ELINs Schedule.pdf
PDF 230 KB Posted
- Attached to
- Pressure Tank Inspection and Maintenance
- Solicitation number
- W912PB25RA005
About this file
The document is an ELINs (Element Line Items) Schedule for a Pressure Tank Inspection and Maintenance contract covering multiple U.S. Army locations in Germany from July 1, 2025, to June 30, 2030. The schedule includes a base year and four option years, with detailed line items for maintenance and inspection services across four primary locations: Grafenwoehr (TB Graf), Vilseck, Hohenfels (HTA Hohenfels), and Garmisch-Partenkirchen.
The schedule breaks down maintenance services into two primary categories: Maintenance and Inspection ELINs (pre-inspection to ensure TUEV standards compliance and prepare for DEKRA certification) and Annual Maintenance ELINs (routine air compressor upkeep including oil changes and filter replacements). Each location has multiple line items covering different inspection categories (A, B, D, E) and annual compressor maintenance, with consistent estimated quantities across the five-year period. The quantities range from 1-67 units per line item, with all units priced "Each" and the unit price column currently blank.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Maintenance and Inspection ELINs are exclusively for the pre-inspection of the entire system to ensure compliance with TUEV standards. During this pre-inspection, the contractor will identify any deficiencies and perform the necessary maintenance to bring the system to 100% operational efficiency, enabling us to pass the DEKRA inspection (the third-party entity responsible for conducting TUEV certification).
Annual Maintenance ELINs is for annual maintenance, focusing solely on routine upkeep of the air compressor component of the system. This maintenance, as clarified, is not conducted as part of the Inspection ELINs and this will include essential tasks such as oil changes, filter replacements, and other scheduled servicing.
Elins POP Jul 1, 2025 to June 30, 2026
Item Supplies/Service Estimated Quantity Unit Unit
Price Amount
A001 Base year Maintenance, Inspection.,Category A, TB Graf 63 Each
A002 Base year Maintenance, Inspection., Category B, TB Graf 2 Each
A003 Base year Maintenance, Inspection., Category D, TB Graf 66 Each
A004 Base year Annual maintenance of compressors at TB Grafenwoehr 67 Each
A005 Base year Maintenance, Inspection., Category D TB Vilseck 14 Each
A006 Base Year, Annual maintenance of compressors at RB Vilseck 21 Each
A007 Base year Maintenance, Inspection., Category A, HTA Hohenfels 25 Each
A008 Base year Maintenance, Inspection., Category B, HTA Hohenfels 2 Each
A009 Base year Maintenance, Inspection., Category D, HTA Hohenfels 5 Each
A010 Base year Maintenance, Inspection., Category E, HOH Hohenfels 3 Each
A011 Base year Annual maintenance of compressors at HTA Hohenfels 27 Each
A012 Base year Maintenance, Inspection., Category A, TB Garmisch 4 Each
A013
Base Year, Annual maintenance of compressors at GAP Garmisch- Partenkirchen 4 Each
A015 Base year Maintenance, Inspection., Category a TB Vilseck 20 Each
Elins POP Jul 1, 2026 to June 30, 2027
Quantity Unit Unit Price Amount
B001 Option Year 1 Maintenance, Inspection.,Category A, TB Graf 63 Each
B002 Option Year 1 Maintenance, Inspection., Category B, TB Graf 2 Each
B003 Option Year 1 Maintenance, Inspection., Category D, TB Graf 66 Each
B004 Option Year 1 Annual maintenance of compressors at TB Grafenwoehr 67 Each
B005 Option Year 1 Maintenance, Inspection., Category D TB Vilseck 14 Each
B006 Option Year 1, Annual maintenance of compressors at RB Vilseck 21 Each
B007 Option Year 1 Maintenance, Inspection., Category A, HTA Hohenfels 25 Each
B008 Option Year 1 Maintenance, Inspection., Category B, HTA Hohenfels 2 Each
B009 Option Year 1 Maintenance, Inspection., Category D, HTA Hohenfels 5 Each
B010 Option Year 1 Maintenance, Inspection., Category E, HOH Hohenfels 3 Each
B011 Option Year 1 Annual maintenance of compressors at HTA Hohenfels 27 Each
B012 Option Year 1 Maintenance, Inspection., Category A, TB Garmisch 4 Each
B013
Option Year 1, Annual maintenance of compressors at GAP Garmisch- Partenkirchen 4 Each
B014 Option Year 1 Maintenance, Inspection., Category B TB Vilseck 1 Each
B015 Option Year 1 Maintenance, Inspection., Elins POP Jul 1, 2027 to June 30, 2028
C001 Option Year 2 Maintenance, Inspection.,Category A, TB Graf 63 Each
C002 Option Year 2 Maintenance, Inspection., Category B, TB Graf 2 Each
C003 Option Year 2 Maintenance, Inspection., Category D, TB Graf 66 Each
C004 Option Year 2 Annual maintenance of compressors at TB Grafenwoehr 67 Each
C005 Option Year 2 Maintenance, Inspection., Category D TB Vilseck 14 Each
C006 Option Year 2, Annual maintenance of compressors at RB Vilseck 21 Each
C007 Option Year 2 Maintenance, Inspection., Category A, HTA Hohenfels 25 Each
C008 Option Year 2 Maintenance, Inspection., Category B, HTA Hohenfels 2 Each
C009 Option Year 2 Maintenance, Inspection., Category D, HTA Hohenfels 5 Each
C010 Option Year 2 Maintenance, Inspection., Category E, HOH Hohenfels 3 Each
C011 Option Year 2 Annual maintenance of compressors at HTA Hohenfels 27 Each
C012 Option Year 2 Maintenance, Inspection., Category A, TB Garmisch 4 Each
C013
Option Year 2, Annual maintenance of compressors at GAP Garmisch- Partenkirchen 4 Each
C014 Option Year 2 Maintenance, Inspection., Category B TB Vilseck 1 Each
C015 Option Year 2 Maintenance, Inspection., Elins POP Jul 1, 2028 to June 30, 2029
D001 Option Year 3 Maintenance, Inspection.,Category A, TB Graf 63 Each
D002 Option Year 3 Maintenance, Inspection., Category B, TB Graf 2 Each
D003 Option Year 3 Maintenance, Inspection., Category D, TB Graf 66 Each
D004 Option Year 3 Annual maintenance of compressors at TB Grafenwoehr 67 Each
D005 Option Year 3 Maintenance, Inspection., Category D TB Vilseck 14 Each
D006 Option Year 3, Annual maintenance of compressors at RB Vilseck 21 Each
D007 Option Year 3 Maintenance, Inspection., Category A, HTA Hohenfels 25 Each
D008 Option Year 3 Maintenance, Inspection., Category B, HTA Hohenfels 2 Each
D009 Option Year 3 Maintenance, Inspection., Category D, HTA Hohenfels 5 Each
D010 Option Year 3 Maintenance, Inspection., Category E, HOH Hohenfels 3 Each
D011 Option Year 3 Annual maintenance of compressors at HTA Hohenfels 27 Each
D012 Option Year 3 Maintenance, Inspection., Category A, TB Garmisch 4 Each
D013
Option Year 3, Annual maintenance of compressors at GAP Garmisch- Partenkirchen 4 Each
D014 Option Year 3 Maintenance, Inspection., Category B TB Vilseck 1 Each
D015 Option Year 3 Maintenance, Inspection., Elins POP Jul 1, 2029 to June 30, 2030
E001 Option Year 4 Maintenance, Inspection.,Category A, TB Graf 63 Each
E002 Option Year 4 Maintenance, Inspection., Category B, TB Graf 2 Each
E003 Option Year 4 Maintenance, Inspection., Category D, TB Graf 66 Each
E004 Option Year 4 Annual maintenance of compressors at TB Grafenwoehr 67 Each
E005 Option Year 4 Maintenance, Inspection., Category D TB Vilseck 14 Each
E006 Option Year 4, Annual maintenance of compressors at RB Vilseck 21 Each
E007 Option Year 4 Maintenance, Inspection., Category A, HTA Hohenfels 25 Each
E008 Option Year 4 Maintenance, Inspection., Category B, HTA Hohenfels 2 Each
E009 Option Year 4 Maintenance, Inspection., Category D, HTA Hohenfels 5 Each
E010 Option Year 4 Maintenance, Inspection., Category E, HOH Hohenfels 3 Each
E011 Option Year 4 Annual maintenance of compressors at HTA Hohenfels 27 Each
E012 Option Year 4 Maintenance, Inspection., Category A, TB Garmisch 4 Each
E013
Option Year 4, Annual maintenance of compressors at GAP Garmisch- Partenkirchen 4 Each
E014 Option Year 4 Maintenance, Inspection., Category B TB Vilseck 1 Each
E015 Option Year 4 Maintenance, Inspection.,
File details come from the government source that posted it. Updated .