08.10.13 28 16 11 Intrusion Detection System 08.10.13 28 23 00 Video Surveillance 08.10.13 28 26 00 Electronic Personal Protection System 08.10.13 28 31 00 Fire Detection and Alarm 08.10.13

DIVISION 31 – EARTHWORK

31 10 00 Site Clearing 08.10.13 31 20 00 Earthwork 08.10.13 31 23 19 Dewatering 08.10.13 31 25 00 Erosion Control 08.10.13 31 50 00 Excavation Support and Protection 08.10.13

Bid Set

COMMUNITY LIVING CENTER (BUILDING 170)

VA Project Number 600-405

August 10, 2018

00 01 10-6

DIVISION 32 – EXTERIOR IMPROVEMENTS

32 05 23 Cement and Concrete for Exterior Improvements 08.10.13 32 12 16 Asphalt Paving 08.10.13 32 12 43 Porous Flexible Paving 08.10.13 32 13 16 Decorative Concrete Paving 08.10.13 32 13 73 Concrete Paving Joint Sealants 08.10.13 32 14 00 Unit Paving 08.10.13 32 15 40 Decomposed Granite Gravel 08.10.13 32 17 23 Pavement Markings 08.10.13 32 17 26 Tactile Warning Surfacing 08.10.13 32 84 00 Planting Irrigation 08.10.13 32 90 00 Planting 08.10.13

DIVISION 33 – UTILITIES

33 08 00 Commissioning of Site Utility Systems 08.10.13 33 10 00 Water Utilities 08.10.13 33 10 11 Underground Chilled Water Piping Distribution System 08.10.13 33 11 16 Pipe Expansion Fittings and Loops 08.10.13 33 30 00 Sanitary Sewer Utilities 08.10.13 33 40 00 Storm Sewer Utilities 08.10.13 33 63 00 Steam Energy Distribution 08.10.13

DIVISION 34 – TRANSPORTATION

34 71 13 Vehicle Barriers 08.10.13

DIVISION 48 – Electrical Power Generation (Reserved)

APPENDICES

Appendix A Graphics Schedule 08.10.13

Bid Set

COMMUNITY LIVING CENTER (BUILDING 170)

VA Project Number 600-405

August 10, 2018

27 05 00 - 1

SECTION 27 05 00

REQUIREMENTS FOR COMMUNICATIONS INSTALLATIONS

PART 1 GENERAL

1.1 DESCRIPTION

A. Furnish and install communications cabling, systems, equipment, and accessories in accordance with the specifications and drawings.

1.2 SUMMARY

A. Part 1 Includes:

1. Description

2. Summary

3. Related Documents

4. References

5. System Description and General Responsibilities

6. Coordination

7. Quality Assurance

8. Submittals

9. Material Delivery, Handling, Storage

10. Sequencing and Scheduling

11. Warranty

B. Part 2 Includes:

1. Product Options and Substitutions

2. Materials and Equipment

3. LEED Requirements for Healthcare

4. Equipment Modification

5. Fabrication

6. Source Quality Control

C. Part 3 Includes:

1. Examination

2. Installation

3. Field Quality Control

4. Cleaning

5. Training

1.3 REFERENCES

A. Codes compliance - Comply with the established project edition of the following codes as applicable:

1. National Electrical Code NEC

2. National Fire Codes NFC

3. Inter-National Building Code IBC

Bid Set

COMMUNITY LIVING CENTER (BUILDING 170)

VA Project Number 600-405

August 10, 2018

27 05 00 - 2

B. Standards Compliance - Comply with the following standards as applicable:

1. American National Standards Institute ANSI

2. American Society for Testing and Materials ASTM

3. Electronics Industry Association EIA

4. Electrical Testing Laboratories ETL

5. Factory Mutual FM

6. Federal Aviation Agency FAA

7. Federal Communications Commission FCC

8. Institute of Elect. and Electronics Engineers IEEE

9. International Standards Organization ISO

10. National Electrical Contractors Association NECA

11. National Electrical Manufacturers Association NEMA

12. National Fire Protection Association NFPA

13. Occupational Safety Health Act OSHA

14. Telecommunications Industry Association TIA

15. Underwriter's Laboratories UL

16. Telecommunications Distribution Methods Manual BICSI

17. Veterans Administration VA

1.4 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specifications, apply to this Section.

B. Related Sections:

1. Section 019100 General Commissioning Requirements

2. Section 270526 Grounding and Bonding for Communications

3. Section 270528 Pathways for Communications Systems

4. Section 271000 Structured Cable System

5. Section 274131 Master Antenna TV System

6. Section 275116 Public Address System

7. Section 275223 Nurse Call System

8. Section 283100 Fire Detection and Alarm

C. Veterans Administration

1. Design Guide Office of Information Technology

2. Electrical Design Manual

3. Fire Protection Design Manual

D. Veterans Administration Site Specific Requirements

1. VALB ISO SOP Dated April 2010 – Cable Installation, Labeling and Testing.

Bid Set

COMMUNITY LIVING CENTER (BUILDING 170)

VA Project Number 600-405

August 10, 2018

27 05 00 - 3

1.5 SYSTEM DESCRIPTION AND GENERAL RESPONSIBILITIES

A. The Communications Division provides the Information Transportation Systems (ITS) and supporting systems for systems and equipment provided by this division, by other divisions, and Government furnished systems.

B. Systems provided by this Division are noted under Related Sections.

C. The work to be performed under this contract includes providing of all labor, materials, and equipment for the work described herein for complete systems.

D. Combined Prescriptive and Performance Design Requirements

1. Division 27 includes a combination of prescriptive and performance specifications. Compliance with the plans, specifications, standards, as well as coordination and integration of the systems will require substantial design work on the part of the Contractor.

2. The prescriptive requirements establish the minimum quality, characteristics, and types of components, equipment, and materials to be used to achieve the stated system performance requirements.

The Contractor is advised, however, that prescriptive specifications have not been provided to satisfy all of the specified performance requirements.

3. The performance requirements are intended to establish overall system performance requirements, satisfy the operational requirements, and establish the inter-coordination requirements for the systems.

4. Telecommunications standards shall be met for both prescriptive and performance criteria. Knowledge of the applicable standards is required for implementation of the design.

5. The Contractor shall carefully consider all of the requirements for each of the systems when preparing its bid. Any questions regarding the intent of these requirements, the scope of the systems or their coordination requirements must be submitted in writing prior to bidding in accordance with the Instructions to Bidders. The Contractor shall have no claim for either extra compensation or extra time on the grounds that it did not understand the scope or the requirements of the work, and/or the coordination requirements of the work with the work of the other Divisions.

6. Compliance with the project requirements will be progressively monitored and adjusted through the submittal process, Shop Test, Performance Test and Continuous Operational Test.

E. Drawing Interpretation

1. The Drawings are diagrammatic and indicate the general arrangement of systems and equipment unless indicated otherwise by dimensions or detail drawings. The Drawings utilize riser, block, installation and schematic diagrams and symbols to outline the Work to be provided. These drawings do not have any dimensional significance nor do they delineate every item required for the intended Work. No interpretation shall be made from the limitations of symbols and diagrams that any elements necessary for complete Work are excluded.

Bid Set

COMMUNITY LIVING CENTER (BUILDING 170)

VA Project Number 600-405

August 10, 2018

27 05 00 - 4

2. The Work shall be provided in accordance with the intent expressed on the Drawings and Specifications, and in conformance with the actual building architectural and structural conditions. When in conflict, field conditions take precedence over the Contract Documents.

3. The meaning of abbreviations shall be the same whether in lower case letters or without periods.

4. The use of words in the singular shall not be considered as singular where other indications denote that more than one item is referred to.

5. Details that appear on the Contract Documents which are specific with regard to the dimensioning and positioning of the Work, are intended only for the purpose of establishing general feasibility.

They do not replace engineering or field coordination by the contractor for the Work.

F. Provide all parts and equipment for a complete and operational system for the Work as described herein and shown on the drawings.

G. Furnish and install all trenching and backfill, duct banks, conduits, raceways, sleeves, boxes, gutters, shelves, enclosures, shelf and enclosure supports, backboards, pull ropes (in unused or spare conduits) required to make all systems fully operational, including components not shown on the Drawings, but necessary for fully operational systems.

H. Furnish, install, terminate, test, dress, and identify all wire and cable required to make systems fully operational, including all wire and cabling not shown on the Drawings, but necessary for fully operational systems.

I. Recognize that the Work entails a considerable amount of custom integration between individual systems, as well as the design and implementation of many system and component interfaces. Take full responsibility for the complete design, installation, and performance of the total integrated system, including integration between systems and various interfaces, in order to achieve the specified operational features and system performance requirements.

J. Recognize that the Work entails a considerable amount of custom-written and custom-tailored software, both high-level language applications and hardware-specific drivers. Take full responsibility for the performance of the total software suite, including the software embedded in manufactured equipment, in order to achieve the specified operational features and system performance requirements.

K. Fully test the systems, demonstrate their satisfactory operation, and train maintenance and operating personnel, as specified in this Section and the Sections governed by this Section.

1.6 COORDINATION

A. The work of this Division required extensive coordination with other trades and the Government. Coordinate with the Government and all other trades as required to ensure that the entire Work of this Project will be carried out in an orderly, complete, and coordinated fashion.

Bid Set

COMMUNITY LIVING CENTER (BUILDING 170)

VA Project Number 600-405

August 10, 2018

27 05 00 - 5

B. Coordinate installation of lighting and ventilation in all equipment rooms and control stations to avoid any possible interference and to enhance system function.

C. Coordinate with the Work of all applicable Divisions and Drawings for the required interfaces to the work of this Division.

1.7 QUALITY ASSURANCE

A. Division 27 requires contractors with similar work experience and specific licenses and certifications to perform the work of this section. Contractors must be certified or licensed at the time of bid where Manufacturer certification or licensure is required. Required licenses and certifications shall be submitted within 3 days of being selected as the apparent low bidder. By submitting a bid for this project, the contractor declares it is qualified to perform this work and fulfills the requirements set forth herein.

B. The Division 27 contractor shall have had experience in the design and installation of similar systems of similar project sizes and similar integration as this project to be considered qualified.

C. The Contractor shall be responsible for all costs incurred including costs incurred by the Government and its representatives for failure to provide the experience and key personnel as specified.

1. Deductive change orders may be issued as a result of the failure to properly engineer the work prior to construction or improperly installed work that results in costs incurred to the Government.

Examples of incurred costs are rejection of submittals for failure to follow specifications or failure to properly engineer the work;

re-inspection of rejected work.

D. Key Project Personnel must have work experience with projects of similar size and complexity. Systems experience shall be demonstrated for the Key Project Personnel. Résumés of prospective key personal shall be submitted.

1. Project Manager Qualifications

a. Bachelors of Science Degree from ABET accredited college in Construction Management or related engineering field or,

b. Five years’ experience with projects of similar size and complexity.

2. Project Engineer Qualifications

a. Licensed Professional Electrical Engineer or,

b. Bachelors of Science Degree from ABET accredited college in Electronics Engineering field and two years’ experience with systems to be provided, or

c. Technical Trade School Degree, Associate of Science Degree, or Bachelor’s Degree and a minimum of six years of demonstrated experience with the systems to be provided.

3. The approved Project Manager shall represent the Contractor at all times in all project matters and shall be responsible for the administrative work including but not limited to, the following:

a. Representation at all project meetings.

Bid Set

COMMUNITY LIVING CENTER (BUILDING 170)

VA Project Number 600-405

August 10, 2018

27 05 00 - 6

b. Progress schedule and progress reporting.

c. Payment schedule of values and pay requests.

d. Representation and management of all employees and sub-contractors.

e. Conduction of on-site performance and acceptance testing.

E. The approved Project Engineer shall be qualified and shall be responsible for technical work including but not limited to, the following:

a. Preparation and signature of all engineering, shop drawings, and product data submittals.

b. System fabrication, field installation work, and testing.

2. Consider all qualification and experience materials submitted as binding. Obtain the Government’s approval in writing prior to any deviations from the minimum requirements in organization, personnel, work plan, quality control plan, procurement plan or other declaration within the qualification submittal. Key project personnel substituted prior to or during the Work must meet the specification requirements and obtain the Government’s approval.

3. Other sections of this Division have additional Key Personal Requirements.

F. Regulatory Requirements and Standards:

1. Code requirements such as the National Electrical Code (NEC) and are minimum safety requirements. The Drawings, Specifications and Telecommunications Standards are the minimum performance requirements that shall be met and shall govern in those instances where requirements are greater than those required by codes.

2. Obtain and pay for all permits and inspections required by all legal authorities and agencies having jurisdiction for the Work.

The certificates of all such permits and inspections shall be delivered to the Government.

G. Approved Shop Drawings and Product Data shall be used for quality assurance from system design to installation and testing. These documents will:

1. Provide the contractor with the documents to review its own design and review with other trades for coordination during planning and engineering.

2. Provide the installer and other trades the documents needed for coordination and placement of devices and routing in relation to each other during installation.

3. Provide the Project Inspector with an approved reference to verify proper installation and code compliance.

4. Demonstrates to the Engineer of Record that the systems have been engineered, coordinated, used the correct equipment, is constructible, and will meet the project requirements.

Bid Set

COMMUNITY LIVING CENTER (BUILDING 170)

VA Project Number 600-405

August 10, 2018

27 05 00 - 7

1.8 SUBMITTALS

A. Submit under provisions of Division 1, Submittals.

B. All submittals shall include an electronic copy in Portable Document Format (pdf) or equal.

C. Contractor is advised that approval or acceptance of product data or shop drawing submittals does not release the contractor from providing all necessary documentation per submittal requirements, nor does it obviate contractor from additional design and coordination throughout the project.

D. CPM Schedule

1. Submit a Critical Path Method Schedule as a Gantt chart format within 30 days of the Notice to Proceed.

2. At a minimum show tasks by area such as by building, by floor or other appropriate designations.

3. Include tasks that are not part of the work of this section but that may affect this section such as work by other trades or contractors or Government review time.

4. Include tasks that are not part of the work of this section but that may affect this section such as work by other trades or contractors or Government review time.

5. If provided by the Contractor, the CPM for this Division may be included in the Contractor’s CPM submittal.

E. Submittal Matrix

1. Prepare a matrix of submittals by type vs. section of all submittals to be made by this Division within 30 days of the Notice to Proceed.

2. Utilize the list of required submittals listed at the end of this section as a starting point. Add columns for expected delivery dates and each specification section. If a listed submittal is not required for a specific section, indicate such with an “N/A” or other means in the column and row cross point.

F. Schedule of Values

1. Submit a Schedule of Values (SOV) based on the CPM schedule, Gantt chart and Submittal Matrix that reflect the value of the systems and installation of work for this Division.

2. That approved SOV will be used as a basis for progress payments.

G. Product Data:

1. Product data is required for all materials and equipment. Include complete bill of materials for each section with the product data submittal.

2. Cross-reference submitted items to the Specifications using their related sections and paragraph numbers.

3. Submit complete product data for the all system components in a single, bound submittal of one or more volumes. Provide a table of contents and labeled divider tabs for each section. Partial submittals for individual sections will be returned without review.

Bid Set

COMMUNITY LIVING CENTER (BUILDING 170)

VA Project Number 600-405

August 10, 2018

27 05 00 - 8

4. Include descriptive literature, catalog cuts, illustrations, schematics, technical data sheets, and test data necessary for the Government’s Representative to ascertain that proposed equipment and materials comply with specification requirements. Include manufacturer’s name, model, catalog, or part numbers. Catalog cuts shall be legible and shall clearly identify equipment being submitted.

5. Include required calculations, I/O point’s lists, system zone schedules, and other tabular data as necessary to clarify system sizing and configuration. Do not, however, consider such submittals as a substitute for complete shop drawings.

6. Disclosure of Product Deviations: Specifically identify and tabulate any and all deviations from the contract documents including all system functions and features. Reference the corresponding specification sections and paragraph/article numbers. All variances and deviations will be reviewed for acceptance or rejection. It will be the Contractor’s sole responsibilities to comply with all other contract requirements not revealed in the disclosure of product deviations.

H. Shop Drawings:

1. Shop drawings are required for all systems and component assemblies.

2. Shop drawings shall be used to demonstrate the contractors understanding of the work, installation of the work, inspection of the work, and the basis for Record Drawings.

3. AutoCAD “.dwg” files of the Contract Drawings may be made available upon request. These files may be used as a first step in the preparation of shop drawings. Do not consider the drawing plots from such files as a substitute for the shop drawings that are to be prepared by the contractor.

4. Shop drawings will not be accepted or considered unless they are submitted as a complete package for each specification section.

Partial submittals covering less than a whole system or with incomplete interfaces to other systems will be rejected.

5. Standard manufacturer’s drawings may not be used as shop drawings unless specifically modified for use on this project.

6. Each drawing requires a unique drawing number and revision level.

Revisions shall per be dated and referenced per submittal number.

Delta numbers and clouds on the drawings shall be used in all instances where changes have been made to the pervious submittal.

7. At a minimum, include the following shop drawings:

a. Floor Plans: Scaled drawings showing equipment and device locations in plan view. Include wire and cable types and quantities, raceway sizing and routing. Routing information shall indicate where rated assemblies are penetrated. Separate into as many plan series as needed to prevent overlapping information. These drawings shall be fully coordinated with other trades prior to submittal. Show relationships to adjacent surrounding structures.

Bid Set

COMMUNITY LIVING CENTER (BUILDING 170)

VA Project Number 600-405

August 10, 2018

27 05 00 - 9

b. Equipment and Control Room Plans and Elevations: Scaled, dimensioned drawings showing security equipment layouts in security equipment rooms, electrical/security closets, and control rooms. Include electrical J-boxes and receptacles, power, conduit sizing and routing, metal gutters, wiring ducts, cable trays, and supports. Indicate all other non-security cabinets, enclosures, and equipment within the room.

c. Cabinet, Enclosure, and Rack Elevations: Scaled, dimensioned drawings for each system equipment cabinet, enclosure, and rack showing component and equipment mounting, wire and cable routing and separation, connector and terminal block locations and labeling, and all necessary fabrication details.

d. System Block Diagrams: Single line block diagrams showing the general relationship between system components and the interconnection between systems. Use these drawings as a reference for the Single line diagrams and point-to-point diagrams by cross-referencing the shop drawing number of those diagrams on these drawings.

e. Single Line Diagrams: Interconnection diagrams for the riser and trunk wiring between equipment cabinets, enclosures racks and major components. Use the same equipment designations as the floor plans and block diagrams.

f. Point-to-Point Diagrams: Drawings which show the wiring of each component or device of each individual system. Include details of power supply, grounding, shielding, shield grounding, surge protection, fusing, connector pin-outs, terminal assignments, and similar wiring and connection details. Use the same component and device designations as the floor plans and other shop drawings.

g. Schematic Diagrams: Drawings which show the component wiring of a system to include but not limited to resistors, diodes, transistors, relays, etc. Required for all custom systems and modified commercial products.

h. Device Installation Diagrams: Details which show the installation and wiring termination of each field device in each individual system. Include settings for dipswitches, jumpers, addresses, port assignments, etc. of all devices.

i. All other shop drawings necessary to install, fabricate, locate, identify, test, service, and repair the systems provided.

8. Shop drawings approved by the Government’s Representative are not a release from Contract requirements as defined by the Drawings, Specifications, and governing codes and regulations.

I. Submit structural and seismic mounting load calculations demonstrating adequate support and bracing in accordance with loads calculated per

ASCE/SEI 7.

Bid Set

COMMUNITY LIVING CENTER (BUILDING 170)

VA Project Number 600-405

August 10, 2018

27 05 00 - 10

J. Samples:

1. Field Samples:

a. Wires and Cables: Submit a one (1) foot sample length of each wire and cable type to be used with the cable identification clearly shown.

b. Submit all required samples along with the product data submittal for review and approval prior to installation.

c. If all wire samples cannot be submitted at the same time, submit samples with a complete list of all cables to be used noting samples which have been submitted. Update the list with each subsequent sample submittal.

2. Devices/Equipment:

a. Submit sample assemblies of each of the following devices or equipment along with the product data submittal for review and approval by the Government’s Representative:

1) Substituted products if requested by Government.

2) Custom component, board, equipment or assembly.

3. Disposition: Submitted samples become property of the Government and will not be returned.

4. Approval of any custom or modified assemblies shall be required.

Submit technical information with samples.

K. Test Procedures:

1. Initial Performance Testing: Submit test procedures, forms, and checklists for point-by-point testing. Include a listing for each individual system, each control station and control panel, each equipment room, and each major system component. At a minimum, forms shall include columns for operational/non-operational status, remarks, workmanship, and date corrected. Submit a sample format for approval by the Government’s Representative a minimum of 20 days prior to testing.

2. Performance Testing: Submit test forms which are identical to or similar to the accepted Initial Performance Testing forms. Obtain approval from the Government’s Representative for any changes in test procedure or forms.

3. Continuous Operational/Functional Testing: Submit a detailed test procedure for the continuous functional testing described in this Section including coordination with other trades, the Government and the testing authority. Submit for approval by the Government’s Representative a minimum of 15 days prior to testing.

L. Test Results:

1. Initial Performance Testing: Submit completed test results for point-by-point testing to the Government’s Representative five days prior to scheduled Performance Testing.

2. Performance Testing: Submit completed test results prior to or with the request to begin the Continuous Operational Test.

Bid Set

COMMUNITY LIVING CENTER (BUILDING 170)

VA Project Number 600-405

August 10, 2018

27 05 00 - 11

M. Progress Record Drawings

1. Record drawing progress submittals shall be submitted electronically as each area is physically completed by type of work. Type of work includes duct banks, under slab, or by areas such as a housing unit. Conduit record drawings which may include devices shall be required for progress payments in that area.

Point-to-point progress drawings shall be submitted as an area is completed and required for progress payments in that area.

2. Progress Record Drawings shall be used as the basis for the Record Drawings.

N. Record Drawings (As-Built):

1. Maintain a current record set of as-built drawings on the job and as construction and installation progress; show the actual installed location of all items, material, and equipment.

2. Accurately record actual routing of all conduits including sizes and types.

3. The as-built drawings shall be available to the Government’s Representative for review and will be required for evaluation of progress payments.

4. Submit as-built shop drawings created from the approved shop drawings and updated from the site as-built drawing set and any other drawings required depicting the as-built conditions of the installed work.

O. Operational Manuals:

1. Submit the required quantity of identical manuals, which shall contain the Theory of Operation, start up, shut down, and emergency procedures, and the manufacturer’s operating instructions.

2. Subdivide the manual by section with tab dividers. Provide a table of contents which identifies each section and the contents therein.

3. Submit an electronic copy in addition to other requirements.

P. Maintenance Manuals:

1. Submit a complete set of maintenance documents as described in this Section.

2. Submit an electronic copy in addition to other requirements.

3. Manuals shall include the following as a minimum requirement:

a. Technical system description.

b. System schematics.

c. Detailed wiring diagrams to identify cabling, termination, and routing.

d. Panel assembly drawings to identify location of components, terminal strips, and equipment as required to correlate with system drawings.

e. Descriptions and drawings as required to maintain equipment from the board to the component level.

Bid Set

COMMUNITY LIVING CENTER (BUILDING 170)

VA Project Number 600-405

August 10, 2018

27 05 00 - 12

f. Description of software and user programmable functions.

Procedures for user programmable functions shall be included.

g. A complete printout of each unique system program.

4. For systems where the program resides on electronic media or other similar storage medium, furnish a copy of the media, or similar medium, to the Government’s Representative.

5. Where multiple systems are combined into a single integrated system, documentation shall include a description of the integrated system and the details of the interfaces between systems.

6. Provide a list of current telephone numbers and addresses of all material vendors and equipment manufacturers who have supplied components in this Project. Include separate service telephone list and purchasing telephone list cross-referencing with each component.

1.9 MATERIAL DELIVERY, STORAGE, AND HANDLING

A. Protect all materials and equipment from damage during storage at the site and throughout the construction period. Protect equipment and materials during shipment and storage against physical damage, dirt, dust, moisture, cold, rain, and any foreign substances that may damage the equipment.

B. Prevent damage from rain, dirt, sun and ground water by storing the equipment on elevated supports and covering them on all sides with securely fastened protective rigid or flexible waterproof coverings.

C. Protect conduit by storing it on elevated supports and capping the ends with suitable closure material to prevent dirt accumulation.

D. Protect all fabricated and/or installed materials and equipment against dust, dirt, moisture, physical damage, metal debris, and any foreign substances that may damage the equipment.

E. Protect painted surfaces with removable heavy Kraft paper, sheet vinyl or equal, installed at the factory and removed prior to final inspection.

1. Replace equipment determined by the Government’s Representative to be damaged. Repaint and finish damaged paint on equipment and materials with the same quality of paint and workmanship used by manufacturer so that repaired areas are not obvious.

F. Where electronic equipment is installed in areas that are subject to dust or other contamination:

1. Protect equipment in air tight and water proof materials.

2. Where equipment must be used and cannot be sealed, seal the equipment area and provide air filtering, filtered positive pressure, and cooling as required to prevent the contamination of equipment.

1.10 SEQUENCING AND SCHEDULING

A. Do not procure any equipment without approved product data submittals.

Do not perform any field installation without approved shop drawings.

Do not begin any extensive software development or programming without approved operational narratives, the required Government’s coordination, and user's requirements.

Bid Set

COMMUNITY LIVING CENTER (BUILDING 170)

VA Project Number 600-405

August 10, 2018

27 05 00 - 13

B. Pre-assemble equipment, racks, and cabinets off-site as most practical.

C. Install system equipment, cabinets, racks, and consoles only after major construction in the area in which they are to be installed has been completed and areas have been cleaned, painted, and sealed.

D. After systems installation and prior to point-by-point performance testing, thoroughly pre-test all devices and device wiring for proper performance. Then, thoroughly pre-test each system function in each state or condition under every operating mode.

E. Work of other trades and the Government prior to project completion will be dependent on the work performed by this Division. This work will primarily consist of pathways and equipment rooms. Coordinate and schedule the work of this Division to be completed within the CPM project schedule.

1.11 WARRANTY

A. Comply with the requirements of Div. 1 Warranty.

B. The Contractor is to provide a warranty of the work provided under this contract (including, but not limited to, software, hardware, and peripheral equipment) as a system, including interfaces to work by others for one year from the date of Acceptance of the Work. Specific sections may require longer warranty periods. Divisions of work among various suppliers, vendors, installers, subcontractors, and other parties will not be recognized or accepted.

C. Guarantee to repair and replace defective materials or workmanship during the warranty period including labor and materials.

D. Where the equipment manufacturer's warranty covers a longer time period than that required by these Specifications, the manufacturer's warranty shall govern.

E. An emergency maintenance (Warranty) request shall be defined as a system or portion of a system failure that affects building safety, security, and operation of critical components. Failure of a single component (i.e., smoke detector, intercom station, camera, or monitor) is not considered an emergency maintenance request.

F. Respond within four hours to an emergency maintenance request. Provide a twenty-four hour telephone contact number (24 hours per day, 365 days per year). Service response time is defined as the period between the placing of a service request and the arrival of a qualified technician capable servicing the problem on-site.

G. Maintain a sufficient parts inventory at the project during the warranty period to meet the guaranteed system repair times.

H. Repair and make operational any defective materials or workmanship resulting from an emergency maintenance request within an 8-hour period from the time of the initial arrival of service personnel at the site.

Correct non-emergency defective materials or workmanship within four

(4) calendar days of receiving notice of the defect.

PART 2 PRODUCTS

2.1 PRODUCT OPTIONS AND SUBSTITUTIONS

A. Comply with the General and Supplementary Conditions and Division 1 Specifications.

Bid Set

COMMUNITY LIVING CENTER (BUILDING 170)

VA Project Number 600-405

August 10, 2018

27 05 00 - 14

B. The products named in this section and the sections governed by this section establish minimum qualities and functions that substitutions must meet to be considered acceptable. The specified products have also been used in preparing the drawings and specifications, and therefore establish the basis for equipment sizing, wire and cable design, power consumption, and other design parameters.

C. Substitutions, if permitted, will be considered only if submitted in strict accordance with the followings:

1. Cross-reference submitted items to the Specifications using their related Section and paragraph number.

2. Submit complete product data, descriptive literature, catalog cuts, illustrations, schematics, technical data sheets, and test data necessary for the Government’s Representative to ascertain that proposed equipment and materials comply with specification requirements. Include manufacturer’s name, model, catalog, or part numbers. Catalog cuts shall be legible and shall clearly identify equipment being submitted.

3. Disclosure of Product Deviations: Specifically identify and tabulate any and all deviations from the contract documents including all system functions and features. Reference the corresponding specification sections and paragraph/article numbers. All variances and deviations will be reviewed for acceptance or rejection. It will be the Contractor’s sole responsibilities to comply with all other contract requirements not revealed in the disclosure of product deviations.

D. The Contractor shall take full responsibility for all design, coordination, and cost associated with substitutions including, but not limited to:

1. Its integration into the total system including physical mounting space, electrical interconnection, signal wiring, power, quality, electromagnetic interference, communication protocols, and similar design considerations.

2. Any additional materials, equipment, components, accessories, items required for equivalent system operation and performance.

3. Any necessary changes to branch power circuits, circuit protective devices, and the Work of other trades.

4. Any modifications to wire, cable, and raceway design.

2.2 MATERIALS AND EQUIPMENT

A. All equipment and materials required for installation under these Specifications shall be new and without blemish or defect.

B. Materials and equipment furnished shall be of current production by manufacturers regularly engaged in the manufacturing of such items, for which replacement parts are available. Specifications are prepared long in advance of project construction; the contractor is to use the newest model of the specified products available at bid time.

Bid Set

COMMUNITY LIVING CENTER (BUILDING 170)

VA Project Number 600-405

August 10, 2018

27 05 00 - 15

C. All material and equipment shall be listed, labeled, or certified by Underwriters’ Laboratories, Inc., where such standards have been established. Equipment and material which are not covered by UL Standard will be accepted provided equipment and material is listed, labeled, certified or otherwise determined to meet safety requirements of a nationally recognized testing laboratory. Equipment of a class which no nationally recognized testing laboratory accepts, certifies, lists, labels, or determines to be safe will be considered, if inspected or tested in accordance with national industrial standards such as NEMA or ANSI.

D. All parts of a system shall be the product of one manufacturer. When more than one unit of the same class of equipment or material is required, such units shall be the products of a single manufacturer.

Constituent parts which are similar shall be the product of a single manufacturer.

E. All components of an assembled unit need not be products of the same manufacturer; however, all components must be acceptable to the Government’s Representative. Components shall be compatible with each other and with the total assembly for the intended service.

F. All computers, workstations, and servers must be from a manufacturer that has been continuously in business of manufacturing computers for a minimum of ten years.

G. Proprietary products or systems are not permitted to be used on this project.

H. Sole source materials and systems have been specified. Sole source requirements are identified in the respective sections and may not be substituted. Sole sourcing has been instituted where existing systems are to be upgraded or expanded, the Governments staff has been trained on specific equipment or systems, or the Government maintains spare parts for those systems.

2.3 LEED REQUIREMENTS FOR HEALTHCARE

A. All adhesives, sealants, paints, and coatings, shall be low-emitting per the following requirements:

1. Adhesives and sealants used on the interior of the building — defined as inside of the weatherproofing system and applied on-site—shall comply with the following requirements as applicable to the project scope:

2. Adhesives, Sealants and Sealant Primers shall comply with South Coast Air Quality Management District (SCAQMD) Rule #1168. Volatile organic compound (VOC) limits correspond to an effective date of July 1, 2005 and rule amendment date of January 7, 2005.

3. Aerosol Adhesives shall comply with Green Seal Standard for Commercial Adhesives GS-36 requirements in effect on October 19, 2000.

4. Adhesives and sealants shall contain no carcinogen or reproductive toxicant components present at more than 1% of total mass of the product as defined in the California Office of Environmental Health Hazard Assessment’s (OEHHA) list entitled “Chemicals Known to the State to Cause Cancer” or the Reproductive Toxicity, Safe Drinking Water and Toxic Enforcement Act of 1986 (Proposition 65).

Bid Set

COMMUNITY LIVING CENTER…