Am6_W912PL-12-R-0019_Specs.pdf
PDF 3 MB Posted
- Attached to
- 664-325 EXPAND RENOVATE RESEARCH LABS, VA SAN DIEGO HEALTHCARE SYSTEM, SAN DIEGO COUNTY, CALIFORNIA
- Solicitation number
- W912PL-12-R-0019
About this file
Amendment 6 Specification
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Am12_W912PL-12-R-0019.pdf | ||
| Am11_W912PL-12-R-0019.pdf | ||
| Am10_W912PL-12-R-0019.pdf | ||
| Am9_W912PL-12-R-0019.pdf | ||
| Am8_W912PL-12-R-0019.pdf | ||
| Am7_W912PL-12-R-0019.pdf | ||
| Am6_W912PL-12-R-0019_Drawings.zip | ZIP file | |
| Am5_W912PL-12-R-0019.pdf | ||
| Am4_W912PL-12-R-0019.pdf | ||
| Am3_W912PL-12-R-0019.pdf | ||
| Am2_Spec_W912PL12R0019.pdf | ||
| Am2_Drwgs_W912PL12R0019.pdf | ||
| Am1_W912PL12R0019.pdf | ||
| Dwgs1_Cover_Architectural_Misc.zip | ZIP file | |
| Spec_W912PL12R0019.pdf | ||
| Dwgs3_Plumbing_Electrical.zip | ZIP file | |
| Dwgs2_Structural_HVAC.zip | ZIP file |
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICAITON NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicble)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICIATION NO.
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a)By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPIRATION DATA (If required)
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc. ) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION ( Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
NSN 7540-01-152-8070
Previous edition unusable
0006 Jun 13, 2012
USACE, Los Angeles District Contracting Division, West Region branch 915 Wilshire Bl,14th Floor P.O. Box 532711 Los Angeles, CA 90053-2325
W912PL-12-R-0019
May 6, 2012
664-325 Expand Renovate Research Labs, VA San Diego Healthcare System, San Diego County, California
Replace SF-1442 changing the Response date to 26 June 2012 at 2:00pm.
The following Sections are amended or added: See SF-30 Continuation sheet.
The following Drawings are amended or added: See SF-30 Continuation sheet.
INSTRUCTIONS
Instructions for items other than those that are self-explanatory, are as follows:
Item 1 (Contract ID Code) . Insert the contract type identification code that appears in the title block of the contract being modified.
Item 3 (Effective date) .
(1)
(2)
(3)
(4)
(5)
For a solicitation amendment, change order, or administrative change, the effective date shall be the issue date of the amendment, change order, or administrative change.
For a supplemental agreement, the effective date shall be the date agreed to by the contracting parties.
For a modification issued as an initial or confirming notice of termination for the convenience of the Government, the effective date and the modification number of the confirming notice shall be the same as the effective date and modification number of the initial notice.
For a modification converting a termination for default to a termination for the convenience of the Government, the effective date shall be the same as the effective date of the termination for default.
For a modification confirming the contacting officer's determination of the amount due in settlement of a contract termination, the effective date shall be the same as the effective date of the initial decision.
(a)
(b)
(c)
(d)
(e)
(f)
Item 6 (Issued By) . Insert the name and address of the issuing office. If applicable, insert the appropriate issuing office code in the code block.
Item 8 (Name and Address of Contractor) . For modifications to a contract or order, enter the contractor's name, address, and code as shown in the original contract or order, unless changed by this or a previous modification.
Item 9, (Amendment of Solicitation No. - Dated), and 10, (Modification of Contract/Order No. - Dated ). Check the appropriate box and in the corresponding blanks insert the number and date of the original solicitation, contract, or order.
Item 12 (Accounting and Appropriation Data) .
When appropriate, indicate the impact of the modification on each affected accounting classification by inserting one of the following entries.
(2) Accounting classification Net decrease $
Include subject matter or short title of solicitation/contract where feasible.
Item 16B . The contracting officer's signature is not required on solicitation amendments. The contracting offier's signature is normally affixed last on supplemental agreements.
(i)
NOTE: If there are changes to multiple accounting classifications that cannot be placed in block 12, insert an asterisk and the words "See continuation sheet".
Item 13 . Check the appropriate box to indicate the type of modification. Insert in the corresponding blank the authority under which the modification is issued. Check whether or not contractor must sign this document. (See FAR 43.103.)
Item 14 (Description of Amendment/Modification) .
Organize amendments or modifications under the appropriate Uniform Contract Format (UCF) section headings from the applicable solicitation or contract. The UCF table of contents, however, shall not be set forth in this document Indicate the impact of the modification on the overall total contract price by inserting one of the following entries:
Total contract price increased by $
Total contract price decreased by $
Total contract price unchanged.
State reason for modification.
When removing, reinstating, or adding funds, identify the contract items and accounting classifications.
When the SF 30 is used to reflect a determination by the contracting officer of the amount due in settlement of a contract terminated for the convenience of the Government, the entry in Item 14 of the modification may be limited to --
A reference to the letter determination; and
A statement of the net amount determined to be due in settlement of the contract.
(g)
(h)
(i)
(ii)
(1)
(2)
(3)
(4)
(5)
(6)
(i)
(ii)
(iii)
STANDARD FORM 30 (REV. 10-83) BACK
(1) Accounting classification Net increase $
664-325, Expand Renovate Research Labs W912PL-12-R-0019 VA San Diego Healthcare System San Diego County, CA
SF30 - 2
Amendment 06
Continuation from Block 14, SF-30 Amendment 06 of Solicitation
Amendment issued to add / revise the following of above-referenced solicitation:
1) Replace or add sections with included sections:
Table of Contents List of Drawings 00 120 Proposal Evaluation and Contract Award 00 800 Special Contract Requirements
00 850 Wage Rates 01 00 00 General Requirements & Construction Signs & Forms 01 27 00 Measurement and Payment 01 32 01 Project Schedule 01 33 00 Construction Submittal Procedures 01 45 10 Contractor Quality Control 01 45 29 Testing Laboratory Services 01 56 80 Environmental Safety and Protection 01 91 00 Commissioning Requirements 08 21 00 Wood Doors
2) Add or Replace the drawings with included drawings:
1-DE FUME WASTE SUCTION DETAILS
A-1.33 CARDIOLOGY EQUIPMENT SCHEDULE
A-1.34 ANESTHESIA EQUIPMENT SCHEDULE
A-1.35 PULMONARY EQUIPMENT SCHEDULE
1-P0.2 PLUMBING SCHEDULES
3) Add this attachment:
COLOR BOARD
TABLE OF CONTENTS - 1
Amendment 6
TABLE OF CONTENTS
Section Title Amend#
DIVISION 00 – BIDDING REQUIREMENTS, CONTRACT FORMS AND CONTRACT CONDITIONS
Cover 664-325 EXPAND RENOVATE RESEARCH LABS
TOC Table of Contents (Am6) LOD List of Drawings (Am6) SF1442 Solicitation, Offer and Award (Am6)
00 010 Price Schedule 00 100 Instructions to Bidders (Am1) 00 110 Proposal Submission and Instruction 00 120 Proposal Evaluation and Contract Award (Am6) 00 600 Representations and Certifications 00 700 Contract Clauses 00 800 Special Contract Requirements (Am6) 00 850 Wage Rates (Am6)
DIVISION 01 - GENERAL REQUIREMENTS
01 00 00 General Requirements & Construction Signs & Forms (Am6) 01 00 01 Infection Control during Construction 01 00 02 VA Construction Standard 01 00 11 Special Requirements 01 21 00 GEMS Evaluation Survey 01 27 00 Measurement and Payment (Am6)
01 32 01 Project Schedule (Am6) 01 32 17 Network Analysis Schedules 01 33 00 Construction Submittal Procedures (Am6) 01 33 00a Submittal Register 01 33 23 Samples and Shop Drawings 01 35 26 Government Safety Requirements
01 42 19 Reference Standards 01 45 02 Quality Control System 01 45 10 Contractor Quality Control (Am6) 01 45 29 Testing Laboratory Services (Am6) 01 50 02 Temporary Construction Facilities 01 56 39 Temporary Tree and Plant Protection
01 56 80 Environmental Safety and Protection (Am6) 01 57 20 Environmental Protection 01 57 23 Storm Water Pollution Measures 01 58 16 Interior Signage 01 58 17 Exterior Signage 01 74 19 Construction Waste Management 01 74 19 Waste Debris Management Plan Spreadsheet (Am2) 01 78 00 Closeout Submittals 01 91 00 Commissioning Requirements (Am6)
TABLE OF CONTENTS - 2
DIVISION 02 – EXISTING CONDITIONS
02 41 00 DEMOLITION
02 82 11 CLASS I NEGATIVE PRESSURE ENCLOSURE ASBESTOS
ABATEMENT
DIVISION 03 – CONCRETE
03 30 00 CAST-IN-PLACE CONCRETE
DIVISION 04 – MASONRY- NOT USED
DIVISION 05 – METALS
05 12 00 STRUCTURAL STEEL FRAMING
05 31 00 STEEL DECKING
05 36 00 COMPOSITE METAL DECKING
05 50 00 METAL FABRICATION
DIVISION 06 – WOOD,PLASTICS AND COMPOSITES
06 10 00 ROUGH CARPENTRY
06 20 00 FINISH CARPENTRY AND MILLWORK
DIVISION 07 THERMAL AND MOISTURE PROTECTION
07 21 13 THERMAL INSULATION
07 22 00 ROOF AND DECK INSULATION
07 54 19 POLYVINYL CHLORIDE ROOFING
07 54 23 THERMOPLASTIC POLYOLEFIN (TPO) ROOFING (Am3)
07 60 00 FLASHING AND SHEET METAL
07 81 05 SPRAYED-ON FIREPROOFING
07 84 00 FIRESTOPPING
07 92 00 SEALANTS AND CAULKING
DIVISION 08 OPENINGS
08 11 15 STEEL DOORS AND FRAMES AND STEEL WINDOW FRAME
08 21 00 WOOD DOORS (Am6)
08 41 13 ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS
08 44 13 GLAZED ALUMINUM CURTAIN WALLS
08 61 50 MANUAL SLIDING INTENSIVE CARE UNIT (ICU) DOORS
08 61 60 BIFOLDING INTENSIVE CARE UNIT (ICU) DOORS
08 71 00 DOOR HARDWARE
08 71 16 ELECTRO-MECHANICAL SWINGING DOOR OPERATORS
08 75 00 INSTALLATION OF DOORS AND HARDWARE
TABLE OF CONTENTS - 3
08 80 00 GLAZING
Section Title Amend#
DIVISION 09 – FINISHES
09 06 00 COLOR AND DESIGN
09 22 16 NON-STRUCTURAL FRAMING SYSTEMS
09 29 00 GYPSUM BOARD
09 30 13 CERAMIC TILING
09 51 00 ACOUSTICAL CEILING
09 65 16 RESILIENT SHEET FLOORING
09 68 20 CARPETING (WITHOUT CUSHION)
09 91 00 PAINTING
DIVISION 10 – SPECIALTIES
10 14 00 SIGNAGE
10 21 13 TOILET COMPARTMENTS
10 28 00 TOILET ACCESSORIES
10 28 25 PRE-FABRICATED SHOWER ENCLOSURES
10 44 13 FIRE EXTINGUISHER CABINETS
10 51 23 PLASTIC LAMINATE LOCKERS
DIVISION 11 – EQUIPMENT
11 53 13 LABORATORY FUME HOODS
11 72 11 WALK-IN COOLERS AND FREEZERS
11 72 14 LABORATORY CONTOLLED COLD ROOM OR WARM ROOMS
DIVISION 12 – FURNISHINGS
12 31 00 METAL CASEWORK
12 32 00 WOOD CASEWORK
12 34 63 ADAPTABLE LABORATORY FURNITURE SYSTEM
12 34 64 BENCH TOP UPRIGHT SYSTEM
12 34 66 WALL RAIL SYSTEM
DIVISION 13 - SPECIAL CONSTRUCTION – NOT USED
DIVISION 14– CONVEYING EQUIPEMENT – NOT USED
DIVISION 21- FIRE SUPPRESSION
21 05 11 COMMON WORK RESULTS FOR FIRE SUPPRESSION
21 13 13 WET-PIPE SPRINKLER SYSTEMS
TABLE OF CONTENTS - 4
DIVISION 22 – PLUMBING
22 05 11 COMMON WORK RESULTS FOR PLUMBING
22 05 12 GENERAL MOTOR REQUIREMENTS FOR PLUMBING EQUIPMENT
22 05 19 METERS AND GAGES FOR PLUMBING PIPING
22 11 00 FACILITY WATER DISTRIBUTION
22 13 00 FACILITY SANITARY AND VENT PIPING
22 15 00 GENERAL SERVICE COMPRESSED-AIR SYSTEMS
22 40 00 PLUMBING FIXTURES
22 62 00 VACUUM SYSTEMS FOR LABORATORY AND HEALTHCARE FACILITIES
22 63 00 GAS SYSTEMS FOR LABORATORY AND HEALTHCARE FACILITIES
22 66 00 CHEMICAL-WASTE SYSTEMS FOR LABORATORY AND HEALTHCARE
FACILITIES
22 77 19 TYPE 2 WATER PURIFICATION SYSTEM
DIVISION 23 – HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
23 05 11 COMMON WORK RESULTS FOR HVAC AND STEAM GENERATION
23 05 12 GENERAL MOTOR REQUIREMENTS FOR HVAC AND STEAM GENERATION
EQUIPMENT
23 05 41 NOISE AND VIBRATION CONTROL FOR HVAC PIPING AND EQUIPMENT
23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC
23 09 23 DIRECT -DIGITAL CONTROL SYSTEM FOR HVAC
23 11 23 FACILITY NATURAL-GAS PIPING
23 21 13 HYDRONIC PIPING
23 22 13 STEAM AND CONDENSATE HEATING PIPING
23 25 00 HVAC WATER TREATMENT
23 31 00 HVAC DUCTS AND CASINGS
23 34 00 HVAC FANS
23 36 00 AIR TERMINAL UNITS
23 37 00 AIR OUTLETS AND INLETS
23 40 00 HVAC AIR CLEANING DEVICES
23 73 00 INDOOR CENTRAL-STATION AIR-HANDLING UNITS
23 74 13 PACKAGED, OUTDOOR, CENTRAL-STATION AIR HANDLING UNITS
23 82 16 AIR COILS
DIVISION 25 – INTEGRATED AUTOMATION – NOT USED
DIVISION 26 – ELECTRICAL
26 05 11 REQUIREMENTS FOR ELECTRICAL INSTALLATIONS
26 05 21 LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES
(600 VOLTS AND BELOW)
26 05 26 GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS
26 05 33 RACEWAY AND BOXES FOR ELECTRICAL SYSTEMS
26 24 16 PANELBOARDS
26 27 26 WIRING DEVICES
26 29 21 DISCONNECT SWITCHES
TABLE OF CONTENTS - 5
DIVISION 26 – ELECTRICAL - CONTINUED
26 51 00 INTERIOR LIGHTING
DIVISION 27 – COMMUNICATIONS
27 05 11 REQUIREMENTS FOR COMMUNICATIONS INSTALLATIONS
27 31 31 VOICE COMMUNICATIONS SWITCHING AND ROUTING
EQUIPMENT – EXTENSION
27 54 81 OFFICE OF INFORMATION & TECHNOLOGY (OI&T) CABLING
STANDARDS AND CRITERIA (Am3)
DIVISION 28 – ELECTRONIC SAFETY AND SECURITY – NOT USED
DIVISION 31 – EARTHWORK – NOT USED
DIVISION 32 – EXTERIOR IMPROVEMENTS – NOT USED
DIVISION 33 – UTILITIES – NOT USED
End of Table of Contents
LIST OF DRAWINGS - 1
AMENDMENT 06
LIST OF DRAWINGS
WASTE AIR GAS SUCTION RESEARCH PROJECT
and
664-325 EXPAND RENOVATE RESEARCH LABS
The drawings listed below accompanying this specification form a part of the contract.
Drawing No. Title AMEND#
WASTE AIR GAS SUCTION RESEARCH PROJECT
1-6I-H - PROJECT AREAS
1-6I-H.1 -NEW FUME WASTE EXHAUST PLAN
Room 6152 WAGS LAYOUT – ELEVATION VIEW ROOM 6152
1-DE FUME WASTE SUCTION DETAILS AMEND 06
664-325 EXPAND RENOVATE RESEARCH LABS
ARCHITECTURAL
T-1.11 COVER SHEET
T-1.12 PROJECT DATA SHEET
F-1.11 FIRE LIFE SAFETY
AS-1.11 ASBESTOS BULK SAMPLE MAP
AS-1.12 INTERIOR ASBESTOS TESTING PLAN
AS-1.13 INTERSTITIAL/EXTERIOR ASBESTOS TESTING PLAN
A-1.10 DEMOLITION PLAN
A-1.11 6 SOUTH INTERSTITIAL DEMO AMEND 02
A-1.21 OVERALL SOUTH WING FLOOR PLAN (1/8" SCALE)
A-1.22 ENLARGED FLOOR PLAN: CARDIOLOGY (1/4" SCALE)
A-1.23 ENLARGED FLOOR PLAN: ANESTH/PULM. (1/4" SCALE)
A-1.31 ENLARGED EQUIPMENT PLAN: CARDIOLOGY (1/4" SCALE)
A-1.32 ENLARGED EQUIPMENT PLAN: ANESTH/PULM. (1/4" SCALE)
A-1.33 CARDIOLOGY EQUIPMENT SCHEDULE AMEND 06
A-1.34 ANESTHESIA EQUIPMENT SCHEDULE AMEND 06
A-1.35 PULMONARY EQUIPMENT SCHEDULE AMEND 06
A-1.41 OVERALL SOUTH WING REFLECTED CEILING PLAN (1/8" SCALE)
A-1.42 ENLARGED REFLECTED CLNG. PLAN: CARDIOLOGY (1/4" SCALE)
A-1.43 ENLARGED REFL. CLNG. PLAN: ANESTH/PULM. (1/4" SCALE)
A-1.44 ENLARGED SOFFIT / FLOOR PATTERN PLANS (1/4" SCALE)
A-1.50 INTERSTITIAL PLAN (1/8" SCALE)
A-1.50 6 SOUTH INTERSTITIAL NEW AMEND 02
A-1.60 OVERALL SOUTH WING ROOF PLAN (1/8" SCALE)
A-2.10 BUILDING EXTERIOR ELEVATIONS
A-2.20 BUILDING SECTIONS
A-2.30 EXTERIOR WALL SECTIONS
A-3.11 INTERIOR ELEVATIONS
A-3.12 INTERIOR ELEVATIONS
A-3.13 INTERIOR ELEVATIONS
A-3.14 INTERIOR ELEVATIONS
A-3.15 INTERIOR ELEVATIONS
A-3.16 INTERIOR ELEVATIONS
A-3.17 INTERIOR ELEVATIONS & SIGNAGE INFORMATION
LIST OF DRAWINGS - 2
ARCHITECTURAL - CONTINUED
A-3.20 STANDARD MOUNTING HEIGHTS & CLEARANCES
A-4.10 DOOR SCHEDULE/TYPES
A-4.11 WINDOW SCHEDULE/TYPES
A-4.20 FINISH SCHEDULE
A-5.10 WALL TYPES & DETAILS
A-6.10 DETAILS
A-6.11 DETAILS
A-6.12 DETAILS
A-6.13 DETAILS
A-6.14 DETAILS
I-1.11 ENLARGED FINISH PLAN: CARDIOLOGY (1/4" SCALE)
I-1.12 ENLARGED FINISH PLAN: ANESTH/PULM. (1/4" SCALE)
1-5I-A 5TH FLOOR INT ARC AMEND 02
1-H2.2A 6th Floor Ints Plan AMEND 02
STRUCTURAL
1-S.1 GENERAL NOTES AND TYPICAL DETAIL
1-S.2 PARTIAL 6TH FLOOR FRAMING PLAN
1-S.3 PARTIAL ROOF FRAMING PLAN
1-S.4 SECTIONS AND DETAILS
1-S.5 SECTIONS AND DETAILS
HVAC
1-H0.1 LEGEND AND GENERAL NOTES
1-H0.2 SCHEDULES
1-H0.3 SCHEDULES
1-H0.4 SCHEDULES
1-H0.5 SCHEDULES
1-H1.1 6TH FLOOR DEMOLITION PLAN
1-H1.2 6TH FLOOR INTERSTITIAL DEMOLITION PLAN
1-H1.3 ROOF DEMOLITION PLAN
1-H2.1 6TH FLOOR PLAN
1-H2.2 6TH FLOOR INTERSTITIAL PLAN
1-H2.2A 6TH FLOOR INTERSTITIAL PLAN
1-H2.2B 6TH FLOOR INTERSTITIAL PLAN
1-H2.2C 6TH FLOOR INTERSTITIAL PLAN
1-H2.3 ROOF PLAN
1-H4.1 DETAILS
1-H4.2 DETAILS
1-H4.3 DETAILS
1-H4.4 DETAILS
1-H5.1 SEQUENCE OF OPERATION
1-H5.2 CONTROL DIAGRAMS
1-H5.3 CONTROL DIAGRAMS
LIST OF DRAWINGS - 3
PLUMBING
1-P0.1 LEGEND AND GENERAL NOTES AMEND 02
1-P0.2 PLUMBING SCHEDULES AMEND 06
1-P1.0 INTERSTITIAL DEMOLITION PLAN AMEND 02
1-P1.1 6TH FLOOR DEMOLITION PLAN AMEND 02
1-P1.2 INTERSTITIAL DEMOLITION PLAN AMEND 02
1-P2.0 INTERSTITIAL FLOOR PLAN
1-P2.1 6TH FLOOR PLAN
1-P2.2 ENLARGED 6TH FLOOR PLAN
1-P2.3 ENLARGED 6TH FLOOR PLAN
1-P2.4 INTERSTITIAL FLOOR PLAN
1-P2.5 ROOF PLAN
1-P4.0 DETAILS
ELECTRICAL
1-E-1 ELECTRICAL SYMBOLS LIST
1-E-2 ABBREVIATIONS, DEMO AND GENERAL NOTES
1-E-3 LIGHT FIXTURE SCHEDULE & DETAILS
1-E-4 6TH FLOOR LIGHTING DEMOLITION PLAN
1-E-5 6TH FLOOR ELECTRICAL DEMOLITION PLAN
1-E-6 6TH FLOOR SIGNAL DEMOLITION PLAN
1-E-7 6TH FLOOR LIGHTING PLAN
1-E-8 6TH FLOOR POWER PLAN
1-E-9 6TH FLOOR COMMUNICATION PLAN
1-E-10 6TH FLOOR FIRE ALARM PLAN
1-E-11 6TH FLOOR INTERSTITIAL ELECTRICAL PLAN
1-E-12 ROOF LEVEL POWER PLAN
1-E-13 6TH FLOOR FIRE NORMAL POWER SINGLE LINE DIAGRAM
1-E-14 6TH FLOOR FIRE EMERGENCY POWER SINGLE LINE DIAGRAM
1-E-15 PANEL SCHEDULES
1-E-16 ENLARGED PLAN
1-E-17 ELECTRICAL DETAILS
END OF LIST OF DRAWINGS
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NUMBER 2. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
3. DATE ISSUED PAGE OF PAGES
IMPORTANT - The "offer" section on the reverse must be fully completed by the offeror.
4. CONTRACT NUMBER 5. REQUISITION/PURCHASE REQUEST NUMBER 6. PROJECT NUMBER
7. ISSUED BY CODE 8. ADDRESS OFFER TO
9. FOR INFORMATION CALL
A. NAME B. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)
SOLICITATION
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date):
11. The Contractor shall begin performance within calendar days and complete it within calendar days after receiving award, notice to proceed. This performance period is mandatory, negotiable. (See .)
12A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
12B. CALENDAR DAYS
YES NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and copies to perform the work required are due at the place specified in Item 8 by (hour) local time (date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror’s name and address, the solicitation number, and the date and time offers are due.
B. An offer guarantee is, is not required.
C. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
NSN 7540-01-155-3212
Designed using Perform Pro, WHS/DIOR, Oct 96
1442-103 STANDARD FORM 1442 (REV. 4-85) (EG)
Prescribed by GSA - FAR (48 CFR) 53.236-1(d)
W912PL-12-R-0019
X
05 May 2012 1 OF 2
USACE, Los Angeles District Contracting Division, CESPL-CT-W 915 Wilshire Blvd.
P. O. Box 532711, Los Angeles, CA 90053-2325
See Item 7
Julie Ayala/Patricia Bonilla 213/452-3241 or 3255
664-325 Expand Renovate Research Labs, VA San Diego Healthcare System, San Diego County, California
The project consists of general construction involving renovation of existing research laboratories at the VA San Diego Healthcare System hospital.
The estimated cost range of this acquisition is between $5,000,000 - $10,000,000.
This procurement is set-aside for Service Disabled Veteran Owned Small Business firms (see FAR 52.219-27, Section 00100).
BIDDERS PLEASE NOTE: This project may be delayed, cancelled, or revised at any time prior to award.
10 *
X X *Section 00800
X 10
See00110 2:00 PM
26 June 2012
X
OFFER (Must be fully completed by offeror)
STANDARD FORM 1442 BACK (REV. 4-85)
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NUMBER (Include area code)
16. REMITTANCE ADDRESS (Include only if different than Item 14)
CODE FACILITY CODE
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within calendar days after the date offers are due. (Insert any number equal or greater than the minimum requirement stated in 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGEMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation - give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20B. SIGNATURE 20C. OFFER DATE
AWARD (To be completed by Government)
21. ITEMS ACCEPTED
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24.SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) ( ) 41 U.S.C. 253(c) ( )
26. ADMINISTERED BY 27. PAYMENT WILL BE MADE BYCODE
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return copies to the issuing office.) Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and
(c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.
29. AWARD. (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN
(Type or print)
30B. SIGNATURE 30C. DATE
31A. NAME OF CONTRACTING OFFICER (Type or print)
31B. UNITED STATES OF AMERICA 31C. AWARD DATE
BY
DUNS NO.: TAX ID NO.:
CAGE CODE NO.:
( ) - ; FAX ( ) -
Sad Diego County, CA
00120 - 1 Bold Italic Underline denotes AMENDMENT 06
SECTION 00120
PROPOSAL EVALUATION AND CONTRACT AWARD
1. GENERAL
2. ELIGIBILITY FOR CONTRACT AWARD. ……………
3. EVALUATION PROCESS
4. EVALUATION FACTORS
00120 - 2
SECTION 00120
PROPOSAL EVALUATION AND CONTRACT AWARD
1. GENERAL
a. A Source Selection Evaluation Board (SSEB) comprised of representatives of the Corps of Engineers, User/Customer, and other required personnel, will evaluate the proposals. Offerors are advised that the technical evaluation and rating of the proposals will be conducted in strict accordance in with Section 00 01 10 and 00 01 20 of the solicitation.
In addition, technical/quality proposals are first reviewed and rated by the SSEB without knowledge of the price offered. The number and identities of offerors are not revealed to anyone who is not involved in the evaluation and award process or to other offerors. Proposals will be evaluated on the factors described herein. The lowest price technically acceptable source selection process will be used for this acquisition. This process allows the Government to select a technically acceptable proposal with the lowest evaluated price.
Reference FAR 15.101.2.
b. Offerors are reminded to include their best technical and price terms in their initial offer and not to automatically assume that they will have an opportunity to participate in discussions or be asked to submit a revised offer. The Government intends to award a contract without discussions based on initial proposals received; therefore, the proposal shall contain the offeror’s best terms from a cost and technical standpoint.
2. ELIGIBILITY FOR CONTRACT AWARD.
In accordance with FAR 1.602-1(b), no contract shall be entered into unless the Contracting Officer ensures that all requirements of law, executive orders, regulations, and other applicable procedures, including clearances and approvals, have been met. This includes the requirement of FAR 9.103 that no award shall be made unless the Contracting Officer makes an affirmative determination of responsibility. To be determined responsible, a prospective contractor must meet the general standards in FAR 9.104-1 and any special standards set forth in the solicitation in accordance with FAR 9.104-2.
3. EVALUATION PROCESS.
The evaluation process essentially consists of three parts: proposal compliance review and responsibility determination, technical/quality evaluation, and price evaluation.
a. Proposal Compliance Review: This is an initial review to ensure that all required forms and certifications are completed and that both a technical and price proposal were received.
b. Technical/Quality Evaluation: The SSEB will evaluate and rate those proposals passing the first review, above. Proposals will be evaluated against the RFP requirements. Factors will be rated on an “acceptable or “non-acceptable”” basis.
00120 - 3
c. Price Evaluation: The SSEB will evaluate price proposals independent of the technical/quality evaluation. The SSEB will not have access to price information until completion of the technical/quality evaluation.
The proposed price will be analyzed for reasonableness. It may also be analyzed to determine whether it is realistic for the work to be performed; reflects a clear understanding of the requirements; and is consistent with the offeror’s Technical Proposals. All offers with separately priced line items and/or sub line items will be analyzed for unbalanced pricing.
4. EVALUATION FACTORS.
Proposals will be evaluated in accordance with the factors listed below.
Award will be made on the basis of the lowest evaluated price of proposals meeting or exceeding the acceptability standards for non-cost factors. The offeror who submits the lowest price proposal with a technically acceptable proposal that has received ratings of “Acceptable” on all non-cost factors will be awarded the contract.
FACTOR 1 – EXPERIENCE ON PROJECTS (Volume 2, Tab #1)
The SSEB will evaluate the Offeror’s experience on projects. To receive an “acceptable” rating, Offeror must demonstrate relevant experience with: at least two (2) projects on Hospital Interior Renovation Specifically on Operational Interior Hospital and/or Operational Interior Clinic Environment; all projects must be not less than $2 Million per project; and all projects must have been completed within the past five (5) years from date in SF1442 Block 13A.
The SSEB will evaluate the Offerors experience information provided in FACTOR No. 1 for:
• minimum number of submitted projects that are accomplished by the
Offeror;
• similarity of submitted projects to Hospital Interior Renovation
Projects Specifically on Operating Interior Hospital and/or Operating Interior Clinic Environment;
• contract amount of completed submitted project;
• and date of completion of each submitted project.
Projects submitted by the Offeror that are not actually done by the Offeror as a Company shall cause FACTOR No. 1 to be evaluated as “non-acceptable”.
Projects that are not related to interior renovation projects involving an operating interior hospital environment and/or operating interior clinic environment shall cause FACTOR No. 1 to be evaluated as “non-acceptable”.
Projects less than $2 million in final contract amount shall cause FACTOR No. 1 to be evaluated as “non-acceptable”.
Projects that do not meet the completed within the past five (5) years time limit shall cause FACTOR No. 1 to be evaluated as “non-
00120 - 4 acceptable”.
• The time limit is defined as the past five (5) years from date in
SF1442 Block 13A.
FACTOR 1 STANDARD FOR ACCEPTABILITY: This standard is met when the Offeror can provide experience on projects meeting the criteria noted above that will be utilized on this design build project.
FACTOR 2 – EXPERIENCE IN INFECTIOUS CONTROL PROCESSES (Volume 2, Tab #2)
The SSEB will evaluate the Offeror’s experience in infectious control processes. To receive an “acceptable” rating, Offeror must demonstrate relevant Experience in Infectious Control Processes on projects provided in FACTOR No. 1.
The SSEB will evaluate the Offeror’s experience in infectious control processes information provided in FACTOR No. 2 for:
• written narrative(s) on infectious control processes utilized on projects submitted in FACTOR no. 1.
Offerors proposals that do not meet the minimum requirements of this FACTOR No. 2 shall cause FACTOR No. 2 to be evaluated as “non-acceptable”.
Missing written narratives on infectious control processes utilized on projects submitted in FACTOR No. 1 shall cause FACTOR No. 2 to be evaluated as “non-acceptable”.
Experience information submitted as written narratives that do not describe infectious control processes on projects submitted in FACTOR
no. 1 shall cause FACTOR No. 2 to be evaluated as “non-acceptable”.
FACTOR 2 STANDARD FOR ACCEPTABILITY: This standard is met when the Offeror can provide experience in infectious control processes meeting the criteria noted above that will be utilized on this design build project.
FACTOR 3 – EXPERIENCE IN CONSTRUCTION SAFETY METHODS (Volume 2, Tab #3)
The SSEB will evaluate the Offeror’s experience in Construction Safety Methods. To receive an “acceptable” rating, Offeror must demonstrate relevant Experience in Construction Safety Methods on projects provided in FACTOR No. 1.
The SSEB will evaluate the Offerors experience information provided in FACTOR No. 3 for:
• written narrative(s) on construction safety methods utilized on projects submitted in FACTOR no. 1.
00120 - 5
Offerors proposals that do not meet the minimum requirements of this FACTOR No. 3 shall cause FACTOR No. 3 to be evaluated as “non-acceptable”.
Missing written narratives on construction safety methods utilized on projects submitted in FACTOR No. 1 shall cause FACTOR No. 3 to be evaluated as “non-acceptable”.
Experience information submitted as written narratives that do not describe construction safety methods on projects submitted in FACTOR
no. 1 shall cause FACTOR No. 3 to be evaluated as “non-acceptable”.
FACTOR 3 STANDARD FOR ACCEPTABILITY: This standard is met when the Offeror can provide experience in construction safety methods meeting the criteria noted above that will be utilized on this design build project.
FACTOR 4 - KEY PERSONNEL RESUMES (Volume 2, Tab #4)
The SSEB will evaluate the three (3) key personnel listed in Section 00110, (Safety Manager, Contractor Quality Control System Manager and Contractor Superintendent). To receive a rating of “acceptable” for this requirement, the offeror must demonstrate relevant experience of key personnel within functioning, operational Hospitals and/or Clinics.
The SSEB will evaluate the Offerors key personnel resumes provided in FACTOR No. 4 for:
• correct name;
• key personnel position for the project and 100 percentage of the individual’s time committed to the project;
• education and or training, description of job related educational experience, including degrees, certificates, etc., and granting institutions;
• minimum years of experience in key position as indicated Section 01 00 00;
• minimum of three (3) years of experience and position held on projects of similar scope and complexity and specifying project experience at VA or other hospital/clinic facilities;
• not less than 1 year employment with offeror.
Any resume submitted with incorrect name by the Offeror shall cause FACTOR No. 4 to be evaluated as “non-acceptable”.
Any key personnel position individual’s time that is less than 100% committed to the project shall cause FACTOR No. 4 to be evaluated as “non-acceptable”.
Any resume submitted with less than required years of experience in key personnel position as required in this solicitation by the Offeror shall cause FACTOR No. 4 to be evaluated as “non-acceptable”.
Any resume submitted with less than three (3) years of experience in hospital/clinic facilities by the Offeror shall cause FACTOR No. 4 to
00120 - 6 be evaluated as “non-acceptable”.
Any resume submitted with less than one (1) year with the Offeror in key personnel position by the Offeror shall cause FACTOR No. 4 to be evaluated as “non-acceptable”.
FACTOR 4 STANDARD FOR ACCEPTABILITY: This standard is met when the Offeror can provide key personnel resumes meeting the criteria noted above that will be utilized on this design build project.
FACTOR 5 – PROPOSED PRELIMINARY CONSTRUCTION SCHEDULE (Volume 2, Tab #5)
The SSEB will evaluate the Offeror’s proposed preliminary construction schedule. To receive an “acceptable” rating, this proposed preliminary construction schedule must include the phasing required in the bid items.
The SSEB will evaluate the Offerors proposed preliminary construction schedule for:
• a construction duration within that stated in Solicitation;
• the phasing required in bid items.
Offerors with a submitted proposed preliminary construction schedule that exceeds construction duration stated in solicitation shall cause FACTOR No. 5 to be evaluated as “non-acceptable”.
Offerors with a submitted proposed preliminary construction schedule that does not have required phasing stated in solicitation shall cause FACTOR No. 5 to be evaluated as “non-acceptable”.
FACTOR 5 STANDARD FOR ACCEPTABILITY: This standard is met when the Offeror can provide a proposed preliminary construction schedule meeting the criteria noted above that will be utilized on this design build project.
---END OF SECTION---
00800 - 1 Bold Italics Underlined denotes amendment Amendment 06
Section 00800 - Special Contract Requirements
CLAUSES INCORPORATED BY FULL TEXT
52.210 MARKET RESEARCH
52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)
52.211-12 LIQUIDATED DAMAGES--CONSTRUCTION (SEP 2000)
52.211-13 TIME EXTENSIONS (SEP 2000)
52.0214-4583 TELEGRAPHIC BIDS/OFFERS ARE NOT ACCEPTABLE
52.219-14 LIMITATIONS ON SUBCONTRACTING (NOV 2011)
52.228-5 INSURANCE--WORK ON A GOVERNMENT INSTALLATION (JAN 1997)
52.228-14 IRREVOCABLE LETTER OF CREDIT (DEC 1999)
52.228-15 Performance and Payment Bonds--Construction (OCT 2010)
52.236-2 DIFFERING SITE CONDITIONS (APR 1984)
52.236-3 SITE INVESTIGATION AND CONDITIONS AFFECTING THE WORK (APR 1984)
52.236-4 PHYSICAL DATA (APR 1984)
52.236-5 MATERIAL AND WORKMANSHIP (APR 1984)
52.236-6 SUPERINTENDENCE BY THE CONTRACTOR (APR 1984)
52.236-7 PERMITS AND RESPONSIBILITIES (NOV 1991)
52.236-8 OTHER CONTRACTS (APR 1984)
52.236-9 PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT, UTILITIES, AND
IMPROVEMENTS (APR 1984)
52.236-10 OPERATIONS AND STORAGE AREAS (APR 1984)
52.236-11 USE AND POSSESSION PRIOR TO COMPLETION (APR 1984)
52.236-12 CLEANING UP (APR 1984)
52.236-13 ACCIDENT PREVENTION (NOV 1991)
52.236-14 AVAILABILITY AND USE OF UTILITY SERVICES (APR 1984)
52.236-15 SCHEDULES FOR CONSTRUCTION CONTRACTS (APR 1984)
52.236-17 LAYOUT OF WORK (APR 1984)
52.236-21 SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION (FEB 1997) - ALTERNATE I (APR
52.236-26 PRECONSTRUCTION CONFERENCE (FEB 1995)
52.0236-4001 PLANT AND MATERIAL REMOVAL AFTER CONTRACT TERMINATION (MAR 1996)
EFARS 52.236-5000
52.0236-4201 CONTRACTOR PERFORMANCE EVALUATIONS
52.236-5000 PLANT AND MATERIAL REMOVAL AFTER CONTRACT TERMINATION (MAR 1995)--
EFARS
252.236-7000 MODIFICATION PROPOSALS - PRICE BREAKDOWN. (DEC 1991)
252.236-7001 CONTRACT DRAWINGS AND SPECIFICATIONS (AUG 2000)
252.236-7008 CONTRACT PRICES - BIDDING SCHEDULES. (DEC 1991)
252.236-7013 REQUIREMENT FOR COMPETITION OPPORTUNITY FOR AMERICAN STEEL
PRODUCERS, FABRICATORS, AND MANUFACTURERS (JAN 2009)
UNAUTHORIZED INSTRUCTIONS FROM GOVERNMENT OR OTHER PERSONNEL
SAFETY REQUIREMENTS
SECURITY CONTRACT LANGUAGE FOR ALL CORPS OF ENGINEERS' UNCLASSIFIED CONTRACTS . 20
REQUIRED INSURANCE
ER 415-1-15 TIME EXTENSIONS FOR UNUSUALLY SEVERE WEATHER (31 OCT 89)
SCR.1 DESIGN-BUILD CONTRACT ORDER OF PRECEDENCE – AUG 1997
SCR 2. PROPOSED BETTERMENTS – AUG 1997
SCR 3. KEY PERSONNNEL, SUBCONTRACTORS AND OUTSIDE ASSOCIATES OR CONSULTANTS –
AUG 1997
00800 - 2
SCR 4. DESIGNER OR RECORD – APR 1999
SCR 5. RESPONSIBILITY OF THE CONTRACTOR FOR DESIGN – FEB 2000
SCR 6. WARRANTY OF CONSTRUCTION WORK – AUG 1997
SCR 7. SEQUENCE OF DESIGN-CONTSTRUCTION – AUG 1997
SCR 8. SEQUENCE OF DESIGN-CONSTRUCTION (FAST TRACK)
SCR 9. CONSTRUCTOR’S ROLE DURING DESIGN – JUN 1998
SCR 10. RECOMMENDED INSURANCE COVERAGE
SCR 12. DESIGN CONFERENCES – AUG 1997
00800 - 3
52.210 MARKET RESEARCH
(a) Definition. As used in this clause--
Commercial item and nondevelopmental item have the meaning contained in Federal Acquisition Regulation 2.101.
(b) Before awarding subcontracts over the simplified acquisition threshold for items other than commercial items, the Contractor shall conduct market research to--
(1) Determine if commercial items or, to the extent commercial items suitable to meet the agency's needs are not available, nondevelopmental items are available that--
(i) Meet the agency's requirements;
(ii) Could be modified to meet the agency's requirements; or
(iii) Could meet the agency's requirements if those requirements were modified to a reasonable extent; and
(2) Determine the extent to which commercial items or nondevelopmental items could be incorporated at the component level.
(End of clause)
52.211-10 COMMENCEMENT, PROSECUTION, AND
COMPLETION OF WORK (APR 1984)
The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 455 Calendar Days after the contractor receives the Notice to Proceed. * The time stated for completion shall include final cleanup of the premises.
52.211-12 LIQUIDATED DAMAGES--CONSTRUCTION (SEP
2000)
(a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of $2,210.00 Contracting Officer insert amount] for each calendar day of delay until the work is completed or accepted.
(b) If the Government terminates the Contractor's right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.
00800 - 4
52.211-13 TIME EXTENSIONS (SEP 2000)
Time extensions for contract changes will depend upon the extent, if any, by which the changes cause delay in the completion of the various elements of construction. The change order granting the time extension may provide that the contract completion date will be extended only for those specific elements related to the changed work and that the remaining contract completion dates for all other portions of the work will not be altered. The change order also may provide an equitable readjustment of liquidated damages under the new completion schedule.
52.0214-4583 TELEGRAPHIC BIDS/OFFERS ARE NOT
ACCEPTABLE
Any telegram to modify or withdraw a bid/offer sent to this office must be physically delivered to the office designated for receipt of bid/offer by the date and time set for bid opening/receipt of proposals.
No one from this office will be dispatched to the local telegraph office to pick up any telegram for any reason.
52.219-14 LIMITATIONS ON SUBCONTRACTING (NOV 2011)
(a) This clause does not apply to the unrestricted portion of a partial set-aside.
(b) Applicability. This clause applies only to--
(1) Contracts that have been set aside or reserved for small business concerns or 8(a) concerns;
(2) Part or parts of a multiple-award contract that have been set aside for small business concerns or 8(a) concerns;
and
(3) Orders set aside for small business or 8(a) concerns under multiple-award contracts as described in 8.405-5 and 16.505(b)(2)(i)(F).
(c) By submission of an offer and execution of a contract, the Offeror/Contractor agrees that in performance of the contract in the case of a contract for--
(1) Services (except construction). At least 50 percent of the cost of contract performance incurred for personnel shall be expended for employees of the concern.
(2) Supplies (other than procurement from a nonmanufacturer of such supplies). The concern shall perform work for at least 50 percent of the cost of manufacturing the supplies, not including the cost of materials.
(3) General construction. The concern will perform at least 15 percent of the cost of the contract, not including the cost of materials, with its own employees.
(4) Construction by special trade contractors. The concern will perform at least 25 percent of the cost of the contract, not including the cost of materials, with its own employees.
00800 - 5
52.228-5 INSURANCE--WORK ON A GOVERNMENT
INSTALLATION (JAN 1997)
(a) The Contractor shall, at its own expense, provide and maintain during the entire performance of this contract, at least the kinds and minimum amounts of insurance required in the Schedule or elsewhere in the contract.
(b) Before commencing work under this contract, the Contractor shall notify the Contracting Officer in writing that the required insurance has been obtained. The policies evidencing required insurance shall contain an endorsement to the effect that any cancellation or any material change adversely affecting the Government's interest shall not be effective (1) for such period as the laws of the State in which this contract is to be performed prescribe, or (2) until 30 days after the insurer or the Contractor gives written notice to the Contracting Officer, whichever period is longer.
(c) The Contractor shall insert the substance of this clause, including this paragraph (c), in subcontracts under this contract that require work on a Government installation and shall require subcontractors to provide and maintain the insurance required in the Schedule or elsewhere in the contract. The Contractor shall maintain a copy of all subcontractors' proofs of required insurance, and shall make copies available to the Contracting Officer upon request.
52.228-14 IRREVOCABLE LETTER OF CREDIT (DEC 1999)
(a) “Irrevocable letter of credit” (ILC), as used in this clause, means a written commitment by a federally insured financial institution to pay all or part of a stated amount of money, until the expiration date of the letter, upon presentation by the Government (the beneficiary) of a written demand therefor. Neither the financial institution nor the offeror/Contractor can revoke or condition the letter of credit.
(b) If the offeror intends to use an ILC in lieu of a bid bond, or to secure other types of bonds such as performance and payment bonds, the letter of credit and letter of confirmation formats in paragraphs (e) and (f) of this clause shall be used.
(c) The letter of credit shall be irrevocable, shall require presentation of no document other than a written demand and the ILC (including confirming letter, if any), shall be issued/confirmed by an acceptable federally insured financial institution as provided in paragraph (d) of this clause, and--
(1) If used as a bid guarantee, the ILC shall expire no earlier than 60 days after the close of the bid acceptance period;
(2) If used as an alternative to corporate or individual sureties as security for a performance or payment bond, the offeror/Contractor may submit an ILC with an initial expiration date estimated to cover the entire period for which financial security is required or may submit an ILC with an initial expiration date that is a minimum period of one year from the date of issuance. The ILC shall provide that, unless the issuer provides the beneficiary written notice of non-renewal at least 60 days in advance of the current expiration date, the ILC is automatically extended without amendment for one year from the expiration date, or any future expiration date, until the period of required coverage is completed and the Contracting Officer provides the financial institution with a written statement waiving the right to payment. The period of required coverage shall be:
00800 - 6
(i) For contracts subject to the Miller Act, the later of--
(A) One year following the expected date of final payment;
(B) For performance bonds only, until completion of any warranty period; or
(C) For payment bonds only, until resolution of all claims filed against the payment bond during the one-year period following final payment.
(ii) For contracts not subject to the Miller Act, the later of--
(A) 90 days following final payment; or
(B) For performance bonds only, until completion of any warranty period.
(d) Only federally insured financial institutions rated investment grade or higher shall issue or confirm the ILC. The offeror/Contractor shall provide the Contracting Officer a credit rating that indicates the financial institution has the required rating(s) as of the date of issuance of the ILC. Unless the financial institution issuing the ILC had letter of credit business of less than $25 million in the past year, ILCs over $5 million must be confirmed by another acceptable financial institution that had letter of credit business of less than $25 million in the past year.
(e) The following format shall be used by the issuing financial institution to create an ILC:
[Issuing Financial Institution's Letterhead or Name and Address]
Issue Date ____________
IRREVOCABLE LETTER OF CREDIT NO. __________
Account party's name _____________________________
Account party's address ___________________________
For Solicitation No. _______________(for reference only)
TO: [U.S. Government agency]
[U.S. Government agency's address]
1. We hereby establish this irrevocable and transferable Letter of Credit in your favor for one or more drawings up to United States $________. This Letter of Credit is payable at [issuing financial institution's and, if any, confirming financial institution's] office at [issuing financial institution's address and, if any, confirming financial institution's address] and expires with our close of business on ________, or any automatically extended expiration date.
2. We hereby undertake to honor your or the transferee's sight draft(s) drawn on the issuing or, if any, the confirming financial institution, for all or any part of this credit if presented with this Letter of Credit and confirmation, if any, at the office specified in paragraph 1 of this Letter of Credit on or before the expiration date or any automatically extended expiration date.
3. [This paragraph is omitted if used as a bid guarantee, and subsequent paragraphs are renumbered.] It is a condition of this Letter of Credit that it is deemed to be automatically extended without amendment for one year
00800 - 7 from the expiration date hereof, or any future expiration date, unless at least 60 days prior to any expiration date, we notify you or the transferee by registered mail, or other receipted means of delivery, that we elect not to consider this Letter of Credit renewed for any such additional period. At the time we notify you, we also agree to notify the account party (and confirming financial institution, if any) by the same means of delivery.
4. This Letter of Credit is transferable. Transfers and assignments of proceeds are to be effected without charge to either the beneficiary or the transferee/assignee of proceeds. Such transfer or assignment shall be only at the written direction of the Government (the beneficiary) in a form satisfactory to the issuing financial institution and the confirming financial institution, if any.
5. This Letter of Credit is subject to the Uniform Customs and Practice (UCP) for Documentary Credits, 1993 Revision, International Chamber of Commerce Publication No. 500, and to the extent not inconsistent therewith, to the laws of _____________________ [state of confirming financial institution, if any, otherwise state of issuing financial institution].
6. If this credit expires during an interruption of business of this financial institution as described in Article 17 of the UCP, the financial institution specifically agrees to effect payment if this credit is drawn against within 30 days after the resumption of our business.
Sincerely, [Issuing financial institution]
(f) The following format shall be used by the financial institution to confirm an ILC:
[Confirming Financial Institution's Letterhead or Name and Address]
(Date) __________________
Our Letter of Credit Advice Number _________________
Beneficiary: ______________ [U.S. Government agency]
Issuing Financial Institution: _______________________
Issuing Financial Institution's LC…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .