0011470571 ES-00049-6P
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
See age 2 for details.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 9
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 29-Jun-2020
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912PF20Q0027
X 9B. DATED (SEE ITEM 11)
20-May-2020
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
29-Jun-2020
CODE
414TH CSB RCO ITALY SUBOFFICE LIVORNO
VIA AURELIA, EDIFICIO 5131
ZONA DEPOSITO
56128 TIRRENIA (PISA)
W912PF 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912PF20Q0027
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
AMENDMENT 0001
The purpose of this amendment is as follows:
- To delete FAR 52.225-7043 titled “Antiterrorism Force Protection Policy for Defense
Contractors Outside the United States (Jun 2015)” that was inserted twice;
- To insert FAR 52.213-4 titled “Terms and conditions – Simplified Acquisitions (Other
Than Commercial Items) (Jan 2020)” in full text;
- To add Addendum 1 to the Scope of Work Project ES 00049-6 “Provide back up transformer Bldg. 5882“ consisting of 1 page dated 16 June 2020;
- To revise Section J. See below for details, and
- To revise Section L. See below for details.
SECTION I - CONTRACT CLAUSES
The following have been added by full text:
52.213-4 TERMS AND CONDITIONS--SIMPLIFIED ACQUISITIONS (OTHER THAN COMMERCIAL
ITEMS) (JAN 2020)
(a) The Contractor shall comply with the following Federal Acquisition Regulation (FAR) clauses that are incorporated by reference:
(1) The clauses listed below implement provisions of law or Executive order:
(i) 52.203-19, Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (JAN 2017)
(section 743 of Division E, Title VII, of the Consolidated and Further Continuing Appropriations Act, 2015 (Pub. L.
113-235) and its successor provisions in subsequent appropriations acts (and as extended in continuing resolutions)).
(ii) 52.204-23, Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by
Kaspersky Lab and Other Covered Entities (Jul 2018) (Section 1634 of Pub. L. 115-91).
(iii) 52.204-25, Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or
Equipment. (AUG 2019) (Section 889(a)(1)(A) of Pub. L. 115-232).
(iv) 52.222-3, Convict Labor (JUN 2003) (E.O. 11755).
(v) 52.222-21, Prohibition of Segregated Facilities (APR 2015).
(vi) 52.222-26, Equal Opportunity (SEPT 2016) (E.O. 11246).
(vii) 52.225-13, Restrictions on Certain Foreign Purchases (JUN 2008) (E.O.s, proclamations, and statutes administered by the Office of Foreign Assets Control of the Department of the Treasury).
(viii) 52.233-3, Protest After Award (AUG 1996) (31 U.S.C. 3553).
(ix) 52.233-4, Applicable Law for Breach of Contract Claim (OCT 2004) (Pub. L. 108-77, 108-78 (19 U.S.C. 3805 note).
(2) Listed below are additional clauses that apply:
(i) 52.232-1, Payments (APR 1984).
(ii) 52.232-8, Discounts for Prompt Payment (FEB 2002).
(iii) 52.232-11, Extras (APR 1984).
(iv) 52.232-25, Prompt Payment (JAN 2017).
(v) 52.232-39, Unenforceability of Unauthorized Obligations (JUN 2013).
(vi) 52.232-40, Providing Accelerated Payments to Small Business Subcontractors (DEC 2013).
(vii) 52.233-1, Disputes (MAY 2014).
(viii) 52.244-6, Subcontracts for Commercial Items (AUG 2019).
(ix) 52.222-55, Minimum Wages Under Executive Order 13658 (MAR 2016) (Applies when 52.222-6 or 52.222-41 are in the contract and performance in whole or in part is in the United States (the 50 States and the District of
Columbia)).
(b) The Contractor shall comply with the following FAR clauses, incorporated by reference, unless the circumstances do not apply:
(1) The clauses listed below implement provisions of law or Executive order:
(i) 52.204-10, Reporting Executive Compensation and First-Tier Subcontract Awards (Oct 2018) (Pub. L. 109-282)
(31 U.S.C. 6101 note) (Applies to contracts valued at $30,000 or more).
(ii) 52.222-19, Child Labor--Cooperation with Authorities and Remedies (Jan 2020) (E.O. 13126). (Applies to contracts for supplies exceeding the micro-purchase threshold).
(iii) 52.222-20, Contracts for Materials, Supplies, Articles, and Equipment Exceeding $15,000 (MAY 2014) (41
U.S.C. chapter 65) (Applies to supply contracts over $15,000 in the United States, Puerto Rico, or the U.S. Virgin
Islands).
(iv) 52.222-35, Equal Opportunity for Veterans (Oct 2015) (38 U.S.C. 4212) (applies to contracts of $150,000 or more).
(v) 52.222-36, Equal Employment for Workers with Disabilities (JUL 2014) (29 U.S.C. 793) (Applies to contracts over $15,000, unless the work is to be performed outside the United States by employees recruited outside the
United States). (For purposes of this clause, ``United States'' includes the 50 States, the District of Columbia, Puerto
Rico, the Northern Mariana Islands, American Samoa, Guam, the U.S. Virgin Islands, and Wake Island.)
(vi) 52.222-37, Employment Reports on Veterans (Feb 2016) (38 U.S.C. 4212) (Applies to contracts of $150,000 or more).
(vii) 52.222-41, Service Contract Labor Standards (AUG 2018) (41 U.S.C. chapter 67) (Applies to service contracts over $2,500 that are subject to the Service Contract Labor Standards statute and will be performed in the United
States, District of Columbia, Puerto Rico, the Northern Mariana Islands, American Samoa, Guam, the U.S.
Virgin Islands, Johnston Island, Wake Island, or the outer Continental Shelf).
(viii)(A) 52.222-50, Combating Trafficking in Persons (JAN 2019) (22 U.S.C. chapter 78 and E.O. 13627) (Applies to all solicitations and contracts).
(B) Alternate I (MAR 2015) (Applies if the Contracting Officer has filled in the following information with regard to applicable directives or notices: Document title(s), source for obtaining document(s), and contract performance location outside the United States to which the document applies).
(ix) 52.222-55, Minimum Wages Under Executive Order 13658 (DEC 2015) (Executive Order 13658) (Applies when 52.222-6 or 52.222-41 are in the contract and performance in whole or in part is in the United States (the 50
States and the District of Columbia)).
(x) 52.222-62, Paid Sick Leave Under Executive Order 13706 (JAN 2017) (E.O. 13706) (Applies when 52.222-6 or
52.222-41 are in the contract and performance in whole or in part is in the United States (the 50 States and the
District of Columbia.))
(xi) 52.223-5, Pollution Prevention and Right-to-Know Information (MAY 2011) (E.O. 13423) (Applies to services performed on Federal facilities).
(xii) 52.223-11, Ozone-Depleting Substances and High Global Warming Potential Hydrofluorocarbons (June, 2016)
(E.O. 13693)(applies to contracts for products as prescribed at FAR 23.804(a)(1)).
(xiii) 52.223-12, Maintenance, Service, Repair, or Disposal of Refrigeration Equipment and Air Conditioners (June, 2016) (E.O. 13693) (Applies to maintenance, service, repair, or disposal of refrigeration equipment and air conditioners).
(xiv) 52.223-15, Energy Efficiency in Energy-Consuming Products (DEC 2007) (42 U.S.C. 8259b) (Unless exempt pursuant to 23.204, applies to contracts when energy-consuming products listed in the ENERGY STAR ® Program or Federal Energy Management Program (FEMP) will be--
(A) Delivered;
(B) Acquired by the Contractor for use in performing services at a Federally-controlled facility;
(C) Furnished by the Contractor for use by the Government; or
(D) Specified in the design of a building or work, or incorporated during its construction, renovation, or maintenance).
(xv) 52.223-20, Aerosols (June, 2016) (E.O. 13693) (Applies to contracts for products that may contain high global warming potential hydrofluorocarbons as a propellant or as a solvent; or contracts for maintenance or repair of electronic or mechanical devices).
(xvi) 52.223-21, Foams (June, 2016) (E.O. 13693) (Applies to contracts for products that may contain high global warming potential hydrofluorocarbons or refrigerant blends containing hydrofluorocarbons as a foam blowing agent;
or contracts for construction of buildings or facilities.
(xvii) 52.225-1, Buy American--Supplies (MAY 2014) (41 U.S.C. chapter 67) (Applies to contracts for supplies, and to contracts for services involving the furnishing of supplies, for use in the United States or its outlying areas, if the value of the supply contract or supply portion of a service contract exceeds the micro-purchase threshold and the acquisition--
(A) Is set aside for small business concerns; or
(B) Cannot be set aside for small business concerns (see 19.502-2), and does not exceed $25,000).
(xviii) 52.226-6, Promoting Excess Food Donation to Nonprofit Organizations (MAY 2014) (42 U.S.C. 1792)
(Applies to contracts greater than $25,000 that provide for the provision, the service, or the sale of food in the
United States).
(xix) 52.232-33, Payment by Electronic Funds Transfer--System for Award Management (OCT 2018) (Applies when the payment will be made by electronic funds transfer (EFT) and the payment office uses the System for
Award Management (SAM) as its source of EFT information.)
(xx) 52.232-34, Payment by Electronic Funds Transfer--Other than System for Award Management (JUL 2013)
(Applies when the payment will be made by EFT and the payment office does not use the SAM database as its source of EFT information.)
(xxi) 52.247-64, Preference for Privately Owned U.S.-Flag Commercial Vessels (FEB 2006) (46 U.S.C. App. 1241)
(Applies to supplies transported by ocean vessels (except for the types of subcontracts listed at 47.504(d).)
(2) Listed below are additional clauses that may apply:
(i) 52.204-21, Basic Safeguarding of Covered Contractor Information Systems (June, 2016) (Applies to contracts when the contractor or a subcontractor at any tier may have Federal contract information residing in or transiting through its information system.
(ii) 52.209-6, Protecting the Government's Interest When Subcontracting with Contractors Debarred, Suspended, or
Proposed for Debarment (Oct 2015) (Applies to contracts over $35,000).
(iii) 52.211-17, Delivery of Excess Quantities (SEP 1989) (Applies to fixed-price supplies).
(iv) 52.247-29, F.o.b. Origin (FEB 2006) (Applies to supplies if delivery is f.o.b. origin).
(v) 52.247-34, F.o.b. Destination (NOV 1991) (Applies to supplies if delivery is f.o.b. destination).
(c) FAR 52.252-2, Clauses Incorporated by Reference (FEB 1998). This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):
https://farsite.hill.af.mil
(d) Inspection/Acceptance. The Contractor shall tender for acceptance only those items that conform to the requirements of this contract. The Government reserves the right to inspect or test any supplies or services that have been tendered for acceptance. The Government may require repair or replacement of nonconforming supplies or reperformance of nonconforming services at no increase in contract price. The Government must exercise its postacceptance rights--
(1) Within a reasonable period of time after the defect was discovered or should have been discovered; and
(2) Before any substantial change occurs in the condition of the item, unless the change is due to the defect in the item.
(e) Excusable delays. The Contractor shall be liable for default unless nonperformance is caused by an occurrence beyond the reasonable control of the Contractor and without its fault or negligence, such as acts of God or the public enemy, acts of the Government in either its sovereign or contractual capacity, fires, floods, epidemics, quarantine restrictions, strikes, unusually severe weather, and delays of common carriers. The Contractor shall notify the
Contracting Officer in writing as soon as it is reasonably possible after the commencement of any excusable delay, setting forth the full particulars in connection therewith, shall remedy such occurrence with all reasonable dispatch, and shall promptly give written notice to the Contracting Officer of the cessation of such occurrence.
(f) Termination for the Government's convenience. The Government reserves the right to terminate this contract, or any part hereof, for its sole convenience. In the event of such termination, the Contractor shall immediately stop all work hereunder and shall immediately cause any and all of its suppliers and subcontractors to cease work. Subject to the terms of this contract, the Contractor shall be paid a percentage of the contract price reflecting the percentage of the work performed prior to the notice of termination, plus reasonable charges that the Contractor can demonstrate to the satisfaction of the Government, using its standard record keeping system, have resulted from the termination.
The Contractor shall not be required to comply with the cost accounting standards or contract cost principles for this purpose. This paragraph does not give the Government any right to audit the Contractor's records. The Contractor shall not be paid for any work performed or costs incurred that reasonably could have been avoided.
(g) Termination for cause. The Government may terminate this contract, or any part hereof, for cause in the event of any default by the Contractor, or if the Contractor fails to comply with any contract terms and conditions, or fails to provide the Government, upon request, with adequate assurances of future performance. In the event of termination for cause, the Government shall not be liable to the Contractor for any amount for supplies or services not accepted, and the Contractor shall be liable to the Government for any and all rights and remedies provided by law. If it is determined that the Government improperly terminated this contract for default, such termination shall be deemed a termination for convenience.
(h) Warranty. The Contractor warrants and implies that the items delivered hereunder are merchantable and fit for use for the particular purpose described in this contract.
(End of clause)
The following have been deleted:
252.225-7043 Antiterrorism/Force Protection Policy for Defense
Contractors Outside the United States
JUN 2015
SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
The following have been modified:
SECTION J
The following documents are incorporated in the Request for Quotation:
Attachment #1 – Scope of Work / Performance Work Schedule, Project ES 00049-6P “Provide back up transformer Bldg. 5882” consisting of 12 pages and 1 enclosure dated 13 February 2020
Attachment #2 – Technical Specifications, Project ES 00049-6P “Provide back up transformer
Bldg. 5882” consisting of 15 pages dated 13 February 2020
Attachment #3 - Drawing ES 00049-6P (A1) consisting of sheet 1 of 1 sheet dated 07 February
Attachment #4 – Self Certification for Antimafia Communication
Attachment #5 – Preliminary PSC “Piano di Sicurezza e Coordinamento – In fase preliminare” consisting of 44 pages dated 11 May 2020
Attachment #6 – Allegato 01 “Schede Valutazione Rischi” consisting of 57 pages dated 11 May
Attachment #7 – Allegato 02 “Costi della sicurezza” consisting of 2 pages dated 11 May 2020
Attachment # 8 – Allegato 03 “Cronoprogramma” consisting of 2 pages dated 11 May 2020
Attachment #9 – Allegato 04 “Planimetria consisting of 4 pages dated 11 May 2020
Attchment #10 – Allegato 05 “Protocollo Anticontagio COVID19” consisting of 15 pages dated
11 May 2020
Attachment #11 – Addendum 1 to Scope of Work Project ES 00049-6 “Provide back up transformer Bldg. 5882” consisting of 1 page dated 16 June 2020.
SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS
The following have been modified:
SECTION L
All quotes must be submitted to the Contracting Officer no later than 12:00 p.m. "noon" (local time, Rome, Italy) on
02 July 2020. All quotes shall be submitted in English and include the company point of contact, phone number, and email address. The Point of Contact for this requirement is:
Sonia Zanobini
414th Contracting Support Brigade
RCO Livorno Sub-Office
Email: sonia.zanobini2.ln@mail.mil
The Alternate Point of Contact for this requirement is:
Cristina Pancaccini
414th Contracting Support Brigade
RCO Livorno Sub-Office
Email: cristina.pancaccini2.ln@mail.mil
Only E-Mail quotes will be accepted. Quotes shall include one scanned copy of the dated offer signed by an official fully authorized to bind the quoter. The documents shall be submitted in Adobe Acrobat (PDF) format.
mailto:sonia.zanobini2.ln@mail.mil
E-Mail Submission Instructions: Quoters shall submit their quotation via E-Mail using the subject line
"W912PF20Q0027, Provide back up transformer Bldg. 5882, S&M Area”. If more than one email is required to submit all quotation attachments, quoters shall indicate in the E-Mail number at the end of the subject (i.e. for the first of three E-Mails, "W912PF20Q0027, Provide back up transformer Bldg. 5882, S&M Area, E-Mail 1 of 3"). If the quotation submission requires multiple E-Mails to submit, ALL E-Mails shall be submitted prior to the time listed above. E-Mails received after shall be considered late and the quote will be rejected. (NOTE: Recommended maximum file(s) size per email is no larger than 5MB. If quotation documents exceed 5MB, submit in multiple emails).
Quoters shall include the names and number of attachments in the body of each E-Mail. E-mail submissions shall be sent to both of the above email addresses. Be advised that the Government does not provide automatic notification of receipt; contact the POC via telephone to receive confirmation.
To be awarded a government contract you MUST have DUNS (Dun & Bradstreet; Phone: 02-28-455-379) and
NCAGE (www.dlis.dla.mil/Forms/Form_AC135.asp) numbers and be registered in SAM (https://www.sam.gov).
I. DOCUMENTATION REQUIRED FOR THE EVALUATION
FACTOR: PRICE
Quoters are required to fill in the lump sum prices for CLIN 0001 and 7500
II. DOCUMENTATION REQUIRED FOR THE DETERMINATION OF RESPONSIBILITY
The U.S. Government requires the quoter to submit the following documentation/certification to be satisfied that a prospective contractor currently meets the applicable standards in Federal Acquisition Regulation 9.104 – Standards.
A. DOCUMENTO UNICO DI REGOLARITĄ CONTRIBUTIVA (DURC)
The Quoter shall provide with the quote a copy certified and NOT older than ninety (90) days at the time set forth for the receipt of the quote of the DURC. (Documento Unico di Regolaritą Contributiva). Self certifications are
NOT allowed. However, if the Quoter has submitted a certified DURC to the issuing office (RCO Sub Office
Livorno) within 90 days from the due date of this quote, then the quoter may submit a copy of the previously certified DURC. The document MUST include the following statement otherwise the quote will be rejected. “Con il presente documento si dichiara che l’impresa RISULTA REGOLARE ai fini del DURC”.
B. CERTIFICATE OF THE CHAMBER OF COMMERCE (CERTIFICATO DI ISCRIZIONE ALLA CAMERA
DI COMMERCIO) (ORDINARIO)
The Quoter shall provide with the quote a copy certified and NOT older than two (2) months at the time set forth for the receipt of the quote of the Chamber of Commerce Certificate of Membership (Certificato di Iscrizione alla
Camera di Commercio). Self-certifications are NOT allowed. However, if the quoter has submitted a certified
Chamber of Commerce Certificate of Membership to the issuing office (RCO Sub Office Livorno) within 90 days from the due date of this quote, then the quoter may submit a copy of the previously certified Chamber of Commerce
Certificate of Membership.
C. SELF CERTIFICATION FOR ANTIMAFIA COMMUNICATION. The Quoter shall complete Attachment titled “Self-Certification for Antimafia communication (Autocertificazione della comunicazione antimafia)” consisting of one (1) page.
D. EXTRACT OF THE REGISTRATION BOOK (ISTITUZIONE DEL LIBRO UNICO)
The quoter shall provide with the quote a copy or a photocopy of the Extract Registration Book (ISTITUZIONE
DEL LIBRO UNICO) listing the employees presently employed by the quoter.
E. EQUIPMENT LIST
The quoter shall provide with the quote a list of all the major equipment presently http://www.dlis.dla.mil/Forms/Form_AC135.asp) https://www.sam.gov/ in its possession.
F. BANK REFERENCE
The quoter shall provide a bank reference that discusses whether or not the quoter has an adequate financial resource to successfully complete the resultant contract.
G. PROFESSIONAL TECHNICAL CAPABILITY IN ACCORDANCE WITH DLGS NO. 81/2008
ATTACHMENT XVII (SAFETY LAW).
In order to verify compliance with the Italian DLGS No. 81/2008, Enclosure XVII (Safety Law), the quoter shall provide the below required documentation/certification. If the offeror has submitted the below information to the issuing office (RCO Sub Office Livorno) within 90 days from the due date of this quote, then the quoter may reference that submission instead of submitting duplicate information. In its quote, the quoter must reference the request for quote number for which the information was previously submitted.
1. Photocopy of the Chamber of commerce, industry or craftsmanship certificate showing the company’s business trade related to the typology of the contract;
2. Evaluation of risks document as in Art. 17, Para. 1, Sub-Para. a), or self-certification as in Art. 29, Para. 5, of the same DLGS;
3. Specific documentation showing that machinery, equipment and provisional clauses are in conformance with what required by the DLGS;
4. List/s of individual safety/protective equipment issued to employees;
5. Appointment of a safety manager responsible for the implementation of preventive and protective safety measures; of the individuals responsible for the fire prevention and fire-fighting measures, the evacuation procedures, for the management of emergencies, and qualified medical physician (doctor) when required;
6. Name/s of the employee’s safety representative/s;
7. Qualification certificates of the above mentioned individuals and employees as prescribed by the DLGS;
8. List of employees as they appear in the offeror’s Istituzione del Libro Unico and relative health records attesting they are medically fit, as required by the DLGS;
9. Photocopy of the record of social security contributions (DURC), as prescribed in D.M. 24 Oct 2007; and
10. Statement that no interim orders, negative administrative provisions or suspensions exists as specified in the Art.
14 of the DLGS no. 81/2008.
(End of Summary of Changes)