CONSTRUCT SOFTBALL FIELD DARBY SOUTH, DARBY MILITARY COMMUNITY, ITALY
Solicitation number
W912PF-20-R-0003
Issued by

About this file

This document provides details for a federal construction contract opportunity for the U.S. Army Corps of Engineers. The project involves designing and building a softball field at Camp Darby in Livorno, Italy, including lighting and irrigation systems. Interested parties must express interest by March 4, 2020 to the specified Army email address. A mandatory site visit will be held on April 7, 2020.

The design-build project has two phases. Phase 1 requires designing the softball field, lighting, and irrigation to applicable Italian and U.S. codes. Supporting documents include area plans and layouts, as well as geotechnical and electrical reports. Phase 2 consists of construction according to the approved design over 150 days, or 180 days if optional lighting is included. The total estimated value is between $250,000 and $500,000. The contract type will be firm-fixed-price awarded to the best value proposal. The performance period for design and construction is 285 days or 315 days respectively.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FENCE

ARRESTOR CABLE

LANDING PAD

HELICOPTER

PANEL SC8

ELECTRIC

PANEL SC7

ELECTRIC

PANEL SC6

ELECTRIC

PANEL SC3

ELECTRIC

PANEL SC4

ELECTRIC

PANEL SC5

ELECTRIC

CONTAINER

PREFABRICATED

POLE

WIND INDICATOR

POLE

STREET LIGHTING

POLE

STREET LIGHTING

POLE

STREET LIGHTING

BLDG 118

ELECTRICAL SUBSTATION

POLE

STREET LIGHTING

POLE

STREET LIGHTING

POLE

STREET LIGHTING

POLE

STREET LIGHTING

LIGHTING POLES

RUNNING TRACK

LIGHTING POLES

RUNNING TRACK

ELECTRIC CABLE DUCT

1 2 3 4 5 6 7 10 11 12 13 14 15 168 9

1 2 3 4 5 6 7 10 11 12 13 14 15 168 9

B

A

C

D

E

F

G

H

L

M

N

P

B

A

C

D

E

F

G

H

L

M

N

P

SYMBOL DESCRIPTION OF REVISION

C

DIRECTORATE OF PUBLIC WORKS

U.S. Army Garrison Italy DMC, APO AE 09613

DRAWN DATE APPR

DRAWN BY

PROJECT NUMBER DATE SHEET OF

1 1

SCALE

1 : 500

ENGINEERED BY CHECKED BY

ISO A1

G. LUCETTI

CONSTRUCT SOFTBALL FIELD, CAMP DARBY

ED 00165-7

CAMPO DA SOFTBALL - PIANTA DELL'AREA

SOFTBALL FIELD - PLAN OF THE AREA

SUBSTATION 118

TO ELECTRIC

ELECTRIC MANHOLE

PANEL DP

FAUCET

WATER

FAUCET

WATER

GYM SET

POLE

TELEPHONE

G. LUCETTI G. LUCETTI

AROUND THE TRACK

TO LIGHTING POLES

AROUND THE TRACK

TO LIGHTING POLES

ALONG THE STREET

TO LIGHTING POLES

FENCE

FENCE

ARRESTOR CABLE

ELECTRIC LINE DIRECTLY BURIED

SUBSTATION 118

TO ELECTRIC

POTABLE/INDUSTRIAL WATER MANHOLE

POLIETHYLENE PIPE INDUSTRIAL WATER DIA. 160mm

NOTE:

KESSLER AVENUE

FOR THE NEW IRRIGATION SYSTEM.

WITHOUT ANY MANHOLE; THIS PIPE SHALL BE USED AS CONNECTION POINT

TERMINATED DIRECTLY BURIED ON THE SIDE OF THE RUNNING TRACK

THE INDUSTRIAL WATER PIPE DIA. 160mm CROSSING KESSLER AVENUE IS

I3MP COMMUNICATION MANHOLE

TELEPHONE MANHOLE

TELEPHONE LINE DIRECTLY BURIED

TOILETS

N

0 10 20 30 40 50 m

TELEPHONE CABLE DUCT

10 JULY 2020

File details come from the government source that posted it. Updated .