A07-Attachment11Drawing_W912PF20R00030001.pdf
PDF 4 MB Posted
- Solicitation number
- W912PF-20-R-0003
About this file
This document provides details for a federal construction contract opportunity for the U.S. Army Corps of Engineers. The project involves designing and building a softball field at Camp Darby in Livorno, Italy, including lighting and irrigation systems. Interested parties must express interest by March 4, 2020 to the specified Army email address. A mandatory site visit will be held on April 7, 2020.
The design-build project has two phases. Phase 1 requires designing the softball field, lighting, and irrigation to applicable Italian and U.S. codes. Supporting documents include area plans and layouts, as well as geotechnical and electrical reports. Phase 2 consists of construction according to the approved design over 150 days, or 180 days if optional lighting is included. The total estimated value is between $250,000 and $500,000. The contract type will be firm-fixed-price awarded to the best value proposal. The performance period for design and construction is 285 days or 315 days respectively.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FENCE
ARRESTOR CABLE
LANDING PAD
HELICOPTER
PANEL SC8
ELECTRIC
PANEL SC7
ELECTRIC
PANEL SC6
ELECTRIC
PANEL SC3
ELECTRIC
PANEL SC4
ELECTRIC
PANEL SC5
ELECTRIC
CONTAINER
PREFABRICATED
POLE
WIND INDICATOR
POLE
STREET LIGHTING
POLE
STREET LIGHTING
POLE
STREET LIGHTING
BLDG 118
ELECTRICAL SUBSTATION
POLE
STREET LIGHTING
POLE
STREET LIGHTING
POLE
STREET LIGHTING
POLE
STREET LIGHTING
LIGHTING POLES
RUNNING TRACK
LIGHTING POLES
RUNNING TRACK
ELECTRIC CABLE DUCT
1 2 3 4 5 6 7 10 11 12 13 14 15 168 9
1 2 3 4 5 6 7 10 11 12 13 14 15 168 9
B
A
C
D
E
F
G
H
L
M
N
P
B
A
C
D
E
F
G
H
L
M
N
P
SYMBOL DESCRIPTION OF REVISION
C
DIRECTORATE OF PUBLIC WORKS
U.S. Army Garrison Italy DMC, APO AE 09613
DRAWN DATE APPR
DRAWN BY
PROJECT NUMBER DATE SHEET OF
1 1
SCALE
1 : 500
ENGINEERED BY CHECKED BY
ISO A1
G. LUCETTI
CONSTRUCT SOFTBALL FIELD, CAMP DARBY
ED 00165-7
CAMPO DA SOFTBALL - PIANTA DELL'AREA
SOFTBALL FIELD - PLAN OF THE AREA
SUBSTATION 118
TO ELECTRIC
ELECTRIC MANHOLE
PANEL DP
FAUCET
WATER
FAUCET
WATER
GYM SET
POLE
TELEPHONE
G. LUCETTI G. LUCETTI
AROUND THE TRACK
TO LIGHTING POLES
AROUND THE TRACK
TO LIGHTING POLES
ALONG THE STREET
TO LIGHTING POLES
FENCE
FENCE
ARRESTOR CABLE
ELECTRIC LINE DIRECTLY BURIED
SUBSTATION 118
TO ELECTRIC
POTABLE/INDUSTRIAL WATER MANHOLE
POLIETHYLENE PIPE INDUSTRIAL WATER DIA. 160mm
NOTE:
KESSLER AVENUE
FOR THE NEW IRRIGATION SYSTEM.
WITHOUT ANY MANHOLE; THIS PIPE SHALL BE USED AS CONNECTION POINT
TERMINATED DIRECTLY BURIED ON THE SIDE OF THE RUNNING TRACK
THE INDUSTRIAL WATER PIPE DIA. 160mm CROSSING KESSLER AVENUE IS
I3MP COMMUNICATION MANHOLE
TELEPHONE MANHOLE
TELEPHONE LINE DIRECTLY BURIED
TOILETS
N
0 10 20 30 40 50 m
TELEPHONE CABLE DUCT
10 JULY 2020
File details come from the government source that posted it. Updated .