Enclosure_1c_List_of_Work_Features_(3_of_4)_E7-00018-7J.XLS
XLS spreadsheet 73 KB Posted
- Attached to
- RENOVATE BUILDING 10
- Solicitation number
- W912PF18R0002
About this file
ENCLOSURE 1C - LIST OF WORK FEATURES
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W912PF18R0002-0001.pdf | ||
| W912PF18R0002-0002.pdf | ||
| Enclosure_3_Design_Project_Information_Sheet.docx | DOCX document | |
| Enclosure_1b_List_of_Work_Features_(2_of_4)_E7-00021-4J,_E8-44070-7J.xlsx | XLSX spreadsheet | |
| Enclosure_4_Past_Performance_Questionnaire_(PPQ).docx | DOCX document | |
| Enclosure_6_Sample_for_Bid_Guarantee.pdf | ||
| W912PF18R0002.pdf | ||
| Enclosure_5_Self_-certification_for_Antimafia_Communication.docx | DOCX document | |
| ATT_1_SOW.pdf | ||
| Enclosure_2__Construction_Project_Information_Sheet.docx | DOCX document | |
| Enclosure_1d_List_of_Work_Features_(4_of_4)_E8-44018-7J.xls | XLS spreadsheet | |
| Enclosure_1a_List_of_Work_Features_(1_of_4)_E8-41122-5J.xlsx | XLSX spreadsheet |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BID-DFAC dishwasher
| INDEPENDENT GOVERNMENT COST ESTIMATE | |||||||||||||
| PREPARED BY: | JAMIE WASIELEWSKI, MECH. ENG. | REVIEWED BY: | ANTHONY FREITAG, RA, Chief ESS | ||||||||||
| DPW, EP&S Div., ESS | DPW, EP&S Div., ESS | ||||||||||||
| Jamie.M.Wasielewski.civ@mail.mil | Anthony.C.Freitag.civ@mail.mil | ||||||||||||
| Phone Number: 637-8103 | Phone Number: 637-8207 | ||||||||||||
| Date: | 16-Jan-18 | Date: | 16-Jan-18 | ||||||||||
| Signature: | Signature: | ||||||||||||
| This IGCE was developed independently by the Govt without seeking any formal proposals from contractors. The costs for materials and labor are based predominately on published price lists of the Veneto Region and Vicenza Chamber of Commerce. For materials and equipment not available in the above price books the costs were based on market surveys. Market surveys are a combination of previous experience with similar projects, internet research, and/or suppliers/manufacturer quotes. | |||||||||||||
| http://www.regione.veneto.it/prezziario/home.aspx | |||||||||||||
| http://www.vi.camcom.it/edili/index.php | |||||||||||||
| Quantity/Quantità | Material Cost/Costo Materiale | Labor Cost/Costo Manodopera | Total Cost/Costo Totale | ||||||||||
| Item | DESCRIPTION | Unit | "K" | "L" | Unit | "K" | "L" | Unit | "K" | "L" | "K" | "L" | "K+L" |
| Unità | Unità | Euro | Euro | Unità | Euro | Euro | Euro | Euro | Euro | ||||
| Project # E7-00018-7J Replace Dishwasher at DFAC Bldg. 10, Caserma Ederle, Vicenza, Italy | |||||||||||||
| 1 | Total demolitions - Totale demolizioni | € 0.00 | € 0.00 | ||||||||||
| 2 | Total civil work - Totale lavoro civile | € 0.00 | € 0.00 | ||||||||||
| 3 | Total mechanical work - Totale lavoro meccanico | € 0.00 | € 0.00 | ||||||||||
| 4 | Total electrical work - Totale lavoro elettrico | € 0.00 | € 0.00 | ||||||||||
| 5 | Design efforts | % | 10.00% | 10.00% | € 0.00 | € 0.00 | € 0.00 | ||||||
| GRAND TOTAL WORK | € 0.00 | € 0.00 | € 0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | |||||||||||
| FY18 RATE | $1.0000 | = | € 0.9329 | ||||||||||
| 1 | DEMOLITION - DEMOLIZIONI | ||||||||||||
| 1.01 | Disconnect and relocate dishwasher. | Hr | |||||||||||
| 1.02 | Remove and dispose of water supply piping in building to dishwasher. | M | |||||||||||
| 1.03 | Remove and dispose of steam and condensate piping in building to dishwasher. Cap existing branch. | M | |||||||||||
| 1.04 | Remove and dispose of drain piping in building from dishwasher. | M | |||||||||||
| 1.05 | Remove and dispose of electrical wiring and conduit to dishwasher. | M | |||||||||||
| Total demolitions - Totale demolizioni | € 0.00 | € 0.00 | € 0.00 | ||||||||||
| 2 | CIVIL WORK-LAVORI CIVILI | ||||||||||||
| 2.01 | Move existing counters to fit to new dishwasher. | Hr | |||||||||||
| 2.02 | New dishwasher, installation, and testing | Ea | |||||||||||
| 2.03 | Furnish and install new drying tunnel | Ea | |||||||||||
| Total civil work - Totale lavoro civile | |||||||||||||
| 3 | MECHANICAL WORK-LAVORI MECCANICI | ||||||||||||
| 3.01 | Furnish and install new water supply connection points. | LS | |||||||||||
| 3.02 | Furnish and install new sanitary sewer connection point. | LS | |||||||||||
| Total mechanical work - Totale lavoro meccanico | € 0.00 | € 0.00 | € 0.00 | ||||||||||
| 4 | ELECTRICAL WORK-LAVORI ELETTRICI | ||||||||||||
| 4.01 | Furnish and install new cables and conduit from substation. | M | |||||||||||
| 4.02 | Furnish and install new electrical panel. | LS | |||||||||||
| 4.03 | Furnish and install new cables and conduit to dishwasher connection point. | M | |||||||||||
| Total electrical work - Totale lavoro elettrico | € 0.00 | € 0.00 | € 0.00 |
&CFOR OFFICIAL USE ONLY&R&P of &N Anthony.C.Freitag.civ@mail.mil Jamie.M.Wasielewski.civ@mail.mil http://www.regione.veneto.it/prezziario/home.aspx http://www.vi.camcom.it/edili/index.php
File details come from the government source that posted it.