B08-SOL_RFQ_W912PF21Q0015_Conformed_20210908.pdf
PDF 1 MB Posted
- Solicitation number
- W912PF21Q0015
About this file
This pre-solicitation notice announces an upcoming firm fixed price contract for inspection, testing, maintenance, and repair of backflow preventers installed at various United States Army installations in Italy. Services are required at locations in Vicenza including Caserma Ederle, Caserma Del Din, Villaggio della Pace, Longare, ASP #7, Lerino, and Torri Di Quartesolo. The base period of performance is one year with four one-year option periods. Interested vendors must submit capability statements by April 9, 2021 demonstrating certification from the Chamber of Commerce for plumbing work, SAM registration including DUNS and NATO codes. A pre-proposal conference will be held in May-June 2021. The award method and type of contract will be specified in the subsequent request for quotation.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SEE ADDENDUM
(No Collect Calls)
W912PF21Q0015 12-Aug-2021
b. TELEPHONE NUMBER
+39-0444-713910
8. OFFER DUE DATE/LOCAL TIME
12:00 AM 16 Sep 2021
5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA – FAR (48 CFR) 53.212
(TYPE OR PRINT)
(SIGNATURE OF CONTRACTING OFFICER)
ADDENDA ARE
26. TOTAL AWARD AMOUNT (For Gov t. Use Only )
23.
CODE 10. THIS ACQUISITION IS
SUCH ADDRESS IN OFFER
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT
BELOW IS CHECKED
TELEPHONE NO.
W912PF9. ISSUED BY
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME
PATRIZIA MELONI
2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER
(TYPE OR PRINT)
30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA
27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.
25. ACCOUNTING AND APPROPRIATION DATA
1. REQUISITION NUMBER
20.
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
SEE SCHEDULE
ARE NOT ATTACHED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
. YOUR OFFER ON SOLICITATION
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
% FOR:SET ASIDE:UNRESTRICTED ORX
SMALL BUSINESS
17a.CONTRACTOR/ CODE FACILITY
OFFEROR CODE
414TH CSB RCO ITALY
414TH CSB - RCO ITALY
VIA DELLA PACE #197
36100 VICENZA
ITALY
18a. PAYMENT WILL BE MADE BY CODE
RATED ORDER UNDER
DPAS (15 CFR 700)
13a. THIS CONTRACT IS A
13b. RATING
CODE15. DELIVER TO CODE W582RR 16. ADMINISTERED BY
12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
14. METHOD OF SOLICITATION
RFQ IFB RFPX
W582RR USAG VICENZA
W6E7 USAG ITALY
UNIT 31401
APO AE 09630
TEL: 314-537-4325 FAX:
FAX:
TEL: SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
8(A)
HUBZONE SMALL
BUSINESS
SIZE STANDARD:
$16,500,000
NAICS:
238220
X
OFFER DATED
29. AWARD OF CONTRACT: REF.
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
EMAIL:
TEL:
31c. DATE SIGNED
SEE SCHEDULE
SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT
24.22.21.19.
WOMEN-OWNED SMALL BUSINESS (WOSB)
ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
EDWOSB
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
(CONTINUED)
PAGE 2 OF102
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
37. CHECK NUMBER
FINALPARTIALCOMPLETE
36. PAYMENT35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER
FINAL
33. SHIP NUMBER
PARTIAL
38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS
STANDARD FORM 1449 (REV. 2/2012) BACK
Prescribed by GSA – FAR (48 CFR) 53.212
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
SEE SCHEDULE
20.
SCHEDULE OF SUPPLIES/ SERVICES
21.
QUANTITY UNIT
22. 23.
UNIT PRICE
24.
AMOUNT
19.
ITEM NO.
W912PF21Q0015
Section SF 30 - BLOCK 14 CONTINUATION PAGE
RFI
The following are the answers to the RFI posed by the prospective quoters:
QUESTION 1.
This is to kindly request an extension of the proposal due date of at least 1 (one) week.
Due to Italian holiday closure of the month of August, we are experiencing delays in receiving feedback from our subcontractors in terms of agreements, Past Performance PPQ submission and receipt.
ANSWER 1.
Block 8, Offer Due Date / Local Time is changed from 12.00 AM 13 September 2021 to 12.00 AM 16 September
2021.
QUESTION 2.
On the price unit voices are requested the inspection, testing, replacement and inventory only for backflow preventer concerning on Del Din site and Caserma Ederle. The other following sites are not mentioned: Villaggio della Pace, Longare, ASP # 7, Lerino and Torri di Quartesolo. How should the relative costs be distributed?
ANSWER 2.
Please see the revised extended description of CLIN 0001, 1001, 2001, 3001, 4001 which include Caserma Ederle, Villaggio della Pace, Longare, ASP # 7, Lerino and Torri di Quartesolo.
QUESTION 3.
Does the unit price to be indicated in ITEM 0001-1001-2001-3001-4001 - 0002-1002-2002-3002-4002 mean for a single backflow preventer or for the group of backflow preventer listed in Appendix C? In the last case, it’s necessary estimate the quantity of unlisted backflow preventer?
ANSWER 3.
They are for the group of backflow preventers listed in Appendix C; the total number is related to the existing inventory.
QUESTION 4.
Appendix C is missing the inventory of ASP # 7, Lerino and Torri di Quartesolo
ANSWER 4.
There are 3 backflow preventers listed at the very last page about ASP#7.
QUESTION 5.
In Appendix C, "recommended device" and "remarks" column, some changes are indicated.
Are the cost of these changes covered by ITEM 0008 –1008 –2008 – 3008– 4008?
ANSWER 5.
Please, ignore column “recommended device” which is not pertinent; column remarks is meant to provide notes on what you may find/notice during the inspection (for example if you see there is a make-up water system not provided with backflow preventer, or if any backflow preventer has no drain pipe…). In case these activities occur, they will be covered under the above mentioned ITEMs for Over and Above Work, not contemplated in the Price
List for Repair Work. The Government will provide the amount to be used at the time of award. Quoters are not required to price these ITEMs.
QUESTION 6.
Must the unit prices for the replacement of the backflow preventers include the filter, the upstream shut-off valve and the downstream shut-off valve?
ANSWER 6.
No.
QUESTION 7.
Reference page 78 of 99, par. 4 d “Submission of quotes in Euros or Dollars currency”. Please confirm that quotes received in different currencies (Euros or Dollars) will be exchanged to the same currency before evaluation and provide the exchange rate that will be used for the conversion.
ANSWER 7.
Please see revised ADDENDUM TO 52.212.1, Paragraph 4. VOUME IV – FACTOR III; PRICE –
SOLICITATION/CONTRACT/STANDARD FORM 1449, Subparagraph d. SUBMISSION OF QUOTES IN
EUROS OR DOLLARS CURRENCY. FAR Clause 52.225-17 Evaluation of Foreign Currency Offers provides for the exchange rate.
QUESTION 8.
Reference B08-SOL_W912PF21Q0015_Attach4_AppendixC_ExistingBackflowPreventionDevices. Please confirm that this attachment is the most recent and updated list of existing backflow preventers and it is the complete inventory of all the ones to be tested and maintained under this Contract.
ANSWER 8.
Yes.
QUESTION 9.
Reference B08-SOL_W912PF21Q0015_Attach4_AppendixC_ExistingBackflowPreventionDevices, page 11 of 11, “Inventory of new backflow prevention devices”. Please confirm that the backflow preventers listed under this inventory are already installed and provide additional information same as the other inventories.
ANSWER 9.
They are all related to quite small backflow preventers, maximum DN32. For quote purposes, please, consider these ones all Caleffi, DN32.
QUESTION 10.
Reference is made to Solicitation Instructions page 72:
52.212-1 INSTRUCTIONS TO OFFERORS--COMMERCIAL ITEMS (JUN 2020)
4) A technical description of the items being offered in sufficient detail to evaluate compliance with the requirements in the solicitation. This may include product literature, or other documents, if necessary;
Please clarify where we should insert the technical description in our proposal and how the Offeror has to fulfil this requirement, which is not described nor mentioned in the Basis of Award.
Where should it be placed within our proposal? Volume I/Volume II/Volume/III or Volume IV?
Please indicate the page limit.
ANSWER 10.
FAR Clause 52.212-1 INSTRUCTION TO OFFERORS—COMMERCIAL ITEMS (JUNE 2020) is a standard clause and it cannot be editable. Paragraph 4) above, makes reference to a technical description of the items being offerred as general instructions which in this specific case, is not applicable to our solicitation W912PF21Q0015.
Please ignore it.
QUESTION 11.
Reference is made to Solicitation Instructions page 75 and 76 ADDENDUM TO 52.212-1
A. INSTRUCTIONS.
3.) Quotes shall not merely repeat to perform work in accordance with the Performance Work Statement (PWS).
The PWS reflects the objectives of the program; therefore, repeating the PWS without sufficient elaboration will not be accepted. Quoters that submit generic Quotes risk receiving unacceptable ratings.
Please clarify how the Offeror has to fulfil this requirement, which is not described nor mentioned in the Basis of
Award.
Where should it be placed within our proposal? Volume I/Volume II/Volume/III or Volume IV?
Please indicate the page limit.
ANSWER 11.
In reference to our solicitation W912PF21Q0015, Offeror is not required to fullfill this the requirement under
ADDENDUM TO FAR 52.212-1, Paragraph A. INSTRUCTIONS, Subparagraph 3. In accordance with Addendum to FAR 52.212-1, the Offeror must comply with the instructions provided for the mandatory documentation and the technical factors required with the solicitation, under each respective VOLUME, as listed.
End of RFI
Section SF 1449 - CONTINUATION SHEET
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Job Inspection & Testing
FFP
Inspection and Testing of Backflow Preventers at USAG Italy, Caserma Ederle, Villaggio della Pace, Longare, ASP#7, Lerino and Torri di Quartesolo sites, in accordance with Performance Work Statement (PWS), paragraph 5.2.1. and
Appendix C - Existing Backflow Prevention Devices.
FOB: Destination
PURCHASE REQUEST NUMBER: 0011610537
PSC CD: J045
NET AMT
0002 1 Job Inspection & Testing
FFP
Inspection and Testing of Backflow Preventers at USAG Italy, Del Din, in accordance with Performance Work Statement (PWS), paragraph 5.2.1. and
Appendix C - Existing Backflow Prevention Devices.
FOB: Destination
0003 1 Job Update inventory/log files
FFP
Update inventory/log files at USAG Italy, Caserma Ederle, Villaggio della Pace, Longare, ASP#7, Lerino and Torri di Quartesolo sites, in accordance with
Performance Work Statement (PWS), paragraph 5.2.3.
FOB: Destination
0004 1 Job Update inventory/log files
FFP
Update inventory/log files at USAG Italy, Del Din, in accordance with
Performance Work Statement (PWS), paragraph 5.2.3.
FOB: Destination
0005 1 Job Replacement of Backflow Preventers
FFP
Replacement of Backflow Preventers at USAG Italy, Caserma Ederle, Villaggio della Pace, Longare, ASP#7, Lerino and Torri di Quartesolo sites, in accordance with Performance Work Statement (PWS), paragrah 5.2.4.
NOTE TO QUOTERS: DO NOT QUOTE THIS CLIN. The amount of this CLIN will be provided at the time of contract award.
Replacement of Backflow Preventers is listed in Technical Exhibit C - Price List for Replacement Work.
The Contractor will be reimbursed for the actual replacement work performed under this CLIN.
FOB: Destination
0006 1 Job Replacement of Backflow Preventers
FFP
Replacement of Backflow Preventers at USAG Italy, Del Din, in accordance with
Performance Work Statement (PWS) paragraph 5.2.4.
Replacement of Backflow Preventers is listed in Technical Exhibit C - Price
List.for Replacement Work.
0007 1 Job Over and Above Work
FFP
Over and Above Work not contemplated in Technical Exhibit C - Price List for
Replacement Work, at USAG Italy Caserma Ederle, Villaggio della Pace, Longare, ASP#7, Lerino and Torri di Quartesolo sites, in accordance with Performance
Work Statement (PWS), paragraph 5.2.5.
The Contractor will be reimbursed for the actual over and above work performed under this CLIN, as approved by the Government.
PURCHASE REQUEST NUMBER: 0011610537-0002
0008 1 Job Over and Above Work
FFP
Over and Above Work not contemplated in Technical Exhibit C - Price List for
Replacement Work, at USAG Italy Del Din, in accordance with Performance Work
Statement (PWS), paragraph 5.2.5.
PURCHASE REQUEST NUMBER: 0011610537-0002
1001 1 Job OPTION Inspection & Testing
FFP
Inspection and Testing of Backflow Preventers at USAG Italy, Caserma Ederle, Villaggio della Pace, Longare, ASP#7, Lerino and Torri di Quartesolo sites, in accordance with Performance Work Statement (PWS), paragraph 5.2.1. and
Appendix C - Existing Backflow Prevention Devices.
1002 1 Job OPTION Inspection & Testing
FFP
Inspection and Testing of Backflow Preventers at USAG Italy, Del Din, in accordance with Performance Work Statement (PWS), paragraph 5.2.1. and
Appendix C - Existing Backflow Prevention Devices.
1003 1 Job OPTION Update inventory/log files
FFP
Update inventory/log files at USAG Italy, Caserma Ederle, Villaggio della Pace, Longare, ASP#7, Lerino and Torri di Quartesolo sites, in accordance with
Performance Work Statement (PWS), paragraph 5.2.3.
1004 1 Job OPTION Update inventory/log files
FFP
Update inventory/log files at USAG Italy, Del Din, in accordance with
Performance Work Statement (PWS), paragraph 5.2.3.
1005 1 Job OPTION Replacement of Backflow Preventers
FFP
Replacement of Backflow Preventers at USAG Italy, Caserma Ederle, Villaggio
1006 1 Job OPTION Replacement of Backflow Preventers
FFP
1007 1 Job OPTION Over and Above Work
FFP
Over and Above Work not contemplated in Technical Exhibit C - Price List for
Replacement Work, at USAG Italy Caserma Ederle, Villaggio della Pace, Longare, 1008 1 Job OPTION Over and Above Work
FFP
Over and Above Work not contemplated in Technical Exhibit C - Price List for
2001 1 Job OPTION Inspection & Testing
FFP
Inspection and Testing of Backflow Preventers at USAG Italy, Caserma Ederle, Villaggio della Pace, Longare, ASP#7, Lerino and Torri di Quartesolo sites, in accordance with Performance Work Statement (PWS), paragraph 5.2.1. and
Appendix C - Existing Backflow Prevention Devices.
2002 1 Job OPTION Inspection & Testing
FFP
Inspection and Testing of Backflow Preventers at USAG Italy, Del Din, in accordance with Performance Work Statement (PWS), paragraph 5.2.1. and
Appendix C - Existing Backflow Prevention Devices.
2003 1 Job OPTION Update inventory/log files
FFP
Update inventory/log files at USAG Italy, Caserma Ederle, Villaggio della Pace, Longare, ASP#7, Lerino and Torri di Quartesolo sites, in accordance with
Performance Work Statement (PWS), paragraph 5.2.3.
2004 1 Job OPTION Update inventory/log files
FFP
Update inventory/log files at USAG Italy, Del Din, in accordance with
Performance Work Statement (PWS), paragraph 5.2.3.
2005 1 Job OPTION Replacement of Backflow Preventers
FFP
Replacement of Backflow Preventers at USAG Italy, Caserma Ederle, Villaggio
2006 1 Job OPTION Replacement of Backflow Preventers
FFP
2007 1 Job OPTION Over and Above Work
FFP
Over and Above Work not contemplated in Technical Exhibit C - Price List for
Replacement Work, at USAG Italy Caserma Ederle, Villaggio della Pace, Longare, 2008 1 Job OPTION Over and Above Work
FFP
Over and Above Work not contemplated in Technical Exhibit C - Price List for
3001 1 Job OPTION Inspection & Testing
FFP
Inspection and Testing of Backflow Preventers at USAG Italy, Caserma Ederle, Villaggio della Pace, Longare, ASP#7, Lerino and Torri di Quartesolo sites, in accordance with Performance Work Statement (PWS), paragraph 5.2.1. and
Appendix C - Existing Backflow Prevention Devices.
3002 1 Job OPTION Inspection & Testing
FFP
Inspection and Testing of Backflow Preventers at USAG Italy, Del Din, in accordance with Performance Work Statement (PWS), paragraph 5.2.1. and
Appendix C - Existing Backflow Prevention Devices.
3003 1 Job OPTION Update inventory/log files
FFP
Update inventory/log files at USAG Italy, Caserma Ederle, Villaggio della Pace, Longare, ASP#7, Lerino and Torri di Quartesolo sites, in accordance with
Performance Work Statement (PWS), paragraph 5.2.3.
3004 1 Job OPTION Update inventory/log files
FFP
Update inventory/log files at USAG Italy, Del Din, in accordance with
Performance Work Statement (PWS), paragraph 5.2.3.
3005 1 Job OPTION Replacement of Backflow Preventers
FFP
Replacement of Backflow Preventers at USAG Italy, Caserma Ederle, Villaggio
3006 1 Job OPTION Replacement of Backflow Preventers
FFP
3007 1 Job OPTION Over and Above Work
FFP
Over and Above Work not contemplated in Technical Exhibit C - Price List for
Replacement Work, at USAG Italy Caserma Ederle, Villaggio della Pace, Longare, 3008 1 Job OPTION Over and Above Work
FFP
Over and Above Work not contemplated in Technical Exhibit C - Price List for
4001 1 Job OPTION Inspection & Testing
FFP
Inspection and Testing of Backflow Preventers at USAG Italy, Caserma Ederle, Villaggio della Pace, Longare, ASP#7, Lerino and Torri di Quartesolo sites, in accordance with Performance Work Statement (PWS), paragraph 5.2.1. and
Appendix C - Existing Backflow Prevention Devices.
4002 1 Job OPTION Inspection & Testing
FFP
Inspection and Testing of Backflow Preventers at USAG Italy, Del Din, in accordance with Performance Work Statement (PWS), paragraph 5.2.1. and
Appendix C - Existing Backflow Prevention Devices.
4003 1 Job OPTION Update inventory/log files
FFP
Update inventory/log files at USAG Italy, Caserma Ederle, Villaggio della Pace, Longare, ASP#7, Lerino and Torri di Quartesolo sites, in accordance with
Performance Work Statement (PWS), paragraph 5.2.3.
4004 1 Job OPTION Update inventory/log files
FFP
Update inventory/log files at USAG Italy, Del Din, in accordance with
Performance Work Statement (PWS), paragraph 5.2.3.
4005 1 Job OPTION Replacement of Backflow Preventers
FFP
Replacement of Backflow Preventers at USAG Italy, Caserma Ederle, Villaggio
4006 1 Job OPTION Replacement of Backflow Preventers
FFP
4007 1 Job OPTION Over and Above Work
FFP
Over and Above Work not contemplated in Technical Exhibit C - Price List for
Replacement Work, at USAG Italy Caserma Ederle, Villaggio della Pace, Longare, 4008 1 Job OPTION Over and Above Work
FFP
Over and Above Work not contemplated in Technical Exhibit C - Price List for
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
0001 Destination Government Destination Government
0002 Destination Government Destination Government
0003 Destination Government Destination Government
0004 Destination Government Destination Government
0005 Destination Government Destination Government
0006 Destination Government Destination Government
0007 Destination Government Destination Government
0008 Destination Government Destination Government
1001 Destination Government Destination Government
1002 Destination Government Destination Government
1003 Destination Government Destination Government
1004 Destination Government Destination Government
1005 Destination Government Destination Government
1006 Destination Government Destination Government
1007 Destination Government Destination Government
1008 Destination Government Destination Government
2001 Destination Government Destination Government
2002 Destination Government Destination Government
2003 Destination Government Destination Government
2004 Destination Government Destination Government
2005 Destination Government Destination Government
2006 Destination Government Destination Government
2007 Destination Government Destination Government
2008 Destination Government Destination Government
3001 Destination Government Destination Government
3002 Destination Government Destination Government
3003 Destination Government Destination Government
3004 Destination Government Destination Government
3005 Destination Government Destination Government
3006 Destination Government Destination Government
3007 Destination Government Destination Government
3008 Destination Government Destination Government
4001 Destination Government Destination Government
4002 Destination Government Destination Government
4003 Destination Government Destination Government
4004 Destination Government Destination Government
4005 Destination Government Destination Government
4006 Destination Government Destination Government
4007 Destination Government Destination Government
4008 Destination Government Destination Government
DELIVERY INFORMATION
CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
0001 POP 26-SEP-2021 TO
25-SEP-2022
N/A W582RR USAG VICENZA
W6E7 USAG ITALY
UNIT 31401
APO AE 09630
314-537-4325
W582RR
0002 POP 26-SEP-2021 TO
N/A (SAME AS PREVIOUS LOCATION)
0003 POP 26-SEP-2021 TO
N/A (SAME AS PREVIOUS LOCATION)
0004 POP 26-SEP-2021 TO
N/A (SAME AS PREVIOUS LOCATION)
0005 POP 26-SEP-2021 TO
N/A (SAME AS PREVIOUS LOCATION)
0006 POP 26-SEP-2021 TO
N/A (SAME AS PREVIOUS LOCATION)
0007 POP 26-SEP-2021 TO
N/A (SAME AS PREVIOUS LOCATION)
0008 POP 26-SEP-2021 TO
N/A (SAME AS PREVIOUS LOCATION)
1001 POP 26-SEP-2022 TO
25-SEP-2023
N/A (SAME AS PREVIOUS LOCATION)
1002 POP 26-SEP-2022 TO
N/A (SAME AS PREVIOUS LOCATION)
1003 POP 26-SEP-2022 TO
N/A (SAME AS PREVIOUS LOCATION)
1004 POP 26-SEP-2022 TO
N/A (SAME AS PREVIOUS LOCATION)
1005 POP 26-SEP-2022 TO
N/A (SAME AS PREVIOUS LOCATION)
1006 POP 26-SEP-2022 TO
N/A (SAME AS PREVIOUS LOCATION)
1007 POP 26-SEP-2022 TO
N/A (SAME AS PREVIOUS LOCATION)
1008 POP 26-SEP-2022 TO
N/A (SAME AS PREVIOUS LOCATION)
2001 POP 26-SEP-2023 TO
25-SEP-2024
N/A (SAME AS PREVIOUS LOCATION)
2002 POP 26-SEP-2023 TO
N/A (SAME AS PREVIOUS LOCATION)
2003 POP 26-SEP-2023 TO
N/A (SAME AS PREVIOUS LOCATION)
2004 POP 26-SEP-2023 TO
N/A (SAME AS PREVIOUS LOCATION)
2005 POP 26-SEP-2023 TO
N/A (SAME AS PREVIOUS LOCATION)
2006 POP 26-SEP-2023 TO
N/A (SAME AS PREVIOUS LOCATION)
2007 POP 26-SEP-2023 TO
N/A (SAME AS PREVIOUS LOCATION)
2008 POP 26-SEP-2023 TO
N/A (SAME AS PREVIOUS LOCATION)
3001 POP 26-SEP-2024 TO
25-SEP-2025
N/A (SAME AS PREVIOUS LOCATION)
3002 POP 26-SEP-2024 TO
N/A (SAME AS PREVIOUS LOCATION)
3003 POP 26-SEP-2024 TO
N/A (SAME AS PREVIOUS LOCATION)
3004 POP 26-SEP-2024 TO
N/A (SAME AS PREVIOUS LOCATION)
3005 POP 26-SEP-2024 TO
N/A (SAME AS PREVIOUS LOCATION)
3006 POP 26-SEP-2024 TO
N/A (SAME AS PREVIOUS LOCATION)
3007 POP 26-SEP-2024 TO
26-SEP-2025
N/A (SAME AS PREVIOUS LOCATION)
3008 POP 26-SEP-2024 TO
N/A (SAME AS PREVIOUS LOCATION)
4001 POP 26-SEP-2025 TO
25-SEP-2026
N/A (SAME AS PREVIOUS LOCATION)
4002 POP 26-SEP-2025 TO
N/A (SAME AS PREVIOUS LOCATION)
4003 POP 26-SEP-2025 TO
N/A (SAME AS PREVIOUS LOCATION)
4004 POP 26-SEP-2025 TO
N/A (SAME AS PREVIOUS LOCATION)
4005 POP 26-SEP-2025 TO
N/A (SAME AS PREVIOUS LOCATION)
4006 POP 26-SEP-2025 TO
N/A (SAME AS PREVIOUS LOCATION)
4007 POP 26-SEP-2025 TO
N/A (SAME AS PREVIOUS LOCATION)
4008 POP 26-SEP-2025 TO
N/A (SAME AS PREVIOUS LOCATION)
LIST OF ATTACHMENTS
- Attachment 1: Past Performance Questionnaire
- Attachment 2: Self-Certification for Antimafia Communication
- Attachment 3: Suitability of the Contractor
- Attachment 4: Appendix C – Existing Backflow Prevention Devices
- Attachment 5: Samples of Photo Log
- Attachment 6: Sample Deficiencies List
- Attachment 7: Example Waterproof Tag
- Technical Exhibit A: Performance Requirement Summary
- Technical Exhibit B: Deliverables Schedule
- Technical Exhibit C: Price List for Replacement Work (to be filled out and returned by the quoter)
CLAUSES INCORPORATED BY REFERENCE
52.212-4 Contract Terms and Conditions--Commercial Items OCT 2018
ADDENDUM TO 52.212-4
tract
In accordance with FAR 12.302, Tailoring of Provisions and Clauses for Acquisition of Commercial Items, FAR 52.212-4 is tailored, as shown below, to reflect the special terms and conditions unique for this contract.
The following shall apply to this contract in addition to those terms and conditions in FAR 52.212-4. The specific paragraph of FAR 52.212-4 is tailored as shown below:
Inspection and Acceptance.
Inspection and acceptance of services under this contract shall be performed by the COR (Contracting Officer’s
Representative). Place of inspection and point of acceptance of the services to be provided under this contract shall be at a destination specified in accordance with the delivery information specified above.
Invoice:
The contractor shall comply with WAWF DFARS Clause 252.232-7006 for submission of invoices. No paper invoices shall be submitted to the Contracting Office for approval. Invoices shall only be submitted through the
WAWF electronic system.
The contractor shall:
Upload the paper version of the invoice in WAWF
Upload a valid DURC certificate in WAWF
Upload the following statement signed in WAWF:
“The amounts requested are only for performance in accordance with the terms and conditions of the contract. All payment due to employees, subcontractors, and suppliers from previous payments received under the contract have been made, and timely payments will be made from the proceeds of the payment covered by this certification, in accordance with terms and conditions of the contract, local labor laws and agreements, subcontract agreements, and the requirements of chapter 39 of Title 31, United States Code.”
Contractor: by
PARTIAL PAYMENTS ARE AUTHORIZED. Only the actual services rendered in accordance with the Performance
Work Statement will be paid.
END OF ADDENDUM
CLAUSES INCORPORATED BY FULL TEXT
52.212-5 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT STATUTES OR
EXECUTIVE ORDERS--COMMERCIAL ITEMS (JAN 2021)
(a) The Contractor shall comply with the following Federal Acquisition Regulation (FAR) clauses, which are incorporated in this contract by reference, to implement provisions of law or Executive orders applicable to acquisitions of commercial items:
(1) 52.203-19, Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (JAN 2017)
(section 743 of Division E, Title VII, of the Consolidated and Further Continuing Appropriations Act, 2015 (Pub. L.
113-235) and its successor provisions in subsequent appropriations acts (and as extended in continuing resolutions)).
(2) 52.204-23, Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by
Kaspersky Lab and Other Covered Entities (Jul 2018) (Section 1634 of Pub. L. 115-91).
(3) 52.204-25, Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or
Equipment. (AUG 2020) (Section 889(a)(1)(A) of Pub. L. 115-232).
(4) 52.209-10, Prohibition on Contracting with Inverted Domestic Corporations (Nov 2015).
(5) 52.233-3, Protest After Award (AUG 1996) (31 U.S.C. 3553).
(6) 52.233-4, Applicable Law for Breach of Contract Claim (OCT 2004) (Public Laws 108-77 and 108-78 (19
U.S.C. 3805 note)).
(b) The Contractor shall comply with the FAR clauses in this paragraph (b) that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial items: (Contracting Officer check as appropriate.)
X (1) 52.203-6, Restrictions on Subcontractor Sales to the Government (JUN 2020), with Alternate I (Oct
1995) (41 U.S.C. 4704 and 10 U.S.C. 2402).
____ (2) 52.203-13, Contractor Code of Business Ethics and Conduct (JUN 2020) (41 U.S.C. 3509).
____ (3) 52.203-15, Whistleblower Protections under the American Recovery and Reinvestment Act of 2009 (JUN
2010) (Section 1553 of Pub. L. 111-5). (Applies to contracts funded by the American Recovery and Reinvestment
Act of 2009.)
X (4) 52.204-10, Reporting Executive Compensation and First-Tier Subcontract Awards (JUN 2020) (Pub.
L. 109-282) (31 U.S.C. 6101 note).
___ (5) [Reserved]
___ (6) 52.204-14, Service Contract Reporting Requirements (Oct 2016) (Pub. L. 111-117, section 743 of Div.
C).
___ (7) 52.204-15, Service Contract Reporting Requirements for Indefinite-Delivery Contracts (Oct 2016) (Pub.
L. 111-117, section 743 of Div. C).
X (8) 52.209-6, Protecting the Government's Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment. (JUN 2020) (31 U.S.C. 6101 note).
____ (9) 52.209-9, Updates of Publicly Available Information Regarding Responsibility Matters (OCT 2018) (41
U.S.C. 2313).
____ (10) [Reserved]
____ (11)(i) 52.219-3, Notice of HUBZone Set-Aside or Sole-Source Award (MAR 2020) (15 U.S.C. 657a).
____ (ii) Alternate I (MAR 2020) of 52.219-3.
____ (12) (i) 52.219-4, Notice of Price Evaluation Preference for HUBZone Small Business Concerns (MAR 2020)
(if the offeror elects to waive the preference, it shall so indicate in its offer) (15 U.S.C. 657a).
____ (ii) Alternate I (MAR 2020) of 52.219-4.
____ (13) [Reserved]
____ (14)(i) 52.219-6, Notice of Total Small Business Set-Aside (NOV 2020) (15 U.S.C. 644).
____ (ii) Alternate I (MAR 2020) of 52.219-6.
____ (15)(i) 52.219-7, Notice of Partial Small Business Set-Aside (NOV 2020) (15 U.S.C. 644).
____ (ii) Alternate I (MAR 2020) of 52.219-7.
____ (16) 52.219-8, Utilization of Small Business Concerns (OCT 2018) (15 U.S.C. 637(d)(2) and (3)).
____ (17)(i) 52.219-9, Small Business Subcontracting Plan (JUN 2020) (15 U.S.C. 637(d)(4)).
____ (ii) Alternate I (NOV 2016) of 52.219-9.
____ (iii) Alternate II (NOV 2016) of 52.219-9.
____ (iv) Alternate III (JUN 2020) of 52.219-9.
____ (v) Alternate IV (JUN 2020) of 52.219-9.
____ (18) (i) 52.219-13, Notice of Set-Aside of Orders (MAR 2020) (15 U.S.C. 644(r)).
____ (ii) Alternate I (MAR 2020) of 52.219-13.
____ (19) 52.219-14, Limitations on Subcontracting (MAR 2020) (15 U.S.C. 637(a)(14)).
____ (20) 52.219-16, Liquidated Damages—Subcontracting Plan (Jan 1999) (15 U.S.C. 637(d)(4)(F)(i)).
____ (21) 52.219-27, Notice of Service-Disabled Veteran-Owned Small Business Set-Aside (MAR 2020) (15
U.S.C. 657f).
____ (22) (i) 52.219-28, Post Award Small Business Program Rerepresentation (NOV 2020) (15 U.S.C. 632(a)(2)).
____ (ii) Alternate I (MAR 2020) of 52.219-28.
____ (23) 52.219-29, Notice of Set-Aside for, or Sole Source Award to, Economically Disadvantaged Women-
Owned Small Business (EDWOSB) Concerns (MAR 2020) (15 U.S.C. 637(m)).
____ (24) 52.219-30, Notice of Set-Aside for, or Sole Source Award to, Women-Owned Small Business Concerns
Eligible Under the Women-Owned Small Business Program (MAR 2020) (15 U.S.C. 637(m)).
____ (25) 52.219-32, Orders Issued Directly Under Small Business Reserves (MAR 2020) (15 U.S.C. 644(r)).
____ (26) 52.219-33, Nonmanufacturer Rule (MAR 2020) (15 U.S.C. 637(a)(17)).
____ (27) 52.222-3, Convict Labor (JUN 2003) (E.O. 11755).
____(28) 52.222-19, Child Labor--Cooperation with Authorities and Remedies (JAN 2020) (E.O. 13126).
____ (29) 52.222-21, Prohibition of Segregated Facilities (APR 2015).
____ (30)(i) 52.222-26, Equal Opportunity (SEPT 2016) (E.O. 11246).
____ (ii) Alternate I (FEB 1999) of 52.222-26.
____ (31)(i) 52.222-35, Equal Opportunity for Veterans (JUN 2020) (38 U.S.C. 4212).
____ (ii) Alternate I (JUL 2014) of 52.222-35.
____ (32)(i) 52.222-36, Equal Opportunity for Workers with Disabilities (JUN 2020) (29 U.S.C. 793).
____ (ii) Alternate I (JUL 2014) of 52.222-36.
____ (33) 52.222-37, Employment Reports on Veterans (JUN 2020) (38 U.S.C. 4212).
____ (34) 52.222-40, Notification of Employee Rights Under the National Labor Relations Act (DEC 2010) (E.O.
13496).
X (35)(i) 52.222-50, Combating Trafficking in Persons (OCT 2020) (22 U.S.C. chapter 78 and E.O. 13627).
____ (ii) Alternate I (MAR 2015) of 52.222-50 (22 U.S.C. chapter 78 and E.O. 13627).
____ (36) 52.222-54, Employment Eligibility Verification (OCT 2015). (E. O. 12989). (Not applicable to the acquisition of commercially available off-the-shelf items or certain other types of commercial items as prescribed in
22.1803.)
____ (37)(i) 52.223-9, Estimate of Percentage of Recovered Material Content for EPA–Designated Items (MAY
2008) (42 U.S.C. 6962(c)(3)(A)(ii)). (Not applicable to the acquisition of commercially available off-the-shelf items.)
____ (ii) Alternate I (MAY 2008) of 52.223-9 (42 U.S.C. 6962(i)(2)(C)). (Not applicable to the acquisition of commercially available off-the-shelf items.)
____ (38) 52.223-11, Ozone-Depleting Substances and High Global Warming Potential Hydrofluorocarbons (JUN
2016) (E.O. 13693).
____ (39) 52.223-12, Maintenance, Service, Repair, or Disposal of Refrigeration Equipment and Air Conditioners
(JUN 2016) (E.O. 13693).
____ (40) (i) 52.223-13, Acquisition of EPEAT® Registered Imaging Equipment (JUN 2014) (E.O.s 13423 and
13514).
____ (ii) Alternate I (OCT 2015) of 52.223-13.
____ (41)(i) 52.223-14, Acquisition of EPEAT® Registered Televisions (JUN 2014) (E.O.s 13423 and 13514).
____ (ii) Alternate I (JUN 2014) of 52.223-14.
____ (42) 52.223-15, Energy Efficiency in Energy-Consuming Products (MAY 2020) (42 U.S.C. 8259b).
____ (43)(i) 52.223-16, Acquisition of EPEAT®-Registered Personal Computer Products (OCT 2015) (E.O.s
13423 and 13514).
____ (ii) Alternate I (JUN 2014) of 52.223-16.
X (44) 52.223-18, Encouraging Contractor Policies to Ban Text Messaging While Driving (JUN 2020) (E.O.
13513).
____ (45) 52.223-20, Aerosols (JUN 2016) (E.O. 13693).
____ (46) 52.223-21, Foams (JUN 2016) (E.O. 13693).
____ (47)(i) 52.224-3, Privacy Training (JAN 2017) (5 U.S.C. 552a).
____ (ii) Alternate I (JAN 2017) of 52.224-3.
____ (48) 52.225-1, Buy American--Supplies (JAN 2021) (41 U.S.C. chapter 83).
____ (49) (i) 52.225-3, Buy American--Free Trade Agreements--Israeli Trade Act (JAN 2021) (41 U.S.C. chapter
83, 19 U.S.C. 3301 note, 19 U.S.C. 2112 note, 19 U.S.C. 3805 note, 19 U.S.C. 4001 note, Pub. L. 103-182, 108-77, 108-78, 108-286, 108-302, 109-53, 109-169, 109-283, 110-138, 112-41, 112-42, and 112-43.
____ (ii) Alternate I (JAN 2021) of 52.225-3.
____ (iii) Alternate II (JAN 2021) of 52.225-3.
____ (iv) Alternate III (JAN 2021) of 52.225-3.
____ (50) 52.225-5, Trade Agreements (OCT 2019) 19 U.S.C. 2501, et seq., 19 U.S.C. 3301 note).
X (51) 52.225-13, Restrictions on Certain Foreign Purchases (JUN 2008) (E.O.'s, proclamations, and statutes administered by the Office of Foreign Assets Control of the Department of the Treasury).
____ (52) 52.225-26, Contractors Performing Private Security Functions Outside the United States (OCT 2016)
(Section 862, as amended, of the National Defense Authorization Act for Fiscal Year 2008; 10 U.S.C. 2302 Note).
____ (53) 52.226-4, Notice of Disaster or Emergency Area Set-Aside (NOV 2007) (42 U.S.C. 5150
____ (54) 52.226-5, Restrictions on Subcontracting Outside Disaster or Emergency Area (NOV 2007) (42 U.S.C.
5150).
____ (55) 52.229-12, Tax on Certain Foreign Procurements (JUN 2020).
____ (56) 52.232-29, Terms for Financing of Purchases of Commercial Items (FEB 2002) (41 U.S.C. 4505, 10
U.S.C. 2307(f)).
____ (57) 52.232-30, Installment Payments for Commercial Items (JAN 2017) (41 U.S.C. 4505, 10 U.S.C. 2307(f)).
X (58) 52.232-33, Payment by Electronic Funds Transfer—System for Award Management (OCT 2018) (31
U.S.C. 3332).
____ (59) 52.232-34, Payment by Electronic Funds Transfer—Other than System for Award Management (JUL
2013) (31 U.S.C. 3332).
____ (60) 52.232-36, Payment by Third Party (MAY 2014) (31 U.S.C. 3332).
____ (61) 52.239-1, Privacy or Security Safeguards (AUG 1996) (5 U.S.C. 552a).
____ (62) 52.242-5, Payments to Small Business Subcontractors (JAN 2017)(15 U.S.C. 637(d)(13)).
____ (63)(i) 52.247-64, Preference for Privately Owned U.S.-Flag Commercial Vessels (FEB 2006) (46 U.S.C.
Appx. 1241(b) and 10 U.S.C. 2631).
____ (ii) Alternate I (APR 2003) of 52.247-64.
____ (iii) Alternate II (FEB 2006) of 52.247-64.
(c) The Contractor shall comply with the FAR clauses in this paragraph (c), applicable to commercial services, that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial items: (Contracting Officer check as appropriate.)
_____ (1) 52.222-41, Service Contract Labor Standards (AUG 2018) (41 U.S.C. chapter 67).
_____ (2) 52.222-42, Statement of Equivalent Rates for Federal Hires (MAY 2014) (29 U.S.C. 206 and 41 U.S.C.
chapter 67).
_____ (3) 52.222-43, Fair Labor Standards Act and Service Contract Labor Standards--Price Adjustment (Multiple
Year and Option Contracts) (AUG 2018) (29 U.S.C. 206 and 41 U.S.C. chapter 67).
_____ (4) 52.222-44, Fair Labor Standards Act and Service Contract Labor Standards--Price Adjustment (MAY
2014) (29 U.S.C 206 and 41 U.S.C. chapter 67).
_____ (5) 52.222-51, Exemption from Application of the Service Contract Labor Standards to Contracts for
Maintenance, Calibration, or Repair of Certain Equipment--Requirements (MAY 2014) (41 U.S.C. chapter 67).
_____ (6) 52.222-53, Exemption from Application of the Service Contract Labor Standards to Contracts for Certain
Services--Requirements (MAY 2014) (41 U.S.C. chapter 67).
_____ (7) 52.222-55, Minimum Wages Under Executive Order 13658 (NOV 2020) (E.O. 13658).
_____ (8) 52.222-62, Paid Sick Leave Under Executive Order 13706 (JAN 2017) (E.O. 13706).
_____ (9) 52.226-6, Promoting Excess Food Donation to Nonprofit Organizations (JUN 2020) (42 U.S.C. 1792).
(d) Comptroller General Examination of Record. The Contractor shall comply with the provisions of this paragraph
(d) if this contract was awarded using other than sealed bid, is in excess of the simplified acquisition threshold, as defined in FAR 2.101, on the date of award of this contract, and does not contain the clause at 52.215-2, Audit and
Records--Negotiation.
(1) The Comptroller General of the United States, or an authorized representative of the Comptroller General, shall have access to and right to examine any of the Contractor's directly pertinent records involving transactions related to this contract.
(2) The Contractor shall make available at its offices at all reasonable times the records, materials, and other evidence for examination, audit, or reproduction, until 3 years after final payment under this contract or for any shorter period specified in FAR Subpart 4.7, Contractor Records Retention, of the other clauses of this contract. If this contract is completely or partially terminated, the records relating to the work terminated shall be made available for 3 years after any resulting final termination settlement. Records relating to appeals under the disputes clause or to litigation or the settlement of claims arising under or relating to this contract shall be made available until such appeals, litigation, or claims are finally resolved.
(3) As used in this clause, records include books, documents, accounting procedures and practices, and other data, regardless of type and regardless of form. This does not require the Contractor to create or maintain any record that the Contractor does not maintain in the ordinary course of business or pursuant to a provision of law.
(e) (1) Notwithstanding the requirements of the clauses in paragraphs (a), (b), (c), and (d) of this clause, the
Contractor is not required to flow down any FAR clause, other than those in this paragraph (e)(1)in a subcontract for commercial items. Unless otherwise indicated below, the extent of the flow down shall be as required by the clause—
(i) 52.203-13, Contractor Code of Business Ethics and Conduct (JUN 2020) (41 U.S.C. 3509).
(ii) 52.203-19, Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (JAN 2017)
(section 743 of Division E, Title VII, of the Consolidated and Further Continuing Appropriations Act, 2015 (Pub. L.
113-235) and its successor provisions in subsequent appropriations acts (and as extended in continuing resolutions)).
(iii) 52.204-23, Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by
Kaspersky Lab and Other Covered Entities (Jul 2018) (Section 1634 of Pub. L. 115-91).
(iv) 52.204-25, Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or
Equipment. (AUG 2020) (Section 889(a)(1)(A) of Pub. L. 115-232).
(v) 52.219-8, Utilization of Small Business Concerns (Oct 2018) (15 U.S.C. 637(d)(2) and (3)), in all subcontracts that offer further subcontracting opportunities. If the subcontract (except subcontracts to small business concerns) exceeds the applicable threshold specified in FAR 19.702(a) on the date of subcontract award, the subcontractor must include 52.219-8 in lower tier subcontracts that offer subcontracting opportunities.
(vi) 52.222-21, Prohibition of Segregated Facilities (Apr 2015).
(vii) 52.222-26, Equal Opportunity (Sep 2016) (E.O. 11246).
(viii) 52.222-35, Equal Opportunity for Veterans (JUN 2020) (38 U.S.C. 4212).
(ix) 52.222-36, Equal Opportunity for Workers with Disabilities (JUN 2020) (29 U.S.C. 793).
(x) 52.222-37, Employment Reports on Veterans (JUN 2020) (38 U.S.C. 4212).
(xi) 52.222-40, Notification of Employee Rights Under the National Labor Relations Act (Dec 2010) (E.O. 13496).
Flow down required in accordance with paragraph (f) of FAR clause 52.222-40.
(xii) 52.222-41, Service Contract Labor Standards (Aug 2018), (41 U.S.C. chapter 67).
(xiii) X (A) 52.222-50, Combating Trafficking in Persons (OCT 2020) (22 U.S.C. chapter 78 and E.O. 13627).
_____ (B) Alternate I (March 2, 2015) of 52.222-50 (22 U.S.C. chapter 78 and E.O. 13627).
(xiv) 52.222-51, Exemption from Application of the Service Contract Labor Standards to Contracts for
Maintenance, Calibration, or Repair of Certain Equipment--Requirements (May 2014) (41 U.S.C. chapter 67.)
(xv) 52.222-53, Exemption from Application of the Service Contract Labor Standards to Contracts for Certain
Services--Requirements (May 2014) (41 U.S.C. chapter 67)
(xvi) 52.222-54, Employment Eligibility Verification (Oct 2015) (E. O. 12989).
(xvii) 52.222-55, Minimum Wages Under Executive Order 13658 (NOV 2020) (E.O. 13658).
(xviii) 52.222-62, Paid Sick Leave Under Executive Order 13706 (Jan 2017) (E.O. 13706).
(xix) (A) 52.224-3, Privacy Training (Jan 2017) (5 U.S.C. 552a).
(B) Alternate I (Jan 2017) of 52.224-3.
(xx) 52.225-26, Contractors Performing Private Security Functions Outside the United States (Oct 2016) (Section
862, as amended, of the National Defense Authorization Act for Fiscal Year 2008; 10 U.S.C. 2302 Note).
(xxi) 52.226-6, Promoting Excess Food Donation to Nonprofit Organizations. (JUN 2020) (42 U.S.C. 1792). Flow down required in accordance with paragraph (e) of FAR clause 52.226-6.
(xxii) 52.247-64, Preference for Privately-Owned U.S. Flag Commercial Vessels (Feb 2006) (46 U.S.C. Appx
1241(b) and 10 U.S.C. 2631). Flow down required in accordance with paragraph (d) of FAR clause 52.247-64.
(2) While not required, the Contractor may include in its subcontracts for commercial items a minimal number of additional clauses necessary to satisfy its contractual obligations.
(End of clause)
CLAUSES INCORPORATED BY REFERENCE
52.203-3 Gratuities APR 1984
52.203-12 Limitation On Payments To Influence Certain Federal
Transactions
JUN 2020
52.203-17 Contractor Employee Whistleblower Rights and Requirement
To Inform Employees of Whistleblower Rights
JUN 2020
52.204-4 Printed or Copied Double-Sided on Postconsumer Fiber
Content Paper
MAY 2011
52.204-9 Personal Identity Verification of Contractor Personnel JAN 2011
52.204-13 System for Award Management Maintenance OCT 2018
52.204-18 Commercial and Government Entity Code Maintenance AUG 2020
52.204-22 Alternative Line Item Proposal JAN 2017
52.223-5 Pollution Prevention and Right-to-Know Information MAY 2011
52.225-25 Prohibition on Contracting with Entities Engaging in Certain
Activities or Transactions Relating to Iran-- Representation and Certifications.
JUN 2020
52.228-3 Worker's Compensation Insurance (Defense Base Act) JUL 2014
52.228-4 Workers' Compensation and War-Hazard Insurance Overseas APR 1984
52.229-6 Taxes--Foreign Fixed-Price Contracts FEB 2013
52.232-8 Discounts For Prompt Payment FEB 2002
52.232-39 Unenforceability of Unauthorized Obligations JUN 2013
52.232-40 Providing Accelerated Payments to Small Business
Subcontractors
DEC 2013
https://www.acquisition.gov/content/part-52-solicitation-provisions-and-contract-clauses#i52_222_62 https://www.acquisition.gov/content/part-52-solicitation-provisions-and-contract-clauses#i52_224_3 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/content/part-52-solicitation-provisions-and-contract-clauses#i52_224_3
52.237-2 Protection Of Government Buildings, Equipment, And
Vegetation
APR 1984
52.237-3 Continuity Of Services JAN 1991
52.242-13 Bankruptcy JUL 1995
52.246-4 Inspection Of Services--Fixed Price AUG 1996
252.203-7000 Requirements Relating to Compensation of Former DoD
Officials
SEP 2011
252.203-7002 Requirement to Inform Employees of Whistleblower Rights SEP 2013
252.203-7003 Agency Office of the Inspector General AUG 2019
252.204-7003 Control Of Government Personnel Work Product APR 1992
252.204-7004 Antiterrorism Awareness Training for Contractors. FEB 2019
252.204-7012 Safeguarding Covered Defense Information and Cyber
Incident Reporting
DEC 2019
252.204-7015 Notice of Authorized Disclosure of Information for Litigation
Support
MAY 2016
252.223-7006 Prohibition On Storage, Treatment, and Disposal of Toxic or
Hazardous Materials
SEP 2014
252.223-7008 Prohibition of Hexavalent Chromium JUN 2013
252.225-7012 Preference For Certain Domestic Commodities DEC 2017
252.225-7048 Export-Controlled Items JUN 2013
252.232-7003 Electronic Submission of Payment Requests and Receiving
Reports
DEC 2018
252.232-7010 Levies on Contract Payments DEC 2006
252.237-7010 Prohibition on Interrogation of Detainees by Contractor
Personnel
JUN 2013
252.244-7000 Subcontracts for Commercial Items JAN 2021
252.247-7023 Transportation of Supplies by Sea FEB 2019
CLAUSES INCORPORATED BY FULL TEXT
52.204-25 PROHIBITION ON CONTRACTING FOR CERTAIN TELECOMMUNICATIONS AND VIDEO
SURVEILLANCE SERVICES OR EQUIPMENT (AUG 2020)
(a) Definitions. As used in this clause--
Backhaul means intermediate links between the core network, or backbone network, and the small subnetworks at the edge of the network (e.g., connecting cell phones/towers to the core telephone network). Backhaul can be wireless (e.g., microwave) or wired (e.g., fiber optic, coaxial cable, Ethernet).
Covered foreign country means The People's Republic of China.
Covered telecommunications equipment or services means--
(1) Telecommunications equipment produced by Huawei Technologies Company or ZTE Corporation (or any subsidiary or affiliate of such entities);
(2) For the purpose of public safety, security of Government facilities, physical security surveillance of critical infrastructure, and other national security purposes, video surveillance and telecommunications equipment produced by Hytera Communications Corporation, Hangzhou Hikvision Digital Technology Company, or Dahua Technology
Company (or any subsidiary or affiliate of such entities);
(3) Telecommunications or video surveillance services provided by such entities or using such equipment; or
(4) Telecommunications or video surveillance equipment or services produced or provided by an entity that the
Secretary of Defense, in consultation with the Director of National Intelligence or the Director of the Federal Bureau of Investigation, reasonably believes to be an entity owned or controlled by, or otherwise connected to, the government of a covered foreign country.
Critical technology means--
(1) Defense articles or defense services included on the United States Munitions List set forth in the International
Traffic in Arms Regulations under subchapter M of chapter I of title 22, Code of Federal Regulations;
(2) Items included on the Commerce Control List set forth in Supplement No. 1 to part 774 of the Export
Administration Regulations under subchapter C of chapter VII of title 15, Code of Federal Regulations, and controlled--
(i) Pursuant to multilateral regimes, including for reasons relating to national security, chemical and biological weapons proliferation, nuclear nonproliferation, or missile technology; or
(ii) For reasons relating to regional stability or surreptitious listening;
(3) Specially designed and prepared nuclear equipment, parts and components, materials, software, and technology covered by part 810 of title 10, Code of Federal Regulations (relating to assistance to foreign atomic energy activities);
(4) Nuclear facilities, equipment, and material covered by part 110 of title 10, Code of Federal Regulations (relating to export and import of nuclear equipment and material);
(5) Select agents and toxins covered by part 331 of title 7, Code of Federal Regulations, part 121 of title 9 of such
Code, or part 73 of title 42 of such Code; or
(6) Emerging and foundational technologies controlled pursuant to section 1758 of the Export Control Reform Act of 2018 (50 U.S.C. 4817).
Interconnection arrangements means arrangements governing the physical connection of two or more networks to allow the use of another's network to hand off traffic where it is ultimately delivered (e.g., connection of a customer of telephone provider A to a customer of telephone company B) or sharing data and other information resources.
Reasonable inquiry means an inquiry designed to uncover any information in the entity's possession about the identity of the producer or provider of covered telecommunications equipment or services used by the entity that excludes the need to include an internal or third-party audit.
Roaming means cellular communications services (e.g., voice, video, data) received from a visited network when unable to connect to the facilities of the home network either because signal coverage is too weak or because traffic is too high.
Substantial or essential component means any component necessary for the proper function or performance of a piece of equipment, system, or service.
(b) Prohibition.
(1) Section 889(a)(1)(A) of the John S. McCain National Defense Authorization Act for Fiscal Year 2019 (Pub. L.
115-232) prohibits the head of an executive agency on or after August 13, 2019, from procuring or obtaining, or extending or renewing a contract to procure or obtain, any equipment, system, or service that uses covered telecommunications equipment or services as a substantial or essential component of any system, or…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .