This document provides details for a federal contract opportunity to construct a softball field at Camp Darby in Italy. The project includes designing and building a standard co-ed slow-pitch softball field, including an optional lighting system and required irrigation system. The design phase will produce construction documents and last 135 calendar days, followed by a 150-day construction period or 180 days if lighting is included. The estimated value is between $250,000 and $500,000. Interested parties must email notice by March 4th to the point of contact provided to attend an optional site visit on April 7th. The solicitation is expected to be posted on SAM.gov in coming weeks. Offerors must have DUNS, NCAGE, and SAM registrations to be eligible for award.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FENCE

ARRESTOR CABLE

LANDING PAD

HELICOPTER

PANEL SC8

ELECTRIC

PANEL SC7

ELECTRIC

PANEL SC6

ELECTRIC

PANEL SC3

ELECTRIC

PANEL SC4

ELECTRIC

PANEL SC5

ELECTRIC

CONTAINER

PREFABRICATED

POLE

WIND INDICATOR

POLE

STREET LIGHTING

POLE

STREET LIGHTING

POLE

STREET LIGHTING

BLDG 118

ELECTRICAL SUBSTATION

POLE

STREET LIGHTING

POLE

STREET LIGHTING

POLE

STREET LIGHTING

POLE

STREET LIGHTING

LIGHTING POLES

RUNNING TRACK

LIGHTING POLES

RUNNING TRACK

ELECTRIC CABLE DUCT

1 2 3 4 5 6 7 10 11 12 13 14 15 168 9

1 2 3 4 5 6 7 10 11 12 13 14 15 168 9

B

A

C

D

E

F

G

H

L

M

N

P

B

A

C

D

E

F

G

H

L

M

N

P

SYMBOL DESCRIPTION OF REVISION

C

DIRECTORATE OF PUBLIC WORKS

U.S. Army Garrison Italy DMC, APO AE 09613

DRAWN DATE APPR

DRAWN BY

PROJECT NUMBER DATE SHEET OF

1 1

SCALE

1 : 500

ENGINEERED BY CHECKED BY

ISO A1

G. LUCETTI

CONSTRUCT SOFTBALL FIELD, CAMP DARBY

ED 00165-7 03 FEBRUARY 2020

CAMPO DA SOFTBALL - PIANTA DELL'AREA

SOFTBALL FIELD - PLAN OF THE AREA

SUBSTATION 118

TO ELECTRIC

ELECTRIC MANHOLE

PANEL DP

FAUCET

WATER

FAUCET

WATER

GYM SET

POLE

TELEPHONE

G. LUCETTI G. LUCETTI

AROUND THE TRACK

TO LIGHTING POLES

AROUND THE TRACK

TO LIGHTING POLES

ALONG THE STREET

TO LIGHTING POLES

FENCE

FENCE

ARRESTOR CABLE

ELECTRIC LINE DIRECTLY BURIED

SUBSTATION 118

TO ELECTRIC

POTABLE/INDUSTRIAL WATER MANHOLE

POLIETHYLENE PIPE INDUSTRIAL WATER DIA. 160mm

NOTE:

KESSLER AVENUE

FOR THE NEW IRRIGATION SYSTEM.

WITHOUT ANY MANHOLE; THIS PIPE SHALL BE USED AS CONNECTION POINT

TERMINATED DIRECTLY BURIED ON THE SIDE OF THE RUNNING TRACK

THE INDUSTRIAL WATER PIPE DIA. 160mm CROSSING KESSLER AVENUE IS

I3MP COMMUNICATION MANHOLE

TELEPHONE MANHOLE

TELEPHONE LINE DIRECTLY BURIED

TOILETS

N

0 10 20 30 40 50 m

TELEPHONE CABLE DUCT

File details come from the government source that posted it. Updated .