ENCLOSURE 1B - LIST OF WORK FEATURES
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W912PF18R0002-0001.pdf | ||
| W912PF18R0002-0002.pdf | ||
| Enclosure_3_Design_Project_Information_Sheet.docx | DOCX document | |
| Enclosure_1c_List_of_Work_Features_(3_of_4)_E7-00018-7J.XLS | XLS spreadsheet | |
| Enclosure_4_Past_Performance_Questionnaire_(PPQ).docx | DOCX document | |
| Enclosure_6_Sample_for_Bid_Guarantee.pdf | ||
| W912PF18R0002.pdf | ||
| Enclosure_5_Self_-certification_for_Antimafia_Communication.docx | DOCX document | |
| ATT_1_SOW.pdf | ||
| Enclosure_2__Construction_Project_Information_Sheet.docx | DOCX document | |
| Enclosure_1d_List_of_Work_Features_(4_of_4)_E8-44018-7J.xls | XLS spreadsheet | |
| Enclosure_1a_List_of_Work_Features_(1_of_4)_E8-41122-5J.xlsx | XLSX spreadsheet |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
IGE-10
| Quantity/Quantità | Material Cost/Costo Materiale | Labor Cost/Costo Manodopera | Total Cost/Costo Totale | ||||||||||
| Item | DESCRIPTION | Unit | "K" | "L" | Unit | "K" | "L" | Unit | "K" | "L" | "K" | "L" | "K+L" |
| Unità | Unità | Euro | Euro | Unità | Euro | Euro | Euro | Euro | Euro |
| INDEPENDENT GOVERNMENT COST ESTIMATE | |||||||
| PREPARED BY: | SILVANO RIZZO, MECH. ENGR. | REVIEWED BY: | ANTHONY C. FREITAG, RA | Chief ESS | |||
| DPW, EP&S Div., ESS | DPW, EP&S Div., ESS | ||||||
| silvano.rizzo.ln.asc@mail.mil | anthony.c.freitag.civ@mail.mil | ||||||
| Phone Number: 637-8258 | Phone Number: | 637-8207 | |||||
| Date: | 16th March 2017 | Date: |
Signature: Signature:
This IGCE was developed independently and prior to seeking any formal proposals from contractors.
The costs of subject project were based mainly on price lists of the Veneto Region and Vicenza Chamber of Commerce (labor and material).
For the materials not available in the above price books the costs were based on market surveys carried out at supplier companies.
http://www.regione.veneto.it/Ambiente+e+Territorio/Lavori+Pubblici/Prezzreg10.htm
| http://www.vi.camcom.it/edili/index.php | |||||||||||||
| Projects # E7-00021-4J Install New AC System in Kitchen for the Ederle Dining Facility, E8-44070-7J Replace kitchen hoods ductworks at Ederle DFAC, Caserma Ederle, Vicenza | |||||||||||||
| Quantity/Quantità | Material Cost/Costo Materiale | Labor Cost/Costo Manodopera | Total Cost/Costo Totale | ||||||||||
| Item | DESCRIPTION | Unit | "K" | "L" | Unit | "K" | "L" | Unit | "K" | "L" | "K" | "L" | "K+L" |
| Unità | Unità | Euro | Euro | Unità | Euro | Euro | Euro | Euro | Euro |
| 1 | Total civil work - Totale lavoro civile | € 0.00 | € 0.00 | |||
| 2 | Total mechanical work - Totale lavoro meccanico | € 0.00 | € 0.00 | |||
| 3 | Total electrical work - Totale lavoro elettrico | € 0.00 | € 0.00 | |||
| 4 | Design efforts | % | 6% | 6% | € 0.00 | € 0.00 |
| GRAND TOTAL WORK | € 0.00 | € 0.00 | ||||
| $0.00 | $0.00 | |||||
| RATE | € 1.0000 | = | $0.9329 |
1 CIVIL WORK-LAVORI CIVILI
1.1 Removal existing false ceiling sq/mt
1.2 Installation new false ceiling sq/mt
1.3 Removal and reinstallation false ceiling sq/mt
1.4 Masonry assistance L/S
Total civil work - Totale lavoro civile
2 MECHANICAL WORK-LAVORI MECCANICI
2.1 Removal and disposal existing HVAC system L/S
2.2 Removal and disposal Hoods exhaust L/S
2.3 HVAC duct Kg
2.4 HVAC duct insulation sq/mt
2.5 HVAC duct supply diffusers each
2.6 HVAC duct return grill each
2.7 Balancing dumpers L/S
2.8 Air Handling Unit each
2.9 Piping connection Air Handling Unit L/S
2.10 Kitchen Hood Exhaust/Supply fan Each
2.11 Kitchen Hood Exhaust/Supply duct Kg
2.12 Tests L/S
Total mechanical work - Totale lavoro meccanico
3 ELECTRICAL WORK-LAVORI ELETTRICI
3.1 Electrical lines and connections L/S
3.2 Modification electrical panel L/S
3.3 Desigo PXC100.E-D as the DDC AHU controller L/S
3.4 Regulating equipment probes, valves, actuators, sensors” L/S
3.5 Upgrade graphic page "Cruscotto Energia" Desigo L/S
Total electrical work - Totale lavoro elettrico
Projects # E7-0021-4J, E8-44070-7J Install New AC System in Kitchen for the Ederle Dining Facility, Replace Kitchen hoods ductworks at Ederle DFAC, Camp Ederle - Vicenza - Italy 14 December 2017
Page &P of &N http://www.vi.camcom.it/edili/index.phphttp://www.regione.veneto.it/Ambiente+e+Territorio/Lavori+Pubblici/Prezzreg10.htmmailto:rosanna.segreto.ln.asc@mail.milmailto:Jeffrey.M.Brockus.civ@mail.mil image1.emf