Enclosure_1b_List_of_Work_Features_(2_of_4)_E7-00021-4J,_E8-44070-7J.xlsx

XLSX spreadsheet 31 KB Posted

Attached to
RENOVATE BUILDING 10
Solicitation number
W912PF18R0002
Issued by

About this file

ENCLOSURE 1B - LIST OF WORK FEATURES

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

IGE-10

Quantity/QuantitàMaterial Cost/Costo MaterialeLabor Cost/Costo ManodoperaTotal Cost/Costo Totale
ItemDESCRIPTIONUnit"K""L"Unit"K""L"Unit"K""L""K""L""K+L"
UnitàUnitàEuroEuroUnitàEuroEuroEuroEuroEuro
INDEPENDENT GOVERNMENT COST ESTIMATE
PREPARED BY:SILVANO RIZZO, MECH. ENGR.REVIEWED BY:ANTHONY C. FREITAG, RAChief ESS
DPW, EP&S Div., ESSDPW, EP&S Div., ESS
silvano.rizzo.ln.asc@mail.milanthony.c.freitag.civ@mail.mil
Phone Number: 637-8258Phone Number:637-8207
Date:16th March 2017Date:

Signature: Signature:

This IGCE was developed independently and prior to seeking any formal proposals from contractors.

The costs of subject project were based mainly on price lists of the Veneto Region and Vicenza Chamber of Commerce (labor and material).

For the materials not available in the above price books the costs were based on market surveys carried out at supplier companies.

http://www.regione.veneto.it/Ambiente+e+Territorio/Lavori+Pubblici/Prezzreg10.htm

http://www.vi.camcom.it/edili/index.php
Projects # E7-00021-4J Install New AC System in Kitchen for the Ederle Dining Facility, E8-44070-7J Replace kitchen hoods ductworks at Ederle DFAC, Caserma Ederle, Vicenza
Quantity/QuantitàMaterial Cost/Costo MaterialeLabor Cost/Costo ManodoperaTotal Cost/Costo Totale
ItemDESCRIPTIONUnit"K""L"Unit"K""L"Unit"K""L""K""L""K+L"
UnitàUnitàEuroEuroUnitàEuroEuroEuroEuroEuro
1Total civil work - Totale lavoro civile€ 0.00€ 0.00
2Total mechanical work - Totale lavoro meccanico€ 0.00€ 0.00
3Total electrical work - Totale lavoro elettrico€ 0.00€ 0.00
4Design efforts%6%6%€ 0.00€ 0.00
GRAND TOTAL WORK€ 0.00€ 0.00
$0.00$0.00
RATE€ 1.0000=$0.9329

1 CIVIL WORK-LAVORI CIVILI

1.1 Removal existing false ceiling sq/mt

1.2 Installation new false ceiling sq/mt

1.3 Removal and reinstallation false ceiling sq/mt

1.4 Masonry assistance L/S

Total civil work - Totale lavoro civile

2 MECHANICAL WORK-LAVORI MECCANICI

2.1 Removal and disposal existing HVAC system L/S

2.2 Removal and disposal Hoods exhaust L/S

2.3 HVAC duct Kg

2.4 HVAC duct insulation sq/mt

2.5 HVAC duct supply diffusers each

2.6 HVAC duct return grill each

2.7 Balancing dumpers L/S

2.8 Air Handling Unit each

2.9 Piping connection Air Handling Unit L/S

2.10 Kitchen Hood Exhaust/Supply fan Each

2.11 Kitchen Hood Exhaust/Supply duct Kg

2.12 Tests L/S

Total mechanical work - Totale lavoro meccanico

3 ELECTRICAL WORK-LAVORI ELETTRICI

3.1 Electrical lines and connections L/S

3.2 Modification electrical panel L/S

3.3 Desigo PXC100.E-D as the DDC AHU controller L/S

3.4 Regulating equipment probes, valves, actuators, sensors” L/S

3.5 Upgrade graphic page "Cruscotto Energia" Desigo L/S

Total electrical work - Totale lavoro elettrico

Projects # E7-0021-4J, E8-44070-7J Install New AC System in Kitchen for the Ederle Dining Facility, Replace Kitchen hoods ductworks at Ederle DFAC, Camp Ederle - Vicenza - Italy 14 December 2017

Page &P of &N http://www.vi.camcom.it/edili/index.phphttp://www.regione.veneto.it/Ambiente+e+Territorio/Lavori+Pubblici/Prezzreg10.htmmailto:rosanna.segreto.ln.asc@mail.milmailto:Jeffrey.M.Brockus.civ@mail.mil image1.emf

File details come from the government source that posted it.