W912PL-15-R-0011_FtIrwin_Munitions_Maintenance.pdf
PDF 886 KB Posted
- Solicitation number
- W912PL-15-R-0011
About this file
Solicitation - 108 pages.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Am4_W912PL-15-R-0011.pdf | ||
| Am3_W912PL-15-R-0011.pdf | ||
| W912PL-15-R-0011_Am2.pdf | ||
| Am1_W912PL-15-R-0011.pdf | ||
| Site_Visit_Information.pdf | ||
| Fort_Irwin-GIS_Data-2015-02-18.zip | ZIP file |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION, OFFER AND AWARD 1. THIS CONTRACT IS A RATED ORDER
UNDER DPAS (15 CFR 7900)
RATING PAGE OF PAGES
2. CONTRACT NUMBER 3. SOLICITATION NUMBER 4. TYPE OF SOLICITATION 5. DATE ISSUED 6. REQUISITION/PURCHASE NUMBER
CODE7. ISSUED BY 8. ADDRESS OFFER TO (If other than item 7)
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
SOLICITATION
9. Sealed offers in original and copies for furnishings the supplies or services in the Schedule will be received at the place specified in item 8, or if hand carried, in the depository located in until local time
CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.
10. FOR
INFORMATION
CALL:
A. NAME B. TELEPHONE (NO COLLECT CALLS)
AREA CODE NUMBER EXT.
C. E-MAIL ADDRESS
11. TABLE OF CONTENTS
(X) SEC. DESCRIPTION PAGE(S) (X) SEC. PAGE(S)DESCRIPTION
A B C D E F G H
I
J
K
L
M EVALUATION FACTORS FOR AWARD
INSTRS., CONDS., AND NOTICES TO OFFERORS
REPRESENTATIONS, CERTIFICATIONS AND OTHER
STATEMENTS OF OFFERORS
PART IV - REPRESENTATIONS AND INSTRUCTIONS
LIST OF ATTACHMENTS
PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACH.
CONTRACT CLAUSESSOLICITATION/CONTRACT FORM
SUPPLIES OR SERVICES AND PRICES/COSTS
DESCRIPTION/SPECS./WORK STATEMENT
PACKAGING AND MARKING
INSPECTION AND ACCEPTANCE
DELIVERIES OR PERFORMANCE
CONTRACT ADMINISTRATION DATA
SPECIAL CONTRACT REQUIREMENTS
NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.
OFFER (Must be fully completed by offeror)
12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the set opposite each item, delivered at the designated point(s), within the time specified in the schedule.
13. DISCOUNT FOR PROMPT PAYMENT
(See Section I, Clause No. 52.232-8)
14. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the SOLICITATION for offerors and related documents numbered and dated):
10 CALENDAR DAYS (%) 20 CALENDAR DAYS (%) 30 CALENDAR DAYS (%) CALENDAR DAYS(%)
DATEAMENDMENT NO.AMENDMENT NO. DATE
15A. NAME AND
ADDRESS
OF OFFER-
OR
CODE FACILITY 16. NAME AND THE TITLE OF PERSON AUTHORIZED TO SIGN OFFER
(Type or print)
15B. TELEPHONE NUMBER
AREA CODE NUMBER EXT.
15C. CHECK IF REMITTANCE ADDRESS IS
DIFFERENT FROM ABOVE - ENTER SUCH
ADDRESS IN SCHEDULE.
17. SIGNATURE 18. OFFER DATE
AWARD (To be completed by Government)
19. ACCEPTED AS TO ITEMS 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION
22. AUTHORITY FOR USING OTHER THAN FULL OPEN COMPETITION:
10 U.S.C. 2304 (c) 41 U.S.C. 253 (c)
24. ADMINISTERED BY (If other than Item 7)
26. NAME OF CONTRACTING OFFICER (Type or print)
IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.
AUTHORIZED FOR LOCAL REPRODUCTION
Previous edition is unusable
23. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
25. PAYMENT WILL BE MADE BY
27. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
28. AWARD DATE
CODE
ITEM
STANDARD FORM 33 (REV,. 9-97)
Prescribed by GSA - Far (48 CFR) 53.214 (c)
SEALED BID (IFB)
NEGOTIATED (RFP)
(Hour) (Date)
PART I - THE SCHEDULE PART II - CONTRACT CLAUSES
SEE BLOCK
USACE, LOS ANGELES DISTRICT, CONTRACTING DIVISION
915 WILSHIRE BLVD, 14TH FLOOR, LOS ANGELES, CA 90017
W912PL-15-R-0011
see Sect. M See Section L 2:00 PM
Patricia.B.Bonilla@usace.army.mil
03 / 06 / 2015
213 452 3255
02 / 03 / 2015
This page was intentionally left blank for duplex printing.
Military Munitions Range Maintenance Support, W912PL-15-R-0011 National Training Center (NTC), Fort Irwin San Bernardino County, California"
Section A
Section A
Solicitation / Contract Form
PROJECT TITLE AND DESCRIPTION
The objective of this contract is to provide range maintenance surface and limited subsurface clearance services to safely locate, identify, mark and dispose of munitions and explosives of concern (MEC) and munitions debris (MD) at the National Training Center, Ft Irwin, California.
The facility is an active military installation used for military training. MEC may be a safety hazard to personnel conducting range maintenance.
Only one award will be made from this solicitation. The proposed contract awarded from this solicitation will be an indefinite delivery, indefinite quantity (IDIQ) type contract. Task orders will be firm-fixed-price (FFP). The proposed contract is for a one base year and four one-year options.
This acquisition is set aside for small business concerns under the standard industrial classification (NAIC) code 562910.
This project may be delayed, cancelled, or revised at any time prior to award.
NOTICE TO CONTRACTOR
Only a warranted Contracting Officer (either PCO) acting within their delegated limits has the authority to issue modifications or otherwise change the terms and conditions of this contract. If an individual other than the Contracting Officer attempts to make changes to the terms and conditions of this contract you shall not proceed with the change and shall immediately notify the Contracting Officer.
This page was intentionally left blank for duplex printing.
National Training Center (NTC), Fort Irwin, San Bernardino County, California
B-1
SECTION B
SUPPLIES OR SERVICES AND PRICES/COSTS
3 February 2015
EXECUTIVE SUMMARY
1. The objective of this contract is to provide range maintenance surface and limited subsurface clearance services to safely locate, identify, mark and dispose of munitions and explosives of concern (MEC) and munitions debris (MD) at the National Training Center, Ft Irwin, California. The facility is an active military installation used for military training. MEC may be a safety hazard to personnel conducting range maintenance. Innovative technologies/approaches, which have been demonstrated and proven effective, are encouraged. The Government intends to award a contract based upon the information contained in the offeror's initial proposal (without discussions), circumstances permitting. This requirement is set aside for small business concerns under the standard industrial classification (NAIC) code 562910.
2. Only one award will be made from this solicitation. The resultant contract awarded from this solicitation will be an indefinite delivery, indefinite quantity (IDIQ) type contract. Information in the Pricing Schedule will provide a basis for pricing of individual task orders. Task orders will be firm-fixed-price (FFP). The proposed contract is for a one base year and four one-year options.
3. The ordering period shall commence upon the date of award and shall continue for a period of five years, if exercised. The Government is under no obligation to issue any task orders against the contract resulting from this solicitation in excess of the minimum contract obligation. The maximum contract capacity is $25,000,000.00 over a period of five years (one base year and 4 option years). Each Task Order price is subject to the availability of funds, however the estimated annual funding is expected to be between the range of $2,500,000 and $5,000,000.00.
4. The Government reserves the right to synopsize and award other contracts for similar work within the geographic areas described in Section C prior to contract award or during contract performance of the resultant contract.
5. The unit prices of the Offeror's proposal will be used for all future task orders of this contract.
6. All assumptions, limitations and issues associated with the Contractor’s proposal will be used only for cost evaluation purposes and will be considered non-bidding by the Government as part of the contract/task order.
B-2
Section B – Supplies or Services and Prices
The Offeror shall propose for the contract line item numbers (CLINs) 0002, 0003 and 0005.
The Offeror shall propose an escalation factor in CLINs 0006 to be applied for the option years, if exercised.
The Offeror shall, also propose for the fixed priced CLIN numbers 7 – 15. VOLUME I, PRICE
PROPOSAL WILL BE EVALUATED ON THE AMOUNTS OF EACH CLIN 0007 THROUGH
0013 OVER THE 5 YEAR PERIOD OF THE CONTRACT. FOR EACH CLIN, THE TOTAL
AMOUNT OF SUBCLINS UNDER THAT CLIN # MUST BE THE TOTAL FOR THAT CLIN, IN
THE EVENT OF A MATHEMATICAL ERROR THE SUBCLIN AMOUNTS WILL BE USED.
Base year - performance of work shall be in accordance with statement of work as set forth in Section C for a period of one year from date of award.
CLIN
DESCRIPTION
U/I
UNIT RATE
0000 BASE YEAR
0001 Not Used Rate
0002 Labor Burden
0002A Burden % (Home Office Rate) Rate
0002B Burden % (Field Rate) Rate
0003 General & Administrative Expense (G&A) % Rate
0004 Not Used
0005 Labor Rates (RAW)
0005AA Biologist Hr
0005AB Chemist Hr
0005AC Field Office Admin Clerk Hr
0005AD Vehicle Mechanic Hr
0005AE Geophysical Instrument Operator Hr
B-3
0005AF Geophysicist Hr
0005AG Heavy Equipment Operator/Mechanic Hr
0005AH Home Office Admin Clerk Hr
0005AI Program Manager Hr
0005AJ Project Manager Hr
0005AK Quality Control Manager Hr
0005AL Safety & Health Manager Hr
0005AM Senior UXO Supervisor (Without HazPay) Hr
0005AN UXO Safety Officer (Without HazPay) Hr
0005AO UXO QC Specialist (Without HazPay) Hr
0005AP UXO Technician III (Without HazPay) Hr
0005AQ UXO Technician II (Without HazPay) Hr
0005AR UXO Technician I (Without HazPay) Hr
0005AS UXO Sweep Personnel (Without HazPay) Hr
0006 Escalation Rate % – Fixed Price
0006A Escalation Rate % For Second Year: Rate
0006B Escalation Rater % For Third Year: Rate
0006C Escalation Rate % For Fourth Year: Rate
0006D Escalation Rate % For Fifth Year: Rate
B-4
FFP PRICING FOR FIRM FIXED-PRICE TASK ORDERS – See Procurement Notes Below and Section C for CLINs 0007 – 0015.
0007 Initial Mobilization (FFP)(one-time only)
Cost to Investigate, Mark MEC/UXO, Collect, Inspect, Transport and Properly Process for Resale Munitions Debris (MD) according to the weight per grid and HAD Support
0008 Grids with 0 lbs or not requiring removal of MD 1 EA 0008A Cost to Investigate, Mark MEC/UXO 0008B Cost to Inspect , Transport and Process MD
0009 Grids with 1 - 100 lbs of MD per grid 1 EA
0009A Cost to Investigate, Mark MEC/UXO, Collect MD 0009B Cost to Inspect , Transport and Process MD
0010 Grids with 101 - 500 lbs of MD per grid 1 EA
0010A Cost to Investigate, Mark MEC/UXO, Collect MD 0010B Cost to Inspect , Transport and Process MD
0011 Grids with 501 – 1,000 lbs of MD per grid 1 EA
0011A Cost to Investigate, Mark MEC/UXO, Collect MD 0011B Cost to Inspect , Transport and Process MD
0012 Grids with 1,001 – 5,000 lbs of MD per grid 1 EA
0012A Cost to Investigate, Mark MEC/UXO, Collect MD 0012B Cost to Inspect , Transport and Process MD
0013 Grids with Greater than 5,000 lbs of MD per grid 1 EA
0013A Cost to Investigate, Mark MEC/UXO, Collect MD 0013B Cost to Inspect , Transport and Process MD
0014 Other UXO Support (FFP)
0014A 1 person; 1 day (UXO Tech III) 1 Daily 0014B Mobilization (if required) 1 Event 0014C Each additional person per day (UXO Tech II) 1 Daily 0014D Mobilization per person (if required) 1 Event 0014E Each additional person per day (UXO Tech I) 1 Daily 0014F Mobilization per person (if required) 1 Event
0015 Target Removal (OPTION)
0015A Light 1 EA 0015B Medium 1 EA 0015C Heavy 1 EA
B-5
PROCUREMENT NOTES:
1. The contract type is an indefinite delivery (IDC) contract pursuant to FAR Part 16, which will consist of Firm-Fixed-Price Task Orders.
2. Each Task Order will consist of individual tasks from CLINs 0007 - 0015 as detailed in the individual task order performance work statement (PWS). A task order will be awarded upon award of the contract and a new task order will be awarded annually to coincide with each option year, if optioned. Each task order will have pre-negotiated rates as per this contract to include escalation if applicable. Once the total funding is available, the task order will be negotiated for CLIN amounts and awarded accordingly. The total price of the task order is the maximum amount authorized without a modification. The normal task order amount is expected to be between $2,500,000.00 and $5,000,000.00. All units of issue will be Estimated Quantities and during performance these quantities are subject to change per on-site instructions and/or direction of the G3-Range Operations. The Contractor must maintain operations throughout the performance period of the task order, normally 365 days unless modified.
3. The Offerors unit price per Grid/each/pound or event shall include all costs, direct and indirect, to perform the required work.
• CLIN 0007 Initial Mobilization; The Offeror will propose a one-time cost for equipment and office trailers, if desired, to be mobilized, retained and secured onsite. The equipment, some or all may be included in the general cost per task order instead of this initial cost. This Initial Mobilization will, also, include the writing of the Basic Work Plans, Standard Operating Procedures (SOP) and all future changes appendices and amendments to plans, to include attending and supporting meetings with the Los Angeles District and Ft Irwin officials as well as official DOD, DA, Federal, State and local investigators, as necessary. Provide a complete detailed breakdown of the cost for the Work Plans, SOPs, equipment and property that will be purchased as part of detailed cost proposal. Refer to Section C for more details.
• CLIN 0008 - 0013 will be used for pricing the cost of each grid cleared as detailed below. Refer to
Section C for more details. Travel, per diem or other TDY costs are not authorized on the contract unless authorized/directed by a task order for specific reasons.
o CLIN 0008 will be used for pricing the cost for each grid cleared that contain less than 1 pound of munitions debris (MD) or was required not to remove any MD.
o CLIN 0009 will be used for pricing the cost for each grid cleared that contains 1 to 100 pounds of munitions debris (MD) per grid.
o CLIN 0010 will be used for pricing the cost for each grid cleared that contains 101 to 500 pounds of munitions debris (MD) per grid.
o CLIN 0011 will be used for pricing the cost for each grid cleared that contains 501 to
1,000 pounds of munitions debris (MD) per grid.
o CLIN 0012 will be used for pricing the cost for each grid cleared that contains 1,001 to
5,000 pounds of munitions debris (MD) per grid.
B-6 o CLIN 0013 will be used for pricing the cost for each grid cleared that contains greater than 5,000 pounds of munitions debris (MD) per grid.
o Sub-CLINS ending with A and B for CLINS 0008 - 0013 are explained below. Refer to section for more details.
A. The cost to sweep military grids (1,000m x 1,000m), identify and mark using standard UXO signs munitions and explosives of concern (MEC) which includes unexploded ordnance (UXO) and discarded military munitions (DMM) and hazardous munitions components, recover, inspect and certify munitions debris (MD) greater than 6 inches in any dimension prior to transport from the range, provide reports, attend meetings and provide authorized escorts into your area of operations, etc.
All MEC will be marked and reported to EOD through Range Operations. If a grid is not 100% cleared due to any reason such as safety, terrain, weather, training mission issues, range operations, etc. then the Contractor will be reimbursed for only that percent that was completed. It is imperative to maintain accurate records and provide to the on-site OESS all grid maps detailing the non-cleared areas and a brief description on the reason. All units and quantities are for estimating purposes only during performance these quantities are subject to change per on-site instructions and/or direction of the G3-Range Operations. The decision to leave equipment downrange during a normal work week must be coordinated with range operations daily and done so at the risk to the Contractor and not the US Army, the Corps of Engineers or Ft. Irwin. It is highly recommended not to leave any equipment downrange during breaks exceeding 24 hours in operations such as a weekend. Additionally the Contractor will provide a two man team consisting of at least a UXO Tech III and a UXO Tech II to support the after-rotation cleanup of the ranges. This support will be to screen all metals being taken off the ranges that are not inspected and released by EOD and staged at the Hands Across the Desert (HAD) Holding Area. This may include trips to the QRP and Landfill to screen anything brought in that may not have been previously screened. The HAD operation normally operates during 4 days of the Regeneration Period after each Rotation, normally starting on Sunday. The support team will screen the HAD site at least twice daily, from Monday – Thursday and the QRP and Landfill when requested by Range Operations. It is envisioned that the support team will be detailed from the sweep teams or processing teams as needed and little or no additional cost incurred. All MEC will be marked and reported to EOD through Range Operations and all MD will be properly inspected, certified and transported to the processing point as needed. No MD will be released to the QRP or Landfill from this contract.
B. Cost to properly inspect, certify and document as material determined to be safe (MDAS) for explosives and hazards, transport from downrange, inspect, demilitarize in accordance with established requirements, disfigurement, mutilation and proper disposal, including documentation and possible sale of all munitions debris (MD). All items that are intact and/or resemble a live piece of ordnance must be disfigured and mutilated in such a way as to no longer resemble a munition prior to Governmental Quality Assurance Acceptance. All items with internal voids must be opened to expose the void. The Contractor will provide a means for weighting MD up to 500 lbs within the compound in partial, daily grid lots. All weights must be witnessed by the on-site OESS. Any weights expected to exceed 500 lbs or too bulky for the small scale must be transported to the Installation Transportation Weight Scales for weighting unless it’s able to be broken down into smaller lots without significant costs.
o CLIN 0014 will be used for pricing support to other UXO Support requested by Range
Operations. The Contractor will provide standby MEC construction support or provide UXO Escort and/or MEC anomaly avoidance, location, identification and safety training and briefing support for Ft.
B-7
Irwin personnel and its contractors. Some examples of support activities may be Archeological, Biological or Ft Irwin Contractor UXO Munitions Recognition and Safety Training as requested. It is assumed that this task will be conducted during the normal daily operations and personnel from the on-site crews will be used to conduct this service, however, if the time is not in conjunction with the normal activities or the task is too extensive and may possibly cause production issues, then a mobilization and travel costs would be required and individuals sent from off-site, with only one vehicle required for all individuals needed. The cost for CLIN 0014A will include a vehicle, safety equipment and schonstedt or like instrument, if required. CLIN 0014C and 0014E will include safety equipment and a schonstedt or like instrument also per person, if required.
o CLIN 0015 will be used for pricing target or target debris removal that is located in MEC contaminated areas, within the training areas of Ft Irwin. The Contractor will mark all UXO for disposal, consolidate if possible and certify all debris hazards free, prior to leaving the site. The Contractor will institute a method IAW DODM 4160.28, to demilitarize and remove target debris directly from the location for final disposition. The Contractor will prepare and submit a separate addendum to their work plan and specific site safety and health plan for this activity, if optioned, describing how the effort will be safely accomplished, including an equipment list and personnel requirements to be utilized for approval.
Light will normally be soft target, light vehicles and trucks. Medium will be heavy trucks, APCs and like vehicles. Heavy will be Tanks and other like vehicles.
*52.215-4998 OFFEROR’S NOTES
1. Any subcontractors required by the Contractor in connection with the services covered by the contract will be limited to individuals or firms that were specifically identified and agreed to during negotiations. The Contractor shall obtain the Contracting Officer’s consent before making any substitutions for these subcontractors.
2. Payment by Electronic Funds Transfer is the mandatory method of contract payment. The Contractor’s attention is directed to Contract Clause No. FAR 52.232-33, “Mandatory Information for Electronic Funds Transfer – Central Contractor Registration.”
3. Principal Contracting Officer. The Contracting Officer who signs this contract will be the Principal Contracting Officer of this contract. However, any Contracting Officer assigned to the Los Angeles District, contracting within his or her authority, may take formal action on this contract when a contract action needs to be taken and the Principal Contracting Officer is unavailable.
4. Proposal Expenses and Pre-contract Costs. This Request for Proposal does not commit the Government to pay costs incurred in preparation and submission of the initial and any subsequent proposals or for any other costs incurred prior to execution of a formal contract.
5. All extensions of the unit prices on all items shown will be subject to verification by the Government. In case of variation between the unit price and the extension, the unit price will be considered to be the offer.
B-8
6. Amounts and prices shall be indicated in either words or figures, NOT BOTH.
7. Offerors shall submit prices on all items of the Price Schedule.
8. Offerors are cautioned to check Price Schedule carefully prior to submission. If the Price Schedule contains unit prices, they must be extended to the ACTUAL AMOUNT AND NOT ROUNDED
OFF.
9. For the purpose of evaluating the Price Schedule, the following will be utilized in resolving arithmetic discrepancies found on the face of the Price Schedule as submitted by the offeror:
a. Obviously misplaced decimal points will be corrected;
b. In case of discrepancy between the unit price and the extended price, the unit price will govern;
c. Apparent errors in extensions of unit prices will be corrected;
d. Apparent error in addition of lump sum and extended prices will be corrected
10. OFFERORS PLEASE NOTE: Although all contract line items numbers (CLINS) show a specific quantity, the actual quantity ordered will be on an “as required” basis. The quantities specified in the Price Schedule are estimates for the purpose of evaluation only and will not necessarily be ordered by this contract.
11. The Maximum Dollar quantity that can be ordered under this contract is $25,000,000.00
C-1
SECTION C
DESCRIPTION / SPECS / WORK STATEMENT
MILITARY MUNITIONS CLEARANCE AND
RANGE MAINTENANCE SUPPORT
NATIONAL TRAINING CENTER (NTC)
FORT IRWIN, CALIFORNIA
2 February 2015
1.0 OBJECTIVE:
1.1 The contractor shall provide range maintenance surface and limited subsurface clearance services to safely locate, identify, mark and dispose of Munitions and Explosives of Concern (MEC), remove, inspect, demilitarize and sale munitions debris as scrap metal at the National Training Center, Ft Irwin California. In addition, the contractor may be required to provide MEC support to construction, biological and archeological activities on an as needed basis.
1.2 Individual task orders will be negotiated for each type of service. The facility is a current active military installation used for military training and other purposes in support of today’s active army. MEC is a safety hazard to personnel conducting range maintenance. Innovative technologies/approaches, which have been demonstrated and proven effective, both operationally and financially, are encouraged. It is the intent of the Government to award primarily firm-fixed-price task orders.
1.3 The technical requirements specified in this work statement are intended to provide requirements for execution of the contract and a general understanding of the functions that the contractor may be required to perform. Standard Task Orders (TOs) will be issued with statements of work (SOW) and Performance-Based Task Orders will be issued with performance work statements (PWS), containing additional detail requirements for each specific project.
2.0 GENERAL
2.1 The Contractor shall perform Installation O&M Services and MMRP/OMRS services to protect human health and the environment from hazards associated with military munitions and Environmental Compliance and Remediation Services to protect human health and the environment from risks associated with HTRW, MC, and other adverse environmental conditions. For the purposes of this contract the terms "Munitions or CWM or MC Response", "MEC or CWM or MC operations", "Munitions Response activities", and "Munitions Response Sites (MRS)" generally apply to work performed under the Military Munitions Response Program (MMRP). The terms "other munitions related services (OMRS)", “other munitions related operations", "other munitions related activities", and "other munitions related sites" generally apply to non- MMRP work involving munitions. The term “HTRW response” represents any and all work required under environmental compliance and remediation. Specific services and task activities are listed in Paragraph 3.
C-2
2.2 Safety and Health Program. The Contractor shall develop and implement a written Safety and Health Program in accordance with guidelines specified in EM 385-1-1, EM 385-1-97 and CEHNC’s DID WERS-001.001. The Contractor shall ensure that its subcontractors, suppliers, and support personnel follow all safety and health provisions established in the approved Accident Prevention Plan (APP) for the site. A Site Safety and Health Plan (SSHP) shall be included in the APP as an Attachment. The Government reserves the right to stop work under this contract for any violations at no additional cost to the Government. The Government will verify that the Contractor has implemented corrective action before allowing continued performance under the contract. EM 385-1-1 Safety and Health Requirements and EM 385-1-97 Explosives Safety & Health Requirements are required during all range maintenance work performed under this work effort.
2.2.1 Medical Surveillance. All personnel performing onsite activities shall participate in an ongoing medical surveillance program meeting the requirements of 29 CFR 1910.120.
2.3 Communications. Currently, the installation is providing all the radios in order to control frequencies. However, the contractor shall provide all communications equipment, to accomplish the range maintenance work as required in any specific task order, include the on-site OESS, if the installation no longer supports the communication effort. All communications equipment will be approved for use thru Ft. Irwin’s communications control department, SPECTRUM. The contractor will also provide an alternate means of communication such as cell phones for emergency purposes.
2.4 Applicable Laws and Regulations. The Contractor shall perform this work in accordance with all applicable laws and regulations. The Contractor shall be responsible for acquiring the latest version of applicable regulatory or agency guidance, including but not limited to the referenced documents cited in this Solicitation and/or subsequent Task Orders issued after award of the Contract, unless otherwise specified.
2.5 Data Ownership and Data Rights. All reports and data whatsoever, including all electronic data and software, generated under this contract will be determined by negotiation IAW the DFARS. When submitting proposals, offeror shall identify IAW DFARS 252.227-7017 to the extent known all technical data or software that will be delivered with restrictions on its use, release, or disclosure.
2.6 Performance-Based Milestones/Objectives: The Government defines Performance Based
Milestones/Objectives as the desired outcome(s) that have been defined in the Performance Work Statement in clear, simple, concise, results-oriented, measurable and legally enforceable terms. The Government defines the completion of a Performance Based Milestone/Objective as: an outcome that has been 100% completed and approved and accepted by the approval authority under the Task Order/Contract. Simply meeting the Milestone/Objective, (i.e., submittal of a document for review) is not the same as completion of the Milestone/Objective, (i.e., approval and acceptance of the document by the regulators). Only upon the completion, approval, and acceptance will the Government pay for that Milestone/Objective.
2.6.1 Performance Work Statement (PWS) for a Task Order will to every extent possible:
– Define desired results/outcomes.
– Define what level of performance is expected (and ensure it is meaningful, measurable and fair) and use performance standards and Quality Assurance Surveillance Plans (QASP).
C-3
– Provide all information known about the site(s), or where it can be located and accessed by the Contractor.
– Define incentives and disincentives.
– Define the terms using clear and concise language avoiding vague or broad statements.
3.0 SPECIFIC SERVICES
3.1 GENERAL The contractor shall, upon receipt of an order, supply all personnel, tools, equipment, transportation, materials and supervision, except as otherwise noted, to safely locate, identify, consolidate, mark, transport, demilitarize, apply disfigurement and properly dispose of all MEC and munitions debris (MD) within the project site, as identified in each task order. This contract allows the contractor to perform explosive disposal of UXO, however, each individual task order will state whether the contractor destroys the UXO or just marks the UXO for EOD to destroy. If the contractor destroys UXO all explosives for this task will be provided by the installation. The contractor will utilize both traditional and innovative methods (as suitable) for range maintenance (i.e., on-site source control/containment, on-site disposal/treatment, etc.).
3.1.1 The contractor shall identify a single Project Manager (PM) to coordinate all administrative and cost accounting details of all task orders. All work shall be accomplished with adequate internal controls and review procedures to eliminate conflicts, errors, and omissions and ensure the accuracy of all output. This position must meet the minimum requirements of a Project Manager in accordance with paragraphs 3.5.1.3 below.
3.1.2 Task Orders. A specific PWS/SOW as well as the types and numbers of submittals and dates required will be included in the individual task orders. The T.O. will identify dates of when information is due in the Los Angeles District Technical & Environmental Support Branch office and the other addressees identified in the order. The types and numbers of submittal and dates, and places for review meetings will be established by each task order under this contract.
3.1.3 Government Administrative Support. If the contractor installs an office/operations trailer(s), it shall include and maintain for use by the Government a lockable office approximately 130 sq/ft to support two office desks, a file cabinet and printer table. In addition, the contractor will provide the following:
• Three separate telephone lines for a telephone, computer and fax machine. All lines will have to be able to be used as a data port for computer use. • Telephone service will include voice mail, caller ID, conference calling.
• High Speed Internet such as DSL, cable or Satellite Disk. • General administrative office supplies, such as paper, printing cartridges, notepads etc.
3.1.4. Government Vehicle Support. The contractor will provide the following for use by the Government: USACE government vehicle maintenance consisting of emergency/urgent tire repair as requested;
provide all field safety equipment, such as radios, large first aid kit and portable fire extinguisher. Normal vehicle services will be accomplished through the vehicles GSA Account.
3.1.5. The contractor shall also record, on DVD, site operations. A minimum of 30 minutes, but not exceed 45 minutes, for every task order, it is envisioned that all aspects of operations, to include any unusual, lessons learned or non-standard events, will be recorded per DVD.
C-4
3.1.6. The contractor shall prepare written reports as specified in the individual task order(s).
The written reports will be due as specified by the Task Order. The contractor may also be required to provide reports, operational data, power point presentations or additional information by the Contracting Officer (KO), Contracting Officer’s Representative (COR), or the On-Site USACE Representative.
3.1.7. All tasks to be completed under this contract shall be performed in accordance with the applicable provisions of 29 CFR 1910.120, the U.S. Army Corps of Engineers Safety and Health Requirements Manuals, EM 385-1-1 and EM 385-1-97, Ft. Irwin applicable Range and Safety Requirements and the approved Basic work Plan.
3.1.8. Government Fuel. At this time, the contractor will be authorized to use government fuel for all vehicles directly involved in the range maintenance efforts. Due to funding cuts, this option may be deleted in the future. No vehicles utilizing the government fuel will be driven off post that is not directly involved in support of the range maintenance effort. POV’s are not authorized to use government fuel.
3.2. PERFORM RANGE MAINTENANCE
3.2.1 Initial Mobilization. The offeror will propose a one-time cost for equipment and offices trailers, if desired, to be mobilized, retained and secured onsite. The equipment, some or all may be included in the general cost per task order instead of this upfront cost. This Initial Mobilization will, also, include the writing of the Basic Work Plans, Standard Operating Procedures (SOP) and all future changes appendices and amendments to plans, to include attending and supporting meetings with the LA District and Ft. Irwin officials, plus official DOD, DA, Federal, State and local investigators as necessary. Refer to Section C for details. All equipment purchased using the funds for CLIN 0007 will become U.S. Government Property and be transferred to the Government, as soon as possible, once proof of ownership/title is received by the contractor and prior to completion of the contract. For the property and equipment listed in the proposal for CLIN 0007, payment will be provided once complete ownership and title is ascertained and invoiced incrementally as purchased and verified by the on-site Government Representative. All purchases must be completed by the end of the Task Order period of performance. It is the contractor’s responsibility to provide insurance, maintenance, repairs, pay taxes, registration and license throughout the life of the contract. Once transferred, the Government will maintain registration and licensing. If any equipment becomes unserviceable, it will not be replaced by the government.
3.2.1.1 Basic Work Plan. The contractor will be required to write a Ft. Irwin Range Maintenance Basic Work Plan detailing all aspects of operations to be conducted at Ft. Irwin. The Basic Work Plan will be updated upon receipt of a new task order or modification as needed and attachments/appendices may be used to incorporate additional information as needed. It is encouraged to use Standard Operating Procedures (SOP) in the completion of the work plan. CEHNC’s DID WERS-001.001 will be used as a guide and any chapters that are not applicable may be skipped. Appendix H will be used for SOPs. Contractor Personnel Qualification Letters will not be part of the Work Plan, but will be submitted separately according to paragraph 3.5.1.6. Appendix I can be eliminated or used as needed. If the current contractor has demobilized, the incoming contractor will mobilize a transition team that may be required to maintain field operations, using the current Contractor’s Work Plan, until the new Work Plan has been approved.
C-5
3.2.2 Range Maintenance. The contractor shall conduct Range Maintenance Operations as defined in each task order. The contractor may utilize both traditional and innovative methods (as suitable) for range maintenance. Each task order will have pre-negotiated rates as per this contract to include escalation if applicable. Once the total funding is available, the task order will be negotiated for CLIN amounts and awarded accordingly. The total price of the task order is the maximum amount authorized without a modification. Each Task Order price is subject to the availability of funds; however, the estimated annual funding is expected to be between the range of $2,500,000 and $5,000,000.00. All units of issue will be Estimated Quantities and during performance these quantities are subject to change per on-site instructions and/or direction of the G3-Range Operations or the on-site OESS. The contractor must maintain normal operations throughout the performance period of the task order, normally 365 days unless modified.
3.2.2.1 Perform Grid Clearance. The contractor will sweep military grids (1,000m x
1,000m), assigned from Range Operations or the on-site OESS, identify and mark, using standard UXO signs provided by Range Operations, munitions and explosives of concern (MEC) which includes unexploded ordnance (UXO), discarded military munitions (DMM) and hazardous munitions components; recover, inspect and certify munitions debris (MD) greater than 6 inches in any dimension or any item that may still resemble a live munition prior to transport from the range, provide reports, attend meetings and provide authorized escorts into your area of operations, etc. All MEC will be marked and reported to EOD through Range Operations. If a grid is not 100% cleared due to any reason such as safety, terrain, weather, training mission issues, range operations, etc. then the contractor will be reimbursed for only that percent that was completed. It is imperative to maintain accurate records and provide to the on-site OESS all grid maps detailing the non-cleared areas and a brief description on the reason. All units and quantities are for estimating purposes only during performance these quantities are subject to change per on-site instructions and/or direction of the G3-Range Operations. The decision to leave equipment downrange during a normal work week must be coordinated with range operations daily and done so at the risk to the contractor and not the US Army, the Corps of Engineers or Ft. Irwin. It is highly recommended not to leave any equipment downrange during breaks exceeding 24 hours in operations such as a weekend. Additionally the contractor will provide a two man team consisting of at least a UXO Tech III and a UXO Tech II to support the after-rotation cleanup of the ranges. This support will be to screen all metals being taken off the ranges that are not inspected and released by EOD and staged at the Hands Across the Desert (HAD) Holding Area. This may include trips to the QRP and Landfill to screen anything brought in that may not have been previously screened. The HAD operation normally operates during 4 days of the Regeneration Period after each Rotation, normally starting on Sunday. The support team will screen the HAD site at least twice daily, from Monday – Thursday and the QRP and Landfill Holding Areas when requested by Range Operations. It is envisioned that the support team will be detailed from the sweep teams or processing teams as needed and little or no additional cost incurred. All MEC will be marked and reported to EOD through Range Operations and all MD will be properly inspected, certified and transported to the contractor’s processing point as needed. No MD will be released to the QRP or Landfill from this contract.
3.2.3 Perform Munitions Debris (MD) Processing. The contractor shall furnish all necessary personnel and equipment to inspect, transport, demilitarize, disfigure, process for sale all recovered inert munitions and munitions debris to a local recycler/scrap dealer or directly to a smelter. All sales will be either through the local Defense Logistic Agency (DLA) or if required, sold by the contractor as per the individual Task Orders SOW/PWS. If required by the task order, all recovered expended small arms cartridge cases (ESACC) will be turned in to the installation QRP, as required by law and regulation. The contractor shall complete a DD Form 1348-1a as turn-in documentation with all sales and QRP. Instructions for completing this
C-6 form are contained in EM 385-1-97. The contractor will provide a means for weighing MD up to 500 lbs within the compound in partial, daily grid lots. All weights must be witnessed by the on-site OESS. Any weights expected to exceed 500 lbs or too bulky for the small scale must be transported to the Installation Transportation Weight Scales for weighting unless it’s able to be broken down into smaller lots without significant costs. All 1348-1 certifications will be signed by the Senior UXO Supervisor (SUXOS) and all verifications will be signed by the UXO Quality Control Officer (UXOQC).
3.2.3.1 The contractor shall propose a detailed inspection process within the Basic Work Plan to guarantee only material determined as safe (MDAS) is documented, transported and processed through every phase up to and including final sale to a recycler or smelter. These procedures will have special emphases during contract proposal evaluations.
3.2.3.2 Inert munition items or items that still resemble a live munition shall be segregated from other types of munition debris. Inert munition items or items that still resemble a live munition will be demilitarized using DoD 4160.28 as a guide, with definitive procedures approved by the Contracting Officer or authorized representative. It is the intention of the LA District to have all items that resemble a live munition be disfigured prior to release as scrap. All items with internal voids must be opened to expose the void. The contractor shall identify and appropriately demilitarize/disfigure these items and outline the procedures in the Work Plan. The contractor is authorized to maintain a limited amount of each inert item as a training aid and will be recorded and accounted as detailed in the contractor’s work plan. These items will not leave the compound unless authorized by the on-site OESS for training purposes within Ft. Irwin and hand receipted as necessary.
3.2.3.3 If required, the contractor shall propose to the Government an innovative method of disposing of all scrap metal without any Government involvement and all funds generated by those sales will be used to offset the contract.
a. The contractor shall maintain accurate source document records of transactions involving the sale of the recyclable material described in the base award contract and subsequent task orders to include:
1) Weight Tickets from the Receiving Recycler
2) Receipts of Payment
3) MDAS Certification Documents
b. When submitting a public voucher, the contractor shall:
1) Subtract the total amount of all funds received from recyclable material sales from the total amount invoiced, submitting copies of all source documents listed above with the voucher.
2) Upon approval of the submitted voucher as indicated by payment of the remaining balance, receive as payment in kind the exact dollar amount subtracted from the total invoice, thus reducing the balance of funds held from recycling to zero, and being made whole the total amount invoiced for work performed.
c. For each subsequent voucher, the contractor shall:
C-7
1) Subtract the total amount of all funds received from recyclable material sales since the previous voucher from the total amount invoiced, submitting copies of all source documents listed above with the voucher.
2) Upon approval of the submitted voucher as indicated by payment of the remaining balance, receive as payment in kind the exact dollar amount subtracted from the total invoice, thus reducing the balance of funds held from recycling to zero, and being made whole the total amount invoiced for work performed.
d. Prior to the completion of each task order, the Government will complete a modification to each task order in which there were recycle funds received and complete a credit back for those funds. It is the intent to immediately convert the credit-back into additional range maintenance activities unless requested by the customer to return those funds.
3.2.3.4 The contractor will coordinate with designated sources during preparation of the Work Plan, to determine specific turn-in requirements.
3.2.4 Other MEC Support Activities. The contractor may be required either through a task order or a separate action under this contract to perform the following activities.
3.2.4.1 Other UXO Support. If required, the contractor will provide standby MEC construction support IAW EM 385-1-97 or provide UXO Escort and/or MEC anomaly avoidance, location, identification and safety training/briefing support for Ft. Irwin. Some examples of support activities may be Archeological, Biological or Ft. Irwin Contractor UXO Munitions Recognition and Safety Training as requested. It is assumed that this task will be conducted during the normal operations and personnel from the on-site crews will be used to conduct this service, however, if the time is not in conjunction with the normal operations or the task is too extensive and may possibly cause production issues, then a mobilization cost would be required and individual sent from off-site, with only one vehicle required for all individuals needed. The cost for CLIN 0013A will include a vehicle, safety equipment and schonstedt or like instrument, if required. CLIN 0013C and 0013E will include safety equipment and a schonstedt or like instrument also per person, if required.
3.2.4.2 Target or Target Debris Removal. If required by a task order or modification, the
Contractor will provide target or target debris removal that is located in MEC contaminated areas, within the training areas of Ft. Irwin. The contractor will mark all UXO for disposal, consolidate if possible and certify all debris hazards free, prior to leaving the site. The contractor will institute a method IAW DODM 4160.28, to demilitarize and remove target debris directly from the location for final disposition. The scrap will be sold as detailed in paragraph 3.2.3 above. The contractor will prepare and submit a separate addendum to their work plan and specific site safety and health plan for this activity, if optioned, describing how the effort will be safely accomplished, including an equipment list and personnel requirements to be utilized for approval. Light will normally be soft targets, light vehicles and trucks. Medium will be heavy trucks, APCs and like vehicles.
Heavy will be Tanks and other like vehicles.
3.2.4.3 UXO Disposals. Currently EOD conducts all UXO Disposals, however, this may change at any time and the contractor will be required to perform UXO Disposals. If required by task order or separate modification the requirement to perform UXO Disposals maybe authorized.
C-8
3.2.5 Locations, Surveys and Mapping. The contractor will provide location surveys and mapping using government provided maps of the site, to locate and document areas cleared of UXO. If base-mapping information is not available for a given site, the contractor will be required to provide surveying and mapping of a given range/area as required by the COR.
3.3 TRANSITION PERIOD (Continuity of Services). It is the goal to provide a transition period of 30 days from date of Notice to Proceed for transition to the follow-on contract. The work to be included during the transition period is as follows, 1) initial mobilization, 2) site familiarization and 3) development of work plans and standard operating procedures (SOP). During this period the contractor will also be required to attend briefings for range access, military police checks, vehicle and personnel access to the installation establishment of vendors, etc. All contractor personnel will be required to obtain a Ft. Irwin contractor’s Identification Card, which requires a background check. The contractor will be allowed to accompanying incumbent contractor on limited field operations as coordinated with the USACE onsite Ordnance and Explosive Safety Specialist (OESS). An escorted field observation will be authorized to assist in the preparation of the Work Plan (WP).
During the transition period for any field activities, particular attention shall be directed to environmentally sensitive areas and concerns, i.e. Desert Tortoise habitats and Shrub re-growth areas, which shall be explicitly addressed in the Work Plan. No munition/explosive handling or intrusive activities shall be conducted during the transition period. The transition teams shall include, at minimum, the Project Manager (PM) or Project Superintendent (PS), Senior UXO Supervisor (SUXOS), and UXO Safety Officer (UXOSO) who will be assigned to the MEC range maintenance effort under subsequent task orders.
3.3.1 Mobilization. The contractor will be required to mobilize on site in accordance with the
Notice to Proceed. The current contractor will be required to provide temporary facilities at the location of the existing compound for the transition team. This will require coordination with the onsite USACE representative and the Directorate of Public Works for utilities. Mobilization also includes the demobilization at the termination or conclusion of this contract.
3.3.1.1. In the event that the current contractor has demobilized prior to award of the contract…