Attachment10Addendum1ToSOW.pdf

PDF 179 KB Posted

Attached to
CONSTRUCT SOFTBALL FIELD DARBY SOUTH, DARBY MILITARY COMMUNITY, ITALY
Solicitation number
W912PF-20-R-0003
Issued by

About this file

This document outlines a federal contract opportunity for the construction of a softball field at Camp Darby in Livorno, Italy. The project includes design and construction of a standard co-ed slow-pitch softball field, including an optional lighting system and required irrigation system. The design phase is estimated at 135 calendar days, with construction of 150 days if no lighting is included or 180 days if lighting is included. The total performance period is estimated at 285 days without lighting or 315 days with lighting. Interested parties must express interest by March 4, 2020 to the specified Army Contracting Command contact in order to receive a solicitation package anticipated to be posted on SAM.gov in coming weeks. The construction magnitude is estimated between $250,000 and $500,000. The pre-solicitation opportunity number is W912PF-20-R-0003.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

25 June 2020

ADDENDUM 001 TO THE

SCOPE OF WORK OF PROJECT ED 00165-7

Construct Softball Field Darby South, Camp Darby, Livorno, Italy

The scope of work is modified as follows:

• In paragraph III Phase 1 (Design) Description / d. Works description / “New softball filed”, after point j., the following point k. is added:

k. Install new poles in the proximity of the arrestor cable line (parallel to the Garrison Fence) behind the outfield fence; install a protection net between the poles from the height of the outfield fence to a height of 12 meters, to avoid that the ball goes on the public road during the games.

• In paragraph III Phase 1 (Design) Description / d. Works description / “Electrical System”, the sentence “Install a protection net between the poles behind the outfield line from the height of the outfield fence to the height of 7 meters, to avoid that the ball goes on the public road during the games” is deleted.

• In paragraph III Phase 1 (Design) Description / d. Works description / “Electrical System”, the text “Note: The construction/installation of the following components will be part of the project option, while the rest will be included in the basic:

- Lighting poles with foundations and accessories, including the protection net behind outfield;

- Lighting fixtures mounted on poles;

- Cables feeding the lighting fixtures on poles;

- Cable ducts and manholes necessary to route cables feeding the lighting system on poles;

- Push buttons box switching on/off the lighting fixtures.”

is modified into “Note: The construction/installation of the following components will be part of the project option, while the rest will be included in the basic:

- Lighting poles with foundations and accessories;

- Lighting fixtures mounted on poles;

- Cables feeding the lighting fixtures on poles;

- Cable ducts and manholes necessary to route cables feeding the lighting system on poles;

- Push buttons box switching on/off the lighting fixtures.”

Gianluca Lucetti Chief Engineering Services Branch

2020-06-25T17:25:14+0200
LUCETTI.GIANLUCA.1466348151

File details come from the government source that posted it. Updated .